Loading...
HomeMy WebLinkAbout2023-09-12 - Agendas - FinalCITY OF FAYETTEVILLE ARKANSAS MEETING AGENDA Water, Sewer, and Solid Waste Committee 12 September 2023 5:30 P.M. (Or immediately following City Council Agenda Session) Committee: Council Member Teresa Turk, Council Member D'Andre Jones, Council Member Mike Wiederkehr, Council Member Scott Berna Copy to: Mayor Lioneld Jordan, Paul Becker, Susan Norton, Kara Paxton, Kit Williams, Chris Brown, Alan Pugh, Terry Gulley, Ross Jackson, Peter Nierengarten, Brian Pugh, Corey Granderson, Aaron Watkins, Cody Ashworth, Greg Weeks, Jan Guy, Mayo Miller, Josh Alleman, Anna White, Rupa Jha, Nick Batker, Trent Williams From: Tim Nyander, Utilities Director CALL TO ORDER UPDATES PRESENTATIONS 1. Overview of July WWTP Monthly Report Jacobs Engineering 2. Overview of Fayetteville's Water & Sewer Infrastructure Corey Granderson, Utilities Department Engineer 3. Rate Study Update Black & Veatch Consulting OLD BUSINESS: NEW BUSINESS: 4. Nutanix Server Software Renewals Nutanix is the software that runs the device servers at the wastewater treatment facilities, and it's the heart of the SCADA system because it runs the City's VTScada software. It communicates with all the control devices in the field, allows for operators to see the status of devices at the treatment facilities from a software interface. Ingram Micro, Inc. submitted a quote in the amount of $63,731.89 plus applicable taxes for a 3- year renewal of Nutanix server software. This will operate the device servers, provide support service, and security updates for both wastewater treatment facilities through October 2026. Two other quotes were obtained, but they are more expensive, and Ingram Micro provides support and security updates which is helpful for staff. Staff recommends a 3-year renewal of Nutanix server software renewal in the amount of $63,731.89 plus applicable taxes from Ingram Micro, Inc., approval of a project contingency in the amount of $10,000.00, and approval of a budget adjustment. STAFF REQUESTS THIS BE FORWARDED TO THE CITY COUNCIL FOR CONSIDERATION FOR APPROVAL 5. Extension of Rental Pump for the Gregg Avenue Sewer Lift Station The Gregg Ave. sewer lift station has four pumps total, and recently had two pump failures. The pumps were sent in for repair, and due to the lead time on parts the City had to have a working pump in its place. Jack Tyler Engineering provided a rental pump at the rate of $7,255 per month. The purchase order was approved in the amount of $27,165.00 plus tax and the pump was installed. This included 3 months of rental, and the inbound/outbound freight for the pump. A two -month extension of the pump rental is needed which will put the total cost over $35,000, requiring City Council approval. The estimated cost of the two -month extension is $14,510.00 plus tax, for a total estimated cost of $41,675.00 plus tax. STAFF REQUESTS THIS BE FORWARDED TO THE CITY COUNCIL FOR CONSIDERATION FOR APPROVAL 6. West Transmission Waterline Engineering Amendment No. 3 The City of Fayetteville owns and operates two parallel water transmission lines from Beaver Water District (BWD) in Lowell that enter from the northeast corner of the City. These lines are a 36-inch pipe installed in 1967 and a 42-inch pipe installed in 1993. BWD intends to build a western water distribution point near HWY-112 and the newly constructed Springdale Northern Bypass, HWY-612. This facility will supply a western water transmission feed to all four customer cities, helping with hydraulics, critical redundancy, and overall utility resiliency. Fayetteville's 11.3-mile connection to the proposed BWD facility has been identified in water master plans for many years, but the timeline was previously unknown. In 2012, the City of Fayetteville hired McClelland Consulting Engineers (MCE) to establish a preliminary alignment for a waterline along this western corridor (Res. 120-12) and begin easement acquisitions. The contract was amended in 2021 (Res. 179-21) to increase funds for appraisals and acquisition support and again in 2022 to bring the design up to 30% (Res. 200- 22). In July 2023 the Arkansas Department of Agriculture Natural Resources Division (ANRD) approved $85M of low interest rate funding through the state's drinking water Revolving Loan Fund program. In July the City conducted a formal Engineering Selection Committee meeting (RFQ 23-05) and selected Garvey to provide CMAR services for the project. Amendment No. 3 with McClelland will allow the detailed design to progress from 30% to 100%, including all related permitting and coordination with state and federal agencies, coordination with Garney during CMAR preconstruction services, and release of early procurement specifications. A detailed scope and fee narrative and schedule have been provided with the amendment document. Staff recommends approval of Amendment No. 3 in the amount of $1,446,340.00 to the Engineering Services Agreement with McClelland Consulting Engineers, Inc. for Final Engineering Design for the West Corridor Water Transmission Line Project. This amendment consists of $1,446,340.00 in engineering services, increasing the total contract amount from $1,547,085.00 to $2,993,425.00. STAFF REQUESTS THIS BE FORWARDED TO THE CITY COUNCIL FOR CONSIDERATION FOR APPROVAL 7. Overview of 48-inch HOBAS Sewer Pipe Repair INFORMATIONAL ITEM ATTACHMENTS July Monthly WWTP Report Fayetteville's Water & Sewer Infrastructure Presentation Black & Veatch Rate Study Presentation Nutanix Server Software Quotes McClelland Engineering Amendment No. 3 ADJOURN Next Water, Sewer, Solid Waste Committee meets on Tuesday, October 10, 2023, at 5:30 p.m. CITY OF WOO FAYETTEVILLE ARKANSAS City of Fayetteville July 2023 Monthly Report Prepared by: .�acobs August 18, 2023 WEST SIDE •ASTtWATtA TRIATrtAT FACILITY N ��� NMI •M �M .?rAl *% I Fayetteville July 2023 Monthly Report Table of Contents 1. Executive Summary....................................................................................................................................2 1.1 Fayetteville Team...................................................................................................................................................... 2 1.2 Special Projects.......................................................................................................................................................... 2 1.3 Compliance..................................................................................................................................................................2 1.4 Financials......................................................................................................................................................................3 Table1.1: Year to Date Budget.......................................................................................................................................... 3 2. Plant Operations.........................................................................................................................................4 2.1 Process Control...........................................................................................................................................................4 3. Laboratory....................................................................................................................................................5 4. Biosolids Management Site.....................................................................................................................6 4.1 Biosolids Operations.................................................................................................................................................6 4.2 Water Treatment Residuals.................................................................................................................................... 6 4.3 Hay Harvest..................................................................................................................................................................6 4.4 Dryer Installation Project........................................................................................................................................7 4.5 Revenue.........................................................................................................................................................................8 Table4.1: BMS Revenue........................................................................................................................................................8 5. Maintenance................................................................................................................................................9 5.1 West Side....................................................................................................................................................................... 9 5.2 Noland............................................................................................................................................................................9 5.3 Lift Stations............................................................................................................................................................... 10 5.4 Key Performance Indicators/Measures.......................................................................................................... 11 Figure 5-1: Labor Hours by Work Order Type............................................................................................................ 11 Figure5-2: Work Order Count by Type......................................................................................................................... 11 5.5 Capital Improvement Projects(CIP)................................................................................................................ 12 6. Industrial Pretreatment.........................................................................................................................13 Table 6.1: Industrial Pretreatment Program (IPP) Revenue............................................................................... 13 7. Woolsey Wet Prairie................................................................................................................................14 8. Community Involvement.......................................................................................................................15 9. Health & Safety........................................................................................................................................16 Appendix A: Noland Effluent & Influent Report............................................................................................17 Appendix B: West Side Effluent & Influent Report........................................................................................18 Appendix C: Jacobs Employee Vacancy and Project Status Report..........................................................19 Jacobs - Fayetteville Fayetteville July 2023 Monthly Report 1. Executive Summary 1.1 Fayetteville Team During the month, the Fayetteville team consisted of 45 full-time staff members including the two temporary summer utility workers joining the maintenance and operations team as fuLL-time employees. Of the 51 authorized employees, 95.7% of the labor hours are dedicated to the Fayetteville Projects and 4.3% of the labor hours are dedicated to other Jacob Projects. There were 6 open recruitments during the month, and the Regional Support team assisted with work order backlog, capital improvement projects, and various special projects. The Employee Vacancy and Project Status Report is presented in Attachment C. 1.2 Special Projects 1.2.1 Dryer Installation Project The dryer commissioning continued through July, and the staff Labor dedicated to the dryer installation and operations were utilized for final dryer component installation; preventive maintenance setup into the site's CMMS (Computerized Maintenance Management System); onsite 0&M (Operations & Maintenance) training and training documentation; and revising some of the handling and loading of the biosolids into the dryer. The amount of labor utilized this month decreased slightly with 498 labor hours dedicated to the dryer installation project. Additional details for the dryer installation project are provided in Section 4.4 of this report. 1.2.2 Noland Master Plan On July 24, the staff received the Planning Criteria Technical Memorandum for review. The document is set for a team review with Garver on August 9, 2023. 1.3 Compliance 1.3.1 Noland and West Side The Noland and West Side Water Resource Recovery Facilities (WRRFs) met all discharge permit parameter limits throughout July. There was one unpermitted discharge at the Noland facility and one sanitary sewer overflow (SSO) occurrence at lift station 19. On July 12, at the Noland Facility, during a routine clarifier scum pump backflushing the staff noticed a small amount of water bubbling through the sidewalk crack which was located beside the Clarifier 3 & 4 Scum Pump Building. The untreated wastewater was estimated at 200- gallons, which was maintained on facility grounds. The cause of the incident was due to a failure of a portion of the scum pump's pipe. The staff stopped the spill by isolating and removing Clarifier No. 3 from the system. The clarifier will remain offline, and the drain line isolated, until line repairs have been completed. On July 20, a farmer reported that there was evidence of manhole SSO near Lift -station No.19 (Malty Wagnon) which sends influent water to the Noland WRRF. The staff investigated and discovered there was a dislodged manhole cover and SSO debris near the location. The following details led to this event: Fayetteville July 2023 Monthly Report On July 15, this station Lost COMM-controls last Friday night (July 14th) following a brief power outage due to a lightning storm. The station operation was returned to service in Less than 2-hrs (early Saturday morning, July 15th) and all station pumps were verified to be fuLLy operational. Maintenance followed up with a site visit Saturday morning (during daylight hours and after the storm) to check nearby manholes for evidence of SSOs; no SSO signs noted during this site visit. Following the July 20 manhole inspection, the manhole cover which staff discovered dislodged was replaced and they applied Lime to the area, along with removing the solids - debris. The staff estimate this spilL's volume could not have been over 100,000 gallons of highly diluted wastewater which overflowed into a ditch -tributary connected to the nearby West Fork White River. The facilities effluent permit parameter limitations requirements changed beginning June 1. The June through September effluent discharge limitations and data summary tables are presented in Appendices A- B. 1.4 Financials The year-to-date financial variance continued to decrease slightly. Due to staff vacancies the labor expense was below budget while the non -labor was slightly over budget. The month ended with the year-to-date is under budget by $25,71 1. Table 1.1: Year to Date Budget Month Labor Dollars Non -Labor Dollars Year -to -Date Dollars Jan 2023 -S6.11s S1.915 -S».199 Feb 2023 -S18.218 -S5.822 -S24.040 I.lar 2023 $3.501 -S88.298 -$84.797 Apr 2023 S 18.185 -S70.93� -S52.750 1.lay 2023 S25.459 S10.289 S35.748 Jun 2023 -S9.687 -S6.596 -S16,283 Jul 2023 -S36.794 S11.083 -S25.711 Aug 2023 Sep 2023 Oct 2023 Nov 2023 Dec 2023 1.1immum -S'c 794 -S88.29E S= 7 1daximum S2S4591 S11.082 S" Fayetteville July 2023 Monthly Report 2. Plant Operations The effluent quality and influent loadings data is presented in Appendices A and B. The Summary tables for Noland and West Side Water Resource Recovery Facilities (WRRFs), effluent permit parameter limitations, were reflect the more restrictive June through September effluent discharge limitations. At Noland, the staff recorded 4.8 inches of rain this month and the average temperature was 80 degrees Fahrenheit. Note: temperature obtained from https://www.timeanddote.com/weotherluso/fayetteville-ar/historic?month=4&yeor=2023 2.1 Process Control 2.1.1 Noland Beginning in early May and continuing this month, the staff noted a steady decrease in the BOD loading which translates to a decrease in the food available for the microbiology. This situation creates a deficiency for the phosphorus biology to sufficiently provide phosphorus removal. The staff utilizes alum dosing to assist with the phosphorus removal and at times discontinues the effluent discharge. During the month, the bacterial growth was severely inhibited, and the effluent discharge was halted on July 12 and following a reseeding from the West Side facility the effluent discharge to White River resumed on July 19. The facility treated 136.9 million gallons (MG) of influent water with an average influent daily flow rate of 4.4 million gallons per day (MGD). The peak daily flow was recorded on July 15, at 11.6 MGD. 2.1.2 West Side During the month, the facility treated 248.1 million gallons (MG) of influent water. The peak daily flow was recorded on July 15, at 14.2 MGD. The average daily flow rate was 8.0 MGD. Fayetteville July 2023 Monthly Report 3. Laboratory The Fayetteville Laboratory provides sampling and analysis for process control and regulatory compliance for both the Noland and West Side WRRF's, and the Biosolids Management Site (BMS), in addition to the samples collected for monitoring the Industrial Pretreatment Program (IPP). This month Ashley Gregg, Jacobs Compliance and Reporting Coordinator, performed a Compliance Reporting Audit. During the audit, the staff implemented suggested changes to the monthly data validation process to document and save data entry changes in the operational database. The staff saved copies of pre -validation and final validation spreadsheets in the laboratory SharePoint along with the digital signature and date. Data entry changes are tracked using a Deming Cycle (Plan, Do, Check, Act) to evaluate and eliminate recurring errors. The industrial data entry options were also updated to include pounds loading and Maximum Allowable Headworks Loading warning limits. Fayetteville July 2023 Monthly Report 4. Biosolids Management Site 4.1 Biosolids Operations The Water Resource Recovery Facility's (WRRFs) produced 1,735 wet tons of belt -pressed biosolids. The staff applied 1,466 biosolids into the solar houses to partially dry the material. There were approximately 268 tons of biosolids sent to the landfill. Approximately 791 tons of water was removed from the material before disposal. By partially drying biosolids before hauling to the landfill, it is estimated that $38,128 was saved in tipping fees. 4.2 Water Treatment Residuals During the month, Beaver Water District sent 931 tons of the water treatment residuals (WTR) to be land applied. There was a reduction in the amount of WTR accepted this month due to rain events and a dryer training event when staff were not unavailable. The application of WTR generated approximately $30,056 in revenue. 4.3 Hay Harvest During July, the staff completed the first hay harvesting and began the second harvesting event. The staff are hopeful the second hay harvest will be completed during August. Fayetteville July 2023 Monthly Report 4.4 Dryer Installation Project During July, vendor and staff continued to struggle with the dryer feed and conveyance systems. The current system does not provide a consistent material feed and the biosolids will compact when utilizing a full hopper. Griffin Residuals and the staff began implementing various methods to improve the output. Initially, the onsite team converted a flightless feed auger in the sludge hopper to a flighted auger by inserting a five -inch PVC pipe into the center of the auger (right photograph). The hope was that the flighted auger would reduce the compaction effect that resulted from the flightless auger. The change is not conclusive as the staff has not seen a significant change. Following a team meeting with Griffin Residuals, the next course of action was to eliminate the sludge hopper / augers from the conveyance system. This required a sludge chute to be installed on Elevator 1. The temporary chute allows material to bypass the sludge hopper / augers and discharge directly into Elevator 2 (left photograph). This alteration eliminated possible compaction areas but decreased the feed storage option which increased the time spent continuously monitoring and slowly applying the biosolids material onto the solar house conveyor. Additionally, the staff must constantly monitor the dryer feed and adjust elevator speeds in g sync to the dryer belt speed. Failure to do so could result in under or over feeding the dryer. If the dryer is underfed, temperatures will rise i in drying chambers and could cause catastrophic damage to the drying belt. If the dryer is overfed, Class A fertilizer standards cannot be achieved. Fayetteville July 2023 Monthly Report The team is optimistic that they can improve the biosolids material delivery issues. The team hopes to make further alterations to the sludge hopper and reintroduce it to the conveyance system. They are hopeful that relocating the discharge point were the material is deposited into the hopper will reduce the hopper's compaction. They are also working on a fabrication of a spreader inside Elevator 2 that will provide evenly material loading across the elevator's flighting. 4.5 Revenue The staff received and land applied 1,275 tons of water treatment residuals (WTRs). There were 123 tons of hay sold this month. There was no fertilizer sold during the month. Product Table 4.1: BMS Revenue Tons Sold/Received I Revenue Generated Hay 273 $15,124 Fertilizer 0 $0 Water Treatment Residuals 931 I $30,056 Fayetteville July 2023 Monthly Report 5. Maintenance 5.1 West Side During the first of the month, there was only one immediate major corrective work order. The operation staff reported that sludge feed pump #4 was barely pumping. This pump supplies sludge to both belt presses. The maintenance staff removed the inspection covers and noticed that the packing needed to be replaced. Following the replacement of the packing cord, the pump was placed into normal operational status. 5.2 Noland This month the Effluent Filter # 2 was refurbished. This project consisted of replacing the screens, troughs, brackets, and sand. The staff worked with a vendor to complete the refurbishment project. The project photograph is presented on the left. The staff were notified of an underground leak on the clarifier #3 scum pump line. The area was excavated, and the staff discovered two holes in the line caused by large rocks rubbing against the top of the pipe. The staff clamped the holes, and the system was returned to normal operational status. Fayetteville July 2023 Monthly Report 5.3 Lift Stations On July 14, the staff was notified by Corey Granderson, City Engineer, that a contractor had Left large items in a sewer channel upstream of Lift Station #7. Unfortunately, the large rain event had washed the items into the collection system, and they were heading to lift station. To protect the Lift Station equipment, the staff placed a large grate in front of the sewer grinder pump (channel monster). The staff monitored the station for 24 hours and periodically inspected the channel. They were able to remove a few items such as a Large bucket and several trash bags. The following day a staff member noticed the grate was not positioned correctly. After further inspection, the staff removed the grate due to damage and it sent to a fabrication shop to be refabricated. The refurbished grate was received in late July and promptly installed. Fayetteville July 2023 Monthly Report 5.4 Key Performance Indicators/Measures Figure 5-1: Labor Hours by Work Order Type =� ❑ 0 200 ,-j 485 ❑ administrative ocorrective maintenance emergency ❑ corrective maintenance non emergency corrective maintenance from pm/pdm Spreventive maintenance ❑ project a safety ❑administrative ®corrective maintenance emergency ocorrective maintenance non emergency corrective maintenance from pm/pdm ■preventive maintenance m project safety Figure 5-2: Work Order Count by Type ® 23, 196 n 0, 0% 0 28, 2% 05, 0% ❑ 93, 6% 23, 2% ® 1412,89% 11 Fayetteville July 2023 Monthly Report 5.5 Capital Improvement Projects (CIP) A purchase order was issued to Vinson Process Controls to calibrate the Noland headworks actuator. The work will be scheduled once the safety prerequisites have been completed and authorized. The Noland Clarifier #2 scum beach is made of carbon -steel and is severely corroded. The staff requested the vendor, MultiCraft, to provide a repair quote. Following their inspection, it was determined the beach could not be repaired. MultiCraft did provide an estimated quote for the scum beach replacement. The staff has purchased new seals and a drive chain for Noland Band Screen #101. This purchase was approved as an unplanned capital improvement project in July. 12 Fayetteville July 2023 Monthly Report 6. Industrial Pretreatment The monthly surcharge and waste hauler reports were completed and sent to the City billing department. Industrial Users, Tyson, Hiland, Marshalltown and Custom Powder Coating submitted their permit renewal applications this month. The IPP Revenue information is presented below. Table 6.1: Industrial Pretreatment Program (IPP) Revenue REVENUE $64,885 Surcharges on June data $2,050 Fees from hauled waste accepted in July $0.00 Other fees paid in July $0.00 Fines assessed in July ZERO VIOLATION Violation on June data Fayetteville July 2023 Monthly Report 7. Woolsey Wet Prairie This month the staff efforts continued with the Invasive Vegetation Management (IVM) treatments. Sericea lespedeza continues to be a driving focus of treatment activity, but peak summer growth also presented control needs for a wide variety of invasive species. Woolsey's July Rosepinh The staff's monitoring and treatment efforts have contained the spread of the Reed Canary Grass. This highly invasive grass species has a notorious reputation for decimating all wildlife diversity in areas where it is allowed to grow. The discovery, treatment, and hand removal of several dozen seed -heads this month will prevent tens of thousands of viable seeds being distributed throughout one of Woolsey's most botanically diverse sectors. The vegetation control will continue to focus through August on wrapping up sericea treatments while also closely monitoring carpet grass development in time to quickly pivot treatment focus onto this invasive wetland grass heading into September. Invasive vegetation removal for a wide variety of plant species includes;Johnsongrass, Himalayan Blackberry, Cal lery Pear, Thistle, White Sweet Clover, Indian Heliotrope, Velvet leaf, SmallCarpetgrass, and Reed Canarygrass. The Flowering Indian Helotrope plant species is presented in the photograph below. The Seeding Red Canary Grass (photograph above) was first documented at Woolsey Wet Prairie in 2021. Fayetteville July 2023 Monthly Report 8. Community Involvement Quarterly Broyles Roadside Trash Pick -Up On July 11, following the quarterly plantwide staff meeting, several of the facility staff participated in the Broyles Ave roadside trash pick-up Approximately 100 pounds of trash was removed along both sides of the 1.5-mile roadway. SeviAnimal Ser lle vices Y tour communitt, tour shelter, sating lives National Feed a Rescue Pet In celebration of National Feed a Rescue Pet, July 24-30, the staff coordinated a donation drive for the City of Fayetteville Animal Services, who in turn distribute the donated items to Local animal shelters. The staff donated kitten food, treats, cat Litter, cleaning supplies and toys, totaling approximately 100 pounds. Washington County Search & Rescue K-9 Unit The last weekend of the month, the Washington County K-9 Search and Rescue Unit visited the Biosolids Management Site, utilizing the expansive open areas of the site to execute their drills and training. Environmental Stewardship: Reduce — REUSE — Recycle The staff continue to find creative ways to provide good environmental stewardship. One of our vendors, Vicky Reed, provided Miner Farmers, a local goat milk production farm, with the laboratory staff's contact information so the empty distilled water plastic jugs could have a second "life". The laboratory produces approximately 20-30 pounds of #2 plastic each month. The sterile containers were prefect as goat milk containers. The farm no longer needs to use expensive glass bottles and simultaneously the site no longer needs to recycle these containers through the City's recycling program. Fayetteville July 2023 Monthly Report 9. Health & Safety The site's safety professional, Wes Cloud, resigned in June and the recruitment process continued throughout July. Brad Stefano, Regional Safety Professional will be assisting the site's safety team and they will continue to maintain the project safety training and assist with site safety needs. During July, James Verbrugge, Jacobs Area Safety Professional, conducted an on -site Safety Audit. Mr. Verbrugge provided an audit to West Side, Noland, and the BMS facilities. The audit is similar to an OSHA Safety inspection. The staff were able to address a few of the safety items during the inspection; the report is still pending. All weekly inspections were completed by the safety team and the Beyond Zero Observations were submitted throughout the month. With the July rising temperature, the site safety focus was the extreme heat. The BMS team was given insulated water bottles to remain hydrated throughout the day and working conditions within the dryer room have been the subject of brainstorming ideas and upgrades. The most promising changes may be the addition of roof covers and internal monitoring equipment. Appendix A: Noland Effluent Report White River Average Daily Effluent Report Month Flow MGD CBOD mg/L CBOD Load Lbs TSS mg/L TSS Load Lbs Total P mg/L Total P Load Lbs NH3 mg/L NH3 Load Lbs D.O (min) mg/L pH (min) SU pH (max) SU Fecal Coliform Geo Mean CFU/100 mL Permit Limit Jun -Sept 4.5 473 5.0 525 1.0 105.0 1.0 105 >6.9 >6.0 <9.0 200 Jul 2023 3.949 3.3 119 <1.3 <50 0.4 12.9 0.06 2.0 12.6 7.1 7.7 63 Jun 2023 5.509 3.2 148 2.8 128 0.3 12.8 0.06 3.0 14.0 7.0 7.7 31 May 2023 6.131 2.9 144 <1.4 <70 0.4 22.1 0.12 5.8 14.8 7.0 7.6 21 Apr 2023 6.275 3.5 186 <1.9 <103 <0.1 <7.4 0.08 4.2 14.2 7.4 7.6 37 Mar 2023 7.907 3.0 201 <1.5 <101 <0.1 <8.8 0.06 4.4 13.3 7.4 7.5 <37 Feb 2023 7.466 3.6 222 3.1 197 0.2 11.1 0.11 7.1 13.6 7.4 7.5 43 Jan 2023 6.447 3.8 205 2.6 140 0.1 8.0 0.09 5.0 14.3 7.4 7.6 26 Dec 2022 5.970 4.2 215 <2.7 <140 0.2 8.2 0.13 6.4 11.7 7.4 7.6 <22 Nov 2022 4.556 3.4 128 1.5 55 0.1 5.5 0.24 7.0 11.7 7.4 7.6 51 Oct 2022 4.277 4.1 141 <1.4 <50 <0.1 <4.2 0.09 2.9 15.5 7.4 7.6 41 Sep 2022 4.620 3.8 142 <1.7 <63 <0.3 <10.5 0.06 2.3 14.9 7.5 7.7 >66 Aug 2022 5.261 4.4 192 <1.6 <70 0.3 14.5 0.06 2.7 14.1 7.2 7.6 136 Ju12022 5.166 2.9 160 <1.5 <79 0.4 19.0 0.11 4.4 11.9 6.9 7.6 107 White River Average Daily Effluent - Minerals Report Month TDS mg/L TDS Load Lbs/dy Sulfate Total As Soo mg/L Sulfate Total Load As Soo Lbs/day NO3 (Nitrate) mg/L NO3 (Nitrate) Load Lbs Permit Limit Jun - Sept 500 52,542 119 12505 report report Jul 2023 362 11,092 61 1,948 Jun 2023 358 17,502 100 5,271 May 2023 360 16,754 52 2,450 Apr 2023 323 19,575 56 3,423 Mar 2023 308 24,645 60 3,568 Feb 2023 368 19,585 63 3,310 Jan 2023 314 17,522 59 3,282 Dec 2022 375 16,383 54 2,500 4.1 191.8 Nov 2022 390 13,159 62 2,079 Oct 2022 383 13,385 74 1,654 Sep 2022 372 14,106 67 2,922 Aug 2022 361 15,694 57 2,643 Ju12022 374 20,534 53 2,201 Appendix A-1: Noland Influent Report Month Flow MGD Hydraulic Loading % CBOD Load Lbs Orangic Loading % TSS Loading Lbs TSS Loading % PO4 Loading Lbs PO4 Loading % NH3 Loading Lbs NH3 Loading % Design Annual Average 12.60 29,666 23,198 765 2,250 Jul 2023 4.42 35.0 10,145 34.2 7,494 32.3 165 21.6 662 29.4 Jun 2023 4.11 32.6 12,964 43.7 8,088 34.9 182 23.8 730 32.5 May 2023 5.39 42.8 12,756 43.0 7,321 31.6 210 27.4 760 33.8 Apr 2023 4.68 37.1 15,926 53.7 8,507 36.7 227 29.7 917 40.8 Mar2023 9.08 72.1 17,506 59.0 10,561 45.5 286 37.4 1,098 48.8 Feb 2023 8.08 64.1 14,485 48.8 8,700 37.5 263 34.4 982 43.6 Jan 2023 6.17 49.0 13,140 44.3 7,756 33.4 217 28.4 760 33.8 Dec 2022 5.99 47.6 11,497 38.8 8,718 37.6 205 26.8 706 31.4 Nov 2022 5.91 46.9 13,234 44.6 9,292 40.1 210 27.4 921 41.0 Oct 2022 4.26 33.8 13,330 44.9 7,379 31.8 229 29.9 930 41.3 Sep 2022 4.34 34.4 11,794 39.8 7,807 33.7 208 27.2 810 36.0 Aug 2022 4.83 38.4 17,100 57.6 8,961 38.6 218 28.6 878 39.0 Ju12022 3.85 30.6 11,832 39.9 7,935 34.2 185 24.2 615 27.3 Appendix B: West Side Effluent Report Goose Creek Average Daily Effluent Report Month Flow MGD CBOD mg/L CBOD Load Lbs TSS mg/L TSS Load Lbs Total P mg/L Total P Load Lbs NH3 mg/L NH3 Load Lbs DO (min) mg/L pH (min) SU pH (max) SU Fecal Coliform Geo Mean MPN/100 mL Permit Limit June - Sept 5.3 442.0 10 834 1.0 83.4 1.0 83.4 >6.9 >6.0 <9.0 200 Jul 2023 8.0 <2.0 <91.4 1.0 65 0.1 6.1 <0.0 <2.2 8.6 7.3 7.8 <9 Jun 2023 7.8 <2.0 <144.6 1.0 64 0.1 7.8 <0.1 <3.4 8.9 7.2 7.7 <12 May 2023 9.0 <2.0 <138.0 1.0 74 <0.1 5.9 <0.0 <1.6 9.3 7.3 7.6 <8 Apr 2023 8.7 <2.0 <101.1 1.0 72 <0.1 5.3 <0.3 <25.2 9.8 7.0 7.4 <11 Mar 2023 13.3 <2.0 <123.5 1.0 103 0.1 8.9 <0.1 <4.3 10.3 6.9 7.4 <6 Feb 2023 11.7 <1.9 <154.1 1.0 103 0.1 7.7 <0.0 <4.3 10.4 7.0 7.4 <6 Jan 2023 9.9 <2.0 <173.0 1.2 104 0.1 7.2 <0.1 <6.5 7.6 7.1 7.3 <5 Dec 2022 9.5 <2.0 <177.9 1.0 79 <0.1 9.2 <0.1 <7.1 8.5 7.0 7.5 <6 Nov 2022 8.0 <1.9 <199.2 1.0 64 <0.1 4.1 0.1 9.8 9.3 7.2 7.6 <6 Oct 2022 6.6 <1.8 <144.5 1.0 57 0.1 4.6 0.0 3.7 9.0 7.2 7.6 <6 Sep 2022 6.8 <2.5 <148.8 1.0 55 <0.1 3.3 <0.0 <3.6 8.6 7.3 7.7 <5 Aug 2022 7.3 <2.3 <127.3 1.0 62 <0.1 4.5 <0.1 <5.7 8.5 7.3 7.7 <8 Ju12022 5.8 <2.0 <129.0 1.0 47 0.1 6.0 <0.0 <2.8 7.9 7.3 7.8 <14 Appendix B-1: West Side Influent Report Month Flow MGD Hydraulic Loading % BOD Load Lbs Orangic Loading % TSS Load Lbs TSS Loading % Total P Load Lbs PO4 Loading % NH3 Load Lbs NH3 Loading % Design Annual Average 10.0 14,595 14,595 584 1,918 Jul 2023 8.0 79.9 9,164 62.8 14,506 99.4 250 42.9 1,253 65.3 Jun 2023 7.8 78.0 10,595 72.6 13,072 89.6 274 46.9 1,261 65.7 May 2023 9.0 90.1 10,842 74.3 12,133 83.1 281 48.1 1,261 65.7 Apr 2023 8.7 87.5 10,393 71.2 11,139 76.3 249 42.6 1,374 71.7 Mar 2023 13.3 133.2 10,374 71.1 14,426 98.8 276 47.3 1,341 69.9 Feb 2023 11.7 117.4 11,289 77.3 11,517 78.9 247 42.3 1,239 64.6 Jan 2023 9.9 99.3 11,398 78.1 10,453 71.6 251 43.0 1,281 66.8 Dec 2022 9.5 95.3 11,463 78.5 12,504 85.7 277 47.4 1,199 62.5 Nov 2022 8.0 80.4 11,688 80.1 11,915 81.6 260 44.5 1,256 65.5 Oct 2022 6.6 66.3 11,918 81.7 10,762 73.7 256 43.8 1,327 69.2 Sep 2022 6.8 67.8 10,419 71.4 11,859 81.3 258 44.1 1,256 65.5 Aug 2022 7.3 72.7 10,496 71.9 12,539 85.9 239 41.0 1,299 67.7 Ju12022 5.8 58.1 10,797 74.0 14,063 96.4 272 46.6 1,396 72.8 Appendix C. Employee Vacancy and Project Status Report Department Job Title Em io ee name Fayetteville % FTE Admin Project Manager Jan Guy 82.00% Admin Assistant Project Manager Mayo Miller 100.00% Admin Health, Safety, Compliance Professional Vacant 70.00% Admin Project Coordinator Brandi Miller-DeWeese 90.00% Admin Administrative Assistant Christy Taylor 100.00% Admin Administrative Assistant Kassandra Foster 100.00% Admin Project Specialist Sarah Garrison 100.00% BMS BMS Supervisor Peter Burrow 100.00% BMS Lead Operator Vacant 100.00% BMS Operator I David Dajani 100.00% BMS Equipment Operator Charlie Boger 100.00% BMS Equipment Operator Anthony DeJesus 100.00% BMS Equipment Operator Vacant 100.00% BMS Operator In Training Christopher Cox 100.00% BMS Operator In Training Ben Shondelmyer 100.00% BMS Operator In Training Robert Donnell 100.00% BMS Operator In Training Vacant 100.00% BMS Mechanic Mike Reed 100.00% Admin Process & Compliance Supervisor Thom Vinson 90.00% Admin Environmental Specialist Jeff Hickle 100.00% LAB Laboratory Director Donna McChristian 90.00% LAB Industrial Pretreatment Coordinator John Byrd 100.00% LAB Lead Laboratory Analyst Matt Benton 100.00% LAB Laboratory Analyst Walter Chodor 100.00% Maint Maintenance Supervisor Joshua Alleman 100.00% Maint Lead Mechanic Buddy Carter 95.00% Maint Lead Electrician Tim Marr 70.00% Maint Electrician Brian Daniels 100.00% Maint Mechanic Robert Ingram 100.00% Maint Mechanic Michael Spohn 100.00% Maint Mechanic Paul Goolsby 100.00% Maint Mechanic Rick Dollarhide 100.00% Maint Mechanic in Training Broc Burus 100.00% Maint Mechanic in Training David Post 100.00% Maint Mechanic in Training Caleb Wheeler 100.00% Maint Utility Worker - Temp Vacant 100.00% Maint Utility Worker - Temp Vacant 100.00% Operations Operations Supervisor Shawn Santellanes 100.00% Operations Lead Operator Travis Patton 100.00% Operations Operator I Anthony Ramsfield 100.00% Operations Operator I Justin Sweeney 100.00% Operations Operator Tom Meunier 100.00% Operations Operator Chandler Smothers 100.00% Operations Operator Brittney Doyle 100.00% Operations Operator In Training Jeremy Johnson 100.00% Operations Operator In Training Michael Stout 100.00% Operations Operator In Training Ezra Maglothin 100.00% SCADA Instruct and Control Tech Christopher Merrit 100.00% SCADA Instrument & Control Tech Pat Cooley 95.00% SCADA Instrument & Control Tech Preston Jones 100.00% SCADA Information & Operational Tech James Mason 50.00% Authorized Positions = 009 Filled Positions = 45.0 Filled FTE's= 43.6 REGIONAL SUPPORT and SPECIAL PROJECTS (Performed in scope) Area Reason Name Hours SCADA Network Upgrade Scada Regional Support 39.75 Maintenance Maintenance, Reporting, and IT Related Activities Various Regional Staff 68.5 BMS Dryer Installation Project Staff & Regional Support 498.1 Noland Master Plan Data Request and Sampling Planning Staff 1.0 Fayetteville Water & Sewer Committee Jacobs July 2023 Monthly Operations Overview 09/12/2023 July Operations SUMMAR I ---Moans= Noland Treated Effluent West Side Treated Effluent Rainfall Temp WRRF Biosolids Landfill Direct Application Solar House Application Landfill Partically Dried Solar House Drying Efficiency Units MG MG inch Degrees F ton ton ton ton July 137 248 4.8 80 1735 268 1466 676 53.9 June 123 234 4.4 75 1921 517 1404 741 47.2 May 190 279 2.7 67 2178 0 2178 1773 18.6 April 140 262 1.5 58 2211 23 2188 1526 30.3 March 245 413 7.2 50 2397 91 2306 1837 20.3 February 209 329 3.1 47 1985 226 1759 1687 4.1 100% NPDES Compliance ., t Community Involvement Miner Farmers Goat Milk Container Ta'v'Menille Animal S rvices _, our commurov, your shelter, saving live., National Feed a Rescue Pet `lam Imp Y Quarterly Broyles Roadside Trash Pick- Up Washington County Search & Rescue K-9 Unit bor lars Non -Labor Dollars Year -to -Date Dollars -S6,114 S1,915 -S4,199 >18,218 -S5,822 -S24,040 S3,501 -S88,298 -S84,797 08,185 -S70,935 -S52,750 >25,459 S10,289 $35,748 -S9,687 -S6,596 -S16,283 i36,794 S11,083 -S25,711 >36,794 -S88,298 -S84,797 ;25,4591 S11,083 S35,748 LI. IPP Revenue Summary $64,885 $2,050 S0.00 $0.00 ZERO VIOLATION Surcharges on June data Fees from hauled •,,jaste acceoted in July Other fees paid 11 July Fines assessed in July Violation on June data 001 LVA 6"Sam: Product Tons Sold/Received Revenue Generated Hay 273 $15,124 Fertilizer 0 $0 Water Treatment Residuals 931 $300056 j �lio,ifT �.: F � �' ` iaY:i t � -. �is ' �( �>k � ..,/..'���� a��"►-� MI Challenging today. gin Q %Oaco S Reinventing tomorrow. Overview of Fayetteville's water and sewer infrastructure BEAVER LAKE STORAGE/DISTRIBUTION WASTEWATER COLLECTION TREATMENT & DISCHARGE CUSTOMER 36. lmc%-rA LE Tr CARROT I I L L_ L�bwYf MwY�r Lwwl�Ilw ��oo • 11 iMU' 0 PLAMATION • r�T� nti QM*K00,& STMAMROWAND WATER OUAUTYMEASIAZMENT SITE WIN ASSOCIATED SITE IDENTIFICATION HUMMER I.,. n PA•D Its WATER OUAEITY YEASUNEi1ENI SITE WAIN ASSOCIATED UAV IDENTIFICATION TIMMER *0 �m LWJ l ry � J LL1 q- 01- �` ���_ �a `� _ ���{ .1. �QF •-r .,,i� Psi �� .f'F{� ,. \I � F JU Imo' ..... ^j Ij,fyeY Rd 10N;IVS ON (,uy IerrV Itd 1- TL�� Mtss,orr ti 49 Drake St' r �y-.-< s �r/ _ I I �) ` i .•Tow n<hq, St - Mount c--444 Rd— 1 y� r N Wyman Rd t L 165NOral t yN WedmgtonDrIf LA -- L YVYlttan Rd - 180#-HuntLakr ----, _62 .. 1St = Maln St I I f f !15G1_ - 1 ^ �I r I 265 F A R M I N IS T 0 N Wr!lnrrglrLy R.r ass - s r t� v J7 o Ot l :._. Vi c.=_ BEAVER LAKE STORAGE/DISTRIBUTION WASTEWATER COLLECTION TREATMENT & DISCHARGE CUSTOMER u Why Perform a Rate Study? • To ensure that rates provide adequate revenue to operate the system in a safe and lawful manner and to cover increasing maintenance expenses as the system grows. The last rate study was in 2007. • To ensure the rates are equitable and that no customer segment carries a disproportionate burden of the costs, while ensuring the City is able to meet demand for delivery of reliable services needed today and in the future. • To provide regular improvements through essential capital improvements to the utility's infrastructure for safe and healthy water/sewer services. Operational costs for water distribution and sewer collection services In 2022, the utility's operational and maintenance budget was $23,55,600 to provide water and sewer services to customers. In 2023, we anticipate the cost to be $25,990,362 and we estimate costs for 2024 to be $28,109,350. Ir ir Krr i.Wo I Wastewater treatment operational costs In 2022 it cost FAYETTEVILLE $7,636,450 to provide wastewater treatment to customers. In 2023, we anticipate the cost to be $8,012,800, and we estimate costs for 2024 to be $8,476,500. There is currently a facilities masterplan underway which will recommend necessary capital projects at the Noland wastewater plant to carry it 20 years into the future. These projects are distinct from the operational costs. These may include construction of new unit processes at the plant, with costs that may exceed typical capital budgets and require additional funding. .y• Residential is Single Family, Duplexes, Quadplexe Apartments, Multi -Unit Residences and Rooming Houses Non -Residential is Commercial, Construction, Government, Institutions and Non -Profits Irrigation also occurs on domestic meters Customer Classes er n-Res. Water 3,610 Non -Res. Sewer 2,944 Irrigation 1,830 Other 13 itial Water 1,403 \� V Industrial 8 Wholesale Water 3 Wholesale Sewer 2 QUESTIONS? CITY OF qvFAYETTEVILLE ARKANSAS v �J QBLACK&VEATCH ie Black & Veatch Corporation, 2023, All Rights Reserved The Black & Veatch name and logo are registered trademarks of Black & Veatch Corporation. Overview of Rate Study Process Revenue Requirements Cost of Service Revenue Adequacy Customer Class Equity A 77 • • - - Cost Recovery &Bill Impact Black & Veatch Industry Accepted Methodologies Financing and Guidelines for Wastewater Cost of Charges for Service and Rate Making wastewater Systems ... 1 .... __.. Principles of Water Rate-.. Guidelines for Water Cost of fctis, and Charges Service and Rate Making Black & Veatch The Importance of "Cost of Service" Rates 1. Recognizes differences between customer classes 2. Provides a fair distribution of costs to each customer class in proportion to the service demands of each class Cost of Service 3. Results in cost -based rates that generate revenue from each customer class in proportion to the cost to serve each customer class Timely cost of service studies are essential for alignment among: Utility Costs, Customer Service Demands, Practical Rates, and Bill Impacts Black & Veatch Wastewater Cost Allocation Approach Revenue Requirements Established by the Financial Plan Operational Cost Centers Functional Cost Components Volume Capacity trength Customer (Contributed & 1/1) (Contributed & I/I) (BOD & TSS) (Billing) P Elkins and West Fork are only allocated Pumping & Treatment related functional costs for Volume, Capacity and Strength. Black & Veatch Elkins' & West Fork's Wastewater System Customers Elkins / West Fork Sewer Service Lines Lift Stations (Sewage Pumping) Elkins / West Fork Sewer Service Lines Es Infiltration/ Inflow Fayettevi I I e's Wastewater System Retail Customers <. (Metering, Billing & Customer Service) � A- Sewer Service Lines - :;z-1er Collection Mains Manholes Lift Stations (Sewage Pumping) Interceptors/ Force Mains Noland and Westside WWTP (Treatment) Infiltration/ Inflow Outfall Ic Illinois River & White River (Disposal) Fixed Charges Volume Charges Black & Veatch Wastewater Costs Allocated to Wholesale and Retail Pumping from point of entry into Fayetteville's system • Treatment and disposal Administrative costs • Wholesale metering & billing costs Sewage Collection Infiltration/Inflow Pumping Treatment and disposal Administrative costs Retail metering and billing costs Black & Veatch Impact of I/I Correction on COS and Volume Charge Wholesale (Elkins and West Fork) COS decreased by $99,900 (8.4%) due to the change. Wholesale proposed volume charge decreased by $0.53 (8.4%). Retail COS increased by $91,400 (Inside) & $3,300 (Outside) Retail volume charge increased $0.03 to recover the difference. Inside City volume charge = 0.5% to 0.6% increase Outside City volume charge = 0.4% increase No change in fixed charges Black & Veatch Before Wholesale 1/1 Correction Proposed Wastewater Rates Effective January 1, 2024 Inches $/month $/month 5/8 12.75 15.71 3/4 12.75 16.01 1 24.45 31.32 1 1/2 44.81 63.14 2 61.64 87.88 3 132.59 184.50 4 218.49 270.52 6 433.00 501.48 8 647.59 558.03 Volume Charge Monthly Water Usage 1,000 gal. Insid 1,000 gal. 1,000 gal. Residential First 2,000 Gallons 4.91 > 2,000 Gallons 6.56 All Usage 7.56 Non -Residential All Usage 5.51 7.56 Major Industrial All Usage 5.82 7.56 Wholesale 85% of metered water usage 6.26 Above 85% of metered water 6.26 Surcharge BOD - $/Ib for strength in excess of 300 ppm 0.5410 TSS - $/Ib for strength in excess of 300 ppm 0.6674 Proposed Wastewater Rates Effective January 1, 2024 --- ro Insidej Inches $/month $/month 5/8 12.75 15.71 3/4 12.75 16.01 1 24.45 31.32 1 1/2 44.81 63.14 2 61.64 87.88 3 132.59 184.50 4 218.49 270.52 6 433.00 501.48 8 647.59 558.03 Volume Charge Monthly Water Usage 1,000 gal. I n Jid _ 0 1,000 gal. 1,000 gal. Residential First 2,000 Gallons 4.94 > 2,000 Gallons 6.59 All Usage 7.59 Non -Residential All Usage 5.54 7.59 Major Industrial All Usage 5.85 7.59 Wholesale 85% of metered water usage 5.74 Above 85% of metered water 5.74 Surcharge BOD - $/Ib for strength in excess of 300 ppm 0.5414 TSS - $/Ib for strength in excess of 300 ppm 0.6679 Black& Veatch QBLACK & VEATCH Discussion ie Black & Veatch Corporation, 2023, All Rights Reserved The Black & Veatch name and logo are registered trademarks of Black & Veatch Corporation. Thank you for contacting Ingram Micro. We value your business greatly and will continue to deliver the services you need to retain it. This quote is not intended to represent the entire conversation; only what was relevant to th solution you requested. We make every effort to provide a complete and correct solution. However, the accuracy of the solution provided is dependent on the information gathered. If relevant information is not provided by our customer, Ingram Micro cannot be held responsible. We urge you to review this quote fully, to ensure it reflects all of your required specifications. If you have additional questions, please contact your designated Ingram Micro contact. Remember to reference your Quote Number. To ensure fastest and most accurate processing of your order, Quote: QUO-15773906-P31`4HII -0 please provide the quote# at the time of purchase Name: Nutanix -CTO QUOTE-XQ-1910034 Customer Name:JACOBS TECHNOLOGY INC Currency: US Dollar Effective From:6/9/2023 Send Date: 06/09/2023 Vendor Bid Expiry Date:6/26/2023 End User Name: City of Fayetteville - AR Special Pricing Information: Special Pricing NumbeKQ-1910034 Start Date: 6/9/2023 Expiry Date:6/26/2023 Customer Question: Nutanix Solution Comments: "All Nutanix POs must have End User PO#, Contact Name, Phone Number and Email Address for processing. "Shipping Estimate - Charges are subject to change based on current shipping rates and Customers are responsible for freight. -$275 per platform for standard 3 day shipping. -$325 per platform for expedited 2 day shipping -$450 per platform for expedited overnight shipping "All orders related to this quote are non -cancelable and non -returnable. Item # SKU Manufacturer Mfr. Part # City Description and Product Info Discount- Avail. City MSRP Ext MSRP Price Ext Price Comments RENEWAL LICS SLIC SN#: Product stocked by manufacturer. 20SW000146462 1 9HH792 NUTANIX R-SW-AOS- 1 Delivery times vary. 0 $236,562.00 $236,562.00 $56,578.58 $56,578.58 Term: 6/2712023 STR-PRD Country of Origin: (None) 4:00:00 PM thru Weight: 0.00 6/26/2026 4:00:00 Dim Weight: 0.00 PM RENEWAL LICS SLIC Product stocked by manufacturer. SN#: R-L-CORES- Delivery times vary. LIC-00931671 Term: 2 9HH793 NUTANIX STR-PRD 96 0 $0.01 $0.96 $0.01 $0.96 6127/20234:00:00 Country of Origin: (None) PM thru 6/26/2026 Weight: 0.00 4:00:00 PM Dim Weight: 0.00 RENEWAL LICS SLIC Product stocked by manufacturer. SN#: R-L- Delivery times vary. LIC-00931672 Term: 3 9HH794 NUTANIX FLASHTIB- 11 0 $0.01 $0.11 $0.01 $0.11 6127/20234:00:00 STR-PRD Country of Origin: (None) PM thru 6/26/2026 Weight: 0.00 4:00:00 PM Dim Weight: 0.00 NUTANIX PROD HW SUP RNWL SN#: Svcs 20FM61_260044, Product stocked by manufacturer. 20FM6L260022 4 7TU986 NUTANIX RS-H-. WPRD- 2 Delivery times vary. 0 $4,839.73 $9,679.46 $3,576.12 $7,152.24 Term: 6/2712023 Country of Origin: (None) thru Weight: 0.00 126/202 4: 6/26/20P 4:00:00 Dim Weight: 0.00 PM Products/ 110 $246,242.53 $63,731.89 Services Total Total I I$63,731.89 Purchase this for $63,731.89 or lease for I .62 per month. Pricing & Ordering Information For specific pricing and to order the above products, you may • Call the Ingram Micro Sales department at 1.800.456.8000 " Your PO number " End user company name " Your fax number " End user address "Shipping instructions " End user contact " End user PO number " End user contact email address " End user license, contract or authorization number " End user contact phone number " End user contact fax number Thank you for your order! This offer to sell the listed product(s) is subject to product availability and Ingram Micro's standard terms and conditions that are published btlos://corp.ingrammicro.com/en-usAegal/sales taq)rices are subject to change without notice. Please contact the Ingram Micro Sales desk at 1.800.456.8000 if you have any additional questions. Leasing Information Win more opportunities by offering your customers flexible financing solutions with Ingram Micro Financial Solutions. • Learn more about Ingram Micro Leasing Program • Contact a leasing specialist today at 877-877-0035 or emaifinancialsolutions a)..inorammicro.com Lease pricing is intended to be a good faith estimate and is being used for marketing purposes only. The actual rate and payment amount may vary, and is subject to credit approval in addition to any terms and conditions that may be required. Tech Dqtaj 6/9/2023 Mayo Miller Jacobs Space Exploration Group AVT Technology Solutions, LLC Quotation #: 125282004-1 410 E Rivulon Blvd. Suite 201 Request #: 14588581-14602597 Gilbert, AZ, 85297 Expiration Date: 6/26/2023 Thank you for your inquiry. We are pleased to provide you with this quote, which is not an order or offer to sell. Until you issue a purchase order and AVT Technology Solutions LLC ("AVT TS") or Tenva TS Canada ULC ("Tenva"), which are wholly owned subsidiaries of Tech Data Corporation, accepts it, there is no contract for sale. Unless you have an existing agreement with AVT TS or Tenva, this quote is governed by the commercial terms of sale located at https://tdcontent.techdata.com/content/visitor/abouttd/conditions.aspx. This summary section and all attachments are incorporated to form the entire quotation and supersede all prior communications between the parties, regardless of form. Further, AVT TS and Tenva are not responsible for compliance with regulations, requirements or obligations associated with any contract resulting from this quotation. Some Tech Data Vendors require that our customers agree to certain terms before we can sell the Vendors' Products. By submitting a purchase order to Tech Data, you are acknowledging, as an authorized representative of your company, that you have read and agree to be bound and abide by any applicable terms located at https://tdcontent.techdata.com/reseller/secure/ commerce/promos/vendor-pass. aspx Orders may be returned via: R2O referencing "14588581-14602597" or by way of your normal ordering process This quote has been prepared by: Tod Tussey Tod.Tussey@tdsynnex.com +14809363106 Make it Easy for your Client to buy the Solution they need; Give Them a Way to Pay! Contact our Financing Specialists to leverage our variety of Financing Solutions. Call 1-800-307-4588 or email financingteam@techdata.com to discuss options and request an End User proposal for the entire project. Any and all products contained in this quote are non -cancelable and non -returnable ("NCNR"). Customer agrees that by issuing a purchase order against this quote, Customer forfeits its ability to cancel the order or return any of the products. XQ-1910033 XQ-1910033-City of Fayetteville - AR Renewal Jun 2023 - TD Synnex 3yr-City of Fayetteville https://www.techdata.com/channelconnection Page 1 of 11 Tech Dqtaj Oppty ID: OPTY-00726854 Start Date 06/27/2023 End Date 06/26/2026 Quotation Summary: NUTANIX QUOTE Subtotal: Quote Total: AVT Technology Solutions, LLC Quotation #: 125282004-1 410 E Rivulon Blvd. Suite 201 Request #: 14588581-14602597 Gilbert, AZ, 85297 Expiration Date: 6/26/2023 $64,394.70 $64,394.70 $64,394.70 Applicable sales taxes and Environmental Fees(where applicable) are not included.(If Hawaii excise taxes are applicable, rates are as follows, .05% for Wholesale transactions and 4% for Retail transactions) Your quotation details are referenced on the following pages. /www.techdata.com/channelconnection Page 2 of 11 Tech Data AVT Technology Solutions, LLC Quotation #: 125282004-1 P410 E Rivulon Blvd. Suite 201 Request #: 14588581-14602597 Gilbert, AZ, 85297 Expiration Date: 6/26/2023 Quoted For: Jacobs Space Exploration Group 620 Discovery Dr NW Ste 140 Huntsville, AL 35806-2816 NUTANIX End User: CITY OF FAYETTEVILLE 113 W Mountain St FAYETTEVILLE, AR 72701-6069 Currency: USD Line Qty Part Number Service Serial #Description Unit List Ext List Unit Price Ext Price Start Date End Date Product Type No. 1 1 R-SW-AOS- 20SW0001464 SUBSCRIPTI STR-PRD 62 ON RENEWAL, ACROPOLIS (AOS) STARTER SOFTWARE LICENSE & P RODUCTION SOFTWARE SUPPORT SERVICE $197,135.00 $197,135.00 $57,167.94 $57,167.94 6/27/2023 6/26/2026 Software https://www.techdata.com/channelconnection Page 3 of 11 Tech Data AVT Technology Solutions, LLC Quotation #: 125282004-1 P410 E Rivulon Blvd. Suite 201 Request #: 14588581-14602597 Gilbert, AZ, 85297 Expiration Date: 6/26/2023 Line Qty Part Number Service Serial #Description Unit List Ext List Unit Price Ext Price Start Date End Date Product Type No. 2 96 R-L-CORES- STR-PRD LIC-00931671 SUBSCRIPTI ON RENEWAL, ACROPOLIS (AOS) STARTER SOFTWARE LICENSE & P RODUCTION SOFTWARE SUPPORT SERVICE FOR 1 CPU CORE $0.00 $0.00 $0.00 $0.00 6/27/2023 6/26/2026 Software https://www.techdata.com/channelconnection Page 4 of 11 Tech Data AVT Technology Solutions, LLC Quotation #: 125282004-1 P410 E Rivulon Blvd. Suite 201 Request #: 14588581-14602597 Gilbert, AZ, 85297 Expiration Date: 6/26/2023 Line Qty Part Number Service Serial #Description No. 3 11 R-L- LIC-00931672 SUBSCRIPTI FLASHTIB- ON STR-PRD RENEWAL, ACROPOLIS (AOS) STARTER SOFTWARE LICENSE & P RODUCTION SOFTWARE SUPPORT SERVICE FOR 1 TIB OF FLASH 4 2 RS-HW-PRD- 20FM6L26002 24/7 PRODUC MY 2,20FM6L2600TION LEVEL 44 MULTI YEAR HW SUPPORT RENEWAL FOR NUTANIX HCI APPLIANCE Unit List Ext List Unit Price $0.00 $0.00 $0.00 Ext Price Start Date End Date Product Type $0.00 6/27/2023 6/26/2026 Software $4,033.11 $8,066.22 $3,613.38 $7,226.76 6/27/2023 6/26/2026 Services https://www.techdata.com/channelconnection Page 5 of 11 Tech Data AVT Technology Solutions, LLC Quotation #: 125282004-1 P410 E Rivulon Blvd. Suite 201 Request #: 14588581-14602597 Gilbert, AZ, 85297 Expiration Date: 6/26/2023 Line Qty Part Number Service Serial #Description Unit List Ext List No. Subtotal: $205,201.22 Solution Total: $205,201.22 Category Ext List Ext Price Total Services: $8,066.22 $7,226.76 Total Software: $197,135.00 $57,167.94 Total: $205,201.22 $64,394.70 Unit Price Ext Price Start Date $64,394.70 $64,394.70 End Date Product Type https://www.techdata.com/channelconnection Page 6 of 11 Tech Dqtaj Quotation Summary: NUTANIX QUOTE Subtotal: Quote Total: AVT Technology Solutions, LLC Quotation #: 125282004-1 410 E Rivulon Blvd. Suite 201 Request #: 14588581-14602597 Gilbert, AZ, 85297 Expiration Date: 6/26/2023 Customer, by its signature below, places its order to TS for the products and services in this Quote. By (authorized signature) Name (please print) Title Date Purchase Order Number Special Pricing/Promo # Payment Terms Authorization $64,394.70 $64,394.70 $64,394.70 Orders may be returned via: R20 referencing "14588581-14602597" or by way of your normal ordering process /www.techdata.com/channelconnection Page 7 of 11 Tech Dqtaj AVT Technology Solutions, LLC Quotation #: 125282004-1 410 E Rivulon Blvd. Suite 201 Request #: 14588581-14602597 Gilbert, AZ, 85297 Expiration Date: 6/26/2023 The End User and Shipping Information on this page will assist AVT Technology Solutions LLC, and its subsidiaries ("TS" or "Advanced Solutions") in arranging for delivery of your order. The Order Information will let TS know the value add and promotions you believe apply to this order, and the payment program you request. TS' approval of your requested payment program will be communicated in accordance with the procedures that apply to such program. Please complete the information on this page and return it with your order. End User Information Shipping Information Name: Name: Address: Address: — Contact Name: Contact Name: Contact Phone: Contact Phone: Email Address: Email Address: Freight Delivery Method: Special Shipping Comments: Inside Delivery Information Delivery Hours? _AM to _PM Will the customer's dock accomodate a 48 foot trailer? Yes/No Is there a loading dock? Yes/No If no loading dock, is Liftgate Truck required? Yes/No If no loading dock, is Ramp required? Yes/No Is the computer room located on the main floor? Yes/No If not on main floor, what floor?; _ Floor(1 st, 2nd, etc.) If not on main floor, is an elevator available? Yes/No If not on main floor, is a stair climber required? Yes/No /www.techdata.com/channelconnection Page 8 of 11 TechDq�aj AVT Technology Solutions, LLC Quotation #: 125282004-1 410 E Rivulon Blvd. Suite 201 Request #: 14588581-14602597 Gilbert, AZ, 85297 Expiration Date: 6/26/2023 Are special floor coverings required? Is Yes, type of floor? Yes/No https://www.techdata.com/channelconnection Page 9 of 11 TechDq�aj AVT Technology Solutions, LLC Quotation #: 125282004-1 410 E Rivulon Blvd. Suite 201 Request #: 14588581-14602597 Gilbert, AZ, 85297 Expiration Date: 6/26/2023 https://www.techdata.com/channelconnection Page 10 of 11 Tech Data AVT Technology Solutions, LLC Quotation #: 125282004-1 P410 E Rivulon Blvd. Suite 201 Request #: 14588581-14602597 Gilbert, AZ, 85297 Expiration Date: 6/26/2023 AVT's Return Policy -If TS made an error on your order, we will give you an RMA to return it at your request. -Customer convenience returns will be considered on a case by case basis. -When you know you have product to return, ask for the RMA as soon as you can. The quicker we work together on the issue, the more likely we will achieve a successful resolution together. -We request that the product is returned within 14 days in order to mitigate risk for TS and our partners. -When opening packages from TS, please take care to retain packaging in the event that a return becomes necessary. -Please put the RMA number on the shipping label of the outside carton when returning product. We cannot accept returns without an RMA number clearly marked. -TS reserves the right to charge a restocking or handling fee. -TS' workmanship on integrated orders is warranted for one full year from date of shipment. How to Request an RMA: You can request an RMA by emailing your request to the TS Return Support Center at ATS-RSC-TS@techdata.com, or by submitting a request on Channel Connection. https://www.techdata.com/channelconnection Page 11 of 11 Arrow Quote Arrow Quote#:SWS14404762-V2 Reseller: JACOBS TECHNOLOGY INC-10d2402 ISR: Srlkantlan, Suwarna Supplier Opp#: OPT-0728856 Contrac[Start Dale: 214UN-23 Quote Name: NUTANpt_Jawbs Technology I- City d End USerlst: Cary of Fayettevllk -AR ISR Phone: SOPpikr Guote#: XO-1861482 Contract End 13 e: 2WUN-26 Fayettevllle-AR-Renewal Jun 2023 3 yr_XG-1861482 Guote Currency: USD Real— US End User St-/Pnwlnce: Supplkr Comrad No: Billing Frcquenry: Qude Expiration Oate: 264UN-23 Quok Ganaretion Oak: 18-MAY-23 Segmed: End Uear ACC# (EA): R—Her Opportunity Numb..*: N.— t RSW-AOSSTR-PRD Subscription Renewal, Acropolis AOS Starter 20SW00014fi462 a1 O612]/2023 O6/26I2026 1,096 $19],135.00 E19],135.00 E19],135.00 Software License Pmduc Suflware$uppod Service 2 R-L-CORESSTR-PRD Subscription Renewal, Acropolis AOS Starter LIC-00931811 96 06127/2023 062 2026 1,W6 50.00 Woo $0.00 $0.00 Software License Pmdu— Suflwere Support Service for 1 CPU core 3 R-L-FLASHTIB-STR-PRD Subscription Renewal, Acropolis AOS Starter LIC-00931812 11 06127/2023 OB/28I2026 1,W6 50.00 Woo $0.00 $0.00 Software License Pmduc0an Suflwere $upport Service for 1 ME dflash 4 RS-HW-PRD-MY 2MT Production Level Muni Year HW Support 20FM61260022 1 OBl27/2023 OB/28I2026 1,098 $4,033.11 $4,033.11 $4,033.11 9.46% $3,651AI $3,651Al Renewal br Nutank HCI appli- 5 RS-HW-PRD-MY 24!7 Pmductgn Level Multi Yen, HW Support 20FWU00044 1 06127/2023 06/2612026 1,096 $4,033.11 $4.033.11 $4.033.11 9.46% $3,651.41 $3,651.41 Renewal for Nutanu HCl appliance TOtal $205,201.22 E65,012.53 Legal Notification: This is a computer generated document, no signature is required. ARROWS TERMS AND CONDITIONS OF SALE Arrow's Terms and Conditions are located at httos://www.arrow.wm/en/leaal/temsof-use This order is hereby governed by Arrow's Terms and Conditions of Sale unless there is a signed agreement between the parties, in which case the signed agreement shall govern. The Arrow's Terms and Conditions of Sale can be accessed in additional languages: • English: httos://www.arrow.wm/entlegal/temns-and-mnditionsof-sale • Spanish: httos://www.arrow.com/es-mX/leaal/terms-and-,ndlti.n—f-sale • French Canadian: httos://www.arrow.com/fr-fr/leaal/terms-and-Contlitions-o(-sale Amendment No. 3 to the Engineering Services Agreement for Water Transmission Line Layout and Easement Acquisition Date: WHEREAS, the CITY OF FAYETTEVILLE and McClelland Consulting Engineers, Inc. (ENGINEER) entered into an Agreement for Professional Engineering Services (AGREEMENT) on June 5, 2012; and, WHEREAS, the CITY OF FAYETTEVILLE and ENGINEER entered into Amendment No. 1 to the AGREEMENT on July 6, 2021 to perform additional services outside of the scope of the AGREEMENT; and, WHEREAS, the CITY OF FAYETTEVILLE and ENGINEER entered into Amendment No. 2 to the AGREEMENT on September 6, 2022 to perform additional services outside of the scope of the AGREEMENT; and, WHEREAS, the CITY OF FAYETTEVILLE has requested that ENGINEER perform additional services outside of the scope of the AGREEMENT, Amendment No. 1 and Amendment No. 2. NOW THEREFORE, the following modifications will be made to the AGREEMENT to include the additional services requested: MODIFICATIONS: 1. Section 2.2.1 — the additional scope of services is included in the attached Appendix "A-1 ". 2. Section 5.1.1 —the maximum not -to -exceed amount is increased from $1,547,085.00 to $2,993,425.00. Modifications to compensation are included in the attached Appendix "A-1 ". IN WITNESS WHEREOF, the parties execute this Amendment No. 3, to be effective on the date set out above. McClelland Consulting Engineers, Inc Nicholas R. Batker, P.E. Senior Associate City of Fayetteville, Arkansas mm Mayor Lioneld Jordan APPENDIX A-1 — SCOPE OF ADDITIONAL SERVICES AMENDMENT NO. 3 TO THE ENGINEERING SERVICES AGREEMENT FOR THE WEST CORRIDOR WATER TRANSMISSION MAIN 1.0 General The ENGINEER is currently under contract with the CITY OF FAYETTEVILLE to perform preliminary design services for the future 48-inch water transmission main extending from Highway 112 (between Van Asche Drive and Truckers Drive) in Fayetteville to the future Beaver Water District (BWD) pump station located north of the intersection of Highway 612 and Miller Road in Springdale. The total length of this pipeline is approximately 59,700 linear feet, or 11.3 miles. The CITY OF FAYETTEVILLE's goal is to have this pipeline installed and ready to be placed into operation by the first quarter of 2026. In an effort to meet this deadline, the CITY OF FAYETTEVILLE has recently selected a Construction Manager at -Risk (CMAR) to perform preconstruction services, potential early materials procurement and/or work packages, and overall construction management services. In addition, the CITY OF FAYETTEVILLE recently accepted an $85 million loan for this project from the Drinking Water State Revolving Loan Fund (DWSRF), administered by the Arkansas Department of Agriculture, Natural Resource Division (ANRD). The loan must be closed including first disbursement of funds on or before July 1, 2024 in order to obtain the 1.75% interest rate offered. In order to continue assisting the CITY OF FAYETTEVILLE with this project, the following scope of additional services covers the effort required by the ENGINEER to complete the final design phase for the water transmission main in order to meet the loan closing deadline and overall project schedule. ENGINEER's services in this Amendment No. 3 shall meet the DWSRF program requirements. 1% 2.0 Scope of Additlanal t es 2.1 Project Management and Coordination The ENGINEER will continue to provide project management and coordination services to the CITY OF FAYETTEVILLE in this Amendment No. 3. The following services are included in this task: • Conduct progress meetings with the CITY OF FAYETTEVILLE and CMAR. At this time, it is assumed that progress meetings will be held biweekly; however, the ENGINEER is available to meet more frequently if required. A total of twenty-four (24) progress meetings have been assumed for this scope. • Attend up to three (3) Fayetteville Water & Sewer Committee meetings. • Attend up to twelve (12) meetings with other stakeholders such as BWD, Springdale Water Utilities, Arkansas Department of Transportation (ARDOT), Washington County, Benton County and the cities of Tontitown, Springdale and Elm Springs. • Attend up to fifteen (15) meetings with property owners to assist in negotiating and finalizing easements required for the project. Appendix A-1 — Scope of Additional Services — West Corridor Water Transmission Main — Amendment No. 3 Page 1 of 7 9/7/2023 • Coordinate with ANRD on meeting DWSRF program requirements. This shall include items such as Memorandum of Agreement preparation assistance, period progress updates, etc. • Prepare and submit invoices with monthly progress summaries. Up to twelve (12) summaries are assumed. 2.2 Additional Surveying Services As part of the Amendment No. 2 scope of work, the ENGINEER performed additional topographic surveys to cover changes in alignment and/or grades that occurred since the original project corridor topographic surveys were completed in 2013-2014. Under this Amendment No. 3, the ENGINEER will perform necessary surveys to complete the final design of the project and final easement acquisitions. Services shall include: • Additional mapping of surface features identified by the ENGINEER and/or CMAR that are required to finalize the design drawings. • Field ties to potholed utilities identified by the ENGINEER and/or CMAR. • Staking of proposed permanent and/or temporary easements requested by the property owner. Project control points used to complete additional surveys will be shown for future use during construction. The ENGINEER will contact Arkansas 811 and wait the allotted 48 hours prior to beginning the survey to allow time to have utilities field located. The ENGINEER will coordinate with CMAR on field locating utilities not marked by Arkansas 811 to minimize conflicts during construction. 2.3 Environmental Services An Environmental Information Document (EID) will need to be prepared to satisfy DWSRF requirements for the loan. Additional required items in conjunction with the EID will include a cultural resources survey and may also include a Threatened & Endangered (T&E) Species evaluation. The ENGINEER will subcontract EID services and the T&E Species evaluation (if determined to be required by ANRD) to FTN Associates Ltd. The ENGINEER will subcontract the cultural resources survey to Flat Earth Archeology, LLC. Following is a detailed scope of work for these items. 2.3.1 Environmental Information Document This task will include the following: • Assemble the documentation necessary for and completing the ANRD Environmental Checklist & Information Document. This checklist/document includes a variety of environmental topics, each of which will be answered/discussed specific to the project. • Coordinate with various agencies (e.g., US Fish & Wildlife Service, Arkansas Historic Preservation Program, etc.) to comply with EID requirements. • Complete one (1) public meeting in accordance with EID requirements. • Coordinate with ANRD regarding EID requirements specific to the project and submittal. Address comments as necessary from ANRD and agencies to obtain concurrence on the EID. Appendix A-1 — Scope of Additional Services — West Corridor Water Transmission Main — Amendment No. 3 Page 2 of 7 9/7/2023 2.3.2 Cultural Resources Survey This task will include the following: Conduct a Phase I archeological survey covering the entire length of the project within the limits of permanent and temporary easements. A pedestrian survey will be performed utilizing shovel test excavations in 20- meter intervals along transect(s) within the project limits to identify and assess the status of any cultural deposits or features inside the project limits. Prepare the cultural resources report based on the background research as well as the field work. The report will include information on any archeological sites identified and recommendation for the proposed project to be in compliance with federal and state regulations regarding cultural resources. The exact locations of any significant prehistoric or historic archeological sites found will be supplied to the OWNER for planning purposes only, with the stipulation that their locations will not be part of any document released to the public. • All work will conform to the standards set for the State of Arkansas which are described in A State Plan for the Conservation of Archeological Resources in Arkansas (Davis, ed. 1982, amended 2010) and the standards set by the U.S. Secretary of Interior's Standards and Guidelines for Archeological and Historic Preservation. Submit the cultural resources report to ANRD, Arkansas Historic Preservation Program, and other agencies/tribes if required for review. Respond to comments and/or questions if required to obtain concurrence on the report. • Phase II (significance testing, deep trenching, removal of cultural features, etc.) and Phase III (site mitigation) are not included in this scope of work. 2.3.3 T&E Species Evaluation If required as part of the agency coordination process of the EID, conduct a T&E species evaluation and submit to ANRD and relevant agencies for review. Address comments as necessary to obtain concurrence on the evaluation. 2.4 Additional Geotechnical Investigations As part of the Amendment No. 2 scope of work, the ENGINEER performed a detailed geotechnical investigation along the project alignment which included up to 81 borings, laboratory testing and analysis and preparation of a geotechnical report. Under this Amendment No. 3, the ENGINEER will perform additional geotechnical borings, laboratory analysis and reporting for up to 15 additional boring locations. Additional investigations may be required at trenchless crossings, major stream crossings and other areas of concern that may be identified by the ENGINEER OR CMAR. The methods of exploration, field services, laboratory analysis and reporting shall be as outlined in Amendment No. 2. Appendix A-1 — Scope of Additional Services — West Corridor Water Transmission Main — Amendment No. 3 Page 3 of 7 9/7/2023 2.5 Final Design The ENGINEER will perform final design phase services as part of this Amendment No. 3 and will utilize the following subconsultants to assist in completing scope items in this task: • Carollo Engineers — development of special details and technical specifications for steel pipe and large diameter valves; and quality control/quality assurance review of plans, specifications, surge analysis and CMAR guaranteed maximum price (GMP) • Coffman Engineers — development of plans, details and technical specifications associated with the impressed current cathodic protection system; and preparation of the final corrosion report • Brown Engineers — development of plans, details and technical specifications for electrical service required for the two (2) proposed cathodic protection rectifier fields • Bennett Trenchless Engineers — development of plans, details and technical specifications for trenchless installations required on the project • Black & Veatch — update the hydraulic surge analysis (previously completed for BWD) of the proposed water transmission main system and associated final report 141111: In accordance with DWSRF requirements, selection of iron and steel products to be used in this project shall be in compliance with the American Iron & Steel (AIS) provisions as outlined on EPA's website: https://www.epa.gov/cwsrf/state-revolving- fund-american-iron-and-steel-ais-requirement. Following is a detailed breakdown of services to be provided during the final design phase. 2.5.1 30% Design Review Workshop • Conduct workshop with CITY OF FAYETTEVILLE and CMAR to review 30% design submittal 2.5.2 60% Design 1% The following items are included in the 60% Design Phase: • 60% Plans o Cover and general sheets o Plan & profile sheets o Trenchless installation plan & profile sheets o Creek crossing details o Existing utility protection details o Standard project details o Cathodic protection plans and details o Electrical site plans, one -line diagrams and details • 60% Technical Specifications o Preliminary technical specifications with emphasis on spiral welded steel pipe and large diameter valves Appendix A-1 — Scope of Additional Services — West Corridor Water Transmission Main — Amendment No. 3 Page 4 of 7 9/7/2023 • Surge Analysis and Report o Hydraulic surge analysis utilizing information obtained from the BWD pump station surge analysis o Brief summary report on findings o Recommended minimum pipe thickness for design purposes • Final Corrosion Report • Technical Memorandum on Additional Design Considerations o Connections to valves and other appurtenances o Coatings for fittings and other appurtenances o Sampling ports o Internal and external access considerations • 60% Design Review Workshop o Conduct workshop with CITY OF FAYETTEVILLE and CMAR to review 60% design submittal o Address comments from workshop o Review and comment on CMAR's 60% GMP • ADH Submittal/Coordination o Address comments from ADH on 30% design submittal o Submit 60% design package for review o Address comments from ADH on 60% design submittal o Obtain ADH conditional approval on potential Early Work Packages (steel pipe, large diameter valves, trenchless installations) 2.5.3 90% Design The following items are included in the 90% Design Phase: • 90% Plans o Same as 60% plans, except to a final review level • 90% Technical Specifications o Final review level technical specifications • Roadway/Highway Crossing Permits o ARDOT crossings o City roadway crossings o County roadway crossings • 90% Design Review Workshop o Conduct workshop with CITY OF FAYETTEVILLE and CMAR to review 90% design submittal o Address comments from workshop o Review and comment on CMAR's 90% GMP • ADH Submittal/Coordination o Submit 90% design package for review o Address comments from ADH on 90% design submittal o Obtain ADH approval on overall project Appendix A-1 — Scope of Additional Services — West Corridor Water Transmission Main — Amendment No. 3 Page 5 of 7 9/7/2023 2.5.4 100% Design The following items are included in the 100% Design Phase: • 100% Plans o Final signed and sealed plans for CMAR use in bidding/construction of work packages • 100% Technical Specifications o Final signed and sealed specifications for CMAR use in bidding/construction of work packages 2.5.5 Early Work Packages It is anticipated that the CMAR will issue Early Work Packages in order to meet the project schedule. Early Work Packages may include pipe procurement, valve procurement, clearing and grubbing, and trenchless installations. As such, the ENGINEER shall provide the following services in this task: • Compilation of contract documents and submittal to ANRD for concurrence. Note that ANRD standard contract forms for construction must be used. All other contract documents shall be subject to approval by the CITY OF FAYETTEVILLE and ANRD. CMAR shall be responsible for preparing bid schedules for the Early Work Packages. • Assist CMAR during the bidding phase of Early Work Packages: o Respond to bidder's questions and requests for information (RFIs) o Assist CMAR with the preparation of addenda o Attend bid openings o Review bid tabulations. CMAR shall be responsible for preparing bid tabulations. o Provide assistance to CITY OF FAYETTEVILLE on recommendation of ward on Early Bid Packages. Alllllln.. 3.0 Project Deliverables 3.1 Environmental Reports — PDF and one (1) hard copy of each: 3.1.1 Draft EID 3.1.2 Final EID pjk 3.1.3 Cultural Resources Survey Report 3.1.4 T&E Species Evaluation Report 3.2 Supplemental Geotechnical Report — PDF and (1) hard copy. 3.3 60% Design Submittal — PDF and one (1) hard copy of each: 3.3.1 60% Plans (11x17 hard copy) 3.3.2 60% Technical Specifications 3.3.3 Surge Analysis Report 3.3.4 Final Corrosion Report 3.3.5 TM on Additional Design Considerations Appendix A-1 — Scope of Additional Services — West Corridor Water Transmission Main — Amendment No. 3 Page 6 of 7 9/7/2023 3.4 90% Design Submittal — PDF and one (1) hard copy of each: 3.4.1 90% Plans (22x34 hard copy) 3.4.2 90% Technical Specifications 3.4.3 Roadway and Highway Crossing Permits 3.5 100% Design Submittal — PDF and one (1) hard copy of each: 3.5.1 100% Sealed Plans 3.5.2 100% Sealed Technical Specifications 3.6 Other electronic files as requested by the CITY OF FAYETTEVILLE. 4.0 Compensation In consideration of the performance of the foregoing services by the ENGINEER, the CITY OF FAYETTEVILLE will by to the ENGINEER compensation as follows: 4.1 Compensation will be paid to the ENGINEER on the basis of ENGINEER's standard hourly rates in effect at the time the work is performed, plus reimbursable expenses. A task hour fee breakdown is provided as Appendix A-2. ENGINEER's current rate schedule is attached hereto as Appendix A-3. 4.2 The maximum not -to -exceed for Amendment No. 3 will be $1,446,340.00. 4.3 The maximum not -to -exceed total contract amount is increased from $1,547,085.000 to $2,993,425.00 5.0 Project Schedule -N i\^ Mk The ENGINEER will begin work under Amendment No. 3 immediately upon receipt of a Notice to Proceed (NTP). The overall anticipated project schedule is provided in Exhibit A. 6.0 Additional Future Services "qq%7 Isk Additional future services will include, but not be limited to the following: Bid Phase Services for Primary Work Package(s); and Construction Phase Services. The scope for these future additional services will be defined by the ENGINEER and CITY OF FAYETTEVILLE prior to completion of the services under this Amendment No. 3, and will be authorized under future amendment(s) to this Agreement. Appendix A-1 — Scope of Additional Services — West Corridor Water Transmission Main — Amendment No. 3 Page 7 of 7 9/7/2023 APPENDIX A-2 City of Fayetteville - West Corridor Water Transmission Main McCLELLAND Amendment No. 3 - Preliminary Design - DRAFT Personnel Hour Fee Estimate MEFCONSULTING 9/7/2023 argrmawnw ENGINEERS, INC. Task Description Sr. Project Project Manager Manager Structural Engineer Project Engineer/ Designer CAD/GIs Technician Reg. Land Surveyor Survey Technician Field Survey Crew Lab Tech I Lab Tech II Geotech Engineer Extended Cost Task 2.1 - Project Management and Coordination Biweekly Progress Meetings 24 total assumed 48.00 48.00 1 48.00 1 1 1 1 1 1 1 $27,840.00 Water & Sewer Committee Meetings 3 total assumed 12.00 12.00 $5 280.00 Other Stakeholder Meetings 12 total assumed 24.00 24.00 6.00 $11,400.00 Property Owner Coordination/Meetings 15 assumed ;;4.00 60.00 30.00 $15 600.00 Coorindation with ANRD on DWSRF Program Requirements 32.00 4.00 1 $7,640.00 Monthly Progress Reports 12 total assumed 12.00 24.00 12.00 9 240.00 Subtotal Labor Hours / Fee - Task 2.11 100.00 1 200.00 1 0.00 1 100.00 0.00 1 0.00 0.00 0.00 1 0.00 0.00 0.00 1 $77,000.00 Estimated Reimbursable Expenses/Subconsultants Mileage $1,000.00 Subtotal Reimbursable Expenses - Task 2.1 $1,000.00 Total Task 2.1 - Project Management and Coordination 1 100.00 200.00 1 0.00 1 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $78,000.00 Task 2.2 - Additional Surveying Services Additional Mapping of Surface Features 30.00 $4,950.00 Field Ties to Potholed Utilities 40.00 $6 600.00 Easement Staking 30.00 $4,950.00 Drafting 5.00 20.00 $2 300.00 QA/QC 5.00 $700.00 Subtotal Labor Hours / Fee - Task 2.21 0.00 1 0.00 1 0.00 1 0.00 1 0.00 1 10.00 1 20.00 1 100.00 1 0.00 1 0.00 1 0.00 1 $19,500.00 Estimated Reimbursable Expenses/Subconsultants Mileage $500.00 Utility Locates Arku s $500.00 Subtotal Reimbursable Expenses -Task 2.21 $1,000.00 Total Task 2.2 - Additional Survey Servicesl 0.00 1 0.00 1 0.00 1 0.00 1 0.00 1 10.00 1 20.00 1 100.00 1 0.00 1 0.00 1 0.00 1 $20,500.00 Task 2.3 - Environmental Services Subconsultant Coordination 1 4.00 1 16.00 1 1 1 1 1 1 1 1 1 $4,040.00 Provide EID Info to Subconsultant 2.00 4.00 24.00 $4 620.00 Review EID and Coordinate with ANRD 4.00 8.00 8.00 $3,640.00 A enc Coordination 6.00 24.00 16.00 $8 300.00 Review Cultural Resources Survey Report 4.00 8.00 1 1 12.00 1 1 1 1 $4 200.00 Subtotal Labor Hours / Fee - Task 2.31 20.00 1 60.00 1 0.00 1 60.00 1 0.00 1 0.00 1 0.00 1 0.00 1 0.00 1 0.00 1 0.00 $24,800.00 Estimated Reimbursable Expenses/Subconsultants Subconsulant - FTN Associates Ltd. Environmental Information Document $10,000.00 Subconsulant - FTN Associates Ltd. T&E Species Survey) - only if required and authorized by City of Fayetteville $30,000.00 Subconsulant - Flat Earth Archeology, LLC Cultural Resources Survey) $30,000.00 Subtotal Reimbursable Expenses - Task 2.3 $70,000.00 Total Task 2.3 - Environmental Servicesl 20.00 1 60.00 1 0.00 1 60.00 1 0.00 1 0.00 0.00 0.00 0.00 0.00 0.00 1 $94,800.00 Task 2.4 - Additional Geotechnical Investigations Geotech Exploration & Field Services 40.00 $4 000.00 Lab Testing & Analysis see below $0.00 Geotech Reporting & Coordination 20.00 1 10.00 4 800.00 Subtotal Labor Hours / Fee - Task 2.41 0.00 1 0.00 1 0.00 1 0.00 1 0.00 1 0.00 1 0.00 1 0.00 1 40.00 1 20.00 1 10.00 1 $8,800.00 Estimated Reimbursable Expenses/Subconsultants Equipment Mobilization/Demobilization assume 2 truck rig mob/demob 0 $300/EA; 2 track rig mob/demob Q $600/EA $1,800.00 Boring Setup 15 bores @ $40/EA $600.00 SPT Auger Drilling assumed 300 LF a $13/LF $3,900.00 Water -Based Rock Coring Diamond Bit assumed 75 LF @ $40/LF $3,000.00 In -House Laboratory Testing Moisture Content, Atterberg Limits, Gradation, Comp. Strength of Rock Cores $1,500.00 Third Party Laboratory Testing Soil Resistivity, H, Sulfates, Chlorides, Sulfides, Redox Potential $2,500.00 Pavement Patching assumed 4 patches a $35/EA $140.00 Diamond Rock Bits assumed 2 bits P $650/EA $1,300.00 Subtotal Reimbursable Expenses - Task 2.4 $14,740.00 Total Task 2.4 - Geotechnical Investigations 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 40.00 20.00 10.00 $23,540.00 Task 2.5 - Final Design 30 % Design Review/Kickoff Workshop with City and CMAR 10.00 10.00 10.00 $5 800.00 60% Design 60% Plans 100.00 240.00 60.00 340.00 600.00 $195 000.00 60% Technical Specifications 20.00 120.00 20.00 200.00 $59,400.00 Surge Analysis and Report Review and Coordination with Sub 10.00 40.00 40.00 $15,700.00 Final Corrosion Report Review and Coordination with Sub 10.00 20.00 20.00 $9,100.00 TM on Additional Design Considerations 10.00 20.00 40.00 $11,900.00 60% Design Review Workshop incl. address comments 20.00 20.00 40.00 40.00 1 $18,800.00 ADHSubmittal/Coordination 20.00 40.00 100.00 60.00 $33200.00 QA/QC 40.00 80.00 10.00 80.00 120.00 $51,400.00 90 % Design 90% Plans 80.00 160.00 20.00 240.00 400.00 $131,600.00 90 % Technical Specifications 20.00 80.00 5.00 160.00 $43 500.00 Roadway/Highway Crossing Permits 10.00 40.00 120.00 $26,900.00 90 % Design Review Workshop incl. address comments 20.00 20.00 40.00 $14,400.00 ADH Submittal/Coordination 20.00 40.00 100.00 60.00 1 $33,200.00 QA/QC 40.00 60.00 10.00 80.00 120.00 $47 600.00 100% Design 100% Plans 10.00 40.00 10.00 100.00 200.00 $47,900.00 100% Technical Specifications 10.00 40.00 5.00 80.00 $22,200.00 QA/QC 10.00 20.00 10.00 40.00 40.00 $18100.00 Earl Work Packages Compile Contract Documents and Obtain ANRD Concurrence 10.00 30.00 30.00 $12,400.00 Bid Phase Assistance u to 4 EW Ps 50 000 100.00 1 10.00 100.00 60.00 $53 900.00 Subtotal Labor Hours / Fee - Task 2.51 520.00 1 1220.00 1 160.00 1 1960.00 1 1700.00 1 0.00 1 0.00 1 0.00 1 0.00 1 0.00 1 0.00 $852,000.00 Estimated Reimbursable Expenses/Subconsultants Mileage $1,000.00 Subconsultant- Coffman Engineers Corrosion Protection Design) $38,500.00 Subconsultant - Brown Engineers Electrical $15,000.00 Subconsultant- BennettTrenchlessEngineers TrenchlessDesign) $100,000.00 Subconsultant- Black & Veatch (Surge Anal is $20,000.00 Subconsultant- Carollo Technical Advisor/QAQC on TMs $203,000.00 Subtotal Reimbursable Expenses - Task 2.5 $377,500.00 Total Task 2.5 - Final DesignJ 520.00 1220.00 160.00 1960.00 1700.00 0.00 0.00 0.00 0.00 1 0.00 1 0.00 $1,229,500.00 GRAND TOTAL AMENDMENT NO. 21 640.00 1480.00 160.00 2120.00 1700.00 10.00 20.00 100.00 40.00 1 20.00 1 10.00 $1,446,340.00 Page 1 of 1 APPENDIX A-3 D NSULTINGIMEE, r.ENGINEERS, INC. 8/7/2023 McCLELLAND CONSULTING ENGINEERS, INC. *STANDARD HOURLY RATES Chief Draftsman $110 - $120 Clerical $45 - $85 Construction Observer $75 - $165 Draftsman $70 - $120 Environmental Scientist/Designer $125 - $145 Geotech Engineer $125 - $200 GIS Technician $80 - $140 HR/Payroll Admin $75-$115 Landscape Architect $95 - $200 Media Specialist $85 - $120 Principal $185 - $275 Project Accountant $70 - $155 Project Designer - Intern $50 - $80 Project Designer $80 - $165 Project Engineer $120 - $175 Project Manager $130 - $210 Registered Land Surveyor $100 - $175 Soils Lab Technician $50 - $140 Specification Writer $50 - $100 Sr. Project Manager $160 - $250 Structural Engineer $140 - $180 Survey (2 man or Robotic) Crew $115 - $165 Survey (3 man) Crew $150 - $200 Survey Field (1 Man or Rodman) $45 - $120 Survey GPS $75 - $135 Survey Technician $65 - $110 Expenses @ Cost Mileage .705/mi * Standard Hourly Rates may be adjusted annually in accordance with the normal salary review practices of McClelland Consulting Engineers. City of Fayetteville - West Corridor Water Transmission Main Amendment No. 3 - Preliminary Design Preliminary Schedule - 9/ 1 /2023 MCCLELLAND CEC TI NG ENGINEERS, INC. Project Phase Easment Acquisition (Current Contract) 60% Design ' 1' • Design