HomeMy WebLinkAbout2023-08-31 - Agendas - FinalCITY OF
FAYETTEVILLE
ARKANSAS
Subdivision Committee Meeting
August 3111, 2023
9:00 AM
113 W. Mountain, Room 326
Members: Jimm Garlock (Chair), Sarah Sparkman, Fred Gulley
City Staff: Jessie Masters, Development Review Manager
Call to Order
Consent:
None.
Old Business:
None.
MEETING AGENDA
New Business:
1. LSD-2023-0009: Large Scale Development (N. BOB YOUNKIN DR. & W. DRAKE
ST/MIDTOWN LANDING, 251): Submitted by COMMUNITY BY DESIGN for property located at
N. BOB YOUNKIN DR. & W. DRAKE ST. The property is zoned RMF-24, RESIDENTIAL MULTI-
FAMILY, 24 UNITS PER ACRE and contains approximately 3.59 acres. The request is for 64
residential units. Planner: Donna Wonsower
2. LSD-2023-0015: Large Scale Development (1175 E. PUMP STATION RD./GIVINGTON,
642): Submitted by JORGENSEN & ASSOCIATES for property located at 1175 E. PUMP
STATION RD. The property is zoned 1-2, GENERAL INDUSTRIAL and contains approximately
6.71 acres. The request is for a 60,000-square-foot office and warehouse structure with
associated parking. Planner: Jessie Masters
Announcements
None.
Adjourn
NOTICE TO MEMBERS OF THE AUDIENCE
All interested parties may appear and be heard at the public hearings. If you wish to address the Planning
Commission on an agenda item please queue behind the podium when the Chair asks for public comment.
Once the Chair recognizes you, go to the podium and give your name and address. Address your comments
to the Chair, who is the presiding officer. The Chair will direct your comments to the appropriate appointed
official, staff, or others for response. Please keep your comments brief, to the point, and relevant to the
agenda item being considered so that everyone has a chance to speak.
Mailing Address:
113 W. Mountain Street www.fayetteville-ar.gov
Fayetteville, AR 72701
Interpreters or TDD, Telecommunication Device for the Deaf, are available for all public hearings; 72 hour
notice is required. For further information or to request an interpreter, please call 575-8330.
As a courtesy please turn off all cell phones and pagers.
A copy of the Planning Commission agenda and other pertinent data are open and available for inspection
in the office of City Planning (575-8267), 125 West Mountain Street, Fayetteville, Arkansas. All interested
parties are invited to review the petitions.
W_qT
TO:
THRU
FROM
CITY OF
FAYETTEVILLE
ARKANSAS
Subdivision Committee
SUBDIVISION COMMITTEE MEMO
Jessie Masters, Development Review Manager
Donna Wonsower, Planner
Josh Boccaccio, Engineering Development Review Manager
Melissa Evans, Urban Forester
MEETING: August 31, 2023
SUBJECT: LSD-2023-0009: Large Scale Development (N. BOB YOUNKIN DR. & W.
DRAKE ST/MIDTOWN LANDING, 251): Submitted by COMMUNITY BY DESIGN
for property located on N. BOB YOUNKIN DR. & W. DRAKE ST. The property is
zoned RMF-4, RESIDENTIAL MULTI -FAMILY — 24 UNITS PER ACRE and
contains approximately 3.59 acres. The request is for 64 residential units.
RECOMMENDATION:
Staff recommends approval of LSD-2023-0009 with conditions.
RECOMMENDED MOTION:
`7 move to approve LSD-2023-0009, recommending:
• In favor of requested variance to §166.11(A), Conformance to Plans and Regulations,
• In favor of requested variance to §166.23(D)(2)(a)(1), Urban Residential Design
Standards,
• In favor of recommended right-of-way dedication,
• In favor of recommended street improvements, and
• In favor of all other conditions as recommended by staff."
BACKGROUND:
The subject property is in north Fayetteville and contains approximately 3.59 acres in the Appleby
Landing Subdivision. The property is currently undeveloped, though it is surrounded by
established single- and two-family neighborhoods to the east and west, a multi -family
development to the south, and medical offices to the north. No environmentally sensitive areas
are present on site and the property is not located within any zoning overlays. The property was
successfully rezoned from R-O, Residential Offices to RMF-24, Residential Multi -Family, 24 units
per Acre in early 2023. Surrounding land uses and zoning are depicted in Table 1.
Table 1:
Surro nding Land Uses and Zoning
Direction
Land Use
Zoning
North
Medical Offices
R-O, Residential Office
South
Multi -family Residential
RMF-24, Residential Multi -Family, 24 Units per Acre
East
Single-family Residential
RMF-24, Residential Multi -Family, 24 Units per Acre
West
Undeveloped (Future Phase of
Midtown Landing)
CS, Community Services
Mailing Address:
113 W. Mountain Street www.fayA40M'�iof.�BTmittee
Fayetteville, AR 72701 Augu 31, 2023
Agenda Item 1
LSD-2023-0009 (MIDTOWN LANDING)
Page 1 of 32
Proposal: The applicant requests large scale development approval to develop the subject
property with thirty-two residential structures totaling sixty-four dwelling units. Two variances have
been requested with the proposal.
Variance #1: UDC §166.11(A), Conformance to Plans and Regulations. All projects shall
conform to the official plans and regulations that make up the City's Master Street Plan.
N. Bob Younkin Dr. is a partially improved residential link street, which typically includes one
seven -foot parking lane, one nine -foot drive lane and one ten -foot parking lane. The existing width
of the street is 36 feet, which is nine feet wider than the typical residential link section. The
applicant proposes to stripe the asphalt with two seven -foot parking lanes and two approximately
10-foot drive lanes.
a. Staff recommendation: Staff recommends approval of the applicant's request. No
hardship is provided in the applicant's letter; however, staff agrees with the
applicant's assertion that on -street parking on both sides of the street may act as
a traffic calming measure, potentially reducing speeds and improving overall
safety. Particularly given the location of the Razorback Greenway within Gordon
Long Park approximately 0.25 miles to the west, staff finds the addition of on -street
parking and potential for reduced speeds could be a public benefit.
Variance #2 §166.23(D)(2)(a)(i): Urban Residential Design Standards. In order to provide a
variety in form and design, one (1) building type may not be utilized more than three (3)
times in a development. Each building type shall be differentiated by variations in
materials, colors and roof forms. The proposal includes four floor plans utilized more than three
times within the development. A four -family floor plan is proposed four times with variation in
siding materials and no variation in roof form. A second four -family floor plan is proposed three
times. A two-family floor plan is proposed a total of eight times with variation in siding materials
and no variation in roof form. Single-family structures are not subject to the Urban Residential
Design Standards and are therefore not subject to this request. The applicant does not describe
a hardship in their request letter.
b. Staff recommendation: Staff recommends approval of the variance with added
conditions. Thirty-two structures are proposed. Five dwelling plans are proposed
throughout this development, including two single-family dwellings, which are not
subject to this request, as well as two four -family dwellings and one two-family
dwelling which are subject to this variance. No hardship has been provided for why
the applicant is unable to meet the letter of the ordinance. A list of color variations
has been provided to staff, and the applicant intends to provide a color exhibit
showing each color for staff review prior to Planning Commission. Compliance with
variation based on color will be checked with building submittal. If approved, staff
recommends that additional variation such as altering the roof line of the covered
porches, providing variation in window and door selections, using multiple designs
for porch railings, or other variations as approved by the Zoning and Development
Administrator shall be required on all units adjacent to public right-of-way.
Right -of -Way to be Dedicated: The subject property will have frontage along W. Drake St. to the
south, W. Bishop Dr. to the north, and N. Bob Younkin Dr. to the west. N. Bob Younkin Dr. and
W. Bishop Dr. are both existing improved Residential Links. The applicant proposes to dedicate
27.48 feet of right-of-way from the centerline along W. Bishop Dr. to include the addition of a 6-
foot proposed green space and 6-foot sidewalk. No additional right-of-way dedication is proposed
for W. Drake St. as existing right-of-way exceeds the requirement for a Neighborhood Link Street.
Subdivision Committee
August 31, 2023
Agenda Item 1
LSD-2023-0009 (MIDTOWN LANDING)
Page 2 of 32
In March 2023, the applicant vacated a total of 18 feet of right-of-way for Bob-Younkin, reducing
the total right-of-way from 70 feet to 52 feet to be in -line with the typical requirements for a
Residential Link street. Staff has requested that right-of-way be re -dedicated so that the proposed
six-foot public sidewalk is fully within right-of-way. The applicant currently proposes to dedicate
30.34 feet of right-of-way from the centerline along N. Bob Younkin Dr. Staff has requested and
that the applicant verify the proposed right-of-way dedication amounts for N. Younkin Dr. and W.
Bishop Dr. given the higher than usual precision of the dedication.
Additionally, the applicant proposes to vacate approximately 150 feet of right of way outside of
public sidewalks at the southeast corner of the N. Bob Younkin Dr. and W. Bishop Dr. intersection.
Street Improvements: Six -foot -wide greenspace and sidewalks will be installed along N. Bob
Younkin Dr. and W. Bishop Dr. with a proposed narrowing of the street intersection. Staff has
requested the applicant re -align the proposed greenspace along N. Bob Younkin Dr. to provide a
consistent 6-foot green space as it is currently a variable 6.2 foot to 6 foot. An existing 6-foot
sidewalk is installed along W. Drake Street, and staff recommends that any damaged portions of
this sidewalk shall be repaired as part of this development. Staff has requested clarification on
proposed streetlight locations as the existing street streetlights do not meet the requirements for
placement at all street intersections and at intervals of no more than 300 feet. A variance has
been requested to street improvements for N. Bob Younkin Dr.
Access Management/Connectivity: Staff has determined that the proposed development is
compliant with the City's access management and connectivity standards. Access to the site is
proposed multiple driveways onto N. Bob Younkin Dr. which are at least 50 feet apart.
Design Standards: This project is subject to the design standards outlined in UDC §166.23, Urban
Residential Design Standards. In reviewing the provided site plan and elevations, staff has
determined that this development is compliant with these site design standards. A variance has
been requested for architectural design standards. Staff is unable to determine at this time if the
development meets §172.04, Parking Lot Design Standards as several motorcycle/scooter
spaces and bicycle parking racks are indicated on the plans but are not drafted on the plans.
Because of this, staff is unable to review these portions of the requirements for compliance with
dimensional and other code requirements.
Water and Sewer System: There are existing 8" sewer and water mains along N. Bob Younkin
Dr. which the applicant is proposing to use for sanitary sewer service, domestic water and fire
protection.
Parkland dedication or fee in -lieu: The Parks and Recreation Advisory Board (PRAB) reviewed
this proposal at a meeting held on July 3, 2023. The Parks and Recreation Advisory Board
recommended fee -in -lieu of parkland dedication in the amount of $60,928 for 64 residential units.
Park fees are due prior to building permit issuance.
Tree Preservation:
Canopy minimum requirement: 20.0%
Existing Canopy: 52.5%
Preserved canopy: 1.1 %
Mitigation required: 63 two-inch caliper trees?
Subdivision Committee
August 31, 2023
Agenda Item 1
LSD-2023-0009 (MIDTOWN LANDING)
Page 3 of 32
An existing 20-foot tree preservation easement is located along the eastern property line. Forestry
has concerns regarding the proximity of several structures within 1 foot of the edge of the existing
tree preservation easement. An agreement letter has been provided to the city clarifying additional
protective measures to be taken to ensure the existing tree preservation easement is not
impacted. Additionally, urban forestry has questions remaining regarding the tree preservation
calculations (see attached memo).
Public Comment: Staff received two inquiries from members of the public who wanted additional
information about the project.
RECOMMENDATION: Staff recommends approval of LSD-2023-0009 with the following
conditions:
Conditions of Approval:
1. Subdivision Committee recommendation of variance to UDC §166.11(A),
Conformance to Plans and Regulations. Staff recommends approval of the requested
variance with no added conditions.
2. Subdivision Committee recommendation of variance to §166.23(D)(2)(a)(i): Urban
Residential Design Standards. Staff recommends approval of the requested variance
with the following conditions:
a. Additional variation in window and door selections, using multiple designs for porch
railings, or other variations as approved by the Zoning and Development
Administrator shall be required on all units adjacent to public right-of-way.
3. Subdivision Committee recommendation of right-of-way dedication. Staff
recommends right-of-way dedication in the following amounts:
a. Right-of-way at back of sidewalk along N. Bob Younkin Dr.
b. Right-of-way at back of sidewalk along W. Bishop Dr.
c. No additional right-of-way along W. Drake St.
4. Subdivision Committee recommendation of street improvements. Staff recommends
street improvements as described below:
a. 6-foot sidewalk and greenspace along N. Bob Younkin Dr, with the street to be
restriped to include two parking lanes and two drive lanes
b. 6-foot sidewalk and greenspace along W. Bishop Dr., with the street to be restriped
to include one on -street parking lane
c. Replace any damaged existing sidewalk along W. Drake St.
d. Narrowing of street at intersection of N. Bob Younkin Dr. and W. Bishop Dr. with
street radii to be approved by engineering
e. Streetlights to meet ordinance distance and spacing requirements.
5. A property line adjustment or a concurrent plat must be approved prior to the issuance of
a grading permits to ensure that no structures are built along the current property lines of
lots 7, 8, and 9 of Appleby Landing.
6. Any proposed easement or right-of-way vacations must be approved prior to the issuance
of a grading permit to ensure that no structures are built within prohibited areas.
Subdivision Committee
August 31, 2023
Agenda Item 1
LSD-2023-0009 (MIDTOWN LANDING)
Page 4 of 32
7. Remaining comments from Planning shall be addressed, including:
a. Add motorcycle / scooter parking per the requirements of Chapter 172.05(A)(6).
b. Add bike racks per the requirements of Chapter 172.10(C).
c. Ensure streetlights meet 300-foot maximum distance requirements.
d. Clearly show and label all public and private easements. No portion of a building
may be located within a public easement.
e. Add note that any currently damaged sidewalk along W. Drake St. must be
repaired during development.
f. Update build -to -zone to reflect right-of-way dedication.
g. Label all streets with their master street plan classification.
h. Fill in missing line types and hatches from legend.
i. Add ADA routes per engineering comment.
8. Conditions of approval from Engineering and Urban Forestry are included in the official
conditions of approval, attached hereto;
a. Include the required detention planting per Chapter 177.
b. Diversify plant species. No more than 20% of one plant should be specified. It is
acceptable to vary the type of Elm trees.
c. Double check the existing tree canopy, preserved and removed numbers in the
tree preservation calculations chart as they are still not correct, and this affects the
mitigation numbers.
d. A chain link fence with posts in the ground will be required to protect the tree
preservation easement per Chapter 167.05(B).
e. The agreement letter needs to also state that it is understood that a Stop Work
Order may be issued, and remedial measures prescribed per Chapter 167.05(B) if
construction encroaches on the tree preservation easement.
f. What does the blue indicated on the trees at the south side the property mean and
were they counted in the tree preservation calculations?
Standard Conditions of Approval:
9. Impact fees for fire, police, water, and sewer shall be paid in accordance with city
ordinance;
10. Technical Plat Review and Subdivision Committee comments (to include written staff
comments provided to the applicant or their representative, and all comments from utility
representatives: Black Hills Energy, AT&T, Ozarks Electric, SWEPCO, and Cox
Communications);
11. All mechanical and utility equipment (roof and ground mounted) shall be screened using
materials that are compatible with and incorporated into the structure. A note shall be
clearly placed on the plat and all construction documents indicating this requirement;
12. Trash enclosures shall be screened on three sides with materials that are complimentary
to and compatible with the principle structure. Containers may also be screened from view
of the street by the principal structure or vegetation. Elevations of the proposed dumpster
enclosure shall be submitted to the Planning and Recycling & Trash Collection divisions
for review prior to building permit;
13. All existing utilities below 12kv shall be relocated underground. All proposed utilities shall
be located underground;
Subdivision Committee
August 31, 2023
Agenda Item 1
LSD-2023-0009 (MIDTOWN LANDING)
Page 5 of 32
14. Staff approval of final detailed plans, specifications and calculations (where applicable) for
grading, drainage, water, sewer, fire protection, streets (public and private), sidewalks,
and tree preservation. The information submitted for the plat review process was reviewed
for general concept only. All public improvements are subject to additional review and
approval. All improvements shall comply with the City's current requirements;
15. All exterior lighting shall comply with city ordinance. Manufacturer's cut -sheets are
required for review and approval prior to issuance of a building permit;
16. All freestanding and wall signs shall comply with ordinance specifications for location, size,
type, number, etc. Any proposed signs shall be permitted by a separate sign permit
application prior to installation;
17. Large scale development approval shall be valid for one year;
18. Contact the City's Emergency 911 Address Coordinator for addressing prior to building
permit;
19. Prior to building permit, a cost estimate for all required landscaping is to be submitted to
the Landscape Administrator for review. Once approval is gained, a guarantee is to be
issued (bond/letter of credit/cash) for 150% of the cost of the materials and installation of
the plants. This guarantee will be held until the improvements are installed and inspected,
at the time of Certificate of Occupancy; and
20. Prior to the issuance of a building permit, the following is required:
a. Grading and drainage permits;
b. Separate easement plat for this project that shall include any tree preservation
areas and all utility and access easements;
c. Exterior lighting package must be provided to the Planning Division;
d. An on -site inspection by the Landscape Administrator of all tree protection
measures prior to any land disturbance;
e. Project Disk with all final revisions; and
f. Completion of all required improvements or the placement of a surety with the City
(letter of credit, bond, escrow) as required by Section 158.01 "Guarantees in Lieu
of Installed Improvements" to guarantee all incomplete improvements. Further, all
improvements necessary to serve the site and protect public safety must be
completed, not just guaranteed, prior to the issuance of a Certificate of Occupancy.
Subdivision Committee Action: O Forwarded O Tabled O Approved
Meeting Date: August 31, 2023
Motion:
Second:
Vote:
Subdivision Committee
August 31, 2023
Agenda Item 1
LSD-2023-0009 (MIDTOWN LANDING)
Page 6 of 32
BUDGET/STAFF IMPACT:
None
ATTACHMENTS:
• Engineering Memo
• Urban Forestry Comments
o Landscape Memo
o Tree Preservation Memo
o Tree preservation Agreement
• Tree Agreement Letter
• Master Street Plan Variance Request and Exhibits
• Urban Residential Design Standards Variance Request and Exhibits
• Site Plans
• Turning Radii Exhibit
• One Mile Map
• Close -Up Map
• Current Land Use Map
Subdivision Committee
August 31, 2023
Agenda Item 1
LSD-2023-0009 (MIDTOWN LANDING)
Page 7 of 32
CITY OF
1p"IFAYETTEVILLE
ARKANSAS
TO: Donna Wonsower, Planner
FROM: Josh Boccaccio, Engineering Development Review Manager
DATE: August 25, 2023
SUBJECT: Subdivision Committee Engineering Comments for
LSD-2023-0009 Midtown Landing
STAFF MEMO
Water: There is an existing 8" water main along Bob Younkin Dr which the applicant is
proposing to use for domestic water and fire protection.
Sewer: There is an existing 8" sewer main along Bob Younkin Dr which the applicant is
proposing to connect to for sanitary sewer service. Private trunk lines going into proposed
manholes shall be a minimum of 6" in diameter.
Drainage: The applicant is proposing to meet the assumptions made in the drainage report
when the subdivision was built. The applicant is also proposing to modify the existing detention
facility to provide bioretention. Calculations will be reviewed during grading permit.
Plan Comments:
1. Additional taps for fire hydrants shall not be permitted unless there is a hardship
preventing the hydrant from being shifted to the greenspace. Parking shall be restricted
in front of the hydrants and hydrant location must meet fire code.
2. Proposed manholes shall be located entirely in the sidewalk or entirely out of the
sidewalk.
3. Additional review of the proposed curb radii shall be completed during grading permit.
Radii shall be approved by the City Engineer.
4. An ADA accessible route shall be provided from the right-of-way to ADA spaces and any
building to which a pedestrian route is required.
5. Abandonment of existing water and sewer services shall be coordinated with the water
and sewer division.
a. However, if existing water service lines can support meter arrays, they shall be
utilized.
6. Profiles of storm and bioretention will be provided at grading permit based on comment
response.
7. Additional topographic information near the structures and a Swale at the east property
line will be provided based on comment response.
8. Storm may have to be installed across Bishop to drain bioretention as stated in comment
response.
9. Manholes shall not cause the sidewalk to shift or be out of compliance with ADA
requirements.
Mailing Address: Subdivision Committee
113 W. Mountain Street www.fayettevilregusgM2023
Fayetteville, AR 72701 Agenda Item 1
LSD-2023-0009 (MIDTOWN LANDING)
Page 8 of 32
Standard Comments:
1. All designs are subject to the City's latest design criteria (water, sewer, streets and
drainage). Review for plat approval is not approval of public improvements, and all
proposed improvements are subject to further review at the time construction plans are
submitted.
2. Any damage to the existing public street due to construction shall be repaired/replaced
at the owner/developers expense
3. All public sidewalks, curb ramps, curb & gutter, and driveway aprons along this project
frontage must meet ADA guidelines and be free of damage. Any existing infrastructure
that does not conform to ADA guidelines or is otherwise damaged must be removed and
replaced to correct the issue. Coordinate with the engineering department for inspection
of existing facilities to determine compliance.
4. Water and sewer impact fees will apply for the additional impact to the system. The fees
will be based on the proposed meter size and will be charged at the time of meter set.
5. Note, the following portions of all projects will typically not be reviewed by the
Engineering Division until time of construction -level review (unless specifically requested
at plat review):
o Storm Sewer pipe/inlet sizing, gutter spread, profiles, or utility conflicts
o Sanitary Sewer pipe sizing, profiles, or utility conflicts
o Waterline fittings, callouts, or utility conflicts
o Street profiles
o Fine grading/spot elevations
Subdivision Committee
August 31, 2023
Agenda Item 1
LSD-2023-0009 (MIDTOWN LANDING)
PaA 9 of 32
1�
CITY of
FAYETTEVILLE
ARKANSAS
URBAN FORESTRY
LANDSCAPE PLAN COMMENTS
To: Brian Teague- Community by Design, Tim Brisiel, Legacy Ventures NWA, Inc
From: Melissa Evans, Urban Forestry
CC: Donna Wonsower, Planner
Meeting Date: August 31, 2023
Subject: LSD-2023-0009: Midtown Landing, Bob Younkin Drive and Drake,
1. General Landscape Plan Checklist
Yes No N/A
a. Irrigation (notes either automatic or hose bib 100' o.c.)
X
UDC Chapter 177.03C7g, 177.04B3a
b. Species of plant material identified
X
UDC Chapter 177.03C7d,e
c. Size of plant material (minimum size 2" caliper for trees and 3 gal. shrubs)
X
UDC Chapter 177.03C7b,c
d. Soil amendments notes include that soil is amended and sod removed
X
UDC Chapter 177.03C6b
e. Mulch notes indicate organic mulching around trees and within landscape beds
X
UDC Chapter 177.03C6c,d
f. LSD, LSIP, and Subdivisions (PPL & FPL) plans stamped by a licensed
X
Landscape Architect, others by Landscape Designer
UDC Chapter 177.03B
g. Planting bed contained by edging
X
UDC Chapter 177.03C6f
h. Planting details according to Fayetteville's Landscape Manual
X
UDC Chapter 177.03C6g
i. Provide information about 3-Year Maintenance plan. The owner shall deposit
X
with the City of Fayetteville a surety for approved landscape estimate.
UDC Chapter 177.05 A2g
2. Parking Lot Requirements 1 Tree : 12 Parking Spaces Yes No N/A
a. Wheel Stops/Curbs X
UDC Chapter 177.04B1
b. Narrow Tree Lawn (8' min. width, 37.5' length) X
UDC Chapter 177.04C
Subdivision Committee
August 31, 2023
Agenda Item 1
LSD-2023-0009 (MIDTOWN LANDING)
Page 10 of 32
c. Tree Island (8' min. width, 18.7' min length OR 150 square feet) X
UDC Chapter 177.04C
d. Placement of Trees (either side at entrances and exits) X
UDC Chapter 177.04C2
3. Perimeter Landscaping Requirements
Yes No N/A
a. Front Property Line (15' wide landscape) and five on sides. X
UDC Chapter 177.04D2a
b. Side and Rear Property Lines (5' Wide Landscape Area) YES
UDC Chapter 177D1
c. Shade trees planted on south and west sides of parking lots X
UDC Chapter 177.04D2e
d. Screening of parking lot from adjacent residential properties. X
4. Street Tree Planting Requirements
Yes No N/A
a. Residential Subdivisions
X
1 Large Shade Species Tree per Lot
UDC Chapter 177.05B1a
b. Non -Residential Subdivisions
X
1 Large Species Shade Tree every 30' (planted in greenspace)
UDC Chapter 177.05B2a
c. Urban Tree Well — Urban Streetscapes
X
Trees every 30' (8' sidewalk)
UDC Chapter 177.05B3a-f
d. Structured Soil — Urban Tree Wells
X
Include a note and/or detail of structural soil on Landscape Plan
UDC Chapter 177.05B3a-f
e. Residential Subdivisions
X
Timing of planting indicated on plans
UDC Chapter 177.05A4
f. Residential Subdivisions
X
Written description for method of tracking planting
UDC Chapter 177.05A4e
2
Subdivision Committee
August 31, 2023
Agenda Item 1
LSD-2023-0009 (MIDTOWN LANDING)
Page 11 of 32
5. Landscape Requirement Totals
Mitigation Trees
Parking Lot Trees
Street Trees
Detention Pond — Large Trees
(1 Tree/3,000 square feet)
Detention Pond — Small Tree/Large Shrub
(4 small trees or large shrubs/3,000 square feet)
Detention Pond — Small Shrubs/Large Grasses
(6 shrubs or grasses (1 gallon)/3,000 square feet)
6. Review Status (See Comments)
Conditionally Approved
Approved
Tabled
Denied
Amount
63
8
1 tree/30 LF
of street
frontage =40
Tech Plat Subdivision Planning
Committee Commission
06-15-2023 08-14-2023
08-30-2023
07-18-2023
Appeal Process: A final administrative determination by the Urban Forester may be appealed in accordance
with Chapter 155 of the Unified Development Code.
Amment
1. Address items above marked "No" and all Redlines provided.
2. Please include required detention plantings per Ch. 177.
3. Please diversify the plant species. No more than 20% of one plant should be specified. It is acceptable to
vary the type of Elm trees. A disease that wipes out one variety may not wipe out another.
4. Most parking islands are too narrow to be sufficient for healthy tree growth without structural soil. Since these
seem to be extra trees (drive trees), they do not have to meet City minimum requirements. It is recommended
that more room be provided for them or structural soil if you want successful tree growth and longevity.
3
Subdivision Committee
August 31, 2023
Agenda Item 1
LSD-2023-0009 (MIDTOWN LANDING)
Page 12 of 32
URBAN FORESTRY
(Ak
TREE PRESERVATION COMMENTS
CITY OF
RAYETTEVILLE
ARKANSAS
To: Brian Teague, Community By Design and Tim Brisiel, Legacy Ventures NWA
From: Melissa Evans, Urban Forestry
CC: Donna Wonsower, Planner
Meeting Date: August 31, 2023
Subject: LSD-2023-0009: Midtown Landing, Bob Younkin Drive and Drake, 251
1. Submittal Requirements Yes
Initial Review with the Urban Forester X
Site Analysis Map Submitted (if justification is needed)
Site Analysis Written Report Submitted (justification is needed)
Complete Tree Preservation Plan Submitted X
Tree Mitigation Table on Plans X
Tree Preservation Wavier Submitted (only use if no trees onsite or near P/L)
2. Tree Preservation Calculations
No N/A
X
X
X
The Tree Preservation Calculations need to be checked again, particularly the existing,
preserved and removed numbers as they are not adding up.
Tree Preservation Calculations
Square Feet Percent of site
Total Site Area *Minus Right of Way and Easements
120,980
100%
Zoning Designation * Select Below with drop down arrow
RMF-24 Multi -Family Residential -Twenty -Four Units Per Acre
24,196
20%
HHOD * Select Below with Drop Down Arrow
No
0
0%
Total Canopy for Minimum Preservation Requirements
24,196
20.0%
Existing Tree Canopy * Minus Right of Way and Easements
63,496
52.5%
Tree Canopy Preserved
1,391
1.1%
Tree Canopy Removed *On Site
63,496
52.5%
Tree Canopy Removed *Off Site
0
Tree Canopy Removed Total
63,496
52.5%
Removed Below Minimum
22,805
Mitigation Requirements
22,805
Subdivision Committee
August 31, 2023
Agenda Item 1
LSD-2023-0009 (MIDTOWN LANDING)
Page 13 of 32
3. Mitigation Requirements
High Priority
Low Priority
Total Mitigation Trees Required
4. Mitigation Type
On -Site Mitigation
Off -Site Mitigation
Tree Escrow (See Conditions of Approval)
5. Tree Preservation Plan Checklist
UDC Chapter 167.04H1
a. 5 year Aerial Check on Existing Trees
b. Property Boundary
c. Natural Features (100ft beyond limits of disturbance)
d. Existing Topography and Proposed Grading
e. Soil Types
f. Significant Trees
g. Groupings of Trees
h. Table Inventory List (species, size, health, priority)
i. All Existing and Proposed Utilities
j. All Existing and Proposed Utility Easements and ROW's
k. All Streams (with approximate center line)
I. Floodplains and floodways
m. Existing Street, Sidewalk or Bike Path ROW
n. Submitted Site Analysis Plan (if required)
o. Shows ALL Proposed Site Improvements
p. Delineates trees/canopy to be preserved and removed
Tree Protection Methods
a. Tree Protection Fencing
b. Limits of Root Pruning
c. Traffic flow on work site
d. Location of material storage
e. Location of concrete wash out
f. Location of construction entrance/exit
Canopy below
Number of 2" caliper
requirement
trees to be planted
4,805?
22?
18,000?
41?
22,805?
63?
Yes
No
N/A
X
?
?
Tech
Subdivision
Planning
Plat
Committee
Commission
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
N/A
N/A
N/A
N/A
Yes
Yes
N/A
N/A
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
No
No
No
No
No
No
Subdivision Committee 2
August 31, 2023
Agenda Item 1
LSD-2023-0009 (MIDTOWN LANDING)
Page 14 of 32
6. Site Analysis Report (if required) Yes No N/A
UDC Chapter 167.04H4
a. Provide graphic examples of multiple options used to X
minimize removal of existing canopy
b. Submitted Analysis Statement — Note the process, iterations,
and approaches to preserve canopy.
X
7. Review Status (See Comments) Tech Plat Subdivision Planning
Committee Commission
Conditionally Approved 06-14-2023 08-14-2023
08-30-2023
Approved
Tabled 07-18-2023
Denied
Appeal Process: A final administrative determination by the Urban Forester may be appealed in accordance
with Chapter 155 of the Unified Development Code.
Comments
1. Address items above marked "No" and all Redlines provided. Highlighted yellow items below must be
addressed with the next submittal or this project may risk being tabled at Planning Commission.
2. Please double-check the Existing Tree Canopy, Preserved and Removed numbers in the Tree Preservation
Calculations Chart as they are still not correct and this affects the mitigation numbers.
3. Mitigation can be done at low priority for this project, most of the trees are invasive, and this was a remnant
orchard.
4. There is no preservation on this site other than an existing tree preservation easement.
5. A chain link fence with posts in the ground will be required to protect the tree preservation easement per Ch.
167.05(B). Thank you for showing this on the tree preservation plans.
6. The applicant has provided an agreement letter stating that the contractor, Legacy Ventures NWA,
Inc., acknowledges the existence of the 20' Tree Preservation Easement along the east property line
and that the building foundations are close to the easement, and that they will use means and methods
to not disturb the easement. In some areas, there is only 1 foot between a building footprint and the
Tree Preservation Easement. Urban Forestry Staff prefers at least five feet of space between the
building and the Tree Preservation Easement. The agreement letter needs to also state that the it is
understood that a Stop Work Order may be issued and remedial measures prescribed per Chapter
167.05(B) if construction encroaches on the Tree Preservation Easement.
7. What does the blue indicate on the trees at the south side of the property? Were they counted in the tree
preservation calculations?
Subdivision Committee 3
August 31, 2023
Agenda Item 1
LSD-2023-0009 (MIDTOWN LANDING)
Page 15 of 32
AGREEMENT BETWEEN
CONTRACTOR AND CITY OF FAYETTEVILLE URBAN FORESTRY
This Agreement is made by and entered Into on this 2311 day of July 2023 by and between the following parties,
CONTRACTOR:
Legacy Ventures NWA, Inc.
PO Box 8216
Fayetteville, AR 72703
tim(a)legacvventuresnwa.com
And:
MUNICIPALITY:
City of Fayetteville Urban Forestry Department
1455 S Happy Hollow Road
Fayetteville, AR 72701
urbanforestrv(favetteville•ar.00v
PROJECT:
Midtown Landing — Phase 1
Bob Younkin Drive
Fayetteville, AR 72703
CONTRACTOR AND MUNICIPALITY HEREBY AGREE AS FOLLOWS:
CONTRACTOR hereby awknowledges the existance of a 20' tree preservation easement along the east property line.
Contractor futher awknowledges the close proximity of the tree preservation easement to the foundations of some of the
structures. Contractor will use construction means and methods that ensure the tree preservation easement is not disturbed
during construction activites on site. Contractor further warrants tree preservation fencing will be installed, mainatained and in
place at all times during construction activities and until such time the Urban Forester instructs Contractor in writing to remove
such fencing.
This Agreement will remain in full force until such time as the City of Fayetteville provides Contractor with a Certiifcate of
Occupancy or the Urban Forester advises Contractor in writing that it is safe to remove the fencing, whichever happens first
If at any time this Agreement is not being followed or the Urban Forester has an issue, please direct all correspondence to Tim
Brisiel at 479-790-3315 or at the address above.
Legacy Ventures
ature must be j�i company owner or officer authorized to sign contracts and change orders.)
PRINT NAME: �I � /✓'cZ _VL3
Subdivision CoMmittee
August 31, 2023
Agenda Item 1
LSD-2023-0009 (MIDTOWN LANDING)
Page 16 of 32
community.hv.dmzinn
• •
', �=iCM.ti'
TOWN PLANNING.URBAN ENGINEERING
August 23, 2023
Via Email: dwonsower(d�fayetteville-ar. og_v
Ms. Donna Wonsower
Planner
City of Fayetteville — Planning Department
125 West Mountain Street
Fayetteville, Arkansas 72701
RE: Midtown Landing LSD 2023 0009 — Master Street Plan Variance Request for Bob Younkin Drive
Ms. Wonsower,
On behalf of the owners and the developers of the proposed Midtown Landing Large Scale Development, please allow
this letter to serve as a variance request from the Master Street Plan (MSP) Residential Link Cross Section for Bob
Younkin Drive. The variance is requested in order to allow parallel parking on both sides of a Residential Link Street or
Bob Younkin Drive. Currently the section contains 2 drive lanes and I continuous center turn lane. The proposal is to
maintain the existing pavement width and to re -stripe to allow for 2 drive lanes and 2 parallel parking lanes. The proposed
cross section is in accordance with the MSP Residential Link Cross Section except that parallel parking is proposed for
both sides of the street not just one. The proposed cross section is shown on the attached Exhibit # 1.
The inclusion of parallel parking on both sides of the street will significantly calm traffic and reduce the speeds of
vehicular traffic passing through, making the street safer for both vehicles and pedestrians.
Thank you for your consideration of these alternatives. Please let me know if you have any questions or concerns.
Sincerely,
Brian Teague
Community By Design
Subdivision Committee
August 31, 2023
100 West Center Street Suitc7401a Item 1
F�1wDtt'@ DI�9WRI'VI:)tWNDING)
479.790.01P517o132
EXHIBIT #1 - PROPOSED STREET CROSS SECTION
BOB YOUNKIN DRIVE LOOKING NORTH
Subdivision Committee
August 31, 2023
Agenda Item 1
LSD-2023-0009 (MIDTOWN LANDING)
Page 18 of 32
community.by.design
TOWN PIANNING.URBAN ENGINEERING
August 23, 2023
Via Email: dwonsowerid:favetteville-ar. og_v
Ms. Donna Wonsower
Planner
City of Fayetteville — Planning Department
125 West Mountain Street
Fayetteville, Arkansas 72701
RE: Midtown Landing LSD 2023 0009 — Urban Residential Design Standards Variance Request
Ms. Wonsower,
On behalf of the owners and the developers of the proposed Midtown Landing Large Scale Development, please allow
this letter to serve as a variance request from the Urban Residential Design Standards requirement to vary roof form, as
stated in UDC 166.23(D)(2)(a)(i): "in order to provide a variety infirm and design, one (1) building type may not be
utilized more than three (3) times in a development. Each building type shall be differentiated by variations in materials,
colors and roof forms. " Please see revised building floor plans and elevations attached to this submittal. Also see the
revised dwelling unit summaries attached to this submittal.
• Buildings #1, #2, and #3 share the same floor plan but vary by color and by material or material combinations.
Buildings #1 and #2 are proposed 1 time each, while building #3 is proposed 2 times.
• Building #4 is proposed 3 times.
• Buildings 95, #6, and #7 share the same floor plan but vary by color and by material or material combinations.
Buildings #5 and #6 are proposed 3 times each, while building #7 is proposed 2 times.
• Buildings #8 and #9 are proposed more than 3 times each but are single family houses. The urban residential
design standards do not apply to single family houses. However, buildings #8 and #9 have been designed with the
same architectural features and character of the other buildings in the spirit of the Urban Residential Design
Standards.
Roof form does not vary between buildings #1, #2, and #3. Roof form does not vary between buildings #5, #6, and #7.
The variance requested would apply to these 2 sets of buildings. The applicant feels that significant variation is provided
through changes in color and material and that the space between the buildings would be of a higher quality and more
harmonious if the roof forms adhere to one architectural character.
Thank you for your consideration of this alternative. Please let me know if you have any questions or concerns.
Sincerely,
Brian Teague
Community By Design
Subdivision Committee
August 31, 2023
100 West Center Street SulttgWga Item 1
F$�QW,KIOQe (AIRTipQJ LjkNDING)
47 9.7 9 0.6PM5 19 of 32
Figure 4: Building 1, 2, and 3 Floor Plans
&WEST 11111001 - 111111 WING
Figure 3: Building 1 (Used Once)
((. WEST ELEVATION �STHET W NG
Figure 1: Building 2 (Used Once)
Figure 2: Building 3 (Used Twice):
Subdivision Committee
August 31, 2023
Agenda Item 1
LSD-2023-0009 (MIDTOWN LANDING)
Page 20 of 32
Figure 5: Building Four (Used Three Times)
NaTEF.L.\.
&N RTR ELEVATION -STREET FACING
community..
E- El
aoEN \'�tim`•
9Ei".SION 0
OSECOND FLOOR PLAN
MIDTOWN
LANDING
BUILDING #4
LAP SIDING
n �
ISSUED FOR
RENEW
NSF ND FLE 9E
,� x -.-DFLCOR ]e, 9F
ND ., BF
SECOND FL
r Fi0'-r'
FLOOR PLANS
n GROUND FLOOR PLAN sREET p�
OWEST ELEVATION - STREET FACT!'.
Comm
_3p IL
2 —4AST 1111,;1TI0P,
LSD-2023-0009 (MI
1, 2023
i Item 1
JDING)
11 of 32
Figure 6: Building F
O SECOND FLOOR PLAN O ONOUND FLOOR PLAN
Figure 7: Building 5, 6, and 7 Floor Plans
w pu Figure 9: Building 5 (Used Three Times)
V0! INSOUT1IELEVATION
�WE$Ti EASTELEVATIOV STREETFACING
Figure 10: Building 6 (Used Three Times)
2 NOriN: SOJTN E! EVATION .,„u...-.....�„�.
ll WEST r EAST ELDATION - $-BEET FACING
Figure 8: Building 7 (Used Twice)
Subdivision Committee
August 31, 2023
Agenda Item 1
LSD-2023-0009 (MIDTOWN LANDING)
Page 22 of 32
Colors Listing
Community By Design - 8/23/23
Midtown Landing - Dwelling Unit Summary Court 1
Dwelling
Associated
Floor Plan
and
Elevation
Siding Color
Trim Color
Tamko 3 Tab
Shingle
Bedrooms
Bath
Master
Down
Private
Courtyard
/ Patio
Front
Porch
Heated
and
Cooled
Square
Footage
1.1
Building #4
SW Bright White
SW Bright White
Rustic Cedar
3
2
Yes
Yes
Yes
1,144
1.2
Building #4
SW Bright White
SW Bright White
Rustic Cedar
3
2
Yes
lYes
Yes
11,144
1.3
Building #4
SW Bright White
SW Bright White
Rustic Cedar
1
1
No
Yes
Yes
722
1.4
Building #4
SW Bright White
SW Bright White
Rustic Cedar
1
1
No
Yes
Yes
722
1.5
Building #9
SW Bright White
SW Bright White
Rustic Cedar
2
2.5
No
Yes
Yes
1,365
1.6
Building #4
SW Bright White
SW Bright White
Rustic Cedar
1
1
No
Yes
Yes
722
1.7
Building#4
SW Bright White
SW Bright White
Rustic Cedar
1
1
No
Yes
Yes
722
1.8
Building#4
SW Bright White
SW Bright White
Rustic Cedar
3
2
Yes
Yes
Yes
1,144
1.9
Building#4
SW Bright White
SW Bright White
Rustic Cedar
3
2
Yes
Yes
Yes
1,144
1.10
Building #3
SW Moonmist
SW Bright White
Tile Red Blend
2
2.5
No
Yes
Yes
1,144
1.11
Building #3
SW Moonmist
SW Bright White
Tile Red Blend
2
2.5
No
Yes
Yes
1,144
1.12
Building #3
SW Moonmist
SW Bright White
Tile Red Blend
2
2.5
No
Yes
Yes
1,144
1.13
Building #3
SW Moonmist
SW Bright White
Tile Red Blend
2
2.5
No
Yes
Yes
1,144
1.14
Building #9
SW Moonmist
SW Bright White
Tile Red Blend
2
2.5
No
Yes
Yes
1,365
1.15
Building #1
SW Moonmist
SW Bright White
Tile Red Blend
12
1 2.5
No
Yes
Yes
1,144
1.16
Building #1
SW Moonmist
SW Bright White
Tile Red Blend
12
1 2.5
No
IYes
Yes
1,144
1.17
Building#1
SW Moonmist
SW Bright White
Tile Red Blend
12
1 2.5
No
iYes
Yes
1,144
1.18
Building#1
SW Moonmist
SW Bright White
Tile Red Blend
12
1 2.5
No
lYes
Yes
1,144
Summaryl
136
1 37.0
19,346
Community By Design - 8/23/23
Midtown Landing - Dwelling Unit Summary Court 2
Dwelling
Associated
Floor Plan
and
Elevation
Siding Color
Trim Color
Tamko 3 Tab
Shingle
Bedrooms
Bath
Master
Down
Private
Courtyard
Front
Porch
Heated
and
Cooled
Square
Footage
2.1
Building #8
SW Moonmist
SW Bright White
Tile Red Blend
3
3.5
Yes
Yes
Yes
1,441
2.21
Building #5
SW Moonmist
SW Bright White
Tile Red Blend
3
2
Yes
Yes
Yes
1,144
2.3
Building #5
SW Moonmist
SW Bright White
Tile Red Blend
3
2
Yes
Yes
Yes
1,144
2.4
Building #9
SW Moonmist
SW Bright White
Tile Red Blend
2
2.5
No
Yes
Yes
1,365
2.5
Building #6
SW Moonmist
SW Bright White
Tile Red Blend
3
2
Yes
Yes
Yes
1,144
2.6
Building #6
SW Moonmist
SW Bright White
Tile Red Blend
3
2
Yes
Yes
Yes
1,144
2.7
Building #8
SW Moonmist
SW Bright White
Tile Red Blend
3
3.5
Yes
Yes
Yes
1,441
2.8
Building #8
SW N.S.E. Green
SW Alabaster
White
3
3.5
Yes
Yes
Yes
1,441
2.9
Building #6
SW N.S.E. Green
SW Alabaster
White
3
2
Yes
Yes
Yes
1,144
2.10
Building #6
SW N.S.E. Green
SW Alabaster
White
3
1 2
Yes
lYes
Yes
1,144
2.11
Building #9
SW N.S.E. Green
SW Alabaster
White
2
2.5
No
Yes
Yes
1,365
2.12
Building #5
SW N.S.E. Green
SW Alabaster
White
3
2
Yes
Yes
Yes
1,144
2.13
Building #5
SW N.S.E. Green
SW Alabaster
White
3
2
Yes
Yes
Yes
1,144
2.14
Building#8
SW N.S.E. Green
SW Alabaster
White
3
3.5
Yes
Yes
Yes
1,441
Summary
-
1
40
35.0
17,646
Subdivision Committee
August 31, 2023
Agenda Item 1
LSD-2023-0009 (MIDTOWN LANDING)
Page 23 of 32
Community By Design - 8/23/23
Midtown Landing - Dwelling Unit Summary Court 3
Dwelling
Associated
Floor Plan
and
Elevation
Siding Color
Trim Color
Tamko 3 Tab
Shingle
Bedrooms
Bath
Master
Down
Private
Courtyard
Front
Porch
Heated
and
Cooled
Square
Footage
3.1
Building #8
SW N.S.E. Green
SW Alabaster
White
3
3.5
Yes
Yes
Yes
1,441
3.2
Building #5
SW N.S.E. Green
SW Alabaster
White
3
2
Yes
Yes
Yes
1,144
3.3
Building #5
SW N.S.E. Green
SW Alabaster
White
13
2
Yes
1 Yes
Yes
11,144
3.4
Building #9
SW N.S.E. Green
SW Alabaster
White
2
2.5
No
Yes
Yes
1,365
IS
Building #6
SW N.S.E. Green
SW Alabaster
White
3
2
Yes
Yes
Yes
1,144
3.6
Building #6
SW N.S.E. Green
SW Alabaster
White
3
2
Yes
Yes
Yes
1,144
3.7
Building #8
SW N.S.E. Green
SW Alabaster
White
3
3.5
Yes
Yes
Yes
1,441
3.8
Building #8
SW Soft Yellow
SW Bright White
Empire Green
3
3.5
Yes
Yes
Yes
1,441
3.9
Building #7
SW Soft Yellow
SW Bright White
Empire Green
3
2
Yes
Yes
Yes
1,144
3.10
Building #7
SW Soft Yellow
SW Bright White
Empire Green
13
2
Yes
Yes
1 Yes
1,144
3.11
Building #9
SW Soft Yellow
SW Bright White
Empire Green
2
2.5
No
Yes
Yes
1,365
3.12
Building #7
SW Soft Yellow
SW Bright White
Empire Green
3
2
Yes
Yes
Yes
1,144
3.13
Building #7
SW Soft Yellow
SW Bright White
Empire Green
3
2
Yes
Yes
Yes
1,144
3.14
Building #8
SW Soft Yellow
1SW Bright White
Empire Green
3
3.5
Yes
Yes
Yes
1,441
Summary
1
40
35.0
17,646
Community By Design - 8/23/23
Midtown Landing - Dwelling Unit Summary Court 4
Dwelling
Associated
Floor Plan
and
Elevation
Siding Color
Trim Color
Tamko3Tab
Shingle Color
Bedrooms
Bath
Master
Down
Private
Courtyard
Front
Porch
Heated
and
Cooled
Square
Footage
4.1
Building #2
SW Soft Yellow
SW Bright White
Empire Green
2
2.5
No
Yes
Yes
1,144
4.2
Building #2
SW Soft Yellow
SW Bright White
Empire Green
2
2.5
No
Yes
Yes
1,144
4.3
Building #2
SW Soft Yellow
SW Bright White
Empire Green
2
2.5
No
Yes
Yes
1,144
4.4
Building #2
SW Soft Yellow
SW Bright White
Empire Green
2
2.5
No
Yes
Yes
1,144
4.5
Building #9
SW Soft Yellow
SW Bright White
Empire Green
2
2.5
No
Yes
Yes
1,365
4.6
Building #3
SW Soft Yellow
SW Bright White
Empire Green
2
2.5
No
Yes
Yes
1,144
4.7
Building #3
SW Soft Yellow
SW Bright White
Empire Green
2
2.5
No
Yes
Yes
1,144
4.8
Building #3
SW Soft Yellow
SW Bright White
Empire Green
12
2.5
No
lYes
Yes
1,144
4.9
Building #3
SW Soft Yellow
SW Bright White
Empire Green
2
2.5
No
Yes
Yes
11,144
4.10
Building #3
SW Bright White
SW Bright White
Rustic Cedar
2
2.5
No
Yes
Yes
1,144
4.11
Building #3
SW Bright White
SW Bright White
Rustic Cedar
2
2.5
No
Yes
Yes
1,144
4.12
Building #3
SW Bright White
SW Bright White
Rustic Cedar
2
2.5
No
Yes
Yes
1,144
4.13
Building #3
SW Bright White
SW Bright White
Rustic Cedar
2
2.5
No
Yes
Yes
1,144
4.14
Building #9
SW Bright White
SW Bright White
Rustic Cedar
2
2.5
No
Yes
Yes
1,365
4.15
Building #4
SW Bright White
SW Bright White
Rustic Cedar
3
1.5
Yes
IYes
Yes
1,144
4.16
Building #4
SW Bright White
SW Bright White
Rustic Cedar
3
1.5
Yes
Yes
Yes
1,144
4.17
Building #4
SW Bright White
SW Bright White
Rustic Cedar
1
136
1
No
Yes
Yes
722
4.18
Building #4
ISW Bright White
SW Bright White
Rustic Cedar
1
I 1
No
Yes
Yes
722
Summary
1
1 40.0
20,190
Subdivision Committee
August 31, 2023
Agenda Item 1
LSD-2023-0009 (MIDTOWN LANDING)
Page 24 of 32
N
cn
D ' e
ITT
m
DEVELOPER SURVEY DESCRIPTION'.
REPRESENTATIVE INFORMATION ,.•em....•aw. re.
ZONING AND SETBACKS:
SURVEY DESCRIPTION:
comM.ty—dwl
I I a
_ BOB YOUNKIN DRIVE I im
wwawawwwwwwwwwwwwwwwwwawwwl �wwwwwwwwwwwwwwwwwwwwww�
COURT 3 3
41
r I REVISION O
21 _
3 I
MIDTOWN LANDING
_ _ _— ___,__ i � • _ LARGE SCALE
DEVELOPMENT
— _ mom. } tl� .�,... M. wn,.✓ I U FAYETTEVILLE,
WASHINGTON COUNTY,
— — — — — — _ — — — • j �•"�x ARKANSAS
CITY PLAT PAGE 251
FLOOD CERTIFICATION: STREET TABLE ISSUED FOR REVIEW
LAND USE SUklWkRY
rimer SGua
SITE PLAN
SHEET 4
1 nMx R
BOB YOUNKIN DRIVE
_ 11r
COIIRI2 B,� � y • � � fpIRT765 • �
IF
p�2/8fi7-000
fLL L 1:,
I
-51
765 02858 000 765-02857-M 765-02856-0DO 765-02855-M 765-02854-ON 765-02853-ODO
RMF-24 I RMF-24 AMF-24 RMF-24 RMF-24 RMF-24 7654
DEVELOPER SURVEY DESCRIPTION: PARKING SUMMARY ROOD CERMCATION: STREET TABLE
REPRESENTATIVE INFORMATION """'•e.owomx.
SURVEY DESCRIPTION:
communityb deli n
�FS I
F r a
PROPS IO�TL
A\ . /f
REVISION 0y
MIDTOWN LANDING
LARGE SCALE
DEVELOPMENT
FAYETTEVILLE,
WASHINGTON COUNTY,
ARKANSAS
CITY PLAT PAGE 251
ISSUED FOR REVIEW
UINU USL SUMAUHY _mx r -.. ,. I- . .i _ "_•`•.
Subdivision Committee
August ,31,,, 2023
Agenda Item 1
LSD-2023-0009 (MIDTOWN LANDING)
Page 25 of 32
765-02864-000
RMF-24
765-02858-ODD I _ 765-02857-000
RMF-24 RMF-24
I
765-02863-NO 765-02862-000
RMF-24 RMF-24
REVISION 0
MIDTOWN LANDING
Mi
LARGE SCALE
DEVELOPMENT
_ pN9
FAYETTEVILLE.
WASHINGTON COUNTY.
_ A ARKANSAS
765-02861-000 765-02860-M 765-02859-000 165-0295M I
RMF-24 RMF-24 RMF-24 RMF-24 CITY PLAT PAGE 251
IISSUED fOR REVIEW
a�
765-02856-000 765-02B55-000 765-02854-M 765-02853-000
RMF-24 RMF-24 RMF-24 R119-24
L
UTIM PLAN 2
SHEET 6
-
community.by.des� n
@�- - _
PRPOIL4510PNPN.
REVISION 0
765-24867-000
MIDTOWN LANDING
"
LARGE SCALE
DEVELOPMENT
FAYETTEVILLE.
WASHINGTON COUNTY,
ARKANSAS
765
CITY PLAT PAGE 251
RMF
— — Leo o 1-1
Subdivision Committee
August 31,_2023
IT, L.v:I
Agenda Item 1
LSD-2023-0009 (MIDTOWN LANDING)
Page 26 of 32
community 3y.desi
- — — — — — — — — — — —
BOB YOUNKIN DRIVE
A--v
21
T
ri
—REVISION 0
)>
MIDTOWN LANDING
LARGE SCALE
DEVELOPMENT
FAYETTEVILLE,
WASHINGTON COUNTY.
-T- .1i -AR,
ARKANSAS
-02 765 02864 000 765-02863-M .5/ 1 000 765-02MG-000 765 02859-000 765-02658-M
CITY
RMF 24 RMF-24 F, RMF-24 RNIF 24 RW-24 PLAT PAGE 251
ISSUED FOR REVIEW
-ST—ANDARD NOTES FCR TR[ PRESERqATION OWNER INF OFMATION.
7;-
sl�
r-
REPRESENTATIVE INFORMATION
FLOOD CERTIFICATION ---------- 4—
TREE PRESERVATION
- — ------ PLAN 2
SHEET 10
yes
cox
mmunit b d I
. . . . . . . . ..
- - - - - - - - - - - - - - - - -
w ems.
BOB YOUNKIN DRIVE
no
- - - - - - - - - -
766-0228 58-000 765 02135T 000 765-0285"DO 765-32855-000 765 U2854 DOD
RYf-24PVF-24 ;NIF-24 RMF-24 RMF-24 RN-IF-24
NUIES FOF 7t- F ?ESE TIAT ON OWIERINFI)FIAAFOL'
REPRESENTATIVE 14FOWTIDI
FLOOD C ERTIMAI)ON:
_7
MIDTOWN LANDING
LARGE SCALE
DEVELOPMENT
FAYETEMLE,
WASHING -ON ODIUM,
— ARKANSAS
765. CRY PLAT PAGE 251
RmF ISSUED FOR REVIEW
�5
Subdivision 'CEW'm ttee
August 31, 2023
jp, 1
LSD--7023-0009 (MIDTOWN LAP41DiNG)
Page N
27 of 32
H
s — -- — — — — — -- comm�u
vpY. vi.xc
� n
U X� I I F )t-
m -
765-02864-000 765-02863-DOO 765-02862-000
RMF-24 RMF-24 RMF-24
LANDSCAPE NOTES:
Z.
765-02858-obi. I 765-02857-ODO 765-02856-000
RMF-24 RMF-24 RMF-24
LANDSCAPE NOTES:
.. ��.. 0 s —_--
I — I ass
BOB YOUNKIN DRIVE ,fin
*i
4 l
I
1 {� L. � J• wq
REVISION 0
MIDTOWN LANDING
LARGE SCALE
aa� DEVELOPMENT
FAYETTEVILLE,
WASHINGTON COUNTY,
-
ARKANSAS
765-Ml-000 7fi5-02860-000 7fi5-02859-M 7fi5-02858-000 I
RMF-24 RMF44 RMF-24 RMF-24 CITY PUT PAGE 251
765-02855-OW — — — 765-02854-ODO
RMF-24 RMF-24
---------- --: LL - - - - --
W
0
0
G
-n 765-24867-000
8-0
765-02853-ODO
RMF-24 7654
vadwm.uniurrx�xdawwowu r.r.�v.
��. •. .:Sub
LSD-2023-0009 (MII
ISSUED FOR REVIEW
o,
go
T°-
ewcweeh
� WET
■■■N■ii■iii■■i16fi■■■iiiii■i�rrr■i■iiii�iN Ni rri�iriNiririirrl�rrrrrrrrrrrrrrrrrr�rNr
i it i
flEVISION 0
r i y
-a �MIDTOWN LANDING
IG SUMMARY
DEVELOPEK SURVEY DESCRIPTION'
REPRESENTATIVE INFORMATION: wvaoe«.ru.a....aw
ZONING AND SETBACKS -
SURVEY DESCRIPTION. _
— '— — — — — — - — — LARGE SCALE
€g DEVELOPMENT
FAELLE
_
5 765 02859-000 gym..... ' I.000 Zs WASHINGTONCOUNTY,
x RMF-24 �# RMF-24 I ; gAKANSA$
CITY PLAT PAGE 251
FLOCERTIFICATION: STREET TABLE ISSUED FOR REVIEW
W
LAND USE SUMMARY
— 1
SRE TRIANGLE AND TURN
MOVEMENT OVERLAY
.��. ,.a..,.._...,.....,.. SHEET
commIF, n
1.
1 -
-------------
�1 1_ a �f•'fl�
j .
I,�-I -
CCURT2�
777
REVISION 0
'd
or,n r �L
TOW
R.
ICI
MIDTOWN LANDING
LARGE SCALE
oilu1j DEVELOPMENT
I «ate •. �„.� ...,,. a 765-0i,,,,,""" I`,� FAYETTEVILLE,
FIMF-24 WASHINGTON COUNTY,
765-02857-000 765-02856.000 765-02855-000 765.02854-OW — — — — -- v,w, ro..,��� 765-02912-000 ARKANSAS
RMF-24 RMF-24
DEVELOPER: SURVEY DESCRIPTION
REPRESENTATIVE INFORMATION:
ZONING AND SETBACKS'. '.
SURVEY DESCRIPTION
IvFW!SSf?1,.,
FLOOD CERTIFICATION STREET TABLE
LAND USE SUMMARY
ISSUED FOR REVIEW
� SCARE
Subdivision Committee
August 31, 2023
Agenda Item 1
LSD -2023 0009 (MIDTOWN LANDING)
Page 29 of 32
LSD-2023-0009 (MIDTOWN LANDING)
Page 30 of 32
LSD-2023-0009 N . BOB YO U N KI N DR. & W.
Close Up View DRAKE S T.
R
z
D
z
m
v
X
RI-12
J
Neighborhood Link
Unclassified
Residential Link
cl� Subject Property
0
z
Y
CS
O
>_ J MOIJ
z
J
z
z
BISHOP DR
RMF-24
z
J
0
Q
U
z
Q
Cn
-----I---------
LU
DRAKE�ST
N Q
AUGUSTA DR— al
Q 0+C3RIM
CI NORTH
Planned Neighborhood Link Feet
Planning Area
Fayetteville City Limits 0 75 150 300 450 600
- - - Trail (Proposed) 1:2,400
RI-12
RMF-24
Residential -Office
Community Services
Subdivision C mmittee
August 1, 2023
Ayunub Item 1
LSD-2023-0009 (MIDTOWN LANDING)
Page 31 of 32
LSD-2023-0009 (MIDTOWN LANDING)
Page 32 of 32
TO:
FROM
CITY OF
FAYETTEVILLE
ARKANSAS
Subdivision Committee
SUBDIVISION COMMITTEE MEMO
Jessie Masters, Development Review Manager
Melissa Boyd, Staff Engineer
Melissa Evans, Urban Forester
MEETING: August 31, 2023
SUBJECT: LSD-2023-0015: Large Scale Development (1175 E. PUMP STATION
RD./GIVINGTON, 642): Submitted by JORGENSEN & ASSOCIATES for property
located at 1175 E. PUMP STATION RD. The property is zoned 1-2, GENERAL
INDUSTRIAL and contains approximately 6.71 acres. The request is for a 60,000-
square-foot office and warehouse structure with associated parking.
RECOMMENDATION:
Staff recommends forwarding LSD-2023-0015 to the full Planning Commission, with a
recommendation of approval, with conditions.
RECOMMENDED MOTION:
"I move to forward LSD-2023-0015, determining:
• In favor of recommended right-of-way dedication,
• In favor of recommended street improvements, and
• In favor of all other conditions as recommended by staff. "
BACKGROUND:
The subject property is in south Fayetteville in the City's industrial park at the southwest corner
of E. Pump Station Road and S. Industrial Drive. The property contains approximately 6.71 acres
and is currently undeveloped and zoned 1-2, General Industrial. Surrounding land use and zoning
are depicted in Table 1.
Table 1:
Surrounding Land Uses and Zoning
Direction
Land Use
Zoning
North
Industrial
1-2, General Industrial
South
Undeveloped
1-2, General Industrial
East
Industrial
1-2, General Industrial
West
Undeveloped
1-2, General Industrial
Proposal: The applicant requests large-scale development approval to develop the subject
property with an 60,000-square-foot warehouse and office for use by Givington's, a fulfillment
service.
Right -of -Way to be Dedicated: The property currently has existing right-of-way along both the E.
Pump Station Road frontage (40 feet from street centerline) and the Industrial Drive frontage (40
feet from street centerline). In both instances, the existing right-of-way exceeds the master street
plan classification requirement, so staff does not recommend any additional right-of-way
dedication.
Mailing Address:
113 W. Mountain Street viww.fayEkbM iei0&. a8wmittee
Fayetteville, AR 72701 Augu 31, 2023
Agenda Item 2
LSD-2023-0015 (GIVINGTON)
Page 1 of 21
Street Improvements: The property has frontage along E. Pump Station Road, a Neighborhood
Link Street, and S. Industrial Drive, a Residential Link Street.
E. Pump Street: Staff recommends the frontage be improved with a 6-foot wide sidewalk and 10-
foot greenspace, and street trees.
S. Industrial Drive: Staff recommends the frontage be improved with a 6-foot side sidewalk and
6-foot greenspace, and street trees.
Access ManagemenUConnectivity: Staff has determined that the proposed development requires
a variance to the typical access management standards. 166.08(F) requires property that fronts
onto more than one (1) public street to place a higher priority on accessing the street with the
lowest functional classification. The applicant proposes a driveway on both street frontages; no
variance has been requested yet.
Design Standards: Industrial uses outside of the 1-540 Overlay District are not subject to any
design standards; however, the proposed structure has approximately 6000 sq. ft. of office space
in a mezzanine, so a proportional amount of the structure still needs to meet 166.25 Mixed Use,
Office, Design and Development Design Standards. Staff finds the applicant is meeting this
requirement.
Water and Sewer System: A 12-inch water main exists along Industrial Drive to which this
development may connect for domestic water service and fire protection. These connections must
be coordinated with City of Fayetteville Water/Sewer if desired.
Parkland dedication or fee in -lieu: N/A; this project is not subject to parkland dedication
requirements.
Tree Preservation:
Canopy minimum requirement: 15%
Existing canopy: 76.4%
Preserved canopy: 19.5%
Mitigation required: (0) two-inch caliper trees
Public Comment: To date, staff has not received any public comment on this item.
RECOMMENDATION: Staff recommends forwarding LSD-2023-0015 to the full Planning
Commission with the following conditions:
Conditions of Approval:
1. Subdivision Committee recommendation of right-of-way dedication. Staff does not
recommend any additional right-of-way dedication at this time;
2. Subdivision Committee recommendation of street improvements. Staff recommends
that the property's E. Pump Station Road frontage be improved with 6-foot sidewalk, 10-
foot greenspace, and street trees; the S. Industrial Drive frontage shall be improved with
6-foot sidewalk, 6-foot greenspace and street trees.
3. Plat comments issued by the Planning Department shall be addressed.
a. Update site plan to reflect compliance with access management standards, or seek
a variance to the standard from the Planning Commission.
Subdivision Committee
August 31, 2023
Agenda Item 2
LSD-2023-0015 (GIVINGTON)
Page 2 of 21
b. Update site plan to reflect required street improvements, or seek a variance to the
master street plan from the Planning Commission.
c. Sidewalk shall be extended to the edge of the property line.
d. Dimension ROW from street centerline.
e. Dumpster location must be identified.
4. Site plan must be updated or a variance request must be received for encroachment into
the existing floodplain by the proposed parking lot and grading plan.
5. Conditions of approval from Engineering and Urban Forestry are included in the official
conditions of approval, attached hereto;
Standard Conditions of Approval:
6. Impact fees for fire, police, water, and sewer shall be paid in accordance with city
ordinance;
7. Technical Plat Review and Subdivision Committee comments (to include written staff
comments provided to the applicant or their representative, and all comments from utility
representatives: Black Hills Energy, AT&T, Ozarks Electric, SWEPCO, and Cox
Communications);
8. All mechanical and utility equipment (roof and ground mounted) shall be screened using
materials that are compatible with and incorporated into the structure. A note shall be
clearly placed on the plat and all construction documents indicating this requirement;
9. Trash enclosures shall be screened on three sides with materials that are complimentary
to and compatible with the principle structure. Containers may also be screened from view
of the street by the principal structure or vegetation. Elevations of the proposed dumpster
enclosure shall be submitted to the Planning and Recycling & Trash Collection divisions
for review prior to building permit;
10. All existing utilities below 12kv shall be relocated underground. All proposed utilities shall
be located underground;
11. Staff approval of final detailed plans, specifications and calculations (where applicable) for
grading, drainage, water, sewer, fire protection, streets (public and private), sidewalks,
and tree preservation. The information submitted for the plat review process was reviewed
for general concept only. All public improvements are subject to additional review and
approval. All improvements shall comply with the City's current requirements;
12. All exterior lights shall comply with city ordinance. Manufacturer's cut -sheets are required
for review and approval prior to issuance of a building permit;
13. All freestanding and wall signs shall comply with ordinance specifications for location, size,
type, number, etc. Any proposed signs shall be permitted by a separate sign permit
application prior to installation;
14. Large scale development approval shall be valid for one year;
Subdivision Committee
August 31, 2023
Agenda Item 2
LSD-2023-0015 (GIVINGTON)
Page 3 of 21
15. Contact the City's Emergency 911 Address Coordinator for addressing prior to building
permit;
16. Prior to building permit, a cost estimate for all required landscaping is to be submitted to
the Landscape Administrator for review. Once approval is gained, a guarantee is to be
issued (bond/letter of credit/cash) for 150% of the cost of the materials and installation of
the plants. This guarantee will be held until the improvements are installed and inspected,
at the time of Certificate of Occupancy; and
17. Prior to the issuance of a building permit, the following is required:
a. Grading and drainage permits;
b. Separate easement plat for this project that shall include any tree preservation
areas and all utility and access easements;
c. Exterior lighting package must be provided to the Planning Division;
d. An on -site inspection by the Landscape Administrator of all tree protection
measures prior to any land disturbance;
e. Project Disk with all final revisions; and
f. Completion of all required improvements or the placement of a surety with the City
(letter of credit, bond, escrow) as required by Section 158.01 "Guarantees in Lieu
of Installed Improvements" to guarantee all incomplete improvements. Further, all
improvements necessary to serve the site and protect public safety must be
completed, not just guaranteed, prior to the issuance of a Certificate of Occupancy.
Subdivision Committee Action: O Forwarded O Tabled O Approved
Meeting Date: August 31, 2023
Motion:
Second:
Vote:
BUDGET/STAFF IMPACT:
None
ATTACHMENTS:
• Engineering Memo
• Urban Forestry Comments
• Request Letter
• Site Plan
• Elevations
• One Mile Map
• Close -Up Map
• Current Land Use Map
Subdivision Committee
August 31, 2023
Agenda Item 2
LSD-2023-0015 (GIVINGTON)
Page 4 of 21
CITY OF
1p"IFAYETTEVILLE
ARKANSAS
TO: Jessie Masters, Development Review Manager
FROM: Melissa Boyd, Staff Engineer
DATE: August 30, 2023
SUBJECT: Subdivision Committee Engineering Comments for
LSD-2023-0015 GIVINGTON'S
STAFF MEMO
Water: There is an existing 12" water main along Industrial Drive that this development is showing
to connect to for domestic water service. This connection must be coordinated with City of
Fayetteville Water/Sewer. The applicant is proposing to extend approximately 142 LF of 6" fire
line to provide fire protection.
Sewer: There is an existing 8" sanitary sewer main present on the northwest corner of the
property that this development is showing to connect to with a private sewer service. This
connection must be coordinated with City of Fayetteville Water/Sewer.
Natural Features: An unnamed tributary of Town Branch is present along the west side of the
property and lies within a FEMA Zone A floodplain and has associated Streamside Protection
Zones.
A portion of the parking lot and grading are shown to encroach into the existing floodplain. The
applicant has indicated that a variance is being requested to recognize the recent FEMA study
and the pending revised mapping for this floodplain; however, staff has not received a formal
variance request letter. The request letter will need to be provided prior to Planning Commission.
Hydric soils appear to be present on this site, which are potential indicators of wetlands that may
be jurisdictional. A wetland delineation must be provided with the grading permit application, and
a jurisdictional determination may be required.
Drainage: This project is required to meet the four Minimum Standards of the Drainage Criteria
Manual. A dry detention pond and proprietary device are being proposed. Water quality is shown
to be met using an AquaSwirl device. Channel protection is shown to be met by sizing the pond
outlet structure to release the runoff volume from 1-year, 24-hour storm over a period of 40 hours.
Overbank flood protection and extreme flood protection requirements will also be met by sizing
the outlet structure so that post -development peak flows do not exceed pre -development peak
flows. Detailed review of the drainage design will be conducted with the grading permit
application.
Plan Comments:
1. Extend 6' sidewalk along Pump Station Rd. to the western property line. Provide no
feasible alternative request letter to City Engineer for portion of sidewalk that will be within
the Waterside Zone.
Mailing Address: Subdivision Committee
113 W. Mountain Street www.fayettevilYegusgb1v2023
Fayetteville, AR 72701 Agenda Item 2
LSD-2023-0015 (GIVINGTON)
Page 5 of 21
2. Address any remaining plan comments with grading permit submittal.
Standard Comments:
1. All designs are subject to the City's latest design criteria (water, sewer, streets and
drainage). Review for plat approval is not approval of public improvements, and all
proposed improvements are subject to further review at the time construction plans are
submitted.
2. Any damage to the existing public street due to construction shall be repaired/replaced at
the owner/developers expense
3. All public sidewalks, curb ramps, curb & gutter, and driveway aprons along this project
frontage must meet ADA guidelines and be free of damage. Any existing infrastructure
that does not conform to ADA guidelines or is otherwise damaged must be removed and
replaced to correct the issue. Coordinate with the engineering department for inspection
of existing facilities to determine compliance.
4. Water and sewer impact fees will apply for the additional impact to the system. The fees
will be based on the proposed meter size and will be charged at the time of meter set.
5. Note, the following portions of all projects will typically not be reviewed by the Engineering
Division until time of construction -level review (unless specifically requested at plat
review):
o Storm Sewer pipe/inlet sizing, gutter spread, profiles, or utility conflicts
o Sanitary Sewer pipe sizing, profiles, or utility conflicts
o Waterline fittings, callouts, or utility conflicts
o Street profiles
o Fine grading/spot elevations
Subdivision Committee
August 31, 2023
Agenda Item 2
LSD-2023-0015 (GIVINGTON)
PaA 6 of 21
URBAN FORESTRY
LANDSCAPE PLAN COMMENTS
CITY of
FAYETTEVILLE
ARKANSAS
To: Justin Jorgensen, PE, Jorgensen + Associates
From: Melissa Evans, Urban Forester
CC: Jessie Masters, Development Review Manager
Meeting Date: August 31, 2023
Subject: LSD-2023-0015: Givington's: 1175 E. Pump Station Rd.
1. General Landscape Plan Checklist
Yes No N/A
a. Irrigation (notes either automatic or hose bib 100' o.c.)
X
UDC Chapter 177.03C7g, 177.04B3a
b. Species of plant material identified
X
UDC Chapter 177.03C7d,e
c. Size of plant material (minimum size 2" caliper for trees and 3 gal. shrubs)
X
UDC Chapter 177.03C7b,c
d. Soil amendments notes include that soil is amended and sod removed
X
UDC Chapter 177.03C6b
e. Mulch notes indicate organic mulching around trees and within landscape beds
X
UDC Chapter 177.03C6c,d
f. LSD, LSIP, and Subdivisions (PPL & FPL) plans stamped by a licensed
X
Landscape Architect, others by Landscape Designer
UDC Chapter 177.03B
g. Planting bed contained by edging
X
UDC Chapter 177.03C6f
h. Planting details according to Fayetteville's Landscape Manual
X
UDC Chapter 177.03C6g
i. Provide information about 3-Year Maintenance plan. The owner shall deposit
X
with the City of Fayetteville a surety for approved landscape estimate.
UDC Chapter 177.05 A2g
2. Parking Lot Requirements 1 Tree : 12 Parking Spaces Yes No N/A
a. Side and Rear Property Lines (5' Wide Landscape Area) X
UDC Chapter 177D1
Subdivision Committee
August 31, 2023
Agenda Item 2
LSD-2023-0015 (GIVINGTON)
Page 7 of 21
b. Wheel Stops/Curbs X
UDC Chapter 177.O4B1
c. Narrow Tree Lawn (8' min. width, 37.5' length) X
UDC Chapter 177.O4C
d. Tree Island (8' min. width, 18.7' min length, 150 square feet) X
UDC Chapter 177.O4C
e. Placement of Trees (either side at entrances and exits) X
UDC Chapter 177.04C2
3. Perimeter Landscaping Requirements
a. Front Property Line (15' wide landscape) and 5' on sides and rear. X
UDC Chapter 177.O4D2a
b. Shade trees planted on south and west sides of parking lots X
UDC Chapter 177.O4D2e
No N/A
c. Screening of parking lot from adjacent residential properties. X
4. Street Tree Planting Requirements
Yes No N/A
a. Residential Subdivisions
X
1 Large Shade Species Tree per Lot
UDC Chapter 177.05B1a
b. Non -Residential Subdivisions
X
1 Large Species Shade Tree every 30' (planted in greenspace)
UDC Chapter 177.O5B2a
c. Urban Tree Well — Urban Streetscapes
X
Trees every 30' (8' sidewalk)
UDC Chapter 177.O5B3a-f
d. Structural Soil — Urban Tree Wells
X
Include a note and/or detail of structural soil on Landscape Plan
UDC Chapter 177.O5B3a-f
e. Residential Subdivisions
X
Timing of planting indicated on plans
UDC Chapter 177.O5A4
f. Residential Subdivisions
X
Written description for method of tracking planting
UDC Chapter 177.O5A4e
2
Subdivision Committee
August 31, 2023
Agenda Item 2
LSD-2023-0015 (GIVINGTON)
Page 8 of 21
i
5. Landscape Requirement Totals
Mitigation Trees
Parking Lot Trees
Street Trees
Detention Pond — Large Trees
(1 Tree/3,000 square feet)
Detention Pond — Small Tree/Large Shrub
(4 small trees or large shrubs/3,000 square feet)
Detention Pond — Small Shrubs/Large Grasses
(6 shrubs or grasses (1 gallon)/3,000 square feet)
6. Review Status (See Comments)
Conditionally Approved
Approved
Tabled
Denied
Tech Plat Subdivision
Committee
07-28-23 08-31-23
08-15-23
Amount
0
5
23
8
32
48
Planning
Commission
Appeal Process: A final administrative determination by the Urban Forester may be appealed in accordance
with Chapter 155 of the Unified Development Code.
Comments
1. Address items above marked "No" and all Redlines provided.
2. Shrubs are not required between the parking lot and S. Industrial Drive because existing trees are being
preserved in that area. Shrubs are not required between the parking lot and E. Pump Station Road due to the
close proximity of the detention shrubs and the existing trees to be preserved.
3
Subdivision Committee
August 31, 2023
Agenda Item 2
LSD-2023-0015 (GIVINGTON)
Page 9 of 21
URBAN FORESTRY
TREE PRESERVATION COMMENTS
CITY OF
FAYETTEVILLE
ARKANSAS
To: Justin Jorgensen, PE, Jorgensen + Associates
From: Melissa Evans, Urban Forester
CC: Jessie Masters, Development Review Manager
Meeting Date: August 31, 2023
Subject: LSD-2023-0015: Givington's: 1175 E. Pump Station Rd.
1. Submittal Requirements Yes
Initial Review with the Urban Forester X
Site Analysis Map Submitted (if justification is needed)
Site Analysis Written Report Submitted (justification is needed)
Complete Tree Preservation Plan Submitted X
Tree Mitigation Table on Plans X
Tree Preservation Wavier Submitted (only use if no trees onsite or near P/L)
2. Tree Preservation Calculations
No N/A
X
X
X
Tree Preservation Calculations
Square Feet Percent of site
Total Site Area *Minus Right of Way and Easements
246,644
100%
Zoning Designation * Select Below with drop down arrow
1-2, General Industrial
36,997
15%
HHOD * Select Below with Drop Down Arrow
No
0
0%
Total Canopy for Minimum Preservation Requirements
36,997
15.0%
Existing Tree Canopy * Minus Right of Way and Easements
188,416
76.4%
Tree Canopy Preserved
48,042
19.5%
Tree Canopy Removed *On Site
140,374
56.9%
Tree Canopy Removed *Off Site
Tree Canopy Removed Total
140,374
56.9%
Removed Below Minimum
0
Mitigation Requirements
0
Subdivision Committee
August 31, 2023
Agenda Item 2
LSD-2023-0015 (GIVINGTON)
Page 10 of 21
3. Mitigation Requirements
11y1I I I- ILY
Low Priority
Total Mitigation Trees Required
4. Mitigation Type
On -Site Mitigation
Off -Site Mitigation
Tree Escrow (See Conditions of Approval)
5. Tree Preservation Plan Checklist
UDC Chapter 167.04H1 and 167.04L 1
a. 5 year Aerial Check on Existing Trees
b. Property Boundary
c. Natural Features (100ft beyond limits of disturbance)
d. Existing Topography and Proposed Grading
e. Soil Types
f. Significant Trees
g. Groupings of Trees
h. Table Inventory List (species, size, health, priority)
i. All Existing and Proposed Utilities
j. All Existing and Proposed Utility Easements and ROW's
k. All Streams (with approximate center line)
I. Floodplains and floodways
m. Existing Street, Sidewalk or Bike Path ROW
n. Submitted Site Analysis Plan (if required)
o. Shows ALL Proposed Site Improvements
p. Delineates trees/canopy to be preserved and removed
q. Tree Preservation Easement/s shown for LSD, LSIP and
Commercial PPL projects
Tree Protection Methods
a. Tree Protection Fencing
b. Limits of Root Pruning
c. Traffic flow on work site
d. Location of material storage
e. Location of concrete wash out
f. Location of construction entrance/exit
Canopy below Number of 2" caliper
requirement trees to be planted
0 0
Yes No N/A
X
X
X
Tech Subdivision Planning
Plat Committee Commission
Yes
Yes
Yes
No
Yes
Yes
Yes
Yes
No
No
No
Yes
Yes
N/A
Yes
Yes
No
Yes
No
No
Yes
Yes
Yes
Subdivision Committee 2
August 31, 2023
Agenda Item 2
LSD-2023-0015 (GIVINGTON)
Page 11 of 21
6. Site Analysis Report (if required)
UDC Chapter 167.04H4
a. Provide graphic examples of multiple options used to
minimize removal of existing canopy
b. Submitted Analysis Statement — Note the process, iterations,
and approaches to preserve canopy.
7. Review Status (See Comments)
Conditionally Approved
Approved
Tabled
Denied
Yes No
Tech Plat Subdivision
Committee
07-28-23 08-31-23
08-15-23
N/A
X
X
Planning
Commission
Appeal Process: A final administrative determination by the Urban Forester may be appealed in accordance
with Chapter 155 of the Unified Development Code.
Comments
1. Address items above marked "No" and all Redlines provided.
2. Please show root pruning limits on the plan next to areas of cut adjacent trees to be preserved.
3. Please show proposed Tree Preservation Easements on the plan as required per Ch. 167.
Subdivision Committee 3
August 31, 2023
Agenda Item 2
LSD-2023-0015 (GIVINGTON)
Page 12 of 21
JORGENSEN
+ASSOCIATES
v Civil Engineering Surveying
July 19, 2023
City of Fayetteville, Development Services
123 W. Mountain St.
Fayetteville, AR 72701
Attn : Development Services
Re: Fayetteville Distribution Center LSD
Site Improvements
There are no existing improvements on the property.
124 W Sunbridge Drive, Suite 5
Fayetteville, AR 72703
Office: 479.442.9127
Fax: 479.582.4807
www.]orgensenassoc.com
Proposed improvements include 1 building with split occupancy. The total square footage will be 60,000 sq. ft.
with 15,284 sq. ft. of office space and 44,716 sq. ft. of warehouse. There are 73 parking spaces, 3 being
handicapped and 3 motorcycle/scooter.
Dumpster service is proposed in the SW corner of the semi -truck drop-off.
Fire will service from an additional hydrant on the NW corner of the building. There is also an existing hydrant
just south of the southern entrance off of Industrial Drive. The new facility will be provided with a 26' aerial
apparatus set down area on the east and north. The FDC and a fire line are on the east with associated
automatic shut-off valves.
Utilities
Water is connected to a 12" main on the west side of Industrial Drive. Sewer will connect to an existing manhole
in the north west corner of the property.
Drainage
Water quality will be satisfied by means of a wet pond on the north side of the property. Detention
will be provided in the approximately 3' of storage above the permanent water surface elevation.
Please contact us with any questions or comments. We look forward to your assistance.
Sincerely;
dAa��
J stin L. forgensen, PE
Subdivision Committee
August 31, 2023
Agenda Item 2
LSD-2023-0015 (GIVINGTON)
Page 13 of 21
aV'3nIA3ll3Am wo.
S,NO19NIAID ¢i5'iroe s[ro:wiMM 3 OSI NOI`JNMIO
aains'an�ae60�a9ulns N, bo� H .[9x-(szb):iay :w enasvax`vama.�oea///xx���is3oixenr Wd IN3MOl3MO3 39Ntl ( V
• S 3Nns+aui�aauibu3x zzOLzzhz v ozu'm'3nu3u3Av[ I � Q/ )� ALTIDtli N011O91H15IO 3i1V,31L3Atli o u
S31b'I�OSSb'+ '�"a a�xursaaiw�c / / LZO£Z i U
N3SN39mor eso-etOz
�'aA ss�3 IWI 3 #�181 g w�ll ll.,
wlE 1wll�llw Y
�8w gg
B'� ��!' 4z�Jz5e�� dell zl Y Y� uv =11 o11§si° �jla
ox.•® ILL III
®a _ rue � � E€ £ §
Pla
'a�
Win W9
divis
Aq
S' 8�4�w m cnL s� 9 e� a 30 3 y Y<s
s
`
25
®�a®
a 'gymg _a €_ _ _€ �IM
L Yg0015
Committee
3t 31, 2023
nda Item 2
14 of 21
S,NOIJNIAIJ
NOLonNiSN00 NOA 3511 lON 00 -ANtlNIWIl3Ld
Htl'3TIA31L3Atl3
SAOL)`NINO ne x.xvaa axcxvmmanono xwsna SNOU-39Nims tl0Itl31%3N
o o[uuvna;'���,�I NI NOLLN91}LL5103TIA3x d..Biaepwnv LZO£Z
QQ a
81
m
�w
s
z
s
Z
Q
Q
W
W
W
OI�
1 1
0
0
SOS
.Sj
- is
N
-
o
3
�
3
r
q
S
�
x
I
w
■
-
Z
0
d
R
-
w
I
W
�
p4 2
LE
888 �
Subdivision Committee
August 31, 2023
Agenda Item 2
LSD-2023-0015 (GIVINGTON)
Page 16 of 21
NOLonNiSN00 NOA 3s11 lON Oa -ANtlNIWIl3Ld
Uv'3111n3 AV3 _
SAOL)`NINO ne x.xvaa axcxvwmanono xwsna SNOU-39N101INN tl01tl3ll(3
O
TVtl3A0
o o[u'uv mzna aazelAtl; WNJ C- ,�}IIJtl3 NOLLf191}LL5103TIA3LL3Atl3 e
x do -B-a wnv LZO£Z m
u�
m
o---�--� -�--
(::-) --*—
,_�° ivision Committee
August 31, 2023
Agenda Item 2
LSD-2023-0015 (GIVINGTON)
Page 17 of 21
NOLonNiSN00 NOA 3s11 lON Oa -ANtlNIWIl3Ld
Utl'3TIA31L3Atlj _
IAOL)` NIN9 ne x.xvaa
axexvmmanono xwsna wx snt31n 9wdva9o51 O
TW3A0
��0i'90 o o[u'uv�3n zna aazelAtl;'wEujc- ,�I NI NOLL091}LL5103TIA3LL3Atl3 e O
x axv..e.:aasm.r LZO£Z i<
,_�° ivision Committee
August 31, 2023
Agenda Item 2
LSD-2023-0015 (GIVINGTON)
Page 18 of 21
LSD-2023-0015 (GIVINGTON)
Page 19 of 21
LSD-2023-0015 (GIVINGTON)
Page 20 of 21
LSD-2023-0015 1175 E. PUMP STATION RD
Current Land Use
I 1
s
Industrial,
r
PU Sub•ect Propert
Undeveloped
*
+"��` I!�k. l Undeveoped
,t ! G
4VTj and Industrial
1I` S
ORTH
r 7r,
Institutional and IndustrialZia
-
# e
ll
Neighborhood Link
Feet
Residential Link
Planning Area 0 112.5 225 450 675 900
Fayetteville City Limits 1:3,600
FEMA Flood Hazard Data
1oo=Year Floodplain
Floodway
Subdivision C mmittee
August 1, 2023
Item 2
LSD-2023-0015 (GIVINGTON)
Page 21 of 21