Loading...
HomeMy WebLinkAbout134-23 RESOLUTIONARCHIVED 113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 Resolution: 134-23 File Number: 2023-782 ARDOT - HIGHWAY 16 (RELOCATION AGREEMENT): A RESOLUTION TO APPROVE A UTILITY RELOCATION AGREEMENT WITH THE ARKANSAS STATE HIGHWAY COMMISSION FOR UTILITY RELOCATIONS RELATED TO THE HIGHWAY 16 EAST WIDENING PROJECT WHEREAS, the Arkansas Department of Transportation has requested utility relocations to prepare for the widening of Highway 16 from Stonebridge Road to East Roberts Road; and WHEREAS, the utility relocations are estimated to cost a total of $4,739,746.08 with reimbursement to the City for 42.49% of the costs. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby authorizes Mayor Jordan to sign a utility relocation agreement, a copy of which is attached to this Resolution, with the Arkansas State Highway Commission for utility relocations related to the Highway 16 East Widening Project. PASSED and APPROVED on June 6, 2023 Page 1 Attest: �'01111: Itf,' ., rram`` • � ,� Kara Paxton, City Clerk reasurer c l : , V ` r - L. Rev. 08/07/2017 . i ARKANSAS STATE HIGHWAY COMMISSION HIGHWAY - UTILITY CONSTRUCTION/RELOCATION AGREEMENT State Job No 040785 (Utilities) County Washington Federal Aid Project STPC-9142(49) Route 16 Section 3 Job Location Stone Bridge Rd. - East Roberts Rd. (Favetteville)(S Utility Owner City of Fayetteville THIS AGREEMENT, made and entered into this �-A day of u U yi e. , 20 23 , by and between the Arkansas State Highway Commission, acting by and through the duly authorized representatives of the Arkansas Department of Transportation, with headquarters at Little Rock, Arkansas, hereinafter referred to as the "Department," and the City of Fayetteville, Arkansas acting by and through its duly authorized representatives, hereinafter referred to as the "Owner' WITNESSETH: The Department proposes to make highway improvements as specified under the above referenced job number and the Owner will adjust or relocate its existing facilities as set out in the attached plans and cost estimate. The Department will participate in the cost of said adjustment/relocation to the extent that eligibility is hereinafter established. Payment will be made on actual cost basis as mutually agreed between Owner and Department. This agreement is governed by all applicable State and Federal laws, rules, and regulations including the Arkansas State Highway Commission Utility Accommodation Policy adopted by Commission Minute Order 2010-146 as amended and supplemented, the Federal Aid Program Guide on Utility Adjustments and Accommodation on Federal Aid Highway Projects as amended and supplemented, and the provisions of 23 CFR § 645 as amended and supplemented. DESCRIPTION OF WORK: See Exhibit A on Page 4 The Department agrees that the required adjustment is 42.49% eligible for reimbursement for the total cost which is estimated to be $3,419,930.08 of which $1,453,128.29 to be paid by the Department and $1,966,801.79 is to be borne by Owner. Page 1 of 4 Rev. 08/07/2017 Job 040785 City of Fayetteville Owner will not commence work until authorized by the Department, and will then endeavor to begin within 270 calendar days and complete within 570 calendar days thereafter. On completion of said work, Owner is responsible for the cleanup and restoration of the work area including the disposal of surplus materials and debris. Final billing must include all supporting detail. Owner shall also submit one (1) set of as -built drawings at this time. Payment will be 100% of lump sum bills and actual cost bills, at the discretion of the Department a 10% retainage can be withheld and released upon completion of an audit review. All final bills for utility relocation are subject to review and audit by state and/or federal auditors. Expenses incurred under an actual cost agreement may be billed to the Department monthly in increments of $5,000.00 or more. Owner must maintain cost records and accounts to support the agreed adjustment/relocation work. Said records to be retained and available for inspection for a period of three (3) years from date of final payment. Owner shall be responsible for any and all hazards to persons, property, and traffic. With respect to traffic control, owner shall adhere to the requirements of the Manual of Uniform Traffic Control Devices as amended and supplemented. To the extent applicable to this agreement, the Owner shall comply with the Buy America and Build America, Buy America requirements (as specified in 23 U.S.C. 313, 23 CFR 635.410 and the Infrastructure Investment and Jobs Act (IIJA)). The Owner is not required to change its existing standards for materials as long as these requirements are met. These requirements take precedence over regulations pertaining to the accommodation or regulation of the Owner's facilities (as specified in 23 CFR 645) on contracts and agreements involving Federal -Aid Highway Program funding and precedence over regulations which allow the Owner to furnish materials from company stock (as specified on 23 CFR 645.117(e)). Company Stock materials that do not meet these requirements may not be permanently incorporated into a Federal -Aid Highway Program funded project. The Owner must provide a definitive statement that all products permanently incorporated into the project are covered under these requirements. This requirement is fulfilled via proper signature and submission of the statement of charges form. In some circumstances, a waiver of these requirements may be granted by the Federal Highway Administration, to be determined on a project -by -project basis. Page 2 of 4 Rev. 08/07/2017 Job 040785 City of Fayetteville Owner shall be responsible for and shall hold harmless the Arkansas State Highway Commission, the Department and their officers and employees from any and all claims, actions, causes of action, suits, damages, losses or liability whatsoever, arising out of Owner's performance of the work subject to this Agreement. Notwithstanding anything hereinbefore written, neither the Owner nor the Department by execution of this Agreement waives or relinquishes any rights which either may legally have within the limits of the Law or Constitution, either State or Federal. City of Fayetteville L (D n e i d Jorby--,, Name (Typed or Printed) FEDERAL TAXPAYER IDENTIFICATION # Kara PAX/41n Name (Typed or Printed) C - G Title Signature r ARKANSAS HIGHWAY COMMISSION Acting By and Through The ARKANSAS DEPARTMENT of Right of Way Division Head Section Head-U ities Section Page 3 of 4 CITY OF FAYETTEVILLE ARKANSAS MEETING OF JUNE 6, 2023 CITY COUNCIL MEMO 2023-782 TO: Mayor Jordan and City Council THRU: Susan Norton, Chief of Staff FROM: Tim Nyander, Utilities Director DATE: SUBJECT: Arkansas Department of Transportation - Highway 16 Utility Relocation Agreement RECOMMENDATION: Staff recommends approval of a Utility Relocation agreement with the Arkansas Department of Transportation related to the Highway 16 East widening project, ARDOT Project 040785. BACKGROUND: The Arkansas Department of Transportation has requested utility relocations to prepare for the widening of Highway 16 from Stonebridge Road to E. Roberts Road. The water and sanitary sewer relocations for this project are estimated to cost approximately $4,739,746.08, subject to public bidding. The relocations are estimated to be 42.49% reimbursable to the City of Fayetteville by ARDOT. Based on the estimated cost, this would result in ARDOT funding $1,449,107.91 and the City of Fayetteville $3,290,638.17. The actual costs of construction will determine the final contributions from each party. This agreement is primarily to establish the reimbursable percentage for both parties. DISCUSSION: McClelland Consulting Engineers, Inc. was selected for and has completed design of the utility relocations necessary for this project. The Arkansas Department of Health project review is complete and easement acquisition is underway, then the project can proceed to bidding. BUDGET/STAFF IMPACT: No impact at this time. Funds would be obligated to this project at the time a construction bid award is presented. ATTACHMENTS: SRF ARDOT Hwy 16 East, Utility Relocation Agreement Mailing address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 == City of Fayetteville, Arkansas y 113 West Mountain Street Fayetteville, AR 72701 (479)575-8323 - Legislation Text File #: 2023-782 Arkansas Department of Transportation - Highway 16 Utility Relocation Agreement A RESOLUTION TO APPROVE A UTILITY RELOCATION AGREEMENT WITH THE ARKANSAS STATE HIGHWAY COMMISSION FOR UTILITY RELOCATIONS RELATED TO THE HIGHWAY 16 EAST WIDENING PROJECT WHEREAS, the Arkansas Department of Transportation has requested utility relocations to prepare for the widening of Highway 16 from Stonebridge Road to East Roberts Road; and WHEREAS, the utility relocations are estimated to cost a total of $4,739,746.08 with reimbursement to the City for 42.49% of the costs. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby authorizes Mayor Jordan to sign a utility relocation agreement, a copy of which is attached to this Resolution, with the Arkansas State Highway Commission for utility relocations related to the Highway 16 East Widening Project. Page 1 Tim Nyander Submitted By City of Fayetteville Staff Review Form 2023-782 Item ID 6/6/2023 City Council Meeting Date - Agenda Item Only N/A for Non -Agenda Item 5/17/2023 WATER SEWER (720) Submitted Date Division / Department Action Recommendation: Staff recommends approval of a Utility Relocation agreement with the Arkansas Department of Transportation related to the Highway 16 East widening project, ARDOT Project 040785. Budget Impact: N/A N/A Account Number Fund N/A N/A Project Number Budgeted Item? No Does item have a direct cost? No Is a Budget Adjustment attached? No Purchase Order Number: Change Order Number: Original Contract Number: Comments: Project Title Total Amended Budget Expenses (Actual+Encum) Available Budget Item Cost Budget Adjustment Remaining Budget Previous Ordinance or Resolution # Approval Date: V20221130 Rev. 08/07/2017 Job 040785 City of Fayetteville EXHIBIT A Adjust water facilities to clear highway construction by abandoning 4,436 LF of eight (8) inch, 173 LF of six (6) inch, 689 LF of two (2) inch water main complete with appurtenances. Restore service by installing 4,482 LF of eighteen (18) inch, 132 LF of twelve (12) inch, 1,630 LF of eight (8) inch, and 35 LF of six (6) inch water main complete with appurtenances. Adjust sewer facilities to clear highway construction by abandoning 146 LF of eight (8) inch and 2,068 LF of six (6) inch sewer main complete with appurtenances. Restore service by installing 1,869 LF of eight (8) inch gravity sewer main complete with appurtenances. Of the 7,512 LF of main to be abandoned, 3,192 LF is located outside existing ARDOT right-of-way; therefore, this work is 3,192 / 7,512 = 42.49% reimbursable. Owner will perform this work with competitively bid contract forces. Owner has elected to upsize eight (8) inch water mains to eighteen (18) inch. A betterment credit has been given the Department which will be updated based on low bid, and based on final quantities installed. Summary of Cost Construction $ 4,311,535.00 Betterment ($ 1,328,286.00) Construction Engineering $ 174,131.08 Force Account Inspection $ 72,000.00 Easement Cost $ 189,050.00 Advertising $ 1,000.00 Health Department Review $ 500.00 Subtotal $ 3,419,930.08 Reimbursable Cost $3,419,930.08 X 42.49% _ $ 1,453,128.29 Page 4 of 4 City of Fayetteville Arkansas HWY 16 Utility Relocations East McCLELLAND Reimbursement summary CONSULTING Prepared by McClelland Consulting Engineers, Inc. NEE� ENGINEERS, INC. Date: 2/22/23 COSTS Probable Construction Cost' $4,308,000.00 Betterment2 $1,329,439.50 Probable Construction Cost Minus Betterment $2,978,560.50 Engineering Services During Construction $169,196.08 ROW Easement Preparation and Acquisition $72,000.00 ROW Easement Costs $189,050.00 Health Department Review4 $500.00 Advertisement $1,000.00 TOTAL PROJECT COST $4,739,746.08 TOTAL PROJECT COST MINUS BETTERMENT $3,410,306.58 REIMBURSEMENT PERCENTAGE 42.49% REIMBURSEMENT SUMMARY ESTIMATED ARDOT REIMBURSEMENT I ESTIMATED COST TO CITY I TOTAL $1,449,107.91 $3,290,638.17 $4,739,746.08 NOTES: 1. See attached construction cost estimate 2. See attached betterment estimate 3. See attached fee proposal 4. Included in contract dated 6/21/2021 between City of Fayetteville and MCE. 5. See attached ROW Easement Cost Table 7. See attached Reimbursement Calculations City of Fayetteville Arkansas HWY 16 Utility Relocations East Estimate of Probable Construction Costs Prepared by McClelland Consulting Engineers, Inc. Date: 2/22123 General Items INEFICONSULTINGD ENGINEERS, INC. Item No. Description Unit Estimated Quantity Estimated Unit Costs Estimated Cost 1 Mobilization LS 1 $130,568 $130,568 2 Bonds and Insurance LS 1 $130,568 $130,568 3 Project Closeout, As-Builts, Record Drawings, Warranty Bond, etc. LS 1 $130,568 $130,568 4 Act 291, 1993 Trench and Excavation Safety System LS 1 $23,000 $23,000 5 Pre -Construction Video LS 1 $3,450 $3,450 6 Environmental Compliance LS 1 $86,252 ,252 7 Traffic Control LS 1 $17,250 $1$867,250 8 Clearing, Grubbing, Tree Removal & Misc. Demo LS 1 1 1 $28,750 $28,750 Subtotal Estimate of Probable Construction Costs $550,000 Utility Items Item No. Description Unit Estimated Quantity Estimated Unit Costs Estimated Cost 9 18" DIP 350 Water Main LF 3,112 $253 $787,336 10 18" DIP 350 Restrained Joint Water Main LF 1,370 $345 $472,650 11 12" DR-14 PVC C900 Restrained Joint Water Main LF 132 $144 $18,975 12 8" DR-14 PVC C900 Water Main LF 1,066 $86 $91,943 13 8" DR-14 PVC C900 Restrained Joint Water Main LF 564 $115 $64,860 14 6" DR-14 PVC C900 Restrianed Joint Water Main LF 15 $75 $1,121 15 6" DIP 350 Water Main LF 20 $75 $1,495 16 8" Gate Valve w/Box EA 6 $4,025 $24,150 17 12" Butterfly Valve w/ Box EA 1 $11,500 $11,500 18 18" Butterfly Valve w/Box EA 5 $28,750 $143,750 19 Ductile Iron Fittings LBS 9,800 $17 $169,050 20 3-Way Fire Hydrant Assembly EA 15 $8,050 $120,750 21 16" Steel Encasement By Bore LF 208 $1,495 $310,960 22 16" Steel Encasement By Open Cut LF 0 $230 $0 23 24" Steel Encasement By Bore LF 108 $1,495 $161,460 24 36" Steel Encasement By Open Cut LF 257 $345 $88,665 25 36" HDPE DR-11 Encasement Pipe By Open Cut LF 100 $288 $28,750 26 2" Air Release Valve and Vault EA 1 $23,000 $23,000 27 8" Tapping Sleeve and Valve w/ Box EA 2 $11,500 $23,000 28 12" Tapping Sleeve and Valve w/ Box EA 2 $13,800 $27,600 29 8" Anchor Collar EA 5 $4,600 $23,000 30 12" Anchor Collar EA 1 $5,750 $5,750 31 18" Anchor Collar EA 5 $9,200 $46,000 32 Special 2" Reconnection EA 1 $3,450 $3,450 33 2" Blow -off Assembly EA 1 $3,450 $3,450 34 Connect New Water Main to Existing Water Main EA 7 $3,450 $24,150 35 Abandon Existing Fire Hydrant EA 7 $1,150 $8,050 36 Abandon Existing Valve EA 12 $575 $6,900 37 Abandon Existing Meter Setter and Service Line EA 31 $575 $17,825 38 Abandon Water Main LF 4,814 $12 $55,361 39 Double Cut and Cap 6" Water Main EA 3 $3,450 $10,350 40 Double Cut and Cap 8" Water Main EA 3 $4,600 $13,800 41 Double Cut and Cap 12" Water Main EA 2 $5,750 $11,500 42 1" Coated Copper Service Tubing LF 1,910 $35 $65,895 43 2" HDPE SDR-9 Water Service Line Encasement By Bore LF 71 $58 $4,083 44 4"x1" Service Tap EA 1 $575 $575 45 6"A" Service Tap EA 6 $1,150 $6,900 46 8"A" Service Tap EA 10 $1,725 $17,250 47 12"x1" Service Tap EA 1 $2,300 $2,300 48 18"A" Service Tap EA 9 $3,450 $31,050 49 Single 5/8" Water Meter Setter EA 24 $3,450 $82,800 50 Dual 5/8" Water Meter Setter EA 3 $5,175 $15,525 51 Connect New Water Service Line to Existing Service Line EA 29 $575 $16,675 52 Asphalt Pavement Repair SY 360 $173 $62,100 53 Asphalt Pavement Repair LF 175 $86 $15,094 54 Concrete Pavement Repair LF 140 $86 $12,075 55 Gravel Pavement Repair LF 353 $40 $14,208 56 Concrete Sidewalk Repair LF 130 $58 $7,475 57 Curb and Gutter Repair LF 130 $29 $3,738 57 Sewer Pipe Pier Supports EA 4 $5,750 $23,000 58 8" SDR-26 PVC Sewer Main LF 1,869 $104 $193,442 59 Gravity Sewer Trenching and Backfll 0'-6' LF 1,869 $40 $75,227 60 4' Epoxy Lined Manhole 0'-6' EA 16 $6,900 $110,400 61 6' Epoxy Lined Manhole 0'-6' EA 1 $17,250 $17,250 62 Abandon Sewer Main LF 2,296 $12 $26,404 63 Abandon Sewer Manhole LF 11 $1,150 $12,650 64 Plug Abandoned Sewer Main EA 20 $1,725 $34,500 65 4" Sewer Service Tap EA 7 $j30 $12,075 66 Sewer Service Cleanout EA 10 $ $11,500 67 Tie New Sewer Service to Existing Sewer Service EA 10 $ $23,000 68 4" SCH40 PVC Sewer Service Line LF 408 $46,920 69 12" SCH40 PVC Sewer Encasement LF 79 $173 $13,628 Subtotal Estimate of Probable Construction Costs $3,758,000 Total Estimate of Probable Construction Costs $4,308,000 City of Fayetteville MCCLELLAND Arkansas HWY 16 Utility Relocations East Estimate of Betterment Costs CONSULTING Prepared by McClelland Consulting Engineers, Inc. catauxtum ENGINEERS INC. Data: 2122/23 Water Mai.1 Cb 8-inch It.. No. 9 Description 18" DIP 350 Water Main Unit LF Estimated QpanliN 2,312 Estimated Unit Costs $253 EsBmated Cost $584.936 10 18'DIP 350 Restrained Joint Water Main LF 1,000 $345 $345.000 11 12" DR-14 PVC C900 Restained Joint Water Main LF 0 $144 $0 12 8" DR-14 PVC C900 Water Main LF 100 $B6 $8.625 13 8" DR-14 PVC C900 Restrained Joint Water Main LF 65 $115 $7.475 14 W DR-14 PVC C900 Restrlaned Joint Water Main LF 0 $75 $0 15 6' DIP 350 Water Main LF 20 $75 $1.495 16 8'Gate Valve w/Box EA 1 $4,025 $4.025 17 12"Butlerlly Valve w/Box EA 1 $11,500 $11,500 18 18'Butterfly Valve./Box EA 3 $28.750 $B5.250 19 Ductile Iron Fittings LBS 6.500 $17 $112.125 20 3-Wav Fire Hvdrant Assembly EA 9 $8,050 $72,450 21 IT Steel Encasement By Bare LF D $1,495 $0 22 IT Steel Encasement By Open Cut LF D $230 $0 23 24' Steel Encasement By Bore LF 0 $1,495 $0 24 36' Steel Encasement By Open Cut LF 150 $345 $51,750 25 36' HDPE DR-11 Encasement Pipe By Open Cut LF 100 $288 $28,750 26 2' Air Release Valve and Vault EA 1 $23,000 $23,000 27 8' Tapping Sleeve and Valve w/ Box EA 0 $11.500 $0 28 12' Tappinq Sleeve and Valve w/ Box EA 0 $13.800 $0 29 WAnchor Collar EA 0 $4.600 $0 30 12' Anchor Collar EA 7 $5,750 $5.750 31 8" Anchor Collar EA 2 $9,200 1 $18,400 32 Special 2" Reconnection EA 0 $3,450 $0 33 2' Blox-off Assembly EA 1 $3,450 $3.450 34 Connect Nee We. Main to Existino Water Main EA 2 $3,450 $6.900 35 Abandon Existing Fire HWrent EA 5 $1,150 $5.750 36 Abandon Existing Valve EA 7 $575 $4.025 37 Abandon Existing MMer Setter and Service Line EA 11 $575 $6.325 38 Abandon Water Main LF 3,200 $12 $36.800 39 Double Cut and Cap 6' Water Main EA 0 $3,450 $0 40 Double Cut and Cao a' Water Main EA 2 $4,600 $9,200 41 Double Cut and Cap 12" W aler Main EA 1 $5,750 $5.750 42 1' Coaled Copper SeMce Tubing LF 1,250 $35 $43.125 43 2' HDPE SDR-9 Water Service Line Encasement By Bore LF 0 $58 $0 44 4'x1"Sewtce Tap EA 1 $575 $575 45 6'x1"Service Tap EA 2 $1,150 $2.300 46 8'x1"Service Tap EA 2 $1,725 $3.450 47 12"x1" Service Tap EA 0 $2.300 $0 48 18'x1"Service Tap EA 7 $3,450 $24,150 49 Single 5/8" Water Meter Seder EA 10 $3,450 $34.500 50 Dual 518' Water Meter Setter EA 2 $5,175 $10,350 51 Connect New Water Seance Line to Epstino Service Line EA 13 $575 $7.475 52 Asphalt Pavement Repair SV 360 $173 $62,100 53 Asphalt Pavement Repair LF 25 S86 $2.156 54 Concrete Pavement Repair LF 16 $86 $1.380 55 Grevel Pavement Repair LF 40 $40 $1.610 56 Concrade Sidewalk Repair LF 0 $58 1 $0 57 Curb and Gutter Repair EA 0 $29 $0 9 W DR-14 PVC C900 LF 2.312 S86 $199.410 10 W DR-14 PVC C900 Radmined Joint Water Main LF 1.000 $115 $115.000 18 WGde Valve w/Box EA 3 $4.025 $12.075 19 Ductile Iron Fittings LBS 1.000 S17 S17.250 23824 16" Steel Encasement By Open Cut LF 150 $230 $34.500 25 16" HDPE DR-11 Encasement Pipe By Open Cut LF 100 $214 $21.385 31 8' Anchor Collar EA 2 S4.600 $9.200 48 8'x1"B-To, EA ] $1,725 $12,075 Subtotal Estimate of Probable Construction Costs (8") $8U2,43 6 Subtotal Estimate of Probable Construction Costs (18") $1,655,902 Betterment Difference $853,466 ptF.TRJlt,F.1RrTn.T:�R4n It.. No. 9 Description 18" DIP 350 Water Main Unit LF Estimated Quantity SDO Estimated Unit Costs $253 Estimated Co. $202,400 10 18'DIP 350 Restrained Joint Water Main LF 370 $345 $127.650 11 12' DR-14 PVC C900 Reet eined Joint Water Main LF 132 $144 $18,975 12 8' DR-14 PVC C900 Water Main LF 0 $86 $0 13 8' DR-14 PVC C900 Restrained Joint Water Main LF 198 $115 $22.770 14 6' DR-14 PVC C900 Restrlaned Joint Water Main LF 15 $75 $1.121 15 6' DIP 350 Water Main LF 0 $75 $0 16 8' Gate Valve w/Box EA 0 $4.025 $0 17 12"Butterltv Valve w/Box EA 0 $11,500 $0 18 18"Butterfly Vdvew/Box EA 2 $28.750 $57,500 19 Ducile Iron Flttings LBS 3,000 $17 $51,750 20 3-Wav Fire Hvdrant Assembly EA 3 $8.050 $24,150 21 IF Steel Encasement By Bare LF 1D8 $1,495 $161.460 22 IF Steel Encasement By Open Cut LF 0 $230 $0 23 24" Steel Encasement By Bore LF 108 $1,495 $161.460 24 36' Steel Encasement By Open Cut LF 107 $345 $36.915 25 36' HDPE DR-11 Encasement Pipe By Open Cut LF 0 $288 $0 26 2' Air Release Valve and Vault EA 0 $23.000 $0 27 8' Tapping Sleeve and Valve w/ Box EA 0 $11.500 $0 28 12" Tappinq Sleeve and Valve w/ Box EA 2 $13.800 $27,600 29 8' Anchor Collar EA 1 $4.600 $4.600 30 12" Anchor Collar EA 0 $5,750 $0 31 8" Anchor Collar EA 3 $9,200 $27,600 32 Special 2" Reconnection EA 1 $3,450 $3.450 33 2' Blomoff Assembly EA 0 $3,450 $0 34 Connect New We. Main to Epstino Water Main EA 2 $3,450 $6.900 35 Abandon Existing Fire Hvdrent EA 1 $1,150 $1.150 36 Abandon Existing Valve EA 2 $575 $1.150 37 Abandon Existing Meter Setter and Service Line EA 6 $575 $3.450 38 Abandon Water Main LF 1,121 $12 $12,892 39 Double Cut and Cap 6' Water Main EA 2 $3,450 $6.900 40 D-bl. Cut antl Cap 8' Water Main EA 1 $4.600 $4.600 41 Double Cut antl Cap 12" W afar Main EA 1 $5,750 $5.750 42 1' Coded Capper SeMceTubino LF 180 $35 $6,210 43 2' HDPE SDR-9 Water Service Line Encasement By Bore LF 0 $58 $0 44 4'x1"Service Tap EA 0 $575 $0 45 6'x1"Service Tap EA 2 $1,150 $2.300 46 8'x1"Service Tap EA 0 $1,725 $0 47 12"x1" Service Tap EA 1 $2,300 $2.300 48 18'x1"Service Tao EA 2 $3,450 $6.9DD 49 Single 5/8" Water Mader Satter EA 4 $3.450 $13,800 50 Dual 518" Water Meter Salter EA 1 $5.175 $5.175 51 Connect New Water Seance Line to Epstino Service Line EA 6 $575 $3.450 52 Asphalt Pavement Repair SV 0 $173 $0 53 Asphalt Pavement Repair LF 1 0 $86 1$0 54 nConrad. Pavement Repair LF 0 $86 $0 55 Grevel Pavement Repair LF 100 $40 $4.025 56 Conrad. Sid-lk Repair LF 0 $58 $0 57 Curb and Gutter Repair EA 0 $29 $0 9 W DR-14 PVC C900 LF 80D S86 $69.000 10 W DR-14 PVC C900 Radmined Joint Water Main LF 370 $115 $42.550 18 WGale Valve w/Box EA 2 $4.025 $6.050 19 Ductile Iron Fittings LBS 574 $17 $9.902 23824 16" Steel Encasement By Ocen Cut LF 215 $230 $49.450 31 8' Anchor Collar EA 3 S4.600 S13.800 48 8"x1"BervtceI EA 2 $1,725 $3.450 Subtotal Estimate of Probable Construction Costs (8") $540,379 Subtotal Estimate of Probable Construction Costs (18") $1,016,353 Betterment Difference $475,974 Water Main Betterment Subtotal Costs $1,329,440 Total Estimate of Probable Betterment Costs $1,329,440 City of Fayetteville Arkansas HWY 16 Utility Relocations East ROW Easement Cost Estimate Prepared by McClelland Consulting Engineers, Inc. Date: 2/22/2023 REFMcCLELLAND CONSULTING ENGINEERS, INC. ROW EASEMENT TYPE I AREA (SQFT) UNIT COST PER SQFT I COST Permenant Water Sewer Easement (WSE) 158100 $1.00 $158,100.00 Temporary Construciton Easement (TCE) 61900 $0.50 $30,950.00 TOTAL 1 $189,050.00 Clry of FXyy. iule MtCEEWMD cnio�s east CONSULTING om. 2-3°ne�a coasw� eaemaara, iaa. RMNEERS, IN[ Exhibit B-4 Fee Proposal Services During Construction In Conjunction with the Highway 16 Utility Relocations MCE Job No. 21-2121 Labor Classification Time/Hours Direct Labor Rate Extended Sr Project Manager 32.00 $68.00 $2,176.00 Project Manager 94.00 $53.00 $4,982.00 Project Engineer 246.00 $36.00 $8,856.00 Construction Observer 1644.00 $25.00 $41,100.00 Chief Draftsman 40.00 $30.00 $1,200.00 Survey Technician 16.00 $25.00 $400.00 Registered Land Surveyor 8.00 $35.00 $280.00 Survey (2-Man or Robotic) 48.00 $50.00 $2,400.00 Direct Labor Subtotal Title II Labor Multiplier Subtotal Labor Costs EXPENSES $61,394.00 2.82 $173,131.08 Estimated Reimbursable Expenses Amount Mileage ($0.42/mile) $1,000.00 Total Estimated Reimbursable Expenses $1,000.00 Total Costs - Construction Engineering $174,131.08 Notes: 1. Title II Multiplier based upon MCE FY22 Indirect Cost Rate (151.55%) for ARDOT projects, plus fixed fee of 12%. 2. Construction Duration Assumed - 545 Calendar Days (Substantial); 575 Calendar Days (Final) 3. Construction Observeration may be performed by MCE, City of Fayetteville, or a combination