Loading...
HomeMy WebLinkAbout124-23 RESOLUTION113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 Resolution: 124-23 File Number: 2023-784 HAWKINS-WEIR ENGINEERS, INC. - HWY 112 (SERVICE AGREEMENT): A RESOLUTION TO APPROVE AMENDMENT NO. 1 TO THE PROFESSIONAL ENGINEERING SERVICES AGREEMENT WITH HAWKINS-WEIR ENGINEERS, INC. IN AN AMOUNT NOT TO EXCEED $98,610.00 FOR ADDITIONAL SERVICES DURING THE FINAL DESIGN PHASES OF THE UTILITY RELOCATIONS ALONG HIGHWAY 112 WHEREAS, on June 1, 2021, the City Council passed Resolution No. 164-21 approving a Professional Engineering Services Agreement with Hawkins -Weir Engineers, Inc. for engineering services associated with the utility relocations along Highway 112 from Truckers Drive to Howard Nickell Road associated with Arkansas Department of Transportation Project 040746; and WHEREAS, Amendment No. 1 to the contract with Hawkins -Weir Engineers, Inc. will provide for costs associated with significant additional services required during the final design phases of the project, with reimbursement from the Arkansas Department of Transportation expected to cover approximately 90% of those costs. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby authorizes Mayor Jordan to sign Amendment No. 1 to the Professional Engineering Services Agreement with Hawkins -Weir Engineers, Inc. in an amount not to exceed $98,610.00 for significant additional services required during the final design phases of the project, as shown in the scope of services attached to Amendment No. 1. PASSED and APPROVED on June 6, 2023 Attest: mvgttnfill," V� GITYLP •� '� ~ Kara Paxton, City Clerk , asurer �S; T F ;Tn— "' Page 1 AMENDMENT NO. 1 TO THE AGREEMENT For PROFESSIONAL ENGINEERING SERVICES BETWEEN CITY OF FAYETTEVILLE, ARKANSAS AND HAWKINS-WEIR ENGINEERS, INC. In accordance with the AGREEMENT For PROFESSIONAL ENGINEERING SERVICES for the Highway 112 Utility Relocation (HW Project No. 2021048), dated June 1, 2021, between the City of Fayetteville, Arkansas (hereinafter called Owner) and Hawkins -Weir Engineers, Inc. (hereinafter called Engineer), Owner hereby authorizes Engineer to proceed with engineering services as modified by this Amendment No. 1. SECTION 1— SCOPE OF SERVICES 1.1 Amendment No. 1 is for the increased scope of work associated with the Final Design Phase of the Highway 112 Utility Relocation project. Additional services are detailed in the Engineer's attached Scope of Services dated January 17, 2023. SECTION 2 — TIME OF SERVICE 2.1 Engineer will proceed with providing the services set forth herein immediately upon execution of this Authorization by all parties. SECTION 3 — COMPENSATION 3.1 Owner shall compensate Engineer for providing the services set forth herein in accordance with the terms of the Agreement. Total payment for Scope of Services described herein shall not exceed Niqety Eight Thousand Six Hundred Ten and 00/100 Dollars ($98,610.00) without written approval of Owner. These additional services adjust the Agreement's not to exceed fee to $524,410.00, but does not adjust the not to exceed reimbursable expenses of $40,200.00. 2021048 Amendment l.doex Page I oft April 13, 2023 Attachments: Scope of Services dated January 17, 2023 Fee Proposal dated January 17, 2023 Arkansas State Highway Commission Utility Change Order Standard ! lourly Billing Rate Structure, effective August 14, 2022 AUTHORIZATION BY: CITY OF FAYETTEVII,I,E, ARKANSAS Date: ACCEPTED BY: HAWKINS-WEIR ENGINEERS, INC. By: � Ub b • ec" Brett D. Peters, P.E. President and CEO Date: 04 113 / 20 23 Jordan, Mayor 2021048 Amendment l.docx Page 2 of April 13, 2023 == City of Fayetteville, Arkansas y 113 West Mountain Street Fayetteville, AR 72701 (479)575-8323 - Legislation Text File #: 2023-784 Hawkins -Weir Engineers, Inc. - Highway 112 Amendment No. 1 A RESOLUTION TO APPROVE AMENDMENT NO. 1 TO THE PROFESSIONAL ENGINEERING SERVICES AGREEMENT WITH HAWKINS-WEIR ENGINEERS, INC. IN AN AMOUNT NOT TO EXCEED $98,610.00 FOR ADDITIONAL SERVICES DURING THE FINAL DESIGN PHASES OF THE UTILITY RELOCATIONS ALONG HIGHWAY 112 WHEREAS, on June 1, 2021, the City Council passed Resolution No. 164-21 approving a Professional Engineering Services Agreement with Hawkins -Weir Engineers, Inc. for engineering services associated with the utility relocations along Highway 112 from Truckers Drive to Howard Nickell Road associated with Arkansas Department of Transportation Project 040746; and WHEREAS, Amendment No. 1 to the contract with Hawkins -Weir Engineers, Inc. will provide for costs associated with significant additional services required during the final design phases of the project, with reimbursement from the Arkansas Department of Transportation expected to cover approximately 90% of those costs. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby authorizes Mayor Jordan to sign Amendment No. 1 to the Professional Engineering Services Agreement with Hawkins -Weir Engineers, Inc. in an amount not to exceed $98,610.00 for significant additional services required during the final design phases of the project, as shown in the scope of services attached to Amendment No. 1. Page 1 Tim Nyander Submitted By City of Fayetteville Staff Review Form 2023-784 Item ID 6/6/2023 City Council Meeting Date - Agenda Item Only N/A for Non -Agenda Item 5/17/2023 WATER SEWER (720) Submitted Date Division / Department Action Recommendation: Staff recommends approval of Amendment No. 1 to the engineering services agreement with Hawkins -Weir Engineers, Inc. for professional services associated with ArDOT Project 040746 Utility Relocations along Highway 112 in an amount not to exceed $98,610.00. Budget Impact: 5400.720.5600-5314.00/5400.720.5700- 5314.00 Account Number 11011.2101 Project Number Budgeted Item? Yes Does item have a direct cost? Yes Is a Budget Adjustment attached? No Purchase Order Number: Change Order Number: Original Contract Number: Comments: Water and Sewer Fund Water/Sewer Relocations - Bond Projects Total Amended Budget Expenses (Actual+Encum) Available Budget Item Cost Budget Adjustment Remaining Budget Project Title $ 5,903,062.00 $ 1,792,948.85 Is 4,110,113.15 $ 98,610.00 Previous Ordinance or Resolution # Approval Date: 4,011,503.15 V20221130 CITY OF FAYETTEVILLE ARKANSAS MEETING OF JUNE 6, 2023 CITY COUNCIL MEMO TO: Mayor Jordan and City Council THRU: Susan Norton, Chief of Staff FROM: Tim Nyander, Utilities Director DATE: SUBJECT: Hawkins -Weir Engineers, Inc. - Highway 112 Amendment No. 1 RECOMMENDATION: 2023-784 Staff recommends approval of Amendment No. 1 to the engineering services agreement with Hawkins -Weir Engineers, Inc. for professional services associated with ArDOT Project 040746 Utility Relocations along Highway 112 in an amount not to exceed $98,610.00. BACKGROUND: The Arkansas Department of Transportation has requested utility relocations to prepare for the widening of Highway 112 from Truckers Drive to Howard Nickell Road. Hawkins -Weir has completed the engineering design of these improvements and now the project is moving forward into easement acquisition and bidding phases. The ArDOT Utility Relocation Agreement for this project is also progressing through the City's committee and council processes. DISCUSSION: Amendment No. 1 is necessary to cover costs associated with significant additional effort encountered during the final design phases. This effort included an additional 3,200-feet of pipeline design, assistance with nearby rezoning coordination that was time -sensitive, four additional meetings with City and ArDOT for final coordination items, and additional 3-D modelling to avoid conflicts with the final ArDOT detailing of underground pedestrian facilities. This amendment has already been approved by ArDOT as a change order to the existing Preliminary Engineering Agreement between the City and ArDOT. The cost for this amendment is $98,610.00, however, ArDOT reimbursement on this project is approximately 90% which will also apply to these engineering fees. BUDGET/STAFF IMPACT: Funds are available in the Water/Sewer Relocations - Bond Projects account within the Water & Sewer fund. Mailing address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 The breakout of the split between the two G/L accounts is below: G/L Account Project Amount 5400.720.5600-5314.00 11011.2101 $73,957.00 5400.720.5700-5314.00 11011.2101 $24,653.00 Total $98,610.00 ATTACHMENTS: SRF Hawkins -Weir Engineers - Hwy 112, Amendment No. 1, 040746 ARDOT Change Order Mailing address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 HN Amendment No. 1 Scope of Services �� Highway 112 Utility Relocations Fayetteville, Arkansas CITY OF HW Project No. 2021048 FAYETTEVILLE January 17, 2023 ARKANSAS D. Task 3 — Final Design (ARDOT Preliminary Engineering — Change Order) 1. Prepare final design calculations, plans, profiles, details, quantity takeoffs, and cost estimates for an additional 3,200 LF of pipe line 2. Prepare exhibits for City of Fayetteville's use relative to a rezoning effort for Benedict Preliminary Master Plan and provide review comments on rezoning for the 112 Drive -In Development 3. Research property records and prepare additional utility easement in Highway 112 Business Park for existing utilities along W. Enterprise Drive 4. Prepare requests and coordinate with ARDOT on proposed right-of-way changes along Arkansas Highway 112 north of Truckers Drive; relocation of proposed ARDOT drainage improvements and elimination of a sanitary sewer relocation on W. Van Ashe Drive; and possible extension of water line improvements along Arkansas Highway 112 north of Howard Nickle Road for future phase of Highway 112 widening 5. Prepare Civil 3D surface model of proposed traffic circle at Arkansas Highway 112 and W. Van Asche Drive to determine location of existing 36-in. transmission line relative to proposed drainage improvements and roadway embankment 6. Attend (1) additional 50% Design Review meeting and prepare additional plan revisions for pipeline alignment and associated easement updates 7. Attend (3) additional 90% (Pre -Final) Design Review meetings with City of Fayetteville Utility Department staff, City land agents, and ARDOT 8. Update technical specifications for project manual based on revised City of Fayetteville Standard Specifications recently approved by the Arkansas Department of Health 9. Coordinate, inspect and perform location survey on the second phase of geotechnical bores at the project site 2021048 Amendment 1 Scope of Services (01-17-23) Page 1 HN Task 3 - Final Design, Amendment 1 (ARDOT Preliminary Engineering - Change Order) Exhibit B Scope of Services and Fee Proposal Summary Contract Amendment No. 1 Revised Highway 112 Utility Relocations City of Fayetteville, Arkansas HW Project No. 2021048 January 17, 2023 �_ c ITY OF FAYETTEVILLE ARKANSAS Highway 112 Utility Relocations, Fayetteville, Arkansas Task Engr VII Engr V Engr III Engr I GPS Survey Surveyor Insp I Tech IV Tech I Total Hours 1. Prepare final design calculations, plans, profiles, details, quantity takeoffs, and cost estimates for an additional 3,200 LF of pipe line 188 8 20 166 4 72 22 480 2. Prepare exhibits for City of Fayetteville's use relative to a rezoning effort for Benedict Preliminary Master Plan and provide review comments on rezoning for the 112 Drive -In Development 12 4 2 18 3. Research property records and prepare additional utility easement in Highway 112 Business Park for existing utilities along W. Enterprise Drive 1 6 7 4. Prepare requests and coordinate with ARDOT on proposed right-of-way changes along Arkansas Highway 112 north of Truckers Drive; relocation of proposed ARDOT drainage improvements and elimination of a sanitary sewer relocation on W. Van Ashe Drive; and possible extension of water line improvements along Arkansas Highway 112 north of Howard Nickle Road for future phase of Highway 112 widening 16 2 2 20 5. Prepare Civil 3D surface model of proposed traffic circle at Arkansas Highway 112 and W. Van Asche Drive to determine location of existing 36-in. transmission line relative to proposed drainage improvements and roadway embankment 4 22 26 6. Attend (1) additional 50 % Design Review meeting and prepare additional plan revisions for pipeline alignment and associated easement updates 6 2 4 12 7. Attend (3) additional 90 % (Pre -Final) Design Review meetings with City of Fayetteville Utility Department staff, City land agents, and ARDOT 16 4 20 40 8. Update technical specifications for project manual based on revised City of Fayetteville Standard Specifications recently approved by the Arkansas Department of Health 36 4 40 9. Coordinate, inspect and perform location survey on the second phase of geotechnical bores at the project site 2 2 4 1 9 Total Hours 281 14 20 194 8 10 0 99 26 652 Final Design, Amendment 1 (ARDOT Preliminary Engineering - Change Order) $98,610 ENGINEERING SERVICES SUMMARY Highway 112 Utility Relocations, Fayetteville, Arkansas A. Task 1 - Preliminary Engineering Services Approved under Agreement for Professional Engineering Services, June 1, 2021 $36,000 B. Task 2 - Final Design Phase (ARDOT Construction Agreement) Approved under Agreement for Professional Engineering Services, June 1, 2022 $389,800 C. Reimbursable Expenses Approved under Agreement for Professional Engineering Services, June 1, 2023 $40,200 D. Task 3 - Final Design, Amendment 1 (ARDOT Preliminary Engineering - Change Order) $98,610 Total Engineering Fee - Not to Exceed $564,610 2021048 Scope of Services Fee Proposal -Amendment I\Annendment 1(Task 3( 01-17-23 Page 1 of 1 ARKANSAS STATE HIGHWAY COMMISSION UTILITY CHANGE ORDER UTILITY City of Fayetteville CHANGE ORDER NO. One (PE) JOB NO. 040746 FAP NO. CMF-TAPF-9142(48) JOB NAME Truckers Dr. - Howard ROUTE 112 SECTION 1 Nickell Rd. (Fayetteville)(S) COUNTY Washington DESCRIPTION OF CHANGE: Increase Preliminary Engineering from the amount entered on the PE Agreement of $466,000.00 to the revised estimated amount of $564,610.00, which results in an increase of $98,610.00. REASON FOR CHANGE: Increase Preliminary Engineering due to additions in the scope of work for design. Additional facilities have been included in the relocation plans, and additional engineering is required due to business developments within the project area. Additional coordination is also being required to complete the Owner's relocation proposal. Please see attached estimate. Item Description Present Amount Revised Amount Increase (Decrease) Preliminary Engineering $466,000.00 $564,610.00 $98,610.00 TOTAL 1 $466,000.00 $564,610.00 1 $98,610.00 COMPUTATION OF REIMBURSABLE AMOUNT: Reimbursable Percentage: 90.31 % (estimated) Present Amount $466,000.00 Reimb. % 90.31 % $420,844.60 Revised Amount $564,610.00 IReimb. % 90.31 % $509,899.29 Overrun $89,054.69 Requested Coordinator�/ Recommended Ul:�/l/ 44,0- qLA , & Section Head-Utilitia Section Approved �^-- ti •• �A� Right of Way Division Upaic�, Authorized Asst. Chief Lr,,,ineer-Design Job Files\Job #\Funding Date 2-8-2023 Date 2-8-2023 Date 2/8/2023 Date 02-08-2023 Engineer Standard Billing Rate Structure For Hourly Fee Based Contracts Hawkins -Weir Engineers, Inc. Effective August 14, 2022 through August 12, 20231" Engineer VII $ 220 Per Hour Engineer VI $ 200 Per Hour Engineer V $ 175 Per Hour Engineer IV $ 150 Per Hour Engineer III $ 130 Per Hour Engineer II $ 115 Per Hour Engineer I $ 100 Per Hour Engineering Technician Designer I $ 110 Per Hour Technician IV $ 95 Per Hour Technician III $ 85 Per Hour Technician II $ 75 Per Hour Technician I $ 65 Per Hour Field Technician - Field Inspector Resident Project Representative (RPR) $ 120 Per Hour Construction Manager $ 100 Per Hour Inspector II $ 85 Per Hour Inspector I $ 75 Per Hour Field Surveying GPS Survey Surveyor Administrative Business Manager Expert Witness Preparation Testimony, less than 1/2 day Testimony, per Day $ 175 Per Hour $ 125 Per Hour $ 85 Per Hour At Engineer's Hourly Rate $ 2,000 $ 4,000 Expenses Reimbursable Expenses and upcharges are determined by the Client Agreement/Contract Subconsultants/Outside Services Express Delivery, Field Supplies, Testing, Review/Filing Fees and Advertising Travel: Hotel and meals Actual Cost Vehicle(2) $0.655 per mile effective l/l/23 Reproduction: Outside printing service Actual Cost In-house printing Letter Copy - B&W $ 0.12 Per Copy Letter Copy - Color $ 0.75 Per Copy 22 x 34 Size Copy - B&W $ 3.00 Per Copy 22 x 34 Size Copy - Color $12.00 Per Copy 22 x 34 Size Copy - Color Photo $ 25.00 Per Copy 11 x 17 Size Copy - B&W $ 1.50 Per Copy 11 x 17 Size Copy - Color $ 5.00 Per Copy CD Copy $ 5.00 Per Copy Binding $ 1.00 Each (1> Billing Rates are reviewed and adjusted annually in August. Regardless, any adjustment in Billing Rates will not impact previously negotiated Not To Exceed (NTE) fee amounts without a formal Contract Amendment. (z) To be adjusted periodically to current IRS mileage rate. All Billings are due upon receipt unless prior arrangements for payment have been made. ARKANSAS STATE HIGHWAY COMMISSION UTILITY CHANGE ORDER UTILITY City of Fayetteville CHANGE ORDER NO. One (PE) JOB NO. 040746 FAP NO. CMF-TAPF-9142(48) JOB NAME Truckers Dr. - Howard ROUTE 112 SECTION 1 Nickell Rd. (Fayetteville)(S) COUNTY Washington DESCRIPTION OF CHANGE: Increase Preliminary Engineering from the amount entered on the PE Agreement of $466,000.00 to the revised estimated amount of $564,610.00, which results in an increase of $98,610.00. REASON FOR CHANGE: Increase Preliminary Engineering due to additions in the scope of work for design. Additional facilities have been included in the relocation plans, and additional engineering is required due to business developments within the project area. Additional coordination is also being required to complete the Owner's relocation proposal. Please see attached estimate. Item Description Present Amount Revised Amount Increase (Decrease) Preliminary Engineering $466,000.00 $564,610.00 $98,610.00 TOTAL 1 $466,000.00 $564,610.00 $98,610.00 COMPUTATION OF REIMBURSABLE AMOUNT: Reimbursable Percentage: 90.31 % (estimated) Present Amount $466,000.00 Reimb. % 90.31 % $420,844.60 Revised Amount $564,610.00 IReimb. % 90.31 % $509,899.29 Overrun $89,054.69 Requested Coordinator�/ Recommended Ul:�/l/ 44,0- qLA , & Section Head-Utilitia Section Approved Right of Way Division Upaic�, Authorized Asst. Chief Lr,,,ineer-Design Job Files\Job #\Funding Date 2-8-2023 Date 2-8-2023 Date 2/8/2023 Date 02-08-2023 ON hw D. Task 3 - Final Design, Amendment 1 (ARDOT Preliminary Engineering - Change Order) Exhibit B Scope of Services and Fee Proposal Summary Contract Amendment No. 1 Revised Highway 112 Utility Relocations City of Fayetteville, Arkansas HW Project No. 2021048 January 17, 2023 Include with PE Change Order #1 CITY OF FAYETTEVILLE ARKANSAS Highway 112 Utility Relocations, Fayetteville, Arkansas Engr Engr Engr Engr GPS Insp Tech Tech Total Task VII V III I Survey Surveyor I IV I Hours 1. Prepare final design calculations, plans, profiles, details, quantity takeoffs, and cost estimates for an additional 3,200 LF of pipe line 188 8 20 166 4 72 22 480 2. Prepare exhibits for City of Fayetteville's use relative to a rezoning effort for Benedict Preliminary Master Plan and provide review comments 12 4 2 18 on rezoning for the 112 Drive -In Development 3. Research property records and prepare additional utility easement in Highway 112 Business Park for existing utilities along W. Enterprise 1 6 7 Drive 4. Prepare requests and coordinate with ARDOT on proposed right-of-way changes along Arkansas Highway 112 north of Truckers Drive; 16 2 2 20 relocation of proposed ARDOT drainage improvements and elimination of a sanitary sewer relocation on W. Van Ashe Drive; and possible extension of water line improvements along Arkansas Highway 112 north of Howard Nickle Road for future phase of Highway 112 widening 5. Prepare Civil 3D surface model of proposed traffic circle at Arkansas Highway 112 and W. Van Asche Drive to determine location of existing 4 22 26 36-in. transmission line relative to proposed drainage improvements and roadway embankment 6. Attend (1) additional 50 % Design Review meeting and prepare additional plan revisions for pipeline alignment and associated easement 6 2 4 12 updates 7. Attend (3) additional 90% (Pre -Final) Design Review meetings with City of Fayetteville Utility Department staff, City land agents, and ARDOT 16 4 20 40 8. Update technical specifications for project manual based on revised City of Fayetteville Standard Specifications recently approved by the 36 4 40 Arkansas Department of Health 9. Coordinate, inspect and perform location survey on the second phase of geotechnical bores at the project site 2 2 4 1 9 Total Hours 281 14 20 194 8 10 0 99 26 652 Final Design, Amendment 1 (ARDOT Preliminary Engineering - Change Order) $98,610 DR, F E. Task 4 - Construction Phase Services, Amendment 1 (ARDOT Construction Engineering) Highway 112 Utility Relocations, Fayetteville, Arkansas Task Engr VII Engr V Engr III Engr II GPS Survey Sury Insp I Tech IV Tech I Total Hours 1. Conduct a Pre -Construction Conference with the Owner and Contractor 4 4 4 2 14 a. Prepare and distribute a Meeting Summary 4 4 4 2 14 b. Provide field survey to establish control monumentation 16 4 20 2. Provide full time observation of Contractor's construction activities Its 240 600 4400 160 5400 3. Conduct 24 monthly progress meetings 80 120 120 320 a. Conduct a Concrete Pre -Placement Conference with the Owner and Contractor 4 4 4 12 b. Conduct a coordination meeting with the Owner and the Contractor prior to connecting to the existing 36-inch transmission line 4 4 4 12 c. Conduct a coordination meeting with the Owner and the contractor prior to hydrostatic pressure testing and disinfection of water lines 4 4 8 d. Prepare and distribute Meeting Summaries 8 48 48 80 184 4. Prepare, review, and coordinate the dissemination of construction documentation including materials submittals, requests for information, testing results, field orders, and change orders as directed by the Owner 80 120 120 40 104 464 5. Review the Contractor's construction quantities and materials stored and prepare monthly pay requests for the Owner's consideration and approval 40 48 96 48 232 6. Conduct as -built surveys of completed water and sanitary sewer improvements 64 8 72 7. Coordinate and conduct a final inspection with the Contractor and the Owner 8 8 4 20 a. Prepare and distribute a punch list of deficient construction items for the Contractor to address 4 4 4 12 b. Monitor Contractor's completion of the punch list items and prepare an acceptance recommendation for the Owner 8 8 8 24 8. Prepare Record Drawings of the completed project and provide one (1) reproducible hard copy and one (1) electronic copy for the Owner's archives 24 20 80 124 Total Hours 240 640 0 1040 80 12 4400 120 400 6932 Construction Phase Services, Amendment 1 (ARDOT Construction Engineering) $667,300 2021048 Scope of Services Fee Proposal -Amendment 1\Proposed Fee Amendment 1-011723 Page 1 of 2 Exhibit B hw ENGINEERING SERVICES SUMMARY Scope of Services and Fee Proposal Summary Contract Amendment No. 1 Revised Highway 112 Utility Relocations City of Fayetteville, Arkansas HW Project No. 2021048 January 17, 2023 CITY OF P"ETTEVILLE ARKANSAS Highway 112 Utility Relocations, Fayetteville, Arkansas A. Task 1 - Preliminary Engineering Services $36,000 B. C. D. E. Task 2 - Final Design Phase (ARDOT Construction Agreement) Reimbursable Expenses Task 3 - Final Design, Amendment 1 (ARDOT Preliminary Engineering - Change Order) Task 4 - Construction Phase Services, Amendment 1 (ARDOT Construction Engineering) $389,800 $40,200 $98,610 $667,300 Total Engineering Fee - Not to Exceed (1) Inspection time based on a 910-day (30 months) Construction Contract Time (182 calendar days to Materials Delivery, 698 days to Substantial Completion, and 30 days to Final Completion). Materials delivery observation is based on 8 hours per week, full-time construction observation is based on 8 hours per day (Monday through Friday), and periodic inspection is based on 16 hours per week until the originally scheduled final completion date. Construction phase services assume that the City of Fayetteville will also provide a city inspector for periodic inspection during construction. $1,231,910 2021048 Scope of Services Fee Proposal -Amendment 1\Proposed Fee Amendment 1-011723 Page 2 of 2 Mashburn, Keith From: Barry McCormick <Barry.McCormick@hawkins-weir.com> Sent: Thursday, January 19, 2023 11:07 AM To: Mashburn, Keith Cc: Corey Granderson P.E. (cgranderson@fayetteville-ar.gov); Josh Durham Subject: Information for PE Agreement Change Order and CE Agreement - Hwy 112, 2021048 Attachments: 2021048 Scope of Services Fee Proposal - Amendment 1 (draft 01-17-23).pdf Follow Up Flag: Follow up Flag Status: Flagged CAUTION: This email originated from outside of ARDOT. Do not click links or open attachments unless you recognize the sender and know the content is safe. Keith This will transmit for your review our updated Scope of Services and Fee Proposal Summary for the Hwy 112 Utility Relocation project, which includes a proposed Change Order for additional Final Design Services (Task 3). As discussed during the coordination meeting with Corey Granderson on January 5, 2023, we understand that the additional Final Design Services fee ($98,610) can be added to Fayetteville's current ArDOT Preliminary Engineering Agreement by Change Order. Please advise if any additional information is needed to execute this change order with ArDOT. The attached fee proposal also includes the proposed fee for the Construction Phase Services ($667,300). As discussed during our January 5 meeting, the City of Fayetteville will also provide inspection services for this project during construction. Our fee for Construction Engineering is based on using both our staff and Fayetteville's staff to inspect the Highway 112 Utility Relocations project. As noted below, Corey has estimated $100,000 for inspection services by Fayetteville staff. Corey has also estimated a labor expense of $30,000 for Fayetteville's land agents in acquiring the necessary utility and temporary construction easements for this project. Please let me know if you need any additional information to prepare the Construction Engineering Agreement with Fayetteville. See also Corey's highlighted questions below — please advise on the timing of taking our Engineering Services Amendment to the City of Fayetteville. If you have any questions, please call. Copy to File: Hwy 112 Utility Relocations, 2021048 Barry K. McCormick, P.E., Principal Hawkins -Weir Engineers, Inc. P.O. Box 648, 110 South 7th St., Van Buren, AR 72957 (P) 479.474.1227 - (F) 479.474.8531 - (M) 479.883.2570 Licensed Professional Engineer in Arkansas and Oklahoma From: Granderson, Corey <cgranderson@fayetteville-ar.gov> Sent: Wednesday, January 18, 2023 9:25 AM To: Barry McCormick <Barry.McCormick@hawkins-weir.com> Cc: Brett Peters <Brett.Peters@hawkins-weir.com>; Josh Durham <Josh.Durham@hawkins-weir.com> Subject: RE: Proposal for Amendment 1- Final Design CO & Construction Phase Services - Hwy 112 2021048 Barry — I do not have any comments on these, thank you for preparing. Here are some of my next thoughts: 1. Brandi's time can be estimated at $30,000 for easement acquisition. 2. City Inspection time can be estimated at $100,000 for a placeholder. 3. We now have all numbers and dates to complete Keith's relocation agreement, correct? a. We need to get everything to Keith so that he can draft the agreement and get ARDOT reviews started, which include the construction plan set review. b. Is there any other info lacking for the agreement document? 4. 1 need to understand when to run the Fayetteville/HW contract amendment through Committee/Council. I realize this might be a Keith question, but curious: a. Can a PE Agreement change order be fully executed, AND the relocation agreement be approved by ARDOT for Fayetteville signature, then I execute the amendment to our contract? b. I hesitate to run our amendment through without these items from ArDOT since reimbursement is on the line. Best, Corey W. Granderson, P.E. Utilities Engineer City of Fayetteville, Arkansas carandersonafavetteville-ar.aov 479.444.3452 www.fayetteville-ar.gov CITY OF V;0 FAYETTEVILLE ARKANSAI From: Barry McCormick <Barry.McCormick@hawkins-weir.com> Sent: Tuesday, January 17, 2023 4:07 PM To: Granderson, Corey <cgranderson@fayetteville-ar.gov> Cc: Brett Peters <Brett.Peters@hawkins-weir.com>; Josh Durham <Josh.Durham@hawkins-weir.com> Subject: Proposal for Amendment 1- Final Design CO & Construction Phase Services - Hwy 112 2021048 CAUTION: This email originated from outside of the City of Fayetteville. Do not click links or open attachments unless you recognize the sender and know the content is safe. Corey Attached for your review are draft copies of a proposed Scope of Services and a Fee Proposal for Amendment 1 to our Engineering Services Agreement on the Highway 112 Utility Relocations Project. The scope and fee proposal are divided into two (2) tasks. • Task 3 is for the additional Design Phase Services that were previously proposed for preparing the construction plans and bidding documents. It is my understanding from our 01/05 meeting with Keith Mashburn, that these additional design services can be added by Change Order to the ArDOT "Preliminary Engineering Agreement." 0 Task 4 is for the proposed Construction Phase Services for the Highway 112 project. Please review and advise if you have any questions or need any additional information. Once we are in agreement on the Task 3 and Task 4 fee totals, we can provide the estimated Construction Engineering amount to Keith Mashburn. I am assuming that you will need to provide a separate estimate for providing a COF inspector for the construction period, as well as an estimate of the easement acquisition expenses. Barry K. McCormick, P.E., Principal Hawkins -Weir Engineers, Inc. P.O. Box 648, 110 South 7th St., Van Buren, AR 72957 (P) 479.474.1227 - (F) 479.474.8531 - (M) 479.883.2570 Licensed Professional Engineer in Arkansas and Oklahoma Rev. 08/07/2017 ARKANSAS STATE HIGHWAY COMMISSION HIGHWAY - UTILITY AGREEMENT FOR PRELIMINARY ENGINEERING SERVICES 00101I C•�1L [lam 11 (Utilities) FAP No. CMF-9142(48) Job Location Truckers Dr. - Howard Nickell Rd. (Fayetteville)(S) Route 112 Section 1 Utility Owner City of Fayetteville Consultant Hawkins -Weir County Washington Engineers, Inc. THIS AGREEMENT, made and entered into this 21st day of July 20 21 , by and between the Arkansas State Highway Commission, acting by and through the duly authorized representatives of the Arkansas Department of Transportation, with headquarters at Little Rock, Arkansas, hereinafter referred to as the "Department" and the City of Fayetteville, Arkansas acting by and through its duly authorized representatives, hereinafter referred to as the "Owner" WITNESSETH: (1) The Department proposes to make highway improvements and the Owner is required to adjust or relocate its facilities, as necessary, to clear highway construction. (2) The Owner is not adequately staffed to carry out the necessary preliminary engineering and has requested the services of the licensed engineering company of Hawkins -Weir Engineers, Inc. to perform the following services. a. Make all necessary field surveys and investigations and subsequently prepare complete plans, estimate of costs, and construction specifications. b. Furnish four (4) copies of plans, specifications, etc. for Department review and approval. c. If construction work is to be performed by other than Owner's forces, prepare all necessary documents to secure bids and let a contract for the proposed work. d. Conduct bid opening and complete contract documents. Page 1 of 3 Rev. 08/07/2017 Job 040746 City of Fayetteville (3) The Owner has entered into a contract with the consultant, subject to the Department's approval, and has furnished a copy which is attached and made part of this agreement. The estimated costs are not to exceed $ 466,000.00. (4a) The cost of preliminary engineering services shall be eligible for actual cost reimbursement from the Department at the same ratio as the adjustment of Owner's facilities are eligible. (4b) Owner agrees to retain cost records and accounts for inspection and audit for a period of three (3) years from the date of final payment. (5) The consultant shall begin work 10 calendar days after receiving written authorization from Owner and complete 300 calendar days thereafter. (6) The Department may suspend or cancel the work under this contract at any time. Reimbursement will be made, in a proportionate amount, for any services performed by the consultant prior to the receipt, by the Owner, of written notice of cancellation. (7) Owner shall be responsible for any and all hazards to persons, property, and traffic. With respect to traffic control, owner shall adhere to the requirements of the Manual of Uniform Traffic Control Devices, as amended and supplemented. (8) This agreement is governed by all applicable State and Federal laws, rules, and regulations including the Arkansas State Highway Commission Utility Accommodation Policy adopted by Commission Minute Order 2010-146 as amended and supplemented, the Federal Aid Program Guide on Utility Adjustments and Accommodation on Federal Aid Highway Projects as amended and supplemented, and the provisions of 23 CFR § 645 as amended and supplemented. (9) To the extent applicable to this agreement, the Owner shall comply with the Buy America requirements (as specified in 23 U.S.C. 313 and 23 CFR 635.410). The Owner is not required to change its existing standards for materials as long as the Buy America requirements are met. Buy America requirements take precedence over regulations pertaining to the accommodation or regulation of the Owner's facilities (as specified in 23 CFR 645) on contracts and agreements involving Federal -Aid Highway Program funding and precedence over regulations which allow the Owner to furnish materials from company stock (as specified on 23 CFR 645.117(e)). Company Stock materials that do not meet Buy America requirements may not be permanently incorporated into a Federal -Aid Highway Program funded project. The Owner must provide a definitive statement that all products permanently incorporated into the project are covered under the Buy America requirements. This requirement is fulfilled via proper signature and submission of the statement of charges form. In some circumstances, a waiver of the Buy America requirements may be granted by the Federal Highway Administration, to be determined on a project -by -project basis. Page 2 of 3 Rev. 08/07/2017 Job 040746 City of Fayetteville (10) Subject to the terms and conditions herein, neither the Owner nor the Department by execution of this agreement waives or relinquishes any rights which either may legally have within the limits of the law or constitution either State or Federal. City of Fayetteville Lioneld Jordan Name (Typed or Printed) 71-6018462 FEDERAL TAXPAYER IDENTIFICATION # Kara Paxton Name (Typed or Printed) ARKANSAS HIGHWAY COMMISSION Acting By and Through The ARKANSAS DEPARTMENT of TRANSPORTATION (Fo Dire for ,�--Right of Way Division Head Section Heid-Utilities Section City Clerk Treasurer .N��+���►h���� Title `��� -AA.• G1TY 0••9`rG Signature 25, J,y9:�'�-1NSPS ••, �i'� •..... • �� �dil /'ON0,,`��. Page 3 of 3