HomeMy WebLinkAbout113-23 RESOLUTION113 West Mountain Street
Fayetteville, AR 72701
(479) 575-8323
Resolution: 113-23
File Number: 2023-720
11TH STREET COTTAGES, LLC:
A RESOLUTION TO APPROVE A COST SHARE AGREEMENT WITH 11TH STREET COTTAGES, LLC FOR
THE EXTENSION OF AN 8-INCH WATER MAIN NEAR THE CORNER OF EAST 11TH STREET AND SOUTH
WASHINGTON AVENUE WITH A REFUND IN AN ESTIMATED AMOUNT OF $47,834.30 TO BE PAID BY
THE CITY OF FAYETTEVILLE, AND TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF
$4,783.43
WHEREAS, 11th Street Cottages, LLC has proposed an infill cluster housing development south of llth Street
between S. Washington Avenue and S. Beebalm Avenue; and
WHEREAS, in order to service this development, Ilth Street Cottages will need to install a water line from
Washington Avenue to the corner of the subject property, approximately 174 feet, and then extend it along the frontage
of the property to the middle of the property, an additional approximately 62 feet, for a total of 236 feet; and
WHEREAS, the installation of an 8-inch water main will allow development of this property and will provide for
ample future capacity which the City recognizes will be necessary for the area served by this main; and
WHEREAS, the total cost of the water main extension is estimated to be $95,668.60 and exceeds the rough
proportionality of the development's impact so the City agrees to pay 50% of the cost.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE,
ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby authorizes Mayor Jordan to sign a cost
share agreement with 1 lth Street Cottages, LLC for the installation of an 8-inch water main near the corner of East 1 lth
Street and South Washington Avenue, with a refund in an amount not to exceed $47,834.30 to be paid by the City of
Fayetteville, and further approves a project contingency in the amount of $4,783.43.
PASSED and APPROVED on May 16, 2023
Page 1
Resolution: 113-23
File Number: 2023-720
Approved:
Attest:
`ttiiscIIIIII
��FtY, �-S�
�. FAYETTEVlI.I_E_:.v
wr■
Kara Paxton, City CEer reasurer; : y
r1► ►► �7-0N0%�ts►�
Page 2
CITY OF
W41iFAYETTEVILLE
ARKANSAS
MEETING OF MAY 16, 2023
CITY COUNCIL MEMO
TO:
Mayor Jordan and City Council
THRU:
Susan Norton, Chief of Staff
FROM:
Tim Nyander, Utilities Director
DATE:
SUBJECT:
11th Street Cottages, LLC - Water Cost Share on 11th Street
RECOMMENDATION:
2023-720
Staff recommends a Cost Share Agreement with 11th Street Cottages, LLC in an amount not to exceed
$47,834.30 for a water line extension near the corner of East 11th Street and South Washington Avenue, and
approval of a project contingency in the amount of $4,783.43.
BACKGROUND:
Infill development is proposed by 11th St Cottages, LLC south of 11th Street between S. Washington Avenue
and S. Beebalm Ave. (parcel 765-03341-000). The site is approximately 0.66-ac, currently vacant, and is
zoned RIU. The developer proposes to build 9 cottages in a cluster housing development. In order to service
these houses, they will need to install a water line from Washington Ave to the corner of the subject property,
approximately 174-ft, and then extend it in along the frontage of the property to the middle of the property, an
additional approximately 62-ft, for a total of 236-ft.
DISCUSSION:
This waterline would also benefit any future development east and north of this project site. 11th St Cottages,
LLC requests a 50% cost share on this waterline installation. The project engineering and permitting has been
completed and the developer has secured three contractor quotes. The low quote is from Pavecon for
$87,183.20 and the engineering costs for the project are $8,485.40 for a total project cost of $95,668.60. The
50% cost share would therefore total $47,834.30. Staff also recommends approval of a project contingency in
the amount of $4,783.43.
The cost share agreement was considered by the Water, Sewer and Solid Waste Committee on April 11, 2023,
which recommended approval by a vote of 4-0.
BUDGET/STAFF IMPACT:
Funds are available in the Water/Sewer Impact Fee Cost Sharing account.
ATTACHMENTS: SRF 11th Street Cottages, LLC, 11th Street Cottages, LLC - Cost Share Agreement, Exhibit
A - Map, Exhibit B - Construction Bids, 11th St Cost Share Proposal, Engineer Fee Estimate 040723
Mailing address:
113 W. Mountain Street www.fayetteville-ar.gov
Fayetteville, AR 72701
City of Fayetteville, Arkansas 113 West Mountain Street
Fayetteville, AR 72701
(479) 575-8323
- Legislation Text
File #: 2023-720
11th Street Cottages, LLC - Water Cost Share on IIth Street
A RESOLUTION TO APPROVE A COST SHARE AGREEMENT WITH IITH STREET
COTTAGES, LLC FOR THE EXTENSION OF AN 8-INCH WATER MAIN NEAR THE CORNER
OF EAST IITH STREET AND SOUTH WASHINGTON AVENUE WITH A REFUND IN AN
ESTIMATED AMOUNT OF $47,834.30 TO BE PAID BY THE CITY OF FAYETTEVILLE, AND
TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $4,783.43
WHEREAS, I Ith Street Cottages, LLC has proposed an infill cluster housing development south of
1 Ith Street between S. Washington Avenue and S. Beebalm Avenue; and
WHEREAS, in order to service this development, I Ith Street Cottages will need to install a water line
from Washington Avenue to the corner of the subject property, approximately 174 feet, and then extend
it along the frontage of the property to the middle of the property, an additional approximately 62 feet,
for a total of 236 feet; and
WHEREAS, the installation of an 8-inch water main will allow development of this property and will
provide for ample future capacity which the City recognizes will be necessary for the area served by this
main; and
WHEREAS, the total cost of the water main extension is estimated to be $95,668.60 and exceeds the
rough proportionality of the development's impact so the City agrees to pay 50% of the cost.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby authorizes Mayor Jordan
to sign a cost share agreement with I Ith Street Cottages, LLC for the installation of an 8-inch water
main near the corner of East 1 Ith Street and South Washington Avenue, with a refund in an amount not
to exceed $47,834.30 to be paid by the City of Fayetteville, and further approves a project contingency
in the amount of $4,783.43.
Page 1
Tim Nyander
Submitted By
City of Fayetteville Staff Review Form
2023-720
Item ID
5/16/2023
City Council Meeting Date - Agenda Item Only
N/A for Non -Agenda Item
4/27/2023 WATER SEWER (720)
Submitted Date Division / Department
Action Recommendation:
Staff recommends a Cost Share Agreement with 11th Street Cottages, LLC in an amount not to exceed $47,834.30
for a water line extension near the corner of East 11th Street and South Washington Avenue, and approval of a
project contingency in the amount of $4,783.43.
5400.720.5600-5808.00
Account Number
04039.1
Project Number
Budgeted Item? Yes
Does item have a direct cost? Yes
Is a Budget Adjustment attached? No
Purchase Order Number:
Change Order Number:
Original Contract Number:
Comments:
Budget Impact:
Water and Sewer
Fund
Water and Sewer Impact Fee Cost Sharing
Total Amended Budget
Expenses (Actual+Encum)
Available Budget
Item Cost
Budget Adjustment
Remaining Budget
Project Title
$ 1,261,190.00
$ 307,528.56
953,661.44
$ 52,617.73
901,043.71
Previous Ordinance or Resolution #
Approval Date:
V20221130
CONTRACTUAL AGREEMENT FOR
COST SHARE OF WATER MAIN INSTALLATION COSTS
This Agreement, made and entered into on this 19th day of May, 2023, by and between
the City of Fayetteville, Arkansas ("City") and 1 lth Street Cottages LLC ("llth Street Cottages"),
witnesseth:
WHEREAS, llth Street Cottages has requested that the City share in the cost of
constructing an 8-inch water main near the corner of East llth Street and South Washington
Avenue, a distance of approximately 236 linear feet, so that 1 lth Street Cottages may develop a
property located on East 11 th Street; and
WHEREAS, constructing this segment of 8-inch water main will allow development of
this property, and will provide for ample future capacity which the City recognizes will be
necessary for the area that is served by this water main.
NOW, THEREFORE, the City of Fayetteville, Arkansas and 11 th Street Cottages LLC
agree as follows:
1. The City of Fayetteville, Arkansas agrees to:
A. Reimburse llth Street Cottages LLC for 50.0% of the cost to install
approximately 236 linear feet of 8-inch water main in the area identified in
Exhibit "A" up to a maximum -not -to -exceed amount of $47,834.30, as was
estimated by the builder's representatives and shown on Exhibit `B", attached.
B. Payments due to 1 lth Street Cottages LLC, shall be remitted within sixty (60)
days after receipt of valid invoices.
2. 11th Street Cottages LLC agrees to:
A. Provide the necessary and normal project management, inspection, and testing
as necessary for a complete and acceptable water main installation, including
submittal of plans and specifications to the City's Engineering Department, per
their standard procedures.
B. Provide a copy of the invoices from the Contractor upon City approval of the
water main upgrade.
C. Pay for the water main installation (with reimbursement of 50.0% of the cost
by the City of Fayetteville in a not -to -exceed amount of $47,834.30).
Page 1 of 2
IN AGREEMENT WITH ALL THE TERMS AND CONDITIONS ABOVE, WE
SIGN BELOW:
ll'h STREET COTTAGES LLC
FINN,
anaging
ATTES
By:
LAUREL DAVID, MEMBER
CITY OFYAYETTEVILLE, ARKANSAS
I: �Lr■ll Nr' . .
AT'
Page 2 of 2
WI:I I =3: r_1
1 .f 24.5 L
239 +J
I �
a
228 1;30 2C~t
225 N
I I r
I 220 217
r�
215
209 532
�--J .534 213
_I L 211
6"
PVC
C Spring st 9L
L
126 Qd
w
423
124 141
J 125
114
CIP
C3
1�7
1�fi I I I
PROPOSED WATER LINE EXTENSION
(Approximately 236 linear feet)
EXHIBIT B
Community By Design 11 th Street Cottages - Water
100 West Center Street, Suite 300 improvements
Fayetteville, Arkansas 72701
Phone: (479) - 790 - 6775 Cost Share Bid Summary 3.24.23
Schedule 1
11th Street Water Main - Per Plans Dated 11/18/22
Public Inftrastructure Cost Estimate - Draft
1/6/2023
Quantity Unit Unit Cost Total Cost
1
Tap Water Main - Tap Sleeve, Valve, Pavement Repair
1
Each
$11,900.00
$11,900.00
2
8 inch - PVC Water Main
236
L.F.
$105.00
$24,780.00
3
8 inch - Gate Valve
1
Each
$3,528.00
$3,528.00
42
inch -Gate Valve
1
Each
$1,722.00
$1,722.00
7
Fittings
1
Each
$3,563.00
$3,563.00
5
Pavement Repair - Cut and T-patch
236
L.F.
$49.00
$11,564.00
6
Mill and Overlay Pavement
1
Each
$21,000.00
$21,000.00
8
Testing
1
Each
$2,100.00
$2,100.00
glEngineering
Each
$8,485.40
$8,485.40
rat 72$88,642.40
BID QUOTES (REFERENCE ATTACHED) - PURSUANT TO APPROVED PERMIT PLANS (11/18/22) SCOPE OF WORK HIGHLIGHTED ABOVE:
GROUND ZERO - BID $98,848 (add engineering $8,485)) _ $107,333
S & G PLUMBING - BID $108,494 (add engineering $8,485) _ $116,988
PAVECON - BID - BID $87,183 (add engineering $8,485) _ $95,668 (low bid)
Community By Design 1/6/2023
Page 1 of 1
11th Street Cottages - Fayetteville (ROW Utilities)
Ar4fd'AWA»' Budget Proposal for Construction
3/3/2023
PAM
Sewer & Water
Item #
Quantity
Unit
Unit Price
Bid Amount
1r
Svstem
$ .00
1
8" Sanitary Sew e PVC) w/full depth gravel
backfill under the paved�aR-26
115
LF
93.00
$ 10,695.00
2
4" Sewer Services
EA
$ 3,200.00
$ 28,800.00
3
Connection to Existing Manhole
EA
$ 3,400.00
$ 6,800.00
4
Sanitary Sewer Manholes (6'-
2
$ 5,710.00
$ 11,420.00
5
Testing of ewer System
115
LF
$
1,150.00
ewer Maintenance Bond 25% for 2 Years
1
LS
$ 835.00
$
2
Water System
$ 75.20
1
8"C900 DR-18 PVC Water Main (0 - 6') Including gravel
bedding & backfill
240
LF
$ 107.00
$ 25,680.00
Water Meter Array **Service lines beyond meter sets by
2
others.**
3
Waterline Connection - 6 x 6 Tapping Assemblies
1
EA
$ 6,100.00
$ 6,100.00
4
8" Gate Valve
1
EA
$ 2,800.00
$ 2,800.00
5
Fittings & Thrust Blocking
1
LS
$ 5,500.00
$ 5,500.00
6
Chlorination & Testing of Water System
240
LF
$ 8.00
$ 1,920.00
7
Water Maintenance Bond 25% for 2 Years
1
LS
$ 975.20
$ 975.20
$42,975.20
8
a
, 79.00
1
Retaining Wall
1
72,904.00
$ 72,904.00
2
4" Topsoil / Seed & Straw
1
LS
$ 7,500.00
$ 7,500.00
3
Installation of Trees
11
825.00
$ 9,075.00
4
n - Automatic Lawn System
1
EA
$ 9,100.00
0.00
Pavecon Budget Total =
4
Site Concrete
$ 44,208.00
1
Mill and Overlay 11th Street 2,900
SF
$ 13.52
$ 39,208.00
2
Street T-Patch 1,000
SF
$ 5.00
$ 5,000.00
Lawrence Finn
From:
herb.harrisjr@cox.net
Sent:
Wednesday, December 14, 2022 9:57 AM
To:
'Lawrence Finn'
Cc:
groundzrod@cox.net
Subject:
11th St Cottages
Lawrence
Breakout for water is $98,848.69
Labor: $50,116.29
Materials: $48,732.40
Let me know if you need anything else.
Herb Harris Jr.
Project Manager/Lead Estimator
Ground Zero Construction, Inc.
Phone:918-422-5354 Mobile:479-957-2966
P.O. Box 830, Siloam Springs, AR 72761
Web: www.groundzeroconstruction.org
Email: herb. harris'r a cox.net
GROUND
I
CONSTRUCTION, INC
Lawrence Finn
From: Sandra Clegg <clegg0209@yahoo.com>
Sent: Sunday, February 5, 2023 3:23 PM
To: Lawrence Finn
Subject: Re: 11th Street Cottages - South Fayetteville (WATER & SEWER)
PROPOSAL:
FROM: S & G PLUMBING
P.O. BOX 8457
FAYETTEVILLE, ARKANSAS 72703
ATTN: LAWRENCE FINN
RE: UTILITY WORK 11 ST. COTTAGES - SOUTH FAYETTEVILLE, AR
NOTE:
WATER MAIN EXTENSION
WATER METER BANK (AS PER CITY OF FAYETTEVILLE)
WATER SERVICE TO NINE PROPOSED COTTAGES
WATER BANK WILL BE SET UP FOR TWELVE
SEWER MAIN EXTENSION AS PER PLANS AND SPEC
TIE INTO EXISTING MAN HOLE AS PER CITY OF FAYETTEVILLE
BUILD TWO MAN HOLE AS PER CITY OF FAYETTEVILLE
SEWER SERVICE TO NINE COTTAGES WITH 6" PVC SCH 40
CLEAN OUTS AS PER CITY OF FAYETTEVILLE
INCLUDED:
ALL HAUL OFF
STREET CUT
BACK FILL STREET WITH COMPACTED SB-2
PATCH CITY STREET WITH T PATCH DETAIL ( ASPHALT PATCH BY OTHER)
ALL CURB STOPS
ALL SHUT OFF TO EACH COTTAGE WITH BOX ( PRESSURE REGULATOR BY OTHER)
EXCLUDED:
ANY ROCK REMOVAL
ANY IMPACTOR DEVELOPMENT FEE'S
ANY ENGINEERING
ANY ENGINEERING INSPECTION
ANY COMPACTION TESTING
TTe:F Tl I'S P RE)P E)S A l . [' 293 !S:7. A 9
SCHULE OF VALUES
CONCRETE T PATCH. $ 11,265.20
WATER MAIN. $ 82,669.88
TOTAL. 175,893.8-7-
5% O.H. 8,794.69
10 %. PROFIT. 18,468.85
$93,934 water service
$4,696 5% O.H
--------------
--------------
$9,863 10% Fee
$ 108,494 TOTAL
January 28, 2023
Zara Niederman
111h St Cottages, LLC
632 Bella Vista Rd.
Bentonville, AR 72712
Mr. Tim Nyander
Water and Sewer Department
City of Fayetteville
CC: Mr. Corey Granderson
Dear Mr Nyander,
I am writing to submit a request for consideration of a Cost Share for a water line on 11th St just east of S
Washington Ave, and on the southern entrance to the Willow Bend subdivision. The site is
approximately 2/3 of an acre, and is zoned RIU. We are looking at building 9 cottages in a cluster
housing development. In order to service these houses, we will need to install a water line from
Washington Ave to our the corner of our property, approximately 174', and then extend it in along the
frontage of our property to the middle of the property, an additional approximately 62', for a total of
236'.
This service will benefit our development, but it will also have the potential to benefit our neighbor to
the west, , who may be able to use this to build more units on his vacant lot. In addition, it may provide
a future benefit to our neighbor across the street, 1090 S Washington, as well as all of the lots to the
north of that lot, which are bordered on both sides by alley right-of-ways, but with no current utility
services. It is possible that the waterline may in the future be able to be connected to the Willow Bend
waterline to make a full service loop for better connectivity, service and flow.
This waterline and development, while not directly in the boundaries of the original 1910 city limits, I
believe meets the general philosophy of infill development, in line with City Plan 2040. This
neighborhood Berl Dodd (aka Burl Dodd) appears to have been platted in 1926, so just shy of 100 years
ago, and is 4 blocks to the south of the southern 1910 border. It is surrounded by development to the
East, West, South, Northeast and Northwest. This location is within the Walker Park Neighborhood
Master Plan area, adopted in 2008, and we believe the development plan is consistent with that plan. In
addition, we believe it is in line with Fayetteville Vision 2025, one of those items from that vision being
"Revitalized South Fayetteville".
Below is our Engineer's Estimate of Probable Costs. We are requesting a 50% cost share. My
understanding is that once submitted, it will go to the Water and Sewer Board with your
recommendations for whether or not to support this. If it is supported by the Board, we will then
provide detailed bids in order to be presented to the City Council. If you need any additional information
or documentation in the meantime, please reach out to me or our engineer, Brian Teague at Community
By Design.
Thank you for your consideration,
Zara. N u o�wta o,
Zara Niederman
Community By Design
100 west Center Street, Suite 300
Fayetteville, Arkansas 72701
Phone: (479) - 79D - 6775
Schedule 1
11th Street water Main - Per Plans Dated 11/18f22
Public IArastructure Cost Estimate - Draft
1 /15J2023
Quantity Unit Unit Cost Total Cost
1
Tap Water Main - Tap Sleeve, Valve, Pavement Repair
1
Each
$11,00.00
$11,900.00
2
9 inch -''VC Water Main
236
L.F.
$105.00
$24,780.00
3
a loch - Gate Valve
1
Each
$3,528.00
$3,523.00
42
inch -Gale Valve
1
Each
81,722.00
$1,722,00
7
Fittings
1
Each
S35B3.00
$3,563.00
5PavementRepair
-CutandT-patch
236
L.F.
$49.00
$11.664.00
61
Mill and Overlay Pavement
1
Each
S21,000.00
$21,000.00
8
Testing
1
Each
S2,100,00
$2,100,00
91
Engineering
1
Each
$8,485.40
$8,485.40
Total $88.642.40
it I Feet
Measurement Result
236.3 Feet
Community By Design
100 West Center Street, Suite 300
Fayetteville, Arkansas 72701
Phone: (479) - 790 - 6775
Schedule 1
11th Street Water Main - Per Plans Dated 11/18/22
Engineer Fee Estimate
4/7/2023
Quantity Unit Unit Cost Total Cost
1
Design and Permitting
1
Each
$6,364.05
$6,364.05
2
Bid Review
1
Each
$424.27
$424.27
3
Construction Administration and Observation
1
Each
$1,697.08
$1,697.08
Total $8,485.40
Community By Design 4/7/2023