MEETING AGENDA
Water, Sewer, and Solid Waste Committee
11 May 2023 (Rescheduled from May 9t")
5:30 P.M.
(Or immediately following City Council Agenda Session)
This is a Virtual Meeting on Zoom
Committee: Council Member Teresa Turk, Council Member D'Andre Jones, Council Member
Mike Wiederkehr, Council Member Scott Berna
Copy to: Mayor Lioneld Jordan, Paul Becker, Susan Norton, Kara Paxton, Kit Williams,
Chris Brown, Alan Pugh, Terry Gulley, Ross Jackson, Peter Nierengarten, Brian
Pugh, Corey Granderson, Aaron Watkins, Cody Ashworth, Greg Weeks, Jan Guy,
Mayo Miller, Josh Alleman
From: Tim Nyander, Utilities Director
CALL TO ORDER
UPDATES
OLD BUSINESS:
1. Rate Study Update
NEW BUSINESS:
2. Hydro -Excavator for Water & Sewer Construction
Many water leak repairs made by the Water & Sewer Division are service lines that are in
customer's yards or crowded general utility easements. Utilizing a hydro- excavator is the
safest, most efficient, and least invasive method to perform these repairs.
The Division repair over 1,300 water leaks annually. In addition to efficiency, hydro excavation
also eliminates the need to wait for utility locates before making a repair whereas traditional
excavation requires locate requests through 811 — Call Before You Dig. These delays can be
from 2-3 hours to 2-3 days before a repair is performed.
The Division currently has one hydro -excavation truck, and often use the sewer vacuum truck in
water line repairs. An additional hydro -excavator would allow Water/Sewer to improve efficiency
when making water leak repairs. It is a safer method of excavation when working near electric
and gas lines, and it would allow the sewer vacuum truck to be utilized more in maintaining the
sewer system to reduce sewer overflows, rather than assisting with water leak repairs.
Working with Fleet Operations, we have received a quote through Sourcewell Contract No.
101221-GPV from GapVax Inc. of Johnstown, PA. The unit is a 2023 model at a total cost of
$665,575.70. The Sourcewell discount is $34,469.30.
STAFF REQUESTS THIS BE FORWARDED TO THE CITY COUNCIL FOR CONSIDERATION
FOR APPROVAL
3. Relocation Agreement with Arkansas Dept. of Transportation — Hwy 16 E
The Arkansas Department of Transportation has requested utility relocations to prepare for the
widening of Highway 16 from Stonebridge Road to E. Roberts Road. McClelland Consulting
Engineers, Inc. was selected for and has completed design of the utility relocations necessary
for this project. Arkansas Department of Health project review is complete and easement
acquisition is underway, then the project can proceed to bidding.
The water and sanitary sewer relocations for this project are estimated to cost approximately
$4,739,746.08, subject to public bidding. The relocations are estimated to be 42.49%
reimbursable to the City of Fayetteville by ARDOT. Based on the estimated cost, this would
result in ARDOT funding $1,449,107.91 and the City of Fayetteville $3,290,638.17. The actual
costs of construction will determine final contributions from each party. This agreement is
Primarily to establish the reimbursable percentage for both parties.
Staff recommends approval of the agreement with the Arkansas Department of Transportation
related to the Highway 16 East widening project. ARDOT Project 040785.
STAFF REQUESTS THIS BE FORWARDED TO THE CITY COUNCIL FOR CONSIDERATION
FOR APPROVAL
4. Relocation Agreement with Arkansas Dept. of Transportation — Hwy 112
The Arkansas Department of Transportation has requested utility relocations to prepare for the
widening of Highway 112 from Truckers Drive to Howard Nickell Road. Hawkins -Weir
Engineers, Inc. was selected for and has completed design of the utility relocations necessary
for this project. Arkansas Department of Health project review and easement acquisition is
underway, then the project can proceed to bidding.
The water and sanitary sewer relocations for this project are estimated to cost approximately
$12,669,315.00, subject to public bidding. The relocations are estimated to be 90.74%
reimbursable to the City of Fayetteville by ARDOT. Furthermore, there is an existing easement
for the City's future West Transmission waterline that will be taken by the new ARDOT Right of
Way which will be reimbursed at 100% of current market value. Based on the estimated cost,
this would result in ARDOT funding $11,520,027.23 and the City of Fayetteville $1,149,287.77.
The actual costs of construction will determine final contributions from each party. This
agreement is primarily to establish the reimbursable percentage for both parties.
Staff recommends approval of the agreement with the Arkansas Department of Transportation
related to the Highway 112 Improvements project. ARDOT Project 040746.
STAFF REQUESTS THIS BE FORWARDED TO THE CITY COUNCIL FOR CONSIDERATION
FOR APPROVAL
5. Change Order #1 to Preliminary Engineering Agreement — Hwy 112
The Arkansas Department of Transportation has requested utility relocations to prepare for the
widening of Highway 112 from Truckers Drive to Howard Nickell Road. Hawkins -Weir has
completed the engineering design of these improvements and now the project is moving forward
into easement acquisition and bidding phases. The ARDOT Utility Relocation Agreement for this
project is also progressing through the City's committee and council processes.
Amendment No. 1 is necessary to cover costs associated with significant additional effort
encountered during the final design phases. This effort included an additional 3,200-feet of
pipeline design, assistance with nearby rezoning coordination that was time -sensitive, four
additional meetings with City and ARDOT for final coordination items, and additional 3-D
modelling to avoid conflicts with the final ARDOT detailing of underground pedestrian facilities.
This amendment has already been approved by ARDOT as Change Order No. 1 to the existing
Preliminary Engineering Agreement between the City and ARDOT. The cost for this amendment
is $98,610.00, however, ARDOT reimbursement on this project is approximately 90% which will
also apply to these engineering fees.
Staff recommends approval of Amendment No. 1 to the engineering services agreement with
Hawkins -Weir Engineers, Inc. for professional services associated with ARDOT Project 040746
Utility Relocations along Highway 112 in an amount not to exceed $98,610.00.
STAFF REQUESTS THIS BE FORWARDED TO THE CITY COUNCIL FOR CONSIDERATION
FOR APPROVAL
6. Amendment No. 1 — Engineering Services Agreement with Hawkins -Weir for MLK
Interchange Relocations Design
ARDOT previously notified the City of Fayetteville to relocate water and sewer infrastructure
along Highway 62 where they will be widening the roadway, reconstructing the 1-49 overpass,
and creating a new overpass at 15th Street. After receiving this notification, a formal selection
committee was held on September 8, 2022, at which Hawkins -Weir was selected for contract
negotiations (RFQ 21-01, Selection #14).
The project includes water distribution and sanitary sewer collection system relocation of
approximately 3,600 linear feet of 8-inch water mains, 1,030 linear feet of 10-inch and smaller
sanitary sewer mains, 1,500 linear feet of 12-inch water mains, 3,710 linear feet of 12-inch
through 15-inch sanitary sewer mains, 6,490 linear feet of 18-inch through 24-inch water
mains, 1,590 linear feet of 18-inch through 24-inch sanitary sewer mains, and 325 linear feet
of 30-inch water transmission main. The project also includes the relocation or elimination
(dependent on the extension of the 15-inch sanitary sewer main) of one sanitary sewer pump
station. Much of this project appears to be reimbursable to the City by ARDOT, however
preliminary engineering is underway to determine exact qualifications. Afterwards, a formal
relocation agreement will be presented to the City Council outlining the terms of reimbursement.
Amendment No. 1 to the City's Engineering Service Agreement with Hawkins -Weir will advance
the design from 30% to 100% bid -ready plans and specifications for just the relocations
necessary near the 15th Street improvements. ARDOT has expressed intent to construct this
area first and therefore all utilities are focusing efforts here prior to MLK Blvd. Future contract
amendments will be proposed for final engineering effort on the remainder of the project, and for
construction phase services when portions of the project advance through bidding.
ARDOT has previously authorized the City of Fayetteville to use a consultant on this project and
a formal "Preliminary Engineering Agreement" is being drafted now and will be forthcoming as a
non -Agenda approval item.
Staff recommends approval of Amendment No. 1 to the engineering services agreement with
Hawkins -Weir Engineers, Inc. for professional services associated with ARDOT Project 040846
Utility Relocations along Martin Luther King Jr. Blvd. at the 1-49 & Hwy-62 Interchange in an
amount not to exceed $276,110.00.
STAFF REQUESTS THIS BE FORWARDED TO THE CITY COUNCIL FOR CONSIDERATION
FOR APPROVAL
7. Water Tank Inspections — KLM Engineering, Inc.
The Arkansas Department of Health (ADH) requires water storage tank inspections be
performed on a maximum 5-year interval. Most of the City's water tanks are due for this
inspection service, including:
Baxter
1-MG and 5-MG Ground Storage Tanks
Rogers Drive
Twin 4-MG Ground Storage Tanks
Mt. Sequoyah
250,000-gal Elevated Storage Tank
Kessler Mountain
Twin 6-MG Ground Storage Tanks
Goshen
300,000-gal Ground Storage Tank
Round Mountain
100,000-gal Standpipe
Gulley Road
750,000-gal Elevated Storage Tank
Surge Tank
250,000-gal Standpipe
Canterbury
500,000-gal Elevated Water Storage Tank
KLM Engineering, Inc. was previously selected for these services. They are a specialty firm
focused on all aspects of Water Storage tank design, inspection, and rehabilitation. Their
expertise will be used to meet all ADH reporting requirements and to make recommendations
and cost estimates for future rehabilitation needed. Inspecting many tanks at once provides an
economy -of -scale savings benefit to the utility.
Staff recommends approval of an engineering services agreement with KLM Engineering, Inc.
for Water Storage Tank Inspection Services for a total cost of $36,062.00 plus contingency. The
Engineering Services Agreement is being drafted and will be presented when this item goes to
the full City Council.
STAFF REQUESTS THIS BE FORWARDED TO THE CITY COUNCIL FOR CONSIDERATION
FOR APPROVAL
8. Damage Claim — 2416 E. Sharon Street
On March 17, 2023, the meter at 2416 E. Sharon St. was turned on by the Meter Department
and continued to run. Seeing this, the meter reader shut the meter off to avoid possible flooding.
However, the cut-off mechanism malfunctioned allowing water to continue through the meter
flooding the home. The Water/Sewer Division returned and replaced the faulty cut off.
The damage from the flooding was to the flooring and drywall. The repairs required replacing
the flooring and sheetrock and painting. The total cost is $10,434.25:
4
The Home Depot - $5,434.25
Stuture Homes - $4,600
Robert's Jill of All Trades - $400
Staff is recommending that the claimant, Mr. Robert Walsh be reimbursed in the amount of
$10,434.25 for repairs from the flooding.
STAFF REQUESTS THIS BE FORWARDED TO THE CITY COUNCIL FOR CONSIDERATION
FOR APPROVAL
9. Damage Claim — 3190 N. Malinda Drive
On February 51h, 2023, the Division received a call about sewer backing up into 3190 N. Malinda
Drive. Upon arrival the crew found a blockage in the sewer main and washed it to clear the
blockage. After televising to ensure the main was clear, they found roots in the downstream
manhole on the floor that were identified as the initial problem/cause of the backup and resulting
damage. Damages included flooring, sheetrock, baseboards, cabinetry and paint. Three bids
were received for the repairs:
Schneider Painting - $42,971.43
Surfco Restoration & Construction - $52,455.36
NWA Restore -It - $52,668.59
Staff is recommending that the claimant, Mr. Steve Mangan be reimbursed in the amount of
$42,971.43 for repairs from the flooding.
STAFF REQUESTS THIS BE FORWARDED TO THE CITY COUNCIL FOR CONSIDERATION
FOR APPROVAL
10. Water Conservation Measures — East Water Service Area
Due to the historical strain of summer irrigation demands in the eastern portions of the City of
Fayetteville's Water System, an impending shortage of water exists. The geographical area
impacted is east of Highway-265, generally following the Highway-45 corridor.
The City of Fayetteville Code of Ordinances Title V, Chapter 51.001 — Water Shortages allows
the City to place limits on the use and withdrawal of water. Staff proposes that limits for the
following purposes should be in effect from June 1st, 2023, through September 15th, 2023:
Watering Yards and Other Vegetation. Yard and landscaping irrigation shall be limited to the
following schedule:
• Even House Address Numbers may irrigate between the hours of 11:00 pm and
3:00 am on Monday, Wednesday, Friday, and Sunday
Odd House Address Numbers may irrigate between the hours of 11:00 pm and
3:00 am on Tuesday, Thursday, Saturday, and Sunday.
Per ordinance, non-compliance may result in discontinuance of service (meter locked `off') until
compliance can be established and ensured. Voluntary water conservation efforts are
encouraged. Information about conservation and the City of Fayetteville's recent and upcoming
Capital Improvement Projects in this area would be provided to customers in the form of a Fact
Sheet.
STAFF REQUESTS THIS BE FORWARDED TO THE CITY COUNCIL FOR CONSIDERATION
FOR APPROVAL
11. Overview of WWTP Monthly Report
March 2023 Monthly WWTP Report
PRESENTATIONS
ATTACHMENTS
Hydro -Excavator Quote
ARDOT Relocation Agreement — Hwy 16
ARDOT Relocation Agreement — Hwy 112
Hwy 112 Relocations Change Order — Hawkins Weir
MLK & 1-49 Interchange Relocations — Hawkins Weir
Water Tank Inspection Agreement — KLM
2416 Sharon St. Repair Receipts
3190 N Malinda Dr Repair Quotes
Water Conservation Notice
March 2023 WWTP Report
ADJOURN
Next Water, Sewer, Solid Waste Committee meets on
Tuesday, June 13, 2023, at 5:30 p.m.
SOURCEWELL CONTRACT NO. 101221-GPV
rapVax,,,
PREPARED BY
GapVax, Inc
575 Central Ave.
Johnstown, PA 15902
PREPARED FOR
Aaron Watkins
City of Fayettevill, Arkansas
/ fir- i
- s
Amw-
QUOTE
�_ -
�i•
' yul•
Ok
April 20, 2023
NOTE: THE GAPVAX HV UNIT MAY EXCEED FEDERAL BRIDGE ALLOWABLE WEIGHTS WHEN LOADED WITH WATER, OR DEBRIS,
AND/OR BOTH WATER AND DEBRIS COMBINED. PLEASE CONSULT FACTORY.
CHAO01
2023 PETERBILT 567 - 500 HP - 315" WHEELBASE
1
CUMMINS X15-500 V RATED FOR 500 HP @ 1900 RPM AND 1850 LB -FT @ 950 RPM
ALLISON 4500 RDS-P TRANSMISSION
CAB PAINTED FACTORY WHITE
1
STD
STOCK CHASSIS ARE SUBJECT TO PRIOR SALE, LIMITED QUANTITY ARE AVAILABLE
DEBRIS BODY OPTIONS
15 USABLE YARD DEBRIS TANK MADE OF 1/4" ASTM A-572 GRADE 50 EXTEN STEEL
1
STANDARD
STD
BOLT -ON CYCLONES AND CYCLONE DUMP CHUTE
STANDARD
STD
TOP -LOADING MATERIAL BACKED BODY INLET
STANDARD
STD
STD
STD
STD
STD
FULL -OPENING REAR TAILGATE
FOUR HYDRAULIC REAR DOOR LOCKS
DUAL TAILGATE LIFT CYLINDERS
FRONT MOUNTED HOIST CYLINDER, POWER UP AND DOWN
STAINLESS STEEL TAILGATE SEALING ROD
STANDARD
STANDARD
STANDARD
STANDARD
STANDARD
STD
THREE TIE -OFFS ON TOP OF THE BODY
STANDARD
STD
SEMI -CIRCULAR BODY BAFFLE WITH SURGE BAR
STANDARD
A2A
DECANT AT BOTTOM OF TAILGATE - 6" BRASS LEVER VALVE
1
A24P
DECANT HALF WAY UP TAILGATE - 4" BRASS VALVE
1
A3
LIQUID LEVEL INDICATOR ON TAILGATE
1
A6C
PUMP OFF SYSTEM - 4" SLUDGE PUMP WITH SILICONE CARBIDE SEALS REQUIRES J303
1
A350Q
UPGRADE FLOAT BALL CAGE TO STAINLESS STEEL
1
A350R
UPGRADE TAILGATE LL INDICATOR TO SS 1/2" ROD INSIDE TAILGATE
1
A23
ELECTRIC VIBRATOR ON DEBRIS TANK
STANDARD
A33A
TAILGATE SPLASH SHIELDS - WELDED TO TANK
1
A44
PNEUMATIC TAILGATE PROP (IN ADDITION TO STANDARD TAILGATE PROP ROD)
REQUIRED
STD
STD
STD
STD
STD
STD
PNEUMATIC ACTUATED BODY PROP
WATER TANK OPTIONS
1,200 GALLON WATER TANK MADE OF 1/4" ASTM A-572 GRADE 50 EXTEN STEEL
WATER TANK COATING NOT WARRANTED
3" WATER FILL LINE WITH 3" Y-STRAINER AND ANTI -SIPHON
WATER LEVEL SIGHT TUBE ON CURBSIDE
2" WATER TANK DRAIN
STANDARD
STANDARD
STANDARD
STANDARD
STANDARD
STANDARD
STD
20" MANWAY ON WATER TANK
B300
UPGRADE TO BUTTERFLY VALVE IN SUPPLY LINE
MOUNTED AT REAR HINGE PIN
B305
ADD 3/4" BALL VALVE AND SPOUT TO WATER TANK SIGHT GLASS
C300
VACUUM SYSTEM OPTIONS
HIBON 8702 VACUUM PUMP 5250 CFM AND 27" HG
STD
12" LIQUID SHUTOFF STAINLESS STEEL FLOAT BALL
STD
SINGLE MODE WET/DRY FILTRATION WITH (6) BOLT -ON EZ-DECON CYCLONES
STD
BAGHOUSE WITH (40) POLYESTER FILTER BAGS
STD
AIR -POWERED PULSATORS FOR CLEANING FILTER BAGS
STD
NOISE AND VIBRATION DAMPENING MOUNTS
STD
ULTRA QUIET EXHAUST/INTAKE SILENCERS
C320
VULKAN VIBRATION DAMPENER ON BLOWER
HIGHLY RECOMMENDED
C321
8" VACUUM RELIEF VALVE
HIGHLY RECOMMENDED
C330A
UPGRADE FILTER BAGS TO 285 DEGREE ACRYLIC BAGS
C399
REMOVE STANDARD PULSATOR SYSTEM EXCEPT FOR TUBES ON BAGHOUSE DOORS
D30
HX WATER SYSTEM OPTIONS
STAINLESS BOX 78" WIDE X 28" DEEP X 24" TALL PUMP ENCLOSURE
HX PUMP MUST BE
HYDRAULICALLY DRIVEN
19 GPM / 2,900 PSI GIANT LP200-SS-GB, HYDRAULICALLY DRIVEN VIA AUTO TRANS PTO
D317HAE
REQUIRES J303A, G213, G330B
(FIXED SPEED HYDRAULIC CONTROL)
D25B-PM
UPGRADE STD REEL TO HD AIR MOTOR RETRACT HOSE REEL WITH 1/2" X 100' HOSE
INCLUDES PUSH LEVER AIR
CONTROL
PNEUMATICALLY OPERATED HX WATER PRESSURE RELIEF VALVE IN LIEU OF 3-WAY
REQUIRES D307HA OR D317HA AND
D4-HX+RAV
AND UPGRADE HOSE REEL VALVE TO P/N: VAL022790 REMOTE ACTUATED INTEGRATED
OPTION D4-HX CONTROL (G2B)
G312A OR G312B
REQUIRES D30 AND ENGINEERING
D372A
HEATED CABINET FOR PUMP AND HOSE - VIA ENGINE COOLANT SYSTEM
APPROVAL
D21
COLD WEATHER RECIRCULATION VIA AUTO TRANSMISSION
REQUIRES D300 OR D315
D18
AIR PURGE SYSTEM - PUMP, REGULATOR, HOSE REEL
D28
GLYCOL INJECTION SYSTEM
D34
BURNER SYSTEM - MOUNTS ONLY
REQUIRES VERTICAL SILENCERS
D35B
1/2" HX LANCE WITH 6' EXTENSION AND RIPSAW NOZZLE
E300
BOOM OPTIONS
TUBE IN TUBE BOOM - EXTENDABLE - 17' - 25' REACH FROM CENTER OF TRUCK,
INCLUDES VERTICAL SILENCERS
E321A
UPGRADE TO REINFORCED BOOM ELBOW (TUBE -IN -TUBE STYLE ONLY)
REQUIRES E300
E323
3" CLEANOUT DOOR ON BACK OF BOOM CANNON
E329
BOOM HYDRAULIC HOSE SUPPORT ARM
E324
BOOM DOCKING PORT
E325A
BOOM TUBE EXTENSION TO BE DOCKED AT BOTTOM OF FRAME
G213
CONTROLS, GAUGES, ACCESSORIES OPTIONS
DM430 DISPLAY MOUNTED ON SIDE CONTROL PANEL, SAFETY SYSTEM INCLUDES
REQUIRES G330B
WATER PUMP ENGAGE SWITCH,
WATER LEVEL, LOW WATER SHUT DOWN, WATER PUMP FLOW AND HOURS
ENGINE / PUMP OVER SPEED SHUT DOWN, LOW PTO OIL PRESSURE WARNING
WATER TEMPERATURE SENSOR WITH SHUT DOWN
G14
BODY UP LIGHT & ALARM IN CAB
G16
BOOM UP LIGHT & ALARM IN CAB
G312B AARCOMM WIRELESS REMOTE WITH BOOM, VACUUM AND WATER FUNCTIONS
STANDARD
REQUIRED
1
STANDARD
STANDARD
STANDARD
STANDARD
STANDARD
STANDARD
STANDARD
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
INCLUDED
INCLUDED
INCLUDED
1
1
1
G312B-ATD TIME),,,,,.r."v.,.,,,,,.,,., ,,.,� ,,.�, _..,,, .-.1 ,,, - ,,,.,,,,...� -11-1..,,. --1 G312B,.� I INCLUDED
G340A
25' GROUNDING CABLE
HIGHLY RECOMMENDED
1
G330B
STD
16" X 20" STAINLESS CONTROL BOX WITH WINDOW ON CURBSIDE
TRUCK-LITE LED STOP, TURN, AND TAIL LIGHTS
1
STANDARD
STD
TRUCK-LITE LED RUNNING (MARKER) LIGHTS
STANDARD
STD
UPGRADE STOP/TAIL/TURN LIGHTS TO LED
STANDARD
HOA
UPGRADE STOP/TAIL/TURN LIGHT BOX TO POLISHED STAINLESS STEEL
STANDARD
H1
ONE LED STROBE BEACON LIGHT - FRONT (SAE CLASS-1 (SAE J595) COMPLIANT)
(WHELEN L10 OR EQUAL)
1
H5B
(2) BOOM WORK LIGHTS - HELLA LED WORK LIGHTS (PN: LHT022429)
1
H613
(2) REAR WORK LIGHTS - HELLA LED WORK LIGHTS (PN: LHT022429)
1
H301 B
(2) CYCLONE WORK LIGHTS - HELLA LED WORK LIGHTS (PN: LHT022429)
1
H302B
(2) BAGHOUSE WORK LIGHTS - HELLA LED WORK LIGHTS (PN: LHT022429)
1
H8B
(2) PUMP AREA WORK LIGHTS - HELLA LED WORK LIGHTS (PN: LHT022429)
1
H18C
REAR WHELEN ION SUPER LED FLASHERS - 6 LIGHT HEADS
1
H22
1300B
3 ON EACH SIDE REAR (1 @ 45 DEGREES)
REAR ARROW LIGHT - LOW PROFILE LED ARROW STICK (CLASS-1 (SAE J595))
STORAGE OPTIONS
TWO FOLD -DOWN TUBE TRAYS
(WHELEN TAM85 OR EQUAL)
1
1
1
INCLUDES SUBFRAME (J302), WASH OUT HOLES, STAINLESS MUD FLAPS AND WHEEL
CHOOCKS & HOLDERS ON EACH SIDE
INCLUDED
17C-DS
36" TOOL BOX - STAINLESS STEEL, 36" WIDE X 24" HIGH X 24" DEEP, DRIVER'S SIDE
1
1303
ALUMINUM 24" X 24" X 48" TOOLBOX ON BURNER MOUNT
REQUIRES D34
1
114
TRAFFIC CONE HOLDER ON DRIVER'S SIDE
INCLUDES CONES
1
119
25' HOSE RACK
1
120A
REAR DRAIN HOSE RACK FOR 6" LAYFLAT HOSE X 15' LONG
1
STD
INSTALLATION AND INTEGRATION OF BODY ONTO CHASSIS
INCLUDED
STD
DOT LIGHTING / FENDERS / MUD FLAPS / TAILGATE SAFETY PROP, ICC LIGHTS
STANDARD
STD
BODY SAFETY PROP
STANDARD
STD
60 GALLON HYDRAULIC OIL TANK
STANDARD
STD
STD
J300
REAR BUMPER
TRIANGLE KIT, FIRE EXTINGUISHER, BACKUP ALARM
MID -SHIP MOUNTED (SPLIT -SHAFT) TRANSFER CASE WITH TOP DISCONNECT
STANDARD
STANDARD
REQUIRED
J001
MUST BE "OMSI" BRAND TRANSFER CASE IN LIEU OF "NAMCO" OR OTHER (CONSULT
ENGINEERING)
NOT AVAILABLE WITH "SPL"
SERIES CHASSIS DRIVELINE
1
J101
UPGRADE TO 8" BODY LIFT CYLINDER UPGRADE, 175" STROKE
MODEL HV56-1200 OR 1400 GALLON
X-LONG BODY ONLY
REQUIRED
J2
TRANSFER CASE OIL LEVEL SIGHT GLASS
1
J303A
ADD TWO HYDRAULIC OIL COOLERS TO CIRCUIT
1
J4A
J14C
J16D
STD
TOW HOOKS - REAR - HEAVY DUTY - WELDED
20,000 LB LIFT AXLE MOUNTED IN THE PUSHER POSITION
3/4" WELDED PINTLE PLATE WITH DUAL GUSSETS AND REMOVABLE REAR STEP
BUMPER
OPTIONSPAINT
PAINTED WITH PPG FLEET URETHANE PAINT
REQUIRES J16
1
1
1
STANDARD
STD
STD
STD
STD
STD
PAINT BODY WHITE
PAINT FRAME BLACK
PAINT PARTS AND BOOM BLACK
FLEET FINISH
MISCELLANEOUS OPTIONS
STANDARD - 8" TO 6" RINGLOCK REDUCER
STANDARD
STANDARD
STANDARD
STANDARD
STANDARD
STD
STANDARD - 6" IN -LINE SAFETY VACUUM BREAK TEE
STANDARD
STD
STANDARD - GAPVAX SAFETY DECALS
STANDARD
M3
FILL HOSE 25' X 2 1/2"
1
M29D
FOUR CAMERA - BACK-UP CAMERA SYSTEM WITH 7" COLOR MONITOR (RV-805A),
INCLUDES DVR-916 REAR, DVR-921 FRONT, AND TWO (2) DVR-920 SIDE CAMERAS. SIDE
1
M334
HEAVY DUTY ALUMINUM HX TUBE, 8" X 5' X 0.090" WALL WITH PRESSED IN STEEL ENDS STD 8" RING LOCK
5
M36
HEAVY DUTY ALUMINUM HX TUBE, 8" X 6' X 0.090" WALL WITH PRESSED IN STEEL ENDS STD 8" R.L. SOFT TIP
AND SOFT TIP END
1
M35
8" RING LOCK TUBE CLAMP, EACH (P/N: CLA000978) STD 8" RING LOCK
6
STD
ONE PAPER OPERATOR'S MANUAL
STANDARD
STD
ONSITE FACTORY TRAINING (1 DAY)
STANDARD
MATERIALS SURCHARGE (EFFECTIVE MAY 1, 2022) 1
INSTALL CUSTOMER WATER METER
PRICE OF BASE UNIT WITH OPTIONS: $ 695,945.00
SOURCWELL DISCOUNT:
DELIVERY: ($1,000.00 MINIMUM)
SUBTOTAL:
SALES TAX:
FEDERAL EXCISE TAX (BODY):
FEDERAL EXCISE TAX (CHASSIS):
ALL PRICES ARE IN US DOLLARS
34,469.30
@ $4.00 PER MILE $ 4,100.00
665,575.70
TERMS: 15% DOWN PAYMENT. BALANCE DUE UPON COMPLETION. IN THE EVENT OF THE PURCHASER'S DEFAULT AND TERMINATION OF THIS SALES
PROPOSAL AGREEMENT PRIOR TO START OF PRODUCTION, 25% OF THE DOWN PAYMENT SHALL BE FOREFEITED AND APPLIED TO GAPVAX, INC. AS
PART OF ITS DAMAGES. ONCE PRODUCTION HAS COMMENDED ON THIS SALES PROPOSAL AGREEMENT, IN THE EVENT OF THE PURCHAERS
CANCELLING THE SALES PROPOSAL AGREEMENT, OR FAILING TO ACCEPT DELIVERY, OR FAILING TO COMPLETE THE SALES PROPOSAL
AGREEMENT, THE ENTIRE DEPOSIT SHALL BE FORFEITED TO GAPVAX, INC. BUT SUCH FORFEITURE SHALL NOT PREJUDICE ANY OTHER REMEDY
WHICH GAPVAX, INC. MAY HAVE FOR BREACH OF ANY OF THE SALES PROPOSAL AGREEMENT. IN THE EVENT OF A COMPLETED UNIT NOT BENG
FUNDED IN A PROMPT AND TIMELY MANNER, AN ADDITIONAL FEE WILL OCCUR TO COVER THE ADDITIONAL FLOOR PLAN EXPENSE.
FEDERAL EXCISE TAX AND DELIVERY ARE LISTED. STATE SALES TAX IS NOT INCLUDED. STATE SALES TAX AND VEHICLE REGISTRATION IS THE
RESPONSIBILITY OF THE PURCHASER. EXLUDES ALL OTHER APPLICABLE TAXES, DUTIES, TARRIFS, BROKERAGE, OR DOCUMENTATION FEES.
DELIVERY, IF COORDINATED BY GAPVAX, IS $3.00 PER MILE, $1,000 MINIMUM.
DELIVERY TERMS
TERMS OF DELIVERY SHALL BE F.O.B. SHIPPING POINT, JOHNSTOWN, PENNSYLVANIA, U.S.A.
THIS PROPOSAL WILL REMAIN IN EFFECT FOR 30 DAYS UNLESS CHANGED IN THE ITERIM UPON WRITTEN NOTICE FROM THE COMPANY
BY SIGNING THIS PROPOSAL, PURCHASER THERBY EXPRESSES ACCEPTANCE OF EACH AND EVERY TERM AND CONDITION SET FORTH HEREIN. ANY
PURCHASE ORDER OR ACKNOWLEDGEMENT OFFERING TERMS INCONSISTENT WITH THE TERMS AND CONDITIONS HEREOF SHALL HAVE NO
BINDING EFFECT WHATSOEVER ON GAPVAX INCORPORATED (THE "COMPANY") OR THE TERMS AND CONDITIONS HEREOF. THIS DOCUMENT AND
THE OTHER DOCUMENTS SPECIFICALLY REFERED TO AS BEING A PART HEREOF CONSTITUTE THE ENTIRE CONTRACT ON THE SUBJECT MATTER,
AND SHALL NOT BE MODIFIED EXCEPT IN WRITING SIGNED BY BOTH PARTIES. ASSIGNMENT MAY BE MADE ONLY WITH WRITTEN CONSENT OF THE
OTHER PARTY.
PLEASE RETURN A SIGNED COPY TO ESMITH@GAPVAX.COM
PURCHASER'S ACCEPTANCE: THE FOREGOING QUOTE 23149 Rev 4 IS
HEREBY ACCEPTED
By:
Title:
Date:
GapVax Incorporated
Terms and Conditions of Sale
i. ORDERS. All orders are subject to acceptance by an officer
of GapVax Inc. Orders for products not regularly carried in
stock or requiring special engineering or manufacture are in
every case subject to approval by an officer of GapVax,
2. PERFORMANCE. GapVax Inc. shall not be liable for failure
to complete the contract in accordance with its terms if
failure is due to wars, strikes, fires, floods, accidents, delays
in transportation or other causes beyond its reasonable
control.
3. EXPERIMENTAL WORK. Work performed at customer's
request such as sketches, drawings, design, testing,
fabrication and materials shall be charged at current rates.
4. SKETCHES, ENGINEERING DRAWINGS, MODELS and all
preparatory work created or furnished by GapVax Inc. shall
remain €ts exclusive property; and no use of same shall be
made, nor may ideas obtained therefrom be used, except
with the consent of and on terms acceptable to GapVax Inc.
5, CANCELLATION. Orders regularly entered cannot be
canceled except upon terms that will compensate GapVax
Inc. for any loss or damage sustained.
6. SHIPMENT. All proposals are based on continuous and
uninterrupted delivery of the order upon completion unless
specifications distinctly state otherwise. In the event that an
agreement is reached for GapVax Inc. to store completed
items, they will be immediately invoiced to the customer and
become due and payable. Storage shall be at the risk of the
customer and GapVax Inc. shall be liable only for ordinary
care of the property.
7. CUSTOMER'S PROPERTY. GapVax Inc. shall charge the
customer at current rates, for handling and storing
customer's property (e.g., truck chassis) held for more than
thirty (30) days after notification of availability for shipment.
All customer's property, or third party's property, that is
stored by GapVax Inc. is at the customer's or other party's
risk. GapVax is not liable for any loss or damage thereto
caused by fire, water, carrasion, theft, negligence, or any
cause beyond its reasonable control.
a. PRICES. All orders are subject to current prices in effect at
the time of order acknowledgment. Prices and Specifications
are Subject to Change Without Notice. PRICING
DISCLAIMER: While we make every effort to maintain and
preserve pricing accuracy, prices are subject to change
without notice. Although the information on this quotation is
presented in good faith and believed to be correct at the time
of printing, we make no representations or warranties as to
the completeness or accuracy of this information. We
reserve the right to change, delete, or otherwise modify the
pricing information which is represented herein without any
prior notice. We carefully check pricing specifications, but
occasionally errors can occur, therefore we reserve the right
to change such prices without notice. We disclaim all liability
for any errors or omissions in the materials_ In no event will
we be responsible for any damages of any nature
whatsoever from the reliance upon information from these
materials. Please check your order to confirm your pricing
information.
9. F.O.B. POINT. Unless otherwise stated, all prices listed are
F.O.S. point of manufacture.
10. TAXES. Unless specifically stated, prices listed do not
include Federal. State. City or other excise occupation.
sales, use or similar taxes which are extra and are to be
added at rates in effect at time of shipment_ If federal Excise
Taxes are included or listed on the reverse side of this
paper, they are stated at the rates and regulations in effect at
the time this order is written and are subject to revision in
accordance with rates and regulations in effect at time of
shipment.
111. PRODUCT IMPROVEMENT_ GapVax Inc_ reserves the right
to change manufacturing specifications and procedures
without incurring any responsibility for modifying previously
shipped products.
12. MOUNTING PRICES. Mounting prices assumes normal
factory installation an a truck chassis suitable for the unit
purchased_ Relocation of batteries, gas tanks, mufflers. air
tanks, etc. will be an additional charge, billed at the standard
factory labor rate.
13, WARRANTY. GapVax Inc. warrants its products to be free
from defects in material and workmanship, subject to the
limitations and conditions set forth in its current published
warranty but makes no warranty of merchantability or fitness
for any particular purpose. GapVax Inc. does not assume
liability for any loss of product, time or any direct, indirect, or
consequential damage, losses or delay or any nature
whatsoever. No warranty, express or implied, is made or
authorized to be made and no obligation is assumed or
authorized to be assumed with respect to products of
GapVax Inc. other than that set forth in the current,
published warranty. It is to be understood that the
acceptance this order is expressly conditioned upon your
acceptance of GapVax Inc. standard written warranty for the
products sold hereunder GapVax Inc. hereby disclaims any
responsibility or liability for any consequential losses delays
or downtime resulting from orders hereunder the use of its
products. GapVax does not and will not warranty any tank
coating or tank lining. PTO damage is not covered when the
PTO protection system or low water shut dawn system is not
selected / installed 1 and operational. GapVax does not and
will not warranty any water system component(s) that show
any sign or Indication of ice or freeze damage.
14. This agreement shall be construed according to the laws of
the State of Pennsylvania. Our failure at any time to exercise
any right we may have under the agreement shall not
constitute a waiver thereof nor prejudice our right to enforce
same thereafter.
15_ This order, including the above terms and conditions
contains the complete and final agreement between the
parties hereto and no other agreement in any way modifying
any of said terms and conditions will be binding on us unless
in writing and agreed to by authorized representative of this
company.
Rev. 08/07/2017
ARKANSAS STATE HIGHWAY COMMISSION
HIGHWAY - UTILITY CONSTRUCTION/RELOCATION AGREEMENT
State Job No
040785
(Utilities) County Washin
Federal Aid Project STPC-9142(49) Route 16
Job Location Stone Bridae Rd. — East
Roberts Rd. (Fayetteville)(S)
n
Section 3
Utility Owner City of Fayetteville
THIS AGREEMENT, made and entered into this day of
20 , by and between the Arkansas State Highway
Commission, acting by and through the duly authorized representatives of the Arkansas
Department of Transportation, with headquarters at Little Rock, Arkansas, hereinafter
referred to as the "Department," and the City of Fayetteville, Arkansas acting by and
through its duly authorized representatives, hereinafter referred to as the "Owner"
WITNESSETH:
The Department proposes to make highway improvements as specified under the
above referenced job number and the Owner will adjust or relocate its existing facilities as
set out in the attached plans and cost estimate.
The Department will participate in the cost of said adjustment/relocation to the extent
that eligibility is hereinafter established.
Payment will be made on actual cost basis as mutually agreed between Owner and
Department.
This agreement is governed by all applicable State and Federal laws, rules, and
regulations including the Arkansas State Highway Commission Utility Accommodation
Policy adopted by Commission Minute Order 2010-146 as amended and supplemented,
the Federal Aid Program Guide on Utility Adjustments and Accommodation on Federal Aid
Highway Projects as amended and supplemented, and the provisions of 23 CFR § 645 as
amended and supplemented.
DESCRIPTION OF WORK: See Exhibit A on Page 4
The Department agrees that the required adjustment is 42.49% eligible for
reimbursement for the total cost which is estimated to be $3,419,930.08 of which
$1,453,128.29 to be paid by the Department and $1,966,801.79 is to be borne by Owner.
Page 1 of 4
Rev. 08/07/2017 Job 040785
City of Fayetteville
Owner will not commence work until authorized by the Department, and will then
endeavor to begin within 270 calendar days and complete within 570 calendar days
thereafter.
On completion of said work, Owner is responsible for the cleanup and restoration of
the work area including the disposal of surplus materials and debris.
Final billing must include all supporting detail. Owner shall also submit one (1) set of
as -built drawings at this time.
Payment will be 100% of lump sum bills and actual cost bills, at the discretion of the
Department a 10% retainage can be withheld and released upon completion of an audit
review. All final bills for utility relocation are subject to review and audit by state and/or
federal auditors.
Expenses incurred under an actual cost agreement may be billed to the Department
monthly in increments of $5,000.00 or more.
Owner must maintain cost records and accounts to support the agreed
adjustment/relocation work. Said records to be retained and available for inspection for a
period of three (3) years from date of final payment.
Owner shall be responsible for any and all hazards to persons, property, and traffic.
With respect to traffic control, owner shall adhere to the requirements of the Manual
of Uniform Traffic Control Devices as amended and supplemented.
To the extent applicable to this agreement, the Owner shall comply with the Buy
America and Build America, Buy America requirements (as specified in 23 U.S.C. 313, 23
CFR 635.410 and the Infrastructure Investment and Jobs Act (IIJA)). The Owner is not
required to change its existing standards for materials as long as these requirements are
met. These requirements take precedence over regulations pertaining to the
accommodation or regulation of the Owner's facilities (as specified in 23 CFR 645) on
contracts and agreements involving Federal -Aid Highway Program funding and precedence
over regulations which allow the Owner to furnish materials from company stock (as
specified on 23 CFR 645.117(e)). Company Stock materials that do not meet these
requirements may not be permanently incorporated into a Federal -Aid Highway Program
funded project. The Owner must provide a definitive statement that all products
permanently incorporated into the project are covered under these requirements. This
requirement is fulfilled via proper signature and submission of the statement of charges
form. In some circumstances, a waiver of these requirements may be granted by the
Federal Highway Administration, to be determined on a project -by -project basis.
Page 2 of 4
Rev. 08/07/2017
Job 040785
City of Fayetteville
Owner shall be responsible for and shall hold harmless the Arkansas State Highway
Commission, the Department and their officers and employees from any and all claims,
actions, causes of action, suits, damages, losses or liability whatsoever, arising out of
Owner's performance of the work subject to this Agreement.
Notwithstanding anything hereinbefore written, neither the Owner nor the
Department by execution of this Agreement waives or relinquishes any rights which either
may legally have within the limits of the Law or Constitution, either State or Federal.
City of Fayetteville
Name (Typed or Printed)
Title
Signature
FEDERAL TAXPAYER IDENTIFICATION #
Name (Typed or Printed)
Title
Signature
ARKANSAS HIGHWAY COMMISSION
Acting By and Through The
ARKANSAS DEPARTMENT of
TRANSPORTATION
(For) Director
Right of Way Division Head
Section Head -Utilities Section
Page 3 of 4
Rev. 08/07/2017 Job 040785
City of Fayetteville
EXHIBIT A
Adjust water facilities to clear highway construction by abandoning 4,436 LF of eight (8)
inch, 173 LF of six (6) inch, 689 LF of two (2) inch water main complete with
appurtenances.
Restore service by installing 4,482 LF of eighteen (18) inch, 132 LF of twelve (12) inch,
1,630 LF of eight (8) inch, and 35 LF of six (6) inch water main complete with
appurtenances.
Adjust sewer facilities to clear highway construction by abandoning 146 LF of eight (8) inch
and 2,068 LF of six (6) inch sewer main complete with appurtenances.
Restore service by installing 1,869 LF of eight (8) inch gravity sewer main complete with
appurtenances.
Of the 7,512 LF of main to be abandoned, 3,192 LF is located outside existing ARDOT
right-of-way; therefore, this work is 3,192 / 7,512 = 42.49% reimbursable. Owner will
perform this work with competitively bid contract forces.
Owner has elected to upsize eight (8) inch water mains to eighteen (18) inch. A betterment
credit has been given the Department which will be updated based on low bid, and based
on final quantities installed.
Summary of Cost
Construction
$
4,311,535.00
Betterment
($
1,328,286.00)
Construction Engineering
$
174,131.08
Force Account Inspection
$
72,000.00
Easement Cost
$
189,050.00
Advertising
$
1,000.00
Health Department Review
$
500.00
Subtotal
$
3,419,930.08
Reimbursable Cost $3,419,930.08 X 42.49% _
$
1,453,128.29
Page 4 of 4
Rev. 08/07/2017
ARKANSAS STATE HIGHWAY COMMISSION
HIGHWAY - UTILITY CONSTRUCTION/RELOCATION AGREEMENT
State Job No
040746
(Utilities) County Washin
Federal Aid Project CMF-TAPF-9142(48) Route 112
Job Location Truckers Dr. — Howard
Nickell Rd. (Fayetteville) (S)
n
Section 1
Utility Owner City of Fayetteville
THIS AGREEMENT, made and entered into this day of
20 , by and between the Arkansas State Highway
Commission, acting by and through the duly authorized representatives of the Arkansas
Department of Transportation, with headquarters at Little Rock, Arkansas, hereinafter
referred to as the "Department," and the City of Fayetteville, Arkansas acting by and
through its duly authorized representatives, hereinafter referred to as the "Owner"
WITNESSETH:
The Department proposes to make highway improvements as specified under the
above referenced job number and the Owner will adjust or relocate its existing facilities as
set out in the attached plans and cost estimate.
The Department will participate in the cost of said adjustment/relocation to the extent
that eligibility is hereinafter established.
Payment will be made on actual cost basis as mutually agreed between Owner and
Department.
This agreement is governed by all applicable State and Federal laws, rules, and
regulations including the Arkansas State Highway Commission Utility Accommodation
Policy adopted by Commission Minute Order 2010-146 as amended and supplemented,
the Federal Aid Program Guide on Utility Adjustments and Accommodation on Federal Aid
Highway Projects as amended and supplemented, and the provisions of 23 CFR § 645 as
amended and supplemented.
DESCRIPTION OF WORK: See Exhibit A on Page 4
The Department agrees that the required adjustment is (See Exhibit A) eligible for
reimbursement for the total cost which is estimated to be $12,669,315.00 of which
$11,520,027.23 to be paid by the Department and $1,149,287.77 is to be borne by Owner.
Page 1 of 4
Rev. 08/07/2017 Job 040746
City of Fayetteville
Owner will not commence work until authorized by the Department and will
then endeavor to begin within 300 calendar days and complete within 900 calendar
days thereafter.
On completion of said work, Owner is responsible for the cleanup and restoration of
the work area including the disposal of surplus materials and debris.
Final billing must include all supporting detail. Owner shall also submit one (1) set of
as -built drawings at this time.
Payment will be 100% of lump sum bills and actual cost bills, at the discretion of the
Department a 10% retainage can be withheld and released upon completion of an audit
review. All final bills for utility relocation are subject to review and audit by state and/or
federal auditors.
Expenses incurred under an actual cost agreement may be billed to the Department
monthly in increments of $5,000.00 or more.
Owner must maintain cost records and accounts to support the agreed
adjustment/relocation work. Said records to be retained and available for inspection for a
period of three (3) years from date of final payment.
Owner shall be responsible for any and all hazards to persons, property, and traffic.
With respect to traffic control, owner shall adhere to the requirements of the Manual
of Uniform Traffic Control Devices as amended and supplemented.
To the extent applicable to this agreement, the Owner shall comply with the Buy
America and Build America, Buy America requirements (as specified in 23 U.S.C. 313, 23
CFR 635.410 and the Infrastructure Investment and Jobs Act (IIJA)). The Owner is not
required to change its existing standards for materials as long as these requirements are
met. These requirements take precedence over regulations pertaining to the
accommodation or regulation of the Owner's facilities (as specified in 23 CFR 645) on
contracts and agreements involving Federal -Aid Highway Program funding and precedence
over regulations which allow the Owner to furnish materials from company stock (as
specified on 23 CFR 645.117(e)). Company Stock materials that do not meet these
requirements may not be permanently incorporated into a Federal -Aid Highway Program
funded project. The Owner must provide a definitive statement that all products
permanently incorporated into the project are covered under these requirements. This
requirement is fulfilled via proper signature and submission of the statement of charges
form. In some circumstances, a waiver of these requirements may be granted by the
Federal Highway Administration, to be determined on a project -by -project basis.
Page 2 of 4
Rev. 08/07/2017
Job 040746
City of Fayetteville
Owner shall be responsible for and shall hold harmless the Arkansas State Highway
Commission, the Department and their officers and employees from any and all claims,
actions, causes of action, suits, damages, losses or liability whatsoever, arising out of
Owner's performance of the work subject to this Agreement.
Notwithstanding anything hereinbefore written, neither the Owner nor the
Department by execution of this Agreement waives or relinquishes any rights which either
may legally have within the limits of the Law or Constitution, either State or Federal.
City of Fayetteville
Name (Typed or Printed)
Title
Signature
FEDERAL TAXPAYER IDENTIFICATION #
Name (Typed or Printed)
Title
Signature
ARKANSAS HIGHWAY COMMISSION
Acting By and Through The
ARKANSAS DEPARTMENT of
TRANSPORTATION
(For) Director
Right of Way Division Head
Section Head -Utilities Section
Page 3 of 4
Rev. 08/07/2017 Job 040746
City of Fayetteville
EXHIBIT A
Adjust water facilities to clear highway construction by abandoning 2,898 LF of thirty-six
(36) inch, 2,382 LF of twelve (12) inch, 710 LF of eight (8) inch, 7,742 LF of six (6) inch,
528 LF of four (4) inch, and 36 LF of two (2) inch water main complete with appurtenances.
Restore service by installing 2,898 LF of thirty-six (36) inch, 8,755 LF of twelve (12) inch,
1,706 LF of eight (8) inch, and 36 LF of six (6) inch water main complete with
appurtenances.
Adjust sewer facilities to clear highway construction by abandoning 2,539 LF of eight (8)
inch and 901 LF of six (6) inch sewer main complete with appurtenances.
Restore service by installing 3,482 LF of eight (8) inch, and 20 LF of four (4) inch sewer
force main complete with appurtenances.
Of the 16,895 LF of main to be abandoned, 15,330 LF is located on private property;
therefore, this work is 15,330 / 16,895 = 90.74% reimbursable. Owner will perform this
work with competitively bid contract forces.
Owner has elected to upsize four (4) inch and six (6) inch water mains to eight (8) inch and
twelve (12) inch water mains. A betterment credit has been given the Department which
will be updated based on low bid, and based on final quantities installed.
Owner will also be replacing their existing West Transmission Easement which was
purchased prior to this project, and will be completely encompassed by the Department's
proposed ROW; therefore, this cost will be 100% reimbursable.
Summary of Cost
Construction
$
11,499,011.00
Betterment
($
324,692.00)
Construction Engineering
$
667,300.00
Force Account Inspection
$
100,000.00
Easement Cost
$
438,196.00
ROW Acquisition
$
30,000.00
Advertising
$
1,000.00
Health Department Review
$
500.00
Subtotal
$
12,411,315.00
Reimbursable Cost $12,411,315.00 X 90.74% _ $ 11,262,027.23
West Transmission Easement Cost X 100% _ $ 258,000.00
Total Reimbursable $ 11,520,027.23
Page 4 of 4
001 pie ody 1 OQII ai Cox I
TO THE
AGREEMENT For PROFESSIONAL ENGINEERING SERVICES
BETWEEN
CITY OF FAYETTEVILLE, ARKANSAS
AND
HAWKINS-WEIR ENGINEERS, INC.
In accordance with the AGREEMENT For PROFESSIONAL ENGINEERING SERVICES for the
Highway 112 Utility Relocation (HW Project No. 2021048), dated June 1, 2021, between the City of
Fayetteville, Arkansas (hereinafter called Owner) and Hawkins -Weir Engineers, Inc. (hereinafter called
Engineer), Owner hereby authorizes Engineer to proceed with engineering services as modified by this
Amendment No. 1.
SECTION 1— SCOPE OF SERVICES
1.1 Amendment No. 1 is for the increased scope of work associated with the Final Design Phase of the
Highway 112 Utility Relocation project. Additional services are detailed in the Engineer's attached Scope
of Services dated January 17, 2023.
SECTION 2 — TIME OF SERVICE
2.1 Engineer will proceed with providing the services set forth herein immediately upon execution of
this Authorization by all parties.
SECTION 3 — COMPENSATION
3.1 Owner shall compensate Engineer for providing the services set forth herein in accordance with the
terms of the Agreement. Total payment for Scope of Services described herein shall not exceed Hipety
Eight Thousand Six Hundred Ten and 00/100 Dollars ($98,610.00) without written approval of Owner.
These additional services adjust the Agreement's not to exceed fee to $524,410.00, but does not adjust the
not to exceed reimbursable expenses of $40,200.00.
2021048 Amendment l.docx Page 1 of 2 April 13, 2023
Attachments: Scope of Services dated January 17, 2023
Fee Proposal dated January 17, 2023
Arkansas State Highway Commission Utility Change Order
Standard Hourly Billing Rate Structure, effective August 14, 2022
AUTHORIZATION BY:
CITY OF FAYETTEVILLE, ARKANSAS
I0
Date:
ACCEPTED BY:
HAWKINS-WEIR ENGINEERS, INC.
By: c7 "-t b • et"
"
Brett D. Peters, P.E.
President and CEO
Date: 04 (13 / 20 2.3
Honorable Lioneld Jordan, Mayor
2021048 Amendment l.docx Page 2 of 2 April 13, 2023
Amendment No. 1
Scope of Services 40
In Highway 112 Utility Relocations
Fayetteville, Arkansas
CITY OF
HW Project No. 2021048 FAYETTEVILLE
January 17, 2023 ARKANSAS
D. Task 3 — Final Design (ARDOT Preliminary Engineering — Change Order)
1. Prepare final design calculations, plans, profiles, details, quantity takeoffs, and cost
estimates for an additional 3,200 LF of pipe line
2. Prepare exhibits for City of Fayetteville's use relative to a rezoning effort for Benedict
Preliminary Master Plan and provide review comments on rezoning for the 112 Drive -In
Development
3. Research property records and prepare additional utility easement in Highway 112
Business Park for existing utilities along W. Enterprise Drive
4. Prepare requests and coordinate with ARDOT on proposed right-of-way changes along
Arkansas Highway 112 north of Truckers Drive; relocation of proposed ARDOT drainage
improvements and elimination of a sanitary sewer relocation on W. Van Ashe Drive; and
possible extension of water line improvements along Arkansas Highway 112 north of
Howard Nickle Road for future phase of Highway 112 widening
5. Prepare Civil 3D surface model of proposed traffic circle at Arkansas Highway 112 and W.
Van Asche Drive to determine location of existing 36-in. transmission line relative to
proposed drainage improvements and roadway embankment
6. Attend (1) additional 50% Design Review meeting and prepare additional plan revisions
for pipeline alignment and associated easement updates
7. Attend (3) additional 90% (Pre -Final) Design Review meetings with City of Fayetteville
Utility Department staff, City land agents, and ARDOT
8. Update technical specifications for project manual based on revised City of Fayetteville
Standard Specifications recently approved by the Arkansas Department of Health
9. Coordinate, inspect and perform location survey on the second phase of geotechnical
bores at the project site
2021048 Amendment 1 Scope of Services (01-17-23) Page 1
PAN
Task 3 - Final Design, Amendment 1 (ARDOT Preliminary Engineering - Change Order)
Exhibit B
Scope of Services and Fee Proposal Summary
Contract Amendment No. 1 Revised
Highway 112 Utility Relocations
City of Fayetteville, Arkansas
HW Project No. 2021048
January 17, 2023
j4i
CITY OF
FAYETTEVILLE
ARKANSAS
Highway 112 Utility Relocations, Fayetteville, Arkansas
Task
Engr
VII
Engr
V
Engr
III
Engr
I
GPS
Survey
Surveyor
Insp
I
Tech
IV
Tech
I
Total
Hours
1. Prepare final design calculations, plans, profiles, details, quantity takeoffs, and cost estimates for an additional 3,200 LF of pipe line
188
8
20
166
4
72
22
480
2. Prepare exhibits for City of Fayetteville's use relative to a rezoning effort for Benedict Preliminary Master Plan and provide review comments on
rezoning for the 112 Drive -In Development
12
4
2
18
3. Research property records and prepare additional utility easement in Highway 112 Business Park for existing utilities along W. Enterprise Drive
1
6
7
4. Prepare requests and coordinate with ARCOT on proposed right-of-way changes along Arkansas Highway 112 north of Truckers Drive;
relocation of proposed ARDOT drainage improvements and elimination of a sanitary sewer relocation on W. Van Ashe Drive; and possible
extension of water line improvements along Arkansas Highway 112 north of Howard Nickle Road for future phase of Highway 112 widening
16
2
2
20
5. Prepare Civil 3D surface model of proposed traffic circle at Arkansas Highway 112 and W. Van Asche Drive to determine location of existing
36-in. transmission line relative to proposed drainage improvements and roadway embankment
4
22
26
6. Attend (1) additional 50 % Design Review meeting and prepare additional plan revisions for pipeline alignment and associated easement
updates
6
2
4
12
7. Attend (3) additional 90 % (Pre -Final) Design Review meetings with City of Fayetteville Utility Department staff, City land agents, and ARDOT
16
4
20
40
8. Update technical specifications for project manual based on revised City of Fayetteville Standard Specifications recently approved by the
Arkansas Department of Health
36
4
40
9. Coordinate, inspect and perform location survey on the second phase of geotechnical bores at the project site
2
2
4
1
9
Total Hours 281 14 20 194 8 10 0 99 26
652
Final Design, Amendment 1 (ARDOT Preliminary Engineering - Change Order)
$98,610
ENGINEERING SERVICES SUMMARY
Highway 112 Utility Relocations, Fayetteville, Arkansas
A. Task 1 - Preliminary Engineering Services Approved under Agreement for Professional Engineering Services, June 1, 2021
$36,000
B. Task 2 - Final Design Phase (ARDOT Construction Agreement) Approved under Agreement for Professional Engineering Services, June 1, 2022
$389,800
C. Reimbursable Expenses Approved under Agreement for Professional Engineering Services, June 1, 2023
$40,200
D. Task 3 - Final Design, Amendment 1 (ARDOT Preliminary Engineering - Change Order)
$98,610
Total Engineering Fee - Not to Exceed
$564,610
202304E Scope of Services Fee Proposal -Amendment 1\Amendment 1(Task 3) 01-17-23 Page 1 of 1
ARKANSAS STATE HIGHWAY COMMISSION
UTILITY CHANGE ORDER
UTILITY City of Fayetteville CHANGE ORDER NO. One (PE)
JOB NO
ROUTE
11WIMA11
FAP NO.
CMF-TAPF-9142(48) JOB NAME Truckers Dr. - Howard
112 SECTION 1
COUNTY Washington
Nickell Rd. (Fayetteville)(S)
DESCRIPTION OF CHANGE:
Increase Preliminary Engineering from the amount entered on the PE Agreement of $466,000.00 to the revised
estimated amount of $564,610.00, which results in an increase of $98,610.00.
REASON FOR CHANGE:
Increase Preliminary Engineering due to additions in the scope of work for design. Additional facilities have been
included in the relocation plans, and additional engineering is required due to business developments within the
project area. Additional coordination is also being required to complete the Owner's relocation proposal. Please
see attached estimate.
Item Description
Present Amount
Revised Amount
Increase
(Decrease)
Preliminary Engineering
$466,000.00
$564,610.00
$98,610.00
TOTAL
1 $466,000.00
1 $564,610.00
1 $98,610.00
COMPUTATION OF REIMBURSABLE AMOUNT:
Reimbursable Percentage: 90.31% (estimated)
Present Amount
$466,000.00
Reimb. % 90.31%
$420,844.60
Revised Amount
$564,610.00
1 Reimb. % 90.31%
$509,899.29
Overrun
$89,054.69
Requested
Coordinator
Recommended
Section Head-UtilitiEd Section
Approved
Right of e ay Division Upa
Authorized
Asst. Chief .,;deer -Design
Job Files\Job #\Funding
Date 2-8-2023
Date 2-8-2023
Date 2/8/2023
Date 02-08-2023
M
Engineer
Standard Billing Rate Structure
For Hourly Fee Based Contracts
Hawkins -Weir Engineers, Inc.
Effective August 14, 2022 through August 12, 2023"'
Engineer VII
$
220
Per Hour
Engineer VI
$
200
Per Hour
Engineer V
$
175
Per Hour
Engineer IV
$
150
Per Hour
Engineer III
$
130
Per Hour
Engineer II
$
115
Per Hour
Engineer I
$
100
Per Hour
Engineering Technician
Designer I
$
110
Per Hour
Technician IV
$
95
Per Hour
Technician III
$
85
Per Hour
Technician II
$
75
Per Hour
Technician I
$
65
Per Hour
Field Technician - Field Inspector
Resident Project Representative (RPR)
$
120
Per Hour
Construction Manager
$
100
Per Hour
Inspector II
$
85
Per Hour
Inspector I
$
75
Per Hour
Field Surveying
GPS Survey
Surveyor
Administrative
Business Manager
Expert Witness
Preparation
Testimony, less than 1/2 day
Testimony, per Day
$ 175 Per Hour
$ 125 Per Hour
$ 85 Per Hour
At Engineer's Hourly Rate
$ 2,000
$ 4,000
Expenses Reimbursable Expenses and upcharges are determined by the Client Agreement/Contract
Subconsultants/Outside Services
Express Delivery, Field Supplies, Testing, Review/Filing Fees
and Advertising
Travel: Hotel and meals
Actual Cost
Vehicle(2)
$0.655 per mile effective l/l/23
Reproduction: Outside printing service
Actual Cost
In-house printing
Letter Copy - B&W
$ 0.12
Per Copy
Letter Copy - Color
$ 0.75
Per Copy
22 x 34 Size Copy - B&W
$ 3.00
Per Copy
22 x 34 Size Copy - Color
$12.00
Per Copy
22 x 34 Size Copy - Color Photo
$ 25.00
Per Copy
11 x 17 Size Copy - B&W
$ 1.50
Per Copy
11 x 17 Size Copy - Color
$ 5.00
Per Copy
CD Copy
$ 5.00
Per Copy
Binding
$ 1.00
Each
(1) Billing Rates are reviewed and adjusted annually in August. Regardless, any adjustment
in Billing Rates will not impact previously negotiated Not To Exceed (NTE) fee amounts without a
formal Contract Amendment.
(2) To be adjusted periodically to current IRS mileage rate.
All Billings are due upon receipt unless prior arrangements for payment have been made.
AMENDMENT NO. 1
TO THE
AGREEMENT For PROFESSIONAL ENGINEERING SERVICES
BETWEEN
CITY OF FAYETTEVILLE, ARKANSAS
F_11►17
HAWKINS-WEIR ENGINEERS, INC.
In accordance with the AGREEMENT For PROFESSIONAL ENGINEERING SERVICES for the Utility
Relocation for I-49/MLK Interchange (HW Project No. 2022129), dated February 7, 2023, between the
City of Fayetteville, Arkansas (hereinafter called Owner) and Hawkins -Weir Engineers, Inc. (hereinafter
called Engineer), Owner hereby authorizes Engineer to proceed with engineering services as modified by
this Amendment No. 1.
SECTION 1— SCOPE OF SERVICES
1.1 Amendment No. 1 is for Task 2 - Preliminary Engineering Agreement associated with the Final
Design Phase of the Utility Relocation for I-49/15th Street Interchange project. Additional services are
detailed in the Engineer's attached Scope of Services dated May 4, 2023.
SECTION 2 — TIME OF SERVICE
2.1 Engineer will proceed with providing the services set forth herein immediately upon execution of
this Authorization by all parties.
SECTION 3 — COMPENSATION
3.1 Owner shall compensate Engineer for providing the services set forth herein in accordance with the
terms of the Agreement. Total payment for Scope of Services described herein shall not exceed Two
Hundred Seventy Six Thousand One Hundred Ten and 00/100 Dollars ($276,110.00) without written
approval of Owner. These additional services adjust the Agreement's not to exceed fee to $544,550.00,
and the adjustment includes $7,500 for geotechnical services. The total not to exceed reimbursable expenses
is adjusted to Fifty Two Thousand Five Hundred and 00/100 Dollars ($52,500).
2022129 Amendment 1 - 15th Street.docx Page 1 of 2 May 4, 2023
Attachments: Exhibit A — Scope of Services dated, May 4, 2023
Exhibit B — Scope of Services and Fee Proposal, dated May 4, 2023
Exhibit C — Standard Hourly Billing Rate Structure, effective August 14, 2022
AUTHORIZATION BY:
CITY OF FAYETTEVILLE, ARKANSAS
By:
Honorable Lioneld Jordan, Mayor
Date:
ACCEPTED BY:
HAWKINS-WEIR ENGINEERS, INC.
Barry McCormick, P.E.
Corporate Secretary
Date:
2022129 Amendment 1 - 15th Street.docx Page 2 of 2 May 4, 2023
Exhibit A — Preliminary Engineering Agreement _
Scope of Services 9%
hN Utility Relocations for 1-49/151h Street Interchange
Fayetteville, Arkansas CITY OF
FAYETTEVILLE
HW Project No. 2022129 ARKANSAS
May 4, 2023
Further Description of Basic Engineering Services and Related Matters:
Scope
The Utility Relocations for the 1-49/15th Street Interchange project include the relocation of
publicly owned utilities to precede the roadway improvements to West 15th Street at the
proposed crossing of Interstate 49 (1-49) by the Arkansas Department of Transportation
(ARDOT). The ARDOT project includes the extension of West 15th Street for an overpass of
1-49 with two (2) traffic circles, entrance and exit ramps, and box culvert structures under
West 15th Street and South Futrall Drive. The utility relocation project will consist of an
estimated 2,014 linear feet of 18-inch water main, 216 linear feet of 12-inch sanitary sewer,
15 linear feet of 24-inch sanitary sewer, and 399 linear feet of 30-inch sanitary sewer.
TASK 1 — Preliminary Engineering Services — Preliminary Design Phase
1. Project Management and Administration — Preliminary Engineering
a. Prepare and submit a Certification of Consultant to ARDOT for the project
b. Attend ARDOT's Pre -Construction Meeting(s) for the highway improvement project
on behalf of the Owner. Provide updates and answer questions regarding the
relocation of the Owner's facilities
2. Topographic Surveys
a. Utilize ARDOT baseline (with references) along centerline of existing roadway. Set
monuments at approximate 500-foot intervals and, if necessary, at intervisible
points in between. The monuments and baseline shall not interfere with traffic
flow and will not require survey crew to enter traffic flow
b. Locate all existing structures, streets, driveways, storm drains, utilities, fences,
trees, landscaping, and other features within 50 feet of proposed public utility
improvements
3. Assist the Owner in negotiations and preparing documents required to enter
into a Highway — Utility Construction/Relocation Agreement with the Arkansas
State Highway Commission
a. Prepare and submit a Preliminary Engineering (PE) proposal for ARDOT's review
in accordance with ARDOT's Utility Accommodation Policy
Review available Record Documents and other information provided by the
Owner to determine the extent of the Owner's existing facilities that will
potentially be impacted by ARDOT's proposed construction limits and/or rights -
of -way
2022129\Exhibit A - PE Agreement - 15th Street (05-04-23) Page 1 of 7
Exhibit A — Preliminary Engineering Agreement _
Scope of Services A
hN Utility Relocations for 1-49/15t'' Street Interchange
Fayetteville, Arkansas CITY OF
FAYETTEVILLE
HW Project No. 2022129 ARKANSAS
May 4, 2023
ii. Based on the information provided by the Owner and the topographic survey,
develop preliminary exhibits or drawings required to illustrate the anticipated
scope of the Owner's existing facilities that will require relocation
iii. Based on information provided by the Owner and the topographic survey,
develop a preliminary list of the Owner's existing facilities that are anticipated
to require relocation to avoid conflict with ARDOT's proposed improvements.
This list will include an estimated breakdown of the existing facilities to be
relocated by diameter and estimated length
iv. Participate in an in -person meeting with the City of Fayetteville to finalize the
preliminary list of facilities. A meeting with ARDOT and their Construction
Manager General Contractor (CMGC) will be scheduled after the preliminary
list of facilities is finalized
V. Prepare a preliminary estimate of the anticipated construction cost based on
the identified scope of the Owner's existing facilities to be relocated. Include
a separate accounting of any betterments that the Owner chooses to include
in the relocation project
vi. Using ARDOT Right -of -Way mapping and the location of the Owner's existing
facilities from the information provided by the Owner, develop a preliminary
reimbursement eligibility ratio. This ratio will provide an accounting of the
linear footage of the Owner's existing facilities claimed in private easement to
the total linear footage of the Owner's existing facilities to be relocated. Obtain
and review title information from Waco Title Company for assessment of
easements and ARDOT Right -of -Way
vii. Prepare a preliminary schedule for the project including the anticipated dates
for starting and completing the relocation design, bidding, and construction,
including any consideration for project phasing
b. Following ARDOT's approval of the PE proposal and subsequent execution of a
PE Agreement between the Owner and ARDOT, prepare and submit a
Construction Agreement proposal for ARDOT's review in accordance with
ARDOT's Utility Accommodation Policy
2022129\Exhibit A - PE Agreement - 15th Street (05-04-23) Page 2 of 7
Exhibit A — Preliminary Engineering Agreement
Scope of Services
hW Utility Relocations for 1-49/15t' Street Interchange
Fayetteville, Arkansas
HW Project No. 2022129
May 4, 2023
TASK 2 — Preliminary Engineering Services — Final Design Phase
1. Project Management and Administration
a. Prepare correspondence and consultation with Owner
I�
CITY OF
FAYETTEVILLE
ARKANSAS
b. Develop a detailed project schedule that outlines the tasks and major milestone
dates for the Final Design Phase
c. Prepare a monthly status report for submission with each invoice
2. Utility Coordination
a. Obtain location and size of existing and proposed overhead and underground
utilities from the CMGC
b. Using utility field survey data, atlas mapping, and information from CMGC, plot
existing and proposed utilities on plans
c. Attend meetings with CMGC and utility companies to discuss necessary
adjustments or relocations
d. Perform field locates by using spot digging performed by Owner and/or CMGC
3. Preliminary Design Phase (50% Design Phase)
a. Manage a geotechnical soils investigation by a subconsultant, GTS, Inc.
b. Prepare preliminary plans (horizontal scale of drawings to be 1-inch equals 20 feet
or larger, and vertical scale to be 1-inch equals 5 feet or larger). Cross section
scale to be 1-inch equals 10 feet horizontal and 1-inch equals 5 feet vertical or
larger, including the following information:
i. Proposed alignments of pipelines and roads
ii. Existing and proposed surface profiles
iii. Pipelines, roads, and structures detailed in the profile view
iv. Buried utility crossing depths shown in profile
v. Pipeline crossing locations (streams and roads)
vi. Proposed utility easements and temporary construction easements
c. Prepare exhibit showing anticipated easement acquisitions for the project.
Prepare property descriptions and exhibits in a format approved by the Purchasing
Department for the Owner's acquisition of utility easements and/or temporary
construction easements
2022129\Exhibit A - PE Agreement - 15th Street (05-04-23) Page 3 of 7
Exhibit A — Preliminary Engineering Agreement _
Scope of Services A
hW Utility Relocations for 1-49/15t'' Street Interchange
Fayetteville, Arkansas CITY OF
FAYETTEVILLE
HW Project No. 2022129 ARKANSAS
May 4, 2023
d. Prepare 50% Opinion of Probable Construction Cost
e. Submit one (1) full-size copy and one (1) PDF copy of the 50% Design Plans, as
well as a copy of the Opinion of Probable Construction Cost
f. Participate in 50% Design Review Meeting within thirty (30) days following
submittal of the 50% Design Documents
4. Pre -Final Design Phase (90% Design Phase)
a. Prepare final design calculations, plans, profiles, details, cross sections, street
crossings, traffic detours and other items. Final plans shall incorporate comments
from the 50% Design Review Meeting, evaluation data, record drawing
information, and information obtained during site visits
i. Prepare construction details which depict all typical items, including but not
limited to fire hydrants, valves, vaults, manholes, and bores utilizing the City of
Fayetteville format and standard detail drawings where applicable
ii. Prepare traffic control plans in accordance with the MUTCD standards and
ARDOT requirements
iii. Prepare stormwater and erosion control measures on plans. As needed,
prepare a Stormwater Pollution Prevention Plan in accordance with the
requirements of ADEQ General Permit ARR150000, Part 11, Section A.4
iv. Prepare plans identifying existing facilities that are to be removed
b. Prepare final notes on plans to fully describe the construction work to be performed
c. Identify material to be used under the Build America, Buy America Act (BABAA)
requirements
d. Prepare Specifications and Contract Documents. The City will provide templates
for the front-end documents
e. Provide construction bid proposal form in electronic format, meeting the City of
Fayetteville's requirements
f. Prepare Final Opinion of Probable Construction Cost
g. Perform QA/QC Review of Final Plans and Specifications
h. Submit one (1) full size copy and one (1) PDF copy of the 90% Design Plans, as
well as a copy of the Final Opinion of Probable Construction Cost and
Specifications
2022129\Exhibit A - PE Agreement - 15th Street (05-04-23) Page 4 of 7
Exhibit A — Preliminary Engineering Agreement _
Scope of Services A
hN Utility Relocations for 1-49/15t'' Street Interchange
Fayetteville, Arkansas CITY OF
FAYETTEVILLE
HW Project No. 2022129 ARKANSAS
May 4, 2023
i. Prepare permits (ADEQ STAA, ADEQ Stormwater Discharge Permit, ADEQ
Hydrostatic Discharge Permit, ARDOT Utility Permit, and USACE Section 404)
j. Assist the City's Appraiser and Right -of -Way Acquisition Agent
k. Participate in 90% Design Review Meeting within thirty (30) days following
submittal of the 90% Design Documents
5. Final Design Phase (100% Design Phase)
a. Incorporate any QA/QC Review Comments and 90% Design Review Comments
b. Submit one (1) full-size copy, one (1) half-size copy and one (1) PDF copy of the
"Issued for Bid" (IFB) Plans, IFB Specifications, and the Final Opinion of Probable
Construction Cost
c. Submit the Final Plans, Contract Documents, and an Opinion of Probable
Construction Cost to the Arkansas Department of Health for review and respond
to any questions or comments
d. Submit the Final Plans, Contract Documents, and an Opinion of Probable
Construction Cost to ARDOT for review and respond to any questions or
comments
6. Advertising and Bidding Phase
a. Provide one (1) PDF copy of the IFB Plans and Specifications updated with the
Owner's project number for use in the Owner's electronic procurement portal, Ion
Wave. The Owner will maintain the official list of plan holders
b. Prepare any necessary addenda for the project
c. Attend Pre -Bid Conference and Site Visit to assist the Owner in answering
questions concerning the project
d. Participate in the Bid Opening (virtually)
e. Review bids and prepare a recommendation to the Owner for the award of a
Construction Contract
f. Assist in the preparation of Contract Documents for execution between the Owner
and Contractor
2022129\Exhibit A - PE Agreement - 15th Street (05-04-23) Page 5 of 7
Exhibit A — Preliminary Engineering Agreement _
Scope of Services A
hN Utility Relocations for 1-49/15t'' Street Interchange
Fayetteville, Arkansas CITY OF
FAYETTEVILLE
HW Project No. 2022129 ARKANSAS
May 4, 2023
TASK 1 — Preliminary Engineering Services: Utility Relocations for I-49/MLK
a. The Preliminary Design Phase (TASK 1) for the I-49/MLK Utility Relocations
Project is already under contract with the City of Fayetteville but has not been
incorporated into a Preliminary Engineering Services Agreement with ARDOT.
Work on TASK 1 for I-49/MLK will continue concurrently with the Preliminary and
Final Design Phase work for the I-49/15th Street Interchange Utility Relocation
Project
Construction Engineering Services — Construction Phase
a. Construction Phase Services for the I-49/151h Street Utility Relocation Project are
not included in this Scope of Services
General
a. The Engineer should anticipate a 30-calendar day review period by the City staff
between the completion of one phase and the beginning of the following phase.
Additional time may be required for review by agencies
b. The Plans, Specifications and Contract Documents authorized by this Agreement
shall be prepared to allow construction bids to be received and construction to be
performed under one (1) Construction Contract for I-49/15th Street Interchange
Utility Relocations
c. Subcontracting of services by the Engineer shall have prior approval of the Owner
Exclusions to the Scope of Services
a. Construction Observation or Administration services including submittal review,
review or preparation of payment requests, assessment of substantial/final
completion, review of Contractor's conformance to construction documents, and
preparation of Record Drawings. Any Scope of Services for Construction Phase
Services will be considered under a separate Agreement or Amendment to this
Agreement
b. Environmental assessment or evaluation of the site
Attachment A — Project Location Map
2022129\Exhibit A - PE Agreement - 15th Street (05-04-23) Page 6 of 7
Ny �
<O G�A
y0 ,
<<
W. CENTER ST.
O�
W. STONE ST. w
Q
(7
z
o
ui
u >
a
Ln
z
O
w
'J
z
w
x
w
Y
EL
R
LJ
N
F P�M�NG�oN
o
��
o
o
G8�v0
Lu
MPR��NO3"
m_
o
G�
�O
WEST 15TH ST.
z
�
U_
CROWNE DR.
Z
PROJECT LOCH TION N
Q
O
0
ILLoy
J
Z_
�1
>
F-
ILLLi
18TH ST.
w
r
a
w
I
w
c�
z
U
w
Y
NG �Q•
m o�
G�O�mQ
of
o
F-
Q
U
O
J
w
0_
F
J
0)
HAWKINSoWEIR
UTILITY RELOCATIONS FOR I-49 / 15th STREET INTERCHANGE
N
N
ENGI N E E R S, i N c.
15TH STREET PROJECT LOCATION MAP
�
N(479)
Van Buren Fort Smith Fayetteville Little Rock
474-1227 I (479) 242-4685 I (479) 455-2206 I (501) 374-4846
FOR: CITY OF FA YETTEVILLE, ARKANSAS
N
www.hawkins-weir.com
MAY2023
SCALE: 1"-1200'
2022129
W N coN N N 7 (0(0(00
J CR y c0 c0 W m M (O
J y F U ENAQ
O > N Q
W Z ai
FFQ >
�W`lz T:° a a a a o m ao o(o
r Q co O N N N N V N V N
Q a 2
LL
m
L L
U U _
a) F
C
N
2
U) U °
L CD — oo
0)
O
o a) N_
C O
O (7
O T
(n
C
a3
'U
L > N
U � M
N
H
d �
� W �
t
_ V
M
CL C> r O F F V N
O cn W
N N N
a � m
a7 C N
m a e N N co cop m
LA mr-Q O N W V3
L N Z
X
W ti w O m o -_
Co N >a
O ❑ h y c d is W= c o n O
CL U iL U o
O 2 O d r c@
w O
Cl) E m
T a o
h
7 a = m
c E
o N U
d 2 U as U
m E 2)
N O LO
s o
C
a J E o
E O
C E U a O m
ID
d m c coo o y 3
�U
❑ N Y L a U
c0 c0 R L E N L
a ~ 3 Y L O C N N
U L C C N m m 0)
o O N O
cn o° E a a c
0
c M a w O C r
C N 2 Ou 0 r y U C N
L O X N a3
W o c a y m o (d U c
i 2 a a) °
Q U N m T
U a
C > c n N m o Z L y
E U W C a L T C U N 3 m a) C d L m ma
a WO c c C CD " o
E 2° O O O c c°
o a a E
N O U mm C U = m c�
tll a3 2 0 2 72 O O .O c E E
cy,_� a a 8� mQo
2 o2 U
maq aaa �O� 7o¢a
W 2
2 N
CL
O
co
(O
Cl)
EA
O
W
V
N
fA
O
W
O
(O
N
EA
O O
p W
M O
n M
fA fA
O O
WIt
O a0
M M
fA fA
O O
N oD
c0 V
n V
fA
�
O
It
aD
ID
fA
00
O p
m �
N _
E1J
O
N
O
N
EA
O
O
N
N
7 N
N M
7 0)
100
� p
N
NN
V
N ao
—
00
�
00 00
aD aD
(° aD
aD
7
7
O
V
aD aD
aD aD
aD p
aD
M V
V
7
�
V
C
L
v a)
a
U
o E
co a
c
>
> C
C O
U m
N>
O
T
❑
c
U
c°O
2)
L
O` o
a3
w p
co
@
E
N N
a 0
C
N
N f0
>
U C
a3
a
UC
O
c°
OID
o
F
L
C T
E
O
m
N
O
i O
y
0
c
T
(n
o
O p
N
o f
co
V
C N
p_
`
N
.LO-.
°
r
OI
3 c
2 0 3
o
4°°
N c
o
CD
o•
U❑
o o
U o
c
c
N
O
N
O U
a3 pl
U
a
N y
mow
o
a n
0 2
m
(D m
m
O
2 a
3
m
m
o
U
N U
c
�
C
n
N
N C
N
a
C
01
.-: j
N E
a) n
O
N L
mN
2 -O
Q) a E
a CD N
o (D
U C
.LMN
c V
C CD
a) N
C
Y r
0 0
3
>
N m C
N@
a
J N
L
'Lo, W
W T N
1] C
a)
❑
5 -a
-a
2 m
o
.n °
o
2v!
m
as
o>
a
75
C N
A oZ5
N aai
m
a 01
c c
U N@°
p h
2
a a .•
U C
o 0 0
m
.N
U
n
O
1
CmL
O NL
❑
a
U
C 'C
C
m
°O
r UC
i
C
o
j
E Q >
t6 C
E r
2
p R
,-. O
Lo
o>
y
o
O
°
2 U w
a as
N
y-
C O
(iaa
C N
O��U
X@ n
0 a d
c
A
❑
W
n C
O
a
O
N C E
(O C 1]
y
C
CD
2'
0 N
x
n
n 0
d Y .O
2°
n d
E
@
2
a W'a
ca
anaO
2La
naa`r2
2
O
°
m
M
000
(O
N
N
W (CLO
V ()
EA EA
c0 V
EA EA
c0
fA
V
O
(D
7 V
7
0
7
7
c0 CO
CO CO
O
V
O
V
7 7
N N
N c0
M A
7
N
V
5
;
s
as as
a
>
>
0 o
. 3
y a C
a
m �a
N
E
m
r m
2 E 0
E
u,
`oo
m
E
m�
d
F asK
2
m
N 2
a a
ID ID a
U °
❑ m¢
a
s
U£
£
c
°c
n
a
d K>
w
m a
op
N
N m
°
y
m
❑ .N
:�
a
C C7
a o
U
E
O E
N
y Q
N>
l°O .0.
O
S y
W
❑ N
O Q@
N
m
2 Z
U
E N
= n O
o
f
Q
a1
O
5 CD
Q>
a o C
0
, E
m o
m
ui E
w IDm
m
w oa°
U
m E Q
c
a"i d
E
E
_oUo
°
n ::
°
a,,;
a
° o°
'2 c w
a
'�
a
5
L
m
C O
rn
anaoL.=
(L-J N
mo3
j
❑
(6 L
a
-2
n 'C
C C
C
-OO
o
a
N
aS C tb
O a1
C y
C
N
m
o� �' 0
.N as c
2 d
t
Uv°,
U E m
y
o
a
all 01
O c
M
N O C
g C
76
rn
c y 3
d E m
d c
2 c
m
(�-J
ca fa m
(a V=
E
o@°
a
m n
m m> y
m
m
n� 0
CL
aa<na
n
c
C
a
2 L U
a o 2
_
__
2
> a
-
m
a
—
a`
V
16
a
c
r
m
a
s
m
M
O
a
O
a`
G7
G7
LL
m
N
d
U
Cn
d
O
m
Q
O
0
Cn
(� N
N
O N
11 (`4 N
Q O N
O Z
w •� C
�a
T
m LL =
E
a`
0
(°D O
W N
00N
N
OD
'I
(O (O
�
O
O
F U
O
M Lo
V N
ILA
V N
2
L �
U _ r
F �
L (p
m - co
O
m N_
2
O �
CO
Lo
a 2
� SEA
N
U
U �
01
H
m=
w
O
7
V O
N V
O Co
7
N
0 7
0
C i r
cq
N
N O
N V
O
W V
W va
W
N
m
w
C
E
d
o
p
m
r
a
m
rn
Q
O
m
❑
(D
a
L
°
o
C
w
O
O
O
m
❑
m
N
N
m
U
r
zo
m
3
oLL
m
m
a
o
O
w
°
W
m
a
a
o
O
m
N
E
o
o
O
a
N
m
E
❑
o
d
m
y
C m
3
o
of
m p
m
U
E
w
U
c
F
m
L
a
N
o o
��
° O
o
j w
.N-.
2 C
a.o
O. ._
N U N
Y
@ "'�
7
Q L
E°
(n p (n
E v
3
U
m 2
C
p a'p
o c>
o
m
C
?
N
❑
E o
o
O (D
9 ami
N
O Oo
d
m c o
a°
W (n
W
L
o) ?+
o
o
c
m c
Q U
l m
ao
U
o
2
o
c m o
� D
Oc
O
O
a a .`O.
O
� 7
m a'
2
c
p
C- a
AL
o y
U C
3
(n 'o
C
O m
y c
N. 0
m
o
C>
N co)
W -
N
>
O
O C
dm
Q 'E
n❑
=
U w
y o
h a
W
m
U
a
y N
c ca
C7 O
y(L
E r
m=U
"' C
(n
m
(n
U LL
(J c 0
D_ z)
m Y C
m
M m
o
m 0
"v, U E
p E
ma`
'O
``a-u)0
aa
m
O)
a`¢
¢ao
00 C' (O 00 (O
6 00 n
W 0
7
N N V N
(D N N O
7
o y
m y
a c o
Y O
m ¢ ❑
`O Q
m O O
_O y N
U U
C C
(p O O
y
O O
m ° U U
E
E a m m _m
U Z E a
3 W U o
N oa
❑ OL U
a ao❑c c UN O aoy 0
ID 0
C
.
N° 'c
0 a a
U O
m
O ad m C O N
Q� O m
CCU
m
6 N a r C E
C ° m n C 0) U
E L j N j 0
amEsc-a0O oc
L) c0❑0❑O
c )° C` N 2 0
.N O Nn No N U0 Uo0 C m
U m
Q O' N C C y C 0
O m m N a
= a
m m m
C@ O 0 y E 0
❑ U J m J m J
C U a U)❑ U d
c
LL m .6 U 'O
ID
LO
�O �O
O N
112
O
(O
('M
N (O
O O
N�
O
ell
O
w
N
OD
O
N (N7
0 N
O
o
N
O �
O C,
O
0
� N
O
V!
O
V M
N
V
fA
O
a)
W
OD
EA
V
V
c0 O
N V
N
0
Lo
(O
M
7
N
0
� N
to
a �
d
a
a
E
3 y
c
m
r
U
O
() U
C m
o
(J
o
d
U
o
o m
N Yo
c
p
o
-
U
U
C m
y
c
2
m
Q C
m
o
c
Y E
�
U
3
m 0o
m
n1
�
M
C
w�
CO
N
C
_o
O
m
3
O
'�
U C
a�
Y
3
O
D
axi
o
d
U
Z
C 'C
O O
U VNl
N m
C
N
(n
O
O O
o
f
C
ao U
LL
o y
r E
m
c
_
mo
mSoo
c
m
o
m
C)L
N
O. f,
o U
m c
y
O. 2?
C
O
@
c_
m
m
a m
y �'
g y
m
a
N
C❑
`o
!A
a�
N Q
(mi U
m d
m o
m
y
y
c :p
C m
n
F
3
o
a
m (n
a
'�
n 3
'U
c
2 U
N
Q
m
C
m
y
E
y
a ra
¢
a
a
Q
O
71
O
N
Exhibit C
Engineer
Standard Billing Rate Structure
For Hourly Fee Based Contracts
Hawkins -Weir Engineers, Inc.
Effective August 14, 2022 through August 12, 2023"'
Engineer VII
$
220
Per Hour
Engineer VI
$
200
Per Hour
Engineer V
$
175
Per Hour
Engineer IV
$
150
Per Hour
Engineer III
$
130
Per Hour
Engineer II
$
115
Per Hour
Engineer I
$
100
Per Hour
Engineering Technician
Designer I
$
110
Per Hour
Technician IV
$
95
Per Hour
Technician III
$
85
Per Hour
Technician II
$
75
Per Hour
Technician I
$
65
Per Hour
Field Technician - Field Inspector
Resident Project Representative (RPR)
$
120
Per Hour
Construction Manager
$
100
Per Hour
Inspector II
$
85
Per Hour
Inspector I
$
75
Per Hour
Field Surveying
GPS Survey
Surveyor
Administrative
Business Manager
Expert Witness
Preparation
Testimony, less than 1/2 day
Testimony, per Day
$ 175 Per Hour
$ 125 Per Hour
$ 85 Per Hour
At Engineer's Hourly Rate
$ 2,000
$ 4,000
Expenses Reimbursable Expenses and upcharges are determined by the Client Agreement/Contract
Subconsultants/Outside Services
Express Delivery, Field Supplies, Testing, Review/Filing Fees
and Advertising
Travel: Hotel and meals
Actual Cost
Vehicle(2)
$0.655 per mile effective l/l/23
Reproduction: Outside printing service
Actual Cost
In-house printing
Letter Copy - B&W
$ 0.12
Per Copy
Letter Copy - Color
$ 0.75
Per Copy
22 x 34 Size Copy - B&W
$ 3.00
Per Copy
22 x 34 Size Copy - Color
$12.00
Per Copy
22 x 34 Size Copy - Color Photo
$ 25.00
Per Copy
11 x 17 Size Copy - B&W
$ 1.50
Per Copy
11 x 17 Size Copy - Color
$ 5.00
Per Copy
CD Copy
$ 5.00
Per Copy
Binding
$ 1.00
Each
(1) Billing Rates are reviewed and adjusted annually in August. Regardless, any adjustment
in Billing Rates will not impact previously negotiated Not To Exceed (NTE) fee amounts without a
formal Contract Amendment.
(2) To be adjusted periodically to current IRS mileage rate.
All Billings are due upon receipt unless prior arrangements for payment have been made.
1WM
CITY OF
FAYETTEVILLE
ARKANSAS
April 6, 2023 Sent via email: DPrinzing(@klmengineering.com
Dewey Prinzing
VP of Business Development KLM Engineering, Inc.
1967 Wooddale Drive, Suite 4 Woodbury, MN 55125
Re: Potential Engineering Services Contract with the City of Fayetteville, Arkansas
Potable Water Storage Tank Inspection Services
City of Fayetteville Engineering Services RFQ 23-01, Selection #3
On March 30, 2023, the City of Fayetteville conducted a formal Engineering Selection meeting.
Your firm has been selected to negotiate an Engineering Services contract for inspection
services related to several of Fayetteville's water storage tanks.
The Arkansas Department of Health (ADH) requires that potable water storage tanks be
inspected every 5-years. The ADH provides guidelines for the scope and extent of these
inspections which will need to be followed precisely. An engineering selection is necessary so
that a qualified firm can perform these inspections and prepare appropriate reports,
documentation, and recommendations for repairs and rehabilitation. Inspections are in -person
and may involve climbing or using mobile lifts to visually inspect exteriors, measure paint
thicknesses and observe deterioration or corrosion. Inspections also involve interior inspections
either via manned -entry or remote operated vehicles. The selected firm will propose best
practices and alternatives for consideration. This scope would include many of Fayetteville's
tanks within the primary pressure plane, with inspections due in 2023. Tanks include: Surge
Tank, both Baxter Lane Tanks, both Rodgers Drive Tanks, both Kessler Mountain Tanks, and
the Canterbury Tank. The scope of work will be defined through non -billable scope meetings at
the Water/Sewer Operations offices.
Please remember that your selection does not guarantee a contract or work. Further, the City's
policies include the condition that should negotiations fail then the City will be required to
negotiate with the next selected firm. Do not perform any billable work of any kind related to this
letter, or the potential project until you have received a contract approved by the City Council
and signed by the Mayor.
Best,
4
Corey W. Granderson, P.E.
Utilities Engineer
City of Fayetteville, Arkansas
cgranderson(o)-fayetteville-ar.gov
479.444.3452
Mailing Address:
113 W. Mountain Street www.fayetteville-ar.gov
Fayetteville, AR 72701
KLN4.
April 18, 2023
Mr. Corey Granderson
Utilities Engineer
City of Fayetteville
113 W. Mountain Street
Fayetteville, AR 72701
REGARDING:
1.
Baxter 1.0MG GSR
2.
Baxter 5.00MG GSR
3.
Rogers 4.OMG GSR
4.
Rogers 4.OMG GSR
5.
Mt. Sequoyah .25MG EWT
6.
Kessler Mtn. 6.OMG GSR
Fayetteville, Arkansas
Dear Mr. Granderson:
Corporate Office
1976 Wooddafe Drive, Suite 4
Woodbury. MN 55125
Sent via Email Only
7. Kessler Mtn. 6.OMG GSR
8. Goshen .30MG GSR
9. Round Mtn..10MG Standpipe
10. Gulley Road .75MG EWT
11. Surge .25MG Standpipe
12. Canterbury .50MG EWT
KLM is pleased to submit this proposal for the remote operated vehicle (ROV) Evaluation of the above -
referenced water storage tank.
KLM Engineering provides NACE and AWS trained inspectors, certified in competent climbing, having
experience and working knowledge of the Occupational Safety and Health Standards (OSHA), American
Water Works Association (AWWA), American Concrete Industry (ACI) and State Regulations.
KLM Engineering provides evaluation reports that are reviewed by an engineer who has authored the
report and/or were written under the engineer's direct supervision.
DOCUMENTATION
KLM will provide the Owner with an evaluation report, which will provide the following benefits:
1. Clearly stating the actual condition of the reservoir.
2. For coated reservoirs, provide a life expectancy estimate of the coatings and/or an estimated
timeline for coating replacement.
3. Identify structure deficiencies and recommended repairs to bring the reservoir into compliance
with ACI, AWWA and OSHA requirements.
4. Provide a schedule for performing recommended maintenance work.
5. Provide a Cost Estimate for all structure repairs and coating replacement.
6. Identify the quantity of sediment and recommend a timeline for cleanout, if warranted.
7. Include color photographs identifying current conditions and any required repairs.
8. Recommend a timeline for future evaluations.
The evaluation report will be provided to the City in digital format (Pdf). After which, KLM will contact
City to discuss the report and answer any questions.
Copyright 2023 by KLM Engineering, Inc.
Page 1 of 8
Fayetteville, AR — (12) ROV Evaluations
SCOPE OF WORK
Float Evaluation of Upper Structure
In order to perform a float evaluation of the upper structure, the Owner must have the water at, or
near, the high-water level (HWL) at the start of the evaluation. KLM's inspectors will insert and inflate a
sterilized rubber raft into the tank interior. During the float evaluation, the Owner will be responsible
for opening and closing the valves to the tank. The inspector, while in the raft, will examine the interior
structure and evaluate the existing coating integrity above the high water line. KLM will float the
following tanks in addition to performing an ROV evaluation on each tank:
1. Baxter S.00MG GSR
2. Rogers 4.OMG GSR
3. Rogers 4.OMG GSR
4. Kessler Mtn. 6.OMG GSR
5. Kessler Mtn. 6.OMG GSR
ROV Evaluation
KLM plans to utilize a two -man crew and a remote operated vehicle (ROV) to perform the evaluation.
This evaluation method can be performed in one day.
KLM will provide inspectors who are properly trained and qualified to perform this type of evaluation.
KLM inspectors will place a disinfected ROV and tether into the reservoir for the interior evaluation of
the roof, walls, partition walls, floor, piping and valves. Photos will be taken with an underwater
camera, which will show the structure conditions and quantity of sediment. The interior of the inlet
pipe is excluded from the evaluation, unless otherwise written into this Agreement.
Exterior and Interior Evaluation
The exterior and interior evaluation is critical to the evaluation to determine whether there are any
structure deficiencies and OSHA compliance.
The exterior will be inspected from all areas accessible without rigging, unless otherwise written into
this Agreement. Coating conditions of both the interior and exterior piping and reservoir coatings, when
applicable, will be examined using dry film thickness (DFT) and standard ASTM tests.
Interior and Exterior:
♦ Roof structure (size and style).
♦ Vents (size and style).
♦ Roof manways (size and style).
♦ Ventilation manways (size and style).
♦ Overflow weir and pipe (size and style)
♦ Support column (size and style).
♦ Capacity level and head range.
♦ Inlet/outlet pipe.
♦ Mud ring.
♦ Site dimensions.
Copyright 2023 by KLM Engineering, Inc.
♦ Safety considerations.
♦ Drains.
♦ Floor condition.
♦ Pitting on piping.
♦ Ladders, cages, platforms and handrails.
♦ Base pad condition, including Flexcell and
grout.
♦ Screens on vents and overflows.
♦ Overflow air breaks, splash pads and
drainage.
♦ Safety devices.
Page 2 of 8
Fayetteville, AR — (12) ROV Evaluations
OWNER'S RESPONSIBILITIES
The Owner's personnel shall also be responsible for:
♦ Set the water at, or near, the high-water operating level.
♦ Cease the water inlet and outlet operation during the ROV inspection.
♦ Taking and testing water samples, as required.
♦ Providing information on the reservoir, including maintenance records, construction drawings,
previous evaluation reports and previous painting or reconditioning specifications. This
information is most useful if obtained prior to the reservoir inspection and evaluation.
FEES
The fee for the above -referenced scope of work is....................................................................... $36,062.00
The fee for lead and chromium collection and testing is an additional $500.00, if requested.
The fee for gasket installation on state -required wet access manway is $100.00.
It is the responsibility of the Owner to make sure that the tank is prepared for the evaluation per the
schedule agreed to in advance by both parties. In the event KLM arrives on site and the tank is not
ready, a second day will be charged as additional time and materials.
Should the tank be deemed unsafe by our inspectors, we reserve the right to revise the proposal to
include necessary equipment and measures to ensure safe access to complete the scope of work. Said
revised proposal would be subject to Owner approval
TERMS AND CONDITIONS
KLM has attached our standard Terms and Conditions. The Terms and Conditions are part of this
Agreement between City of Fayetteville KLM Engineering, Inc. unless otherwise agreed to in writing by
both parties.
Fees are subject to change, if proposed work exceeds twelve (12) months from the date of this proposal.
ADDITIONAL INFORMATION
Additional information can be found at KLM's website at: www.klmeneineerinL7.com
Copyright 2023 by KLM Engineering, Inc.
Page 3 of 8
Fayetteville, AR — (12) ROV Evaluations
AGREEMENT
This proposal is valid for sixty (60) days from the date of this proposal. If the City of Fayetteville finds
the proposal acceptable, please sign and return by mail, fax or email. By signing and returning this
signature page only, you agree to the terms of the entire proposal document submitted. When KLM
receives the signed proposal, we will contact the City to coordinate an evaluation date. Upon delivery of
the report to the City, an invoice will be submitted according to the terms of this Agreement.
This Agreement, between the City of Fayetteville of Fayetteville, Arkansas and KLM Engineering, Inc. of
Woodbury, Minnesota is accepted by:
CITY OF FAYETTEVILLE
113 W. Mountain Street
Fayetteville, AR 72701
Signature
Name
Title
Date
We look forward to working with you.
Sincerely,
KLM ENGINEERING, INC.
Dewey Prinzing
Vice President of Business Development
1976 Wooddale Drive, Suite 4
Woodbury, MN 55125
Cell: 651-434-4321
Email: dprinzing@klmengineering.com
Attachment: KLM Terms and Conditions
Rev 2023.04.07
KL
Copyright 2023 by KLM Engineering, Inc.
KLM ENGINEERING, INC.
1976 Wooddale Drive, Suite 4
Woodbury, MN 55125
Signature
Prizin
Name
Vice President of Business Development
Title
April 18, 2023
Date
Page 4 of 8
�
k
�\-
-
�_
i
r
.
: ■
�
f
.
�
� �
{isI
■
,
�
$f
f
�
_`
��
� �■ �
,
.:
-
f
�
$
�
$
2
@
�
`
`
�
�
�
,
�
■
�
2
�
�
�
■
,
a
.
_
■
�
�
�
;
■
-
&
2
,
Z 01-7
ƒ
�
a
�
�
L1
S
S
O
�
4
❑ A
'� •\
J
Vi
v
.44
{
, AllCIS
Q
r:±
+
�
I
3
i
Er
77
Y
IL M
•- is
v r Y,
N
x
i r
C'Ja
rl
r
VO
r5
CV I ►
A �
V'CV
Cho . ♦ _
.{
O CVcv
C
NO
_
N
M
�
M
u7
•r-ar-
; • to
0
0
�
n
LU
/N
o
0
qq
a
?
�
LU
0C
° �
k k
>Lij
<
�.
k
LU
\
x
/
o
z
±
R
0
0
0
0
-J
<
u
m
m
/
§
2
%
\
/
0
�
2
>
/
o
a
a
�
I
�
m
E
k
CL
IL
§
w
$
mU)
§
z
7
E
g
0
�
a
C
,
0
2
Ix
L
CL
o
/
/
w
2
Q
m
?
y
z
d
U)
E
c
/
©
S
^
�&�
3
2 r
0
�NE
%
kk
w
z
e
/�
�>,
j
/ a
=
t (
» c
~
0
0.
Z
\�
\�s-
\
�
0
2>1 o
=
wf
c�
«
kf
CD_
_LLE
kj
?�
0
i
3
ICA
rui
�.
i
Cn
Ir
Ln
an
N
J
N
Ir
ru
cc
❑ <
NOR
ptNlo23 yllSo :,9111163
a
m
4n
N _
O I�
�AM1
Nm+�
II
NOry
pOc7.m
H IEOO
II
N ' LE.
mz
Ln I
II mZ
I
M
J
i No
J
- I ry
�
�
M
7
�
lu
❑
❑
3
3190 N Malinda Dr
Interior 1,189.73
-Final cleaning - construction - Residential - 1,160.18 SF
-Dumpster load - Approx. 12 yards:
-Residential Supervision / Project Management:
Master Bedroom 2,790.37
- Remove Carpet 183.85 SF
-Remove Carpet pad 183.85 SF
-Carpet pad 326.85 SF
-Carpet 422.33 SF
Baseboard - 2 1/4" 27.00 LF
-Mask and prep for paint - tape only 73.50 LF
-Seal & paint baseboard - two coats 73.50 LF
-Casing - 2 1/4" 21.00 LF
-Paint door/window trim & jamb - 21ea
-Paint door/window trim & jamb - 1.00 EA
-Paint door slab only - 2 coats
-1/2" - drywall per LF - up to 2' tall 8.00 LF
-Paint the walls - two coats 603.78 SF
-Window blind - horizontal or vertical - Detach & replace 2.00 EA
-replace doors
Master Closet 192.46
-R&R Carpet pad 32.78 SF
-Remove Carpet 32.78 SF
-Carpet 37.69 SF
-replace doors
Master Coat Closet 862.71
-Carpet pad 12.50 SF
-Carpet 14.38 SF
-1/2" - drywall per LF - up to 2' tall 12.17 LF
-Paint the walls - two coats 103.11 SF
-Baseboard - 2 1/4" 12.17 LF
-Mask and prep for paint - tape only 12.17 LF
-Seal & paint baseboard - two coats 12.17 LF
-Casing - 2 1/4" 14.00 LF
-Paint door/window trim & jamb - 1.00 EA Large - 2 coats (per side)
- Bifold door set - Colonist - Double 1.00 EA
-Paint door slab only - 2 coats
replace doors
ra Lss►.akrss
p
PAINTING
FROM
Schneider Painting
Schneider Painting
P.O. Box 7948
Springdale, AR 72766
www.schneiderpaintingnwa.com
PHONE
479-283-3138
FOR
Allan Mangan
EMAIL
Allenmangan@gmaii.com
QUOTE NUMBER
1069
DATE
April 24, 2023
VALID UNTIL
June 18, 2023
I Download PDF
Master Bath
1,233.52
-Toe kick - pre -finished wood - 1/2" 4.00 LF
-Stain & finish toe -kick 4.00 LF
-Baseboard - 2 1/4" 20.67 LF
-Mask and prep for paint - tape only 20.67 LF
-Seal & paint baseboard - two coats 20.67 LF
-Casing - 2 1/4" 14.00 LF
-Paint door/window trim & jamb - 2
-Interior door unit 1.00 EA
-Paint door slab only - 2 coats
1/2" - drywall per LF - up to 2' tall 20.67 LF
Paint the walls - two coats 201.17 SF
Toilet - Detach & reset 1.00 EA
replace doors
Bedroom 1
Carpet 186.50 SF
Remove Carpet pad 92.51 SF
Carpet pad 92.51 SF
Remove Carpet 102.51 SF
Paint door/window trim & jamb - 2
Closet 1
- Carpet 11.31 SF
-R&R Carpet pad 9.83 SF
-. Remove Carpet 9.83 SF
Hall Closet
-Vapor barrier - visqueen - 6mil 3.96 SF
-Snaplock Laminate - simulated wood flooring 3.96 SF
Baseboard - 2 1/4" 6.33 LF
Mask and prep for paint - tape only 6.33 LF
Seal & paint baseboard - two coats 6.33 LF
Hallway
-Vapor barrier - visqueen - 6mil 46.71 SF
- Snaplock Laminate - simulated wood flooring 46.71 SF
-Baseboard - 2 1/4" 20.33 LF
Mask and prep for paint - tape only 20.33 LF
Seal & paint baseboard - two coats 20.33 LF
1/2" - drywall per LF - up to 2' tall 20.33 LF
Paint the walls - two coats 179.33 SF
Casing - 2 1/4" 42.00 LF
Paint door/window trim & jamb - 2 4.00 EA
-Cold air return cover - Detach & reset 1.00 EA
- Paint door slab only - 2 coats
Bedroom 2
-Carpet 187.17 SF
Carpet pad 102.51 SF
Remove Carpet 58.51 SF
Remove Carpet pad 58.51 SF
Paint door/window trim & jamb
Baseboard - 2 1/4" 22.67 LF
Mask and prep for paint - tape only 33.67 LF
Seal & paint baseboard - two coats 33.67 LF
Paint the walls - two coats 278.44 SF
Window blind - horizontal or Vertical 1.00 EA
908.91
57.75
58.51
1,069.66
1,261.90
Closet 2
79.28
Carpet 15.53 SF
R&R Carpet pad 13.50 SF
Remove Carpet 13.50 SF
Hall Bath
Baseboard - 2 1/4" 3.67 LF
Mask and prep for paint - tape only 3.67 LF
Seal & paint baseboard - two coats 3.67 LF
-1 /2" - drywall per LF - up to 2' tall 3.67 LF
- Paint the walls - two coats 95.83 SF
- Toilet - Detach & reset 1.00 EA
-R&R Toe kick - pre -finished wood 5.00 LF
Stain & finish toe -kick 5.00 LF
Casing - 2 1/4" 14.00 LF
-Paint door/window trim & jamb
Interior door unit 1.00 EA
Paint door slab only
Living Room
Remove Snaplock Laminate - 196.09 SF
Vapor barrier - 15# felt 196.09 SF
-Vapor barrier - visqueen - 6mil 264.09 SF
Snaplock Laminate - simulated wood flooring 264.09 SF
Baseboard - 2 1/4" 43.17 LF
-Baseboard - Detach & reset 10.00 LF
Mask and prep for paint - tape only 53.17 LF
Seal & paint baseboard - 53.17 LF
Batt insulation - 4" - R13 - paper foil faced 20.00 SF
1/2" - drywall per LF - up to 2' 35.17 LF
Paint the walls - two coats 476.25 SF
Window blind - horizontal or vertical - Detach & reset 2.00 EA
Pantry
- Paint door/window trim & jamb - 1.00 EA
-Vapor barrier - visqueen - 6mil 4.88 SF
Snaplock Laminate - simulated 4.88 SF
Baseboard - 2 1/4" 6.92 LF
Mask and prep for paint - tape 6.92 LF
Seal & paint baseboard - 6.92 LF
Kitchen
-Vapor barrier - visqueen - 6mil 188.71 SF
Snaplock Laminate - simulated 188.71 SF
Baseboard - 2 1/4" 35.42 LF
Mask and prep for paint - tape 35.42 LF
Seal & paint baseboard - 35.42 LF
-1/2" - drywall per LF - up to 2' 15.00 LF
Paint the walls - two coats 383.78 SF
Refrigerator - Remove & reset 1.00 EA
Casing - 2 1/4" 31.00 LF
Paint door/window trim & jamb - 2.00 EA
R&R Toe kick - pre -finished 14.00 LF
Window blind - horizontal or vertical - Detach & reset 1.00 EA
Range - electric - Remove & reset 1.00 EA
-Range hood - Detach & reset 1.00 EA
- Dishwasher - Detach & reset 1.00 EA
912.57
2,731.36
100.38
22,760.33
Contents
6,761.99
Content Manipulation charge - 64.00 HR 4 technicians for16hrs to pack out
Contents Evaluation and/or 8.00 HR Supervisor/Admin - per hour Working
supervisor on site, communication with customer and administrative tasks.
-Provide stretch film/wrap 2.00 RL
Provide furniture heavyweight blanket/pad 40.00 EA
Provide box, packing paper & tape - large size 30.00 EA
Provide wardrobe box & tape large size - 6.00 EA
-Provide plastic mattress cover & packing tape - King size 4.00 EA
- Bubble Wrap 12" wide - Add -on cost for fragile items125.00 LF
Job -site cargo container - pick up/del. (each way) 16'-40' 2.00 EA
-Job-site cargo/storage container - 2.00
Padlock/disc lock 1.00 EA
Content Manipulation charge - 72.00 HR 4 technicians for 18hrs to pack in,
additional time needed due to new building materials
Total $42,971.43
Thank you for the opportunity to estimate your project! We will reach out to
discuss scheduling and further details once you accept the estimate.
We prefer a check upon completion. There will be a 3% fee for all credit/debit
payments added to the invoice. We request a 20% deposit for projects over
$10,000.
We include a 1-year craftsmanship warranty, and we are licensed and insured.
We look forward to working with you!
www.schneiderpaintingnwa.com
Ask a Question
3190 N Malinda Dr
Total $42,971.43
O Yes, I Allan Mangan agree to and accept this quote, on May 5, 2023 at 7:39 AM.
Accept Quote
Decline this quote...
Rw ,rod by GmIlent
Client: Jesse Wigins
Property: 3190 NORTH MALINDA DRIVE
Fayetteville, AR 72703
Operator: BROCK
Estimator:
Christian Rodas
Position:
Estimator
Company:
Surfco Restoration & Construction
Type of Estimate:
Date Entered:
4/27/2023 Date Assigned: 3/15/2023
Price List:
ARFA8X_APR23
Labor Efficiency:
Restoration/Service/Remodel
Estimate:
JESSE WEEGEN
Home: (479) 402-0601
Business: (479) 601-2474
E-mail: christian.r@teamsurfco.com
JESSE_WEEGEN
Main Level
Main Level
DESCRIPTION QTY REMOVE REPLACE
TAX O&P TOTAL
1. Final cleaning - construction - 1,160.18 SF 0.00 0.31 43.16 71.94 474.76
Residential
3. Dumpster load -Approx. 12 yards, 1- 1.00 EA 474.80 0.00 56.98 94.96 626.74
3 tons of debris
4. Residential Supervision / Project 4.00 HR 0.00 66.39 0.00 53.12 318.68
Management - per hour
Total: Main Level
Bedroom 1
DESCRIPTION
329.33 SF Walls
435.24 SF Walls & Ceiling
11.77 SY Flooring
41.17 LF Ceil. Perimeter
QTY REMOVE REPLACE
100.14 220.02 1,420.18
Height: 8'
105.90 SF Ceiling
105.90 SF Floor
41.17 LF Floor Perimeter
TAX O&P TOTAL
56. Remove Carpet pad
58. Carpet
59. Carpet pad
60. Remove Carpet
61. Paint door/window trim & jamb - 2
coats (per side)
92.51 SF 0.12
186.50 SF 0.00
92.51 SF 0.00
102.51 SF 0.29
1.00 EA 0.00
0.00
3.70
0.64
0.00
31.68
0.00 2.22
82.81 138.02
7.10 11.84
0.00 5.94
0.50 6.44
13.32
910.88
78.15
35.67
38.62
Totals: Bedroom 1
90.41 164.46
1,076.64
~10' 6" Bedroom 2
Height: 8'
lag^
fV
l aet
329.33 SF Walls
105.90 SF Ceiling
o Bedroom
435.24 SF Walls & Ceiling
105.90 SF Floor
11.77 SY Flooring
41.17 LF Floor Perimeter
41.17 LF Ceil. Perimeter
~allway� 9
DESCRIPTION
QTY REMOVE REPLACE
TAX O&P
TOTAL
86. Carpet
187.17 SF 0.00
3.70
83.10 138.50
914.13
87. Remove Carpet
58.51 SF 0.29
0.00
0.00 3.40
20.37
88. Carpet pad
102.51 SF 0.00
0.64
7.87 13.12
86.60
JESSE_WEEGEN
4/27/2023
Page:2
CONTINUED - Bedroom 2
DESCRIPTION QTY REMOVE REPLACE TAX O&P TOTAL
89. Remove Carpet pad
58.51 SF
0.12
0.00
0.00
1.40
8.42
90. Paint door/window trim & jamb - 2
1.00 EA
0.00
31.68
0.50
6.44
38.62
coats (per side)
91. R&R Baseboard - 2 1/4"
22.67 LF
0.46
2.72
2.68
14.96
89.73
92. Mask and prep for paint - tape only
33.67 LF
0.00
0.62
0.17
4.22
25.27
(per LF)
94. Seal & paint baseboard - two coats
33.67 LF
0.00
1.49
0.40
10.12
60.69
95. Paint the surface area - two coats
278.44 SF
0.00
0.99
6.96
56.54
339.16
96. Window blind - horizontal or
1.00 EA
0.00
33.36
0.00
6.68
40.04
vertical - Detach & reset
Totals: Bedroom 2
1'-2'4"--I Closet 2
2'
fJ
1 se
fV �
DESCRIPTION
140.00 SF Walls
153.50 SF Walls & Ceiling
1.50 SY Flooring
17.50 LF Ceil. Perimeter
QTY REMOVE REPLACE
101.68 255.38 1,623.03
Height: 8'
13.50 SF Ceiling
13.50 SF Floor
17.50 LF Floor Perimeter
TAX O&P TOTAL
97. Carpet
15.33 SF
0.00
3.70
6.80
11.34
74.86
98. R&R Carpet pad
13.50 SF
0.12
0.64
1.03
2.04
13.33
99. Remove Carpet
13.50 SF
0.29
0.00
0.00
0.78
4.70
Totals: Closet 2
Closet
1� F- ---1114"1
T _
V Closet
rA
4' 10" 11 o
DESCRIPTION
110.67 SF Walls
120.74 SF Walls & Ceiling
1.12 SY Flooring
13.83 LF Ceil. Perimeter
QTY REMOVE REPLACE
7.83 14.16 92.89
Height: 8'
10.07 SF Ceiling
10.07 SF Floor
13.83 LF Floor Perimeter
TAX O&P TOTAL
65. Carpet
11.31 SF 0.00 3.70 5.03 8.38
55.26
66. R&R Carpet pad
9.83 SF 0.12 0.64 0.76 1.50
9.73
67. Remove Carpet pad
9.83 SF 0.12 0.00 0.00 0.24
1.42
JESSE_WEEGEN
4/27/2023
Page:3
CONTINUED - Closet
DESCRIPTION
QTY REMOVE REPLACE
TAX O&P
TOTAL
Totals: Closet
5.79 10.12
66.41
Closet CI
Master Closet
Height: 8'
184.00 SF Walls
32.22 SF Ceiling
Master Close_
216.22 SF Walls & Ceiling
32.22 SF Floor
I�
3.58 SY Flooring
23.00 LF Floor Perimeter
23.00 LF Ceil. Perimeter
2'2"i
DESCRIPTION
QTY REMOVE REPLACE
TAX O&P
TOTAL
29. R&R Carpet pad
32.78 SF 0.12
0.64
2.52 4.98
32.41
30. Remove Carpet
32.78 SF 0.29
0.00
0.00 1.90
11.41
31. R&R Carpet
37.69 SF 0.29
3.70
16.74 30.08
197.20
Totals: Master Closet
19.26 36.96
241.02
IMet-Hallwa
? Master Bedroom
Height: 8'
_ s
M ter ster n
_
i0
692.00 SF Walls
331.90 SF Ceiling
'2"
F
1,023.90 SF Walls & Ceiling
331.90 SF Floor
&ster Bedroom _
~
36.88 SY Flooring
86.50 LF Floor Perimeter
1
86.50 LF Ceil. Perimeter
1
DESCRIPTION
QTY REMOVE REPLACE
TAX O&P
TOTAL
7. Remove Carpet
183.85 SF 0.29
0.00
0.00 10.66
63.98
9. Remove Carpet pad
183.85 SF 0.12
0.00
0.00 4.42
26.48
10. Carpet pad
326.85 SF 0.00
0.64
25.10 41.84
276.12
11. R&R Carpet
422.33 SF 0.29
3.70
187.51 337.02
2,209.63
12. R&R Baseboard - 2 1/4"
27.00 LF 0.46
2.72
3.19 17.80
106.85
14. Mask and prep for paint - tape only
73.50 LF 0.00
0.62
0.37 9.20
55.14
(per LF)
16. Seal & paint baseboard - two coats
73.50 LF 0.00
1.49
0.88 22.08
132.48
17. R&R Casing - 2 1/4"
21.00 LF 0.55
2.28
3.02 12.50
74.95
18. Paint door/window trim & jamb - 2
1.00 EA 0.00
31.68
0.50 6.44
38.62
coats (per side)
19. Paint door/window trim & jamb -
1.00 EA 0.00
37.28
0.59 7.58
45.45
Large - 2 coats (per side)
JESSE_WEEGEN
4/27/2023
Page:4
CONTINUED - Master Bedroom
DESCRIPTION QTY REMOVE REPLACE TAX O&P TOTAL
20. Prime & paint door slab only -
3.00 EA
0.00
46.29
4.43
28.66
171.96
exterior (per side)
21. R&R 1/2" - drywall per LF - up to
8.00 LF
2.43
8.43
1.21
17.60
105.69
2' tall
23. Paint the surface area - two coats
603.78 SF
0.00
0.99
15.10
122.56
735.40
24. Window blind - horizontal or
2.00 EA
0.00
33.36
0.00
13.34
80.06
vertical - Detach & reset
Totals: Master Bedroom
DESCRIPTION
241.90 651.70 4,122.81
Master BAth Height: 8'
261.33 SF Walls
304.41 SF Walls & Ceiling
4.79 SY Flooring
32.67 LF Ceil. Perimeter
QTY REMOVE REPLACE
43.08 SF Ceiling
43.08 SF Floor
32.67 LF Floor Perimeter
TAX O&P TOTAL
41. R&R Toe kick - pre -finished wood
4.00 LF
2.04
8.49
1.71
8.78
52.61
- 1/2"
43. Stain & finish toe kick
4.00 LF
0.00
1.58
0.09
1.28
7.69
44. R&R Baseboard - 2 1/4"
20.67 LF
0.46
2.72
2.44
13.62
81.79
45. Mask and prep for paint - tape only
20.67 LF
0.00
0.62
0.10
2.58
15.50
(per LF)
46. Seal & paint baseboard - two coats
20.67 LF
0.00
1.49
0.25
6.22
37.27
47. R&R Casing - 2 1/4"
14.00 LF
0.55
2.28
2.02
8.32
49.96
48. Paint door slab only - 2 coats (per
1.00 EA
0.00
37.92
0.83
7.74
46.49
side)
49. R&R Interior door unit
1.00 EA
20.29
299.81
25.18
69.06
414.34
51. Paint door/window trim & jamb - 2
1.00 EA
0.00
31.68
0.50
6.44
38.62
coats (per side)
52. R&R 1/2" - drywall per LF - up to
20.67 LF
2.43
8.43
3.12
45.52
273.12
2' tall
53. Paint the surface area - two coats
201.17 SF
0.00
0.99
5.03
40.84
245.03
54. Toilet - Detach & reset
1.00 EA
0.00
259.32
0.83
52.02
312.17
Totals: Master BAth 42.10 262.42 1,574.59
JESSE_WEEGEN 4/27/2023 Page:5
Hallway Height: 8'
00 260.00 SF Walls 37.33 SF Ceiling
0Sla ,c gets' 10 x 297.33 SF Walls & Ceiling 37.33 SF Floor
26' o
6'2" 21 lo' 4.15 SY Flooring 32.50 LF Floor Perimeter
Sh er AUX t� 32.50 LF Ceil. Perimeter
Missing Wall
Missing Wall
DESCRIPTION
2' 8"
1' 6"
QTY
X 8'
X 8'
REMOVE
REPLACE
Opens into Exterior
Opens into HALL -CLOSET
TAX O&P
TOTAL
74. R&R Vapor barrier - visqueen -
46.71 SF
0.09
0.30
1.68
3.64
23.53
6mi1
75. R&R Snaplock Laminate -
46.71 SF
1.27
5.71
32.00
65.20
423.23
simulated wood flooring
76. R&R Baseboard - 2 1/4"
20.33 LF
0.46
2.72
2.40
13.42
80.47
77. Mask and prep for paint - tape only
20.33 LF
0.00
0.62
0.10
2.54
15.24
(per LF)
78. Seal & paint baseboard - two coats
20.33 LF
0.00
1.49
0.24
6.10
36.63
79. R&R 1/2" - drywall per LF - up to
20.33 LF
2.43
8.43
3.07
44.78
268.63
2' tall
80. Paint the surface area - two coats
179.33 SF
0.00
0.99
4.48
36.40
218.42
81. R&R Casing - 2 1/4"
42.00 LF
0.55
2.28
6.05
25.00
149.91
82. Paint door/window trim & jamb - 2
4.00 EA
0.00
31.68
2.00
25.74
154.46
coats (per side)
83. Cold air return cover - Detach &
1.00 EA
0.00
18.77
0.00
3.76
22.53
reset
85. Paint door slab only - 2 coats (per
1.00 EA
0.00
37.92
0.83
7.74
46.49
side)
Totals: Hallway 52.85 234.32 1,439.54
Hallway
F2' 4" -4
2'
T VNr
M terT
a o et
Ta�op
1
�h '(Al)
DESCRIPTION
Master Coat Closet
26. R&R Carpet pad
27. Remove Carpet
32. R&R 1/2" - drywall per LF - up to
2' tall
JESSE_WEEGEN
141.33 SF Walls
155.00 SF Walls & Ceiling
1.52 SY Flooring
17.67 LF Ceil. Perimeter
QTY REMOVE REPLACE
Height: 8'
13.67 SF Ceiling
13.67 SF Floor
17.67 LF Floor Perimeter
TAX O&P TOTAL
12.50 SF
0.12
0.64
0.96
1.90
12.36
14.38 SF
0.29
0.00
0.00
0.84
5.01
12.17 LF
2.43
8.43
1.84
26.80
160.80
4/27/2023 Page:6
CONTINUED - Master Coat Closet
DESCRIPTION
QTY
REMOVE
REPLACE
TAX
O&P
TOTAL
33. Paint the surface area - two coats
103.11 SF
0.00
0.99
2.58
20.94
125.60
34. R&R Baseboard - 2 1/4"
12.17 LF
0.46
2.72
1.44
8.02
48.16
35. Mask and prep for paint - tape only
12.17 LF
0.00
0.62
0.06
1.54
9.15
(per LF)
36. Seal & paint baseboard - two coats
12.17 LF
0.00
1.49
0.15
3.66
21.94
37. R&R Casing - 2 1/4"
14.00 LF
0.55
2.28
2.02
8.32
49.96
38. Paint door/window trim & jamb -
1.00 EA
0.00
37.28
0.59
7.58
45.45
Large - 2 coats (per side)
39. R&R Bifold door set - Colonist -
1.00 EA
16.23
346.42
25.65
77.66
465.96
Double
40. Paint door slab only - 2 coats (per
2.00 EA
0.00
37.92
1.66
15.50
93.00
side)
Totals: Master Coat Closet 36.95 172.76 1,037.39
Hallway Hall Bath
1'-2r+2r Err+2� 6" r 1
T
1' IQrr I rr
wet ( 1) V ity abi
Hall Bath
Coa 1 set a
j i
lion 2' 3" 3' 3"
DESCRIPTION
202.67 SF Walls
241.22 SF Walls & Ceiling
4.28 SY Flooring
25.33 LF Ceil. Perimeter
QTY REMOVE REPLACE
Height: 8'
38.55 SF Ceiling
38.55 SF Floor
25.33 LF Floor Perimeter
TAX O&P TOTAL
100. R&R Baseboard - 2 1/4"
3.67 LF
0.46
2.72
0.43
2.42
14.52
101. Mask and prep for paint - tape
3.67 LF
0.00
0.62
0.02
0.46
2.76
only (per LF)
102. Seal & paint baseboard - two
3.67 LF
0.00
1.49
0.04
1.10
6.61
coats
103. R&R 1/2" - drywall per LF - up to
3.67 LF
2.43
8.43
0.55
8.08
48.49
2' tall
104. Paint the surface area - two coats
95.83 SF
0.00
0.99
2.40
19.46
116.73
105. Toilet - Detach & reset
1.00 EA
0.00
259.32
0.83
52.02
312.17
106. R&R Toe kick - pre -finished
5.00 LF
2.04
8.49
2.14
10.96
65.75
wood - 1/2"
107. Stain & finish toe kick
5.00 LF
0.00
1.58
0.11
1.60
9.61
108. R&R Casing - 2 1/4"
14.00 LF
0.55
2.28
2.02
8.32
49.96
109. Paint door/window trim & jamb -
1.00 EA
0.00
31.68
0.50
6.44
38.62
2 coats (per side)
110. Paint door slab only - 2 coats (per
1.00 EA
0.00
37.92
0.83
7.74
46.49
side)
Totals: Hall Bath 9.87 118.60 711.71
JESSE_WEEGEN 4/27/2023 Page:7
Living Room
Missing Wall
DESCRIPTION
Height: 8'
525.33 SF Walls 272.72 SF Ceiling
798.05 SF Walls & Ceiling 272.72 SF Floor
30.30 SY Flooring 65.67 LF Floor Perimeter
65.67 LF Ceil. Perimeter
2' 8" X 8' Opens into Exterior
QTY REMOVE REPLACE TAX O&P TOTAL
111. Remove Snaplock Laminate -
196.09 SF
1.27
0.00
0.00
49.80
298.83
simulated wood flooring
112. R&R Vapor barrier - visqueen -
264.09 SF
0.09
0.30
9.50
20.60
133.10
6mil
113. Vapor barrier - 15# felt
196.09 SF
0.00
0.27
6.35
10.58
69.87
114. Snaplock Laminate - simulated
264.09 SF
0.00
5.71
180.96
301.60
1,990.51
wood flooring
116. R&R Baseboard - 2 1/4"
43.17 LF
0.46
2.72
5.09
28.48
170.85
117. Baseboard - Detach & reset
10.00 LF
0.00
2.26
0.02
4.52
27.14
118. Mask and prep for paint - tape
53.17 LF
0.00
0.62
0.27
6.66
39.90
only (per LF)
119. Seal & paint baseboard - two
53.17 LF
0.00
1.49
0.64
15.96
95.82
coats
120. R&R Batt insulation - 4" - R13 -
20.00 SF
0.27
1.05
1.58
5.60
33.58
paper / foil faced
122. R&R 1/2" - drywall per LF - up to
35.17 LF
2.43
8.43
5.31
77.46
464.71
2' tall
124. Paint the surface area - two coats
476.25 SF
0.00
0.99
11.91
96.68
580.08
125. Window blind - horizontal or
2.00 EA
0.00
33.36
0.00
13.34
80.06
vertical - Detach & reset
Totals: Living Room 221.63 631.28 3,984.45
Kitchen
Cabin (A3) �g
ooil Kitchen
1-4' 6„ 1 F4' 6"
DESCRIPTION
524.00 SF Walls
740.85 SF Walls & Ceiling
24.09 SY Flooring
65.50 LF Ceil. Perimeter
QTY REMOVE REPLACE
Height: 8'
216.85 SF Ceiling
216.85 SF Floor
65.50 LF Floor Perimeter
TAX O&P TOTAL
132. R&R Vapor barrier - visqueen - 188.71 SF 0.09 0.30 6.79 14.72 95.10
6mil
133. R&R Snaplock Laminate - 188.71 SF 1.27 5.71 129.30 263.44 1,709.93
simulated wood flooring
JESSE_WEEGEN 4/27/2023 Page:8
DESCRIPTION
CONTINUED - Kitchen
QTY REMOVE REPLACE
134. R&R Baseboard - 2 1/4"
35.42 LF
135. Mask and prep for paint - tape
35.42 LF
only (per LF)
136. Seal & paint baseboard - two
35.42 LF
coats
137. R&R 1/2" - drywall per LF - up to
15.00 LF
2' tall
138. Paint the surface area - two coats
383.78 SF
139. Refrigerator - Remove & reset
1.00 EA
141. R&R Casing - 2 1/4"
31.00 LF
142. Paint door/window trim & jamb -
2.00 EA
2 coats (per side)
143. R&R Toe kick - pre -finished
14.00 LF
wood - 1/2"
144. Window blind - horizontal or
1.00 EA
vertical - Detach & reset
145. Range - electric - Remove & reset
1.00 EA
146. Range hood - Detach & reset
1.00 EA
148. Dishwasher - Detach & reset
1.00 EA
149. R&R Custom cabinets - base
15.67 LF
units - High grade
151. Stain & finish cabinet
1.00 EA
152. Countertop - solid surface/granite -
35.34 SF
Detach & reset
153. Content Manipulation charge -
64.00 HR
per hour
154. Contents Evaluation and/or
8.00 HR
Supervisor/Admin - per hour
155. Provide stretch film/wrap
2.00 RL
156. Provide furniture heavyweight
40.00 EA
blanket/pad
157. Provide box, packing paper &
30.00 EA
tape - large size
158. Provide wardrobe box & tape -
6.00 EA
large size
159. Provide plastic mattress cover &
4.00 EA
packing tape - King size
160. Bubble Wrap 12" wide - Add -on
125.00 LF
cost for fragile items
161. Job -site cargo/storage container -
2.00 MO
40' long (per month)
162. Padlock/disc lock
1.00 EA
163. Content Manipulation charge -
72.00 HR
per hour
TAX O&P TOTAL
0.46
2.72
4.18
23.36
140.17
0.00
0.62
0.18
4.44
26.58
0.00
1.49
0.43
10.64
63.85
2.43
8.43
2.27
33.06
198.23
0.00
0.99
9.60
77.90
467.44
0.00
50.97
0.00
10.20
61.17
0.55
2.28
4.46
18.46
110.65
0.00
31.68
1.00
12.88
77.24
2.04
8.49
5.98
30.70
184.10
0.00
33.36
0.00
6.68
40.04
0.00
38.23
0.00
7.64
45.87
0.00
67.33
0.00
13.46
80.79
0.00
247.67
0.00
49.54
297.21
8.13
392.66
559.44
1,367.96
8,207.78
0.00
5,200.00
1.45
1,040.30
6,241.75
0.00
27.40
0.25
193.72
1,162.29
0.00
47.51
0.00
608.12
3,648.76
0.00
62.55
0.00
100.08
600.48
0.00
28.36
5.67
12.48
74.87
0.00
18.26
73.04
160.68
964.12
0.00
5.06
35.22
33.40
220.42
0.00
26.64
37.08
35.16
232.08
0.00
9.16
3.66
8.06
48.36
0.00
0.09
1.13
2.48
14.86
0.00
115.84
23.17
50.98
305.83
0.00
14.24
1.42
3.12
18.78
0.00
47.51
0.00
684.14
4,104.86
JESSE_WEEGEN 4/27/2023 Page:9
DESCRIPTION
CONTINUED - Kitchen
QTY REMOVE REPLACE TAX O&P TOTAL
164. Insulation -Labor Minimum 1.00 EA 0.00 134.43 0.00 26.88 161.31
165. Electrical -Labor Minimum 1.00 EA 0.00 181.48 0.00 36.30 217.78
166. R&R Custom cabinets - wall 13.67 LF 8.13 260.72 307.67 796.56 4,779.41
units - 30" tall - High grade
Totals: Kitchen
1,213.39 5,737.54 34,602.11
2' 6"
Pantry
Height: 8'
T
72.00 SF Walls
5.06 SF Ceiling
c+�
PantryN
77.06 SF Walls & Ceiling
5.06 SF Floor
c�
j�
0.56 SY Flooring
9.00 LF Floor Perimeter
1
1
9.00 LF Ceil. Perimeter
�--2' 7"
DESCRIPTION
QTY REMOVE REPLACE
TAX O&P TOTAL
126. Paint door/window trim & jamb -
1.00 EA 0.00
31.68
0.50 6.44
38.62
2 coats (per side)
127. R&R Vapor barrier - visqueen -
4.88 SF
0.09
0.30
0.18 0.38
2.46
6mi1
128. R&R Snaplock Laminate -
4.88 SF
1.27
5.71
3.35 6.82
44.23
simulated wood flooring
129. R&R Baseboard - 2 1/4"
6.92 LF
0.46
2.72
0.82 4.56
27.38
130. Mask and prep for paint - tape
6.92 LF
0.00
0.62
0.04 0.86
5.19
only (per LF)
131. Seal & paint baseboard - two
6.92 LF
0.00
1.49
0.08 2.08
12.47
coats
Totals: Pantry
4.97 21.14
130.35
�- 1' 8" Hall Closet
Height: 8'
53.33 SF Walls
3.56 SF Ceiling
1' 4"
- o0
56.89 SF Walls & Ceiling
3.56 SF Floor
cq 11 Clo N
0.40 SY Flooring
6.67 LF Floor Perimeter
M
6.67 LF Ceil. Perimeter
116111
Missing Wall
1' 4" X 8'
Opens into HALLWAY
DESCRIPTION
QTY REMOVE REPLACE
TAX O&P
TOTAL
68. R&R Vapor barrier - visqueen -
3.96 SF
0.09
0.30
0.14 0.32
2.01
6mi1
JESSE_WEEGEN
4/27/2023
Page:10
CONTINUED - Hall Closet
DESCRIPTION
QTY
REMOVE
REPLACE
TAX
O&P
TOTAL
70. R&R Snaplock Laminate -
3.96 SF
1.27
5.71
2.71
5.52
35.87
simulated wood flooring
71. R&R Baseboard - 2 1/4"
6.33 LF
0.46
2.72
0.75
4.18
25.06
72. Mask and prep for paint - tape only
6.33 LF
0.00
0.62
0.03
0.78
4.73
(per LF)
73. Seal & paint baseboard - two coats
6.33 LF
0.00
1.49
0.08
1.90
11.41
Totals: Hall Closet
3.71
12.70
79.08
Total: Main Level
2,152.48
8,543.56
52,202.20
Labor Minimums Applied
DESCRIPTION
QTY
REMOVE
REPLACE
TAX
O&P
TOTAL
84. Heat, vent, & air cond. labor
1.00 EA
0.00
210.96
0.00
42.20
253.16
minimum
Totals: Labor Minimums Applied
0.00
42.20
253.16
Line Item Totals: JESSE NWEGEN
Grand Total Areas:
4,062.67
SF Walls
1,250.09
SF Floor
0.00
SF Long Wall
1,250.09
Floor Area
1,538.33
Exterior Wall Area
0.00
Surface Area
0.00
Total Ridge Length
2,152.48 8,585.76 52,455.36
1,250.09
SF Ceiling
5,312.75
SF Walls and Ceiling
138.90
SY Flooring
507.83
LF Floor Perimeter
0.00
SF Short Wall
507.83
LF Ceil. Perimeter
1,364.67
Total Area
4,066.67
Interior Wall Area
175.67
Exterior Perimeter of
Walls
0.00
Number of Squares
0.00
Total Perimeter Length
0.00
Total Hip Length
JESSE_WEEGEN 4/27/2023 Page: II
Summary
Line Item Total
41,717.12
Material Sales Tax
1,156.58
Cleaning Matl Tax
31.16
Storage Rental Tax
23.17
Subtotal
42,928.03
Overhead
4,292.88
Profit
4,292.88
Service Sales Tax
941.57
Replacement Cost Value
$52,455.36
Net Claim
$52,455.36
Christian Rodas
Estimator
JESSE_WEEGEN 4/27/2023 Page:12
Recap of Taxes, Overhead and Profit
Overhead
Profit (10%) Material Sales Cleaning Mad
Service Sales
Manuf. Home
Storage
State Food
Local Food
(10%)
Tax (10%) Tax (10%)
Tax (10%)
Tax (6.5%)
Rental Tax
Tax (1.5%)
Tax (3.5%)
(10%)
Line Items
4,292.88
4,292.88 1,156.58 31.16
941.57
0.00
23.17
0.00
0.00
Total
4,292.88
4,292.88 1,156.58 31.16
941.57
0.00
23.17
0.00
0.00
JESSE_WEEGEN 4/27/2023 Page:13
Recap by Room
Estimate: JESSE WEEGEN
Area: Main Level
1,100.02
2.64%
Bedroom 1
821.77
1.97%
Bedroom 2
1,265.97
3.03%
Closet 2
70.90
0.17%
Closet
50.50
0.12%
Master Closet
184.80
0.44%
Master Bedroom
3,229.21
7.74%
Master BAth
1,270.07
3.04%
Hallway
1,152.37
2.76%
Master Coat Closet
827.68
1.98%
Hall Bath
583.24
1.40%
Living Room
3,131.54
7.51%
Kitchen
27,651.18
66.28%
Pantry
104.24
0.25%
Hall Closet
62.67
0.15%
Area Subtotal: Main Level
41,506.16
99.49%
Labor Minimums Applied
210.96
0.51 %
Subtotal of Areas
41,717.12
100.00%
Total
41,717.12
100.00%
JESSE_WEEGEN 4/27/2023 Page:14
Recap by Category
O&P Items Total
APPLIANCES
404.20
0.77%
CABINETRY
10,880.61
20.74%
CONT: GARMENT & SOFT GOODS CLN
311.64
0.59%
CLEANING
359.66
0.69%
CONTENT MANIPULATION
6,707.28
12.79%
CONT: PACKING,HANDLNG,STORAGE
1,335.41
2.55%
GENERAL DEMOLITION
2,153.30
4.11%
DOORS
646.23
1.23 %
DRYWALL
969.53
1.85%
ELECTRICAL
181.48
0.35%
FLOOR COVERING - CARPET
3,561.13
6.79%
FLOOR COVERING - WOOD
3,108.10
5.93%
FINISH CARPENTRY / TRIMWORK
872.18
1.66%
HEAT, VENT & AIR CONDITIONING
229.73
0.44%
INSULATION
155.43
0.30%
LABOR ONLY
265.56
0.51%
PLUMBING
518.64
0.99%
PAINTING
8,856.85
16.88%
WINDOW TREATMENT
200.16
0.38%
O&P Items Subtotal
41,717.12
79.53%
Material Sales Tax
1,156.58
2.20%
Cleaning Matl Tax
31.16
0.06%
Storage Rental Tax
23.17
0.04%
Overhead
4,292.88
8.18%
Profit
4,292.88
8.18%
Service Sales Tax
941.57
1.79%
Total 52,455.36 100.00%
JESSE_WEEGEN 4/27/2023 Page:15
Main Level
Main Level
JESSE_WEEGEN 4/27/2023 Page:16
NWA
yvww. nwarestoreiF.com
NWA Restore - It, Inc.
13525 W HWY 102
Centerton, AR 72719
Office: (479) 795-1300
Fax: (479) 795-1156
Tax ID:72-1532198
Client: Nikiville, LLC
Property: 3190 N Melinda Dr
Fayetteville, AR
Operator: JOELB
Type of Estimate:
Date Entered: 2/8/2023
Price List: ARFA8X_FEB23
Labor Efficiency: Restoration/Service/Remodel
Estimate: NIKIVILLE 0049G&C
Date Assigned:
This is an ESTIMATE only for the work described. Any expenses or materials not listed in this estimate will be considered
additional and will be billed in addition to the amount of this estimate. This estimate is good for 30 days from receipt.
- NWA Restore - It, Inc.
NWA 13525 W HWY 102
Yrww.nwarestorer.c m Centerton, AR 72719
Office: (479) 795-1300
Fax: (479) 795-1156
Tax ID: 72-1532198
NIKIVILLE_0049G&C
Interior
Interior
DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL
1. Final cleaning - construction - 1,160.18 SF
0.00 0.30 40.72
69.62
458.39
Residential
2. Dumpster load -Approx. 12 yards, 1- 1.00 EA
474.80 0.00 55.55
94.96
625.31
3 tons of debris
3. Residential Supervision / Project 4.00 HR
0.00 65.83 0.00
52.66
315.98
Management - per hour
Total: Interior
96.27
217.24
1,399.68
._r5i eb Hallway Master Bedroom
Height: 8'
7„
r81 V,
ester Bedroom = _
Door
Door
Door
Door
DESCRIPTION
4. Remove Carpet
5. Remove Carpet pad
6. Carpet pad
7. Carpet
8. Baseboard - 2 1/4"
9. Mask and prep for paint - tape only
(per LF)
10. Seal & paint baseboard - two coats
11. Casing - 2 1/4"
12. Paint door/window trim & jamb - 2
coats (per side)
13. Paint door/window trim & jamb -
Large - 2 coats (per side)
14. Paint door slab only - 2 coats (per
side)
NIKIVILLE_0049G&C
603.78 SF Walls
930.63 SF Walls & Ceiling
36.32 SY Flooring
85.33 LF Ceil. Perimeter
326.85 SF Ceiling
326.85 SF Floor
73.50 LF Floor Perimeter
2' 6" X 6' 8" Opens into MASTER BATH
4' 4" X 6' 8" Opens into MASTER COAT_
2' 6" X 6' 8" Opens into HALLWAY
21611 X 6' 8" Opens into MASTER CLOSE
QTY RESET REMOVE REPLACE TAX O&P TOTAL
183.85 SF
0.29
0.00
0.00
10.66
63.98
183.85 SF
0.12
0.00
0.00
4.42
26.48
326.85 SF
0.00
0.64
24.48
41.84
275.50
422.33 SF
0.00
3.68
181.84
310.84
2,046.85
27.00 LF
0.00
2.71
3.11
15.26
91.54
73.50 LF
0.00
0.62
0.36
9.20
55.13
73.50 LF
0.00
1.49
0.86
22.08
132.46
21.00 LF
0.00
2.27
2.95
10.14
60.76
1.00 EA
0.00
31.56
0.49
6.42
38.47
1.00 EA 0.00 37.12 0.57 7.54 45.23
3.00 EA 0.00 37.78 2.42 23.14 138.90
2/27/2023 Page:2
- NWA Restore - It, Inc.
NWA 13525 W HWY 102
Www_"we,estore;r.� m Centerton, AR 72719
Office: (479) 795-1300
Fax: (479) 795-1156
Tax ID: 72-1532198
CONTINUED - Master Bedroom
DESCRIPTION
QTY RESET REMOVE
REPLACE
TAX O&P
TOTAL
15. 1/2" - drywall per LF - up to T tall
8.00 LF 0.00
8.34
1.14 13.56
81.42
16. Paint the walls - two coats
603.78 SF 0.00
0.99
14.72 122.48
734.94
17. Window blind - horizontal or
2.00 EA 0.00
33.07
0.00 13.22
79.36
vertical - Detach & reset
Totals: Master Bedroom
232.94 610.80
3,871.02
Closet 1
LL �10 Master Closet
Height: 8'
168.67 SF Walls
32.78 SF Ceiling
Master Closet o
201.44 SF Walls & Ceiling
32.78 SF Floor
j
1
3.64 SY Flooring
20.67 LF Floor Perimeter
"+-2' 6" 1
23.17 LF Ceil. Perimeter
P 7"
Door
2' 6" X 6' 8"
Opens into MASTER BEDRO
DESCRIPTION
QTY RESET REMOVE
REPLACE
TAX O&P
TOTAL
18. R&R Carpet pad
32.78 SF 0.12
0.64
2.46 4.98
32.35
19. Remove Carpet
32.78 SF 0.29
0.00
0.00 1.90
11.41
20. Carpet
37.69 SF 0.00
3.68
16.22 27.74
182.66
Totals: Master Closet
18.68 34.62
226.42
~2' 4" Master Coat Closet
Height: 8'
103.11 SF Walls
12.50 SF Ceiling
h_w1
Ma eroa t
e
115.61 SF Walls & Ceiling
12.50 SF Floor
1.39 SY Flooring
12.17 LF Floor Perimeter
1
16.50 LF Ceil. Perimeter
�ait� (B1)
Door
4' 4" X 6' 8"
Opens into MASTER BEDRO
DESCRIPTION
QTY RESET REMOVE
REPLACE
TAX O&P
TOTAL
21. Carpet pad
12.50 SF 0.00
0.64
0.94 1.60
10.54
22. Carpet
14.38 SF 0.00
3.68
6.19 10.58
69.69
23. 1/2" - drywall per LF - up to T tall
12.17 LF 0.00
8.34
1.73 20.64
123.87
24. Paint the walls - two coats
103.11 SF 0.00
0.99
2.51 20.92
125.51
NIKIVILLE_0049G&C
2/27/2023
Page:3
- NWA Restore - It, Inc.
NWA 13525 W HWY 102
Yrww.nwarestorer.c m Centerton, AR 72719
Office: (479) 795-1300
Fax: (479) 795-1156
Tax ID:72-1532198
CONTINUED - Master Coat Closet
DESCRIPTION
QTY
RESET REMOVE
REPLACE
TAX
O&P
TOTAL
25. Baseboard - 2 1/4"
12.17 LF
0.00
2.71
1.40
6.88
41.26
26. Mask and prep for paint - tape only
12.17 LF
0.00
0.62
0.06
1.54
9.15
(per LF)
27. Seal & paint baseboard - two coats
12.17 LF
0.00
1.49
0.14
3.64
21.91
28. Casing - 2 1/4"
14.00 LF
0.00
2.27
1.97
6.76
40.51
29. Paint door/window trim & jamb -
1.00 EA
0.00
37.12
0.57
7.54
45.23
Large - 2 coats (per side)
30. Bifold door set - Colonist - Double
1.00 EA
0.00
337.95
24.25
72.46
434.66
31. Paint door slab only - 2 coats (per
2.00 EA
0.00
37.78
1.62
15.44
92.62
side)
Totals: Master Coat Closet 41.38 168.00 1,014.95
Master Bath
2' 5'
Master Bad, 6' T
N
Door
Door
DESCRIPTION
32. Toe kick - pre -finished wood - 1/2"
33. Stain & finish toe -kick
34. Baseboard - 2 1/4"
35. Mask and prep for paint - tape only
(per LF)
36. Seal & paint baseboard - two coats
37. Casing - 2 1/4"
38. Paint door/window trim & jamb - 2
coats (per side)
39. Interior door unit
40. Paint door slab only - 2 coats (per
side)
41. 1/2" - drywall per LF - up to T tall
42. Paint the walls - two coats
NIKIVILLE_0049G&C
201.17 SF Walls
244.24 SF Walls & Ceiling
3.99 SY Flooring
31.50 LF Ceil. Perimeter
Height: 8'
43.08 SF Ceiling
35.93 SF Floor
20.67 LF Floor Perimeter
2' 6" X 6' 8"
2' 6" X 6' 8"
QTY RESET
REMOVE
Opens into Exterior
Opens into MASTER BEDRO
REPLACE TAX O&P
TOTAL
4.00 LF
0.00
8.45 1.67
7.10
42.57
4.00 LF
0.00
1.58 0.09
1.28
7.69
20.67 LF
0.00
2.71 2.38
11.68
70.08
20.67 LF
0.00
0.62 0.10
2.58
15.50
20.67 LF
0.00
1.49 0.24
6.20
37.24
14.00 LF
0.00
2.27 1.97
6.76
40.51
1.00 EA
0.00
31.56 0.49
6.42
38.47
1.00 EA
0.00
299.41 24.55
64.80
388.76
1.00 EA
0.00
37.78 0.81
7.72
46.31
20.67 LF
0.00
8.34 2.94
35.06
210.39
201.17 SF
0.00
0.99 4.90
40.82
244.88
2/27/2023
Page:4
- NWA Restore - It, Inc.
NWA 13525 W HWY 102
Www_�we,estoetr.� m Centerton, AR 72719
Office: (479) 795-1300
Fax: (479) 795-1156
Tax ID:72-1532198
DESCRIPTION
CONTINUED - Master Bath
QTY RESET REMOVE REPLACE TAX O&P TOTAL
43. Toilet - Detach & reset 1.00 EA 0.00 256.53 0.81 51.46 308.80
Totals: Master Bath
Bedroom 1
40.95 241.88 1,451.20
Height: 8'
278.44 SF Walls 102.51 SF Ceiling
Bedroom 1 380.96 SF Walls & Ceiling 102.51 SF Floor
11.39 SY Flooring 33.67 LF Floor Perimeter
-
40.50 LF Ceil. Perimeter
Closet
'3" 4"
CI et
Door
4' 4" X 6' 8"
Opens into CLOSET-1
Door
2' 6" X 6' 8"
Opens into HALLWAY
DESCRIPTION
QTY RESET
REMOVE
REPLACE TAX
O&P
TOTAL
44. Carpet
186.50 SF
0.00
3.68 80.30
137.26
903.88
45. Remove Carpet pad
92.51 SF
0.12
0.00 0.00
2.22
13.32
46. Carpet pad
92.51 SF
0.00
0.64 6.92
11.84
77.97
47. Remove Carpet
102.51 SF
0.29
0.00 0.00
5.94
35.67
48. Paint door/window trim & jamb - 2
1.00 EA
0.00
31.56 0.49
6.42
38.47
coats (per side)
Totals: Bedroom 1 87.71 163.68 1,069.31
Closet 1 Height: 8'
81.78 SF Walls 9.83 SF Ceiling
I 91.61 SF Walls & Ceiling 9.83 SF Floor
Closet 1 1N' N 1.09 SY Flooring 9.50 LF Floor Perimeter
u'to5 13.83 LF Ceil. Perimeter
Door 4' 4" X 6' 8" Opens into BEDROOM-1
DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL
49. Carpet 11.31 SF
0.00 3.68 4.87 8.32 54.81
50. R&R Carpet pad 9.83 SF
0.12 0.64 0.73 1.50 9.70
51. Remove Carpet 9.83 SF
0.29 0.00 0.00 0.58 3.43
NIKIVILLE_0049G&C
2/27/2023 Page:5
- NWA Restore - It, Inc.
NWA 13525 W HWY 102
Www."we.estoe;F.� m Centerton, AR 72719
Office: (479) 795-1300
Fax: (479) 795-1156
Tax ID: 72-1532198
CONTINUED - Closet 1
DESCRIPTION
QTY RESET REMOVE
REPLACE
TAX
O&P
TOTAL
Totals: Closet 1
5.60
10.40
67.94
1' 7" i Hall Closet
Height: 8'
1
11311
54.00 SF Walls
3.96 SF Ceiling
11 Hoset
57.96 SF Walls & Ceiling
3.96 SF Floor
0.44 SY Flooring
6.33 LF Floor
Perimeter
i
8.83 LF Ceil. Perimeter
1115111
Door
21611 X 61811
Opens into
HALLWAY
DESCRIPTION
QTY RESET REMOVE
REPLACE
TAX
O&P
TOTAL
52. Vapor barrier - visqueen - 6mil
3.96 SF
0.00
0.29
0.13
0.24
1.52
53. Snaplock Laminate - simulated
3.96 SF
0.00
5.70
2.64
4.52
29.73
wood flooring
54. Baseboard - 2 1/4"
6.33 LF
0.00
2.71
0.73
3.58
21.46
55. Mask and prep for paint - tape only
6.33 LF
0.00
0.62
0.03
0.78
4.73
(per LF)
56. Seal & paint baseboard - two coats
6.33 LF
0.00
1.49
0.07
1.90
11.40
Totals: Hall Closet
3.60
11.02
68.84
Hallway
L
CI 4 Ha ]wa
= 12' 6,� II � � � �� i2' 6" I -
1' 11 2' 3' N 11
Cl- S went 2W 'ri
Door
Door
Door
Door
Missing Wall
Door
DESCRIPTION
179.33 SF Walls
226.04 SF Walls & Ceiling
5.19 SY Flooring
32.83 LF Ceil. Perimeter
Height: 8'
46.71 SF Ceiling
46.71 SF Floor
20.33 LF Floor Perimeter
2' 6"
X 6' 8"
Opens into MASTER BEDRO
2' 6"
X 6' 8"
Opens into HALL -CLOSET
2' 6"
X 6' 8"
Opens into BEDROOM-1
2' 6"
X 6' 8"
Opens into BEDROOM-2
31211
X 8'
Opens into LIVING ROOM
2' 6"
X 6' 8"
Opens into HALL -BATH
QTY
RESET
REMOVE REPLACE TAX O&P TOTAL
NIKIVILLE_0049G&C 2/27/2023 Page:6
- NWA Restore - It, Inc.
��
NWA 13525 W HWY 102
Yrww.nwarestorer.c m Centerton, AR 72719
Office: (479) 795-1300
Fax: (479) 795-1156
Tax ID: 72-1532198
CONTINUED - Hallway
DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL
57. Vapor barrier - visqueen - 6mil
46.71 SF
0.00
0.29
1.58
2.72
17.85
58. Snaplock Laminate -simulated
46.71 SF
0.00
5.70
31.15
53.26
350.66
wood flooring
59. Baseboard - 2 1/4"
20.33 LF
0.00
2.71
2.34
11.48
68.91
60. Mask and prep for paint - tape only
20.33 LF
0.00
0.62
0.10
2.54
15.24
(per LF)
61. Seal & paint baseboard -two coats
20.33 LF
0.00
1.49
0.24
6.10
36.63
62. 1/2" - drywall per LF - up to T tall
20.33 LF
0.00
8.34
2.89
34.50
206.94
63. Paint the walls - two coats
179.33 SF
0.00
0.99
4.37
36.38
218.29
64. Casing - 2 1/4"
42.00 LF
0.00
2.27
5.90
20.24
121.48
65. Paint door/window trim & jamb - 2
4.00 EA
0.00
31.56
1.95
25.64
153.83
coats (per side)
66. Cold air return cover - Detach &
1.00 EA
0.00
18.56
0.00
3.72
22.28
reset
67. Paint door slab only - 2 coats (per
1.00 EA
0.00
37.78
0.81
7.72
46.31
side)
Totals: Hallway
51.33
204.30
1,258.42
~ .. Bedroom 2
Height: 8'
r10' 2" 1
let
278.44 SF Walls
102.51 SF Ceiling
c Bedroom .. 1
380.96 SF Walls & Ceiling
102.51 SF Floor
11.39 SY Flooring
33.67 LF Floor Perimeter
40.50 LF Ceil. Perimeter
4"
Hallway
Door
4' 4" X 6' 8"
Opens into CLOSET-2
Door
2' 6" X 6' 8"
Opens into HALLWAY
DESCRIPTION
QTY RESET REMOVE
REPLACE
TAX
O&P
TOTAL
68. Carpet
187.17 SF
0.00
3.68
80.59
137.76
907.14
69. Carpet pad
102.51 SF
0.00
0.64
7.68
13.12
86.41
70. Remove Carpet
58.51 SF
0.29
0.00
0.00
3.40
20.37
71. Remove Carpet pad
58.51 SF
0.12
0.00
0.00
1.40
8.42
72. Paint door/window trim & jamb - 2
1.00 EA
0.00
31.56
0.49
6.42
38.47
coats (per side)
73. Baseboard - 2 1/4"
22.67 LF
0.00
2.71
2.61
12.80
76.85
NIKIVILLE_0049G&C 2/27/2023 Page:7
- NWA Restore - It, Inc.
��
NWA 13525 W HWY 102
trww.nwarestorer.c m Centerton, AR 72719
Office: (479) 795-1300
Fax: (479) 795-1156
Tax ID: 72-1532198
CONTINUED - Bedroom 2
DESCRIPTION
QTY
RESET REMOVE
REPLACE
TAX
O&P
TOTAL
74. Mask and prep for paint - tape only
33.67 LF
0.00
0.62
0.16
4.22
25.26
(per LF)
75. Seal & paint baseboard - two coats
33.67 LF
0.00
1.49
0.39
10.12
60.68
76. Paint the walls - two coats
278.44 SF
0.00
0.99
6.79
56.50
338.95
77. Window blind - horizontal or
1.00 EA
0.00
33.07
0.00
6.62
39.69
vertical - Detach & reset
Totals: Bedroom 2
98.71
252.36
1,602.24
~2' 4" Closet 2
Height: 8'
111.11
SF Walls
13.50 SF Ceiling
124.61
SF Walls & Ceiling
13.50 SF Floor
case
1.50
SY Flooring
13.17 LF Floor Perimeter
_
17.50
LF Ceil. Perimeter
Door
4' 4"
X 6' 8"
Opens into BEDROOM-2
DESCRIPTION
QTY
RESET REMOVE
REPLACE
TAX
O&P
TOTAL
78. Carpet
15.53 SF
0.00
3.68
6.68
11.44
75.27
79. R&R Carpet pad
13.50 SF
0.12
0.64
1.01
2.04
13.31
80. Remove Carpet
13.50 SF
0.29
0.00
0.00
0.78
4.70
Totals: Closet 2 7.69 14.26 93.28
Hallway Hall Bath Height: 8'
1-3' 3" --�-2' 6" --+-2' 3"
T
3' I" I'll 95.83 SF Walls 37.50 SF Ceiling
hower(B2 vmity I 133.33 SF Walls & Ceiling 15.42 SF Floor
all Bath
c"a I set 1.71 SY Flooring 3.67 LF Floor Perimeter
T 6„ I 25.00 LF Ceil. Perimeter
rs" rs I I 1
Door 2' 6" X 6' 8" Opens into HALLWAY
DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL
81. Baseboard - 2 1/4" 3.67 LF 0.00 2.71 0.42 2.08 12.45
82. Mask and prep for paint - tape only 3.67 LF 0.00 0.62 0.02 0.46 2.76
(per LF)
NIKIVILLE_0049G&C 2/27/2023 Page:8
- NWA Restore - It, Inc.
NWA 13525 W HWY 102
Www."we.estoe;F.� m Centerton, AR 72719
Office: (479) 795-1300
Fax: (479) 795-1156
Tax ID: 72-1532198
CONTINUED - Hall Bath
DESCRIPTION
QTY
RESET REMOVE
REPLACE
TAX
O&P
TOTAL
83. Seal & paint baseboard - two coats
3.67 LF
0.00
1.49
0.04
1.10
6.61
84. 1/2" - drywall per LF - up to 2' tall
3.67 LF
0.00
8.34
0.52
6.22
37.35
85. Paint the walls - two coats
95.83 SF
0.00
0.99
2.34
19.44
116.65
86. Toilet - Detach & reset
1.00 EA
0.00
256.53
0.81
51.46
308.80
87. R&R Toe kick - pre -finished wood
5.00 LF
2.02
8.45
2.08
10.90
65.33
- 1/2"
88. Stain & finish toe -kick
5.00 LF
0.00
1.58
0.11
1.60
9.61
89. Casing - 2 1/4"
14.00 LF
0.00
2.27
1.97
6.76
40.51
90. Paint door/window trim & jamb - 2
1.00 EA
0.00
31.56
0.49
6.42
38.47
coats (per side)
91. Interior door unit
1.00 EA
0.00
299.41
24.55
64.80
388.76
92. Paint door slab only - 2 coats (per
1.00 EA
0.00
37.78
0.81
7.72
46.31
side)
Totals: Hall Bath 34.16 178.96 1,073.61
Living Room
Door
Missing Wall
Missing Wall - Goes to Floor
DESCRIPTION
93. Remove Snaplock Laminate -
simulated wood flooring
94. Vapor barrier - 15# felt
95. Vapor barrier - visqueen - 6mil
96. Snaplock Laminate - simulated
wood flooring
97. Baseboard - 2 1/4"
98. Baseboard - Detach & reset
99. Mask and prep for paint - tape only
(per LF)
NIKIVILLE_0049G&C
476.25 SF Walls
763.99 SF Walls & Ceiling
29.34 SY Flooring
70.26 LF Ceil. Perimeter
Height: Peaked
287.74 SF Ceiling
264.09 SF Floor
53.17 LF Floor Perimeter
2' 6" X 6' 8" Opens into Exterior
31211 X 8' Opens into HALLWAY
4' 10" X 6' 8" Opens into KITCHEN2
QTY RESET REMOVE REPLACE TAX O&P TOTAL
196.09 SF
1.26
0.00
0.00
49.42
296.49
196.09 SF
0.00
0.27
6.19
10.58
69.71
264.09 SF
0.00
0.29
8.96
15.32
100.87
264.09 SF
0.00
5.70
176.12
301.06
1,982.49
43.17 LF
0.00
2.71
4.97
24.40
146.36
10.00 LF
0.00
2.24
0.02
4.48
26.90
53.17 LF
0.00
0.62
0.26
6.66
39.89
2/27/2023 Page:9
- NWA Restore - It, Inc.
��
NWA 13525 W HWY 102
Www."we.estoe;F.� m Centerton, AR 72719
Office: (479) 795-1300
Fax: (479) 795-1156
Tax ID:72-1532198
CONTINUED - Living Room
DESCRIPTION
QTY RESET
REMOVE
REPLACE
TAX
O&P
TOTAL
100. Seal & paint baseboard -two
53.17 LF
0.00
1.49
0.62
15.96
95.80
coats
101. Batt insulation - 4" - R13 - paper /
20.00 SF
0.00
1.01
1.48
4.34
26.02
foil faced
102. 1/2" - drywall per LF - up to 2'
35.17 LF
0.00
8.34
5.01
59.66
357.99
tall
103. Paint the walls - two coats
476.25 SF
0.00
0.99
11.61
96.62
579.72
104. Window blind - horizontal or
2.00 EA
0.00
33.07
0.00
13.22
79.36
vertical - Detach & reset
Totals: Living Room
215.24
601.72
3,801.60
2' 6" Pantry
Height: 8'
T
I
57.89 SF Walls
4.88 SF Ceiling
62.76 SF Walls &
Ceiling
4.88 SF Floor
anhycn
N N
0.54 SY Flooring
6.92 LF Floor Perimeter
1
8.83 LF Ceil. Perimeter
F--2' 6"
Door
1' 11" X 6' 8"
Opens into KITCHEN2
DESCRIPTION
QTY RESET
REMOVE
REPLACE
TAX
O&P
TOTAL
105. Paint door/window trim & jamb -
1.00 EA
0.00
31.56
0.49
6.42
38.47
2 coats (per side)
106. Vapor barrier - visqueen - 6mil
4.88 SF
0.00
0.29
0.17
0.28
1.87
107. Snaplock Laminate - simulated
4.88 SF
0.00
5.70
3.25
5.56
36.63
wood flooring
108. Baseboard - 2 1/4"
6.92 LF
0.00
2.71
0.80
3.92
23.47
109. Mask and prep for paint - tape
6.92 LF
0.00
0.62
0.03
0.86
5.18
only (per LF)
110. Seal & paint baseboard - two
6.92 LF
0.00
1.49
0.08
2.08
12.47
coats
Totals: Pantry
4.82
19.12
118.09
NIKIVILLE_0049G&C 2/27/2023 Page:10
- NWA Restore - It, Inc.
NWA 13525 W HWY 102
Www."we.estoe;F.� m Centerton, AR 72719
Office: (479) 795-1300
Fax: (479) 795-1156
Tax ID:72-1532198
-�-`"rCab is (M) �_
z W
o, Kitchen
13' 6" 1 13' 6" 1
Door
Door
Missing Wall - Goes to Floor
Door
DESCRIPTION
Kitchen Height: 8'
383.78 SF Walls 219.33 SF Ceiling
603.11 SF Walls & Ceiling 188.71 SF Floor
20.97 SY Flooring 35.42 LF Floor Perimeter
65.83 LF Ceil. Perimeter
2' 6" X 6' 8" Opens into Exterior
1' 11" X 6' 8" Opens into PANTRY
4' 10" X 6' 8" Opens into LIVING ROOM
4' 10" X 61811 Opens into Exterior
QTY RESET REMOVE REPLACE TAX O&P TOTAL
111. Vapor barrier - visqueen - 6mil
188.71 SF
0.00
0.29
6.41
10.94
72.08
112. Snaplock Laminate -simulated
188.71 SF
0.00
5.70
125.86
215.14
1,416.65
wood flooring
113. Baseboard - 2 1/4"
35.42 LF
0.00
2.71
4.08
20.02
120.09
114. Mask and prep for paint - tape
35.42 LF
0.00
0.62
0.17
4.44
26.57
only (per LF)
115. Seal & paint baseboard -two
35.42 LF
0.00
1.49
0.41
10.64
63.83
coats
116. 1/2" - drywall per LF - up to 2'
15.00 LF
0.00
8.34
2.14
25.44
152.68
tall
117. Paint the walls - two coats
383.78 SF
0.00
0.99
9.36
77.86
467.16
118. Refrigerator - Remove & reset
1.00 EA
0.00
50.54
0.00
10.10
60.64
119. Casing - 2 1/4"
31.00 LF
0.00
2.27
4.35
14.96
89.68
120. Paint door/window trim & jamb -
2.00 EA
0.00
31.56
0.98
12.82
76.92
2 coats (per side)
121. R&R Toe kick - pre -finished
14.00 LF
2.02
8.45
5.83
30.48
182.89
wood - 1/2"
122. Window blind - horizontal or
1.00 EA
0.00
33.07
0.00
6.62
39.69
vertical - Detach & reset
123. Range - electric - Remove & reset
1.00 EA
0.00
37.90
0.00
7.58
45.48
124. Range hood - Detach & reset
1.00 EA
0.00
66.58
0.00
13.32
79.90
125. Dishwasher - Detach & reset
1.00 EA
0.00
244.91
0.00
48.98
293.89
126. R&R Custom cabinets - base
15.67 LF
8.05
392.36
545.45
1,363.98
8,183.85
units
127. R&R Custom cabinets - wall
13.67 LF
8.05
260.42
299.98
793.98
4,763.94
units
128. Stains and finish cabinets
1.00 EA
0.00
5,200.00
207.87
1,081.58
6,489.45
129. Detach & Reset Countertop -
35.34 SF
27.17 0.00
0.00
0.24
192.08
1,152.51
solid surface
NIKIVILLE_0049G&C 2/27/2023 Page: II
- NWA Restore - It, Inc.
�M
uNk
NWA 13525 W HWY 102
Www."we.estoe;F.� m Centerton, AR 72719
Office: (479) 795-1300
Fax: (479) 795-1156
Tax ID:72-1532198
CONTINUED - Kitchen
DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL
Totals: Kitchen 1,213.13 3,940.96 23,777.90
Total: Interior 2,152.21 6,669.32 40,894.50
Pack -out
DESCRIPTION
Contents
QTY RESET REMOVE REPLACE TAX O&P TOTAL
130. Content Manipulation charge -
64.00 HR
0.00
per hour
4 technicians for I6hrs to pack out
131. Contents Evaluation and/or
8.00 HR
0.00
Supervisor/Admin - per hour
Working supervisor on site, communication
with customer and administrative tasks.
132. Provide stretch film/wrap
2.00 RL
0.00
133. Provide furniture heavyweight
40.00 EA
0.00
blanket/pad
134. Provide box, packing paper &
30.00 EA
0.00
tape - large size
135. Provide wardrobe box & tape -
6.00 EA
0.00
large size
136. Provide plastic mattress cover &
4.00 EA
0.00
packing tape - King size
137. Bubble Wrap 12" wide - Add -on
125.00 LF
0.00
cost for fragile items
138. Job -site cargo container - pick
2.00 EA
0.00
up/del. (each way) 16'40'
1 container, pick up and delivery
47.11 0.00 603.00 3,618.04
62.02
0.00
99.24
595.40
37.06
7.23
16.26
97.61
23.77
66.22
203.40
1,220.42
6.76
14.13
43.38
260.31
37.30
15.58
47.88
287.26
12.82
3.57
10.98
65.83
0.13
1.58
3.58
21.41
139.16
27.14
61.08
366.54
139. Job -site cargo/storage container - 2.00 MO 0.00 300.00 58.50 131.70 790.20
40' long - per month
1 container rental for 2 months. Actual time stored will be calculated.
140. Padlock/disc lock 1.00 EA 0.00 69.37 6.76 15.24 91.37
Totals: Pack -out
Pack -in
200.71 1,235.74 7,414.39
DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL
NIKIVILLE_0049G&C 2/27/2023 Page:12
- NWA Restore - It, Inc.
NWA 13525 W HWY 102
Www.�we.estoe;F.� m Centerton, AR 72719
Office: (479) 795-1300
Fax: (479) 795-1156
Tax ID: 72-1532198
CONTINUED - Pack -in
DESCRIPTION
QTY
RESET REMOVE
REPLACE
TAX
O&P
TOTAL
141. Content Manipulation charge -
72.00 HR
0.00
47.11
0.00
678.38
4,070.30
per hour
4 technicians for 18hrs to pack in, additional time needed due to new building materials
Totals: Pack -in
0.00
678.38
4,070.30
Total: Contents
200.71
1,914.12
11,484.69
Labor Minimums Applied
DESCRIPTION
QTY
RESET REMOVE
REPLACE
TAX
O&P
TOTAL
142. Insulation labor minimum
1.00 EA
0.00
128.31
0.00
25.66
153.97
143. Electrical labor minimum
1.00 EA
0.00
112.85
0.00
22.58
135.43
Totals: Labor Minimums Applied
0.00
48.24
289.40
Line Item Totals: NIKIVILLE 0049G&C
Grand Total Areas:
3,073.58
SF Walls
1,160.18
SF Floor
0.00
SF Long Wall
1,160.18
Floor Area
1,685.41
Exterior Wall Area
0.00
Surface Area
0.00
Total Ridge Length
1,243.68
SF Ceiling
128.91
SY Flooring
0.00
SF Short Wall
1,343.23
Total Area
193.50
Exterior Perimeter of
Walls
0.00
Number of Squares
0.00
Total Hip Length
2,352.92 8,631.68 52,668.59
4,317.27
SF Walls and Ceiling
342.83
LF Floor Perimeter
480.42
LF Ceil. Perimeter
3,073.58
Interior Wall Area
0.00 Total Perimeter Length
NIKIVILLE_0049G&C 2/27/2023 Page:13
NWA
yvww. nwarestoreiF.com
NWA Restore - It, Inc.
13525 W HWY 102
Centerton, AR 72719
Office: (479) 795-1300
Fax: (479) 795-1156
Tax ID:72-1532198
Summary
Line Item Total
41,683.99
Material Sales Tax
1,387.64
Storage Rental Tax
85.64
Subtotal
43,157.27
Overhead
4,315.84
Profit
4,315.84
Service Sales Tax
879.64
Replacement Cost Value
$52,668.59
Net Claim
$52,668.59
NIKIVILLE_0049G&C 2/27/2023 Page:14
Interior
20'
Interior
NIKIVILLE_0049G&C 2/27/2023 Page:15
►i
CITY OF
FAYETTEVILLE
ARKANSAS
To Fayetteville Waterworks Customers:
Due to the historical strain of summer irrigation demands in the eastern portions of the City of
Fayetteville's Water System, an impending shortage of water exists. By the authority of the City of
Fayetteville Code of Ordinances Title V, Chapter 51.001— Water Shortages (attached), I do hereby
prohibit the use and withdrawal of water by any person as specified herein:
■ The geographical area impacted by this prohibition is east of Highway-265, generally following
the Highway-45 corridor and is shown in the attached exhibit. If you are receiving this letter,
your meter is subject to this prohibition.
Limits on the use and withdrawal of water for the following purposes shall be in effect from
June V, 2023 through September 15`h, 2023:
Watering Yards and Other Vegetation. Yard and landscaping irrigation shall be limited to
the following schedule:
■ Even House Address Numbers may irrigate between the hours of 11:00 pm and 3:00
am on Monday, Wednesday, Friday, and Sunday
■ Odd House Address Numbers may irrigate between the hours of 11:00 pm and 3:00
am on Tuesday, Thursday, Saturday, and Sunday.
■ Per this ordinance, non-compliance may result in discontinuance of service (meter locked 'off')
until compliance can be established and ensured.
■ Voluntary water conservation efforts are encouraged. Information about conservation and the
City of Fayetteville's recent and upcoming Capital Improvement Projects in this area are
attached as a "Fact Sheet."
Respectfully,
Tim Nyander
Utilities Director
City of Fayetteville, AR
Mailing Address:
113 W. Mountain Street www.fayetteville-ar.gov
Fayetteville, AR 72701
CODE OF ORDINANCES CITY OF FAYETTEVILLE, ARKANSAS
TITLE V - PUBLIC WORKS
CHAPTER 51: - WATER AND SEWERS
ARTICLE I - WATER USAGE REGULATIONS
51.001 Water Shortages
(A) Definitions. For the purpose of this section the following definitions shall apply unless the context clearly
indicates or requires a different meaning.
Person. Any person, firm, partnership, association, corporation, company, or organization of any kind.
Water. Water from the city water supply system.
(B) The provisions of this section shall apply to all persons using water both in and outside the city.
(C) The Mayor, or his/her duly authorized representative, is hereby authorized to prohibit the use and
withdrawal of water by any person when there is an impending shortage of water for any one or more of the
following purposes:
(1) Watering Yards. The sprinkling, watering, or irrigation of lawns, grass, or ground cover.
(2) Watering Other Vegetation. The sprinkling, watering, or irrigation of shrubbery, trees, plants, vines,
gardens, vegetables, flowers, or any other vegetation.
(3) Washing Mobile Equipment. The washing of automobiles, trucks, trailers, trailer -houses, railroad cars,
or other types of mobile equipment.
(4) Cleaning Outdoor Surfaces. The washing of sidewalks, driveways, filling station aprons, porches, and
other outdoor surfaces.
(5) Cleaning Buildings. The washing of the outside of dwellings; the washing of the inside and outside of
office buildings.
(6) Ornamental Fountains. The operation of any ornamental fountain or other structure making a similar
use of water.
(7) Swimming Pools. Swimming and wading pools not employing a filter and recirculating system.
(D) Notice of prohibitions shall be published once in a newspaper of general circulation in the city.
(E) The County Sanitarian shall have the authority to permit a reasonable use of water in any case necessary to
maintain adequate health and sanitation standards.
(F) The Water and Wastewater Director shall have available and furnish all records necessary to determine the
usages of water restricted under the terms of this section.
(G) Every police officer of the city shall, in connection with his duties imposed by law, diligently enforce the
provisions of this section.
(H) The Mayor or his/her duly authorized representative shall have the authority to enforce the provisions of this
section by the discontinuance of water service in event of violation hereof.
(Code 1965, §§21-1.1-21-1.8; Ord. No. 1757, 8-17-70; Code 1991, §51.001)
(Supp. No. 27)
Created: 2022-12-12 10:36:33 [EST]
Page 1 of 1
CDru
LO
5 RELQVRQ $ YH
+ Z \
or I
/
*X,rl
nHLU 5G
1 1
1 1 I
00
� J
1 + �11 APDQSG
X
11
C. :DWHU6HUYLFH$UHD
_1 :DWHU3URKLELWLRQ$UHD
0 'RVKHQ
0 6SULQJGDOH
0 )D\HWWHYLOOH
+LJKZD\
ODMRU6WUHHW
6WUHHW
OLOHV
l i i i l
+Z\ `
Outdoor Water Conservation Tips
• Water only when needed. Look at the grass, feel the soil, or use a soil moisture meter to
determine when to water.
• Do not over -water. Water needs vary greatly by season, grass species and amount of
shade.
• Water lawns early in the morning during the hotter summer months to avoid evaporation.
• Set automatic sprinkler systems to provide thorough but infrequent watering. Pressure -
regulating devices should be set to design specifications. Rain shut-off devices can
prevent watering in the rain.
• Use drip -irrigation systems for bedded plants, trees and shrubs.
• Forget about watering the streets, sidewalks or driveways. They will never grow a
thing.
Indoor Water Conservation Tips
• Take short showers or turn the water off while washing and back on again to rinse.
• Take a shower versus a bath. Reduce the level of the water being used in a bathtub by
one or two inches if a shower is not available.
• Test toilets for leaks. Add a few drops of food coloring or a dye tablet to the water in the
tank, but do not flush the toilet. Watch to see if the coloring appears in the bowl with a
few minutes. If it does, the toilet has a silent leak that needs to be repaired.
• Do not use hot water when cold will do.
• When brushing teeth, turn the water off until it is time to rinse.
• Do not let the water run when washing hands. Water should be turned off while washing
and scrubbing and be turned on again to rinse.
• When shaving, fill the sink with hot water instead of letting the water run continuously.
• Install faucet aerators to reduce water consumption.
• Install a low -flow shower head that limits the flow from the shower to less than 3 gallons
per minute.
• Scrape the dishes clean instead of rinsing them before washing. There is no need to
rinse unless they are heavily soiled.
• Never run the dishwasher without a full load. This practice will save water, energy,
detergent and money.
• Use the garbage disposal sparingly or start a compost pile.
• Use a small pan of cold water when cleaning vegetables rather than letting the water run
over them.
• Wash only a full load when using an automatic washing machine (32-59 gallons are
required per load).
• Whenever possible, use the lowest water -level setting for light or partial loads.
• Use cold water as often as possible.
• Check for hidden water leakage such as a leak between the water meter and the house.
To check, turn off all indoor and outdoor faucets and water -using appliances. The water
meter should be read at 10- to 20-minute intervals. If it continues to run or turn, a leak
probably exists and needs to bae located and repaired.
City of Fayetteville
Monthly Report for March 2023
Prepared by:
-jaco s
April 24, 2023
CITY OF
r FAYETTEVILLE
ARKANS
ARKAHSAS
• 41Ar
r L
R
Fayetteville Monthly Report for March 2023
Table of Contents
1. Executive Summary ....................................................................................................................................3
1.1 Fayetteville Team...................................................................................................................................................... 3
1.2 Special Projects..........................................................................................................................................................4
1.3 Compliance..................................................................................................................................................................4
1.4 Financials......................................................................................................................................................................5
Table1.1: Year to Date Budget............................................................................................................................................ 5
2. Plant Operations.........................................................................................................................................6
2.1 Process Control........................................................................................................................................................... 6
3.
Laboratory ....................................................................................................................................................7
3.1
Bio Aquatic Analysis (WET and TRE).................................................................................................................. 7
3.2
Biosolids and Soil Analyses.................................................................................................................................... 7
3.3
Laboratory Performance......................................................................................................................................... 7
4.
Biosolids Management Site.....................................................................................................................8
4.1
Biosolids Operations.................................................................................................................................................8
4.2
Water Treatment Residuals.................................................................................................................................... 8
4.3
Dryer Installation Project........................................................................................................................................8
4.4
Fertilizer Product........................................................................................................................................................9
4.5
Compliance.................................................................................................................................................................. 9
4.6 Revenue.........................................................................................................................................................................9
Table 4-1: Revenue generated from the BMS.............................................................................................................. 9
5. Maintenance.............................................................................................................................................10
5.1 West Side.................................................................................................................................................................... 10
5.2 Noland.........................................................................................................................................................................10
5.3 Lift Stations............................................................................................................................................................... 12
5.4 Key Performance Indicators/Measures.......................................................................................................... 13
Figure 5-1: Labor Hours by Work Order Type............................................................................................................ 13
Figure 5-2: Work Order Count by Type......................................................................................................................... 14
5.5 Capital Improvement Projects(CIP)................................................................................................................ 14
6. SCADA (Supervisory Control and Data Acquisition).......................................................................15
6.1 Water Sites................................................................................................................................................................. 15
6.2 Noland.........................................................................................................................................................................15
7. Industrial Pretreatment.........................................................................................................................16
Table 7-1: Industrial Pretreatment Program (IPP) Revenue Summary ......................................................... 17
8. Woolsey Wet Prairie................................................................................................................................18
9. Sustainability, Stewardship & Community Involvement...............................................................19
10. Health & Safety........................................................................................................................................21
Jacobs - Fayetteville
Fayetteville Monthly Report for March 2023
Appendices
Appendix A: Noland Effluent & Influent Report............................................................................................22
Appendix B: West Side Effluent & Influent Report........................................................................................23
Appendix C: Jacobs Employee Vacancy and Project Status Report..........................................................24
Jacobs - Fayetteville
Fayetteville Monthly Report for March 2023
1. Executive Summary
1.1 Fayetteville Team
During the month, the Fayetteville team consisted of 48 members of which 97.5% full-time employees
(FTE's) are dedicated to the Fayetteville Projects and 2.5% are assisting with other Projects. During the
month, there were three open positions. The Regional Support team was utilized to assist with the work
order backlog, capital improvement projects, and various special projects. The Employee Vacancy and
Project Status Report is presented in Attachment C.
A. Team Award
The City of Fayetteville's Environmental Action Committee (EAC) informed us that we were selected
as a 2023 Mayor's Environmental Stewardship Award winner in the Business category. The EAC was
very impressed and noted our strategic planning related to the City's biosolids dryer and disposal
issues. The EAC also stated that our community outreach and engagement around sustainability
and environmental stewardship issues set a great example for others.
The awards will be presented by the Mayor at the City's Earth Day Celebration, April 22.
B. Staff Awards
Jacobs Operations Management and Facilities Services (OMFS) Group presents Annual Teamwork
Awards. The OMFS's Projects and people continue to rise above and excel for the communities and
crafts. Our 2022 OMFS Teamwork Award winners are:
Laboratory
SECOND: Matthew Benton and Walter
Chodor, Fayetteville, Arkansas
Pretreatment Professional
FIRST: Johnson Byrd, Fayetteville, Arkansas
On February 27, the team winnersjoined in a
celebration lunch which was hosted by Greg
Weeks, Regional Manager and Jan Guy, Project
Manager. From left to right, John Byrd, Matt
Benton, and Walter Chodor
Fayetteville Monthly Report for March 2023
1.2 Special Projects
1.2.1 Dryer Installation Project
The onsite team continued to conduct internal bi-weekly meetings during March to document and
provide project status updates. To assist with project coordination, the onsite team participated in
weekly meetings with the City and the Dryer Vendor.
The Dryer Installation Project is scheduled to conclude on April 20 as we begin the commissioning and
operational phases. Most of the labor hours previously dedicated to the dryer operations were utilized
for the dryer installation project along with onsite SCADA and Electrical Technicians. The labor support
increased during March, a total of 815 labor hours were recorded by site staff and regional support to
the dryer installation project. Additional details for the dryer installation project are provided in Section
4.5 of this report.
1.2.2 Noland Master Plan
Garver Engineering was awarded the contract to develop the Noland Wastewater Master Plan. The staff
continues to assist Garver with the development of the Master Plan.
On March 7, the Garver Engineering Group met with the site's operational group at the Noland facility.
The agenda for the meeting included discussing the site's flow measurement locations, inspecting the
recently drained digester tanks, and reinspecting the cracks in the Biological Nutrient Removal.
On March 13-15, the Garver Survey Team were assisted by staff with various safety gear equipment
and a manlift so they could safely perform the site survey.
1.3 Compliance
1.3.1 Noland
The Noland facility met all discharge permit parameter limits throughout March. There were two
unpermitted discharges that occurred at the facility during March. On March 2 through March 3, the
Fayetteville area experienced over 3 inches of rainfall within approximately 15-hour period, which
significantly increased the collection system inflow to the facility.
On March 3, an unpermitted discharge of untreated process water was reported. The release
occurred late Thursday through Friday morning.
March 20, the release of reuse water (W3) occurred late Monday night, when the fitting of a 2-inch
water hose disconnected and sprayed water onto a nearby gravel area. The water was being used
to fill the East Aeration Basin. The discharge was quickly stopped by closing the hydrant valve and
the hose re -secured to the basin's rim to prevent another accidental release. No W3 water escaped
the plant grounds.
1.3.2 West Side
The West Side facility met all discharge permit parameter limits throughout March. There was a Lift
Station Sanitary Sewer Overflow (SSO) reported:
On March 3, a manhole overflowed upstream of Lift Station 5, Gregg Avenue. Due to the heavy
rainfall (over 3 inches) the collection system inflow flow rate increased substantially. The station
had two pumps out for repairs and the two operational pumps were not able to handle the
Fayetteville Monthly Report for March 2023
additional flow. The overflow ceased in the afternoon, following a decrease in the collection
system inflow. Additional pump maintenance details are provided in Section S.3 of this report.
1.4 Financials
The month ended with a positive year to date financial variance. The non -labor expenses were under budget
and the Labor expenses were slightly over budget which reflects this month's five -week period and reduction
from four -staff vacancies to only two -staff vacancies.
The March (year-to-date) projected budget for the year is favorable by $84,797.
Table 1.1: Year to Date Budget
Budget Performance
Month
Labor
Dollars
Non -Labor
Dollars
Year -to -Date
Dollars
Jon 2023
-5 .11
51.91 `
-54.199
FeC 2023
-519.219
-5E.822
-524.040
r.1ar2023
sa.501
-585.253
-584.787
Apr 2023
[A ay 2023
Jun 2023
J u 12023
Aug 202?,
Sep 2023
Oct2023
Now 2023
Dec 2023
r.iinimum
-513.213
-535.283
-53--.757
rJaximum
53.E01
I 51.91E
-5-.199
Fayetteville Monthly Report for March 2023
2. Plant Operations
A total of 7.51 inches of rain was recorded with an average temperature of 50.2 degrees. The effluent quality
and influent loadings data is presented in Appendices A and B.
Note - The previous Appendix A effluent data report utilized the maximum monthly results for Fecal
Coliform instead of the monthly Geo Mean. Appendix A has been amended to accurately report the
previous monthly results.
2.1 Process Control
2.1.1 Noland
During the month, the staff placed the second aeration basin online following the installation of new
west basin anaerobic banana mixers. The additional basin is part of the seasonal operational
procedures as we transition to the more restrictive April 1 permit parameter limitations.
The facility treated 281.4 million gallons (MG) of influent water with an average daily flow rate of 9.08
million gallons/day (mgd). The peak flow was recorded on March 3, at 30.74 mgd.
The Ozone Chiller 1 temperature sensors were damaged in February by wildlife activity and were
replaced during March. If required, the Ozone Disinfection System is now able to disinfect at 600
pounds a day.
2.1.2 West Side
The facility treated 412.8 million gallons (MG) of influent water. The peak flow was recorded on March
25, at 25.0 mgd. The average daily flow rate was 13.3 million gallons/day (mgd), which is over the
designed 10.0 annual daily average flow. Additionally, the Total Suspended Solids (TSS) loading was
14,426 pounds, which is at 98.8 % of the facility design.
Fayetteville Monthly Report for March 2023
3. Laboratory
The Fayetteville Laboratory provides sampling and analysis for process control and regulatory compliance
for both the Noland and West Side WRRF's, and the Biosolids Management Site (BMS), in addition to the
samples collected for monitoring the Industrial Pretreatment Program (IPP).
3.1 Bio Aquatic Analysis (WET and TRE)
Whole Effluent Toxicity (WET) samples were collected for the White River outfall at the Noland facility.
Samples were sent to Cove Environmental in Stillwater, OK for analysis. White River passed WET testing for
both species; Ceriodaphnia Dubia, water flea, for survival and reproduction and the Pimephales promelas,
fathead minnow, for growth assessment, showing neither lethal nor sublethal effects, in the full dilution
series outlined in the permit of 97%, 73%, 55%, 41 %, 31 %, and 0%.
West Side Goose Creek samples were collected to complete a Toxicity Reduction Evaluation (TRE) Screening
test as outlined in the TRE Plan. The test passed, showing no toxicity for survival or growth to the fathead
minnow, Pimephales promelas.
At the expiration of the Noland NPDES permit on December 31, 2022, the previous agreement for a
reduction in WET testing also ceased. The White River outfall testing frequency reverted from twice per year
to four events per year (quarterly) until the issuance of the new permit. The permit renewal application was
submitted in June 2022 and the issuance of a new permit is pending.
3.2 Biosolids and Soil Analyses
As required by Solid Waste 503 regulations, Noland and West Side belt filter press solid samples were
analyzed for percent solids and metals (arsenic, cadmium, chromium, copper, lead, mercury, molybdenum,
nickel, selenium, and zinc). All results were statistically within limits and exhibited no unusual trends.
3.3 Laboratory Performance
During the month, Ryan Vedrode, Jacobs Compliance and Reporting Regional Laboratory Coordinator,
conducted a Laboratory Audit (inspection of laboratory operations). The audit provided a favorable review
with a few suggested improvements: such as using a UVC light dosage card to verify the intensity of the
sterilization of fecal coliform pipets, applying a new method to determination of Method Detection Limits,
and updating the chemical inventory list along with training documents to the Chemical Hygiene Plan. A
response report was submitted to indicate the suggestions were implemented.
The staff completed a semi-annual Performance Evaluation (PE) study, and the staff successfully passed all
the testing parameters.
Fayetteville Monthly Report for March 2023
4. Biosolids Management Site
4.1 Biosolids Operations
During the month the WRRF's produced 2,397 wet tons of belt -filter -pressed biosolids. Due to the reduction
of solar house capacity, approximately 91 tons of biosolids were sent directly to the landfill. The remaining
2,306 wet tons of biosolids were applied into the solar houses and partially dried. There were approximately
1,837 tons of partially dried biosolids sent to the landfill. This computes to 469 tons of water removed from
the material before disposal. By partially drying biosolids before hauling to the landfill, it is estimated that
$22,601 was saved in tipping fees. The total cost of tipping fees for the month was approximately $92,910.
The BMS team welcomed two new operators, Christopher Cox and Chris Robinson. They are assisting with
the dryer installation project, learning about the new dryer equipment and learning the BMS operational
processes. The new team will transition to the night shift dryer operations upon startup.
The site's Commercial Driver's License (CDL) drivers assisted the Operations and Maintenance departments
with hauling the material from the Noland basin cleanout. On March 8, approximately 40 tons of biomass
mixed with grit screenings was hauled to the landfill.
4.2 Water Treatment Residuals
The Water Treatment Residuals (WTR) application was impacted due to wet field conditions. The application
zones must be without standing water for application to proceed. The site received a total of 700 tons, or
35 dump truck loads, which generated approximately $22,637 in revenue.
4.3 Dryer Installation Project
The BMS team completed the staging of discharge augers 2 and 3. Two solar house ceiling fans were
relocated for air exchange and electrical connections have been made. Duct work for the burner and blower
systems were installed. Elevator 2, which feeds the new dryer, was repositioned to discharge material directly
into the dryer's sifter. Lastly, all staged equipment was fastened and mounted into final position.
Fayetteville Monthly Report for March 2023
4.4 Fertilizer Product
On March 1, the staff coordinated the semi-annual fertilizer reservation event. The demand for the site's
fertilizer is in high demand. The event generated 45 customers requesting approximately 4,100 tons.
4.5 Compliance
During the month, the permit required soil samples were collected from Field Areas 1, 2, 3, 4, 5, and 6 and
sent to GTS for the following annual analyses: pH, electrical conductivity, cation -exchange capacity, % total
solids, sodium absorption ratio (SAR), nitrate nitrogen, phosphorus, and metals (cadmium, copper, lead,
nickel, zinc, potassium, arsenic, mercury, molybdenum, selenium, aluminum, and iron). The SAR data is a
measure of the ability of the soil to allow proper water drainage and root growth. A SAR below 13 indicates
a well aerated soil. Results were all statistically within range and exhibited no unusual trends.
4.6 Revenue
Product
Hay
Fertilizer
Water Treatment Residuals
Table 4-1: Revenue generated from the BMS
Tons Sold/Received
C
C
700
Revenue Generated
$0
$0
$22,637
Fayetteville Monthly Report for March 2023
5. Maintenance
5.1 West Side
The site's motor control center (MCC) new heating, ventilation, and air conditioning (HVAC) units were
placed into service during the month, just in time for the warmer weather. The old units were outdated and
required an upgrade to more environmentally acceptable refrigerants.
West Side
MCC rooms
receive new
AC units
5.2 Noland
In early March, the staff completed the Noland West Biological Basin cleaning. The staff utilized a crane and
a skidsteer (which was lowered into the basin) to remove the biosolids and grit sediment. The maintenance,
operation, and BMS staff worked together to remove approximately 40 wet tons (2.5 truckloads) of
sediment and trash.
Fayetteville Monthly Report for March 2023
r� j
Noland
West Bio Unit
Sediment
Removal
Six new Anoxic Mixers were installed in the west biological unit. This was a two-year project that has proven
to be a beneficial upgrade to both biological units by allowing more consistent mixing in the anoxic zones.
There is a significant reduction in power consumption and labor due to hours spent maintaining the older
equipment The previous 5-horsepower motor mixers were replaced with 1.5 horsepower mixers. This is a
42-horsepower reduction (12 mixers) for an approximate annual savings of $16,462.
Noland Anoxic Mixers
Fayetteville Monthly Report for March 2023
The Noland Scum Pump #2 was replaced with a new VogelsangO pump. The old pump was experiencing
mechanical and electrical issues and was replaced with a new style Vogelsang pump. The new pump is
designed with rotary blades which allows scum to pass through easier with less clogging.
Noland Scum Pump 2 Replacement
5.3 Lift Stations
Lift Station 22, Double Springs Road, Pump 1 was replaced with a rebuilt Myers° pump from Jack Tyler
Engineering. This station has returned to normal operating status. The new pump will minimize the risk of
overflows during the rainy season.
Lift Station 5, Gregg Avenue, Pump #2 failed on Saturday, March 4th. The staff removed the pump and
determined there was an electrical issue. They notified the pump repair vendor and discovered that one of
the station's pumps (Pump #1) had just been rebuilt and was immediately available. The staff was able to
remove the failed pump and place the newly rebuilt pump into service.
This station typically has four pumps but currently only two are operational. There was a pump failure in
mid -February which staff were trying to get the repairs covered under warranty. The vendor evaluation
stated the failure was not due to recent repairs and are holding the pump pending payment of the initial
repairs. which sent to the vendor
The staff is working to expedite the rebuild for recently failed pump but there is a lead time of 6-8 weeks
(about 2 months) for parts and then approximately 10-weeks for the repair. Lift Station 5 will be closely
monitored in the interim.
Fayetteville Monthly Report for March 2023
5.4 Key Performance Indicators/Measures
❑ 543.55, 0
7
Lift Station 5
Gregg Avenue
Pump 2 Replacement
Figure 5-1: Labor Hours by Work Order Type
He
❑ administrative
❑ corrective maintenance emergency
❑ corrective maintenance non
emergency
❑ corrective maintenance from
❑ 15.00, 0 pm/pdm
❑ preventive maintenance
❑ project
❑ safety
13
Fayetteville Monthly Report for March 2023
Figure 5-2: Work Order Count by Type
❑ administrative
❑ corrective maintenance emergency
❑ corrective maintenance non
emergency
❑ corrective maintenance from
pm/pdm
❑ preventive maintenance
❑ project
❑ safety
❑ 1442, 88'. _
�o
3%
5.5 Capital Improvement Projects (CIP)
The new HVAC system for the West Side MCC room was commissioned in late March. This project was
approved by the City Council in 2022 as a scheduled capital improvement project.
Gregg Avenue Lift Station, Pump 1 was reinstalled by the maintenance staff. The pump seized during a high
flow event in 2022 and sent to Electric Motor Center for a hidden damage repair.
Farmington Lift Station, Pump 3 was replaced with a new pump and an upgraded variable frequency drive.
Gregg Avenue Lift Station Pump 2 failed, and the staff had Electric Motor Center complete a hidden
damages inspection. There is a lead time of approximately 6-8 weeks.
Noland Headworks W3 Strainer was installed, and staff also received approval to replace the second strainer
during this year CIP.
All six anoxic mixers were replaced on the west side of the Noland aeration basin.
Noland Clarifier 1, Scum Pump 2 was replaced with a new pump.
A quote was received to repair the blades and shafts on aerators no. 2 and no. 3 at Noland.
Dunn Rite Millwright Services provided a quote to fabricate 180 replacement pins and bushings for band
screen 103 at Noland.
Fayetteville Monthly Report for March 2023
6. SCADA (Supervisory Control and Data Acquisition)
6.1 Water Sites
Over the past couple of months, SCADA technicians coordinated with City personnel and contractors related
to improvements on the Markham water tank, Township water tank, and the Benson water tank. SCADA
equipment was removed and reinstalled for the recently completed rehabilitation of the Markham Hill tank.
The Township and Benson tanks were more involved since these sites received new tanks requiring new
controls, instrumentation, programing, communication, and modifications to VTScada®. All three sites have
been transitioned to the new control systems.
6.2 Noland
As improvements continue in the Noland headworks, SCADA technicians worked with operations and
maintenance to improve equipment monitoring and control. Several asset monitoring communications
were verified and improved along with additional graphics added.
As the facilities age, control devices, instrumentation, and electronics are often the first devices to fail. Due
to age related failure, the following controllers and monitoring instruments were replaced: chemical tank
levels, secondary clarification turbidity, and biological units suspended solids. In years past, Hach devices
were utilized, but a few of the replacements this month were YSI units. The maintenance and probe
replacements on the YSI units are much more efficient than the Hach models. If the YSI devices continue to
function satisfactorily, the Hach units will be replaced with YSI, as needed.
Obsolete Motor Control Centers (MCCs) are in the design phase and will be replaced with modern
equipment. The staff worked with the engineering firm Allgeier, Martin and Associates, Inc. and provided a
draft design review and then provided feedback of the electrical input and output wiring diagrams which are
necessary for interaction with programmable logic controllers (PLCs).
Fayetteville Monthly Report for March 2023
7. Industrial Pretreatment
The quarterly, 40 CFR 122 Appendix D Table III, samples were collected at both facilities for the analysis of
cyanide, phenolics, and metals (antimony, arsenic, beryllium, cadmium, chromium, copper, lead, low level
mercury, nickel, selenium, silver, thallium, and zinc). Table III analyses are required for NPDES permitted
facilities that maintain an Industrial Pretreatment Program. Samples were collected from the Noland
influent, White River effluent, West Side influent, and Goose Creek effluent and sent to Geotechnical and
Testing Services, Inc. (GTS) for analysis. Data results were statistically within scope and exhibit no unusual
trends. The results are reported annually to ADEQ by the Industrial Pretreatment department. Arsenic
results are reported quarterly to ADEQ as required by the newest Noland permit.
During March, the Walmart Optical Lab was issued a Notice of Violation (NOV) for unauthorized discharge
of a propylene glycol/water solution used in a lens shaving machine. The documented procedure was not
followed resulting in the discharge and Walmart Optical lab submitted a rectifying response to the NOV in
the required time frame addressing the inadequacies and a correction plan.
An NOV was issued to Wolfspeed regarding a late submittal (>5 days) of their permit -required 90-day
compliance report. A written corrective response was submitted within the required 5 business days, this
report has since been received and no further action is necessary.
A notice of violation (NOV) was issued to EPC in response to the absence of notification given for a non -
routine batch discharge of Hysol AMD, an industrial grade epoxy adhesive used in the bonding of dissimilar
surfaces. There were no adverse environmental impacts observed, and none expected given the specific
substance and volume. The required 5-day response contained corrective actions and no further action is
necessary.
Elkhart Products Corporation (EPC) is being reviewed for an elevated BOD result in February. The data
resulted in a surcharge fee issued to EPC. BOD and TSS will be sampled quarterly beginning in the 2nd quarter
during the routine sampling for three other surcharged industries. Due to an elevated cyanide result, EPC
will also be sampling for cyanide semi-annually for one year after the industrial permit is renewed.
The University of Arkansas sent a process certification statement notification that a new lab will be starting
in the Electrical and Electronic Components category. The lab will be performing semiconductor crystal
growth using chemical vapor deposition with an associated wet bench procedure that will discharge diluted
acids into a neutralization tank. The determination of an industrial user permit is pending.
Industrial permit renewal notices were sent to five industries whose permits expire later this year. The
renewal notice requires the receipt of a permit renewal application submitted 90 days before the permit
expires. The affected industries include Custom Powder Coating (metal finisher), Marshalltown Tools (metal
finisher), Hiland Dairy (SIU), ConAgra (SIU) and Ecotech Consumer Products (plastic molding and forming).
The monthly surcharge and waste hauler reports were completed and sent to the city for billing. The IPP
Revenue information is presented in Table 7-1.
Fayetteville Monthly Report for March 2023
Table 7-1: Industrial Pretreatment Program (IPP) Revenue Summary
Revenue
1 $76,894.26 1 Surcharges on February data
$2,050.00 I Fees from hauled waste accepted in March
$0.00 1 Other fees paid in March
$0.00 I Fines assessed in March
Zero violations for all industrial users I Violations on February data
Fayetteville Monthly Report for March 2023
8. Woolsey Wet Prairie
March's abundance of precipitation demonstrated the functionality and value of West Side's Entrance
Bioswale area as the pervious weirs slowed down hundreds of gallons of facility stormwater run-off. This
short-term water retention encourages soil infiltration of stormwater and decreases run-off impacts to
nearby Goose Creek.
March also offered encouraging signs of spring activity as bluebirds take advantage of the facility rain
garden habitats and available nest -boxes for the upcoming hatching and parenting of young chicks. The
facility nest boxes, and occupying birds act as points -of -engagement for community interest and serve as
indicator species that reflect the presence of a multitude of less distinguishable ecosystem benefits
produced by the rain garden habitat assets.
West Side WRRF bluebird eggs, Rain Garden No. 3
Woolsey Wet Prairie wetland cell E4
West Side WRRF Entrance Bioswale stormwater retention
Fayetteville Monthly Report for March 2023
9. Sustainability, Stewardship & Community Involvement
The Washington County Search and Rescue K9 Unit utilized the BMS grounds for training.
The staff hosted tours for over 35 AP environmental science students from Fayetteville High School.
Two staff members participated in the STEM Career Fair which was held at the Bud Walton Arena.
Sharing a More Sustainable Future with U of A STEM Students
IN
Fayetteville Monthly Report for March 2023
The staff organized an invasive removal event at the Woolsey Homestead Historic Site that included support
from City Parks staff, Rec Urban Forestry, and Long-range planning Departments, WCRC group, NWA Master
Naturalists as well as multiple individual volunteers from around the community.
This is the third year we have participated in this
project. Over 200 pounds of trash was collected
along with 10,000 square feet of mature bush
honeysuckle and privet.
W,c
20
Fayetteville Monthly Report for March 2023
10. Health & Safety
The Fayetteville team has been busy creating a safer work environment by actively fostering a more inclusive
and spirited accountability network. Employees have continued to fully utilize daily work plans, job task
hazard analyses, and applicable safety training events. The interactive database, ION City, has primarily been
used to prepare work plans for each day. ION has been refined to include safety inspections, vehicle
inspections, and to provide real time data The staff submitted over 600 pre -task work plans for the month
and the safety team performed four weekly safety inspections during the month.
There were three new associates added to the team during February and March. New hire training consisted
of several safety courses and included a comprehensive orientation period which covered relevant site safety
plans, emergency action plans, driving assessments, site hazards and chemical awareness, and evacuation
procedures.
Appendix A: Noland Effluent Report
White River Average Daily Effluent Report
Month
Flow
MGD
CBOD
mg/L
CBOD
Load
Lbs
TSS
mg/L
TSS Load
Lbs
Total P
mg/L
Total P
Load
Lbs
NH3
mg/L
NH3
Load
Lbs
D.O
(min)
mg/L
pH (min)
SU
pH
(max)
SU
Fecal
Coliform
Geo Mean
CFU/100
mL
Permit Limit
Dec -Mar
20.0
2,102
15.0
1,576
1.0
105.0
4.0
420
>8.7
>6.0
<9.0
1,000
Mar 2023
7.907
3.0
201
<1.5
<101
<0.1
<8.8
0.42
4.4
13.3
7.4
7.5
<37
Feb 2023
7.466
3.6
222
3.1
197
0.2
11.1
0.13
7.1
13.6
7.4
7.5
43
Jan 2023
6.447
3.8
205
2.6
140
0.1
8.0
0.07
5.0
14.3
7.4
7.6
26
Dec 2022
5.970
4.2
215
<2.7
<140
0.2
8.2
0.12
6.4
11.7
7.4
7.6
<22
Nov 2022
4.556
3.4
128
1.5
55
0.1
5.5
0.11
7.0
11.7
7.4
7.6
51
Oct 2022
4.277
4.1
141
<1.4
<50
<0.1
<4.2
0.06
2.9
15.5
7.4
7.6
41
Sep 2022
4.620
3.8
142
<1.7
<63
<0.3
<10.5
0.06
2.3
14.9
7.5
7.7
>66
Aug 2022
5.261
4.4
192
<1.6
<70
0.3
14.5
0.09
2.7
14.1
7.2
7.6
136
Ju12022
5.166
2.9
160
<1.5
<79
0.4
19.0
0.24
4.4
11.9
6.9
7.6
107
Jun 2022
5.990
5.2
261
3.6
183
0.4
17.9
0.13
5.7
11.4
7.0
7.6
<37
May 2022
7.847
4.1
287
2.0
136
0.2
12.1
0.09
5.2
10.1
7.1
7.6
36
Apr 2022
8.788
3.6
269
2.1
157
<0.2
<11.4
0.11
9.1
14.8
7.3
7.5
<27
Mar 2022 6.105 3.9
192 3.6
178 <0.2
<8.3
0.06
22.9 16.5
7.2
7.5
<19
White River Average Daily Effluent - Minerals Report
Month
TDS
mg/L
TDS Load
Lbs/dy
Sulfate
Total As
Soo
mg/L
Sulfate Total
Load As Soo
Lbs/day
NO3
(Nitrate)
mg/L
NO3
(Nitrate)
Load
Lbs
Permit Limit
Dec -Mar
500
52,542
119
12505
report
report
Mar 2023
308
24,645
60
3,568
Feb 2023
368
19,585
63
3,310
Jan 2023
314
17,522
59
3,282
Dec 2022
375
16,383
54
2,500
4.1
191.8
Nov 2022
390
13,159
62
2,079
Oct 2022
383
13,385
74
1,654
Sep 2022
372
14,106
67
2,922
Aug 2022
361
15,694
57
2,643
Ju12022
374
20,534
53
2,201
Jun 2022
368
20,717
47
2,932
May 2022
310
21,509
50
3,736
Apr 2022
296
22,171
65
4,413
Mar 2022 325 16,343 67 3,453
Appendix A-1: Noland Influent Report
Month
Flow
MGD
Hydraulic
Loading
%
CBOD
Load
Lbs
Orangic
Loading
%
TSS
Loading
Lbs
TSS
Loading
%
PO4
Loading
Lbs
PO4
Loading
%
NH3
Loading
Lbs
NH3
Loading
%
Design
Annual Average
12.60
29,666
23,198
765
2,250
Mar 2023
9.08
72.1
17,506
59.0
10,561
45.5
286
37.4
1,098
48.8
Feb 2023
8.08
64.1
14,485
48.8
8,700
37.5
263
34.4
982
43.6
Jan 2023
6.17
49.0
13,140
44.3
7,756
33.4
217
28.4
760
33.8
Dec 2022
5.99
47.6
11,497
38.8
8,718
37.6
205
26.8
706
31.4
Nov 2022
5.91
46.9
13,234
44.6
9,292
40.1
210
27.4
921
41.0
Oct 2022
4.26
33.8
13,330
44.9
7,379
31.8
229
29.9
930
41.3
Sep 2022
4.34
34.4
11,794
39.8
7,807
33.7
208
27.2
810
36.0
Aug 2022
4.83
38.4
17,100
57.6
8,961
38.6
218
28.6
878
39.0
Ju12022
3.85
30.6
11,832
39.9
7,935
34.2
185
24.2
615
27.3
Jun 2022
4.94
39.2
13,202
44.5
8,182
35.3
176
23.0
599
26.6
May 2022
8.07
64.1
12,877
43.4
8,113
35.0
246
32.2
826
36.7
Apr 2022
8.88
70.5
16,421
55.4
11,615
50.1
249
32.5
1,006
44.7
Mar 2022 7.12 56.5
18,925
63.8
10,512 45.3 216 28.2
767 34.1
Appendix B: West Side Effluent Report
Goose Creek Average Daily Effluent Report
Month
Flow
MGD
CBOD
mg/L
CBOD
Load
Lbs
TSS
mg/L
TSS
Load
Lbs
Total P
mg/L
Total P
Load
Lbs
NH3
mg/L
NH3
Load
Lbs
DO (min)
mg/L
pH (min)
SU
pH
(max)
SU
Fecal
Coliform
Geo Mean
MPN/100
mL
Permit Limit
Dec -Mar
10.0
13.3
1,109.2
15.0
1,251
1.0
83.4
3.7
341.9
>8.7
>6.0
<9.0
1,000
Mar 2023
13.3
<2.0
<189.2
1.0
103
0.1
8.9
<0.1
<7.0
10.3
6.9
7.4
<6
Feb 2023
11.7
<1.9
<228.1
1.0
103
0.1
7.7
<0.1
<8.4
10.4
7.0
7.4
<5
Jan 2023
9.9
<2.0
<210.2
1.2
104
0.1
7.2
<0.0
<4.0
7.6
7.1
7.3
<6
Dec 2022
9.5
<2.0
<127.7
1.0
79
<0.1
9.2
<0.1
<4.4
8.5
7.0
7.5
<7
Nov 2022
8.0
<1.9
<91.4
1.0
64
<0.1
4.1
<0.0
<2.2
9.3
7.2
7.6
<9
Oct 2022
6.6
<1.8
<144.6
1.0
57
0.1
4.6
<0.1
<3.4
9.0
7.2
7.6
<12
Sep 2022
6.8
<2.5
<138.0
1.0
55
<0.1
3.3
<0.0
<1.6
8.6
7.3
7.7
<8
Aug 2022
7.3
<2.3
<101.1
1.0
62
<0.1
4.5
<0.3
<25.2
8.5
7.3
7.7
<11
Ju12022
5.8
<2.0
<123.5
1.0
47
0.1
6.0
<0.1
<4.3
7.9
7.3
7.8
<6
Jun 2022
7.7
<2.0
<154.1
1.0
65
0.1
4.7
<0.0
<4.3
8.7
7.2
7.7
<6
May 2022
12.6
<2.0
<173.0
1.0
109
<0.1
14.9
<0.1
<6.5
9.1
7.0
7.5
<5
Apr 2022
12.8
<2.0
<177.9
1.0
112
<0.1
7.7
<0.1
<7.1
9.7
7.0
7.4
<6
Mar 2022 11.0 <2.0
<199.2 1.0
94
<0.1
6.9
0.1 9.8
9.8 7.0
7.4 <6
Appendix B-1: West Side Influent Report
Month
Flow
MGD
Hydraulic
Loading
%
BOD Load
Lbs
Orangic
Loading
%
TSS Load
Lbs
TSS
Loading
%
Total P
Load
Lbs
PO4
Loading
%
NH3 Load
Lbs
NH3
Loading
%
Design
Annual Average
10.0
14,595
14,595
584
1,918
Mar 2023
13.3
133.2
10,374
71.1
14,426
98.8
276
47.3
1,341
69.9
Feb 2023
11.7
117.4
11,289
77.3
11,517
78.9
247
42.3
1,239
64.6
Jan 2023
9.9
99.3
11,398
78.1
10,453
71.6
251
43.0
1,281
66.8
Dec 2022
9.5
95.3
11,463
78.5
12,504
85.7
277
47.4
1,199
62.5
Nov 2022
8.0
80.4
11,688
80.1
11,915
81.6
260
44.5
1,256
65.5
Oct 2022
6.6
66.3
11,918
81.7
10,762
73.7
256
43.8
1,327
69.2
Sep 2022
6.8
67.8
10,419
71.4
11,859
81.3
258
44.1
1,256
65.5
Aug 2022
7.3
72.7
10,496
71.9
12,539
85.9
239
41.0
1,299
67.7
Jul 2022
5.8
58.1
10,797
74.0
14,063
96.4
272
46.6
1,396
72.8
Jun 2022
7.7
77.3
10,377
71.1
11,381
78.0
239
40.8
1,337
69.7
May 2022
12.6
125.5
10,734
73.5
10,772
73.8
271
46.3
1,291
67.3
Apr 2022
12.8
128.1
12,021
82.4
14,644
100.3
252
43.2
1,312
68.4
Mar 2022
11.0
109.9
11,456
78.5
11,879
81.4
287
49.1
1,368
71.3
Average 9.5 95 11,110 76
12,209
84
260.4 45 1,300.2
68
Appendix C. Employee Vacancy and Project Status Report
Department
Job Title
Employee Name
Fayetteville % FTE
Admin
Project Manager
Jan Guy
82.00%
Admin
Assistant Project Manager
Mayo Miller
100.00%
Admin
Project Specialist
Sarah Garrison
100.00%
Admin
Environmental Specialist
Jeff Hickle
100.00%
Admin
Health, Safety, Compliance Professional
Wes Cloud
70.00%
Admin
Project Coordinator
Brandi Miller-DeWeese
90.00%
Admin
Administrative Assistant
Christy Taylor
100.00%
Admin
Administrative Assistant
Kassandra Foster
100.00%
BMS
BMS Supervisor
Peter Burrow
100.00%
BMS
Lead Operator
John Tenberge
100.00%
BMS
Operator I
David Dajani
100.00%
BMS
Equipment Operator
Charlie Boger
100.00%
BMS
Equipment Operator
Anthony DeJesus
100.00%
BMS
Equipment Operator
Vacant
100.00%
Operator In Training
Christopher Cox
100.00%
BMS
Operator In Training
Ben Shondelmyer
100.00%
BMS
Operator In Training
Robert Donnell
100.00%
BMS
Operator In Training
Vacant
100.00%
BMS
Mechanic
Mike Reed
100.00%
Admin
Admin-Ops Supervisor
Thom Vinson
90.00%
LAB
Laboratory IPP Director
Donna McChristian
90.00%
LAB
Industrial Pretreatment Coordinator
John Byrd
100.00%
LAB
Lead Laboratory Analyst
Matt Benton
100.00%
LAB
Laboratory Analyst
Walter Chodor
100.00%
Maint
Maintenance Supervisor
Joshua Alleman
100.00%
Maint
Lead Mechanic
Brian Daniels
95.00%
Maint
Lead Electrician
Tim Marr
70.00%
Maint
Mechanic
Robert Ingram
100.00%
Maint
Mechanic
Buddy Carter
100.00%
Maint
Mechanic
Tom Cotter
100.00%
Maint
Mechanic
Paul Goolsby
100.00%
Maint
Mechanic
Rick Dollarhide
100.00%
Maint
Mechanic
Michael Spohn
100.00%
Maint
Mechanic in Training
David Post
100.00%
Maint
Mechanic in Training
Caleb Wheeler
100.00%
Operations
Operations Supervisor
Shawn Santellanes
100.00%
Operations
Lead Operator
Travis Patton
100.00%
Operations
Operator I
Anthony Ramsfield
100.00%
Operations
Operator I
Justin Sweeney
100.00%
Operations
Operator
Tom Meunier
100.00%
Operations
Operator
Chandler Smothers
100.00%
Operations
Operator
Brittney Doyle
100.00%
Operations
Operator In Training
Jeremy Johnson
100.00%
Operations
Operator In Training
Michael Stout
100.00%
Operations
Operator In Training
Patrick Cypret
100.00%
SCADA
SCADA Supervisor
Vacant
100.00%
SCADA
Instrument & Control Tech
Pat Cooley
95.00%
SCADA
Instrument & Control Tech
Preston Jones
100.00%
SCADA
Information & Operational Tech
James Mason
50.00%
Authorized Positions =
49.0
Filled Positions =
46.0
Filled FTE's= 44.3
REGIONAL SUPPORT and SPECIAL PROJECTS (Performed in scope)
Area
Reason
Name
Hours
SCADA
Network Upgrade
Scada Regional Support
44.5
Maintenance
Maintenance, Reporting, and IT Related Activities
Various Regional Staff
215.4
BMS
Dryer Installation Project
Staff & Regional Support
412.8
Noland
Master Plan Data Request and Sampling Planning
Staff
17.0