HomeMy WebLinkAbout74-23 RESOLUTION113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 Resolution: 74-23 File Number: 2023-497 Amendment 3, Hawkins Weir Engineers, Inc.: A RESOLUTION TO APPROVE AMENDMENT NO. 3 TO THE PROFESSIONAL ENGINEERING SERVICES AGREEMENT WITH HAWKINS-WEIR ENGINEERS, INC. IN THE AMOUNT OF $80,660.00 FOR ADDITIONAL SERVICES ASSOCIATED WITH THE PROJECT TO ALLEVIATE FLOODING NEAR THE NORTH COLLEGE AVENUE AND EAST SUNBRIDGE DRIVE INTERSECTION, AND TO APPROVE A BUDGET ADJUSTMENT— 2019 DRAINAGE BOND PROJECT WHEREAS, on September 17, 2019, the City Council passed Resolution 211-19 to authorize Mayor Jordan to sign a Professional Engineering Services Agreement with Hawkins -Weir Engineers, Inc. for conceptual drainage design services to alleviate the flooding at the intersection of North College Avenue and East Sunbridge Drive; and WHEREAS, Amendment No. 3 provides for additional design services as well as construction phase services. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby authorizes Mayor Jordan to sign Amendment No. 3 to the Professional Engineering Services Agreement with Hawkins -Weir Engineers, Inc. in an amount of $80,660.00 for engineering design services and construction phase services associated with the project to alleviate flooding near the intersection of North College Avenue and East Sunbridge Avenue. Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment, a copy of which is attached to this Resolution. PASSED and APPROVED on March 21, 2023 Page 1 Attest: ara Paxton, City Clem reasurer CITY OF Pow, FAYETTEVILLE ARKANSAS MEETING OF MARCH 21, 2023 CITY COUNCIL MEMO 2023-497 TO: Mayor Jordan and City Council THRU: Chris Brown, Public Works Director FROM: Alan Pugh, Staff Engineer DATE: SUBJECT: Approval of a contract amendment #3 with Hawkins Weir Engineers, Inc. in the amount of $80,660 for a total contract amount not to exceed $455,160 for additional engineering design services and construction phase services associated with flooding near the intersection of N College Ave and E Sunbridge Dr. and approval of a budget adjustment RECOMMENDATION: Staff recommends approval of a contract amendment #3 with Hawkins Weir Engineers, Inc. in the amount of $80,660 for a total contract amount not to exceed $455,160 for additional engineering design services and construction phase services associated with flooding near the intersection of N College Ave and E Sunbridge Dr. and approval of a budget adjustment. BACKGROUND: Hawkins Weir was selected originally for this project by RFQ 19-01 selection #15 with the original contract being approved through resolution 211-19. That contract included conceptual drainage work to determine the impacts of proposed detention basins and the original proposed routing. Subsequently, the contract was amended through resolution 124-20 to include an investigation of alternative storm drain routing. Based on the conceptual layouts and investigation, the most feasible routing option was determined and plans began to be developed. DISCUSSION: This project has been identified as one of the projects to be funded by the 2019 Drainage Bond Program. Hawkins -Weir Engineers, Inc has provided a proposed scope and an additional fee/reimbursables in the amount of $80,660 to complete additional design services as well as construction phase services to include as- builts, change orders, field revision review and some observation services. The contract will be paid based on hourly rates for work completed, up to the total contract amount (currently $455,160 including this amendment). The current total estimated project amount is $5.5 million for construction and asement acquisition is currently underway. BUDGET/STAFF IMPACT: The design for this project will be paid for with the funds from the 2019 Drainage Bond Project. ATTACHMENTS: SRF Hawkins Weir Amend 3, 2023-497 BA Hawkins Weir Amend 3, Sunbridge & College - Amendment No. 3 Mailing address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 City of Fayetteville, Arkansas 113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 - Legislation Text File #: 2023-497 Approval of a contract amendment #3 with Hawkins Weir Engineers, Inc. in the amount of $80,660 for a total contract amount not to exceed $455,160 for additional engineering design services and construction phase services associated with flooding near the intersection of N College Ave and E Sunbridge Dr. and approval of a budget adjustment A RESOLUTION TO APPROVE AMENDMENT NO. 3 TO THE PROFESSIONAL ENGINEERING SERVICES AGREEMENT WITH HAWKINS-WEIR ENGINEERS, INC. IN THE AMOUNT OF $80,660.00 FOR ADDITIONAL SERVICES ASSOCIATED WITH THE PROJECT TO ALLEVIATE FLOODING NEAR THE NORTH COLLEGE AVENUE AND EAST SUNBRIDGE DRIVE INTERSECTION, AND TO APPROVE A BUDGET ADJUSTMENT— 2019 DRAINAGE BOND PROJECT WHEREAS, on September 17, 2019, the City Council passed Resolution 211-19 to authorize Mayor Jordan to sign a Professional Engineering Services Agreement with Hawkins -Weir Engineers, Inc. for conceptual drainage design services to alleviate the flooding at the intersection of North College Avenue and East Sunbridge Drive; and WHEREAS, Amendment No. 3 provides for additional design services as well as construction phase services. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby authorizes Mayor Jordan to sign Amendment No. 3 to the Professional Engineering Services Agreement with Hawkins -Weir Engineers, Inc. in an amount of $80,660.00 for engineering design services and construction phase services associated with the project to alleviate flooding near the intersection of North College Avenue and East Sunbridge Avenue. Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment, a copy of which is attached to this Resolution. Page 1 City of Fayetteville Staff Review Form 2023-497 Item ID 3/21/2023 City Council Meeting Date - Agenda Item Only N/A for Non -Agenda Item Chris Brown 2/28/2023 ENGINEERING (621) Submitted By Submitted Date Division / Department Action Recommendation: Approval of a contract amendment #3 with Hawkins Weir Engineers, Inc. in the amount of $80,660 for a total contract amount not to exceed $455,160 for additional engineering design services and construction phase services associated with flooding near the intersection of N College Ave and E Sunbridge Dr. and approval of a budget adjustment 4704.860.7415-5860.02 Account Number 46040.7415.1000 Project Number Budgeted Item? Yes Does item have a direct cost? Yes Is a Budget Adjustment attached? Yes Purchase Order Number: Change Order Number: Original Contract Number: Comments: 2019-661 2019-36 Budget Impact: 4704-Drainage Projects (2022 Bonds) Fund Drainage Projects (Bonds) - Sunbridge/College Total Amended Budget Expenses (Actual+Encum) Available Budget Item Cost Budget Adjustment Remaining Budget Project Title $ 9,443,214.00 $ 2,166,055.41 $ 7,277,158.59 $ 80,660.00 $ 7,196,498.59 V20221130 Previous Ordinance or Resolution # 211-19; 124-20, 278-2C Approval Date: City of Fayetteville, Arkansas - Budget Adjustment (Agenda) Budget Year Division Adjustment Number ENGINEERING (621) /Org2 2023 Requestor: Chris Brown BUDGET ADJUSTMENT DESCRIPTION / JUSTIFICATION: Approval of a contract amendment #3 with Hawkins Weir Engineers, Inc. in the amount of $80,660 for a total contract amount not to exceed $455,160 for additional engineering design services and construction phase services associated with flooding near the intersection of N College Ave and E Sunbridge Dr. and approval of a budget adjustment COUNCIL DATE: 3/14/2023 ITEM ID#: 2023-497 Noll y Black 31212023 5:57 RIP Budget Division Date TYPE: D - (City Council) JOURNAL #: GLDATE: RESOLUTION/ORDINANCE CHKD/POSTED: TOTAL - - v.2023223 increase/ (Decrease) Project.Sub# Account Number Expense Revenue Project Sub.Detl AT Account Name 4704.860.7999-5899.00 (80,660) - 46040 7999 EX Unallocated - Budget 4604.860.7415-5860.02 80,660 - 46040 7415.1000 EX Capital Prof Svcs - Engineering/Architecture 1 of 1 AMENDMENT NO.3 TO THE AGREEMENT For PROFESSIONAL ENGINEERING SERVICES BETWEEN CITY OF FAYETTEVILLE, ARKANSAS AND HAWKINS-WEIR ENGINEERS, INC. In accordance with the AGREEMENT For PROFESSIONAL ENGINEERING SERVICES for the Sunbridge/College, Phase 1 Drainage Project (HW Project No. 2019070), dated September 17, 2019, between the City of Fayetteville, Arkansas (hereinafter called Owner) and Hawkins -Weir Engineers, Inc. (hereinafter called Engineer), Owner hereby authorizes Engineer to proceed with engineering services as modified by this Amendment No. 3. SECTION 1— SCOPE OF SERVICES 1.1 The City of Fayetteville Engineering Department has directed the Engineer to amend services included in the AGREEMENT on the PROJECT. These amended services include the additional surveying and engineering design services necessary to complete the final design of the project (Task 4); and Construction Phase Services (Task 5). Detailed services included in AMENDMENT NO. 3 are included in the attached Appendix A, Scope of Services. SECTION 2 — TIME OF SERVICE 2.1 The additional scope of services defined as Task 4 above will be completed within 210 calendar days added to the 525 calendar days provided in the AGREEMENT and previous AMENDMENT NOS. 1 AND 2. The additional scope of services defined as Task 5 above will be completed within a 390-calendar day construction Contract Time in 2023 and 2024. Engineer will proceed with providing the services set forth herein immediately upon execution of this AMENDMENT NO. 3. Amendment No. 3 - FEB. 28, 2023 .docx Pagel of 2 February 28, 2023 SECTION 3 — COMPENSATION 3.1 Owner shall compensate Engineer for providing the services set forth herein in accordance with the terms of the Agreement. "Total payment for Scope of Services described herein shall not exceed Eighty Thousand. Six Hundred Sixty mid OOI100 Dollars ($80,660.00) without written approval of Owner. These additional services adjust the Agreement's not to exceed fee to $430,860.00 and the not to exceed reimbursable expenses to $24,300.00, for a total contract amount of $455,160.00. Attachments: Appendix A, Scope of Services dated February 2023 Appendix B, Fee Proposal Breakdown dated February 2023 AUTHORIZATION BY: CITY OF FAYETTEVILLE, ARKANSAS ACCEPTED BY: HAW KINS-WEIR ENGINEERS, INC. (. XBy:F J. Kyle Salyer, P.E., P.S. Vice President Date: 21"'7-0Z3 Amendment No. 3 - MR 28, 2023 doex Page 2 of February 28, 2023 r Appendix B Amendment No. 3 Fee Proposal Sunbridge Drive and College Avenue Drainage Improvements City of Fayetteville, Arkansas HWEI Project No. 2019070 February 2023 Task 4 - Additional Design Services 1. Revised public sanitary sewer relocation plans across 64 E Granada Street 2. Revised public water relocation plans across 267 E Granada Street 3. Realign drainage channel across 2709 N Drake street 4. Evaluate private development plans as requested at 2709 N Drake Street 5. Prepare additional land descriptions and exhibits for permanent and temporary construction easements 6. Assist the Owner with Easement Acquisition by staking properties 7. Assist the Owner in NWP permitting with USACE TOTAL HOURS = Task 5 - Construction Phase Services 1. Conduct Pre -Construction Conference with the Owner and Contractor 2. Conduct a field survey to establish control monumentation 3. Prepare, review, and coordinate the dissemination of construction documentation including material submittals, field orders, and change orders as directed by the Owner 4• Provide a weekly project site visit during construction of the improvements Iil 5. Assists the Owner with preparation of Monthly Pay Requests 6. Coordinate and conduct a final inspection with the Owner and Contractor, and prepare a punch list of deficient construction items for the Contractor to address 7. Conduct as -built surveys of completed water and sanitary sewer improvements 8. Conduct as -built surveys of completed drainage improvements 9. Prepare record Drawings of the completed project and provide one (1) reproducible hard copy and one (1) electronic copy for the Owner's archives TOTAL HOURS = I Wis CITY OF FAYETTEVILLE ARKANSAS Engr Engr VII IV Tech IV Tech I Insp II Surveyor GPS Survey 4 12 16 4 8 4 24 24 2 2 4 8 16 2 4 8 16 2 16 4 8 16 64 52 16 0 24 16 Task Subtotal $24,900 Engr VII Engr IV Tech IV Tech 1 Insp II Surveyor GPS Survey 2 2 4 4 2 2 8 12 8 32 16 18 52 12 16 24 12 8 8 8 2 8 24 8 4 16 2 8 24 8 4 24 2 8 16 56 136 64 44 40 16 52 Task Subtotal $55,760 (1) Based on 390-calendar day Contract Time (360-calendar days until substantial completion, and 30-calendar days until final completion thereafter). Site visit is based on 1-hour per week through the substantial completion date for Eng. IV. Engineering Services Summary Task 4 Additional Design Services $24,900 Task 5 Construction Phase Services $55,760 Total Amendment No. 3 Fee - Not to Exceed $80,6 2019070\Scope of Services and Fee Proposal Amendment No. 3.xlsx