Loading...
HomeMy WebLinkAbout55-23 RESOLUTION0 113 West Mountain Street Fayetteville, AR 72701 (479)575-8323 Resolution: 55-23 File Number: 2023-446 LAWRENCE SCHEMEL SEWER DAMAGE CLAIM: A RESOLUTION PURSUANT TO §39.10(CX4) OF THE FAYETTEVILLE CITY CODE TO AUTHORIZE THE MAYOR TO PAY THE AMOUNT OF $33,347.65 TO LAWRENCE SCHEMEL FOR A SEWER DAMAGE CLAIM ARISING AT 2143 WEST LOREN CIRCLE WHEREAS, pursuant to §39.10(C)(4) of the City Code, the City Council may in an extraordinary case, upon the Mayor's recommendation and by two-thirds majority, approve the payment of water or sewer damage claims exceeding $25,000.00 up to $50,000.00. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas, pursuant to § 39.10(C)(4) of the Fayetteville City Code, authorizes Mayor Jordan to pay the amount of $33,347.65 to Lawrence Scheme] for Flooring, cabinets, sheetrock, trim and painting expenses related to the water main break damage at 2143 West Loren Circle. PASSED and APPROVED on March 7. 2023 Page I Attest: Kara Paxton, CiticledTreasure, CITY OF Pow, FAYETTEVILLE ARKANSAS MEETING OF MARCH 7, 2023 CITY COUNCIL MEMO TO: Mayor Jordan and City Council THRU: Susan Norton, Chief of Staff FROM: Timothy Nyander, Utilities Director DATE: SUBJECT: Lawrence Schemel Sewer Damage Claim at 2143 West Loren Circle RECOMMENDATION: 2023-446 Staff recommends approval of a damage claim payment to Lawrence Schemel in the amount of $33,347.65 for water damage remediation at 2143 West Loren Circle after a City sewer overflow caused damage to the property. BACKGROUND: On November 21, 2022, the City of Fayetteville experienced a sewer overflow on Loren Circle. Lawrence Schemel owns the home located at 2143 West Loren Circle. The sewer overflow caused water damage to the property. DISCUSSION: Per City Code Section 39.10 — Water and Wastewater Damage Claims, "The Utilities Department Director may not authorize any payment greater than $10,000.00 for any claim pursuant to this section. The Mayor may request the City Council to authorize an amount greater than $10,000.00 by resolution, but in no case shall the city pay more than $25,000.00 pursuant to this claims procedure for a damage claim related to a water or wastewater utility infrastructure occurrence unless in an extraordinary case the Mayor recommends and the City Council by two-thirds (%) majority approves an exemption from the $25,000.00 damage cap and approves a payment up to $50,000.00." Mr. Schemel's property received extensive damage due to the overflow, requiring the tenants to move out so renovations can take place. The water damage occurred in the living room, kitchen, bedrooms and bathrooms of the home. Floors, cabinets, sheetrock, and trim were damaged and will require repair and then painting. Three competitive bids were obtained for repairs, with JM Roofing & Construction being the most economical at $35,847.65. Mr. Schemel's insurance paid his limit of $2,500.00 toward the claim, leaving a total reimbursement of $33,347.65. Staff requests approval to reimburse Lawrence Schemel in the amount of $33,347.65 to pay for the necessary repairs. BUDGET/STAFF IMPACT: Funds are available in the Insurance Self (Non -Vehicle Damage) account within the Water & Sewer fund. ATTACHMENTS: SRF Lawrence Schemel Sewer Damage Claim, Insurance Documentation, Construction Mailing address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 Estimates Mailing address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 City of Fayetteville, Arkansas 113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 - Legislation Text File #: 2023-446 Lawrence Schemel Sewer Damage Claim at 2143 West Loren Circle A RESOLUTION PURSUANT TO §39.10(C)(4) OF THE FAYETTEVILLE CITY CODE TO AUTHORIZE THE MAYOR TO PAY THE AMOUNT OF $33,347.65 TO LAWRENCE SCHEMEL FOR A SEWER DAMAGE CLAIM ARISING AT 2143 WEST LOREN CIRCLE WHEREAS, pursuant to §39.10(C)(4) of the City Code, the City Council may in an extraordinary case, upon the Mayor's recommendation and by two-thirds majority, approve the payment of water or sewer damage claims exceeding $25,000.00 up to $50,000.00. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas, pursuant to § 39.10(C)(4) of the Fayetteville City Code, authorizes Mayor Jordan to pay the amount of $33,347.65 to Lawrence Schemel for flooring, cabinets, sheetrock, trim and painting expenses related to the water main break damage at 2143 West Loren Circle. Page 1 Tim Nyander Submitted By City of Fayetteville Staff Review Form 2023-446 Item ID 3/7/2023 City Council Meeting Date - Agenda Item Only N/A for Non -Agenda Item 2/16/2023 WATER SEWER (720) Submitted Date Division / Department Action Recommendation: Staff recommends approval of a damage claim payment to Lawrence Schemel in the amount of $33,347.65 for water damage remediation at 2143 West Loren Circle after a City sewer overflow caused damage to the property. 5400.720.4410-5311.04 Account Number N/A Project Number Budgeted Item? Yes Does item have a direct cost? Yes Is a Budget Adjustment attached? No Purchase Order Number: Change Order Number: Original Contract Number: Comments: Budget Impact: Total Amended Budget Expenses (Actual+Encum) Available Budget Item Cost Budget Adjustment Remaining Budget Water and Sewer Fund N/A Project Title $ 156,223.62 156,223.62 $ 33,347.65 122,875.97 Previous Ordinance or Resolution # Approval Date: V20221130 Berkshire Hathaway HOMESTATE COMPANIES BERKSHIRE HATHAWAY HOMESTATE INSURANCE COMPANY - BHHC SPECIAL RISKS CONTINENTA CONTINENTAL INSURANCE COMPANY -CYPRESS INSURANCE COMPANY NSOAK RIVER INSURANCE COMPANY REDWOOD FIRE AND CASUALTY INSURANCE COMPANY December 15, 2022 SENT VIA US MAIL WITH PROOF OF MAILING SCHEMEL FAMILY LLC 3999 LAURAL RIDGE SPRINGDALE, AR 72764 RE: Claim Number: 00598624 Policy Number: 02PRM084394-02 Insured: SCHEMEL FAMILY LLC Location: 2143 W LOREN CIRCLE, FAYETTEVILLE, AR 72701 Date of Loss: November 22, 2022 PARTIAL DENIAL OF COVERAGE AND PAYMENT EXPLANATION Dear Policyholder: This letter concerns the above -captioned claim ("Claim") with respect to Commercial Property Policy Number 02PRM084394-02 issued by Berkshire Hathaway Homestate Insurance Company (the "Company") for the period of March 3, 2022 to March 3, 2023. For the reasons described below, a portion of the damages sought in the Claim are not within the coverage afforded by the Policy. We understand the material facts and circumstances regarding the Claim to be as follows: On November 22, 2022, you reported a sewer backup at the above referenced property. During our phone conversation on that same date, you stated that the City had been working on the sewer outside the property and caused a backup from all drains in the house. Local Independent Adjuster, John Hart with Signature Adjustment Group was assigned to assist with the investigation and report on this claim. Mr. Hart's inspection found water damage consistent with the claim of a backup from toilets and drains. Mitigation efforts had been completed prior to his inspection, and Mr. Hart reported that the City confirmed that they had workers in the area and had an issue which caused backups in some houses. The City had contacted ServiceMaster directly for mitigation, and ServiceMaster will be billing the City directly. We have reviewed the material facts and circumstances regarding the Claim with respect to the coverage afforded by the Policy. The Building is insured subject to the Building And Personal Property Coverage Form CP0010 0607. This coverage form is subject to certain exclusions, limitations, and endorsements which modify the coverage provided. Claims Department • P.O. Box 31361 •Omaha, Nebraska 68131-0361 Phone: (402) 9163800 • Fax: (402) 916-3031 E-mail: reports@nationalindemnity.com Berkshire Hathaway HOMESTATE COMPANIES December 15, 2022 Page 2 The CP 10 30 0607 Causes Of Loss — Special Form i A. Covered Causes Of Loss s When Special is shown in the Declarations, Covered Causes of Loss means Risks Of Direct Physical Loss unless the loss is: 1. Excluded in Section B., Exclusions; or 2. Limited in Section C., Limitation; that follow. B. Exclusions 1. We will not pay for loss or damage caused directly or indirectly by any of the following. Such loss or damage is excluded regardless of any other cause or event that contributes concurrently or in any sequence to the loss. g. Water [... ] — see Water Exclusion Endorsement CP 1032 0808 below The Policy includes the Water Exclusion Endorsement CP 10 32 08 08 which modifies the policy as it relates to the Water Exclusion. This form reads in pertinent part: A. The exclusion in Paragraph B. replaces the Water Exclusion in this Coverage Part or Policy. B. Water 1. Flood, surface water, waves (including tidal wave and tsunami), tides, tidal water, overflow of any body of water, or spray from any of these, all whether or not driven by wind (including storm surge); 2. Mudslide or mudflow; 3. Water that backs up or overflows or is otherwise discharged from a sewer, drain, sump, sump pump or related equipment; 4. Water under the ground surface pressing on, or flowing or seeping through: a. Foundations, walls, floors or paved surfaces; b. Basements, whether paved or not; or c. Doors, windows or other openings; or 5. Waterbome material carried or otherwise moved by any of the water referred to in Paragraph L, 3. or 4., or material carried or otherwise moved by mudslide or mudflow. This exclusion applies regardless of whether any of the above, in Paragraphs 1. through 5., is caused by an act of nature or is otherwise caused. An example of a situation to which this exclusion applies is the situation where a dam, levee, seawall or other boundary or containment system fails in whole or in part, for any reason, to contain the water. Berkshire Hathaway HOMESTATE COMPANIES December 15, 2022 Page 3 But if any of the above, in Paragraphs 1. through 5., results in fire, explosion or sprinkler leakage, we will pay for the loss or damage caused by that fire, explosion or sprinkler leakage (if sprinkler leakage is a Covered Cause of Loss). The Property Extensions, Form CPM 002 08 12 is part of your Policy. Section II — The following modifications are made to the Causes of Loss — Special Form: A. The following is added to SECTION F. ADDITIONAL COVERAGE EXTENSIONS: 4. Sewer Back Up. We will pay for the loss or damage caused by or resulting from water that backs up from a sewer or drain. We will not pay for the cost to repair any defect of a sewer or drain system from which water backs up. The most we will pay is $2,500 during the policy period, subject to a $2,500 limit in any one occurrence. This amount is subject to the deductible applicable in this endorsement. SECTION III —The following provisions are applicable to all coverage modifications made by this endorsement unless a modification expressly states otherwise. A. Excess Insurance The extended coverage provided by this endorsement is excess over any other valid and collectible insurance. B. Deductible One deductible of $500 applies to all coverage extensions on this endorsement unless specifically indicated otherwise on this endorsement. We will not pay for loss or damage in any one occurrence until the amount of loss exceeds $500. We will then pay the amount of loss in excess of the deductible up to the limit stated in that particular coverage extension. This $500 deductible is in addition to the deductible shown in the Declarations. This deductible will not be used to satisfy the requirements of the deductible shown in the Declarations. If one occurrence causes losses covered by more than one of the coverage extensions under this endorsement, only one deductible will apply to the coverage extensions under this endorsement. The deductible that will apply is the highest deductible under any one of the coverage extensions, with a maximum deductible of $1,000. Based on the information developed in the investigation, a portion of the Claim, as presently articulated, does not implicate the coverage afforded by the Policy. Specifically, the Policy states we will not pay for loss or damage caused directly or indirectly by surface water, water that backs up or overflows or is otherwise discharged from a sewer, drain, sump, sump pump or related equipment, and or water under the ground surface pressing on, or flowing or seeping through foundations, walls, floors, or paved surfaces; basements, whether paved or not; or doors, windows or other openings. Such loss or damage is excluded regardless of any other cause or event that contributes concurrently or in any sequence to the loss. You made a claim for a water damage resulting from a sewer backup at the above referenced property. The Independent Adjuster confirmed damage consistent with a sewer backup as well as confirmed with the City that they had workers in the area and had an issue which caused backups in some houses. As the water damage is a result of water backing up from a sewer / drain, the Policy does not apply. However, the Policy also includes Property Extensions which states we will pay for the loss or damage caused by or resulting from water that is discharged from a sewer or drain. We will not pay for the cost to repair any defect of a sewer or drain system from which water backs up. The most we will pay is $2,500 during the policy period, subject to a $2,500 limit in any one occurrence. This amount is subject to the additional deductible applicable in Berkshire Hathaway HOMESTATE COMPANIES December 15, 2022 Page 4 this endorsement which provides this additional extended coverage. You submitted a claim for damages resulting from a sewer backup through the drains in your house. The Independent Adjuster's inspection confirmed the damage was the result of water backing up from drains at the property. Therefore, via the Property Extensions portion of the Policy, which is subject to an additional $500 deductible above your normal Policy deductible, we will provide limited coverage for the resulting damage from a sewer or drain back up per the Policy language. The Policy does not apply to any costs over this $2,500 limited coverage. Enclosed is our payment in the amount of $2,500.00, representing payment for the policy limit for a loss due to a sewer or drain backup. A copy of the Independent Adjusters estimate is included for your reference. Please note that all parties listed on the check must endorse the back of the check before the funds will be released. This letter is intended to provide an explanation of The Company's determination with respect to the coverage for the Claim under the Policy. Other Policy terms, conditions, exclusions, or limitations may apply to the Claim but are not set forth herein. The Company reserves its rights with respect to such terms, conditions, exclusions, or limitations and their absence from this letter is not a waiver or modifications thereof. Furthermore, The Company specifically reserves the rights to seek and obtain a declaration regarding the absence of coverage and to amend this communication. This letter is based upon the facts and information regarding the Claim, as we presently understand them. In the event you have additional facts or information you contend support a contrary conclusion, or in the event new facts or information regarding the Claim becomes available, please provide such facts or information to us immediately and we will consider them as quickly as possible. This letter is subject in all respects to the Policy and no term or provision thereof is or is intended to be waived or otherwise modified in any respect. We welcome the opportunity to speak with you regarding our determination as described in this letter. Please do not hesitate to contact the undersigned at 531-484-1627 in the event you have any questions. We have now closed our file. Sincerely, Berkshire Hathaway Homestate Insurance Company 4V Aaron Earl Claims Department Berkshire Hathaway HOMESTATE COMPANIES December 15, 2022 Page 5 It is a crime to knowingly provide false, incomplete or misleading information to an insurance company for the purpose of defrauding the company. Penalties may include imprisonment, fines, or denial of insurance benefits. cc: The Hilb Group Central, LLC 6800 Isaac's Orchard Rd Springdale, AR 72762 on JM Roofing & Construction Client: Larry Schemel Property: 2143 Loren Cir Fayetteville, AR 72701 Operator: INFO2 Estimator: Jane Fraley Company: JM Roofing Business: 700 W Oak St Rogers, AR 72756 Type of Estimate: Water Damage Date Entered: 12/22/2022 Price List: ARFA8X_DEC22 Labor Efficiency: Restoration/Service/Remodel Estimate: LARRY-SCHEMEL-RESTOR Date Assigned: 12/21/2022 Home: (479) 200-0070 Business: (479) 381-0006 E-mail: oadmin@rogersroofingpros. com ■ agg'ag- JM Roofing & Construction LARRY-SCHEMEL-RE STOR Main Level Main Level DESCRIPTION QTY 1. Haul debris - per pickup truck load - including dump fees 1.00 EA 2. Final cleaning - construction - Residential 1,585.40 SF Master Bedroom Height: Peaked Subroom: Powder Area (1) Height: Peaked Subroom: MB Closet (2) Height: 8' Subroom: Room13 (3) Height: 8' DESCRIPTION QTY 3. 1/2" - drywall per LF - up to T tall 9.92 LF 4. R&R Tile floor covering - High grade 13.03 SF 5. Additional labor to remove tile from concrete slab 13.03 SF 6. Floor preparation for resilient flooring - Heavy 13.03 SF 7. R&R Vanity 4.00 LF 8. Cabinet knob or pull 4.00 EA 9. Seal & paint vanity - faces only 12.17 LF 10. Countertop - Granite or Marble 8.33 SF 11. Sink - single 1.00 EA 12. Sink faucet - Bathroom 1.00 EA 13. Angle stop valve 2.00 EA 14. Plumbing fixture supply line 2.00 EA 15. Baseboard - 3 1/4" 85.05 LF 16. Paint baseboard - one coat 85.05 LF 17. Mask and prep for paint - plastic, paper, tape (per LF) 98.55 LF 18. Paint the walls - one coat 744.29 SF 19. Carpet 295.42 SF 20. Carpet pad 233.63 SF 21. T- molding - for wood flooring 2.50 LF MB Bath Subroom: MB Shower (1) DESCRIPTION 22. Toilet - Detach & reset 23. 1/2" - drywall per LF - up to T tall 24. Floor preparation for resilient flooring - Heavy Height: 8' Height: 8' QTY 1.00 EA 8.58 LF 17.92 SF LARRY-SCHEMEL-RESTOR 12/23/2022 Page:2 . aM��soo JM Roofing & Construction CONTINUED - MB Bath DESCRIPTION 25. Additional labor to remove tile from concrete slab 26. R&R Tile floor covering - High grade 27. Baseboard - 3 1/4" 28. Mask and prep for paint - plastic, paper, tape (per LF) 29. Paint baseboard - one coat 30. Paint the walls and ceiling - one coat QTY 17.92 SF 17.92 SF 12.17 LF 22.17 LF 12.17 LF 207.75 SF Hall Bath Subroom: Hall Shower (1) DESCRIPTION Height: 8' Height: 8' QTY 31. Toilet - Detach & reset 1.00 EA 32. 1/2" - drywall per LF - up to T tall 12.00 LF 33. Floor preparation for resilient flooring - Heavy 23.75 SF 34. Additional labor to remove tile from concrete slab 23.75 SF 35. R&R Vanity 2.50 LF 36. R&R Tile floor covering - High grade 37.08 SF 37. Seal & paint vanity - faces only 4.50 LF 38. Cabinet knob or pull 2.00 EA 39. Sink - single 1.00 EA 40. Sink faucet - Bathroom 1.00 EA 41. Angle stop valve 2.00 EA 42. Plumbing fixture supply line 2.00 EA 43. Baseboard - 3 1/4" 12.00 LF 44. Mask and prep for paint - plastic, paper, tape (per LF) 26.67 LF 45. Paint the walls - one coat 200.33 SF 46. R&R T- molding - for wood flooring 2.33 LF Bedroom 1 Subroom: BR1 Closet (1) DESCRIPTION 47. 1/2" - drywall per LF - up to T tall 48. R&R Closet Organizer - Melamine Repair closet built-in 49. Baseboard - 3 1/4" 50. Mask and prep for paint - plastic, paper, tape (per LF) 51. Paint the walls -one coat 52. Paint baseboard - one coat 53. Seal & paint closet shelving Height: 8' Height: 8' QTY 12.00 LF 5.33 LF 62.67 LF 62.67 LF 501.33 SF 62.67 LF 5.33 LF LARRY-SCHEMEL-RESTOR 12/23/2022 Page:3 . aM��soo JM Roofing & Construction CONTINUED - Bedroom 1 DESCRIPTION QTY 54. Carpet 203.75 SF 55. Carpet pad 148.00 SF 56. T- molding - for wood flooring 2.50 LF 57. Interior door - Reset - slab only 1.00 EA 58. Bifold door set - (4 slabs only) - Double reset 1.00 EA Bedroom 2 Height: 8' Subroom: BR2 Closet (1) Height: 8' DESCRIPTION QTY 59. 1/2" - drywall per LF - up to T tall 10.00 LF 60. Baseboard - 3 1/4" 62.00 LF 61. Mask and prep for paint - plastic, paper, tape (per LF) 62.00 LF 62. Paint the walls - one coat 496.00 SF 63. Paint baseboard - one coat 62.00 LF 64. Carpet 200.50 SF 65. Carpet pad 150.00 SF 66. T- molding - for wood flooring 2.50 LF 67. Interior door - Reset - slab only 1.00 EA 68. Bifold door set - (4 slabs only) - Double reset 1.00 EA Living Room Height: 10' Subroom: Hallway (2) Height: 8' Subroom: Coat Closet (1) Height: 8' Subroom: Linen Closet (3) Height: 8' DESCRIPTION QTY 69. 1/2" - drywall per LF - up to T tall 10.00 LF 70. Baseboard - 3 1/4" 117.08 LF 71. Mask and prep for paint - plastic, paper, tape (per LF) 114.24 LF 72. Paint the walls - one coat 1,041.15 SF 73. Paint baseboard - one coat 117.08 LF 74. Floor preparation for resilient flooring - Heavy 437.54 SF 75. R&R Engineered wood flooring - High grade 437.54 SF 76. Add for glued down application over concrete substrate 437.54 SF 77. T- molding - for wood flooring 8.25 LF Entry Height: 10' LARRY-SCHEMEL-RESTOR 12/23/2022 Page:4 . aM� asoo JM Roofing & Construction DESCRIPTION QTY 78. R&R Tile floor covering - High grade 30.73 SF 79. Additional labor to remove tile from concrete slab 30.73 SF 80. Floor preparation for resilient flooring - Heavy 30.73 SF 81. Baseboard - 3 1/4" 17.58 LF 82. Mask and prep for paint - plastic, paper, tape (per LF) 17.58 LF 83. Paint the walls - one coat 175.83 SF 84. Paint baseboard - one coat 17.58 LF Kitchen Height: 10' DESCRIPTION QTY 85. Floor preparation for resilient flooring - Heavy 66.51 SF 86. Additional labor to remove tile from concrete slab 66.51 SF 87. R&R Tile floor covering - High grade 66.51 SF 88. Baseboard - 3 1/4" 16.58 LF 89. Mask and prep for paint - plastic, paper, tape (per LF) 31.83 LF 90. Paint cabinetry - lower - faces only 24.00 LF 91. Paint the walls - one coat 272.58 SF 92. Paint baseboard - one coat 16.58 LF Laundry Room Height: 8' DESCRIPTION QTY 93. Laundry tub - Detach & reset 1.00 EA 94. Floor preparation for resilient flooring - Heavy 54.47 SF 95. R&R Tile floor covering - High grade 54.47 SF 96. Additional labor to remove tile from concrete slab 54.47 SF 97. Baseboard - 3 1/4" 32.67 LF 98. R&R Cabinetry - lower (base) units 2.75 LF 99. R&R Cabinetry - upper (wall) units 2.75 LF 100. Cabinet knob or pull 4.00 EA 101. Mask and prep for paint - plastic, paper, tape (per LF) 32.67 LF 102. Paint baseboard - one coat 32.67 LF 103. Paint the walls - one coat 261.33 SF 104. Paint cabinetry - lower - faces only 3.00 LF 105. Paint cabinetry - upper - faces only 3.00 LF Garage Height: 9' DESCRIPTION QTY 106. Clean with pressure/chemical spray - Heavy 696.00 SF LARRY-SCHEMEL-RESTOR 12/23/2022 Page:5 . aM��soo JM Roofing & Construction CONTINUED - Garage DESCRIPTION QTY 107. 1/2" - drywall per LF - up to T tall 8.25 LF 108. Baseboard - 3 1/4" 77.33 LF 109. Mask and prep for paint - plastic, paper, tape (per LF) 77.33 LF 110. Paint the walls - one coat 696.00 SF 111. Paint baseboard - one coat 77.33 LF Grand Total Grand Total Areas: 4,703.51 SF Walls 1,585.40 SF Floor 0.00 SF Long Wall 1,585.40 Floor Area 1,907.39 Exterior Wall Area 0.00 Surface Area 0.00 Total Ridge Length Jane Fraley 1,646.87 SF Ceiling 176.16 SY Flooring 0.00 SF Short Wall 1,761.17 Total Area 193.83 Exterior Perimeter of Walls 0.00 Number of Squares 0.00 Total Hip Length $35,847.65 6,350.38 SF Walls and Ceiling 532.63 LF Floor Perimeter 562.87 LF Ceil. Perimeter 4,703.51 Interior Wall Area 0.00 Total Perimeter Length LARRY-SCHEMEL-RESTOR 12/23/2022 Page:6 Client: Schemel, Larry Property: 2143 Loren Circle Fayetteville, AR Operator: JDAVIS Estimator: Andrew Davis Company: Northwest Restoration Business: 1380 Oak Grove Rd Springdale, AR 72762 Type of Estimate: Date Entered: 12/19/2022 Price List: ARFA8X_DEC22 Labor Efficiency: Restoration/Service/Remodel Estimate: 2143 -SCHEMEL File Number: 2143-Schemel estimate to be revised if trim cannot be matched estimate to be revised if additional damages are found not responsible for paint/stain to match perfectly Date Assigned: Home: (479) 200-0070 Business: (479) 750-7821 2143-SCHEMEL Main Level Main Level DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL 1. Dumpster load -Approx. 12 yards, 1- 1.00 EA 474.80 0.00 56.01 99.71 630.52 3 tons of debris 2. Cleaning Technician - per hour 16.00 HR 0.00 48.12 90.83 161.68 1,022.43 3. Content Manipulation charge - per 8.00 HR 0.00 46.69 0.00 78.44 451.96 hour move around contents so flooring, trim, paint can be installed Total: Main Level 146.84 339.83 2,104.91 4' "" Entry/Foyer Height: 10' 180.83 SF Walls 31.96 SF Ceiling 'DinhyF°yer ; 212.79 SF Walls & Ceiling 31.96 SF Floor II 3.55 SY Flooring 18.08 LF Floor Perimeter 18.08 LF Ceil. Perimeter Missing Wall 4' 11" X 10' Opens into LIVING_ROOM DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL 4. Additional labor to remove tile from 31.96 SF 1.84 0.00 0.00 12.35 71.16 concrete slab 5. R&R Tile floor covering 31.96 SF 2.66 9.45 35.63 81.27 503.93 6. Baseboard - 3 1/4" 18.08 LF 0.00 3.30 3.05 13.18 75.89 7. Paint baseboard - two coats 18.08 LF 0.00 1.31 0.25 5.04 28.97 8. Paint the walls - one coat 180.83 SF 0.00 0.62 2.47 24.06 138.64 Totals: Entry/Foyer 41.40 135.90 818.59 8" �-16' Living Room etc tV V Living Room to �te Missing Wall - Goes to Floor Missing Wall Missing Wall 2143-SCHEMEL 700.93 SF Walls 1,077.68 SF Walls & Ceiling 41.86 SY Flooring 75.17 LF Ceil. Perimeter 311191X61811 41 11" X 10' 3'1"X10' Height: 10' 376.74 SF Ceiling 376.74 SF Floor 68.17 LF Floor Perimeter Opens into KITCHEN Opens into ENTRY -FOYER Opens into HALLWAY 12/20/2022 Page: 2 �2' 3"� CONTINUED - Living Room Subroom: Coat CL (1) 108.28 SF Walls 117.77 SF Walls & Ceiling 1.05 SY Flooring 13.54 LF Ceil. Perimeter Height: 8' 9.48 SF Ceiling 9.48 SF Floor 13.54 LF Floor Perimeter DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL 9. Drywall patch / small repair, ready 1.00 EA 0.00 63.84 0.36 13.48 77.68 for paint 10. Add for glued down application 386.23 SF 1.60 1.15 52.41 223.06 1,337.60 over concrete substrate 11. R&R Engineered wood flooring 386.23 SF 2.49 9.06 412.83 936.80 5,810.58 12. R&R T- molding - for wood 12.00 LF 0.41 7.72 10.93 20.48 128.97 flooring 13. Baseboard - 3 1/4" 81.71 LF 0.00 3.30 13.78 59.52 342.94 14. Base shoe 81.71 LF 0.00 1.47 6.05 26.50 152.66 15. Paint baseboard - two coats 81.71 LF 0.00 1.31 1.12 22.70 130.86 16. Seal & paint base shoe or quarter 81.71 LF 0.00 0.74 0.96 12.91 74.34 round 17. Paint the walls - one coat 809.22 SF 0.00 0.62 11.05 107.69 620.46 Totals: Living Room Hallway A 6' 9�'8.1 Hal HN17 6"�1.2'6" i 4" 223.33 SF Walls 261.36 SF Walls & Ceiling 4.23 SY Flooring 27.92 LF Ceil. Perimeter Missing Wall 3' 1" X 8' ~2' 7" Subroom: Linen (1) T F�F 6 4j' 1 5„ 58.67 SF Walls 61.97 SF Walls & Ceiling 0.37 SY Flooring 7.33 LF Ceil. Perimeter 509.49 1,423.14 8,676.09 Height: 8' 38.03 SF Ceiling 38.03 SF Floor 27.92 LF Floor Perimeter Opens into LIVING -ROOM Height: 8' 3.30 SF Ceiling 3.30 SF Floor 7.33 LF Floor Perimeter 2143-SCHEMEL 12/20/2022 Page:3 CONTINUED - Hallway DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL 18. Add for glued down application 41.33 SF 1.60 1.15 5.60 23.86 143.12 over concrete substrate 19. R&R Engineered wood flooring 41.33 SF 2.49 9.06 44.18 100.25 621.79 20. R&R T- molding - for wood 12.00 LF 0.41 7.72 10.93 20.48 128.97 flooring 21. Baseboard - 3 1/4" 35.25 LF 0.00 3.30 5.95 25.69 147.97 22. Base shoe 35.25 LF 0.00 1.47 2.61 11.43 65.86 23. Paint baseboard - two coats 35.25 LF 0.00 1.31 0.48 9.80 56.46 24. Seal & paint base shoe or quarter 35.25 LF 0.00 0.74 0.41 5.57 32.07 round 25. Paint the walls - one coat 282.00 SF 0.00 0.62 3.85 37.52 216.21 Totals: Hallway 74.01 234.60 1,412.45 1'-„iz, 6"' Bed 1 Height: 8' 7' 377.33 SF Walls 138.42 SF Ceiling T47 F"v j 515.75 SF Walls & Ceiling 138.42 SF Floor Bed 1 15.38 SY Flooring 47.17 LF Floor Perimeter 47.17 LF Ceil. Perimeter 1 1-13' 1"� DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL 26. Tackless strip - per LF 47.17 LF 0.00 0.61 3.40 6.05 38.22 27. Carpet pad 138.42 SF 0.00 0.64 10.45 18.61 117.65 28. Carpet 159.18 SF 0.00 3.68 69.10 123.02 777.90 29. Baseboard - 3 1/4" 47.17 LF 0.00 3.30 7.96 34.37 197.99 30. Paint baseboard - two coats 47.17 LF 0.00 1.31 0.64 13.11 75.54 31. Paint the walls - one coat 377.33 SF 0.00 0.62 5.15 50.21 289.30 Totals: Bed 1 1 2143-SCHEMEL 96.70 245.37 1,496.60 CLI Height: 8' 116.00 SF Walls 10.50 SF Ceiling 126.50 SF Walls & Ceiling 10.50 SF Floor 1.17 SY Flooring 14.50 LF Floor Perimeter 14.50 LF Ceil. Perimeter 12/20/2022 Page:4 CONTINUED - CL1 DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL 32. R&R Closet shelf and rod package 17.00 LF 3.98 17.72 7.39 79.02 455.31 33. Tackless strip - per LF 14.50 LF 0.00 0.61 1.04 1.86 11.75 34. Carpet pad 10.50 SF 0.00 0.64 0.80 1.41 8.93 35. Carpet 12.08 SF 0.00 3.68 5.24 9.34 59.03 36. Baseboard - 3 1/4" 14.50 LF 0.00 3.30 2.45 10.57 60.87 37. Paint baseboard - two coats 14.50 LF 0.00 1.31 0.20 4.03 23.23 38. Paint the walls - one coat 116.00 SF 0.00 0.62 1.58 15.43 88.93 39. Seal & paint closet shelving 17.00 LF 0.00 8.35 2.50 30.35 174.80 Totals: CL1 21.20 152.01 882.85 Hall Bath Bed 2 Height: 8' 4s s Ci 416.00 SF Walls 151.58 SF Ceiling 1 567.58 SF Walls & Ceiling 151.58 SF Floor Bed L 16.84 SY Flooring 52.00 LF Floor Perimeter 52.00 LF Ceil. Perimeter ►3'2" 4' 1"4 DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL 40. Tackless strip - per LF 52.00 LF 0.00 0.61 3.74 6.66 42.12 41. Carpet pad 151.58 SF 0.00 0.64 11.45 20.37 128.83 42. Carpet 174.32 SF 0.00 3.68 75.69 134.72 851.91 43. Baseboard - 3 1/4" 52.00 LF 0.00 3.30 8.77 37.89 218.26 44. Paint baseboard - two coats 52.00 LF 0.00 1.31 0.71 14.45 83.28 45. Paint the walls - one coat 416.00 SF 0.00 0.62 5.68 55.36 318.96 Totals: Bed 2 TN T M T 12 cq � a DESCRIPTION CL2 118.67 SF Walls 129.50 SF Walls & Ceiling 1.20 SY Flooring 14.83 LF Ceil. Perimeter QTY RESET REMOVE REPLACE 106.04 269.45 1,643.36 Height: 8' 10.83 SF Ceiling 10.83 SF Floor 14.83 LF Floor Perimeter TAX O&P TOTAL 46. R&R Closet shelf and rod package 17.00 LF 3.98 17.72 7.39 79.02 455.31 2143-SCHEMEL 12/20/2022 Page:5 WelelY1►U1DIlira rN DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL 47. Tackless strip - per LF 14.83 LF 0.00 0.61 1.06 1.91 12.02 48. Carpet pad 10.83 SF 0.00 0.64 0.82 1.45 9.20 49. Carpet 12.46 SF 0.00 3.68 5.41 9.63 60.89 50. Baseboard - 3 1/4" 14.83 LF 0.00 3.30 2.50 10.80 62.24 51. Paint baseboard - two coats 14.83 LF 0.00 1.31 0.20 4.12 23.75 52. Paint the walls - one coat 118.67 SF 0.00 0.62 1.62 15.79 90.99 53. Seal & paint closet shelving 17.00 LF 0.00 8.35 2.50 30.35 174.80 Totals: CL2 21.50 153.07 889.20 inen Hall Bath - -r l� 1 Hall Bath Height: 8' 212.00 SF Walls 253.25 SF Walls & Ceiling 4.58 SY Flooring 26.50 LF Ceil. Perimeter DESCRIPTION QTY 54. Detach & Reset Toilet 1.00 EA 55. Additional labor to remove tile 41.25 SF from concrete slab 56. R&R Tile floor covering 41.25 SF 57. Detach & Reset Mirror - 1/4" plate 12.00 SF glass estimate to be revised if mirror breaks 58. R&R Custom cabinets - base units 2.60 LF 59. R&R Countertop subdeck - 12.00 SF plywood 60. R&R Countertop - flat laid plastic 6.00 LF laminate 61. Detach & Reset Sink -single 1.00 EA 62. Detach & Reset Sink faucet - 1.00 EA Bathroom 63. R&R P-trap assembly - ABS 1.00 EA (plastic) 64. Baseboard - 3 1/4" 26.50 LF 65. Paint baseboard - two coats 26.50 LF 66. Paint the walls - one coat 212.00 SF 67. Prime cabinets 2.60 LF 41.25 SF Ceiling 41.25 SF Floor 26.50 LF Floor Perimeter RESET REMOVE REPLACE TAX O&P TOTAL 254.94 0.00 0.00 0.81 53.70 309.45 1.84 0.00 0.00 15.94 91.84 2.66 9.45 45.99 104.90 650.43 5.89 0.00 0.00 0.00 14.85 85.53 7.98 249.90 54.47 152.24 877.20 0.72 3.10 1.86 10.02 57.72 4.59 39.65 16.78 59.27 341.49 156.16 0.00 0.00 0.05 32.82 189.03 124.86 0.00 0.00 0.00 26.23 151.09 7.97 64.61 0.78 15.42 88.78 0.00 3.30 4.47 19.31 111.23 0.00 1.31 0.36 7.37 42.45 0.00 0.62 2.89 28.21 162.54 0.00 28.79 0.02 15.72 90.59 2143-SCHEMEL 12/20/2022 Page:6 CONTINUED - Hall Bath DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL 68. Seal & paint cabinetry - lower - 2.60 LF 0.00 36.24 1.29 20.05 115.56 inside and out Totals: Hall Bath 129.77 576.05 3,364.93 T Master Bedroom Height: Peaked ster Ba 522.93 SF Walls 227.17 SF Ceiling roan 750.09 SF Walls & Ceiling 201.93 SF Floor U8" 22.44 SY Flooring 55.76 LF Floor Perimeter iter Cin64.12 LF Ceil. Perimeter Ha Missing Wall 4' 6 13/16" X 8' Opens into MASTER VANI2 DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL 69. Tackless strip - per LF 55.76 LF 0.00 0.61 4.02 7.14 45.17 70. Carpet pad 201.93 SF 0.00 0.64 15.25 27.14 171.63 71. Carpet 232.22 SF 0.00 3.68 100.82 179.46 1,134.85 72. Baseboard - 3 1/4" 55.76 LF 0.00 3.30 9.40 40.61 234.02 73. Paint baseboard - two coats 55.76 LF 0.00 1.31 0.76 15.51 89.32 74. Paint the walls - one coat 522.93 SF 0.00 0.62 7.14 69.58 400.94 Totals: Master Bedroom 137.39 339.44 2,075.93 Master Vanity Height: 8' 2'1F' _ �1, T it 118.55 SF Walls 139.44 SF Walls & Ceiling 20.89 SF Ceiling 20.89 SF Floor rn :-Master Vanity M 2.32 SY Flooring 14.82 LF Floor Perimeter 4' Z..� 14.82 LF Ceil. Perimeter 4' Missing Wall 4' 6 13/16" X 8' Opens into MASTER BEDRO DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL 75. Drywall patch / small repair, ready 1.00 EA for paint 76. Additional labor to remove tile 20.89 SF from concrete slab 77. R&R Tile floor covering 20.89 SF 78. Detach & Reset Mirror - 1/4" plate 16.00 SF glass 2143-SCHEMEL 0.00 63.84 0.36 13.48 77.68 1.84 0.00 0.00 8.07 46.51 2.66 9.45 23.29 53.13 329.40 5.89 0.00 0.00 0.00 19.79 114.03 12/20/2022 Page:7 CONTINUED - Master Vanity DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL estimate to be revised if mirror breaks 79. R&R Custom cabinets - base units 4.00 LF 7.98 249.90 83.80 234.22 1,349.54 80. R&R Countertop subdeck - 12.00 SF 0.72 3.10 1.86 10.02 57.72 plywood 81. R&R Countertop - flat laid plastic 8.00 LF 4.59 39.65 22.37 79.02 455.31 laminate 82. Detach & Reset Sink - single 1.00 EA 156.16 0.00 0.00 0.05 32.82 189.03 83. Detach & Reset Sink faucet - 1.00 EA 124.86 0.00 0.00 0.00 26.23 151.09 Bathroom 84. R&R P-trap assembly - ABS 1.00 EA 7.97 64.61 0.78 15.42 88.78 (plastic) 85. Baseboard - 3 1/4" 14.82 LF 0.00 3.30 2.50 10.80 62.21 86. Paint baseboard - two coats 14.82 LF 0.00 1.31 0.20 4.12 23.73 87. Paint the walls - one coat 118.55 SF 0.00 0.62 1.62 15.78 90.90 88. Prime cabinets 4.00 LF 0.00 28.79 0.02 24.19 139.37 89. Seal & paint cabinetry - lower - 4.00 LF 0.00 36.24 1.99 30.87 177.82 inside and out Totals: Master Vanity 138.84 577.96 3,353.12 Master CL DESCRIPTION 181.52 SF Walls 212.04 SF Walls & Ceiling 3.39 SY Flooring 22.69 LF Ceil. Perimeter Height: 8' 30.52 SF Ceiling 30.52 SF Floor 22.69 LF Floor Perimeter QTY RESET REMOVE REPLACE TAX O&P TOTAL 90. R&R Closet shelf and rod package 24.00 LF 3.98 17.72 10.44 111.56 642.80 replace shelving that had water damage 91. Tackless strip - per LF 22.69 LF 0.00 0.61 1.63 2.90 18.37 92. Carpet pad 30.52 SF 0.00 0.64 2.30 4.10 25.93 93. Carpet 35.10 SF 0.00 3.68 15.23 27.13 171.53 94. Baseboard - 3 1/4" 22.69 LF 0.00 3.30 3.83 16.53 95.24 95. Paint baseboard - two coats 22.69 LF 0.00 1.31 0.31 6.30 36.33 96. Paint the walls - one coat 181.52 SF 0.00 0.62 2.48 24.15 139.17 97. Seal & paint closet shelving 24.00 LF 0.00 8.35 3.53 42.82 246.75 Totals: Master CL 39.75 235.49 1,376.12 2143-SCHEMEL 12/20/2022 Page:8 1­6' 9" 1 Master Bath 6' 5" Master Bath l {1 Master Vanity DESCRIPTION 181.33 SF Walls 212.88 SF Walls & Ceiling 3.51 SY Flooring 22.67 LF Ceil. Perimeter Height: 8' 31.55 SF Ceiling 31.55 SF Floor 22.67 LF Floor Perimeter QTY RESET REMOVE REPLACE TAX O&P TOTAL 98. Drywall patch / small repair, ready for paint 99. Detach & Reset Toilet 100. Additional labor to remove tile from concrete slab 101. R&R Tile floor covering 102. Baseboard - 3 1/4" 103. Paint baseboard - two coats 104. Paint the walls - one coat 1.00 EA 1.00 EA 254.94 31.55 SF 31.55 SF 22.67 LF 22.67 LF 181.33 SF 0.00 0.00 1.84 2.66 0.00 0.00 0.00 63.84 0.00 0.00 9.45 3.30 1.31 0.62 0.36 13.48 0.81 53.70 0.00 12.20 35.17 80.24 3.82 16.51 0.31 6.30 2.48 24.13 77.68 309.45 70.25 497.48 95.14 36.31 139.03 Totals: Master Bath 42.95 206.56 1,225.34 ~ Kitchen Height: 10' 9, 5° - T - 403.89 SF Walls 113.78 SF Ceiling 517.67 SF Walls & Ceiling 113.78 SF Floor Kitchen 12.64 SY Flooring 39.08 LF Floor Perimeter 43.00 LF Ceil. Perimeter „421 „+- , N Missing Wall - Goes to Floor 3' 11" X 6' 8" Opens into LIVING ROOM DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL 105. Detach & Reset Refrigerator - top 1.00 EA 50.09 0.00 0.00 0.00 10.52 60.61 freezer - 14 to 18 cf 106. Detach & Reset Dishwasher 1.00 EA 243.35 0.00 0.00 0.00 51.11 294.46 107. Dishwasher connection 1.00 EA 0.00 149.54 3.28 32.09 184.91 108. Detach & Reset Appliance water 2.00 EA 95.39 0.00 0.00 4.21 40.95 235.94 line - 1/4" water line for fridge and dishwasher 109. Additional labor to remove tile 113.78 SF 1.84 0.00 0.00 43.97 253.33 from concrete slab 110. R&R Tile floor covering 113.78 SF 2.66 9.45 126.84 289.35 1,794.06 111. Baseboard - 3 1/4" 39.08 LF 0.00 3.30 6.59 28.48 164.03 112. Paint baseboard -two coats 39.08 LF 0.00 1.31 0.53 10.86 62.58 2143-SCHEMEL 12/20/2022 Page:9 DESCRIPTION CONTINUED - Kitchen QTY RESET REMOVE REPLACE TAX O&P TOTAL 113. Paint the walls - one coat 403.89 SF 0.00 0.62 5.51 53.75 309.67 Totals: Kitchen f2 +'- 1 Laundry Room F2�lb 1 wx DESCRIPTION Laundry Room 264.00 SF Walls 317.53 SF Walls & Ceiling 5.95 SY Flooring 33.00 LF Ceil. Perimeter QTY RESET REMOVE REPLACE 146.96 561.08 3,359.59 Height: 8' 53.53 SF Ceiling 53.53 SF Floor 33.00 LF Floor Perimeter TAX O&P TOTAL 114. Washer/Washing machine - 1.00 EA 0.00 48.74 0.00 10.23 58.97 Remove & reset 115. Detach & Reset Appliance water 1.00 EA 95.39 0.00 0.00 2.11 20.47 117.97 line - 1/4" water line for washing machine 116. Dryer - Remove & reset 1.00 EA 0.00 37.56 0.00 7.89 45.45 117. Detach & Reset Laundry tub 1.00 EA 308.53 0.00 0.00 0.00 64.79 373.32 118. Detach & Reset Sink faucet - 1.00 EA 124.86 0.00 0.00 0.00 26.23 151.09 Kitchen 119. R&R P-trap assembly - ABS 1.00 EA 7.97 64.61 0.78 15.42 88.78 (plastic) 120. R&R Custom cabinets - base 3.00 LF 7.98 249.90 62.85 175.66 1,012.15 units 121. R&R Countertop subdeck - 12.00 SF 0.72 3.10 1.86 10.02 57.72 plywood 122. R&R Countertop - flat laid plastic 6.00 LF 4.59 39.65 16.78 59.27 341.49 laminate 123. Additional labor to remove tile 53.53 SF 1.84 0.00 0.00 20.69 119.19 from concrete slab 124. R&R Tile floor covering 53.53 SF 2.66 9.45 59.68 136.14 844.07 125. Baseboard - 3 1/4" 33.00 LF 0.00 3.30 5.57 24.04 138.51 126. Paint baseboard - two coats 33.00 LF 0.00 1.31 0.45 9.18 52.86 127. Paint the walls - one coat 264.00 SF 0.00 0.62 3.60 35.14 202.42 128. Prime cabinets 3.00 LF 0.00 28.79 0.02 18.14 104.53 129. Seal & paint cabinetry - lower - 3.00 LF 0.00 36.24 1.49 23.14 133.35 inside and out Totals: Laundry Room 155.19 656.45 3,841.87 2143-SCHEMEL 12/20/2022 Page:10 1 Garage ems, g., 7,. 71-5, 2 L o, Garage t IL19'6" 1'-za 2^ DESCRIPTION Height: 8' 620.00 SF Walls 375.38 SF Ceiling 995.38 SF Walls & Ceiling 375.38 SF Floor 41.71 SY Flooring 77.50 LF Floor Perimeter 77.50 LF Ceil. Perimeter QTY RESET REMOVE REPLACE TAX O&P TOTAL 130. Baseboard - 3 1/4" 77.50 LF 0.00 3.30 13.07 56.46 325.28 131. Paint baseboard - two coats 77.50 LF 0.00 1.31 1.06 21.55 124.14 132. Paint the walls - one coat 620.00 SF 0.00 0.62 8.46 82.50 475.36 Totals: Garage 22.59 160.51 924.78 Total: Main Level 1,830.62 6,266.91 37,445.73 Labor Minimums Applied DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL 133. Drywall labor minimum 1.00 EA 0.00 135.52 0.00 28.46 163.98 Totals: Labor Minimums Applied 0.00 28.46 163.98 Line Item Totals: 2143-SCHEMEL Grand Total Areas: 4,932.28 SF Walls 1,648.42 SF Floor 0.00 SF Long Wall 1,648.42 Floor Area 1,898.47 Exterior Wall Area 0.00 Surface Area 0.00 Total Ridge Length 1,673.65 SF Ceiling 183.16 SY Flooring 0.00 SF Short Wall 1,779.49 Total Area 196.83 Exterior Perimeter of Walls 0.00 Number of Squares 0.00 Total Hip Length 1,830.62 6,295.37 37,609.71 6,605.93 SF Walls and Ceiling 571.56 LF Floor Perimeter 590.83 LF Ceil. Perimeter 4,932.28 Interior Wall Area 0.00 Total Perimeter Length 2143-SCHEMEL 12/20/2022 Page: II Summary Line Item Total 29,483.72 Material Sales Tax 492.85 Subtotal 29,976.57 Overhead 2,997.76 Profit 3,297.61 Service Sales Tax 1,337.77 Replacement Cost Value $37,609.71 Net Claim $37,609.71 Andrew Davis 2143-SCHEMEL 12/20/2022 Page:12 Main Level 2,. 2143-SCHEMEL 0 �o m Main Level 12/20/2022 Page:13 h*ro ai'r3uhmated To Adace><s 11 Phone K Proposal KNEBEL ONSTRUCTION\\ Thomas iF- trCnebel, Owner Experience In aft phases of construction. Cell Phone: 479-387-0802 Job Name Job N - Job Location Dale 1 j Date of Plans I Architect We hereby submit specifications and estimates for: �C �o0(1rq� A �} .��� ��aot''�r ���.�,�N �•o�s-� rq�ict'tir 5W4jh 'o� ��.- O5 � t ll f'�� 5 1 T} CLIi 1]Q4,7 Q✓ l��l'C� h V e pirlopose hereby to fumish material and labor -- complete in accordance with the above specifications for the sum of: n payments to be made as follows: Dollars Merstatt or daMbon tram 8tbovO gX?dIcatronw involving extra costs MR Respectfu Y eWOd ordy upon *Man order, and wilt be:OMO an extra charge over and �- a rite &EfirmW All agmementa CwMgent �n strikeS. accidents, or dei4ys submitted I t our r lot Note - this proposal may be withdrawn by us if not accepted within � Q-- days. _ Y Arrryt{-><rt cr of pr[I Lj5z,, Me pr9cns, 5pet:i6cabom and condbons are s0sfactory and are ' eccapted You are authorized to'do the worts as specified, arts will be made as snitaned above. Signature