Loading...
HomeMy WebLinkAbout54-23 RESOLUTION0 113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 Resolution: 54-23 File Number: 2023432 MCCLELLAND CONSULTING ENGINEERS, INC. - ROCKWOOD TRAIL WATERLINE PROJECT A RESOLUTION TO APPROVE A CONTRACT WITH MCCLELLAND CONSULTING ENGINEERS, INC. IN THE AMOUNT OF $58,610.00 FOR FIELD SURVEYING SERVICES AND UTILITY RELOCATION FEES ASSOCIATED WITH THE ROCKWOOD TRAIL WATERLINE PROJECT, AND TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $5,711.00 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby authorizes Mayor Jordan to sign a contract with McClelland Consulting Engineers, Inc. in the amount of $58,610.00 for field surveying services and utility relocation fees associated with the Rockwood Trail Waterline Project, and further approves a project contingency in the amount of $5,711.00. PASSED and APPROVED on March 7, 2023 Page I Attest: Kara Puton, City Clerk Tfcasurcr CITY OF Pow, FAYETTEVILLE ARKANSAS MEETING OF MARCH 7, 2023 CITY COUNCIL MEMO 2023-432 TO: Mayor Jordan and City Council THRU: Susan Norton, Chief of Staff FROM: Timothy Nyander, Utilities Director DATE: SUBJECT: McClelland Consulting Engineers, Inc. - Surveying for Rockwood Trail Waterline RECOMMENDATION: Staff recommends approval of a contract with McClelland Consulting Engineers, Inc. in the amount of $57,110.00 for field survey services on Rockwood Trail plus utility relocation fees in the amount of $1,500.00 for a total amount of $58,610.00 to support the Engineering Division's design of waterline replacements, and approval of a contingency in the amount of $5,711.00. BACKGROUND: McClelland Consulting Engineers, Inc. was selected for citywide on -call survey services per Resolution 85-22 (RFQ #22-01, Selection 3). Upon review of the City's 2023 Paving Plan, the Rockwood Trail waterline was identified as an aging line with frequent leaks and repairs needed. For this reason, Water/Sewer requested the paving be delayed until a replacement project could be completed. To save time and money, the Engineering Division will perform the project engineering design of this project once the survey is completed. DISCUSSION: This survey by McClelland Consulting Engineers Inc. will allow the Engineering Division to perform their waterline design, prepare plans and specifications, and bid the project for construction in a timely, cost- effective manner. Rockwood currently has several older waterlines in multiple sizes and materials. This project would create a uniform 8" PVC waterline for approximately 5,000 linear feet. Staff recommends approval of a contract with McClelland Consulting Engineers, Inc. in the amount of $57,110.00 for surveying services on Rockwood Trail plus utility relocation fees in the amount of $1,500.00 for a total amount of $58,610.00. Staff also recommends approval of a contingency in the amount of $5,711.00. BUDGET/STAFF IMPACT: Funds are available for this project in the Water System Rehabilitation account within the Water & Sewer fund. ATTACHMENTS: SRF McClelland - Surveying for Rockwood Trail Waterline, Proposal for Surveying Services - Rockwood Trail Mapping with Exhibit A, 85-22 RESOLUTION Mailing address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 City of Fayetteville, Arkansas 113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 - Legislation Text File #: 2023-432 McClelland Consulting Engineers, Inc. - Surveying for Rockwood Trail Waterline A RESOLUTION TO APPROVE A CONTRACT WITH MCCLELLAND CONSULTING ENGINEERS, INC. IN THE AMOUNT OF $58,610.00 FOR FIELD SURVEYING SERVICES AND UTILITY RELOCATION FEES ASSOCIATED WITH THE ROCKWOOD TRAIL WATERLINE PROJECT, AND TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $5,711.00 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby authorizes Mayor Jordan to sign a contract with McClelland Consulting Engineers, Inc. in the amount of $58,610.00 for field surveying services and utility relocation fees associated with the Rockwood Trail Waterline Project, and further approves a project contingency in the amount of $5,711.00. Page 1 Tim Nyander Submitted By City of Fayetteville Staff Review Form 2023-432 Item ID 3/7/2023 City Council Meeting Date - Agenda Item Only N/A for Non -Agenda Item 2/14/2023 WATER SEWER (720) Submitted Date Division / Department Action Recommendation: Staff recommends approval of a contract with McClelland Consulting Engineers, Inc. in the amount of $57,110.00 for field survey services on Rockwood Trail plus utility relocation fees in the amount of $1,500.00 for a total amount of $58,610.00 to support the Engineering Division's design of waterline replacements, and approval of a contingency in the amount of $5,711.00. Budget Impact: 5400.720.5600-5314.00 Water and Sewer Account Number Fund 12009.1 Water System Rehabilitation/Replacement Project Number Project Title Budgeted Item? Yes Total Amended Budget $ 6,729,060.00 Expenses (Actual+Encum) $ 2,879,224.95 Available Budget Is 3,849,835.05 Does item have a direct cost? Yes Item Cost $ 64,321.00 Is a Budget Adjustment attached? No Budget Adjustment $ - Remaining Budget 3,785,514.05 V20221130 Purchase Order Number: Previous Ordinance or Resolution # Change Order Number: Approval Date: Original Contract Number: Comments: RFQ #22-01, Selection 3 M[CLELLAND 1580 E. Stearns Street lfl CONSULTING Fayetteville, AR 73703 "CE�479-443-2377/Fax 479-443-9241 ENGINEERS, INC. www.mce.us.com January 27, 2023 Mr. Matt Casey, P.E. Engineering Design Manager City of Fayetteville 125 West Mountain Street Fayetteville, AR. 72701 Re: Proposal for Surveying Services: Design survey mapping on East Rockwood Trail, Fayetteville, AR. Dear Mr. Casey: As requested, we are presenting herewith a proposed engineering services contract between McClelland Consulting Engineers, Inc., hereinafter referred to as the ENGINEER, and City of Fayetteville, Arkansas, hereinafter referred to as the OWNER, which is associated with the provision of professional services as defined in Article 1, and for the consideration defined in Article 2 hereinafter. The OWNER would like for the ENGINEER to provide design survey mapping for a proposed water line along East Rockwood Trail in Fayetteville, AR as shown on the attach EXHIBIT A. The ENGINEER will complete the tasks as outlined in Article 1. ARTICLE 1 Task 1 — Design Survey Mapping ENGINEER will complete a detailed design survey along East Rockwood Trail in Fayetteville. The survey will begin at the intersection of East Rockwood Trail and North Missouri Boulevard and proceed east to the easterly end of East Rockwood Trail, approximately 5000 feet. The mapping width will be 40 foot wide, 20 feet on each side of the road centerline. The design survey limits are shown on the attached drawing. Design survey details typically shown on the final drawing include (but are not limited to): contours, flowlines, utility poles and pedestals, roads, edges of asphalt, curb lines, sidewalks, storm water manholes and structures, drainage pipes, ditches, sanitary sewer manholes with inverts, water meters, water valves, fire hydrants and utility marks provided by a utility location service. Property pins will be located as part of the mapping. Deeds of properties adjoining the mapping route will be reviewed and resolved and the right of way lines along East Rockwood Trail will be shown on the final drawing. City of Fayetteville, AR. 2023 Water & Sewer On -Call Services, East Rockwood Trail January 27, 2023 Page 2 ARTICLE 2 Task 1 — Design Survey Mapping • Payment for the design survey mapping shall be a lump sum fee plus direct expense basis. Total fee for professional services is anticipated not to exceed $57,110. Payments shall be made in monthly installments as surveying progresses. ARTICLE 3 It is understood that time is of essence and that the ENGINEER shall endeavor to plan and provide his services in a timely manner. ARTICLE 4 It is further mutually agreed by the parties hereto: • That the OWNER shall make available to the ENGINEER all technical data in the OWNER's possession including maps and other information required by the ENGINEER and relating to his work. • That, the ENGINEER shall maintain a level of competency presently maintained by other practicing professional surveyors in the same type of work for the professional and technical soundness and accuracy of all drawings, and other work and materials furnished under this Agreement. • All documents including drawings, specifications, estimates, field notes and other data pertaining to the work or to the project shall become the property of the OWNER. • That the ENGINEER's direct expenses are defined as the costs incurred on or directly for the Project, other than the Salary and General Overhead Costs, as defined hereinbefore. Such direct expenses shall be computed on the basis of actual purchase price for items obtained from commercial sources and on the basis of usual commercial charges for items provided by the ENGINEER. Direct expenses shall include, but not be limited to, necessary transportation costs, (including mileage at the ENGINEER'S current rate per mile when the ENGINEER's own automobiles are used and the project is greater than 20 miles from ENGINEERS's Fayetteville office); meals and lodging; title and easement City of Fayetteville, AR. 2023 Water & Sewer On -Call Services, East Rockwood Trail January 27, 2023 Page 3 searches; utility locates; and review fees for documents submitted to city or regional planning offices. a. Anticipated direct expenses for this project include: i. Utility locate fees (Estimated cost: $1500) b. Whenever possible, if other direct expenses not listed here are needed to complete the scope of work of this project, ENGINEER will discuss the items needed and costs associated with said items with the OWNER prior to engaging services/making purchases. • That the OWNER may, from time to time, request changes in the scope of the services of the ENGINEER to be performed hereunder. Such changes, including any increase or decrease in the amount of the ENGINEER'S compensation, which are mutually agreed upon by and between the OWNER and the ENGINEER, shall be incorporated in written amendments to this Agreement. • Payment for professional services provided by the ENGINEER are due within 30 days of invoice receipt. All documents including drawings, specifications, estimates, field notes, and other data pertaining to the work or to the Project shall become the property of the OWNER. The OWNER shall not be restricted in the subsequent use of the design, design documents, or ideas incorporated in the work. However, the ENGINEER shall bear no responsibility for such reuse of the design unless specifically agreed to in writing. We appreciate the opportunity to present this proposal to you. If you are in agreement, please sign and date in the spaces provided below and return a copy to our office. Sincerely, McClelland Consulting Engineers, Inc. Paul Walla, PLS Survey Department Manager McClelland Consulting Engineers, Inc is hereby authorized to proceed in accordance with the foregoing proposal. Name Title Date PIN �zo ��� � II � o 11 µ181 14 B X, 4 ti i-J, owj1p—m 4 cr Sri Lp I.v AP ji —441. I'll 113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 Resolution: 85-22 File Number: 2022-0298 RFQ #22-01, SELECTION #3 MCCLELLAND CONSULTING ENGINEERS, INC. AND OLSSON ASSOCIATES, INC.: A RESOLUTION TO AWARD RFQ #22-01 SELECTION #3 AND AUTHORIZE THE PURCHASE OF ON -CALL SURVEYING SERVICES FROM MCCLELLAND CONSULTING ENGINEERS, INC. AND OLSSON, INC. BASED ON RATES PROVIDED AND AVAILABILITY AS NEEDED THROUGH APRIL 30, 2023 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby awards RFQ #22-01 Selection #3 and authorizes the purchase of on -call surveying services from McClelland Consulting Engineers, Inc. and Olsson, Inc., based on rates provided and availability as needed through April 30, 2023. PASSED and APPROVED on 4/19/2022 Attest: '0Aj I I It I It I If, .�`` GLER K �• •' �t 1' «5f''. �'• 0 Kara Paxton, City Clerk Treasurer- S«' Page t Printed on 4120122 City of Fayetteville, Arkansas 113 West Mountain Street Fayetteville, AR 72701 (479)575-8323 Text File File Number: 2022-0298 Agenda Date: 4/19/2022 Version: 1 Status: Passed In Control: City Council Meetinq Agenda Number: A.2 File Type: Resolution RFQ #22-01, SELECTION #3 MCCLELLAND CONSULTING ENGINEERS, INC. AND OLSSON ASSOCIATES, INC.: A RESOLUTION TO AWARD RFQ #22-01 SELECTION #3 AND AUTHORIZE THE PURCHASE OF ON -CALL SURVEYING SERVICES FROM MCCLELLAND CONSULTING ENGINEERS, INC. AND OLSSON, INC. BASED ON RATES PROVIDED AND AVAILABILITY AS NEEDED THROUGH APRIL 30, 2023 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby awards RFQ #22-01 Selection #3 and authorizes the purchase of on -call surveying services from McClelland Consulting Engineers, Inc. and Olsson, Inc., based on rates provided and availability as needed through April 30, 2023. City of Fayetteville, Arkansas Page 1 Printed on 412012022 Matt Casey Submitted By City of Fayetteville Staff Review Form 2022-0298 Legistar File ID 4/19/2022 City Council Meeting Date - Agenda Item Only N/A for Non -Agenda Item 3/30/2022 ENGINEERING (621) Submitted Date Division / Department Action Recommendation: Approval of a resolution to award RFQ 22-01, Selection #3 to McClelland Consulting Engineers, Inc and Olsson Associates, Inc. as primary providers based on rates provided and availability for on -call surveying services as needed through April 30, 2023. Budget Impact: Account Number Fund Project Number Project Title Budgeted Item? No Current Budget $ Funds Obligated $ Current Balance Does item have a cost? No Budget Adjustment Attached? No Purchase Order Number: Change Order Number: Original Contract Number: Comments: Item Cost $ Budget Adjustment $ Remaining Budget V20210527 Previous Ordinance or Resolution # Approval Date: CITY OF FAYETTEVILLE ARKANSAS MEETING OF APRIL 19, 2022 TO: Mayor and City Council THRU: Susan Norton, Chief of Staff Chris Brown, Public Works Director CITY COUNCIL MEMO FROM: Matt Casey, Engineering Design Manager DATE: March 30,2022 SUBJECT: Approval of a resolution to award RFQ 22-01, Selection #3 to McClelland Consulting Engineers, Inc and Olsson Associates, Inc. as primary providers based on rates provided and availability for on -call surveying services as needed through April 30, 2023. RECOMMENDATION: Approval of a resolution to award RFQ 22-01, Selection #3 to McClelland Consulting Engineers, Inc and Olsson Associates, Inc. as primary providers based on rates provided and availability for on -call surveying services as needed through April 30, 2023. BACKGROUND: The Engineering Division has a two -person survey crew as part of the design team. The survey crew provides surveying services to multiple City Divisions in addition to the surveys needed for the in-house projects designed by the City engineers. As a result, the current workload for the survey crew is quite large. With the potential for many projects to begin in 2022, additional surveying services may be required. DISCUSSION: An engineering selection committee selected McClelland Consulting Engineers, Inc. and Olsson Associates, Inc. to be used for on -call surveying services for various city projects until April 30, 2023. BUDGET/STAFF IMPACT: Funds for the material testing have been budgeted in various capital projects with the Sales Tax Capital Improvements Fund, the Transportation Bond Fund, Drainage Bond Fund and the Water and Sewer Fund. Attachments: Standard Rate Schedules Mailing Address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 1 2 3 olsson 2022 Springfield/Joplin/Fayetteville Survey Billing Rate Schedule Classification Hourly Rate Team Leader $170.00 Senior Surveyor $138.00 Surveyor $110.00 Associate Surveyor $85.00 Assistant Surveyor $65.00 Senior Technician $95.00 Associate Technician $80.00 Assistant Technician $65.00 1 Man Field Crew $130.00 2 Man Field Crew $175.00 Equipment Daily Rate Boat $50.00 ATV $50.00 HD Scanner $500.00 Drone $375.00 Lidar $2,500.00 Travel Mileage (Portal to Portal) Mile $0.75 Hotel Daily $140.00 Meals Daily $50.00 Additional Notes These Unit Fees are in effect until January 1, 2023. Services and fees not listed above will be quoted upon request. Services on weekends, holidays, and in excess of 8-hours/day will be charged 1.5 times the unit fee. Subcontracted services will be invoiced at our cost plus 20% McCLELLAND R"CE� CONSULTING ENGINEERS, INC. 2022 McCLELLAND CONSULTING ENGINEERS, INC. *STANDARD HOURLY RATES Chief Draftsman $95 - $110 Clerical $45 - $75 Construction Observer $70 - $140 Draftsman $65 - $95 Environmental Scientist/Designer $105 - $120 Geotech Engineer $85 - $170 GIS Technician $80 - $140 HR/Payroll Admin $75-$100 Landscape Architect $90 - $140 Media Specialist $80 - $100 Principal $160 - $240 Project Accountant $70 - $155 Project Designer $80 - $140 Project Engineer $120 - $175 Project Manager $120 - $200 Registered Land Surveyor $95 - $140 Soils Lab Technician $50 - $135 Specification Writer $50 - $90 Sr. Project Manager $140 - $230 Survey (2 man or Robotic) Crew $115 - $160 Survey (3 man) Crew $135 - $195 Survey Field (1 Man or Rodman) $45 - $105 Survey GPS $75 - $130 Survey Technician $65 - $95 Water Lab Supervisor $70 - $120 Water Lab Tech $50 - $95 Expenses @ Cost Mileage .585/mi** * Standard Hourly Rates may be adjusted annually in accordance with the normal salary review practices of McClelland Consulting Engineers. **Subject to change based on Internal Revenue Service (IRS) Guidelines/ Regulations