HomeMy WebLinkAbout51-23 RESOLUTION0 113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 Resolution: 51-23 File Number: 2023-423 CRAFTON, TULL AND ASSOCIATES, INC. - AMENDMENT #3 - 2019 TRAIL IMPROVEMENT BOND PROJECT: A RESOLUTION TO APPROVE AMENDMENT NO. 3 TO THE CONTRACT WITH CRAFTON, TULL AND ASSOCIATES, INC. FOR ADDITIONAL DESIGN AND CONSTRUCTION MANAGEMENT SERVICES ASSOCIATED WITH THE MISSION BOULEVARD TRAIL AND STREET IMPROVEMENTS PROJECT IN THE AMOUNT OF $58,300.00, AND TO APPROVE A BUDGET ADJUSTMENT — 2019 TRAIL IMPROVEMENT BOND PROJECT WHEREAS, on July 7, 2020, the City Council passed Resolution 181-20 to approve a Contract with Cr-afton, Tull and Associates, Inc. for the design of the Mission Boulevard Trail and Street Improvements Project; and WHEREAS, Amendment No. 3 addresses additional design services to include plan modifications to meet ARDOT permit requirements, utility relocation coordination, design of pedestrian push buttons, and conduit for the North Street intersection; construction management services as necessary; and observation services during construction. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves Amendment No. 3 to the contract with Craft, Tull and Associates, Inc., a copy of which is attached to this Resolution, for additional design and construction management services related to the Mission Boulevard Trail and Street Improvements Project in the amount of $58,300.00. Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment, a copy of which is attached to this Resolution. PASSED and APPROVED on March 7, 2023 Page J Attest: ERK . TRt \>: O\TY OF �: FAYETTEVIL, Kara Pazmq Ciry ClerkTreasurer L`L •, y ':J�S'.PkA NSPr' CITY OF W41iFAYETTEVILLE ARKANSAS MEETING OF MARCH 7, 2023 TO: Mayor Jordan and City Council THRU: Chris Brown, Public Works Director Susan Norton, Chief of Staff FROM: Matt Mihalevich, Active Transportation Manager DATE: CITY COUNCIL MEMO SUBJECT: 2023-423 Amendment #3 with Crafton, Tull and Associates for design and construction management assistance for the Mission Blvd. Trail RECOMMENDATION: 2023-423 Staff recommends approval of contract amendment #3 in the amount of $58,300 with Crafton, Tull & Associates, Inc. to provide continued professional services for the design and construction management assistance for the Mission Blvd. Trail and approval of a budget adjustment. BACKGROUND: In July of 2020, a contract was approved by Resolution 181-20 with Crafton, Tull & Associates for the design of the Mission Blvd. Trail and street improvements project in the amount of $211,785.00. Amendment 1 was a no cost change in scope to remove the roundabout design at North Street and Mission Blvd. that was approved administratively. Amendment 2 was approved by Resolution 32-22 on February 1st, 2022 and included the preparation of the right of way documents in an additional amount of $59,000. The goal of the Mission Blvd. Trail and Street Improvements Project is to complete a missing link for the east side of Fayetteville by connecting the existing trail on Mission Blvd, Old Wire Rd. Trail and Niokaska Creek Trail to downtown and the Razorback Greenway. This 1.5-mile corridor is proposed to include a 10 and 12- foot-wide shared use paved trail with green space separation including trees, lighting, curb and storm drainage with a focus on bike and pedestrian safety. This project is identified as a priority in the Active Transportation Master Plan and as a catalyst project in the Northwest Arkansas Bicycle & Pedestrian Plan. In addition, this project ranks number 6 by the Mobility Plan project prioritization scoring matrix. DISCUSSION: Crafton, Tull & Associates, Inc. has developed final plans for the project and have been working through the ARDOT permitting process for approval to start construction. They have completed the original scope of the design but additional work related to permitting has exceeded the contract amount. Also, as we move into construction, we would like Crafton, Tull & Associates to provide limited construction management services. The additional design services will include plan modifications to meet ARDOT permit requirements, utility relocation coordination, design of pedestrian push buttons and conduit for the North Street intersection, and construction management services as necessary for clarification and observation services during construction. The contract will be paid based on hourly rates for work completed, up to the total contract amount. Design Mailing address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 should be complete and ready for construction in Spring 2023. BUDGET/STAFF IMPACT: The design for this project will be paid for with the funds from the 2022 Trails Bond Funds. Fee Summary: Primary Contract $211,785 Addendum #1 $0 Addendum #2 $59,000 Addendum #3 $58,300 ATTACHMENTS: 2023-423 SRF Crafton Tull CA3 - Mission Blvd, 2023-423 BA Crafton Tull CA3 - Mission Blvd, Crafton Tull - Mission - Amendment 3 Mailing address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 City of Fayetteville, Arkansas 113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 - Legislation Text File #: 2023-423 2023-423 Amendment #3 with Crafton, Tull and Associates for design and construction management assistance for the Mission Blvd. Trail A RESOLUTION TO APPROVE AMENDMENT NO. 3 TO THE CONTRACT WITH CRAFTON, TULL AND ASSOCIATES, INC. FOR ADDITIONAL DESIGN AND CONSTRUCTION MANAGEMENT SERVICES ASSOCIATED WITH THE MISSION BOULEVARD TRAIL AND STREET IMPROVEMENTS PROJECT IN THE AMOUNT OF $58,300.00, AND TO APPROVE A BUDGET ADJUSTMENT — 2019 TRAIL IMPROVEMENT BOND PROJECT WHEREAS, on July 7, 2020, the City Council passed Resolution 181-20 to approve a Contract with Crafton, Tull and Associates, Inc. for the design of the Mission Boulevard Trail and Street Improvements Project; and WHEREAS, Amendment No. 3 addresses additional design services to include plan modifications to meet ARDOT permit requirements, utility relocation coordination, design of pedestrian push buttons, and conduit for the North Street intersection; construction management services as necessary; and observation services during construction. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves Amendment No. 3 to the contract with Craft, Tull and Associates, Inc., a copy of which is attached to this Resolution, for additional design and construction management services related to the Mission Boulevard Trail and Street Improvements Project in the amount of $58,300.00. Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment, a copy of which is attached to this Resolution. Page 1 Matt Mihalevich Submitted By City of Fayetteville Staff Review Form 2023-423 Item ID 3/7/2023 City Council Meeting Date - Agenda Item Only N/A for Non -Agenda Item 2/15/2023 ENGINEERING (621) Submitted Date Division / Department Action Recommendation: Staff recommends approval of contract amendment #3 in the amount of $58,300 with Crafton, Tull & Associates, Inc. to provide continued professional services for the design and construction management assistance for the Mission Blvd. Trail and approval of a budget adjustment. 4703.860.7302-5860.02 Account Number 46030.7302 Project Number Budgeted Item? Yes Does item have a direct cost? Yes Is a Budget Adjustment attached? Yes Purchase Order Number: Change Order Number: Original Contract Number: Comments: Budget Impact: Trails Projects (2022 Bonds) Fund Trail Projects (Bonds) - Mission Blvd Corridor Total Amended Budget Expenses (Actual+Encum) Available Budget Item Cost Budget Adjustment Remaining Budget Project Title $ 5,093,777.00 $ 1,497,149.25 Is 3,596,627.75 $ 58,300.00 3,538,327.75 V20221130 Previous Ordinance or Resolution # 181-20 & 32-22 Approval Date: City of Fayetteville, Arkansas - Budget Adjustment (Agenda) Budget Year Division ENGINEERING (621) Adjustment Number 2023 /Org2 Requestor: Matt Mihalevich BUDGET ADJUSTMENT DESCRIPTION / JUSTIFICATION: Staff recommends approval of contract amendment #3 in the amount of $58,300 with Crafton, Tull & Associates, Inc. to provide continued professional services for the design and construction management assistance for the Mission Blvd. Trail and approval of a budget adjustment. RESOLUTION/ORDINANCE COUNCIL DATE: 3/7/2023 ITEM ID#: 2023-423 Nolly Black 21912023 5:37 61n Budget Division Date TYPE: D - (City Council) JOURNAL #: GLDATE: CHKD/POSTED: TOTAL - - v.2023117 Increase / (Decrease) Proiect.Sub# Account Number Expense Revenue Project Sub.Detl AT Account Name 4703.860.7302-5860.02 58,300 - 46030 7302 EX Capital Prof Svcs - Engineering/Architects 4703.860.7999-5899.00 (58,300) - 46030 7999 EX Unallocated - Budget K:\Trails\Projects\Mission Blvd Trail\Crafton-Tull\Amendment 3 - City Council\2023-423 BA Crofton Tull CA3 - Mission Blvd 1 of 1 AMENDMENT NO.3 TO OWNER -ENGINEER AGREEMENT Subject of Amendment: Modification of Services 1. Background Data: a. Effective Date of OWNER -ENGINEER Agreement: 7/7/2020 b. OWNER: City of Fayetteville Arkansas C. ENGINEER: Crafton Tull & Associates. Inc d. Project: Mission Boulevard Trail and Street Improvements 2. Nature of Amendment The scope of services is being updated to include additional design services for a modified scope a the Mission Blvd. & North Street intersection as well as construction phase services. 3. Description of Modifications See Attachment 1, "Modifications" OWNER and ENGINEER hereby agree to modify the above -referenced Agreement as set forth in this Amendment. All provisions of the ement not odified by this or previous Amendments remain in effect. The Effective Date of this Amendment is f.�1 OWNER: Cl B} Ti Date Signed: 83 — O—j - 7.3 ENGINEER: CRAFTON, TULL & ASSOCIATES, INC. Title: Vice president Date signed: 0210812023 EICDC No. E-501 1999 Edition Page I of 2 ATTACHMENT 1 MODIFICATIONS • Additional Services to be performed by ENGINEER: Mission & North Street Intersection: Redesign of traffic signal improvements to re -use existing signal poles and modifications to road widening north of the intersection. Construction phase consultation: ■ Includes periodic site visits and field change engineering as requested by the City of Fayetteville. Fee includes 120 hours of project manager/project engineer time. ■ Does not include construction observation or review/approval of contractor pay applications. Additional effort for requirements by ARDOT and Washington County regarding lighting and ROW documents, respectively. • Modifications to Payment to ENGINEER: o Modification to Contract Exhibit A-2 (ROW Documents): $9,500 o Modification to Contract Exhibit A-3 (Street/Drainage Design): $30,000 ■ Redesign of North Street signal/approaches: $12,500 ■ Design of Lighting Plans in accordance with ARDOT requirements: $17,500 o Addition of construction phase services: $18,800 Fee Summary: Primary Contract $ 211,785 Addendum #1 $ 0 Addendum #2 $ 59,000 Addendum #3 $ 58,300 Revised Total Compensation $ 329,085 EJCDC No. E-501 1999 Edition Page 2 of 2