File Number: 2023-423
CRAFTON, TULL AND ASSOCIATES, INC. - AMENDMENT #3 - 2019 TRAIL IMPROVEMENT BOND
PROJECT:
A RESOLUTION TO APPROVE AMENDMENT NO. 3 TO THE CONTRACT WITH CRAFTON, TULL AND
ASSOCIATES, INC. FOR ADDITIONAL DESIGN AND CONSTRUCTION MANAGEMENT SERVICES
ASSOCIATED WITH THE MISSION BOULEVARD TRAIL AND STREET IMPROVEMENTS PROJECT IN THE
AMOUNT OF $58,300.00, AND TO APPROVE A BUDGET ADJUSTMENT — 2019 TRAIL IMPROVEMENT
BOND PROJECT
WHEREAS, on July 7, 2020, the City Council passed Resolution 181-20 to approve a Contract with Cr-afton, Tull and
Associates, Inc. for the design of the Mission Boulevard Trail and Street Improvements Project; and
WHEREAS, Amendment No. 3 addresses additional design services to include plan modifications to meet ARDOT
permit requirements, utility relocation coordination, design of pedestrian push buttons, and conduit for the North Street
intersection; construction management services as necessary; and observation services during construction.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE,
ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves Amendment No. 3 to the
contract with Craft, Tull and Associates, Inc., a copy of which is attached to this Resolution, for additional design and
construction management services related to the Mission Boulevard Trail and Street Improvements Project in the
amount of $58,300.00.
Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment, a copy of
which is attached to this Resolution.
PASSED and APPROVED on March 7, 2023
Page J
Attest: ERK . TRt
\>: O\TY OF
�: FAYETTEVIL,
Kara Pazmq Ciry ClerkTreasurer L`L •, y
':J�S'.PkA NSPr'
CITY OF
W41iFAYETTEVILLE
ARKANSAS
MEETING OF MARCH 7, 2023
TO: Mayor Jordan and City Council
THRU: Chris Brown, Public Works Director
Susan Norton, Chief of Staff
FROM: Matt Mihalevich, Active Transportation Manager
DATE:
CITY COUNCIL MEMO
SUBJECT: 2023-423 Amendment #3 with Crafton, Tull and Associates for design and
construction management assistance for the Mission Blvd. Trail
RECOMMENDATION:
2023-423
Staff recommends approval of contract amendment #3 in the amount of $58,300 with Crafton, Tull &
Associates, Inc. to provide continued professional services for the design and construction management
assistance for the Mission Blvd. Trail and approval of a budget adjustment.
BACKGROUND:
In July of 2020, a contract was approved by Resolution 181-20 with Crafton, Tull & Associates for the design of
the Mission Blvd. Trail and street improvements project in the amount of $211,785.00. Amendment 1 was a no
cost change in scope to remove the roundabout design at North Street and Mission Blvd. that was approved
administratively. Amendment 2 was approved by Resolution 32-22 on February 1st, 2022 and included the
preparation of the right of way documents in an additional amount of $59,000.
The goal of the Mission Blvd. Trail and Street Improvements Project is to complete a missing link for the east
side of Fayetteville by connecting the existing trail on Mission Blvd, Old Wire Rd. Trail and Niokaska Creek
Trail to downtown and the Razorback Greenway. This 1.5-mile corridor is proposed to include a 10 and 12-
foot-wide shared use paved trail with green space separation including trees, lighting, curb and storm drainage
with a focus on bike and pedestrian safety. This project is identified as a priority in the Active Transportation
Master Plan and as a catalyst project in the Northwest Arkansas Bicycle & Pedestrian Plan. In addition, this
project ranks number 6 by the Mobility Plan project prioritization scoring matrix.
DISCUSSION:
Crafton, Tull & Associates, Inc. has developed final plans for the project and have been working through the
ARDOT permitting process for approval to start construction. They have completed the original scope of the
design but additional work related to permitting has exceeded the contract amount. Also, as we move into
construction, we would like Crafton, Tull & Associates to provide limited construction management services.
The additional design services will include plan modifications to meet ARDOT permit requirements, utility
relocation coordination, design of pedestrian push buttons and conduit for the North Street intersection, and
construction management services as necessary for clarification and observation services during construction.
The contract will be paid based on hourly rates for work completed, up to the total contract amount. Design
Mailing address:
113 W. Mountain Street www.fayetteville-ar.gov
Fayetteville, AR 72701
should be complete and ready for construction in Spring 2023.
BUDGET/STAFF IMPACT:
The design for this project will be paid for with the funds from the 2022 Trails Bond Funds.
Fee Summary:
Primary Contract $211,785
Addendum #1 $0
Addendum #2 $59,000
Addendum #3 $58,300
ATTACHMENTS: 2023-423 SRF Crafton Tull CA3 - Mission Blvd, 2023-423 BA Crafton Tull CA3 - Mission
Blvd, Crafton Tull - Mission - Amendment 3
Mailing address:
113 W. Mountain Street www.fayetteville-ar.gov
Fayetteville, AR 72701
City of Fayetteville, Arkansas 113 West Mountain Street
Fayetteville, AR 72701
(479) 575-8323
- Legislation Text
File #: 2023-423
2023-423 Amendment #3 with Crafton, Tull and Associates for design and construction
management assistance for the Mission Blvd. Trail
A RESOLUTION TO APPROVE AMENDMENT NO. 3 TO THE CONTRACT WITH CRAFTON,
TULL AND ASSOCIATES, INC. FOR ADDITIONAL DESIGN AND CONSTRUCTION
MANAGEMENT SERVICES ASSOCIATED WITH THE MISSION BOULEVARD TRAIL AND
STREET IMPROVEMENTS PROJECT IN THE AMOUNT OF $58,300.00, AND TO APPROVE A
BUDGET ADJUSTMENT — 2019 TRAIL IMPROVEMENT BOND PROJECT
WHEREAS, on July 7, 2020, the City Council passed Resolution 181-20 to approve a Contract with
Crafton, Tull and Associates, Inc. for the design of the Mission Boulevard Trail and Street
Improvements Project; and
WHEREAS, Amendment No. 3 addresses additional design services to include plan modifications to
meet ARDOT permit requirements, utility relocation coordination, design of pedestrian push buttons,
and conduit for the North Street intersection; construction management services as necessary; and
observation services during construction.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves Amendment No.
3 to the contract with Craft, Tull and Associates, Inc., a copy of which is attached to this Resolution, for
additional design and construction management services related to the Mission Boulevard Trail and
Street Improvements Project in the amount of $58,300.00.
Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget
adjustment, a copy of which is attached to this Resolution.
Page 1
Matt Mihalevich
Submitted By
City of Fayetteville Staff Review Form
2023-423
Item ID
3/7/2023
City Council Meeting Date - Agenda Item Only
N/A for Non -Agenda Item
2/15/2023 ENGINEERING (621)
Submitted Date Division / Department
Action Recommendation:
Staff recommends approval of contract amendment #3 in the amount of $58,300 with Crafton, Tull & Associates,
Inc. to provide continued professional services for the design and construction management assistance for the
Mission Blvd. Trail and approval of a budget adjustment.
4703.860.7302-5860.02
Account Number
46030.7302
Project Number
Budgeted Item? Yes
Does item have a direct cost? Yes
Is a Budget Adjustment attached? Yes
Purchase Order Number:
Change Order Number:
Original Contract Number:
Comments:
Budget Impact:
Trails Projects (2022 Bonds)
Fund
Trail Projects (Bonds) - Mission Blvd Corridor
Total Amended Budget
Expenses (Actual+Encum)
Available Budget
Item Cost
Budget Adjustment
Remaining Budget
Project Title
$
5,093,777.00
$
1,497,149.25
Is 3,596,627.75
$
58,300.00
3,538,327.75
V20221130
Previous Ordinance or Resolution # 181-20 & 32-22
Approval Date:
City of Fayetteville, Arkansas - Budget Adjustment (Agenda)
Budget Year Division ENGINEERING (621) Adjustment Number
2023 /Org2
Requestor: Matt Mihalevich
BUDGET ADJUSTMENT DESCRIPTION / JUSTIFICATION:
Staff recommends approval of contract amendment #3 in the amount of $58,300 with Crafton, Tull & Associates, Inc.
to provide continued professional services for the design and construction management assistance for the Mission
Blvd. Trail and approval of a budget adjustment.
RESOLUTION/ORDINANCE
COUNCIL DATE: 3/7/2023
ITEM ID#: 2023-423
Nolly Black
21912023 5:37 61n
Budget Division Date
TYPE: D - (City Council)
JOURNAL #:
GLDATE:
CHKD/POSTED:
TOTAL - - v.2023117
Increase / (Decrease) Proiect.Sub#
Account Number Expense Revenue Project Sub.Detl AT Account Name
4703.860.7302-5860.02 58,300 - 46030 7302 EX Capital Prof Svcs - Engineering/Architects
4703.860.7999-5899.00 (58,300) - 46030 7999 EX Unallocated - Budget
K:\Trails\Projects\Mission Blvd Trail\Crafton-Tull\Amendment 3 - City Council\2023-423 BA Crofton Tull CA3 - Mission Blvd 1 of 1
AMENDMENT NO.3 TO OWNER -ENGINEER AGREEMENT
Subject of Amendment: Modification of Services
1. Background Data:
a. Effective Date of OWNER -ENGINEER Agreement: 7/7/2020
b. OWNER: City of Fayetteville Arkansas
C. ENGINEER: Crafton Tull & Associates. Inc
d. Project: Mission Boulevard Trail and Street Improvements
2. Nature of Amendment
The scope of services is being updated to include additional design services for a modified scope a the Mission Blvd. &
North Street intersection as well as construction phase services.
3. Description of Modifications
See Attachment 1, "Modifications"
OWNER and ENGINEER hereby agree to modify the above -referenced Agreement as set forth in this Amendment. All
provisions of the ement not odified by this or previous Amendments remain in effect. The Effective Date of this
Amendment is f.�1
OWNER:
Cl
B}
Ti
Date Signed: 83 — O—j - 7.3
ENGINEER:
CRAFTON, TULL & ASSOCIATES, INC.
Title: Vice president
Date signed: 0210812023
EICDC No. E-501
1999 Edition
Page I of 2
ATTACHMENT 1
MODIFICATIONS
• Additional Services to be performed by ENGINEER:
Mission & North Street Intersection: Redesign of traffic signal improvements to re -use existing signal
poles and modifications to road widening north of the intersection.
Construction phase consultation:
■ Includes periodic site visits and field change engineering as requested by the City of
Fayetteville. Fee includes 120 hours of project manager/project engineer time.
■ Does not include construction observation or review/approval of contractor pay applications.
Additional effort for requirements by ARDOT and Washington County regarding lighting and ROW
documents, respectively.
• Modifications to Payment to ENGINEER:
o Modification to Contract Exhibit A-2 (ROW Documents): $9,500
o Modification to Contract Exhibit A-3 (Street/Drainage Design): $30,000
■ Redesign of North Street signal/approaches: $12,500
■ Design of Lighting Plans in accordance with ARDOT requirements: $17,500
o Addition of construction phase services: $18,800
Fee Summary:
Primary Contract
$
211,785
Addendum #1
$
0
Addendum #2
$
59,000
Addendum #3
$
58,300
Revised Total Compensation $ 329,085