HomeMy WebLinkAbout233-22 RESOLUTION113 West Mountain Street
Fayetteville, AR 72701
(479) 575-8323
Resolution: 233-22
File Number: 2022-0865
U.S. GEOLOGICAL SURVEY JOINT FUNDING AGREEMENT:
A RESOLUTION TO APPROVE A JOINT FUNDING AGREEMENT WITH THE U.S.
GEOLOGICAL SURVEY FOR STREAM GAUGE OPERATION AND MAINTENANCE AND
WATER QUALITY SAMPLING AND MONITORING AT VARIOUS LOCATIONS IN THE
CITY OF FAYETTEVILLE IN 2022 WITH THE AMOUNT PAID BY THE CITY NOT TO
EXCEED $61,5 82.00
WHEREAS, since 1998, the City of Fayetteville has participated in a joint funding agreement with the
U.S. Geological Survey for the operation and maintenance of urban stream gauging stations to record
data concerning rainfall and runoff; and
WHEREAS, in 2015, the City modified its agreement with the USGS to begin monitoring major
pollutants at Town Branch and Mud Creek and the City will continue this monitoring to provide more
accurate information regarding the pollutants leaving the City at these points; and
WHEREAS, the USGS, which purchased and installed the monitoring equipment at no cost to the
City, provides these services at a cost much lower than the City could receive from any other provider;
and
WHEREAS, pursuant to A.C.A. §14-58-104 the City may renew or extend the term of an existing
contract without soliciting bids.
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves a joint funding
Page 1 Printed on 1015122
Resolution: 233-22
File Number: 2022-0865
agreement, a copy of which is attached to this Resolution and made a part hereof, between the City of
Fayetteville and the U.S. Geological Survey for stream gauge operation and maintenance and water
quality sampling and monitoring at various locations in the City of Fayetteville in 2022 with the amount
paid by the City of Fayetteville not to exceed $61,582.00
PASSED and APPROVED on 10/4/2022
Attest:
fA. L �. �P,lt�l,0�1 C�CDu CMG
Kara Paxton, City Clerk Treasurer 1
A{��iy�srtlrr
R
FAYETTr1'ILLE :
c TON
Page 2 Printed on 1015122
City of Fayetteville, Arkansas 113 West Mountain Street
Fayetteville, AR 72701
(479)575-8323
Text File
File Number: 2022-0865
Agenda Date: 10/4/2022 Version: 1 Status: Passed
In Control: City Council Meetinq File Type: Resolution
Agenda Number: A.16
U.S. GEOLOGICAL SURVEY JOINT FUNDING AGREEMENT:
A RESOLUTION TO APPROVE A JOINT FUNDING AGREEMENT WITH THE U.S. GEOLOGICAL
SURVEY FOR STREAM GAUGE OPERATION AND MAINTENANCE AND WATER QUALITY
SAMPLING AND MONITORING AT VARIOUS LOCATIONS IN THE CITY OF FAYETTEVILLE IN
2022 WITH THE AMOUNT PAID BY THE CITY NOT TO EXCEED $61,582.00
WHEREAS, since 1998, the City of Fayetteville has participated in a joint funding agreement with the U.S.
Geological Survey for the operation and maintenance of urban stream gauging stations to record data
concerning rainfall and runoff, and
WHEREAS, in 2015, the City modified its agreement with the USGS to begin monitoring major pollutants at
Town Branch and Mud Creek and the City will continue this monitoring to provide more accurate information
regarding the pollutants leaving the City at these points; and
WHEREAS, the USGS, which purchased and installed the monitoring equipment at no cost to the City,
provides these services at a cost much lower than the City could receive from any other provider; and
WHEREAS, pursuant to A.C.A. §14-58-104 the City may renew or extend the term of an existing contract
without soliciting bids.
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves a joint funding
agreement, a copy of which is attached to this Resolution and made a part hereof, between the City of
Fayetteville and the U.S. Geological Survey for stream gauge operation and maintenance and water quality
sampling and monitoring at various locations in the City of Fayetteville in 2022 with the amount paid by the City
of Fayetteville not to exceed $61,582.00
City of Fayetteville, Arkansas Page 1 Printed on 101512022
City of Fayetteville Staff Review Form
2022-0865
Legistar File ID
10/4/2022
City Council Meeting Date - Agenda Item Only
N/A for Non -Agenda Item
Chris Brown 9/13/2022 ENGINEERING (621)
Submitted By Submitted Date Division / Department
Action Recommendation:
Approval of the 2022 USGS joint funding agreement in the amount of $61,582.00 (City's share) for stream gauge
operation and maintenance as well as water quality sampling and monitoring for various locations within the City
of Fayetteville
Budget Impact:
4470.621.8810-5314.00 and 5400.730.5800-
5314.00
Account Number
02108.1 and 13018.1
Project Number
Budgeted Item? Yes
Does item have a cost? Yes
Budget Adjustment Attached? No
Purchase Order Number:
Change Order Number:
Original Contract Number:
Comments:
4470-Sales Tax Capital Improvement 5400-
Water and Sewer
Fund
Other Drainage Improvements and Wastewater
Treatment/Water Quality
Current Budget
Funds Obligated
Current Balance
Item Cost
Budget Adjustment
Remaining Budget
Project Title
$ 1,263,346.00
$ 175,330.54
$ 1,088,015.46
$ 61,582.00
S 1,026,433.46
V20210527
Previous Ordinance or Resolution #
Approval Date:
CITY OF
FAYETTEVILLE
ARKANSAS
MEETING OF OCTOBER 4, 2022
TO: Mayor and City Council
THRU: Susan Norton, Chief of Staff
Chris Brown, Public Works Director
FROM: Alan Pugh, Staff Engineer
DATE: September 12, 2022
CITY COUNCIL MEMO
SUBJECT: Approval of the 2022 USGS joint funding agreement in the amount of
$61,582.00 (City's share) for stream gauge operation and maintenance as
well as water quality sampling and monitoring for various locations within
the City of Fayetteville
RECOMMENDATION:
Staff Recommends approval of the 2022 USGS joint funding agreement in the amount of
$61,582.00 (City's share) for stream gauge operation and maintenance as well as water quality
sampling and monitoring for various locations within the City of Fayetteville.
BACKGROUND:
In 2015 the City of Fayetteville modified its contract with USGS to begin monitoring both flow
and major pollutants at two location on major outfalls from the City, Town Branch and Mud
Creek . This data is being gathered continuously and through sampling at various times in order
to more closely model the pollutant concentrations in these streams. This combined with the
flow data will give accurate information on the total amount of the various constituents being
measured leaving the City at these points. The information produced by the gauges can be
viewed on the USGS website by following:
Town Branch: http://waterdata.usgs.gov/usa/nwis/uv?07048495
Mud Creek: http://waterdata.usgs.gov/ar/nwis/uv?site no=071948095
DISCUSSION:
The proposed program would change slightly from the 2021 program. The proposed program
would again include a continuous monitor stream gauge with sampling and determination of
various pollutant concentrations at two locations within the City of Fayetteville. However, one of
the locations is proposed to move from the Armstrong Bridge at Town Branch to the
Morningside Bridge at Town Branch directly upstream. The main reason is to avoid backwater
impacts from West Fork White River currently influencing the gauge. The gauge will be moved
after the bridge is removed from the scour critical list. The other revision includes a reduction in
physical sampling to quarterly based on the fact a long history has been established and the
Mailing Address:
113 W. Mountain Street www.fayetteville-ar.gov
Fayetteville, AR 72701
difficulty in obtaining samples in a flash storm event. This sampling frequency will still comply
with our MS4 permit.
The locations would continue to track continuous information regarding flow, turbidity,
temperature and conductance. The sampling at these locations would provide a mechanism in
which these constituents could be related to other pollutants such as total suspended solids
(TSS) essentially providing relatively accurate continuous pollutant loading information.
The first station is located on Town Branch near Armstrong currently and would monitor a
largely developed area that discharges into the West Fork White River. The West Fork White
River currently has Total Maximum Daily Load (TMDL) defined by ADEQ for turbidity.
Monitoring just upstream of the West Fork allows the City to determine Fayetteville's
contribution to this TMDL. Results indicate that the stream may meet the TMDL for base flow
conditions, however, it much higher during storm events. If/when the gauge is moved it will
continue to run in the same fashion as that listed here.
The second station is located on Mud Creek near Greg Avenue and monitors a largely
developed area that discharges into the Illinois River via Clear Creek. Clear Creek is currently
on the impaired list for pathogens, however, has been found to meet water quality standards
over the last few years. This gauge is in place to meet the sampling requirements in the
Municipal Separate Storm Sewer (MS4) permit for discharge into an impaired waterway.
The total cost for the program described above would be $66,582 with the USGS contributing
$5,000 in Cooperative Funding for a total cost to the City of Fayetteville of $61,582. In addition
to the Cooperative Funds, the USGS provided and installed the equipment in 2015 at no cost to
the City.
BUDGET/STAFF IMPACT:
As stated, the total cost of the program would be $66,582 with the USGS contributing $5,000 in
funding. The remaining $61,582 would be split between projects managed by the Engineering
Division and the Water and Sewer Department. As the information collected would benefit both
departments equally, it is proposed to split the required funds 50/50 between the two projects,
or a total of $30,791 each.
Attachments:
Proposed Agreement with USGS
United States Department of the Interior
U.S. GEOLOGICAL SURVEY
Lower Mississippi -Gulf Water Science Center
640 Grassmere Park, Suite 100
Nashville, TN 37211
Mr. Lioneld Jordan
Mayor
City of Fayetteville
113 West Mountain Street
Fayetteville, AR 72701
Dear Mr. Jordan:
August 4, 2022
This is a standard joint -funding agreement between the City of Fayetteville and the United States Geological Survey
(USGS) for two stream gages and two continuous water -quality meters, one on Mud Creek and one on Town Branch,
during the period January 1, 2022 through December 31, 2022 in the amount of $61,582 from your agency. U.S.
Geological Survey contributions for this agreement are $5,000 for a combined total of $66,582. Please sign and return
one fully -executed original to My-Chae' J. May, Budget Analyst at 3535 S. Sherwood Forest Blvd. Suite 120, Baton
Rouge, LA 70816.
Federal law requires that we have a signed agreement before we start or continue work. Please return the signed
agreement as soon as possible. Please contact Drew Westerman by phone number (501) 228-3643 or email
dawester@usgs.gov to make alternative arrangements.
This is a fixed cost agreement to be billed quarterly via Down Payment Request (automated Form DI-1040). Please
allow 30-days from the end of the billing period for issuance of the bill. If you experience any problems with your
invoice(s), please contact My-Chae May at phone number (225) 298-5481 or email gs-w-lmg_agreements@usgs.gov.
The results of all work performed under this agreement will be available for publication by the U.S. Geological
Survey. We look forward to continuing this and future cooperative efforts in these mutually beneficial water
resources studies.
Sincerely,
Rodney R. Knight
Director, LMG Water Science Center
Enclosure
22MLJFAARDA150 (2)
Form 9-1366
(May 2018)
U.S. Department of the Interior
U.S. Geological Survey
Joint Funding Agreement
FOR
Water Resource Investigations
Customer #: 6000000775
Agreement #: 22MUFAARDA150
Project #: ML009Z5
TIN #: 71-6018462
Fixed Cost Agreement YES[ X ] NO[ ]
THIS AGREEMENT is entered into as of the January 1, 2022, by the U.S. GEOLOGICAL SURVEY, Lower
Mississippi -Gulf Water Science Center, UNITED STATES DEPARTMENT OF THE INTERIOR, party of the first part,
and the City of Fayetteville party of the second part.
1. The parties hereto agree that subject to the availability of appropriations and in accordance with their respective
authorities there shall be operation and maintenance of two stream gages and two continuous water -quality meters,
one on Mud Creek and one on Town Branch; sampling quarterly for nutrients, major anions, inorganics, bacteria, and
suspended sediment at the stream gage on Mud Creek, herein called the program. The USGS legal authority is 43
USC 36C; 43 USC 50, and 43 USC 50b.
2. The following amounts shall be contributed to cover all of the cost of the necessary field and analytical work
directly related to this program. 2(b) include In -Kind -Services in the amount of $0.00
(a) $5,000 by the party of the first part during the period
January 1, 2022 to December 31, 2022
(b) $61,582 by the party of the second part during the period
January 1, 2022 to December 31, 2022
(c) Contributions are provided by the party of the first part through other USGS regional or national programs,
in the amount of: $0
Description of the USGS regional/national program:
(d) Additional or reduced amounts by each party during the above period or succeeding periods as may be
determined by mutual agreement and set forth in an exchange of letters between the parties.
(e) The performance period may be changed by mutual agreement and set forth in an exchange of letters
between the parties.
3. The costs of this program may be paid by either party in conformity with the laws and regulations respectively
governing each party.
4. The field and analytical work pertaining to this program shall be under the direction of or subject to periodic review
by an authorized representative of the party of the first part.
5. The areas to be included in the program shall be determined by mutual agreement between the parties hereto or
their authorized representatives. The methods employed in the field and office shall be those adopted by the party of
the first part to insure the required standards of accuracy subject to modification by mutual agreement.
6. During the course of this program, all field and analytical work of either party pertaining to this program shall be
open to the inspection of the other party, and if the work is not being carried on in a mutually satisfactory manner,
either party may terminate this agreement upon 60 days written notice to the other party.
7. The original records resulting from this program will be deposited in the office of origin of those records. Upon
request, copies of the original records will be provided to the office of the other party.
8. The maps, records or reports resulting from this program shall be made available to the public as promptly as
possible. The maps, records or reports normally will be published by the party of the first part. However, the party of
the second part reserves the right to publish the results of this program, and if already published by the party of the
first part shall, upon request, be furnished by the party of the first part, at cost, impressions suitable for purposes of
reproduction similar to that for which the original copy was prepared. The maps, records or reports published by
either party shall contain a statement of the cooperative relations between the parties. The Parties acknowledge that
scientific information and data developed as a result of the Scope of Work (SOW) are subject to applicable USGS
review, approval, and release requirements, which are available on the USGS Fundamental Science Practices
website (https://www.usgs.gov/about/organization/science-support/science-quality-and-integrity/fundamental-science-
practices).
Form 9-1366 U.S. Department of the Interior Customer #: 6000000775
(May 2018) U.S. Geological Survey Agreement #: 22MUFAARDA150
Joint Funding Agreement Project #: ML009Z5
FOR TIN #: 71-6018462
Water Resource Investigations
9. Billing for this agreement will be rendered quarterly: Invoices not paid within 60 days from the billing date will bear
Interest, Penalties, and Administrative cost at the annual rate pursuant the Debt Collection Act of 1982, (codified at
31 U.S.C. § 3717) established by the U.S. Treasury.
USGS Technical Point of Contact
Customer Technical Point of Contact
Name:
Drew Westerman
Name:
Alan Pugh
Data Chief, AR/TN
Staff Engineer
Address:
401 Hardin Road
Address:
113 West Mountain Street
Little Rock, AR 72211
Fayetteville, AR 72701
Telephone:
(501) 228-3643
Telephone:
(479) 575-8208
Fax:
(501) 228-3601
Fax:
Email:
dawester@usgs.gov
Email:
apugh@fayetteville-ar.gov
USGS Billing Point of Contact
Customer Billing Point of Contact
Name:
My-Chae May
Name
Lioneld Jordan
Budget Analyst
Mayor
Address:
3535 South Sherwood Forest Blvd.
Address:
113 West Mountain Street
Baton Rouge, LA 70816
Fayetteville, Arkansas 72701
Telephone:
(225) 298-5481
Telephone:
(479) 575-8330
Fax:
Fax:
Email:
gs-w-Img_agreements@usgs.gov
Email:
mayor@fayetteville-ar.gov
U.S. Geological Survey
United States
City of Fayetteville
Department of Interior
Signature
By Date: August 4, 2022
Name: Rn R. Knight
Title: Director, LMG Water Science Center
AD: SDW
Signatures
vl�- 1 4 -- _U�)--u-
Name:
Title:
By ' "''�11.
Name: Kn r►� oh�€o+�
Date:
Title: St^irr liL�tN ��iIrpRK 1 P111,,
'
G4� ' G'•
By
Name:
Date-�'��'•
�y..
Title:
— FAti'ETTE', ILLE ;
•