Loading...
HomeMy WebLinkAbout178-22 RESOLUTION113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 Resolution: 178-22 File Number: 2022-0686 CHANGE ORDER NO. 5 TRI STAR CONTRACTORS, LLC: A RESOLUTION TO APPROVE CHANGE ORDER NO. 5 TO THE CONTRACT WITH TRI STAR CONTRACTORS, LLC FOR ADDITIONAL WORK ASSOCIATED WITH THE ZION ROAD - VANTAGE DRIVE TO CROSSOVER ROAD PROJECT IN THE AMOUNT OF $264,597.22, TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $120,000.00, AND TO APPROVE A BUDGET ADJUSTMENT - 2019 TRANSPORTATION BOND PROJECT WHEREAS, on June 24, 2020, the City Council passed Resolution 194-20 to approve a Contract with Tri Star Contractors, LLC for the construction of the Zion Road - Vantage Drive to Crossover Road Project; and WHEREAS, Change Order No. 5 includes the addition of quantities and bid items necessary for roadway repair due to poor soil conditions. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves Change Order No. 5 to the Contract with Tri Star Contractors, LLC in the amount of $264,597.22 for additional work associated with the Zion Road - Vantage Drive to Crossover Road Project, and further approves a project contingency in the amount of $120,000.00. Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment, a copy of which is attached to this Resolution. Page 1 Printed on 8118122 Resolution: 178-22 File Number: 2022-0686 PASSED and APPROVED on 8/16/2022 '`%,%ItIlrrrfit, ,I. Attest: ��.� ; ! '9 r .tom 6\1 Y 0,�:.S� �. • l 1� • •Sn i FAYETTEVILLE, rr.• : �� c ,� Kara Paxton, City Clerk Treasurerr�-s*•9' h'At�t`� � 1 Page 2 Printed on 8118122 City of Fayetteville, Arkansas 113 West Mountain Street Fayetteville, AR 72701 (479)575-8323 Text File File Number: 2022-0686 Agenda Date: 8/16/2022 Version: 1 Status: Passed In Control: City Council Meetinq File Type: Resolution Agenda Number: A.4 CHANGE ORDER NO.5 TRI STAR CONTRACTORS, LLC: A RESOLUTION TO APPROVE CHANGE ORDER NO. 5 TO THE CONTRACT WITH TRI STAR CONTRACTORS, LLC FOR ADDITIONAL WORK ASSOCIATED WITH THE ZION ROAD - VANTAGE DRIVE TO CROSSOVER ROAD PROJECT IN THE AMOUNT OF $264,597.22, TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $120,000.00, AND TO APPROVE A BUDGET ADJUSTMENT - 2019 TRANSPORTATION BOND PROJECT WHEREAS, on June 24, 2020, the City Council passed Resolution 194-20 to approve a Contract with Tri Star Contractors, LLC for the construction of the Zion Road - Vantage Drive to Crossover Road Project; and WHEREAS, Change Order No. 5 includes the addition of quantities and bid items necessary for roadway repair due to poor soil conditions. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves Change Order No. 5 to the Contract with Tri Star Contractors, LLC in the amount of $264,597.22 for additional work associated with the Zion Road - Vantage Drive to Crossover Road Project, and further approves a project contingency in the amount of $120,000.00. Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment, a copy of which is attached to this Resolution. City of Fayetteville, Arkansas Page 1 Printed on 811812022 Matt Casey Submitted By City of Fayetteville Staff Review Form 2022-0686 Legistar File ID 8/16/2022 City Council Meeting Date - Agenda Item Only N/A for Non -Agenda Item 7/26/2022 ENGINEERING (621) Submitted Date Division / Department Action Recommendation: Staff recommends approval of Change Order 5 with Tri-Star Contractors in the amount of $264,597.22 for the Zion Road - Vantage to Crossover project, approval of $120,000 additional project contingency (Water/Sewer = $85,000, Transportation = $35,000), and approval of a budget adjustment. 5400.860.5700-5815.00 Account Number 11011.2019.7212 Project Number Budgeted Item? Yes Does item have a cost? Yes Budget Adjustment Attached? Yes Budget Impact: 5400 - Water & Sewer Fund Zion Rd. Improvements Project Title Current Budget Funds Obligated Current Balance Item Cost Budget Adjustment Remaining Budget $ 1,083,701.00 $ 1,083,668.28 $ 32.72 $ 264,597.22 $ 349,598.00 85,033.50 V20210527 Purchase Order Number: 2020-00000589 Previous Ordinance or Resolution # 194-20 Change Order Number: 4 Approval Date: Original Contract Number: 2020-00000043 Comments: Item Cost is equal to the change order amount; Budget Adjustment is equal to change order amount plus W/S contingency —� CITY OF FAYETTEVILLE ARKANSAS MEETING OF AUGUST 16, 2022 TO: Mayor and City Council THRU: Susan Norton, Chief of Staff Chris Brown, Public Works Director Tim Nyander, Utilities Director FROM: Matt Casey, Engineering Design Manager DATE: July 27, 2022 CITY COUNCIL MEMO SUBJECT: Approval of Change Order 5 with Tri-Star Contractors in the amount of $264,597.22 for the Zion Road — Vantage to Crossover project, approval of $120,000 additional project contingency and approval of a budget adjustment. RECOMMENDATION: Staff recommends approval of Change Order 5 with Tri-Star Contractors in the amount of $264,597.22 for the Zion Road - Vantage to Crossover project, approval of $120,000 additional project contingency (Water/Sewer = $85,000, Transportation = $35,000), and approval of a budget adjustment. BACKGROUND: On June 24, 2020 the City Council approved a contract with Tri Star Contractors, LLC for the construction of this project. Construction began in September of 2020 and is expected to be complete in the Fall of 2022. DISCUSSION: As part of this roadway project, the Utilities Department added the construction of a 15" diameter sanitary sewer main that extends from Old Missouri Road to the east side of Crossover Road. This sewer main will serve areas of the city east of Crossover Road and will remove the need for future lift stations in this area. The sanitary sewer main was designed to be installed under the existing asphalt pavement along Zion Road. The sewer trench was planned to be patched with concrete and then covered with the asphalt overlay from the roadway project. During installation of the sanitary sewer main under the existing pavement, the contractor experienced very poor soil conditions under the roadway. The contractor is taking every precaution to protect the existing pavement and is using standard trenching practices, however the soils are so poor that the roadway adjacent to the sewer trenching is failing as soon as the trenches are dug, not allowing time for the contractor to install the shoring used to hold the soils in place. Given the size of the sewer trench and the additional area of failure, there will be only a few feet of asphalt pavement left to salvage. The City Engineering staff evaluated the options and recommended that the full depth roadway reconstruction continue in this area similar to what is included in the roadway portion of the project directly west of this location. This change order includes that addition of the quantities and bid items Mailing Address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 necessary for this roadway repair. In addition to the roadway repair items, certain bid item prices are being adjusted to account for inflation and fuel increases. The City Council usually approves project contingency with projects of this nature. The contingency provides additional funds beyond the contract amount to account for unexpected items that are discovered during construction. City staff typically requests 10% contingency for approval. Given the total cost of this project a project contingency of 5% was requested. Unfortunately, the changes encountered in this project were more than expected and will exceed the approved 5% contingency. For that reason, staff is requesting an approval of additional contingency of $85,000 for the water and sewer portion and $35,000 for the transportation portion of the project. BUDGET/STAFF IMPACT: Roadway and drainage improvements are funded by the Transportation Bond Program, and water/sewer relocations in this project are funded by the Water and Sewer Fund Capital Improvement project appropriation. The Water and Sewer Fund will fund the additional costs of this change order. Tri Star Contractors Original (Legistar 2020-0528) CO 1 (Legistar 2021-0213) CO 2 (Legistar 2021-0495) CO 3 (Legistar 2021-1015) CO 4 (Legistar 2022-0685) CO 5 (Legistar 2022-0686) CONTRACT CONTINGENCY Transportation water/Sewer Transportation water/Sewer Bond Bond $ 4,395,109.35 61,737.50 $ 4,456,846.85 PURCHASE ORDER DETAIL $ 2,424,965.85 13,000.00 98,966.00 9,000.00 145,334.87 $ 220,000.00 (61,737.50) (145,334.87) $ 121,000.00 (13,000.00) (98,966.00) (9,000.00) 264,597.22 35,000.00 85,000.00 $ 2,955,863.94 $ 47,927.63 $ 85,034.00 GL ACCOUNT PROJECT AMOUNT 5400.860.5700-5815.00 11011.2019.7212 $ 264,597.22 Attachments: Change Order 5 CHANGE ORDER CITY OF JVM 'AYETTEVILLrz ARKANSAS Contract Title: Zion Road Phase II Improvements Change Order No. 5 Date of Issuance September 1, 2022 To Contractor: TRI-STAR CONTRACTORS LLC ORDINANCE/RESOLUTION:194-20 The Contract is changed as follows: Effective September 1, 2022 Bid Bid Previous Unit Contract Revised Revised Original Revised Contract Item Item Estimated of Unit Estimated Unit Estimated Estimated Changes No. Description Quantity Measure Price Quantity Price Cost Cost 3-43 ACHM Superpave Binder 500.00 TON $ll5.00 795.00 $139.86 57,500.00 $111,188.70 Course CO-2 3-45 (Demolition of Existing Asphalt 0.00 SY $0.00 2650.00 $10.00 - $26,500.00 CO-4 3-46 Unclassified Excavation-Sewer- 0.00 CY $0.00 3300.00 $8.75 $28,875.00 CO-4 3-47 Select Embankment -Sewer- 0.00 CY $0.00 2800.00 $11.75 $32,900.00 CO-4 3-48 8" Class 7 Aggregate Base 0.00 SY $0.00 3230.00 $13.21 $42,668.30 .Course-Sewer-CO-4 3-49 Subgrade Preparation -Sewer- 0.00 SY $0.00 3230.00 $2.00 $6,460.00 CO-4 3-50 Undercut and Backfill 0.00 CY $0.00 1000.00 $22.00 $22,000.00 (Allowance)-Sewer-CO-4 161 15-inch PVC SDR-26 Gravity 2430.00 LF $65.00 1133.00 $65.00 157,950.00 $73,645.00 Sewer Main 3-51 15-inch PVC SDR-26 Gravity 0.00 LF $0.00 1297.00 $67.53 $87,586.41 ;Sewer Main-CO-4 163 ;8-inch PVC SDR-26 Sewer 1000.00 LF $55.00 538.00 $55.00 55,000.00 $29,590.00 Main 3-52 8-inch PVC SDR-26 Sewer 0.00 LF $0.00 462.00 $57.06 - $26,361.72 Main-CO-4 166 16-Inch D.I., Expoxy Lined 670.00 LF $140.00 670.00 $142.58 93,800.00 $95,528.60 w/polywrap,SewerMain 172 Sewer Main Trenching & 1365.00 LF $15.00 1921.00 $15.00 20,475.00 $28,815.00 Backfill, 10-14 Feet Deep 173 Sewer Main Trenching& 350.00 LF $19.00 430.00 $]9.00 6,650.00 $8,170.00 Backfill, 14-18 Feet Deep Full Depth Class 7 Aggregate 192 Base Course Backfill (Sewer) 3775.00 LF $15.00 2004.00 $15.00 56,625.00 $30,060.00 :Full Depth Class 7 Aggregate 3-53 Base Course Backfill (Sewer)- 0.00 LF $0.00 2281.00 $27.29 - $62,248.49 CO-4 valid The originil Contract Price was Net change by previously authorized change orders The Contract Price prior to this Change Order was The Contract Price will be adjusted by The new Contract Price including this Change Order will be The Contract Time(s) will be increased by Re uired dates of Completion as of the date of this Change Order therefore are: summation or Can 9901UVV.UV 0,+ I •� Net Cost For this Change Order $26407.22 $ 328,038.37 $ 7,148,113.57 $ 264,597.22 S 7,412,710.79 ---- 0 ...___ calerid ar days 4 Substantial Completion 21-Feb-22 Final Completion •---------------- ---------------------- -------------- - ------ ---- ------------------- 23-Mar-22 NOTE: This summary does not reflect changes in the Contract Price or Time(s) which have been authorized by Work Change Directives not incorporated in this or previous Change Orders. TRI-STAR CONSTRACTORS LLC . C E YETTE ILL( 7/26/22 BY DATE BY DATE City of Fayetteville, Arkansas - Budget Adjustment Form (Legistar) Budget Year Division Adjustment Number /Org2 ENGINEERING (621) 2022 Requestor: Matt Casey BUDGET ADJUSTMENT DESCRIPTION / JUSTIFICATION: Staff recommends approval of Change Order 5 with Tri-Star Contractors in the amount of $264,597.22 for the Zion Road - Vantage to Crossover project, approval of $120,000 additional project contingency (Water/Sewer = $85,000, Transportation = $35,000), and approval of a budget adjustment. RESOLUTION/ORDINANCE COUNCIL DATE LEGISTAR FILE ID# 8/16/2022 2022-0686 }f oil y 31ac1� 7/27/2022 12:15 PM Budget Director TYPE: JOURNAL #: GLDATE: CHKD/POSTED: Date D - (City Council) 8/16/2022 TOTAL Account Number - - Increase / (Decrease) Expense Revenue Proiect.Sub# Project Sub.Detl AT v.20220718 Account Name 5400.860.5700-5815.00 264,598 - 11011 2019.7212 EX Improvements - Sewer 5400.860.5700-5911.99 5400.720.5600-5808.00 85,032 - (349,598) - 11011 11011 2019.7212 1 EX EX Contingency - Capital Project Improvements - Water Line 5400.860.5600-5911.99 4602.860.7212-5911.99 (32) - 35,000 - 11011 46020 2019.7212 7212 EX EX Contingency - Capital Project Contingency - Capital Project 4602.860.7999-5899.00 (35,000) - 46020 7999 EX Unallocated - Budget H:\Budget Adjustments\2022_Budget\CITY COUNCIL\08-16-22\2022-0686 BA Zion C05 1 of 1