Resolution: 177-22
File Number: 2022-0632
AMENDMENT NO. 2, BURNS & MCDONNELL ENGINEERING COMPANY, INC.:
A RESOLUTION TO APPROVE AMENDMENT NO. 2 TO THE PROFESSIONAL
ENGINEERING SERVICES AGREEMENT WITH BURNS & MCDONNELL ENGINEERING
COMPANY, INC. IN THE AMOUNT OF $33,880.00 FOR A HYDRAULIC ANALYSIS AND
SURVEY ASSOCIATED WITH A PROJECT TO ADDRESS SCOUR AT THE SOUTH
ARMSTRONG AVENUE BRIDGE OVER TOWN BRANCH
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE,
ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby authorizes Mayor Jordan
to sign Amendment No. 2 to the Professional Engineering Services Agreement with Burns &
McDonnell Engineering Company, Inc. in the amount of $33,880.00 for a hydraulic analysis and
survey associated with a project to address excessive scour at the South Armstrong Avenue bridge
over Town Branch.
PASSED and APPROVED on 8/16/2022
Attest: ����estitl irhit�
ERA l ■rRE�
-U: FAYETTFVIL U ;
Kara Paxton, City Clerk Treasurer' VL3179�i'hA �,�.• ���
•0 i
Page 1 Printed on 8118122
City of Fayetteville, Arkansas 113 West Mountain Street
Fayetteville, AR 72701
(479)575-8323
Text File
File Number: 2022-0632
Agenda Date: 8/16/2022 Version: 1 Status: Passed
In Control: City Council Meetinq File Type: Resolution
Agenda Number: A.3
AMENDMENT NO.2, BURNS & MCDONNELL ENGINEERING COMPANY, INC.:
A RESOLUTION TO APPROVE AMENDMENT NO.2 TO THE PROFESSIONAL ENGINEERING
SERVICES AGREEMENT WITH BURNS & MCDONNELL ENGINEERING COMPANY, INC. IN
THE AMOUNT OF $33,880.00 FOR A HYDRAULIC ANALYSIS AND SURVEY ASSOCIATED
WITH A PROJECT TO ADDRESS SCOUR AT THE SOUTH ARMSTRONG AVENUE BRIDGE OVER
II111WATH iHAQ goo
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby authorizes Mayor Jordan to sign
Amendment No. 2 to the Professional Engineering Services Agreement with Burns & McDonnell Engineering
Company, Inc. in the amount of $33,880.00 for a hydraulic analysis and survey associated with a project to
address excessive scour at the South Armstrong Avenue bridge over Town Branch.
City of Fayetteville, Arkansas Page 1 Printed on 811812022
City of Fayetteville Staff Review Form
2022-0632
Legistar File ID
8/16/2022
City Council Meeting Date - Agenda Item Only
N/A for Non -Agenda Item
Chris Brown 7/26/2022 ENGINEERING (621)
Submitted By Submitted Date Division / Department
Action Recommendation:
Approval of contract amendment #2 with Burns and McDonnell Engineering Company, Inc. in the amount of
$33,880 (total contract amount $96,634) for engineering design services to address excessive scour associated with
Town Branch Bridge at S Armstrong Ave pursuant to selection RFQ 21-01 selection 10.
4470.621.8810-5314.00
Account Number
02108.2101
Project Number
Budgeted Item? Yes
Does item have a cost? Yes
Budget Adjustment Attached? No
Purchase Order Number:
Change Order Number:
Original Contract Number:
Comments:
Budget Impact:
02108 Other Drainage Improvements
Fund
Town Branch at Armstrong Bridge
Current Budget
Funds Obligated
Current Balance
Item Cost
Budget Adjustment
Remaining Budget
Project Title
$ 100,154.00
$ 42,764.00
57,390.00
$ 33,880.00
23,510.00
V20210527
2021-343 Previous Ordinance or Resolution #
2021-000030
Approval Date:
CITY OF
FAYETTEVILLE
ARKANSAS
MEETING OF AUGUST 16, 2022
TO: Mayor and City Council
THRU: Susan Norton, Chief of Staff
Chris Brown, Public Works Director
FROM: Alan Pugh, Staff Engineer
DATE: July 26, 2022
CITY COUNCIL MEMO
SUBJECT: Approval of contract amendment #2 with Burns and McDonnell Engineering
Company, Inc. in the amount of $33,880 (total contract amount $96,634) for
engineering design services to address excessive scour associated with
Town Branch Bridge at S Armstrong Ave pursuant to selection RFQ 21-01
selection 10
RECOMMENDATION:
Staff recommends approval of contract amendment #2 with Burns and McDonnell Engineering
Company, Inc. in the amount of $33,880 (total contract amount $96,634) for engineering design
services to address excessive scour associated with Town Branch Bridge at S Armstrong Ave
pursuant to selection RFQ 21-01 selection 10.
BACKGROUND:
The bridge in question appears to have been in place since at least 1978 according to aerial
photography. This bridge receives annual inspections from ARDOT similarly to all bridges
within the area. The bridge has been experiencing scour for quite some time; however, recent
rains seem to have accelerated this scour.
DISCUSSION:
Due to the increase in scour under the bridge over the past few years, ARDOT has placed the
bridge on their scour critical list. This requires the City to perform an inspection of the scour
after every rain event that causes the stream gauge to exceed 10.83 feet in height. This is
obviously a short-term monitoring program with the need of a more permanent solution to
address the scour that has occurred and prevent further scour in the future.
During the initial investigation and design, it was determined that the cost to rehabilitate the
bridge would likely be much greater than originally anticipated. As such, staff began to research
the potential for state/federal aid to replace the bridge. As the potential replacement moves
forward, it is necessary to do some hydraulic analysis to determine the height and length of a
new bridge. Amendment #2 includes survey work necessary to complete the hydraulic design
and the hydraulic design itself.
Mailing Address:
113 W. Mountain Street www.fayetteville-ar.gov
Fayetteville, AR 72701
In the interim, staff is having discussions with Transportation to determine if we can address the
scour issues with a temporary solution while the replacement is pursued.
BUDGET/STAFF IMPACT:
The design for this project is proposed to be paid for with CIP funds, project 02108 Other
Drainage projects.
Attachments:
Contract Amendment 2
N BURNS
*KMSDONNELL
AMENDMENT No. 2
AMENDMENT TO PROFESSIONAL ENGINEERING
SERVICES AGREEMENT
Date: 06/24/2022
THIS AMENDMENT modifies the Agreement dated May 12, 2021 made by and between Burns &
McDonnell Engineering Company, Inc., (hereinafter called ENGINEER), and City of Fayetteville,
Arkansas acting by and through its Mayor (hereinafter called CITY OF FAYETTEVILLE) for the
following Project: Armstrong Ave Bridge over Town Branch. For good and valuable consideration, the
sufficiency of which is acknowledged, the parties agree to make the following changes to their
Agreement.
1. The parties agree that the ENGINEER's Scope of Services is amended as follows:
The Scope of Services to be furnished by ENGINEER during the Project is included in Appendix A
attached hereto and made part of this Agreement.
2. The following adjustments are made to the ENGINEER's compensation:
The lump sum authorized for this Amendment No. 2 is $33,880. Justification of costs and fees is included
in Appendix B attached hereto and made part of this Agreement.
3. The time for completion of ENGINEER's Services is adjusted as follows:
The provisions of this Amendment have been agreed to in anticipation of the orderly progress of the
Project through completion of the services stated in the Amendment. ENGINEER will proceed with
providing the authorized services immediately upon receipt of written authorization from CITY OF
FAYETTEVILLE. Said authorization shall include the scope of the services authorized and the time in
which the services are to be completed. The anticipated schedule for this project is described in Appendix
A.
4. Other changes to the Agreement, if any, are stated below:
None
5. The terms of this AMENDMENT supersede any contrary terms of the Agreement. This
AMENDMENT will be deemed a part of, and be subject to, all other terms and conditions of the
Agreement. Except as modified above, the Agreement will remain in full force and effect.
IN WITNESS WHEREOF, the parties have executed this AMENDMENT the day and year first written
above.
THIS AGREEMENT CONTAINS A BINDING ARBITRATION PROVISION, WHICH MAY BE
ENFORCED BY THE PARTIES.
AE-6 FORM
CITY OF FAY.ETTEVILLE, ARKANSAS
Name: Lioneld
BURNS & MCDONNELL ENGINEERING
COMPANY, INC.
i
By:
Name: Steven Beam
Title: Mayor Title: Business Manager
ATTEST: ���►ARK 1 !�R `�'++
(3,t��.rCf����
By: E
—�� I'AYETTEVEL1
Name:ANJ
Title: City Clerk:( ('.o �vor
AE-6 FORM
N BURNS
*KMSDONNELL
APPENDIX A
TO
AMENDMENT NO.2
PROFESSIONAL ENGINEERING SERVICES AGREEMENT
SCOPE OF SERVICES
PROJECT DESCRIPTION
The City of Fayetteville (Owner) plans to conduct engineering for the rehabilitation of the embankment
slopes and structural steel pile for the intermediate bents on the Armstrong Road bridge over Town
Branch. Bridge inspection reports performed by ARDOT has listed these items as Priority C-Important.
The proposed project amendment will be to provide support for the hydraulic analysis and will include a
topographic survey of the site as shown in Appendix C. This will provide a better understanding of the
flows through the existing structure and assist with the direction of the project.
Phase IIA: Hydraulic Analysis and Survey
Items not included in this Phase are:
A. Geotechnical investigation
B. FEMA model request
C. CLOMR/LOMR
Task 1— Project Management/Administration
Provide the management functions required to complete the scope of work. Tasks include:
A. Correspondence with the City.
B. Quality control and quality assurance reviews.
C. Scheduling and assignment of personnel resources.
D. Monitoring of work progress.
E. Invoicing for work performed.
F. Providing project status updates to the City outlining work performed during the invoicing
period, upcoming work activities, and outstanding actions required by the City.
Task 2 — Hydraulic Analysis and Survey
Perform hydraulic analysis of existing and proposed structures. Tasks include:
A. Field survey.
B. Hydraulic analysis using a 25-year design storm event (4% annual chance).
Deliverables
The deliverable for the project will be a brief report capturing the following:
A. Comparison table between existing and proposed hydraulic data points such as flows, water
surface elevations, velocities, freeboard etc.
B. Conceptual bridge design identifying proposed bridge width and length, potential grade raise
and estimated project length.
Schedule
Survey will begin within two to three (2-3) weeks from Notice To Proceed (NTP) and the hydraulic
analysis will begin once the survey is received. Estimated deliverable date is August 19, 2022.
Appendix B - Justification of Costs and Fees
June 24, 2022
Armstrong Ave Bridge over Town Branch
City of Fayetteville
Phase IIA: Hydraulic Analysis and Survey
MANHOURS
TASK
PM
SE
ASTE
TECH
ADMIN
TOTAL
Task 1 - Project Management/Administration
0
Covered under Phase II
as 2 -Hydraulic Analysis and Survey
110
Hydraulic analysis
2
100
102
Report / Memo
8
8
TOTAL MH - Phase IIA:
0
10
100
0
0
110
LABOR COSTS
Category - Description
Rate
MH
Amount
PM - Project Manager
$241.00
0
$0
SE - Senior Engineer
$228.00
10
$2,280
ASTE - Assistant Engineer
$126.00
100
$12,600
TECH - Technician
$169.00
0
$0
ADMIN - Administrative Assistant
$126.00
0
$0
Subtotal Labor Costs
$14,880
SUBCONSULTANTS
Subconsultant
Amount
McClelland Consulting Engineers
$19,000
Subtotal Subconsultants
$19,000
EXPENSES
ITEM
Quantity
Unit
Rate
Amount
Printing (8 1/2 x 11)
0
each
$0.08
$0
Printing (11 x 17)
0
each
$0.35
$0
Plotting (22 x 34)
0
each
$1.35
$0
Mileage (1 trip @ 40 miles)
0
1 mile
$0.560
$0
Lodging
0
each
$88.00
$0
Meals (per day)
0
each
$25.00
$0
$0.00
$0
Subtotal Expenses
$0
TOTAL COSTS - Phase IIA: Hydraulic Analysis and Survey
$33,880