HomeMy WebLinkAbout2022-06-28 - Agendas - FinalCITY OF
_! FAYETTEVILLE
ARKANSAS
MEETING AGENDA
City Council Transportation Committee
Tuesday, June 28, 2022
5:30 pm or Immediately Following Agenda Session
NOTICE: THE TRANSPORTATION COMMITTEE WILL BE HELD VIRTUALLY WITH NO
PHYSICAL LOCATION TO ATTEND
VIDEO CONFERENCING BY ZOOM WILL BE USED FOR THIS MEETING. TO REGISTER
FOR THE MEETING GO TO THIS Registration Link
Members: Sarah Bunch, Chairperson; Sonia Harvey; Holly Hertzberg; Mark Kinion
City Staff: Chris Brown, Public Works Director/City Engineer; Terry Gulley, Asst. PW Director
for Operations/Transportation Services Director
Agenda:
1. New Business:
A. Appleby Bikeway Striping: Review of proposed bike lane improvements along
sections of Appleby Road
B. ARDOT 1-49 / MLK Interchange Improvements: Project update.
https://vpiph03-job-040846-hwy-62-interchange-improvements-ardot.hub.arcqis.com/
2. Adjourn
Mailing Address:
113 W. Mountain Street www.fayetteville-ar.gov
Fayetteville, AR 72701
CITY OF
-- ! FAYETTEVILLE
ARKANSAS
TO: Transportation Committee
THRU: Chris Brown, Public Works Director
Matt Mihalevich, Active Transportation Manager
FROM: Dane Eifling, Mobility Coordinator
DATE: June 231h, 2022
SUBJECT: Appleby Bikeway
STAFF MEMO
RECOMMENDATION:
Staff is recommending improvements to the bike lanes on sections of Appleby Rd in conjunction
with repaving in fall of 2022.
BACKGROUND:
Appleby Rd has had bike lanes since 2011. The street is 30 feet wide and currently has 10-foot
driving lanes and two 5-foot bike lanes on each side. Average speeds on this street are 33 MPH
with an ADT of 5,446. The existing 5-foot striped bike lanes do not meet current All -Ages -And -
Abilities standard for on -street bicycle facilities.
Staff is proposing an 8-foot two-way protected bike facility on the south side of the street from
the Goodwill parking lot to Bishop Street. Between the Razorback Regional Greenway and Bob
Younkin Dr, staff is proposing a 7-foot protected eastbound climbing lane and shared downhill
lane westbound.
DISCUSSION:
The scope of this project is limited to the asphalt portions of Appleby Rd and will not include
work on concrete sections. Protection for the bike facilities will consist of a bolt -down modular
plastic "Tuff Curb" specifically designed for protected bike lanes. The Tuff Curbs will be spaced
every 10 feet include built-in reflectors and will be green in color. The Tuff Curbs are 8" wide x
40" long x 2" high and will not negatively impact street sweeping or emergency vehicles. Traffic
delineators have not been included the design but could be easily added to Tuff Curbs to
increase visibility for drivers and or snow plow operators.
This protected bike lane will be an important connection for future Plainview extension and
Rolling Hills Dr improvements which include side paths. The long-term goal for this bikeway will
be to replace the plastic Tuff Curbs with more permanent concrete curbs for better protection
and lowered maintenance costs.
BUDGET/STAFF IMPACT:
Estimated cost for materials and striping, tuff curbs and thermoplastic installed by transportation
crews $35,565.91 budgeted through trails on -street CIP fund.
Attachments:
Concept Designs/ Images/Budget
Mailing Address:
113 W. Mountain Street www.fayetteville-ar.gov
Fayetteville, AR 72701
i i,
U
i
11.0'
-- --------------—
f--
'': _ / � � ��� -� � � � 1:O'er• �, 1
'mot �� ` ► �' r •' ` r b
+�cRr
f
11111001111111111
1
Scale: 1" = 50'
Is ORIA
THERMOPLASTIC "qs!1
�• OR CYCLEGRIP �; • `
\- w
f !� "`+ Q
11.0'
10.0'
DTAL) s y,
N
00 Appleby Road
mRazorback Greenway to Bob Younkin Dr.
Aft CITY OF F YETTEVILLE APPLEBY ROAD Jun. 22, 2022
�' ARKANSAS
ENGINEERING N DIVISION113 W. STREET STRIPING PLAN
d
C)
Z
Y
Z w
Z)
O
a
w
0
w
GREEN SPACE WIDTH VARIES
0
0
T�
(�
Ko
U
y0
_ m
o�
W
�3
w
z
3Z
>m
K0
oN
ow
0
U
,
O
Q O
Z
Y
mm
a
w
w n
�U
m'�
N3
T
7
I
GREEN SPACE WIDTH VARIES
J
X3
W W
h N
LLI
CL
Q
IT_Y
8" WHITE SKIP STRIPE-
2' PAINT, 2' GAP
BISHOP DR.
r
z
z
H
Q
I � 1
0
f'—
U)
W
LL
m
W
Z
SKIP STRIPE-
J
3' PAINT, 9' GAP
•
I-
10.01
10.0'
r" I,r
8.0' 1
z
1 `
Z
r
f �a.•
a�
1
•�
Scale: 1" = 50'
Uj w
z �� Z z
Q U
10..0'
10, T 101.0' I
T
,r
CITY OFAPPLEBY ROAD Jun. 22, 2022
T
�� ARKANSAS
EVILLE
ENGINEERING DIVISION STRIPING PLAN
' • . ' I Y �^ (.n 13 W. MOUNTAIN STREET-_
U
w
Z
--
U
10.0'
—low 1
W
J
w
w
Y
U
r
I
r
10.
Ir10,
}
10
jffC \ 'GIs r.sliruii�
�40"�
Tuff Curb XLP
Extreme Low Profile
Curbing System
GOO G \-01
P PR�UN
>J>
N >
w
U)
w
a�
5
LU
U
o
0
w
w
b
�
m
U
O
(} O
Z
J■ylT_
��
O
3
ro
N
of a
7 U
m J
N �
}
I
GREEN SPACE WIDTH VARIES
J
Xa
w3
in 0
Appleby Road
Bishop Dr. to Goodwill Parking Lot
13.0'
Scale: 1" = 50' I
Aft CITY OF
AYETT EVILLE
APPLEBY
ROAD
Jun. 22, 2022
AS
.� RKANS
ENGINEERING DIVISION
3
113 W. MOUNTAIN STREET
STRIPING
PLAN
►i
CITY OF
FAYETTEVILLE
ARKANSAS
CITY OF FAYETTEVILLE
TRANSPORTATION BOND PROGRAM
PROGRESS REPORT — JUNE 2022
The Transportation Bond Program consists of projects that will be designed, contracted, and
administered by City Staff or consultants/contractors working for the City. Funding for the Bond
Program includes $36 million in bonds for the first phase of the program.
UPCOMING CONSTRUCTION PROJECTS
PROJECT NAME
BID DATE
ESTIMATED CONST. COST
Prairie and West
TBD
$3,000,000
CURRENT CONSTRUCTION PROJECTS
PROJECT NAME
ESTIMATED
CONSTRUCTION
COMPLETION
CONTRACT
Zion Rd. (Vantage to Crossover)
August
$4,395,109.35
2022
Sain St. Extension
August
*$607,900.29
2022
Shiloh Fulbright Intersection
October
$1,680,751.00
2022
Midtown Corridor — Porter and Deane at
November
$4,169,565.00
PD Site
2022
Center/Harmon Intersection
February
$1,752,736.50
2023
Archibald Yell Blvd. Safety Improvements
May
*$2,678,711.32
2023
*Transportation Bond Program portion of the contract.
Mailing Address:
113 W. Mountain Street
Fayetteville, AR 72701
www.fayetteville-ar.gov
COMPLETED PROJECTS
PROJECT NAME
COMPLETION
YEAR
ORIGINAL BUDGET
FINAL PROJECT
COST
Rupple Road
2021
$3,000,000
$3,532,722.51
Steamboat Dr./Dorothy Jeanne
2021
$670,000
$410,979.35
Centennial Park Entrance Drive
2021
$1,000,000
$834,721.75
For details regarding each of the Transportation Bond Projects, use the links provided below for
each project.
1) RUPPLE ROAD (TANYARD DR. TO WEIR RD.)
https://www.favetteville-ar.gov/3597/Rupple-Road-Extension
2) ZION ROAD PHASE II (VANTAGE DR TO CROSSOVER RD)
https://www.fayetteville-ar.gov/3586/Zion-Road-I mprovements
3) STEAMBOAT / DOROTHY JEANNE CONNECTION
https://www.favetteville-ar.gov/3596/SteamboatDorothy-Jean ne-St-Connection
4) SHILOH DR. / FULBRIGHT EXPRESSWAY INTERSECTION
https://www.fayetteville-ar.gov/3594/Shiloh-DrFuIbright-Expressway-Intersecti
5) CENTER / HARMON INTERSECTION
https://www.favetteville-ar.gov/3595/CenterHarmon-Intersection
6) MIDTOWN CORRIDOR
https://www.faVetteville-ar.gov/3877/Midtown-Corridor-Promect
7) SAIN STREET EXTENSION (FRONT ST. TO JOYCE BLVD.)
https://www.favetteville-ar.gov/3598/Sain-Street-Extension
8) MAPLE ST. CYCLE TRACK
https://www.favetteville-ar.gov/3581 /Maple -Street -Cycle -Track
9) 15t" ST. / RAZORBACK RD. INTERSECTION
https://www.favetteville-ar.gov/3592/15th Razorback -Intersection
10) HIGHWAY 71 B CORRIDOR
2
https://www.fayetteville-ar.gov/3588/Highway-71 B-Corridor
11) APPLEBY / PLAINVIEW / ROLLING HILLS CONNECTION
https://www.favetteville-ar.gov/3771 /ApplebyPlainviewRolling-Hills-Connection
12) ARCHIBALD YELL BLVD. SAFETY IMPROVEMENTS
https://www.fayetteville-ar.gov/3584/Arch ibald-Yell-Blvd-Safety-Improvements
13) ROLLING HILLS IMPROVEMENTS (COLLEGE TO OLD MISSOURI)
https://www.fayetteville-ar.gov/3585/Rolling-Hills-Improvements
14) JOYCE BLVD. SAFETY IMPROVEMENTS
https://www.faVettevi I le -a r. g ov/3732/Joyce-Blvd-Safety-Improvements
15) NORTH ST. / MISSION BLVD. CORRIDOR
https://www.fayetteville-ar.gov/3589/North-Street-Corridor
16) OLD WIRE RD. CYCLE TRACK (EXTENSION)
https://www.favetteville-ar.gov/3583/Old-Wire-Road-Cycle-Track
17) PAVEMENT MAINTENANCE / OVERLAYS
https://www.fayetteville-ar.gov/3600/Pavement-Mai ntenance0verlays
• 20.85 Miles of overlays have been completed as of June 2022
• $2,706,434.87 of the $2,700,000 has been spent or encumbered as of May
2022.
18) TRAFFIC SIGNAL HARDWARE / UPGRADES
nttps://www.fayetteville-ar.gov/3599/Signal-HardwareSoftware-Upgrades
• 103 of 110 signal controllers and 56 of 66 Video Detectors have been
upgraded as of March of 2022.
• $1,399,999.51 of the $1,400,000 has been spent or encumbered as of June
2022.
6/22/2022
Status Ward Street From To
2022 Sidewalk Projects
Placement Type
Complete
2
Mt. Comfort Rd.
Addington Ave.
Garland Ave.
South
New
Constructed new 12 foot wide sections with curbs and storm drainage improvements.
Complete
4
Heritage Ave.
Reliance St.
Wedin ton Dr/
West
Rep
Replaced damaged sections of sidewalk
Complete
4
Vanike Dr.
at
Deane Solomon Rd.
Both
New
Installed new access ramps and sidewalk connections
On Going
2
Church Ave.
Spring St.
Mountain St.
West
Rep
Waiting on utility relocations
On Going
All
Ramps / Maintenance
Various
Locations
Any
Rep
Maintenance repairs
Underway
2
Dickson St.
Arkansas Ave.
College Ave.
Both
Rep
Maintenance repairs School Ave. to locust Ave.
Underway
1
Eleventh St.
Duncan Ave.
Hill Ave.
North
IRep
Repair deteriorated areas of sidewalk and curbs
Pending
2
Mountain St.
West Ave.
School Ave.
South
Rep
Schedule after Dickson St. repairs completed
Pending
2
Spring St. (Phase 1)
West Ave.
Church Ave.
Both
Rep
Schedule after light improvements completed
Pending
1
Hollywood Ave.
MLK Jr. Blvd.
Parnell Dr.
West
New
Engineering working on design
Pending
3
College Ave.
Sunbridge Dr.
Township St.
East
Rep
Install pedestrian crossing with access ramps
Pending
3
Old Missouri Rd.
Frazier Terrace
Stearns St.
West
New
Complete sidewalk connection
Pending
4
Salem Rd.
lCilearwood Dr.
I Mt. Comfort Rd.
JWest
New
Complete sidewalk connection. Engineering working on design/right of way.
Pending
1
Happy Hollow Rd.
lAcacia Crossing
Fourth St.
lWest
I New
Design pending
Pending
2
Lewis Ave.
I Deane St.
lWedington Dr.
lWest
New
Design pending
Pending
2
Leverett Ave.
Sycamore St.
Hazel St.
West
Rep
Design complete, working on right of way. Bid pending.
Maintenance Repairs (Completed to date 2022)
Amber Dr.
Old Wire Rd.
Cypress Lane
South
Rep
Replace deteriorated sidewalk, repair drop inlet
Candleshoe Dr.
Madison Dr.
Arapaho Dr.
East
Rep
Replace deteriorated sidewalk
Fletcher Ave.
Lafayette St.
Dickson St.
East
New
Construct drop inlet
Homespun Dr.
Tumbleweed Dr.
Broyles Ave.
West
Rep
Added 4 ea. 8 foot extensions to drain boxes (2)
Lewis Ave.
Nettleship St.
Maine St.
West
New
Install trench grate
Loxley Ave.
Oakcliff St.
Oaks Manor Dr.
West
Rep
Replace deteriorated curb and gutter
One Mile Rd
Old Farmington Rd.
MLK Jr. Blvd.
East
New
Concrete for truck/bus turning radius
Square (Block Ave.)
Center St.
Mountain St.
East
Rep
Replace deteriorated sidewalk and steps to Old Post Office
Proposed 2023 - 2025 Sidewalk Projects
Sidewalk
Ward Street From To Placement Type Length
2
Center St.
Gregg Ave.
School Ave.
Both
Rep
Replace deteriorated sidewalk
2
Cleveland St.
Levered Ave.
Whitham Ave.
North
New
Fill gaps
2
Lindell Ave.
Douglas St.
Maple St.
East
Rep
Replace deteriorated sidewalk
2
Lindell Ave.
Hughes St.
Cleveland St.
West
Gap
Fill gaps
2
Oakland Ave.
Cleveland St.
Existing sidewalk
West
New
Fill gaps
2
Reagan St.
Arkansas Ave.
Gregg Ave.
South
Rep
Replace deteriorated sidewalk
21
Rebecca St.
College Ave.
Mission Blvd.
North
New
New construction to complete connection between College Ave. and Mission Blvd.
2
School Ave.
Spring St.
Center St.
West
Rep
Replace deteriorated sidewalk
2
Spring St. (Phase 2)
Church Ave.
College Ave.
Both
Rep
Improve access ramps
2
Watson St.
Campbell Ave.
Thompson Ave.
South
Rep
Replace deteriorated sidewalk
3
Mission Blvd.
Winwood Dr.
Libby Ln.
North
New
Fill gaps
3
Mission Blvd.
Libby Ln.
Lisa Ln.
North
New
Fill gaps
4
Salem Rd.
Fairfax St.
Wedington Dr.
Both
Rep
Install missing access ramps
2022 Overlay Projects
COMPLETED
Street
To
From
Length (ft)
Government
Dead End
MILK
540
Old Wire Rd.
Skillern Rd.
City Limits
2472
West Ave.
Center St.
South St.
1735
Gregg Ave.
Prairie St.
MILK
460
Mount Comfort Rd.
Garland Ave.
Addington Ave.
1005
Old Wire Rd.
Oak Bailey Dr.
Crossover Rd.
1452
Old Wire Rd.
Skillern Rd.
City Limits
2472
Goff Farms
Deaad Horse Mt.
SAg Habor Ave.
5307
Shiloh
Gregg St.
Steele Blvd.
1350
Lincoln Ave.
Maple St.
Louise St.
632
McConnell Ave.
Knapps St.
Drake St.
2640
Mekeig Ct.
Warwick Dr.
Cul de sac
190
Roberts Rd.
Huntsville Rd.
Isag Habor Ave.
1 1770