Loading...
HomeMy WebLinkAboutOrdinance 6549of 6ATErr� � R i ac. ayr.ti ns'S 113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 Ordinance: 6549 File Number: 2022-0235 JACK TYLER ENGINEERING, INC.: AN ORDINANCE TO WAIVE COMPETITIVE BIDDING AND ACCEPT A QUOTE IN THE AMOUNT OF $266,250.00 PLUS APPLICABLE TAXES AND FREIGHT CHARGES FROM JACK TYLER ENGINEERING, INC. FOR THE PURCHASE OF SIX ANOXIC MIXERS FOR THE NOLAND WATER RESOURCE RECOVERY FACILITY, AND TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $26,625.00 WHEREAS, the Utilities Department determined that the anoxic mixers in both the East and West Basins at the Noland Water Resource Recovery Facility required replacement but, because one basin must remain open, the mixers can only be replaced in one basin at a time; and WHEREAS, on October 5, 2021, the City Council awarded Bid #21-63 and authorized the purchase of six replacement anoxic mixers for the East Basin from Jack Tyler Engineering; and WHEREAS, Jack Tyler Engineering is the sole authorized dealer of this type of anoxic mixer for our area and mixers for the West Basin must match those in the East Basin. NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby determines an exceptional situation exists in which competitive bidding is deemed not feasible or practical and therefore waives the requirements of formal competitive bidding and authorizes the purchase of six anoxic mixers for the Noland Water Resource Recovery Facility for the amount of $266,250.00 (plus any applicable taxes and freight charges) from Jack Tyler Engineering, Inc., and further approves a project contingency in the amount of $26,625.00. Page 1 Printed on 416122 Ordinance: 6549 File Number: 2022-0235 PASSED and APPROVED on 4/5/2022 Attest: t • ti Kara Paxton, City Clerk Treasurer 1� L7N G0� ';,'i`� riImli Page 2 Printed on 416122 City of Fayetteville, Arkansas 113 West Mountain Street Fayetteville, AR 72701 (479)575-8323 Text File File Number: 2022-0235 Agenda Date: 4/5/2022 Version: 1 Status: Passed In Control: City Council Meetinq File Type: Ordinance Agenda Number: DA JACK TYLER ENGINEERING, INC.: AN ORDINANCE TO WAIVE COMPETITIVE BIDDING AND ACCEPT A QUOTE IN THE AMOUNT OF $266,250.00 PLUS APPLICABLE TAXES AND FREIGHT CHARGES FROM JACK TYLER ENGINEERING, INC. FOR THE PURCHASE OF SIX ANOXIC MIXERS FOR THE NOLAND WATER RESOURCE RECOVERY FACILITY, AND TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $26,625.00 WHEREAS, the Utilities Department determined that the anoxic mixers in both the East and West Basins at the Noland Water Resource Recovery Facility required replacement but, because one basin must remain open, the mixers can only be replaced in one basin at a time; and WHEREAS, on October 5, 2021, the City Council awarded Bid #21-63 and authorized the purchase of six replacement anoxic mixers for the East Basin from Jack Tyler Engineering; and WHEREAS, Jack Tyler Engineering is the sole authorized dealer of this type of anoxic mixer for our area and mixers for the West Basin must match those in the East Basin. NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby determines an exceptional situation exists in which competitive bidding is deemed not feasible or practical and therefore waives the requirements of formal competitive bidding and authorizes the purchase of six anoxic mixers for the Noland Water Resource Recovery Facility for the amount of $266,250.00 (plus any applicable taxes and freight charges) from Jack Tyler Engineering, Inc., and further approves a project contingency in the amount of $26,625.00. City of Fayetteville, Arkansas Page 1 Printed on 41612022 City of Fayetteville Staff Review Form 2022-0235 Legistar File ID 4/5/2022 City Council Meeting Date - Agenda Item Only N/A for Non -Agenda Item Tim Nyander 3/18/2022 WASTEWATER TREATMENT (730) Submitted By Submitted Date Division / Department Action Recommendation: Staff recommends approval of the purchase of six (6) anoxic mixers for the Noland Water Resource Recovery Facility from Jack Tyler Engineering, Inc. in the amount of $266,250.00 including applicable taxes and freight charges, and approval of a contingency in the amount of $26,625.00. Budget Impact: 5400.730.5800-5801.00 Water and Sewer Account Number Fund 02069.1 Plant Pumps and Equipment - WWTP Project Number Project Title Budgeted Item? Yes Current Budget $ 1,459,141.00 Funds Obligated $ 571,499.44 Current Balance $ 887,641.56 Does item have a cost? Yes Item Cost $ 292,875.00 Budget Adjustment Attached? No Budget Adjustment $ - Remaining Budget 594,766.56 V20210527 Purchase Order Number: Previous Ordinance or Resolution # Change Order Number: Original Contract Number: Approval Date: Comments: The total estimated cost including freight and taxes is $266,250.00. Staff also requests a 10% contingency in the amount of $26,625.00. CITY OF FAYETTEVILLE ARKANSAS MEETING OF APRIL 5, 2022 TO: Mayor and City Council THRU: Susan Norton, Chief of Staff Water & Sewer Committee FROM: Tim Nyander, Utilities Director DATE: March 18, 2022 CITY COUNCIL MEMO SUBJECT: Jack Tyler Engineering, Inc. — Six Anoxic Mixers for Noland WRRF RECOMMENDATION: Staff recommends approval of the purchase of six (6) anoxic mixers for the Noland Water Resource Recovery Facility from Jack Tyler Engineering, Inc. in the amount of $266,250.00 including applicable taxes and freight charges, and approval of a contingency in the amount of $26,625.00. BACKGROUND: Bid #21-63 was conducted for the replacement of the anoxic mixers for the East Basin at Noland WRRF. The project was intended to replace all the mixers in both the West and East Basins. Jack Tyler was the lowest responsive bidder and was selected to provide the equipment because the only other bidder did not meet specifications. The bid specifications required engineering to match the mixers with the process design for wastewater treatment. The East and West Basins are symmetrical and require the same mixer configuration to operate in the same manner. DISCUSSION: It was not possible to bid 12 mixers and replace them at the same time. During the fall/winter/early spring, the permit is relaxed allowing the plant to treat with only one basin. However, one basin must remain in service. We were only able to purchase six mixers because we could only install one basin in that time period. The remaining mixers will be installed in the next permit period that allows one basin. Because Jack Tyler Engineering is the sole provider of the brand of anoxic mixers to match existing equipment, staff is seeking a bid waiver to complete the rehabilitation of the remaining basin in 2022. Jack Tyler Engineering has submitted a quote for six anoxic mixers. The total estimated cost including freight and taxes is $266,250.00. Staff also requests a 10% contingency in the amount of $26,625.00 due to fluctuations in the current materials market. Mailing Address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 BUDGET/STAFF IMPACT: Funds are available in the Plant Pumps and Equipment account. Attachments: Quote from Jack Tyler Engineering ��Net E lg - JACK TYLER ENGINEERING, INCORPORATED 6112 PATTERSON AVENUE, LITTLE ROCK, ARKANSAS 72209 (501) 562-2296 FAX (501) 562-4273 WATTS 1-800-562-2296 � a Ooorpove QUOTATION NUMBER: SJ22422A Rv1 QUOTATION DATE: March 17, 2022 PAGE: 1 OF 2 TO: City of Fayetteville 1400 Fox Hunter Road Fayetteville, AR 72901 ATTN: Josh Alleman COPIES: James Spann Cory Gray Phone: 479-502-0963 Email: Joshua.alleman@jacobs.com ITEM 1: Xylem FLYGT Adaptive Mixer, model 4320 1.5HP with 3 blade 2.0 Meter diameter mixer. 460 volt 3— single speed operation. Includes MinCAS and socket for mixer monitoring. PRICE EACH.................................................................................................................. $ 35,500 PRICE FOR SIX UNITS................................................................................................$ 213,000 DELIVERY: 14-16 Weeks, ARO FOB POINT: Shipping Point; Standard Freight and Fayetteville (9.75%) Sales Taxes Included ITEM 2: Xylem FLYGT Mixer Tripod with 20 foot tall 4" square mast. Constructed of 304 stainless steel. PRICE EACH....................................................................................................................$ 8,875 PRICE FOR SIX UNITS..................................................................................................$ 53,250 DELIVERY: 14-16 Weeks, ARO FOB POINT: Shipping Point; Standard Freight and Fayetteville (9.75%) Sales Taxes Included 'NOTE: FREIGHT CHARGES AND ANY APPLICABLE SALES TAXES ARE NOT INCLUDED IN QUOTED PRICE. Thank you for the opportunity to quote on your requirements. If we may be of further assistance, please do not hesitate to contact me at scott(a_jteng.com or 479-806-8970. Very truly yours, JACK TYLER ENGINEERING, INCORPORATED Scott Jones Senior Sales Representative �,\ler Eqo,� JACK TYLER ENGINEERING, INCORPORATED 6301 S UNIVERSITY AVE, LITTLE ROCK, ARKANSAS 72209 iy ea (501) 562-2296 • FAX (501) 562-4273 • ARKANSAS WATS 1-800-562-2296 rorporat STATEMENT OF TERMS AND CONDITIONS TERMS/PAYMENTS: Our terms of payment are net cash 15 days from date of the invoice subject to Seller's prior credit approval. If the Buyer shall fail to make any payments in accordance with the terms and conditions of sale, the Seller, in addition to its other rights and remedies, but not in limitation thereof, may, at its option, without prior notice, cancel this order as to any undelivered products or defer shipments or deliveries hereunder, or under any other agreement between Buyer and Seller, except upon Seller's receipt of cash before shipment or such security as Seller considers satisfactory. Seller reserves the right to impose an interest charge of 16% on the balance of each invoice not paid on its due date for the period from the due date to the date of receipt of payment by Seller. In the event Buyer's failure to make timely payments to Seller results in Seller incurring additional costs, including but not limited to collection expenses and attorneys' fees, said costs shall be added to the amount due Seller from Buyer. Buyer shall have no right to any discount or retainage and shall not withhold payment as a set-off on Seller's invoice in any amount. Visa, MasterCard, Discover, and American Express credit card purchases are accepted. SHIPMENT: The date of shipment is subject to our receiving your order with complete information at our office, final approval of any prints or drawings as may be required, credit approval, and the acceptance of your order by the company. Freight Charges are not included in the quoted price. EXPIRATION: Quotation expires 30 days from the date of proposal and, in the interim, is subject to change without notice. TAXES: Unless otherwise stated in the proposal, the prices quoted herein are exclusive of all sales, use and similar taxes and, wherever applicable, such taxes will be added to the invoice as separate items. SPECIAL NOTE: THIS PROPOSAL IS BASED ON CURRENT PRICES. EQUIPMENT IS SUBJECT TO THE SAME PERCENTAGE INCREASE AS MADE BY OUR SUPPLIERS AND THE INVOICE WILL REFLECT PRICE IN EFFECT AT TIME OF SHIPMENT UNLESS SPECIFICALLY EXCEPTED. WE WILL NOT ACCEPT RETAINAGE ON ANY OF OUR INVOICES! ***** A $50.00 minimum order charge will apply ***** WARRANTY: "The products sold by Jack Tyler Engineering, Inc. hereunder are manufactured by others, and the only warranties that apply to these products are those of the manufacturer of the products which can be passed on by Jack Tyler Engineering, Inc. to its customers. No other warranty of any kind is given in connection with the sale of any of the above products, and JACK TYLER ENGINEERING, INC. MAKES NO WARRANTY OF ANY KIND, EXPRESS OR IMPLIED, AS TO MERCHANTABILITY, FITNESS FOR A PARTICULAR PURPOSE, OR AS TO ANY OTHER MATTER RESPECTING THESE PRODUCTS. Jack Tyler Engineering, Inc. shall not be liable in connection with the sale of the above products for any incidental or consequential damages of any kind." An electronic copy of the latest version is available online at www.jteng.com. Form No. 41-1 Rev. 07 - 06/27/17