City Council Transportation Committee
Tuesday, March 29, 2022
5:30 pm or Immediately Following Agenda Session
NOTICE: THE TRANSPORTATION COMMITTEE WILL BE HELD VIRTUALLY WITH NO
PHYSICAL LOCATION TO ATTEND
VIDEO CONFERENCING BY ZOOM WILL BE USED FOR THIS MEETING. TO REGISTER
FOR THE MEETING GO TO THIS Registration Link
Members: Sarah Bunch; Sonia Gutierrez; Holly Hertzberg; Mark Kinion
City Staff: Chris Brown, Public Works Director/City Engineer; Terry Gulley, Asst. PW Director
for Operations/Transportation Services Director
Agenda:
1. New Business:
A. Trailblazers+ETHIC — SLOW STREETS
B. NEW BRIDGE RD — TRAFFIC CALMING. Staff is requesting a recommendation for the
proposed traffic calming plan for New Bridge Road.
C. TRANSPORTATION BOND PROGRAM COST UPDATE
2. Adjourn
Mailing Address:
113 W. Mountain Street www.fayetteville-ar.gov
Fayetteville, AR 72701
\I
GES -
J • w- ` �" FROM 28' WIDE (WEST)
TO 31' WIDE EAST),
ir
Via V11
o
i 4828 4810� 4792 r�
Z 756
9 F.I 695 >� m
y
i h * S M ! 1• ;F
+/ \
W NEW BRIDGE RD
F 7
rip 4847 Y...; ►'� M`'
4811' 4793 827714775 �1822
zS "1 i
"T
Y \
I'
i
V
7
0
r I LIJ
W 0
LU
W LLJ
� Q
LU
" 4511 i U) Z
k 4557
REVISED
b� r
ON
' 4
` hoLU
� r
§ LLUjQ 0 v~
OZ Z
LLI
a
Q
0LLLLQ z0
Ld
M m
28' STREET WIDTH 31' $TREET WIDTH
s' e' V
2.6 T 2' 2 J r �, 2. 4 Z
LLJ
DATE Oct 29, 2021
SPEED CUSHION DETAIL SHEET
DIMENSION OF ONE SPEED CUSHION
: O O
i ONE
DRAWING.
New Bridge Tmflic Calming Layout
—� CITY OF
FAYETTEVILLE
ARKANSAS
TRANSPORTATION COMMITTEE
MEETING OF MARCH 29, 2022
TO: Transportation Committee Members
THRU: Chris Brown, Public Works Director
FROM: Matt Casey, Engineering Design Manager
DATE: March 23, 2022
SUBJECT: 2019 TRANSPORTATION BOND PROGRAM
CITY COUNCIL MEMO
On December 18, 2018, The Fayetteville City Council approved Ordinance 6126 authorizing the
special election seeking approval of ten questions regarding issuance of bonds. On April 9, 2019,
the voters approved all ten bond questions of the special election. Question 2 of the special
election authorized the issuance of capital improvement bonds for an amount not to exceed
$73,925,000. On September 3, 2019, the City Council approved the appropriation of $36,037,589
for the 2019 Transportation Bond Program.
The overall transportation project list developed in conjunction with the special election request
was prioritized and the Phase 1 Transportation Bond project list was established (see
attachment). The list included 19 projects identified to be fully funded from design through
construction and 7 projects to be funded for design only with the intent to fund construction in
Phase 2. The current status of these projects is as follows:
PROJECTS COMPLETED
• Steamboat Drive
• Rupple Rd. (Tanyard to Weir)
• Centennial Park Entrance Drive
• Downtown Sidewalk Improvements (Church Ave.)
• Signal Upgrades
PROJECTS OUT FOR BID
• Archibald Yell Safety Improvements
• Center/Harmon Intersection
PROJECTS UNDER CONSTRUCTION
• Zion Rd.
• Sain St. Extension
• Shiloh Drive/Fulbright Expressway Intersection
• Midtown Corridor Phase 1 (Porter and Deane Intersection)
• Pavement Overlays
Mailing Address:
113 W. Mountain Street www.fayetteville-ar.gov
Fayetteville, AR 72701
• Downtown Sidewalk Improvements (Spring St. Lighting)
PROJECTS UNDER DESIGN
• North Street Corridor
• Highway 71 B Corridor
• Midtown Corridor
• 151h/Razorback Intersection
• Midtown Corridor (Deane and Sycamore)
• Midtown Corridor (Poplar)
• Futrall/ Gregg and Shiloh/Gregg Railroad Crossings
• Downtown Sidewalk Improvements (Prairie and West)
• Downtown Sidewalk Improvements (Dickson St)
• Appleby/Plainview/Rolling Hills Connection
• Millsap/College Intersection
• Rolling Hills Drive
Since the issuance of the bonds, the construction industry has changed significantly. We have
seen large cost increases that are causing projects to come in well over their original budget
amounts. In some cases, project bids come in higher than our allowable amount to award. Other
bids have failed to receive bidders at all. The original cost estimate for the transportation bond
projects was $62,285.000. Current that project estimate is almost double at $122,976,551.
As a result of this construction and bidding environment, the transportation project list will need
to be reprioritized. Engineering staff has prepared a spreadsheet showing the current status and
project estimates for each of the transportation projects as well as the project priority with regards
to the funding available (see attachment). The sheet shows the project list with a cumulative cost
column based on the funding. Currently there is just over $9,000,000 remaining in the phase 1
issuance. Using this priority list, Center/Harmon, Archibald Yell, 15th/Razorback and a portion of
Deane and Sycamore can be funded in phase 1. The phase 2 issuance can be up to $37,887,411.
The list shows the additional 14 projects that could be funded in with those funds. We identified
the additional 11 projects that exceed the funding limits by approximately $40,000,000. Staff is
currently looking into other funding opportunities including federal aid grants and private grants
that will help stretch our bond funding to include some of the projects that the bond funds will not
cover.
Staff is requesting that the Transportation Committee review the project priority list shown on the
spreadsheet and make recommendations on the project priorities as well as any additional
projects that should be considered.
Attachments (2)
Transportation Bond Program
Phase 1 Funding
Total
Cost
City
Cost
Other
Funding
Phase
1
Phase 1 Construction
Porter Rd./149 Interchange
$1,000,000
$1,000,000
$0
$ 1,000,000
Porter Rd. and Deane St. - 149 to Garland Ave.
$4,240,000
$2,140,000
$2,100,000
$ 2,140,000
Appleby/Plainview/Rolling Hills Connection
$3,500,000
$3,500,000
$0
$ 3,500,000
15th St. /Razorback Rd. Intersection
$1,100,000
$1,100,000
$0
$ 1,100,000
Shiloh Dr./ Fulbright Expressway Intersection
$860,000
$860,000
$0
$ 860,000
Center St./ HarmonAve. Intersection
$1,300,000
$1,300,000
$0
$ 1,300,000
Steamboat Dr./ Dorothy Jeanne St. Connection
$670,000
$670,000
$0
$ 670,000
Rupple Rd. Extension - Tanyard Dr. to Weir Rd.
$3,000,000
$3,000,000
$0
$ 3,000,000
Sain St. Extension
$6,600,000
$1,320,000
$5,280,000
$ 1,320,000
Centennial Park Entrance Drive
$1,000,000
$1,000,000
$0
$ 1,000,000
Archibald Yell Blvd. Safety Improvements
$700,000
$700,000
$0
$ 700,000
Maple St. Cycle Track
$4,000,000
$1,000,000
$3,000,000
$ 1,000,000
Zion Rd. Improvements
$4,900,000
$4,900,000
$0
$ 4,900,000
Futrall/Gregg and Shiloh/Gregg RR Crossings
$1,000,000
$1,000,000
$0
$ 1,000,000
Downtown Sidewalk Impts (Incl. Cultural Arts Corr.)
$3,000,000
$3,000,000
$0
$ 2,580,000
MLK Area Walkability Improvements
$1,000,000
$1,000,000
$0
$ 852,000
Pavement Maintenance / Overlays
$5,000,000
$5,000,000
$0
$ 2,700,000
Signal Hardware / Software Upgrades
$1,400,000
$1,400,000
$0
$ 1,400,000
Other Signalization (4-5 Locations TBD)
$1,000,000
$1,000,000
$0
$ 1,000,000
Total Phase 1 Construction $ 32,022,000
Phase 1 Design Only
Sycamore St. - Garland Ave. to Gregg Ave.
$2,960,000
$2,960,000
$0
$296,000
Highway 71 B - North St. to Township St.
$10,000,000
$10,000,000
$0
$500,000
North Street - Garland Ave. to Mission Blvd.
$720,000
$3,420,000
$0
$342,000
Millsap Rd. / College Ave. Intersection Improvements
$1,200,000
$1,200,000
$0
$120,000
Old Wire Rd. Cycle Track (Extension)
$800,000
$400,000
$400,000
$80,000
Rolling Hills Improvements - College to Old Missouri
$3,500,000
$3,500,000
$0
$350,000
Joyce Blvd. Safety Impr. (Vantage to Old Missouri)
$1,250,000
$1,250,000
$0
$125,000
Total Phase 1 Design Only $ 1,813,000
Contingency/Unallocated $ 2,165,000
Total Phase 1 Funding $ 36,000,000
TRANSPORTATION BOND PROGRAM
Status/
Priority
Remaining Transportation Bond Program
Projects
Original
Cost
Estimate
Current
Project
Estimate
Difference
Original to
Current
Other
Funding
Available
Spent or
Encumbered
To Date
Funds
Needed
To Complete
Phase 1
Funding
Cumulative
Phase 2
Funding
Cumulative
Future
Funding
Cumulative
Complete
Steamboat Drive
$
670,000.00
$
410,539.35
$
(259,460.65)
$
410,539.35
$
$
$
Complete
Rupple Rd Extension
$
3,000,000.00
$
3,469,804.35
$
469,804.35
$
3,469,804.35
$
$
$
Complete
Centennial Park Entrance Drive
$
1,000,000.00
$
844,836.88
$
(155,163.12)
$
844,836.88
$
$
$
Construction
Zion Rd. Improvements
$
4,900,000.00
$
4,741,001.98
$
(158,998.02)
$
4,741,001.98
$
$
$
Construction
Sain St. Extension
$
1,320,000.00
$
776,922.09
$
(543,077.91)
$
776,922.09
$
$
$
Construction
Shiloh Dr/Fulbright Expressway Intersection
$
860,000.00
$
1,972,183.32
$
1,112,183.32
$
1,972,183.32
$
$
$
Construction
Midtown Corridor - Porter and Deane at PD HQ
$
1,240,000.00
$
4,293,754.80
$
3,053,754.80
$
4,293,754.80
$
$
$
Complete
North Street Corridor - Conceptual Design
$
342,000.00
$
250,948.69
$
(91,051.31)
$
250,948.69
$
$
$
Design
North Street Corridor - Mission Intersection
$
358,000.00
$
104,845.00
$
(253,155.00)
$
104,845.00
$
$
$
Design
Highway 71B Corridor - Design
$
1,200,000.00
$
1,209,987.37
$
9,987.37
$
1,209,987.37
$
$
$
Design
Midtown Corridor - Design***
$
820,000.00
$
1,436,721.47
$
616,721.47
$ 439,316.00
$
997,405.47
$
$
$
Ongoing
Signal Upgrades
$
1,400,000.00
$
1,400,000.00
$
-
$
1,256,763.51
$
143,236.49
$
143,236.49
Design
Center St./ Harmon Ave. Intersection
$
1,300,000.00
$
3,000,778.08
$
1,700,778.08
$
257,318.38
$
2,743,459.70
$
2,886,696.19
$
Design
Archibald Yell Blvd. Safety Improvements
$
700,000.00
$
3,088,910.43
$
2,388,910.43
$
273,145.11
$
2,815,765.32
$
5,702,461.51
$
Design
15th St. /Razorback Rd. Intersection****
$
1,100,000.00
$
2,280,000.00
$
1,180,000.00
$
-
$
2,280,000.00
$
7,982,461.51
$
Design
Midtown Corridor - East Deane, Sycamore and Poplar
$
5,140,000.00
$
8,460,872.00
$
3,320,872.00
$ 1,600,000.00
$
46,082.75
$
6,814,789.25
$
9,066,180.65
$
5,731,070.11
Design
Futrall/Gregg Railroad Crossing
$
500,000.00
$
1,434,579.15
$
934,579.15
$
45,432.10
$
1,389,147.05
$
7,120,217.16
Design
Jocelyn Closure
$
-
$
750,000.00
$
750,000.00
$
-
$
750,000.00
$
7,870,217.16
Design
Highway 71B Corridor - North to Green Acres
$
4,000,000.00
$
6,026,000.00
$
2,026,000.00
$ 3,000,000.00
$
-
$
3,026,000.00
$
10,896,217.16
Ongoing
Pavement Maintenance/Overlays
$
5,000,000.00
$
5,000,000.00
$
$
2,639,110.87
$
2,360,889.13
$
13,257,106.29
Ongoing
Downtown Sidewalk Improvements*
$
3,000,000.00
$
4,661,820.35
$
1,661,820.35
$
2,220,572.77
$
2,441,247.58
$
15,698,353.87
Maple Street
$
1,000,000.00
$
8,000,000.00
$
7,000,000.00
$ 7,200,000.00
$
63,261.18
$
736,738.82
$
16,435,092.69
Design
North Street Corridor - College and North Int.
$
400,000.00
$
550,000.00
$
150,000.00
$
550,000.00
$
16,985,092.69
Design
North Street Corridor - Garland to Greenway
$
720,000.00
$
2,600,000.00
$
1,880,000.00
$
2,600,000.00
$
19,585,092.69
Design
Appleby/Plainview/Rolling Hills Connection
$
3,500,000.00
$
6,597,704.00
$
3,097,704.00
$
509,451.52
$
6,088,252.48
$
25,673,345.17
Design
Millsap Rd. / College Ave. Intersection Improvements
$
1,200,000.00
$
4,280,000.00
$
3,080,000.00
$
302,728.71
$
3,977,271.29
$
29,650,616.46
Design
Shiloh/Gregg Railroad Crossings
$
500,000.00
$
1,434,579.14
$
934,579.14
$
1,434,579.14
$
31,085,195.60
University Closure
$
-
$
800,000.00
$
800,000.00
$
-
$
800,000.00
$
31,885,195.60
Design
15th Street Overpass
$
-
$
2,250,000.00
$
2,250,000.00
$ 1,500,000.00
$
-
$
750,000.00
$
32,635,195.60
Design
Highway 71B Corridor - Green Acres to Township
$
2,800,000.00
$
14,702,000.00
$
11,902,000.00
$
14,702,000.00
$ 14,702,000
Design
Highway 71B Corridor - 15th St to MLK
$
2,000,000.00
$
8,675,000.00
$
6,675,000.00
$
8,675,000.00
$ 23,377,000
MLK Area Walkability Improvements
$
1,000,000.00
$
1,000,000.00
$
-
$
12,685.53
$
987,314.47
$ 24,364,314
North Street Corridor - College to Mission
$
900,000.00
$
980,000.00
$
80,000.00
$
980,000.00
$ 25,344,314
North Street Corridor - Gregg to College
$
350,000.00
$
520,000.00
$
170,000.00
$
520,000.00
$ 25,864,314
North Street Corridor - Greenway to Gregg
$
350,000.00
$
480,000.00
$
130,000.00
$
480,000.00
$ 26,344,314
Joyce Blvd. Safety Impr. (Vantage to Old Missouri)
$
1,250,000.00
$
2,000,000.00
$
750,000.00
$
3,444.49
$
1,996,555.51
$ 28,340,870
Midtown Corridor - Porter Interchange
$
1,000,000.00
$
2,000,000.00
$
1,000,000.00
$
-
$
2,000,000.00
$ 30,340,870
Other Signalization**
$
1,000,000.00
$
1,000,000.00
$
$
-
$
1,000,000.00
$ 31,340,870
Design
Rolling Hills Improvements - College to Old Missouri
$
3,500,000.00
$
6,527,763.32
$
3,027,763.32
$
314,515.58
$
6,213,247.74
$ 37,554,118
Admin
$
2,965,000.00
$
2,965,000.00
$
$
260,629.00
$
2,704,371.00
$ 40,258,489
Totals
$
62,285,000.00
$
122,976,551.77
$
60,691,551.77
$ 13,739,316.00
$
27,277,370.80
$
81,959,864.97
Remaining Funds From Issuance #1 $ 9,066,181
Issuance #2 $ 33,000,000
Issuance #3 $ 2,963,664
Total Bond Funds Remaining $ 45,029,845
Trail Bond Program
* Includes Dickson, Prairie and West Ave. (South of South St.), Spring St. Lighting, Square Lighting, Church St, Cultural Arts Corridor Existing Federal Aid
** Possible Intersections Include Huntsville/Morningside, MLK/Wood, Woodlark?Mt. Comfort, Wedington/51st, Wedington/Broyles and Hwy 265/Cliffs Potential Federal Aid
***Spent to Date Does Not Include $410,000 WFF Grant
****Current project estimate for Razorback/15th is for the full construction. We are currently pursing a signal only option which will lower the project estimate to $1,200,000
CITY OF
FAYETTEVILLE
ARKANSAS
CITY OF FAYETTEVILLE
TRANSPORTATION BOND PROGRAM
PROGRESS REPORT — MARCH 2O22
The Transportation Bond Program consists of projects that will be designed, contracted, and
administered by City Staff or consultants/contractors working for the City. Funding for the Bond
Program includes $36 million in bonds for the first phase of the program.
UPCOMING CONSTRUCTION PROJECTS
PROJECT NAME
BID DATE
ESTIMATED CONST. COST
Center/Harmon Intersection
January 11,
2022
New bid opening set for
April 12,2022
Archibald Yell Blvd. Safety Improvements
January 11,
2022
New bid opening set for
April 5,2022
CURRENT CONSTRUCTION PROJECTS
PROJECT NAME
ESTIMATED
CONSTRUCTION
COMPLETION
CONTRACT
Zion Rd. (Vantage to Crossover)
June 2022
$4,395,109.35
Sain St. Extension
August
*$607,900.29
2022
Shiloh Fulbright Intersection
October
$1,680,751.00
2022
Midtown Corridor — Porter and Deane at
October
$4,169,565.00
PD Site
2022
*Transportation Bond Program portion of the contract.
COMPLETED PROJECTS
PROJECT NAME
COMPLETION
YEAR
ORIGINAL BUDGET
FINAL PROJECT
COST
Rupple Road
2021
$3,000,000
$3,532,722.51
Steamboat Dr./Dorothy Jeanne
2021
$670,000
$410,979.35
Centennial Park Entrance Drive
2021
$1,000,000
$834,721.75
Mailing Address:
113 W. Mountain Street
Fayetteville, AR 72701
www.fayetteville-ar.gov
For details regarding each of the Transportation Bond Projects, use the links provided below for
each project.
1) RUPPLE ROAD (TANYARD DR. TO WEIR RD.)
https://www.favetteville-ar.gov/3597/Rupple-Road-Extension
2) ZION ROAD PHASE II (VANTAGE DR TO CROSSOVER RD)
https://www.fayetteville-ar.gov/3586/Zion-Road-Improvements
3) STEAMBOAT / DOROTHY JEANNE CONNECTION
https://www.fayetteville-ar.gov/3596/SteamboatDorothy-Jean ne-St-Connection
4) SHILOH DR. / FULBRIGHT EXPRESSWAY INTERSECTION
https://www.fayetteville-ar.gov/3594/Shiloh-DrFuIbright-Expressway-I ntersecti
5) CENTER / HARMON INTERSECTION
https://www.favetteville-ar.gov/3595/CenterHarmon-Intersection
6) MIDTOWN CORRIDOR
https://www.favetteviIIe-ar.gov/3877/Midtown-Corridor-Prowect
7) SAIN STREET EXTENSION (FRONT ST. TO JOYCE BLVD.)
https://www.favetteville-ar.gov/3598/Sain-Street-Extension
8) MAPLE ST. CYCLE TRACK
https://www.favetteville-ar.gov/3581 /Maple -Street -Cycle -Track
9) 15t" ST. / RAZORBACK RD. INTERSECTION
https://www.favetteville-ar.gov/3592/15th Razorback -Intersection
10) HIGHWAY 71 B CORRIDOR
https://www.favetteville-ar.gov/3588/Highway-71 B-Corridor
11) APPLEBY / PLAINVIEW / ROLLING HILLS CONNECTION
https://www.favetteville-ar.gov/3771 /ApplebyPlainviewRolling-Hills-Connection
12) ARCHIBALD YELL BLVD. SAFETY IMPROVEMENTS
4
https://www.faVettevi I le-ar. gov/3584/Arch i ba Id -Yell -Blvd -Safety -Improvements
13) ROLLING HILLS IMPROVEMENTS (COLLEGE TO OLD MISSOURI)
https://www.faVettevilie-ar.gov/3585/Rolling-Hills-Improvements
14) JOYCE BLVD. SAFETY IMPROVEMENTS
https://www.faVettevi I le-ar. gov/3732/Joyce-B lvd-Safety-Improvements
15) NORTH ST. / MISSION BLVD. CORRIDOR
https://www.faVetteville-ar.gov/3589/North-Street-Corridor
16) OLD WIRE RD. CYCLE TRACK (EXTENSION)
https://www.faVetteville-ar.gov/3583/Old-Wire-Road-Cycle-Track
17) PAVEMENT MAINTENANCE / OVERLAYS
https://www.faVetteviIle-ar.gov/3600/Pavement-Maintenance0verlaVs
• 16.68 Miles of overlays have been completed as of March 2022
• $2,634,633.23 of the $2,700,00 has been spent or encumbered as of March
2022.
18) TRAFFIC SIGNAL HARDWARE / UPGRADES
httos://www.favetteville-ar.aov/3599/Sianal-HardwareSoftware-UDarades
• 103 of 110 signal controllers and 56 of 66 Video Detectors have been
upgraded as of March of 2022.
• $1,266,171.09 of the $1,400,000 has been spent or encumbered as of March
2022.
3
2021/2022 Overlay Projects
COMPLETED
Street
To
From
Length (ft)
Width (ft)
Tons
Plumberosa Dr.
Finger Rd.
City Limits
2890
18
942
85TH Ave.
Wedington Dr.
Goose Creek Rd.
6037
23
1698
Ravenswood Ln.
Country Club Dr.
Club Oak Dr.
419
24
123
Club Oak Dr.
Ravenswood Ln.
29th Ct.
1175
24
344
29th Ct.
Sand Trap Ln.
Cul de sac
577
26
183
Country Club Dr.
29th Circle
Sand Trap Ln.
345
24
102
28th Circle
Cul de sac
Country Club Dr.
401
26
128
27th Circle
Cul de sac
Country Club Dr.
300
25
92
West Ave.
11th
15th
1286
25
393
West Ave.
15th
Salvation Ln
421
30
155
Tally HO Dr.
Hunt Ln.
Cul de sac
922
30
338
Steeple Chase Dr.
Dead End
Hunt Ln.
550
30
202
Deane Solomon Rd.
Shiloh Dr.
112
8700
26
2765
Kings Dr.
Mission Blvd.
Arlington Ter.
1130
26
360
Old Dominion Way
Natchez Trace
Skillern Rd.
532
26
170
James Town
Natchez Trace
Cul de sac
346
26
110
Natehez Trce.
Williamsburg Ln.
Jamestown Rd.
503
28
173
Williamsburg
Natchez Trace
Cul de sac
295
28
101
Raliegh Circle
Charleston Xing
Cul de sac
286
27
95
Valerie Dr.
Hillside Ter.
Joyce St.
2300
22
619
Hillside Ter.
Dead End
Crossover Rd.
1488
24
437
Chestnut Ave.
Popular St.
Dead End
1065
30
391
Birch Ave.
Popular St.
Dead End
391
16
77
Old Farmington Rd.
Shiloh Dr.
One Mile Rd.
2187
27
722
Centinial
Old Farmington Rd
Centennnial Park
3901
18
1288
Persimmon St.
54TH St.
Broyles Ave.
2645
22
712
Maple St
Razorback Rd.
Oliver Ave.
399
26
127
Arbuckle Ln.
MLK
Dead End
308
23
87
Main St.
Eastern Ave.
Lewis Ave.
327
17
68
Neptune St.
Eastern Ave.
Dead End
295
18
65
Venus St.
Eastern Ave.
Dead End
322
21
83
Mitchell St.
Razorback Rd.
Gabbard Dr.
1154
30
424
Eastern Ave
Nettleship St.
MLK
1740
20
426
Palmer PI.
Palmer Ave.
Hartman Ave.
291
24
86
Palmer Ave.
Center St.
Palmer PI.
331
20
81
Hotz
Palmer PI.
Hartman Ave.
388
27
129
Hartman
Hotz Dr.
Nettleship St.
1300
27
429
Razorback Rd
Maple St.
Cleveland St.
1288
23
362
Sang Ave.
Cleveland St.
Wedington Dr.
1317
28
451
Leverette
Douglas St.
North St.
2060
24
605
Hughes
Leverette Ave.
Alley
150
22
41
Hughes St.
Alley
Garland Ave.
1 1331
26
43
Oakland
Hughes St.
Dead End
142
20
35
Lindall
Eagle St.
Hughes St.
675
27
223
Church St.
Center St.
Spring St.
713
30
262
54th St.
Sellers Rd.
Woolsey Farm Rd.
1323
20
122
Woolsey Farm
Broyles Ave.
54TH
1265
21
122
Forest Hills Dr.
85th Ave.
Walnut Ridge Ln.
2569
45
530
Cedar Ridge
Cul de sac
Cul de sac
1065
30
165
Sand Trap Ln.
Country Club Dr.
Dead End
164
31
63
Holly St.
Leverette Ave.
Oakland Ave.
365
26
116
Holly St.
Oakland Ave.
Lindell Ave.
345
30
127
Lindall
Parking Lot
Holly St.
214
18
48
Double Springs Rd.
Dot Tippton
Shreve DR.
3261
21
837
Gravel Rd.
Double Springs
Dead End
868
19
303
Sellers
54TH St.
Double Springs Rd.
3976
21
672
Hill St.
Stone St.
RR Tracks
650
22
66
College Ave.
MILK
15TH
2919
28
375
Ash St.
Walnut Ave.
Old Wire Rd.
2687
25
308
Walnut
Sycamore St.
Walnut St.
690
24
76
Sycamore
College Ave.
Walnut St.
780
26
92
Katherine Ave.
Wroxton Ct.
Oak Bailey Dr.
615
32
91
Oak Bailey Dr.
Old Wire Rd.
Katherine Ave.
1307
30
180
Charlee Ave
Rutherford Ave
Mission Blvd.
1217
30
168
Walnut
Gunter St.
Prospect St.
1136
21
292
Johnson
Walnut Ave.
Oliver Ave.
432
20
106
Olive Ave.
Maple St.
Prospect St.
1482
20
363
Huntsville Rd.
Blair Ave.
Morningside Dr.
511
54
338
MLK
College Ave.
Blair Ave.
2140
28
733
College Ave.
Rock St.
MLK
1649
28
565
Total
88055
23605
UP NEXT
Cardwell Ln.
Razorback Rd.
Oliver Ave.
397
24
117
Wood Ave.
MILK
McClinton St
1445
21
140
Clark St.
Dead End
Dead End
1301
22
350
Anson St.
Dead End
Dead End
1390
26
442
Ray St
100 Ft. N of 4th
Huntsville Rd.
1780
22
479
Charston Xing
Fredricksburg Cir.
Cul de sac
933
26
297
Beechwood Ave.
MLK
15th
2785
28
953
Brooks
15th St.
Boone St.
1097
24
322
Garland Ave.
Boone St.
Cato Springs Rd.
1751
24
514
Prospect
Park Ave.
Wilson Ave.
1532
23
431
Ila
Park Ave.
Wilson Ave.
1502
28
514
Mt. Comfort
Garland Ave.
Addington Ave.
1008
26
321
Finger
MLK
City Limits
4372
20
1067
Huntsville Rd.
Mill Ave.
Mashburne Ave
1784
24
524
Mashburne Ave.
Huntsville Rd.
MLK
126
54
84
Mill
I Rock ST
ISouth St.
1 3381
22
91
Rock Ave.
College Ave.
Mill Ave.
538
24
158
West Ave.
Meadow St.
Prarie St.
2106
22
567
Prairie
School St.
Government
925
23
260
South St.
School St
West Ave.
327
30
120
Gregg Ave
Center St.
MLK
2333
22
628
Government
Dead End
MLK
540
28
185
School St.
South St.
Archibald Yell Blvd
424
30
156
Oaks Manor Dr.
Sheryl Ave
Rollig Hills
1968
30
722
2021/2022 Sidewalk Projects
COMPLETED
Ward
Street
From
To
Placement
Type
Type
Comments
1
Huntsville Rd.
Seven Hills Dr.
Erika Ave.
South
New
Shelter Pad
Construct concrete pad and access for bus shelters
2
Lewis Ave.
Deane St.
Mt. Comfort Rd.
West
New
Shelter Pad
Construct concrete pad and access for bus shelters
2
Highland Ave.
Lafayette St.
Dickson St.
West
New
Shelter Pad
Construct concrete pad and access for bus shelters
2
Sycamore St.
Saddlehorn Ave.
Porter Rd.
South
Rep
Maintenance
Install 2 access ramps
4
Cleveland St.
Oliver Ave.
Sunset Dr.
Both
Rep
Maintenance
install 2 access ramps, correct driveway slope
4
Persimmon St.
Salem Rd.
Betty Jo Dr.
North
New
Maintenance
Install 4 access ramps
4
Verona Ln.
Ika Ln.
Miramar Dr
West
Rep
Maintenance
Replace failing sections of sidewalk
4
Bentgrass Rd.
Hay Meadows Ave.
Salem Rd.
Both
Rep
Maintenance
Replace access ramps
1
Finger Rd.
MLK Jr. Blvd.
Walmart driveway
West
New
Bus Stop
Widen street for bus pull off
1
Ray Ave.
Cul de sac
Pinyon Pt.
East
Rehab
Maintenance
Clean, replace failing sections
2
University Ave.
Whiteside St.
Powerhouse Ave.
East
Rep
Maintenance
Replace failing sections of sidewalk
3
Warwick Dr.
Pine St.
Notting Hill Dr.
North
Rep
Maintenance
Replace failing sections of sidewalk
1
Cato Springs Rd.
Razorback Rd.
Vale Ave.
North
Rehab
Maintenance
Clean and seal joints
2
Hill Ave.
Stone St.
MLK Jr. Blvd.
West
New
Shelter Pad
Construct concrete pad and access for bus shelters
2
Hill Ave.
Stone St.
MLK Jr. Blvd.
East
New
Shelter Pad
Construct concrete pad and access for bus shelters
3
Creekwood Ave.
Township St.
Cul-de-sac
North
New
Request
Connect neighborhood to Gulley Park and trail system
3
Birdie Dr.
Par Ct.
Crossover Rd.
North
Rep
Maintenance
Replace failing sections of sidewalk
3
Stearns St.
Abington /ct.
Old Missouri Rd.
North
Rehab
Maintenance
Clean and seal joints
UPCOMING
2
Mt. Comfort Rd.
Addington Ave.
Garland Ave.
South
New
Walk
Complete sidewalk/trail connection
1
Eleventh St.
Duncan Ave.
Hill Ave.
North
Rehab
Maintenance
Clean, replace failing sections
2
Mountain St.
West Ave.
School Ave.
South
Rep
Request
Brick border and sidewalk in poor condition
Mall Ave.
Joyce Blvd.
Van Asche Dr.
West
New
Shelter Pad
Construct concrete pad and access for bus shelters
Mall Ave.
Joyce Blvd.
Van Asche Dr.
East
New
Shelter Pad
Construct concrete pad and access for bus shelters
41
Heritage Ave.
Reliance St.
lWedington Dr.
Both
Rep
Maintenance
Replace heaved sidewalk and add access ramps
Proposed Project for complete construction by contractor (2022)
2
Leverett Ave.
Sycamore St.
Hazel St.
West
Rep
Replace deteriorated, non ADA sidewalk
2
Prairie St.
Gregg Ave.
Archibald Yell Blvd.
Both
New
Improvement Project - Bond
2
West Ave.
South St.
Prairie St.
Both
New
Improvement Project - Bond
Possible 2022 Projects
2
Lewis Ave.
Deane St.
Wedington Dr.
West
New
Fill gaps in sidewalk to complete connections
2
Lindell Ave.
Hughes St.
Cleveland St.
West
New
Fill gaps in sidewalk to complete connections
1
Hollywood Ave.
MLK Jr. Blvd.
Best Way St.
West
New
New sidewalk with storm drainage
2
Dickson St.
JArkansas Ave.
College Ave.
Both
Rep
Improvement/Rehab project - Bond
Page 1 of 1