FAYETTEVILLE PUBLIC SCHOOLS COST SHARE AGREEMENT:
A RESOLUTION TO APPROVE A COST SHARE AGREEMENT WITH FAYETTEVILLE
PUBLIC SCHOOLS FOR THE UPSIZING OF A WATER LINE ALONG RUPPLE ROAD
WITH A REFUND IN AN ESTIMATED AMOUNT OF $94,890.00 TO BE PAID BY THE CITY
OF FAYETTEVILLE, AND TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT
OF $18,978.00
WHEREAS, Fayetteville Public Schools is constructing a new middle school on Rupple Road which
requires an 8-inch waterline to service the project; and
WHEREAS, the City's water master plan identifies a 12-inch waterline grid every 1/2-mile and this
project provides an opportunity to cost share for a 12-inch line instead of 8-inch line at an estimated
cost to the City of $94,890.00; and
WHEREAS, pursuant to Ark. Code Ann. § 19-11-251, agreements between public procurement
units for intergovernmental use of commodities and services are exempt from competitive bidding
requirements.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby authorizes Mayor Jordan
to sign a cost share agreement with Fayetteville Public Schools to upsize an 8-inch waterline along
Rupple Road to a 12-inch waterline with a refund in an amount not to exceed $94,890.00 to be paid
by the City of Fayetteville for the cost of improvements that exceed the rough proportionality of the
impact of the development, and further approves a project contingency in the amount of $18,978.00.
Page 1 Printed on 31V22
Resolution: 54-22
File Number.' 2022-0093
PASSED and APPROVED on 3/1/2022
Attest:
Kara Paxton, City Clerk Treasurer :.k rF- 7� �'1C�
kANS p,5 ���•`
�<<i6� C'6o,�►�
Page 2 Printed on 3/2122
City of Fayetteville, Arkansas 113 West Mountain Street
Fayetteville, AR 72701
(479)575-8323
Text File
File Number: 2022-0093
Agenda Date: 3/1/2022 Version: 1 Status: Passed
In Control: City Council Meetinq File Type: Resolution
Agenda Number: A.2
FAYETTEVILLE PUBLIC SCHOOLS COST SHARE AGREEMENT:
A RESOLUTION TO APPROVE A COST SHARE AGREEMENT WITH FAYETTEVILLE PUBLIC
SCHOOLS FOR THE UPSIZING OF A WATER LINE ALONG RUPPLE ROAD WITH A REFUND IN
AN ESTIMATED AMOUNT OF $94,890.00 TO BE PAID BY THE CITY OF FAYETTEVILLE, AND
TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $18,978.00
WHEREAS, Fayetteville Public Schools is constructing a new middle school on Rupple Road which requires
an 8-inch waterline to service the project; and
WHEREAS, the City's water master plan identifies a 12-inch waterline grid every'/z-mile and this project
provides an opportunity to cost share for a 12-inch line instead of 8-inch line at an estimated cost to the City of
$94,890.00; and
WHEREAS, pursuant to Ark. Code Ann. § 19-11-251, agreements between public procurement units for
intergovernmental use of commodities and services are exempt from competitive bidding requirements.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby authorizes Mayor Jordan to sign a
cost share agreement with Fayetteville Public Schools to upsize an 8-inch waterline along Rupple Road to a
12-inch waterline with a refund in an amount not to exceed $94,890.00 to be paid by the City of Fayetteville
for the cost of improvements that exceed the rough proportionality of the impact of the development, and
further approves a project contingency in the amount of $18,978.00.
City of Fayetteville, Arkansas Page 1 Printed on 31212022
Tim Nyander
Submitted By
City of Fayetteville Staff Review Form
2022-0093
Legistar File ID
3/1/2022
City Council Meeting Date - Agenda Item Only
N/A for Non -Agenda Item
2/9/2022 WATER SEWER (720)
Submitted Date Division / Department
Action Recommendation:
Staff recommends approval of a cost share agreement with Fayetteville Public Schools in an amount not to exceed
$94,890.00 to upsize an 8-inch diameter water main to 12-inch diameter for the construction of a new middle
school, and approval of a project contingency in the amount of $18,978.00.
Budget Impact:
5400.720.5600-5808.00
Water and Sewer
Account Number
Fund
04039.1
Water Impact Fee Cost Sharing Projects
Project Number
Project Title
Budgeted Item? Yes
Current Budget
$ 1,343,130.00
Funds Obligated
$ 593,457.60
Current Balance
749,672.40
Does item have a cost? Yes
Item Cost
$ 113,868.00
Budget Adjustment Attached? No
Budget Adjustment
$ -
Remaining Budget
635,804.40
V20210527
Purchase Order Number: Previous Ordinance or Resolution #
Change Order Number: Approval Date:
Original Contract Number:
Comments:
CITY OF
FAYETTEVILLE
ARKANSAS
MEETING OF MARCH 1, 2022
TO: Mayor and City Council
THRU: Susan Norton, Chief of Staff
Water & Sewer Committee
FROM: Tim Nyander, Utilities Director
DATE: February 9, 2022
CITY COUNCIL MEMO
SUBJECT: Fayetteville Public Schools — Cost Share Agreement for Upsizing a Water
Main on Rupple Road
RECOMMENDATION:
Staff recommends approval of a cost share agreement with Fayetteville Public Schools in an
amount not to exceed $94,890.00 to upsize an 8-inch diameter water main to 12-inch diameter
for the construction of a new middle school on Rupple Road, and approval of a project
contingency in the amount of $18,978.00.
BACKGROUND:
A new middle school is under construction on Rupple Road and is required to install an 8-inch
waterline to service the project. The City's Water Master Plan has recommended an
approximate 12-inch waterline grid throughout the city at 1/2-mile spacing. As developments
have occurred, the City has participated to extend 12-inch waterlines along the newer portion of
Rupple Road between Persimmon Street and MLK Blvd. in pursuit of this recommendation.
DISCUSSION:
This project presents an opportunity for the City to pay the upcharge for installation of
approximately 1,378 feet of 12-inch water main. The overall project was priced from the
contractor performing the utility work for the school district. To install just the 8-inch water main
would have a cost of $315,720.00, and to install the 12-inch water main would have a cost of
$410,610.00. The difference of $94,890.00 is the amount that the City is proposing a cost share
on.
Since the Water Master Plan recommends this larger diameter, staff recommends approval of a
cost share agreement with Fayetteville Public Schools in an amount not to exceed $94,890.00
to pay for 100% of the cost to upsize the water main. Staff also recommends approval of a
project contingency in the amount of $18,978.00 to cover any unexpected additional costs that
could arise during construction.
Mailing Address:
113 W. Mountain Street www.fayetteville-ar.gov
Fayetteville, AR 72701
BUDGET/STAFF IMPACT:
Funds are available within the Water/Sewer Impact Fee Cost Sharing account.
Attachments:
Cost Share Agreement
Area Map
Cost Share Request Letter with Engineering/Construction Estimates
CONTRACTUAL AGREEMENT FOR
COST SHARE OF WATER MAIN INSTALLATION COSTS
This Agreement, made and entered into on this_Lday of March, 2022, by and between
the City of Fayetteville, Arkansas ("City") and Fayetteville School District No. 1 of Washington
County ("FPS"), witnesseth:
WHEREAS, FPS is extending an 8-inch water main along Rupple Road and is to facilitate
the construction of a new middle school which will be served by the City of Fayetteville's water
system; and
WHEREAS, the City's Water Master Plan recommends a 12-inch water main in this area
to provide capacity for future development; and
WHEREAS, constructing this segment of water main will provide service to the new
middle school, allow the City to upsize the water main from 8-inch to 12-inch to follow the
recommendation of the City's Water Master Plan, and also allow for ample future capacity which.
the City recognizes will be necessary for the area that is served by this water main.
NOW, THEREFORE, the City of Fayetteville, Arkansas and FPS agree as follows:
1. The City of Fayetteville, Arkansas agrees to:
A. Reimburse FPS for 100% of the cost to upsize the required 8-inch water main to
12-inch water main in the area identified in Exhibit "A" up to a maximum -not -to -
exceed amount of 94,890.00, as was estimated by the builder's representatives and
shown on Exhibit `B", attached.
B. Payments due to FPS, shall be remitted within sixty (60) days after receipt of valid
invoices upon completion of the project.
2. FPS agrees to:
A. Provide the necessary and normal project management, inspection, and testing as
necessary for a complete and acceptable water main installation, including
submittal of plans and specifications to the City's Engineering Department, per
their standard procedures.
B. Submit all required plans and specifications to the City and receive approval from
the City's Engineering and Utilities Departments prior to commencing work on the
project.
C. Provide a copy of the invoices from the Contractor upon City approval of the
water main installation.
D. Pay for the water main installation (with reimbursement from the City of
Fayetteville not to exceed $94,890.00).
IN AGREEMENT WITH ALL THE TERMS AND CONDITIONS ABOVE, WE
SIGN BELOW:
FAYETTEVILLE PUBLIC SCHOOLS
CITY OF FAYETTEVILLE,
ATTEST: �0111 i r 11111ifr.
ATTEST: .� G\.ER K ;'•pr, ►rri
Y
DR. MEGAN DUNCAN, KARA PAXTON, City Clerk = `
Associate SuperintendentLPX�.y�,
lii5t0"
699
w Baitidt=ra St 766
7713
798 801 798
620 823 822
872 875 M 674
EXHIBIT A
Ul
;l
{
/i
791
825
677
914 917 Ln 916 919
926 929 928 931
938 941 940 943
New
Fayetteville
Middle
School
Location
W Santa Fe..St
4257 4235
4223 4211 4199
1 4258
4238 4220 4188
4236 4216
4755
4232 4214
4254
4230 4210
W Coolidge pl
1 i17£ 4267 4259
Water main proposed to be
upsized from 8" to 12"
JORGENSEN
♦ +ASSOCIATES
Cvil Engineering SurveY ng
November 11, 2021
City of Fayetteville
Development Services
113 West Mountain Street
Fayetteville, AR 72701
EXHIBIT B
Re: Fayetteville Middle School Waterline Extension
124 W Sunbridge Drive, Suite 5
Fayetteville, AR 72703
Office: 479.442.9127
Mwww.lorgensenassoc.com
Established 1985
In regards the waterline extension along the Rupple Road, we are kindly seeking a cost share with the
city for this extension to upgrade the line from an 8 inch to a 12 inch. While this particular expenditure is
currently be incurred by one developer (Fayetteville Public Schools), we think that it is reasonable to anticipate
further development along with corridor and the upgrading line will aid in this future growth. Therefore, we are
asking that a portion of this extension be cost shared by the City.
8" Waterline Installation Cost: $315,720
Engineering/Surveying/Inspection: $31,572
Total Costs: $347,292
12" Waterline Installation Cost: $410,610
Engineering/Surveying/Inspection: $31,572
Total Costs: $442,182
We are kindly asking that the City cost share the difference in this upgrade to this extension: $442,182 -
$347,292 = $94,890
We also are seeking to allow a provision for overruns to be cost shared in the event that substantial rock is
encountered or if unknown circumstances require existing utilities to be relocated.
Please review at your convenience and let us know how we can be of further assistance for this project.
CW Utilities LLC
14491 Skyview E. Rd
West Fork, AR 72774
PH: (479) 846 - 4847
Cell: (479) 414 - 4129
Email: estimator@crosswaterconstruction.net
Fayetteville New Middle School
The price for the new water line using 12-inch C-900 is $410,610
Includes:
• Approx. 73-feet Jack & Bore with steel encasement
• Approx. 1,378-feet of 12-inch C900 w/ fittings
• Three Fire Hydrant Assemblies
• Vertical transition to go under storm drain
• Steel encasement going under storm drains
• One tee w/ valve for Fire Line
• Approx. 180-feet of 8" C-900 w/ fittings
• One Blow -Off
• Anchor Collars
The price for the new water line using 8-inch C-900 is $315,720
Includes:
• Approx. 73-feet Jack & Bore with steel encasement
• Approx. 1,558-feet of 8-inch C900 w/ fittings
• Three Fire Hydrant Assemblies
• Vertical transition to go under storm drain
• Steel encasement going under storm drains
• One tee w/ valve for Fire Line
• One Blow -Off
• Anchor Collars
Price for 12-inch: $410,610
Price for 8-inch: $315,720
Difference of: $ 94,890
Submitted by: Jason Stallings, Estimator
Sub Contractor's Summary
Price Difference
Scope of Work Description:
Price Difference Between 12" & 8"
Trade: Underground Utilities
Sub's Name: CW Utilities
Project: NMS
Date: 11 /1 /2021
Sales Tax %: 9.50%
Scope of Work Description
Materials
Labor
Equipment
Total Cost
Item Description
112-inch
Unit
Qty
Cost Per Unit
Total
Rate
# MH Hours
Total
Eq. Type
I # Hrs.
Rate
I Total
12-inch Material
C-900
FT
1 12781
$73.451
$93,869.10
1 $0.00
1
1 $0.00
$93,869.10
12-inch 45's
PC
1 5
$728.001
$3,640.001
1 $0.001
1
1 $0.00
$3,640.00
12-inch 11.25's
PC
I 41
$704.001
$2,816.001
1 $0.00I
1
1 $0.00
$2,816.00
12-inch 22.5
PC
1 3
$822.131
$2,466.391
1 $0.001
1
1 $0.00
$2,466.39
12x6 Anchor Tee
PC
1 4
$1,197.901
$4,791.601
$0.00
1
$0.00
$4,791.60
12x8 Anchor Tee
PC
1 3
$1,250.001
$3,750.001
1 $0.001
1
$0.00
$3,750.00
12-inch Anchor Coupling
PC
1 6
$1,289.161
$7,734.961
1 $0.001
1
1 $0.00
$7,734.96
12-inch Cap
PC
1 2
$549.871
$1,099.741
1 $0.001
1
1 $0.00
$1,099.74
12-inch Valve
PC
1 3
$3,250.00
$9,750.00
$0.00
1
1 $0.00
$9,750.00
24-inch Casing
FT
1 105
$140.351
$14,736.751
1 $0.001
1
1 $0.00
$14,736.75
24-inch End Seal
PC
1 6
$156.001
$936.001
1 $0.001
1
1 $0.00
$936.00
Casing Spacers
PC
1 11
$195.001
$2,145.001
1 $0.001
1
1 $0.00
$2,145.00
Class 67 Rock
Ton
1 566.581
$24.00
$13,597.92
$0.00
1
1 $0.00
$13,597.92
Class 7 Base
Ton
1 66.51
$21.001
$1,396.501
1 $0.001
1
1 $0.00
$1,396.50
8-inch Material
8-Inch C-900
FT
1 1278
-$31.25
-$39,937.501
1 $0.001
1
1 $0.00
-$39,937.50
8-inch 45's
PC
1 5
-$44.00
-$220.001
1 $0.001
1
1 $0.00
-$220.00
18-inch 11.25's
PC
1 41
-$396.001
-$1,584.001
1 $0.001
1
1 $0.00II
-$1,584.00
8-inch 22.5
PC
1 3
-$388.00
-$1,164.001
1 $0.001
11
1 $0.00
-$1,164.00
8x6 Anchor Tee
PC
1 4
-$603.00
-$2,412.001
$0.00
1
$0.00
-$2,412.00
8x8 Anchor Tee
PC
1 3
-$790.00
-$2,370.001
1 $0.001
1
1 $0.00
-$2,370.00
8-inch Anchor Coupling
PC
1 6
-$575.00
-$3,450.001
1 $0.001
1
1 $0.00
-$3,450.00
8-inch Cap
PC
1 2
-$310.00
-$620.00
$0.00
1
1 $0.00
-$620.00
8-inch Valve
PC
1 3
-$1,900.00
-$5,700.001
1 $0.001
J
1 $0.00
-$5,700.00
116-inch Casing
FT
1 1051$101.231
-$10,629.151
1 $0.001
1
1 $0.00
-$10,629.15
16-inch End Seal
PC
1 6
-$78.00
-$468.001
1 $0.001
1
1 $0.00
-$468.00
Casing Spacers
PC
1 11
-$49.40
-$543.401
1 $0.001
1
1 $0.00
-$543.40
Class 67 Rock
Ton
1251.811
-$24.00
-$6,043.441
1 $0.001
1
1 $0.00
-$6,043.44
Class 7 Base
Ton
1 44.33
-$21.00
-$930.931
1 $0.001
1
1 $0.00
-$930.93
Subtotals
$86,657.541 1 0.01 $0.00
PAGE 1 OF 1
0.01 1 $0.00
Taxes
Sub's Mark Up
Total Cost
$86,657.54
$8,232.47
$0.00
$94,890.01
Sub Contractor's Summary
Price Difference
Scope of Work Description:
Price Difference Between 12" & 8"
Trade: Underground Utilities
Sub's Name: CW Utilities
Project: NMS
Date: 11 /1 /2021
Sales Tax %: 9.50%
Scope of Work Description
Materials
Labor
Equipment
Total Cost
Item Description
112-inch
Unit
Qty
Cost Per Unit
Total
Rate
# MH Hours
Total
Eq. Type
I # Hrs.
Rate
I Total
12-inch Material
C-900
FT
1 12781
$73.451
$93,869.10
1 $0.00
1
1 $0.00
$93,869.10
12-inch 45's
PC
1 5
$728.001
$3,640.001
1 $0.001
1
1 $0.00
$3,640.00
12-inch 11.25's
PC
I 41
$704.001
$2,816.001
1 $0.00I
1
1 $0.00
$2,816.00
12-inch 22.5
PC
1 3
$822.131
$2,466.391
1 $0.001
1
1 $0.00
$2,466.39
12x6 Anchor Tee
PC
1 4
$1,197.901
$4,791.601
$0.00
1
$0.00
$4,791.60
12x8 Anchor Tee
PC
1 3
$1,250.001
$3,750.001
1 $0.001
1
$0.00
$3,750.00
12-inch Anchor Coupling
PC
1 6
$1,289.161
$7,734.961
1 $0.001
1
1 $0.00
$7,734.96
12-inch Cap
PC
1 2
$549.871
$1,099.741
1 $0.001
1
1 $0.00
$1,099.74
12-inch Valve
PC
1 3
$3,250.00
$9,750.00
$0.00
1
1 $0.00
$9,750.00
24-inch Casing
FT
1 105
$140.351
$14,736.751
1 $0.001
1
1 $0.00
$14,736.75
24-inch End Seal
PC
1 6
$156.001
$936.001
1 $0.001
1
1 $0.00
$936.00
Casing Spacers
PC
1 11
$195.001
$2,145.001
1 $0.001
1
1 $0.00
$2,145.00
Class 67 Rock
Ton
1 566.581
$24.00
$13,597.92
$0.00
1
1 $0.00
$13,597.92
Class 7 Base
Ton
1 66.51
$21.001
$1,396.501
1 $0.001
1
1 $0.00
$1,396.50
8-inch Material
8-Inch C-900
FT
1 1278
-$31.25
-$39,937.501
1 $0.001
1
1 $0.00
-$39,937.50
8-inch 45's
PC
1 5
-$44.00
-$220.001
1 $0.001
1
1 $0.00
-$220.00
18-inch 11.25's
PC
1 41
-$396.001
-$1,584.001
1 $0.001
1
1 $0.00II
-$1,584.00
8-inch 22.5
PC
1 3
-$388.00
-$1,164.001
1 $0.001
11
1 $0.00
-$1,164.00
8x6 Anchor Tee
PC
1 4
-$603.00
-$2,412.001
$0.00
1
$0.00
-$2,412.00
8x8 Anchor Tee
PC
1 3
-$790.00
-$2,370.001
1 $0.001
1
1 $0.00
-$2,370.00
8-inch Anchor Coupling
PC
1 6
-$575.00
-$3,450.001
1 $0.001
1
1 $0.00
-$3,450.00
8-inch Cap
PC
1 2
-$310.00
-$620.00
$0.00
1
1 $0.00
-$620.00
8-inch Valve
PC
1 3
-$1,900.00
-$5,700.001
1 $0.001
J
1 $0.00
-$5,700.00
116-inch Casing
FT
1 1051$101.231
-$10,629.151
1 $0.001
1
1 $0.00
-$10,629.15
16-inch End Seal
PC
1 6
-$78.00
-$468.001
1 $0.001
1
1 $0.00
-$468.00
Casing Spacers
PC
1 11
-$49.40
-$543.401
1 $0.001
1
1 $0.00
-$543.40
Class 67 Rock
Ton
1251.811
-$24.00
-$6,043.441
1 $0.001
1
1 $0.00
-$6,043.44
Class 7 Base
Ton
1 44.33
-$21.00
-$930.931
1 $0.001
1
1 $0.00
-$930.93
Subtotals
$86,657.541 1 0.01 $0.00
PAGE 1 OF 1
0.01 1 $0.00
Taxes
Sub's Mark Up
Total Cost
$86,657.54
$8,232.47
$0.00
$94,890.01
E I
_—
�sor�SM�ARF,�L
.e � � reDpxxpxxp�Nxx� arxwA
7.
.,.�
SCIAGIF I,e mwx.. eAll GRAPHIC SCALE
A. g-- oAln
I�
r 65-16271-102ZZ" � .MST N
DEvemPFa: JORGEm
E,xxs. PSR1 rngl rM] fAYETTEVILLEPPoUB'ZC0]H00LS CONSULTING
IN
PoBO%999 CONSULTING ENGINEERS INC. `^' C
FAYEFlEVILL WEST SLE AS
SUITE5 YY L
fAYET—NO,AR ]2)03
(4]91442-9121 C
PI zr $$ .J
d
z�
/// �1 rerereo-o-o-lll��I—{{{IIPI����II,I mxmc.wnLA AS I— I.,
/� 1 RN I I£GPL DESCflIP110N: NOTES,
�t AEd SM NE1/4 of Me NE114 part If Me W114Ath,NE1/40N-21, antls pan M Me SW'1/4 MMe SE1/4 M SIS113 a11'n T16N,
SNOW ix WasA'ungtpx CguMy, Aid N,axtlA gd,—I,,d as illwvs:lCgmmarAng al BY NE Comerd-NE1/4. NE1/4 sad pNMceggan 1. FLAT PAGE R556.
JJ 5MRL Mence NB855'35W 2GS5 ARF b Me west NM N w M 2.PARCELNUMBER'. 165-I62/1-1028]6522366]02.
9 uDiwnore Tral wM1¢M1isetM PEINT OF BEGINNING.MenIl R,ngesaitl AgMFplway S06°4Y12"E 3908feeL Merce S-457"E 11211 CYL
_ J M ce GINS1B"E]B.3]hN,Mence523°4895'EB9.93het,Mence528°4228'E91.]BIea, Mencelravlrq eutl xAM Nwa 569°4Y41W 3. ROTATION BASED ON ARINNSAS STATE PIANE GRID NORTH ]ONE
529.261ft B497 irpnpipnMenae SG3°15'26'RV]00.36Adh Me SE-GIRMIGNWl/4,NE1/4,sad WMNNafpxndirpnplPo.Mence (NAG897.
x, s.e. •> s,9, <a1.,T Em NBT26'18W 4841 N—beast AAMalwayNG. Ruppk Road, Menu alpnA aaitl Iv--NOY22'18453.321eet Mengea.R a pulveh
az621e.m ]1eM aaM curve AaanAaradiva N583AD1eeleMacAON AeannA all6 Aiahnce N NBT55'34'W 208A 11e dthmae N18°132611 4. CURRENTiONING. C3 COMMUNIN SERVICES SPI INS]ITIRIONVL.
581eM5M1arx»aonA aaurvaM tM tlAM 1]3.821ed, Wald curve M1avinparatlius M183.ODIedandacM1ord AeaM1N arAtll,anceN
NCT55'31"N172I—L Menge NOY22'18'E 11OG1 ie4 Menu along acurvetp Me figM8114hd. satl tuns AaviNanIW N 1]30011. S. OWNEF: FAYETTEALE PUBUC SCHODL9-PC BOX 80-FAYETTEVILLE.
m11 Al ,xu.csa" uA aceaclwrtl AeannA antl Uisbnce pf NO]°1M9'E81.04 fuE Mence NonA acurvehheleA221 ntttt satl curve AanNarztliusN515.00 feel AN, 72I020849.
-11
antlaaMrd AeafinA antl tllMange pl NO22°2 3-11�..lMEMe cecN3]°21]E]2051eeL Menae almA rveMtMIeM1 14D1d21eeLs ticurve 6. BOUNDARY BASED ON PROPERTY LINE ADJUSTMENT BY MILHOLAND
culn ear u a."us 1
1. feelaMacM1ON APafiN aM tlistame NN04°52'0]"E 13212 Tut Hence leampsaM NAMgf way SBN3923'E 161.00 COMPPI2YFlLE #201800032851.
— — 35 fee{tM1mee GB6°55'35'ENES55ARS Ma P01NTOFBEGINNING: CmfLnIN 22.98 xrea bore wlesa auAynta
eaaameMs arAelgM al watt' Mrecerd. ].TIN S PROPERTYIS NOT AFFECTED BY THE IGO YEAR FLOOD PLAIN AS IT
11NII RrsM FIRM-143CO215F DATED MAY 16, SEN.
sT � 1A
wrzeT MM PARBINGSMEWUK� 1.11 AC ASf. o.
xsrtn 15reFl PMxING5mEWNK' 1.83 AC 2102n OF
f. F S
FLL BERTH3-1 FINISH FLOOR ELE
FINISH GPAG
DING GPOGN
336 LF.OF 6"O CtILE 1RON FIRE LINE
cuss Pcuss zso
$ " LOFFSET
J
r'
L1�
s e
F
o
;
DO L.F. OF B'CP00
DO L.F. OF B'CP00
GR14 WATfP LINE
_
_________
_______ __
__________
_______
LL
IEPTH BABKPLL
R1ICAL OFF
ET
SPNG GP
GNO
FlNISHG
O
NLL
_ _--_
:1249.
__
__
El(.2-
fl�FL 124E
V
'PCP
0
('•
IX9
fL 12
RBP 4'
fi 22
In
mg
•fig
n�
gg
7
8
�
�
`-0•SWP
1,2]S LF. GF
TBPW G1I4 WA
E -LINE
$, F3
g
mfi
�'P�
mx ryg
& m
o
]3LF.JABKGBBE
24"STEEL EXC
e y
w y£
E
w
24•LSIEEL
EFFIGLOFFEET
BASEMENT
+�
��'�
s i
STEEL ENO
ERR
�'f�
1
Al
'