Loading...
HomeMy WebLinkAbout10-97 RESOLUTION..,_i.i.. r^•ra�'''+..:1�8hrsawc..:,. .. is .. e.. y STAFF REVIEW FORM 'F s�/0%j AGENDA REQUEST /�Jl� ( ' £aa- XXXX CONTRACT REVIEW /p _:7 7 GRANT REVIEW For the Fayetteville City Mayor's signature. FROM: Wayne Ledbetter h* Engineering Public Works Name Division Department ACTION REQUIRED: Approval of Amendment #1 to the Engineering Services for Reconstruction of Old Missouri Rd. and Zion Rd. intersection with McClelland Consulting Engineers, Inc. in the amount of $ 1,373.07. COST TO CITY: Old Missouri Rd./ S 1,373.07 S 571,819 Zion Rd. Intersection Cost of this Request Category/Project Budget Category/Project Name ssi,4o� 4470-9470-5809-00 S 5-69.0-64- Street Improvements • Account Number Funds Used To Date Program Name • -i 97027-0010 S 55 Sales Tax r Project Number Remaining Balance Fund �.. B ET EW: XXXx Budgeted It m Budget Adjustment Attached Budget Coordinator Administrative se ices Director CONTRACT/GRANT/LEASE REVIEW: GRANTING AGENCY: Acco ti M a r Date ADA Coordinator Date Cy Attorney Date I ' ernal Auditor 5-86- Date Purchasing Officer Date STAFF REC aua�D a . Staff a:ecoaauaaen i.aao'. a.aac �.ounc3 approve the amendment to the contract with McClelland Engineers, Inc. for engineering services relating to Old Missouri Rd. and Zion Rd. intersection. 5/9q Date Cross Reference -S—i—�lrt New Item: Yes Date nn Ump Prev Ord/Res #: /O• -17 tor Date Orig Contract Date: Ct O O [r] 1. Existing Conditions. Old Missouri Rd and Zion Rd are two-lane asphalt surface streets with open ditches and shoulders. Zion lays east and west while Old Missouri lays northeast to southwest and both converge to create a "Y' intersection. These streets typically have stormwater runoff conveyed by the open ditches. They are both presently classified as collectors. 2. Proposed conditions. The Old Missouri Rd. and Zion Rd. intersection will be constructed according to the City of Fayetteville's present pavement and drainage criteria. Old Missouri and Zion Rd. will be planned as thirty -s=,: (36) foot (measured from back of curb to back of curb) wide paved sections. These pavement sections will be planned for asphalt with concrete curb and gutter. Additional improvements will include minor drainage construction. The intent of this improvement is to create a safer intersection and improve the level of service for vehicular traffic. An estimated amount of $ 571,819 is in the approved Capital Improvement Plan for this project. The engineering services for this project is an estimated $ 68,380. These services include all design and construction engineering along with geotechnical investigation services. Other services included in this price are easement preparation and construction staking. Due to negotiations with a property owner, the plans were revised and additional engineering in the amount of $ 1,073.07 was required. Also, the health review fee of $ 300 for the water line relocation is a reimbursable expense. These additional amounts total $ 1,373.07. 3. Staff Recommendation. The Staff recommends that the Mayor approve Amendment #1 for Engineering Services with McClelland Engineers Inc., for additional engineering services relating to the reconstruction of the Old Missouri Rd. and Zion Rd. intersection. This amount is $ 1,373.07. AMENDMENT #1 TO PURCHASE ORDER #0050839 AGREEMENT WITH McCLELLAND CONSULTING ENGINEERS. INC CONTRACT #585 (4470 9470 5809 0097027 10) OLD MISSOURI ROAD & ZION ROAD INTERSECTION This is an amendment to the Agreement for Engineering Services dated the 4th day of February, 1997, between the City of Fayetteville, Arkansas, and McClelland Consulting Engineers, Inc.. Additional costs have been incurred to: 1) revise the project drawings to add a sidewalk along the Jacoway property as a result of the City's negotiations to acquire right-of-way. • Additional fee = $ 1,073.07 2) reimburse the engineer for the direct expense incurred by obtaining Arkansas Department of Health review of the water line relocation part of the plans/specifications. • Direct expense = $ 300.00 TOTAL AMENDMENT AMOUNT = $ 1,373.07 CITY OF FAYETTEVILLE Date: Mayor O 1 McCLELLAND CONSULTING ENGINEERS, INC. Company 0 Date: President FOR OFFICE USE ONLY Existing P.O. # Contract# E- 11JN%ED LIhN,�Y00:�31 �9 C:\data\96\962165AmendPURORD4-99:sr ••.': .r• e • SCAN RESOLUTION NO. SCANNED �0 A RESOLUTION AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE AN AGREEMENT WITH McCLELLAND CONSULTING ENGINEERS, INC. FOR ENGINEERING SERVICES FOR THE RECONSTRUCTION OF THE OLD MISSOURI ROAD AND ZION ROAD INTERSECTION, IN THE AMOUNT OF $68,380. PLUS A CONTINGENCY AMOUNT OF $6,838. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council hereby authorizes the Mayor and City Clerk to execute an agreement with McClelland Consulting Engineers, Inc. for engineering services for the reconstruction of the Old Missouri Road and Zion Road intersection, in the amount of$68,380, plus a contingency amount of$6,838. A copy of the agreement is attached hereto marked Exhibit "A" and made a part hereof. , ftft f, ` PASSED AND APPROVED this 4th day of February , 1997. r i APPROVED: tiziy 44///444,-se------ red Hanna, Mayor ATTEST. By: Traci Paul, City Clerk EXHIBIT A CITY OF FAYETTEVILLE AGREEMENT FOR ENGINEERING SERVICES STATE OF ARKANSAS COUNTY OF WASHINGTON This Agreement entered into and executed this 7 f 1, day of Fe b r e4 Q r / , 1997, by and between the City of Fayetteville acting by and through its Mayor hereinafter called the "OWNER" and McClelland Consulting Engineers, Inc. with offices in Fayetteville, Arkansas, hereinafter called the "ENGINEER". WITNESSETH: Whereas, the "OWNER" is planning to reconstruct the intersection of Old Missouri Road and Zion Road with a realignment of Zion Road and Old Missouri Road at their intersection for future traffic projections; and Whereas the "OWNER'S" forces are fully employed on other urgent work that prevents their early assignment to the aforementioned work; and Whereas, the "ENGINEER'S" staff is adequate and well qualified and it has been determined that its current work load will permit completion of the plans for the project on schedule; Now therefore, it is considered to be in the best public interest for the "OWNER" to obtain assistance of the "ENGINEER'S" organization in connection with said engineering services. In consideration of the faithful performance of each party of the mutual covenants and agreements set forth hereinafter, it is mutually agreed as follows: FY96165:ENGAGR:REV1/17/97:jm/wj - 1 SECTION I - EMPLOYMENT OF ENGINEER The "OWNER" agrees to employ the "ENGINEER" to perform, and the "ENGINEER" agrees to perform, professional engineering services in connection with the project set forth in the Sections to follow; and the "OWNER" agrees to pay and the "ENGINEER" agrees to accept, as specified in the Sections to follow as full and final compensation for work accomplished in the specified time. SECTION II - DESCRIPTION OF THE PROJECT Reconstruction of the intersection of Old Missouri Road and Zion Road. The streets are to be designed to handle future traffic conditions, as both streets are presently designated as Collectors, however Zion Road is to be planned as a future Minor Arterial. The streets are to be planned for curb and gutter, sidewalks, drainage improvements meeting the "OWNER's" present street, pavement and drainage design criteria. Roadway alignment, water and sewer line relocations are included in the project scope. SECTION III - INFORMATION & SERVICES The "OWNER" will furnish any specifications, standards and other information which may relate to the project including GPS survey data. Aerial mapping data will be provided, free of charge, to the ENGINEER on magnetic media. FY96165:ENGAGR:REV1/17/97:jm/wj -2 1 • SECTION IV - SERVICES TO BE FURNISHED BY THE "ENGINEER" DURING "DESIGN" PHASE The project will be designed and constructed to meet local street standards in accordance with the "OWNER'S" pavement design and drainage criteria. Construction specifications shall be based on "Standard Specifications for Highway Construction Edition 1996 of the AHTD" and latest special provisions and City of Fayetteville Specifications, except that metric units will not be used. The design concept with regard to street alignment, street cross section, geometrics, detours, right-of-way, and utility relocation shall be submitted by the "ENGINEER" and approved by the "OWNER" prior to beginning design work. The "ENGINEER" shall provide all field survey data from field work for designing the project and this shall be tied to the "OWNER'S" GPS control network. The "ENGINEER" shall be responsible for obtaining, interpreting and evaluating geotechnical data for pavement design and embankment stability. The "ENGINEER" shall conduct preliminary design and prepare preliminary construction limits, required right of way, ownership map, perform all needed stability analyses, design of detours where needed, and preparation of maintenance of traffic plans detailing needed signing and striping during construction, as well as for permanent application after the completion of street construction. The "ENGINEER" shall provide surveying, mapping, and related services as required to prepare Right-of-Way/Easement documents for the "OWNER'S" use in acquisition activities. FY96165:ENGAGR:REV1/17/97:jm/wj - 3 The "ENGINEER" shall furnish plans to all utility companies affected by the project and shall conduct a coordination meeting among all affected utility companies to enable them to develop utility agreements regarding any necessary utility relocations. During the "design" phase of the project, the "ENGINEER" shall conduct final designs to prepare construction plans and specifications including final construction details and quantities, special provisions, cost estimates, make final design field inspection with "OWNER", make any needed plan changes as a result of the final design field inspection and all other work required to advertise and receive bids. Prior to the start of construction, the "ENGINEER" shall establish benchmarks for elevation control and tie layout work to Fayetteville's GPS and provide centerline construction reference points/alignment at all PCs, PTs, and at a reasonable number of POTs for the proposed roadway. SECTION V - COORDINATION WITH "OWNER" The "ENGINEER" shall hold conferences throughout the design of the project with representatives of the "OWNER" to the end that the design, as perfected, shall have full benefit of the "OWNER'S" knowledge and be consistent with the current policies and construction practices of the "OWNER". The "OWNER" reserves the right to accept or reject any or all plans, but this stipulation will not relieve the "ENGINEER" of responsibility for the design of the project. FY96165:ENGAGR:REV1/17/97:jm/wj -4 SECTION VI - OFFICE LOCATION FOR REVIEW OF WORK Review of the work as it progresses under this Agreement shall be made at the "OWNER'S" City Engineer's office. SECTION VII - PRELIMINARY DESIGN SUBMISSION The "ENGINEER" shall prepare a Preliminary Engineering Report to address the following key issues: A. Intersection geometry and Zion Road realignment for present and future traffic; B. Utility locations and adjustments which will be required before, or in conjunction with, construction; and C. Preliminary Construction Cost Estimates. The "ENGINEER" shall submit three (3) sets of preliminary plans for each submittal at 65 percent and 95 percent design stages and meet with the "OWNER'S" staff following each submittal. SECTION VIII - FINAL DESIGN SUBMISSION The final submission for the construction contract shall consist of the following: A. One (1) copy of all design calculations B. The originals of all drawings, specifications and contract documents. All design drawings on magnetic media shall be submitted on disks compatible with AutoCAD Release 12 software. FY96165:ENGAGR:REV1/17/97:jm/wj - 5 C. The estimated cost of construction and a detailed estimate of time in calendar days required for completion of the contract. D. Three (3) copies of the final plans for "OWNER'S" use. SECTION IX - ENGINEER RESPONSIBILITY DURING "BIDDING" AND "CONSTRUCTION" PHASES During the "Bidding" phase of the project, the "ENGINEER" shall provide all engineering and administrative services needed to obtain bids for the construction project, evaluate the bids, and consult with and advise the "OWNER" as to the acceptability of the best bidder. During the "Construction" phase of work, the "ENGINEER" shall provide administrative and engineering services including resident construction observation services to determine whether the Contractor has met the requirements of the design plans and specifications. The "ENGINEER" shall review the Contractor's progress payment requests based on the actual quantities of contract items completed and accepted, and shall make a recommendation to the "OWNER" regarding payment. SECTION X - SUBCONTRACTING Subcontracting by the "ENGINEER" of any of the services provided herein, other than the subcontract with (not applicable) as attached to this Agreement shall require prior approval by the "OWNER". FY96165:ENGAGR:REV1/17/97:jm/wj -6 SECTION XI - TIME OF BEGINNING AND COMPLETION The "ENGINEER" shall begin work under this Agreement within ten (10) days of notice to proceed and shall complete the plans for the construction contract within 120 calendar days. The above completion time is predicated upon the fact that the "OWNER" will cause to be processed approvals of interim work in an expeditious manner(5 working days per submittal). SECTION XII - FEES AND PAYMENTS A. Title I Services (Engineering Planning and Design Services Preceding Construction). The ENGINEER shall provide, as hereafter enumerated individually, design, bidding, geotechnical, and easement preparation services for a total not-to-exceed cost of $ 40,377.00 , including a total fixed fee of $ 4,127.00 . 1. "Design" Phase Services: For, and in consideration of, the services to be rendered by the "ENGINEER", the "OWNER" shall pay the "ENGINEER" on the basis of actual salary costs for work- time directly connected with work chargeable to the project, plus payroll additives and general overhead costs of 176% of direct labor costs, plus direct reimbursable expenses associated with the project, plus a fixed fee which are payable as follows: FY96165:ENGAGR:REV1/17/97:jm/wj - 7 a) "Design" phase services, "surveying services", and preparation of the Ownership•Map/Right-of-Way Plan Costs not to exceed: $29,333.00 b) Fixed fee for "Design" services: $ 3,520.00 c) Engineering contract amount for "Design" phase services not to exceed: $32,853.00 The basis of this upper limit and justification for the fee is contained in Appendix "A" attached hereto. Adjustment of the upper limit may be made should the "ENGINEER" establish and the "OWNER" agree that there has been or is to be a significant change in scope, complexity or character of the services to be performed; or if the "OWNER" decides to shorten the duration of work from the time period specified in the Agreement for completion of work and such modification warrants such adjustment. Appendix "B" covers the classification of personnel and the salary rate for all personnel anticipated to be assigned to this project by the "ENGINEER". Final payment for Design services shall be made upon the "OWNER'S" approval and acceptance with the satisfactory completion of the "Design" phase for the project. FY96165:ENGAGR:REV1/17/97:jm/wj - 8 • • 2. "Bidding" Phase Services: For "bidding" phase services rendered by the "ENGINEER", the "OWNER" shall pay the "ENGINEER" on the basis of salary costs for work-time directly connected with the project, plus payroll additives and general overhead costs of 176% of direct labor costs, (plus direct reimbursable expenses associated with the project), plus a fixed fee which are as follows: a) "Bidding" phase services costs not to exceed: $ 960.00 b) Fixed fee for"Bidding" services: $ 117.00 c) Engineering contract amount for "Bidding" phase services not to exceed: $1,077.00 Final payment for "Bidding" phase services shall be made upon the "OWNER'S" approval and acceptance with the satisfactory completion of the "Bidding" phase of the project. 3. "Geotechnical Investigation" Services: For geotechnical investigative services associated with design, the "OWNER" shall pay the "ENGINEER" on the basis of standard hourly rates and unit prices, not to exceed $ 1,867.00 . FY96165:ENGAGR:REV1/17/97:jm/wj -9 • 4. "Easement Preparation" Services: For "Easement preparation" services, the "OWNER" shall pay the "ENGINEER" on the basis of salary costs for work-time directly connected with the project, plus payroll additives and general overhead costs of 176% of direct labor costs, (plus direct reimbursable expenses associated with the project), plus a fixed fee which are as follows: a) "Easement preparation" services costs not to exceed: $4,090 b) Fixed fee for "easement preparation" services: $490 c) Engineering Contract amount for "easement preparation" services not to exceed: $4,580 Final payment for easement preparation services shall be made upon the OWNER's approval and acceptance of the easement documents. B. Title II Services (Construction Phase Services): The ENGINEER shall provide, as hereafter enumerated individually, construction phase and construction staking services for a total not-to-exceed cost of $ 28,003.00, including a total fixed fee of $ 3,001.00 . 1. "Construction" Phase Services: For "Construction" phase services rendered by the "ENGINEER", the "OWNER" shall pay the "ENGINEER" on the basis of salary costs for work-time directly FY96165:ENGAGR:REV1/17/97:jm/wj - 10 connected with the project, plus payroll additives and general overhead costs of 176% of direct labor costs,(plus direct reimbursable expenses associated with the project), plus a fixed fee which are as follows: a) "Construction " phase services costs not to exceed: $23,694.00 b) Fixed fee for"construction" phase services: $ 2,843.00 c) Engineering contract amount for "Construction" phase services not to exceed $26,537.00 (based upon providing an average of 5 hrs/day of observation during an assumed construction period not to exceed 180 calendar days) Final payment for "Construction" phase services shall be made upon the "OWNER'S" approval and acceptance with the satisfactory completion of the "construction" phase of the project. 2. "Construction Staking" Services: For "Construction Staking" services, if authorized in writing separately from this Agreement, the "ENGINEER" shall establish roadway centerline rough grade staking with offset staking on one side at 100-ft. stations, establish curb and gutter staking on both sides at 100-ft. stations along tangents and 50-ft. stations along curves, and perform drainage structures staking. This construction staking is to be performed by the "ENGINEER" one time only, with additional staking to be the FY96165:ENGAGR:REV1/17/97:jm/wj - 11 responsibility of the Contractor. For this work, the "OWNER" shall pay the "ENGINEER" on the basis of.actual salary cost for work-time directly connected with construction staking, plus payroll additives and general overhead costs of 176% of direct labor costs, plus direct reimbursable expenses, plus a fixed fee payable as follows: a) "Construction Staking" costs not to exceed: $1,308.00 b) Fixed fee for "construction staking": $ 158.00 c) Engineering contract amount for"construction staking" services not to exceed $1,466.00 SECTION XIII - CHANGES The "OWNER" may at any time, by written order, make changes within the general scope of the contract in the work and services to be performed. If any such change causes an increase or decrease in the cost of, or the time required for, performance of this contract, an equitable increase or decrease shall be made in the upper limit contract amount, including fee or time of required performance, or both, and the contract shall be modified in writing accordingly. Any claim by the "ENGINEER" for adjustment under this clause must be asserted with thirty (30) days from the date of receipt by the "ENGINEER" of the notification of change; provided, however, that the "OWNER", if it decides that the facts justify such action, may receive and act upon any such claim asserted at any time prior to the date of final payment under this FY96165:ENGAGR:REV1/17/97:jm/wj - 12 i I • contract. Failure to agree to any adjustment shall be cause for a dispute concerning a question of.fact within the meaning of the clause of-this contract entitled SECTION XVII - • MISCELLANEOUS PROVISIONS, (1) Dispute Resolutions. However, nothing in this clause shall excuse the "ENGINEER" from proceeding with the contract as changed. SECTION XIV - OWNERSHIP OF DOCUMENTS All documents, including original drawings, disks of CADD drawings and cross sections, estimates, specification field notes, and data are and remain the property of the "OWNER". The "ENGINEER" may retain reproduced copies of drawings and copies of other documents. SECTION XV - POSTPONEMENT OR CANCELLATION OF THE CONTRACT It is understood that the "OWNER" will have the right to suspend or cancel the work at any time. A. Postponement - Should the "OWNER", for any reason whatsoever, decide to postpone the work at any time, the "OWNER" will notify the "ENGINEER", who will immediately suspend work. Should the "OWNER" decide during such suspension not to resume the work, or should such suspension not be terminated within a year, the work shall be canceled as hereinafter provided. B. Cancellation - Should the "OWNER", for any reason whatsoever, decide to cancel or to terminate the use of the "ENGINEER'S" service, the "OWNER" will give written notice thereof to the "ENGINEER", who will immediately terminate the work. If the "OWNER" so elects, the "ENGINEER" may be instructed to bring a FY96165:ENGAGR:REV1/17/97:jm/wj - 13 reasonable stage of completion to those items whose value would otherwise be lost. The,"ENGINEER" shall turn over all data, charts, survey notes, figures, drawings and other records or information collected or produced hereunder whether partial or complete. Upon such termination of the "ENGINEER'S" services, the "ENGINEER" shall be paid on an proportional amount of the total fee, less prior partial payments, based on the ratio of work done to the total amount of work to be performed. SECTION XVII - MISCELLANEOUS PROVISIONS 1. Dispute resolution - Any dispute concerning a question of fact in connection with the work and having a financial value of $10,000, or less, shall be referred for determination to the Mayor of the City of Fayetteville whose decisions in the matter shall be final and conclusive. Disputes resulting from claims greater than $10,000 shall be subject to mediation. 2. Responsibility for Claims and Liability - The "ENGINEER" shall save harmless the "OWNER" from all claim and liability due to its [the "ENGINEER'S"] activities, or those subcontractors, its agents, or its employees during the time this contract is in force. 3. General Compliance with Laws - The "ENGINEER" shall comply with all federal, state and local laws and ordinances applicable to the work. It shall be a professional engineer, licensed in the State of Arkansas. FY96165:ENGAGR:REV1/17/97:jm/wj - 14 • 4. Engineer's Endorsement - The "ENGINEER" shall endorse and recommend all plans, specifications, estimates and engineering data finished by it. All design shall be checked in accordance with accepted engineering practices. All plan quantities shall be checked and verified. SECTION XVIII - SUCCESSORS AND ASSIGNS The "OWNER" and the "ENGINEER" each binds itself and its partners, successors, executors, administrators, and assigns to the other party of this Agreement, except as above, neither the "OWNER" nor the "ENGINEER" shall assign, sublet or transfer its interest in this Agreement without written consent of the other. Nothing herein shall be construed as creating any possible personal liability on the part of any officer or agent of any public body which may be party hereto. SECTION XIX - COVENANT AGAINST CONTINGENT FEES The "ENGINEER" warrants that it has not employed or retained by company or person, other than a bonafide employee working solely for the "ENGINEER", to solicit or secure this contract, and that it has not paid or agreed to pay any company or person, other than a bonafide employee working solely for the "ENGINEER", any fee, commission, percentage, brokerage fee, gifts, or any other consideration, contingent upon or resulting from the award or making of this contract. FY96165:ENGAGR:REV1/17/97:jm/wj - 15 • For breach or violation of this warranty, the "OWNER" shall have the right to annul this contract without liability. • IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be duly exeayted-ash gf,the date and year first herein written. i A CITY OF FAYETTEVILLE By: /4/1"A44 ATTEST. City Clerk McCLELLAND CONSULTING ENGINEERS, INC. By: _LE:4:C %-, 047444c\- ATTES : Vice President /, FY96165:ENGAGR:REV1/17/97:jm/wj - 16 APPENDIX A PROJECT NAME:ZION RD.INTERSECTION PROJECT MANAGER:WAYNE JONES DATE BUDGET PREPARED:JAN.3,1996 • HOURS BUDGETED FOR EACH DISCIPLINE LINE TASK PROJ. PROJ. DESIGN ENGR. REG. SURV. DRFT. SR. JR. CONSTR.CONSTR. OTHER EXTENDED NO. DESCRIPTION DIR. MGR. ENGR. TECH. SURV. CREW SUPV. DRFTMN.DRFTMN.CLERICA ENGR. OBSERV. DIR.EXP. COST JO WAYNE LEE CRAIG HADLOCK 2-MAN RUNT PAT TOM JANE JIM DAYMON 1 SURVEYING 2 PLANNING FOR FIELD SURVEYS(OR AERIAL PHOTO.) 2.00 2.00 2.00 $288 3 NOTIFY UTILITY COMPANIES TO MARK THEIR FACILIT 1.00 $27 4 UTILITY COMPANIES TO MARK THEIR FACILITIES S0 5 EXECUTION OF FIELD SURVEYS(OR AERIAL PHOTO.) 6 FIELD WORK(OR AERIAL PHOTO.) - _ 32.00 $1,563 • 7 NOTE REDUCTION/DRAFTING OR AERIAL MAPPING 2.00 8.00 1.00 6371 8 'SUR INS:SUBTOTALS 0.00 4;00 :013 . .4:00 ' ' 8.000 0° XV ;00 0:00 4 ' 9 10 GEOTECHNICAL INVESTIGATION • 11 PLANNING FOR GEOTECHNICAL INVESTIGATION 1.00 1.00 $117 12 EXECUTION OF GEOTECHNICAL INVESTIGATION 13 FIELD WORK _ 1,500.00 $1,500 14 LABORATORY WORK 15 REPORT 250.00 5250 SO 16 OEOTECHNICALISUBTOTALS'. :,' . r • '..i'' ].:.':. z:.MO 1' „ .. 00-D00 00010WW0:00WIM 00IR +0.00 0o t1.98Z 17 18 DESIGN PHASE SERVICES 19 PRE-DESIGN MEETING WITH OWNER 3.00 4.00 3.00 1.00 6788 - 20 SCHEDULING&BUDGETING FOR THE PROJECT 2.00 6222 21 IDENTIFY/LIST PROJECT COMPONENTS 2.00 $77 22 DEVELOP PROPOSED CRITERIA FOR COMPONENTS 1.00 4.00 6232 23 PRELIMINARY ENGR.REPORT W/COST ESTIMATES 17.00 46.50 2.00 17.00 10.00 45.00 $3,959 • ^ - 24 QA REVIEW OF PRELIMINARY ENGR.REPORT 1.00 10.00 S121 25 MTG.WITH OWNER TO DETERMINE PRECISE PROJE 3.00 3.00 3.00 10.00 $693 26 PRELIMINARY DESIGN 27 MINI-PLANS , 28 cover sheet 0.50 6.00 5184 29 site grading/layout plan 2.00 16.00 6685 30 utilities plan 1.00 8.00 8.00 $689 31 site details(by name only) 0.50 s 4.00 $193 32 structural plan 1.00 6.00 16.00 6916 33 structural details(by name only) 0.50 4.00 6193 . - 34 plan&profile sheets(4 ea) 2.00 16.00 64.00 $2,525 - 35 cross-sections(3 ea) 0.50 8.00 18.00 18.00 . 61,523 36 marking&traffic control plans _ 8.00 8.00 6611 37 storm drainage plan _ 1.00 16.00 16.00 $1,131 38 landscaping plan 0.50 4.00 4.00 $302 39 OUTLINE SPECIFICATIONS 0.50 4.00 2.00 $246 40 PRELIMINARY COST ESTIMATE(S) 1.00 8.00 4.00 $519 . 41 PRELIMINARY EASEMENT PLAN 2.00 4.00 2.00 6.00 _ $540 42 PRELIMINARY PERMITTING PLAN - 0.50 2.00 1.00 $142 43 QA REVIEW OF PRELINIMARY DESIGN 2.00 8.00 _ 4.00 _ 4.00 _ 25.00 41,222 44 MTG.WITH OWNER TO REVIEW PRELIM.DESIGN _ 3.00 3.00 3.00 1.00 25.00 $734 45 DETAILED DESIGN 46 DRAWINGS a - 47 cover sheet 0.50 _ 1.00 $47 48 sitework/site plan 2.00 4.00 $229 49 sitework details 16.00 16.00 $1,222 50 utilities plan 1.00 8.00 8.00 $604 51 utility details 4.00 8.00 $373 52 structural plan 8.00 6.00 - 6535 53 structural details _ 12.00 _ 8.00 _ $680 54 plan&profile sheets(4 ea) 6.00 _ 8.00 8.00 $753 55 cross-sections(3 ea) 1.00 24.00 6696 OP6:OATA:962165:ZION2.WB2:WJ APPENDIX A PROJECT NAME:ZION RD.INTERSECTION PROJECT MANAGER:WAYNE JONES DATE BUDGET PREPARED:JAN.3,1996 HOURS BUDGETED FOR EACH DISCIPLINE LINE TASK PROJ. PROJ. DESIGN ENGR. REG. SURV. DRFT. SR. JR. CONSTR.CONSTR. OTHER EXTENDED NO. DESCRIPTION DIR. MGR. ENGR. TECH. SURV. CREW SUPV. DRFTMN.DRFTMN.CLERICA ENGR. OBSERV.DIR.EXP. COST JQ WAYNE LEE CRAIG HADLOCK 2-MAN RUNT PAT TOM JANE JIM DAYMON 56 marking&traffic control plans 6.00 4.00 $340 57 storm drainage plan 8.00 8.00 $526 58 landscaping 4.00 4.00 $263 59 landscaping details 4.00 4.00 6263 60 DETAILED COST ESTIMATES 1.00 4.00 2.00 1.00 $333 61 PROJECT MANUAL - 62 front-end documents 1.00 8.00 8.00 $598 63 technical specifications 16.00 16.00 $1,039 64 QA REVIEW OF DETAILED DESIGN 4.00 6.00 4.00 4.00 50.00 61,312 65 RE-EVALUATE SCHEDULE&BUDGET 1.00 1.00 $189 66 MTG.WITH OWNER TO REVIEW DESIGN 3.00 3.00 3.00 - 1.00 50.00 6759 67 REVISIONS TO PLANS&SPECIFICATIONS 2.00 8.00 4.00 4.00 1.00 8752 68 SUBMITTALS TO REGULATORY AGENCIES _ 1.00 4.00 2.00 _ 2.00 150.00 $490 69 REVISIONS TO PLANS&SPECIFICATIONS 2.00 2.00 1.00 $158 70 DESION;SUBTOTAL .•.. C: ' :•, .:.,-22.00 65.00 :5Q 8.00. 5 8 00 044ft00 N8:6 1108.80 210.0600C y $3.541010•830,604i1ik 71 72 EASEMENT PREPARATION ASSISTANCE 73 FORMULATE OWNERSHIP MAP/EASEMENT PLAN 1.00 2.00 16.00 8.00 4.00 1.00 $1,085 74 PREPARE EASEMENT/ACQUISITION DOCUMENTS 1.00 2.00 8.00 32.00 16.00 $1,716 74A BOUNDARY SURVEYS 8.00 32.00 $1,780 EM?, ;. REPARATION25UBTOT, e- - _t...:: e- e. !_�..1►.-.:' ssu�lo:cr ..,..r :1 8_:- -x2• ....?�.. i,; ._....�. ...�:•� v.'r_C .. ..:.u' 76 77 BIDDING SERVICES 78 ADVERTISE FOR BIDS 0.50 1.00 1.00 $104 79 BIDDING PERIOD 0.50 6.00 1.00 $296 - 80 OPEN BIDS 3.00 3.00 - - 2.00 10.00 $413 81 RE-EVALUATE SCHEDULE&BUDGET 0.50 0.50 $95 82 RECOMMEND AWARD OF CONTRACT 0.50 1.00 1.00 $104 83 ISSUE NOTICE OF AWARD TO CONTRACTOR 1.00 1.00 $65 84 BIDDING SUBTOTALS , o so. 5:00a1x oo;so.00 i, o:ooi pro ooaD:oto oa000t 6 :00 afaxlofM 85 86 CONSTRUCTIONISTAKIN�-' 3 .','• 30 5 '�:1$661$ , 870 :' I:UO 8 00 1 12D. 88 CONSTRUCTION PHASE SERVICES _ . - 89 REVIEW BONDS/INSURANCE DOCUMENTS 0.50 2.00 6109 90 PRE-CONSTRUCTION CONFERENCE/NOTICE TO PR 3.00 1.00 5.00 3.00 $476 91 PROJECT ADMINISTRATION 4.00 8.00 8.00 16.00 30.00 $3,231 92 RESIDENT CONSTRUCTION OBSERVATION(SHRS/DA 660.00 $21,137 93 REVIEW SHOP DRAWINGS 8.00 2.00 $402 94 FINAL INSPECTION 4.00 4.00 4.00 $472 95 CONTRACT CLOSE-OUT/FINISH PUNCHLIST 4.00 1.00 4.00 $371 96 DISINFECTION,PERFORMANCE TESTING,START-UP 4.00 $128 97 PREPARE RECORD DRAWINGS 1.00 4.00 2.00 $212 98 CONSTRUCTION SUBTOTALS : ai ..t=4.00`!r "8:00 -A..28:00'37,Ato.00a.;1g0 00 i 44 0.00". -•000:00 0:007 iI 4.00te- i18,50 n '47:00 873:00 , 0`.00 i$28.537/4 99 100 , 101 �TOTAL'"EFEOR _ 26:50 81 60 338.50. 2 40.00 fi 65.00 ?t 80:00 •l 8:06 108.00- 214i00 k87 601 50:OQ$ 87.Si00, 2;160 $613;381 OP6:DATA:962165:ZION2.W B2:W J APPENDIX "B" CITY OF FAYETTEVILLE OLD MISSOURI ROAD-ZION ROAD INTERSECTION SALARY RANGES LOWER UPPER END END Principal Engineer $34.00 $45.00 Project Manager 22.00 35.00 Project Engineer 19.00 25.00 Design Engineer 13.50 19.00 Project Surveyor 13.00 22.00 Surveyor 10.00 15.00 Survey Crew (2 men) 18.00 22.00 Survey Crew (3 men) 25.00 30.00 CADD Technician 9.00 13.00 Clerical 7.00 11.00 Senior Engr. Tech. 16.50 19.50 Engineering Tech. 12.00 18.00 Chief Draftsman 15.00 20.00 Senior Draftsman 10.00 15.00 Junior Draftsman 6.50 10.00 Construction Engineer 15.00 22.00 Sr. Construction Observer 16.50 19.50 Jr. Construction Observer 12.00 18.00 FY96165:SALSKD:jm rYl G.C EZLi9''D STAFF REVIEW FORM //91 AGENDA REQUEST ak/42,v XXXX CONTRACT REVIEW iO -'7 GRANT REVIEW For the Fayetteville City Mayor ' s signature . MICROFILMED FROM: Wayne Ledbetter Engineering Public Works Name Division Department ACTION REQUIRED: Approval of Amendment #1 to the Engineering Services for Reconstruction of Old Missouri Rd. and Zion Rd. intersection with McClelland Consulting Engineers, Inc . in the amount of $ 1, 373 . 07 . COST TO CITY: Old Missouri Rd. / $ 1, 373 .07 $ 571, 819 Zion Rd. Intersection Cost of this Request Category/Project Budget Category/Project Name 53i.407 4470-9470-5809-00 $ 569, 0G4 Street Improvements Account Number Funds Used To Date Program Name 14 97027-0010 $ 2175s Sales Tax Project Number Remaining Balance Fund B ET IEW: XXXX Budgeted It m Budget Adjustment Attached 1 vM Budget Coordinator Administrative Ser ices Director CONTRACT/GRANT/LEASE REVIEW: GRANTING AGENCY: Acco ti M a er Date ADA Coordinator Date ti r 6 7 -6/c1 / 5- 7- %. Ci y Attorney i Date I ernal Auditor -8 7 Date Purchasing Officer Date STAFF RECOMMENDATION: Staff recommends that the Council approve the amendment to the contract with McClelland Engineers, Inc. for engineering services relating to Old Missouri Rd. and Zion Rd. intersection. tuag 6101 sion Hea (� Date Cross Reference 6-4-gil New Item: Yes e artmentOvitifilv__ Dirreector 1Datee V✓1 Ifn"hu'I Prey Ord/Res #: /0-r7 l Admin' rative ervices Director79 Date /(Alyy1/' ---. / Orig Contract Date: May Dat • • . . . EAYETTEVILLE . . THE CITY OF FAYETTEVILLE,ARKANSAS DEPARTMENTAL CORRESPONDENCE To: Mayor Fred Hanna Thru: Charles Venable, Public Works Director Don Bunn, Assistant Public Works Director Jim Beavers, City Engineer From: Wayne Ledbetter, Engineering Date: May 6, 1999 RE: Old Missouri Rd. and Zion Rd. Intersection Amendment# 1 Engineering Services 1. Existing Conditions. Old Missouri Rd and Zion Rd are two-lane asphalt surface streets with open ditches and shoulders. Zion lays east and west while Old Missouri lays northeast to southwest and both converge to create a "Y" intersection. These streets typically have stormwater runoff conveyed by the open ditches. They are both presently classified as collectors. 2. Proposed conditions. The Old Missouri Rd. and Zion Rd. intersection will be constructed according to the City of Fayetteville's present pavement and drainage criteria. Old Missouri and Zion Rd. will be planned as thirty-six(36)foot (measured from back of curb to back of curb) wide paved sections. These pavement sections will be planned for asphalt with concrete curb and gutter. Additional improvements will include minor drainage construction. The intent of this improvement is to create a safer intersection and improve the level of service for vehicular traffic. An estimated amount of$ 571,819 is in the approved Capital Improvement Plan for this project. The engineering services for this project is an estimated $ 68,380. These services include all design and construction engineering along with geotechnical investigation services. Other services included in this price are easement preparation and construction staking. Due to negotiations with a property owner, the plans were revised and additional engineering in the amount of$ 1,073.07 was required. Also, the health review fee of$ 300 for the water line relocation is a reimbursable expense. These additional amounts total $ 1,373.07. 3. Staff Recommendation. The Staff recommends that the Mayor approve Amendment#1 for Engineering Services with McClelland Engineers Inc., for additional engineering services relating to the reconstruction of the Old Missouri Rd. and Zion Rd. intersection. This amount is $ 1,373.07. AMENDMENT #1 TO PURCHASE ORDER #0050839 AGREEMENT WITH McCLELLAND CONSULTING ENGINEERS, INC. CONTRACT #585 (4470 9470 5809 0097027 10) OLD MISSOURI ROAD & ZION ROAD INTERSECTION This is an amendment to the Agreement for Engineering Services dated the 4' day of February, 1997, between the City of Fayetteville, Arkansas, and McClelland Consulting Engineers, Inc.. Additional costs have been incurred to: 1 ) revise the project drawings to add a sidewalk along the Jacoway property as a result of the City's negotiations to acquire right-of-way. • Additional fee = $ 1 ,073.07 2) reimburse the engineer for the direct expense incurred by obtaining Arkansas Department of Health review of the water line relocation part of the plans/specifications. • Direct expense = $ 300.00 TOTAL AMENDMENT AMOUNT = $ 1 ,373.07 CITY OF FAYETTEVILLE 4444.4444--- Date: 4 7/ Mayor McCLELLAND CONSULTING ENGINEERS, INC. Company Date: d q-! President FOR OFFICE USE ONLY Existing P.O. # Contract # ECEIMED M Y :13 9 C:\data\96\962165AmendPURORD4-99:sr ' FA'YETTEVILLE THE CITY OF FAYETTEVILLE,ARKANSAS DEPARTMENTAL CORRESPONDENCE To: Wayne Ledbetter, Engineering From: Heather Woodruff, City Clerk Date: May 12, 1999 Attached is a copy of the staff review form and amendment to the contract with McCelland Consulting for your records. The original will be microfilmed and filed with the city clerk. Your purchase requisition has been forwarded to the internal auditor. cc. Internal Auditor file