HomeMy WebLinkAbout37-22 RESOLUTION113 West Mountain Street
Fayetteville, AR 72701
(479) 575-8323
Resolution: 37-22
File Number: 2022-0034
RFQ #21-01, SELECTION #2 GTS, INC. - 2019 CULTURAL ARTS CORRIDOR BOND
PROJECT:
A RESOLUTION TO APPROVE A MATERIALS TESTING CONTRACT WITH GTS, INC. IN
THE AMOUNT OF $100,780.00 FOR MATERIALS TESTING SERVICES ASSOCIATED
WITH THE REPLACEMENT PARKING DECK FOR THE CULTURAL ARTS CORRIDOR
PHASE I, TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $10,000.00,
AND TO APPROVE A BUDGET ADJUSTMENT - 2019 CULTURAL ARTS CORRIDOR
BOND PROJECT
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE,
ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby authorizes Mayor Jordan
to sign a Materials Testing Contract with GTS, Inc. in the amount of $100,780.00, pursuant to RFQ
21-01, Selection #2, for materials testing services associated with the replacement parking deck for
the Cultural Arts Corridor Phase I, and further approves a project contingency in the amount of
$10,000.00.
Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget
adjustment, a copy of which is attached to this Resolution.
PASSED and APPROVED on 2/1/2022
Page 1 Printed on 2W22
Resolution: 37-22
File Number. 2022-0034
Attest:
OAIItIIIFF►r►
r .. ►r
.r� G • R K
.� A, C 1 T N
O�•'JG:
Kara Paxton, City Clerk Treasurq
Page 2 Printed an W2122
City of Fayetteville, Arkansas 113 West Mountain Street
Fayetteville, AR 72701
(479)575-8323
Text File
File Number: 2022-0034
Agenda Date: 2/1/2022 Version: 1 Status: Passed
In Control: City Council Meetinq File Type: Resolution
Agenda Number: A.15
RFQ #21-01, SELECTION #2 GTS, INC. - 2019 CULTURAL ARTS CORRIDOR BOND
PROJECT:
A RESOLUTION TO APPROVE A MATERIALS TESTING CONTRACT WITH GTS, INC. IN THE
AMOUNT OF $100,780.00 FOR MATERIALS TESTING SERVICES ASSOCIATED WITH THE
REPLACEMENT PARKING DECK FOR THE CULTURAL ARTS CORRIDOR PHASE I, TO
APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $10,000.00, AND TO APPROVE A
BUDGET ADJUSTMENT - 2019 CULTURAL ARTS CORRIDOR BOND PROJECT
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby authorizes Mayor Jordan to sign a
Materials Testing Contract with GTS, Inc. in the amount of $100,780.00, pursuant to RFQ 21-01, Selection
#2, for materials testing services associated with the replacement parking deck for the Cultural Arts Corridor
Phase I, and further approves a project contingency in the amount of $10,000.00.
Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment, a
copy of which is attached to this Resolution.
City of Fayetteville, Arkansas Page 1 Printed on 21212022
Wade Abernathy
Submitted By
City of Fayetteville Staff Review Form
2022-0034
Legistar File ID
2/1/2022
City Council Meeting Date - Agenda Item Only
N/A for Non -Agenda Item
1/14/2022 FACILITIES MANAGEMENT (140)
Submitted Date Division / Department
Action Recommendation:
Approve Materials Testing Services Agreement with GTS, Inc. Pursuant to RFQ# 21-01, Selection #2 in the amount
of $100,780 and a $10,000 contingency for materials testing related to the replacement parking deck for the
Cultural Arts Corridor Phase 12019 Bond project and approve a budget adjustment.
Budget Impact:
4608.860.7820-5860.02 Arts Corridor 2019 Bonds
Account Number Fund
46080.7820 Arts Corridor 2019 Bonds - Parking
Project Number Project Title
Budgeted Item? Yes Current Budget $ 11,381,017.00
Funds Obligated $ 11,337,286.80
Current Balance I 43,730.20
Does item have a cost? Yes Item Cost $ 110,780.00
Budget Adjustment Attached? Yes Budget Adjustment $ 110,780.00
Remaining Budget 43,730.20
V20210527
Purchase Order Number: Previous Ordinance or Resolution #
Change Order Number: Approval Date:
Original Contract Number:
Comments:
CITY OF
FAYETTEVILLE
ARKANSAS
MEETING OF FEBRUARY 1, 2022
TO: Mayor and City Council
THRU: Susan Norton, Chief of Staff
Paul Becker, Chief Financial Officer
CITY COUNCIL MEMO
FROM: Wade Abernathy, Director Bond and Construction Projects
DATE: January 14, 2022
SUBJECT: Materials Testing Services Agreement for Replacement Parking
RECOMMENDATION:
Staff Recommends approval of a Materials Testing Services Agreement with GTS, Inc. pursuant
to RFQ#21-01, Selection #2 in the amount of $100,780.00 and a contingency of $10,000 for
materials testing and concrete placement observation related to the replacement parking deck
for the Cultural Arts Corridor Phase 12019 Bond Project and approval of a budget adjustment.
BACKGROUND:
November 2021, Council passed resolution 284-21 approving Nabholz Inc., contract Change
Order for the early grading package for the replacement parking deck.
December 2021, Council passed resolution 309-21 approving Nabhohz Inc., contract Change
Order for the GMP for the replacement parking deck.
DISCUSSION:
Materials testing is a required to ensure the materials are placed in accordance with the
Engineers Specifications. GTS was selected thru our Purchasing RFQ process in early 2021.
The scope of their services include earthwork testing, drilled piers inspections, structural
concrete and post tension inspections, structural steel inspections, and concrete placement
observations.
BUDGET/STAFF IMPACT:
A Budget Adjustment will move funds from the Phase 1 Arts Corridor Bond Unallocated Budget
(46080.7999) to the Arts Corridor Parking project (46080.7820).
Attachments:
Materials Testing Agreement
Mailing Address:
113 W. Mountain Street www.fayetteville-ar.gov
Fayetteville, AR 72701
1915 North Shiloh Drive, Suite 1 Licensed:
Fayetteville, Arkansas 72704 Arkansas • Oklahoma • Missouri • Texas GTS, Inc.
Office: (479) 521-7645 Kansas • Louisiana • Arizona • Kentucky G—tech.k.f a Testing Services
www.gtsconsulting.net
January 6, 2022
CITY OF
FAYETTEVILLE
ARKANSAS
125 West Mountain Street
Fayetteville, Arkansas 72701
Attention: Mr. Wade Abernathy
Re: Special Inspections and Materials Testing Services Proposal
Downtown Parking Deck
Fayetteville, Arkansas
No. GTS1211093
Mr. Abernathy:
GTS, Inc. appreciates the opportunity to perform Special Inspections and Construction
Materials Testing (CMT) Services for the planned Fayetteville Downtown Parking Deck project.
This is our understanding of our scope of services for the structure, and the total fees
anticipated based on the project schedule and trips to the site.
It is understood and agreed to that an amendment will be issued if the below quantities need
to be adjusted.
Sincerely,
GTS, In c.
G—technle,16 reefing Services
r
Jason Williams, P.E.
Project Engineer
Copies to: addressee
David Berry, P.E.
President
Geotechnical Engineering I Construction Materials Testing I Environmental Due Diligence
City of Fayetteville
Downtown Parking Structure
Fayetteville, Arkansas
GTS Proposal No. GTS1211093
Page 2 of 8
PROJECT SUMMARY
GTS, In c.
Geatechnicat & Testing Services
The project site is in downtown Fayetteville along West Avenue north of Dickson Street. GTS
Inc. understands that this project will consist of new construction of a 6-tier parking deck totaling
140,000 square feet. Each level is roughly 23,000 square feet. The ground level will consist of a
retail space, mechanical room and planned police station area. The retail space is currently
planned to remain unfinished for this project. Civil improvements will include underground
utilities and new asphalt pavements and improvements along West Avenue.
The structure will be supported on a pier/grade beam foundation system. Construction will also
include cast -in -place concrete columns and post -tensioned concrete slabs. elevator shafts and
stairwell structures that will consist of cast -in -place concrete walls extend to the roof level. A
stair tower is planned on the north side of the building. An elevator tower with two elevator
shafts and a stairwell is planned at the south side of the building. The south elevator tower is to
consist of reinforced CMU construction. A structural steel colonnade is planned along the east
perimeter of the structure. Reinforced CMU walls are located at the ground level for the
mechanical room and Tier 3 of the structure. Earthwork is planned to consist of undercutting
the existing fill soils and supporting floor slabs with a minimum of 3 feet of new fill material per
the provided geotechnical report.
SCOPE OF SERVICES AND FEES
GTS, Inc. has reviewed the specifications regarding testing frequencies and testing
requirements provided by Olsson engineering and Walker Consultants. Based on the review,
the parking deck structural plans and our understanding of the construction schedule provided
by Nabholz combined with our experience on previous projects, CMT and Special Inspection
Services for this project are anticipated to include the following scope:
Earthwork Testing
• GTS will provide engineering support and field staff to evaluate and consult when
problematic soil conditions are encountered.
• GTS will provide field technicians to perform field density testing of imported fill soils.
• Perform soil laboratory testing services for proposed fill soils at the project site.
• Undercut and replace 3 feet of new fill within the building pad per project documents
Trips
• Proofroll and/or Subgrade Evaluations by Staff Engineer — 5 total
• Undercut and replace 3 feet of new fill within the building pad as recommended
in the Geotechnical Report — 6 trips
• Subgrade and Base Density Testing in Pavement Areas - 7 trips
• Trench Backfill at Utility Street Crossing and Storm Drain Backfill (assuming
compacted backfill)— 15 trips
• Ramp and wall backfill — 5 trips
• Soil and Base Samples — 2 proctors with sieve analysis and Atterberg limits tests
Geotechnical Engineering I Construction Materials Testing I Environmental Due Diligence
City of Fayetteville
Downtown Parking Structure
Fayetteville, Arkansas GTS, In c.
GTS Proposal No. GTS1211093
Geatechnicat &Testing Services
Page 3 of 8
Drilled Pier Foundations
The construction schedule details 30 days for foundation pier drilling. We anticipate providing
the following:
• Full-time inspection of drilled pier deep foundations by a Staff Engineer or Geologist
including verification of plumbness, diameters, lengths, socket embedment and suitable
bearing material and additional information as outlined in specification section 31 63 29,
Item B
• Inspect pier reinforcing steel cages for number of bars, diameter, size and spacing
• Sample and test plastic concrete per project specifications. Testing of the plastic
concrete will include casting of concrete cylinders for testing of compressive strength,
testing of its slump, air content, and temperature.
Drilled Pier Inspection and Testing Services
We understand the schedule for drilled pier installation of 30 working days
We anticipate providing full-time staff during installation of drilled piers for 30 days
We estimate concrete placement occurring each day of pier drilling and casting 1 set
of cylinders resulting in 30 sets of concrete cylinders
Structural Concrete Inspection and Testing
For budgeting purposes, we have separated the structural concrete at the ground level from the
remaining tiers. Additionally, a testing scope and budget for the post -tensioned slabs is outlined
on the following page. GTS proposes the following for concrete related inspections and testing:
• Perform observations of structural concrete reinforcing elements for location, number of
bars, size and spacing.
• Sample and test plastic concrete per project specifications. Testing of the plastic
concrete will include casting of concrete cylinders for testing of compressive strength,
testing of its slump, air content, and temperature. Per specifications, 3 sets of cylinders
per 100 cubic yards of concrete placed
• Provide on -site curing box for concrete specimens and perform site visits to pick-up
concrete specimens for further laboratory compressive strength testing.
• Perform laboratory compressive strength tests on cured concrete cylinders.
Ground Level Structural Concrete - Grade Beams, Walls, Columns
The construction schedule details approximately 30 days of construction for the foundation
grade beams and 14 days for construction of the concrete columns. Roughly 1,225 linear feet of
foundation grade beams is planned. A total of 39 concrete columns is planned for the ground
level.
Geotechnical Engineering I Construction Materials Testing I Environmental Due Diligence
City of Fayetteville
Downtown Parking Structure
Fayetteville, Arkansas
GTS Proposal No. GTS1211093
Page 4 of 8
Trips — Ground Level
GTS, In c.
Geatechnicat & Testing Services
• Grade Beams and Pier Caps Foundations — 10 trips for reinforcing steel inspections and
10 trips for concrete field testing casting a total of 10 sets of cylinders
• Concrete Walls and Bumper Walls — 4 trips for reinforcing steel inspections and 4 trips
for concrete field testing casting a total of 4 sets of cylinders
• Concrete Columns - 5 trips for reinforcing steel inspections and 5 trips for concrete field
testing casting a total of 5 sets of cylinders (8 columns poured per concrete placement)
• Garage Slab on Grade (100 CY) — 1 trip sampling 3 sets of cylinders
• Mechanical Room Slab on Grade — 1 trip and 1 set of cylinders
• Garage Ramp Slab on Grade — 1 trip and 1 set of cylinders
• Retaining Wall at West side of Building - 1 trip and 1 set of cylinders
Structural Concrete - Tiers 2 thru Tier 6
The construction schedule details approximately 60 days of construction to erect each elevated
floor. Each level has been divided into two (2) areas. The following information was provided
regarding the construction schedule:
- 14 days to install rebar and PT tendons (two (2) sperate 7-day durations)
- 14 days to construct and pour concrete 36 columns (two 7-day durations)
- 2 slab pours
Estimated Trips — Tiers 2 thru Tier 6
• Concrete Columns — 2 pours per 7-day period resulting in a total of 4 pours per
tier resulting in a total of 24 column pours and 24 sets of cylinders
• Slab Pour-Backs/Infill, Structural Upturn Beam — 3 pours per tier resulting in 15
concrete placements and 15 sets of cylinders.
Post Tensioned Concrete Slab Testing and Inspections
• GTS employees 4 certified Post Tensioning Institute (PTI) inspectors. These inspectors
will perform inspections of PT cables and slab reinforcement prior to concrete pours.
• GTS PTI inspectors will observe stressing operations of PT cables and record
elongations.
• Provide certified technicians to sample and test plastic concrete per project
specifications. Testing of the plastic concrete will include casting of concrete cylinders
for testing of compressive strength, testing of its slump, air content, and temperature.
Per specifications, 3 sets of cylinders per 100 cubic yards of concrete placed
• Based the project documents and previous experience with Walker Consultants, 9
cylinders per set is required (3 cylinders will be field cured)
• Provide on -site curing box for concrete specimens and perform site visits to pick-up
concrete specimens for further laboratory compressive strength testing.
• Perform laboratory compressive strength tests on cured concrete cylinders.
Geotechnical Engineering I Construction Materials Testing I Environmental Due Diligence
City of Fayetteville
Downtown Parking Structure
Fayetteville, Arkansas
GTS Proposal No. GTS1211093
Page 5 of 8
The following was used to develop a budget for the PT slab inspections and testing:
GTS, In c.
Geatechnicat & Testing Services
- The construction schedule and structural plans outline two (2) PT slab pours per tier.
A total of 11 PT slab pours are planned. Slab pours are roughly 200-300 cubic yards.
- Construction schedule outlines 1 day of PT tendon stressing per slab pour (11 days
of stressing operations)
Trips (PT Slabs and Beams)
• Slab pre -pour rebar and PT cable inspections - 11 trips by PTI inspector from
GTS
• PT Slab Pours - 11 pours sampling 9 sets of cylinders resulting in a total of 99
sets of cylinders
• PT Stressing operations - 11 full-time days by certified GTS PTI Inspector
Concrete Testing - Civil Items and Pavement Approaches
• Sample and test plastic concrete per City of Fayetteville specifications. Testing of the
plastic concrete will include casting of concrete cylinders for testing of compressive
strength, testing of its slump, air content, and temperature. 1 set of 5 test cylinders will
be cast
• Provide on -site curing box for concrete specimens and perform site visits to pick-up
concrete specimens for further laboratory compressive strength testing.
• Perform laboratory compressive strength tests on cured concrete cylinders.
Estimated Trips
• Commercial Driveway Apron on West - 1 trip and 1 set of cylinders
• Colonnade Sidewalk - 3 trips and 3 sets of cylinders
• Sidewalk along the South Side of Building - 2 trips and 2 sets of cylinders
• Curb and Gutter - 3 trips and 3 sets of cylinders
• Transformer Pad and Dumpster Pad - 1 trip and 1 set of cylinders
• Storm Inlet structures - 2 trips
Structural Steel Inspections
• Inspection of structural steel elements by a Certified Welding Inspector including bolted
connections
• Observe structural steel related items in accordance with Item B on Sheet S0.01
• A formal report will be generated documenting field inspections
Trips
• North Stair Tower: Structural Steel Observations - 2 trips
• South Stair Tower: HSS Weld Connections and Structural Steel Observations - 2
trips
Geotechnical Engineering I Construction Materials Testing I Environmental Due Diligence
City of Fayetteville
Downtown Parking Structure
Fayetteville, Arkansas
GTS Proposal No. GTS1211093
Page 6 of 8
GTS, In c.
Geatechnicat & Testing Services
• Colonnade Structure: Welded Connections and Structural Steel Observations — 3
trips
• Ground Level and Tier 3 Top of CMU Masonry Connection to bottom of Beam
and PT Slab — 2 trips
RECOMMENDED ADDITIONAL INSPECTION AND TESTING (Per Sheet S0.3)
Although not requested, GTS is providing a scope to inspect masonry construction and perform
testing services. Project structural sheet S0.01 identifies certain items to require verification and
special inspection which include masonry construction items and guardrail strand inspections.
Detailed inspections will be required considering the vast amount of reinforcing steel present
within these walls and full grouting.
Guardrail Strands for the parking deck require additional inspection and testing per project
plans. This is outlined on the following page.
Considering the frequency of testing for laboratory cylinders and anticipating the expediency of
concrete pours, GTS is recommended a second technician to provide continuous monitoring of
concrete placement and discharge of concrete during placement pours.
Masonry Construction Inspections and Testing
• Inspect the installation of reinforcing steel for masonry foundation walls, masonry unit
cell for cleanliness, observation of mortar and expansion joints, and performing
sampling and testing of grout and mortar.
• Perform laboratory compressive strength tests on cured grout and report results.
• We anticipate the following for the South Stair Tower:
Anticipate low -lift -grouting resulting in 3 grout lifts per pour. GTS to inspect rebar
prior to grout placement resulting in 7 tiers and the roof level with 19 trips
Estimate 1 set of grout prims per tier — 8 total grout sets
• We anticipate the following for the Mechanical Room and planned Police Area:
• 5 trips to inspect masonry construction and reinforcing steel
• 3 samples of grout obtained for grout prisms
• We anticipate the following for the Tier 3 West CMU Walls:
• 3 trips to inspect masonry construction and reinforcing steel
• 1 sample of grout obtained for grout prisms
Geotechnical Engineering I Construction Materials Testing I Environmental Due Diligence
City of Fayetteville
Downtown Parking Structure
Fayetteville, Arkansas
GTS Proposal No. GTS1211093
Page 7 of 8
Guardrail Strands Inspections
GrTS, In c.
Geatechnicat & Testing Services
• Verify material and inspect placement of strands
• Continually observe stressing to seat wedges and stressing forces
• Perform periodic inspection of corrosion protection and sealing of sleeves in columns.
Trips
• Estimate 10 hours of inspections for stressing operations for the project
• Assume stressing per level will occur on separate days resulting in 10 site visits
• Provide summary report of stressing and field observations
Continuous Observation During Concrete Slab Pours
Structural Sheet S0.01 identifies required continuous inspections of concrete placement for
proper application and techniques. Considering the sampling frequency of concrete (3 sets per
100 cubic yards) and our past experience on large concrete placement pours, a second
technician is typically required to provide continuous observation. For concrete slab pours, we
estimate a second technician will be required on -site for 4-5 hours to perform this observation.
We recommend a budget of $3,250 be allocated for this task.
Geotechnical Engineering I Construction Materials Testing I Environmental Due Diligence
City of Fayetteville
Downtown Parking Structure
Fayetteville, Arkansas
GTS Proposal No. GTS1211093
Page 8of8
COST - PARKING STRUCTURE
E
S, In c.
kd i Tooting gorvlaaa
Based on the information outlined in this proposal, GTS, Inc. has prepared a budget for Testing
and Special Inspection Services for this Parking Garage are summarized in the table below.
We have appended a breakdown of these fees tabulated on the following pages.
Item
Amount
Earthwork Testing
$4,800
Drilled Piers Inspection and Concrete Testing
$28,902
Structural Concrete Testing and PT Inspections
$48,723
Civil Related Concrete Testing
$3,200
Structural Steel Inspections
$3,270
Requested Scope - Subtotal
$88,895
Additional Recommended Scope
Recommended Masonry and Guardrail Strand Inspections
(required by structural drawings)
$8,635
Additional Staffing for Continuous Observation during large concrete
placement pours
$3,250
Total
$100,780
GT
BY
Ma
Date 111312.1,
S, Inc.
Date r �2
Geotechnical Engineering I Construction Materials Testing I Environmental Due Diligence
GTS, In c.
TESTING BUDGET
REQUESTED SPECIAL INSPECTIONS AND TESTING SERVICES
DOWNTOWN PARKING DECK
CITY OF FAYETTEVILLE
FAYETTEVILLE, ARKANSAS
FIELD SERVICES
Units
Qty.
Unit Price
Extension
Soil and Base Density Technician
hour)
50
$50.00
$2,500.00
Staff Engineer-Proofrolls/Subgrade Evaluation
hourly
10
$90.00
$900.00
Reinforcing Steel Inspections
hourly
120
$90.00
$10,800.00
Concrete Field Technician
hourly
230
$50.00
$11,500.00
Post Tension Slab Inspections
hour)
45
$90.00
$4,050.00
PTI Certified Staff - Tendon Stressing
daily
11
$800.00
$8,800.00
Structural Steel Inspections
hourl
27
$120.00
$3,240.00
Staff Engineer - Drilled Piers
hourly
270
$90.00
$24,300.00
Trips (6 miles round trip - Fayetteville Lab)
each
343
$3.40
$1,166.20
Subtotal: Field Inspection and Testing $67,256.20
LABORATORY TESTING
Units
Qty.
Unit Price
Extension
Standard Proctor
each
2
$140.00
$280.00
Atterberg Limits
each
2
$65.00
$130.00
Sieve Analysis
each
2
$65.00
$130.00
Soil Sample Preparation
each
2
$75.00
$150.00
Curing, Stripping,Storing Concrete Cylinders
each set
180
$30.00
$5,400.00
Compressive Strength of Concrete Cylinders
each
949
$11.00
$10,439.00
Subtotal: Laboratory Testing $16,529.00
PROJECT MANAGEMENT/REPORT FEES
Units
Qty.
I Unit Price
I Extension
Professional Engineer Review
hourly
20
$120.001
$2,400.00
Report Preparation (Concrete, Density)
each
1 271
$10.001
$2,710.00
Subtotal: Project Management & Reporting $5,110.00
REQUESTED SCOPE TOTAL $88,895
MASONRY & GUARDRAIL STRANDS INSPECTIONS (see following page) $11,885
G Ts, In c.
ADDITIONAL RECOMMENDED SCOPE ITEMS
ITEMS OUTLINED IN STRUCTURAL DRAWINGS
DOWNTOWN PARKING DECK
CITY OF FAYETTEVILLE
FAYETTEVILLE, ARKANSAS
FIELD SERVICES
Units
Qty.
Unit Price
Extension
Masonry Inspections
hourly
47
$90.00
$4,230.00
Grout Field Technician
hourly
15
$57.00
$855.00
Guardrail Strand Stressing
hourly
10
$75.00
$750.00
Continuous Concrete Placement Observations
hourly
65
$50.00
$3,250.00
Trips (6 miles round trip - Fayetteville Lab)
each
50
$3.40
$170.00
Subtotal: Field Inspection and Testing $9,255.00
LABORATORY TESTING
Units
Qty.
Unit Price
Extension
Compressive Strength of Grout Prisms
each
44
$25.00
$1,100.00
Curing, Stripping,Storing Grout Prisms
each set
11
$30.00
$330.00
Subtotal: Laboratory Testing $1,430.00
PROJECT MANAGEMENT/REPORT FEES
Units
I Qty.
I Unit Price
I Extension
Professional Engineer Review
hourly
1 8
$120.001
$960.00
Report Preparation (Grout)
each
1 24
$10.001
$240.00
Subtotal: Project Management & Reporting $1,200.00
F=-- MASONRY INSPECTION TOTAL $11,885
City of Fayetteville, Arkansas - Budget Adjustment Form (Legistar)
Budget Year Division Adjustment Number
/Org2 FACILITIES MANAGEMENT (140)
2022
Requestor: Wade Abernathy
BUDGET ADJUSTMENT DESCRIPTION / JUSTIFICATION:
Approve Materials Testing Services Agreement with GTS, Inc. Pursuant to RFQ# 21-01, Selection #2 in the amount of
$100,780 and a $10,000 contingency for materials testing related to the replacement parking deck for the Cultural Arts
Corridor Phase 12019 Bond project.
RESOLUTION/ORDINANCE
COUNCIL DATE: 2/1 /2022
LEGISTAR FILE ID#: 2022-0034
111312022 8:58 AM
Budget Director Date
TYPE: D - (City Council)
JOURNAL #:
2/1/2022
GLDATE:
CHKD/POSTED:
TOTAL
Account Number
- -
Increase / (Decrease)
Expense Revenue
Proiect.Sub#
Project Sub.Detl AT
v.20211122
Account Name
4608.860.7820-5860.02
100,780 -
46080 7820 EX
Capital Prof Svcs - Engineering/Architectu
4608.860.7820-5911.99
4608.860.7999-5899.00
10,000 -
(110,780) -
46080 7820 EX
46080 7999 EX
Contingency -Capital Project
Unallocated - Budget
H:\Budget Adjustments\2022_Budget\CITY COUNCIL\02-01-22\2022-0034 BA CAC Parking Deck GTS materials testing.xlsm 1 of 1