HomeMy WebLinkAbout11-22 RESOLUTION113 West Mountain Street
Fayetteville, AR 72701
(479) 575-8323
Resolution: 11-22
File Number: 2021-1040
BID #21-80 CALDWELL TANKS, INC.:
A RESOLUTION TO AWARD BID 421-80 AND AUTHORIZE A CONTRACT WITH
CALDWELL TANKS, INC. IN THE AMOUNT OF $1.155,000.00 FOR THE
CONSTRUCTION OF THE BENSON MOUNTAIN ELEVATED WATER STORAGE TANK
IMPROVEMENTS PROJECT, ASSOCIATED SITE IMPROVEMENTS AND DEMOLITION
OF THE EXISTING TANK, TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT
OF $231,000.00, AND TO APPROVE A BUDGET ADJUSTMENT
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE,
ARKANSAS:
Section 1: That the City Council of the City of Fayetteville. Arkansas hereby awards Bid #21-80 and
authorizes Mayor Jordan to sign a contract with Caldwell Tanks, Inc., a copy of which is attached to
this Resolution. in the amount of $1,155,000.00 for the construction of the Benson Mountain Elevated
Water Storage Tank Improvements Project, and further approves a project contingency in the amount
of $231,000.00.
Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget
adjustment, a copy of which is attached to this Resolution.
PASSED and APPROVED on 1/4/2022
Page 1 Printed on 115122
Resolution: 11-22
File Number: 2021-1040
Attest:
.'0"C R'Kt;
cJY
Kara Paxton, City Clerk Treaguror FgyErTt f .;
•, • �gNSFS •',�y �•
Page 2 Printed on 115122
City of Fayetteville, Arkansas 113 West Mountain Street
Fayetteville, AR 72701
(479)575-8323
Text File
File Number: 2021-1040
Agenda Date: 1/4/2022 Version: 1 Status: Passed
In Control: City Council Meetinq File Type: Resolution
Agenda Number: A.12
BID #21-80 CALDWELL TANKS, INC.:
A RESOLUTION TO AWARD BID #21-80 AND AUTHORIZE A CONTRACT WITH CALDWELL
TANKS, INC. IN THE AMOUNT OF $1,155,000.00 FOR THE CONSTRUCTION OF THE BENSON
MOUNTAIN ELEVATED WATER STORAGE TANK IMPROVEMENTS PROJECT, ASSOCIATED
SITE IMPROVEMENTS AND DEMOLITION OF THE EXISTING TANK, TO APPROVE A PROJECT
CONTINGENCY IN THE AMOUNT OF $231,000.00, AND TO APPROVE A BUDGET
ADJUSTMENT
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby awards Bid #21-80 and
authorizes Mayor Jordan to sign a contract with Caldwell Tanks, Inc., a copy of which is attached to this
Resolution, in the amount of $1,155,000.00 for the construction of the Benson Mountain Elevated Water
Storage Tank Improvements Project, and further approves a project contingency in the amount of
$231,000.00.
Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment, a
copy of which is attached to this Resolution.
City of Fayetteville, Arkansas Page 1 Printed on 11512022
Tim Nyander
Submitted By
City of Fayetteville Staff Review Form
2021-1040
Legistar File ID
1/4/2022
City Council Meeting Date - Agenda Item Only
N/A for Non -Agenda Item
12/21/2021 WATER SEWER (720)
Submitted Date Division / Department
Action Recommendation:
Staff recommends awarding Bid #21-80 and approving a construction contract with Caldwell Tanks, Inc. in the
amount of $1,155,000.00 for construction of a new elevated water storage tank, associated site improvements, and
demolition of the existing tank. Staff also recommends approval of a project contingency in the amount of
$231,000.00, and approval of a budget adjustment.
5400.720.5600-5808.00
Account Number
10006.1
Project Number
Budgeted Item? Yes
Does item have a cost? Yes
Budget Adjustment Attached? Yes
Budget Impact:
Water and Sewer
Fund
Benson Mountain Pressure Plan Project
Project Title
Current Budget
Funds Obligated
Current Balance
Item Cost
Budget Adjustment
Remaining Budget
$
681,152.00
$
632,305.82
48,846.18
$
1,386,000.00
$
1,386,000.00
V20210527
Purchase Order Number: Previous Ordinance or Resolution #
Change Order Number:
Original Contract Number:
Comments:
Approval Date:
CITY OF
FAYETTEVILLE
ARKANSAS
MEETING OF JANUARY 4, 2022
TO: Mayor and City Council
THRU: Susan Norton, Chief of Staff
Tim Nyander, Utilities Director
FROM: Corey Granderson, Utilities Engineer
DATE: December 21, 2021
CITY COUNCIL MEMO
SUBJECT: Bid #21-80, Caldwell Tanks, Inc. — Construction Contract for Benson
Mountain Elevated Water Storage Tank Improvements
RECOMMENDATION:
Staff recommends awarding Bid #21-80 and approving a construction contract with Caldwell
Tanks, Inc. in the amount of $1,155,000.00 for construction of a new elevated water storage
tank, associated site improvements, and demolition of the existing tank. Staff also recommends
approval of a project contingency in the amount of $231,000.00, and approval of a budget
adjustment.
BACKGROUND:
On December 14th, 2021 the City of Fayetteville accepted sealed competitive bids for the
Benson Mountain Elevated Water Storage Tank Improvements project. Caldwell Tanks, Inc.
submitted the lowest bid. All bids are shown here:
Caldwell Tanks, Inc. $1,155,000.00
Maguire Iron, Inc. $1,445,600.00
Phoenix Fabricators & Erectors, Inc. $1,315,671.00
DISCUSSION:
This project will remove the aging and undersized water standpipe (35,000 gal) serving the
Benson Mountain Pressure Plane and will construct a new, larger elevated water storage tank
(100,000 gal) to better meet system demands in this vicinity. These improvements were
recommended in the City's Water Master Plan by Olsson, Inc.
Mailing Address:
113 W. Mountain Street www.fayetteville-ar.gov
Fayetteville, AR 72701
BUDGET/STAFF IMPACT:
This project is eligible for utilization of impact fee funds. Funds will be moved from the Water
Impact Fee and Sanitary Sewer Rehabilitation accounts to the Water System Rehabilitation
account to cover the costs of this project.
Attachments:
Project Vicinity Map
Certified Bid Tab, Bid #21-80
Submittal
Agreement
Benson Pressure Plane Improvements
Vicinity Map I NT
CITY OF
FAYETTEVILLE
ARKANSAS
BID TABULATION
BID 21-80, CONSTRUCTION - BENSON WATER TANK
DEADLINE: TUESDAY, DECEMBER 14, 2021 BEFORE 2 PM, LOCAL TIME
CERTIFICATION OF FUNDS
Certified Funds
$
1,500,000.00
25%Additional Allowance Allowed Per State Law $
375,000.00
Maximum Award Amount $
1,875,000.00
Caldwell Tanks, Inc. Maguire Iron, Inc.
Phoenix Fabricators and Erectors, LLC
TOTAL BASE BID (ALL BID SCHEDULES)
$ 1,155,000.00
$1,445,600.00
$1,315,671.00
Caldwell Tanks, Inc. Maguire Iron, Inc.
Phoenix Fabricators and Erectors, LLC
Bid
Schedule
Bid Schedule 1
TotalCost
TotalCost
TotalCost
Number
H1-1
Performance and Payment Bond
$4,400.00
$30,000.00
$16,500.00
#1-2
Mobilization
$55,000.00
$70,000.00
$50,000.00
H1-3
Construction Erosion Control
$1,500.00
$6,000.00
$5,000.00
#1-4
Site Preparation and Grading
$3,500.00
$18,000.00
$15,000.00
#1-5
Clearing and Grubbing
$3,000.00
$17,000.00
$17,000.00
#1-6
OSHA Trench Safety
$2,000.00
$3,000.00
$3,000.00
#1-7
Improvements as shown in the Plans and stated in the Specifications
$1,019,870.00
$1,224,340.00
$1,131,771.00
ti1-8
Demolish Existing 35,0000-Gallon Benson Mountain Standpipe
$30,000.00
$13,700.00
$13,500.00
ti1-9
Construct Gravel Access Drive (8" Thickness)
$19,680.00
$39,360.00
$36,900.00
#1-10
Undercut Gravel Access Drive and Backfill with Oversize Rock
$8,250.00
$12,000.00
$12,500.00
k1-11
Remove Gravel Access Drive and Restore with Seed, Fertilize, and Mulch
$6,300.00
$11,200.00
$14,000.00
k1-12
Install Temporary 20' Gate Assembly and Remove following Construction
$1,500.00
$1,000.00
$500
CITY OF
FAYETTEVILLE
ARKANS
ARKANSAS
Bid
21-80,
Construction -
Benson
Water Tank -
Bid
21-80,
Construction -
Benson
Water Tank
Project Overview
Project Details
Reference ID Bid 21-80, Construction - Benson Water Tank
Project Name Bid 21-80, Construction - Benson Water Tank
Project Owner Jonathan Smith
Project Type ITB
Department Purchasing
Budget
$0.00 - $0.00
The City of Fayetteville is accepting sealed bids from properly licensed
firms for the construction of the 100,000-gallon Benson Mountain Multi -
Project Description
Column Elevated Water Storage Tank with related site improvements and
demolition of the existing 35,000-gallon Benson Mountain Standpipe. All
questions should be addressed to Jonathan Smith, Sr. Purchasing Agent
at jonsmith@fayetteville-ar.gov.
Open Date
Nov 14, 2021 12:00 AM CST
Close Date
Dec 14, 2021 2:00 PM CST
Highest Scoring Supplier
Caldwell Tanks, Inc.
Seal status
Score
100 pts
CITY OF
FAYETTEVILLE
ARKANS
ARKANSAS
Requested Information Unsealed on Unsealed by
Bid Bond Dec 14, 2021 2:11 PM CST Jonathan Smith
Required Signature Forms Dec 14, 2021 2:11 PM CST Jonathan Smith
AR Secretary of State Filing # Dec 14, 2021 2:11 PM CST Jonathan Smith
Arkansas Contractor's License Dec 14, 2021 2:11 PM CST Jonathan Smith
Pursuant Arkansas Code
Annotated §25-1-503, the
Contractor agrees and certifies
that they do not currently
boycott Israel and will not
boycott Israel during any time in
which they are entering into, or Dec 14, 2021 2:11 PM CST Jonathan Smith
while in contract, with any
public entity as defined in §25-
1-503. If at any time during
contract the contractor decides
to boycott Israel, the contractor
must notify the contracted
public entity in writing.
Bid 21-80 Bid Table (BT-470S) Dec 14, 2021 2:11 PM CST Jonathan Smith
Conflict of Interest
# Declaration of Conflict of Interest You have been chosen as a Committee member for this
Evaluation. Please read the following information on conflict of interest to see if you have any
problem or potential problem in serving on this committee. ## Code of Conduct All information
related to submissions received from Suppliers or Service Providers must be kept confidential by
Committee members. ## Conflict of Interest No member of a Committee shall participate in the
evaluation if that Committee member or any member of his or her immediate family: * has direct or
indirect financial interest in the award of the contract to any proponent; * is currently employed by,
or is a consultant to or under contract to a proponent; * is negotiating or has an arrangement
concerning future employment or contracting with any proponent; or, * has an ownership interest in,
or is an officer or director of, any proponent. Please sign below acknowledging that you have
received and read this information. If you have a conflict or potential conflict, please indicate your
CITY OF
FAYETTEVILLE
ARKANS
ARKANSAS
conflict on this acknowledgment form with information regarding the conflict. I have read and
understood the provisions related to the conflict of interest when serving on the Evaluation
Committee. If any such conflict of interest arises during the Committee's review of this project, I will
immediately report it to the Purchasing Director.
Name Date Signed Has a Conflict of Interest?
Jonathan Smith Dec 14, 2021 2:11 PM CST No
CITY OF
FAYETTEVILLE
ARKANS
ARKANSAS
Questions and Answers
C & G Land Service
Clearing and undercut
LINDA LEWIS, Nov 29, 2021 10:02 AM CST
Just to clarify, in one paragraph it states that cleared material can be burned if a permit is obtained
ahead of time, in another it states that material will be hauled off. Can material cleared be burned
onsite? If undercut is called for, can it be wasted onsite?
Jonathan Smith, Nov 29, 2021 10:36 AM CST
Your question has been added to the list and will be answered when we issue addendum 1.
Modern Fence and Supply
Fencing on Bid Table
Hunter Van Dusen, Nov 19, 2021 11:57 AM CST
The only Fencing mentioned on the Bid Table is the 20' temp gate Though other sheets show
fencing and gate at the new Tank site. Will this be added later or be part of award winners bidding
with Subs?
Jonathan Smith, Nov 19, 2021 1:29 PM CST
Your question has been added to the list and will be answered when we issue addendum 1 shortly
after our pre -bid meeting next week.
CITY OF
FAYETTEVILLE
ARKANS
ARKANSAS
Public Notices
Bid 21-80, Addendum 1
Jonathan Smith, Nov 29, 2021 2:49 PM CST
Addendum 1 has been posted. This addendum was used to answer all questions submitted to the
Purchasing Division as well as to provide a complete list of everyone who attended the pre -bid
meeting last week.
Bid 21-80, FILE 07 -Addendum 2
Jonathan Smith, Dec 06, 2021 9:05 AM CST
Addendum #2 has been posted for Bid 21-80. Items in this addendum are technical in nature and
were generated based on internal discussions about safety and communications at the tower.
CITY OF
FAYETTEVILLE
ARKANS
ARKANSAS
Internal Discussions
No messages
wxcaxsnsVILLE
Approvals
No approval requests
CITY OF
.V FAYETTEVILLE
ARKANSAS
Submissions
Supplier I Date Submitted
Phoenix Fabricators and Dec 14, 2021 7:14 AM
Erectors, LLC i CST
Caldwell Tanks, Inc.
Maguire Iron, Inc.
Dec 14, 2021 12:08 PM
CST
Dec 14, 2021 1:47 PM
CST
Name Email Confirmation Code
Phoenix Fabricators vicki.gossel@phoenixtank.com MTc5ODYz
Eric Monske emonske@caldwelltanks.com MTgwMD10
Shannan Ellefson ellefsons@maguireiron.com MTgwMDk2
CITY OF
.V FAYETTEVILLE
ARKANSAS
Project Criteria
Criteria Points I Description
Total Lump Sum Bid Price 100 pts I Total Lump Sum Bid
Within Certified Funds
Pass/Fail I Total base bid must be within 125% of certified funds.
Total 100 pts
CITY OF
.V FAYETTEVILLE
ARKANSAS
Scoring Summary
Active Submissions
Total Total Lump Sum Bid Price Within Certified Funds
Supplier I 1100 pts 1100 pts Pass/Fail
Caldwell Tanks, Inc. 1 100 pts 100 pts ($1,155,000.00) Pass
Phoenix Fabricators and Erectors, 87.79 pts 87.79 pts ($1,315,671.00) Pass
LLC
Maguire Iron, Inc. 1 79.9 pts 79.9 pts ($1,445,600.00) 1 Pass
OR
aKKAK TEVILLE
sas
Proposal Scores
Phoenix Fabricators and Erectors, LLC - Scoring Summary
Evaluation Group 1 - Main Evaluation
Total
Total Lump Sum Bid Price
Reviewer
/ 100 pts
/ 100 pts
Amanda Beilfuss
-
-
Andrea Foren
-
Jonathan Smith
87.79 pts
$1,315,671.00
Average:
$1,315,671.00
i
Calculated:
87.79 pts
87.79 pts ($1,315,671.00)
Within Certified Funds
Pass/Fail
Pass
Pass
i
Pass
CITY OF
.V FAYETTEVILLE
ARKANSAS
CITY OF
.V FAYETTEVILLE
ARKANSAS
Caldwell Tanks, Inc. - Scoring Summary
Evaluation Group 1 - Main Evaluation
Total
Total Lump Sum Bid Price
Reviewer
/ 100 pts
/ 100 pts
Amanda Beilfuss
-
-
Andrea Foren
-
Jonathan Smith
100 pts
$1,155,000.00
Average:
$1,155,000.00
1
Calculated:
100 pts
100 pts ($1,155,000.00)
Within Certified Funds
Pass/Fail
Pass
Pass
1
Pass
CITY OF
.V FAYETTEVILLE
ARKANSAS
Maguire Iron, Inc. - Scoring Summary
Evaluation Group 1 - Main Evaluation
Total
/ 100 pts
-
-
Total Lump Sum Bid Price
/ 100 pts
-
Reviewer
Amanda Beilfuss
Andrea Foren
Jonathan Smith
79.9 pts
Average:
$1,445,600.00
$1,445,600.00
1
Calculated:
79.9 pts
79.9 pts ($1,445,600.00)
Within Certified Funds
Pass/Fail
Pass
Pass
1
Pass
OR
aKKAK TEVILLE
sas
Proposal Score Comments
Phoenix Fabricators and Erectors, LLC - Scoring Comments
Total Lump Sum Bid Price - Reviewer Scores
Reviewer Score Reason
Jonathan Smith 87.79 pts ($1,315,671.00)
Within Certified Funds - Reviewer Scores
Reviewer Score Reason
Jonathan Smith Pass Meets the requirement(s)
Comments
Total Base Bid
Comments
Below Certified amount.
CITY OF
.V FAYETTEVILLE
ARKANSAS
Caldwell Tanks, Inc. - Scoring Comments
Total Lump Sum Bid Price - Reviewer Scores
Reviewer Score
Jonathan Smith 100 pts ($1,155,000.00)
Within Certified Funds - Reviewer Scores
Reason Comments
Total Base Bid
Reviewer Score Reason
Comments
Jonathan Smith I Pass I Meets the requirement(s) I Below the Certified Funds
OR
aKKAK TEVILLE
sas
Maguire Iron, Inc. - Scoring Comments
Total Lump Sum Bid Price - Reviewer Scores
Reviewer I Score
Jonathan Smith 179.9 pts ($1,445,600.00)
Within Certified Funds - Reviewer Scores
Reason
Reviewer Score Reason
Comments
Total Base Bid
Comments
Jonathan Smith I Pass I Meets the requirement(s) I Below the Certified amount.
CITY OF
.V FAYETTEVILLE
ARKANSAS
CITY OF
FAYETTEVILLE
ARKANS
ARKANSAS
Signatures
Name
Signatures
Jonathan Smith Digitally signed by Jonathan
(Project Owner) Jonathan Smith Smith
Date: 2021.12.15 09:48:36-06'00'
Amanda Beilfuss Digitally signed by Amanda
(Evaluator) Amanda Beilfuss Beilfuss
Date: 2021.12.20 15:30:53-06'00'
Andrea Foren
(Evaluator)
Jonathan Smith
(Evaluator)
Andrea
Foren
Digitally signed
by Andrea Foren
Date: 2021.12.20
15:29:30-06'00'
Jonathan Smith Digitally signed by Jonathan Smith
Date: 2021.12.15 09:48:58-06'00'
City of Fayetteville, Arkansas
Benson Mountain Elevated Water Storage Tani: Improvements
SECTION 00410 — BID BONI)
KNOW ALL ML?N BY fI IESFI l'R1_;S1 NTS: that we
Caldwell T;ankti Inc.
4000 Tower Road
Louisville, KY 40219
--_._
as Principal, hereinafter called the Principal, and
Great American Ir1suranCe Comp mY—
301 Est a4th Street
-- ---_._ -__ -------
Cincinnati, 01145202
a corporation duly organized under the laws of the State of Ohio as Surety, hereinafter
called Surety, are held and firmly bound unto
City of Fayetteville, Arkansas
1 13 West Mountain Street
Fayetteville, Arkansas 72701
as Obligee, hereinafter called Owner, in the sum 01 Five Percent of' 'I'of al Bid Amount------- ----------
-- _..__ __...-_ - --_ _._.... -- Dollars (S5`%) of Bid A1110ur1t ), for the I�rtyntent of which surrr,
_
well and truly to be trade, Principal and said Surety, bind ourselves, our heirs, executors, administrators,
successors and assigns,jointly and severally, firmly by these presents.
WI-ILRLAS, Principal has submitted a Bid for:
Benson Mountain Elevated Water Storage Tank Improvements, Bid 21-80, Construction.
NOW, TIIC,REFORF", if the Owner shall accept the Bid of Principal and the Principal sllall enter into a
Contract with the Owner In accordance with the terms of'such Bid, and give such Bond of Bonds as may
be specified in the Bidding or Contract Documents with good and sufficient st.tfety for the faithful
perforrnanc-e oi' such Contract and for the prompt payment of labor and material furnished in the
prosecution thereof; or in the event of the failure of Principal to enter such Contract and give such Bond
or Bonds, if the Principal shall pay to the Owner the difference not to exceed the penalty hercol' between
the amount specified in said Bid and such larger amount fof which the Owi-ler may in good faith contract
with another party to perform the Work covered by said Bid, then this obligation shall be null and void,
otherwise to remain in full force and effect.
Signed and sealed this 14th day of December 2021
00 110-Bid Bond 00410-1 November M.) I
City of Fayetteville, Arkansas
Benson Mountain Elevated Water Storage Tank Improvements
SECTION 00410 - BID BOND (continued)
PRINCIPAL
Caldwell Tanks. Inc.
Byil�
(Signature)
Eric W. Monsker Sales Manager
(Type or print)
SURETY
Great American Insurance Company
By
(Signature)
Cherie Brewer
(Type or print)
ATTORNEY -IN -FACT
Cherie Brewer - Jo n % ar trad
By !/
(Sign�yuurre�i
Jt16fn Mark Strader
(Type or print)
This Bond shall be accompanied with
Attorney-in-Fact's authority from Surety
\J'C' t A T 4s SEAL)
.0-
�'. SEAL
/'G�SrVILLE;
END OF SECTION 00410
(CORPORATE SEAL) j' o
00410-Bid Bond 00410-2 November 2021
GREAT AMERICAN INSURANCE COMPANY®
Administrative Office: 301 E 4TH STREET * CINCINNATI, OHIO 45202 f 513-369-5000 • FAX 513-723-2740
The number of persons authorized by
this power of attorney is not more than FIVE
POWER OF ATTORNEY
No. 0 21502
KNOW ALL MEN BY THESE PRESENTS: That the GREAT AMERICAN INSURANCE COMPANY, a corporation organized and existing under
and by virtue of the laws of the State of Ohio, does hereby nominate, constitute and appoint the person or persons named below, each individually if more than
one is named, its true and lawful attorney -in -fact, for it and in its name, place and stead to execute on behalf of the said Company, as surety, any and all bonds,
undertakings and contracts of suretyship, or other written obligations in the nature thereof; provided that the liability of the said Company on any such bond,
undertaking or contract of suretyship executed under this authority shall not exceed the limit stated below.
Name
Address Limit of Power
PHILIP D. ANDERTON
ALL OF ALL
BRIAN CRAWFORD
LOUISVILLE, $100,000,000
NED BOOKER
KENTUCKY
CHERIE BREWER
JOHN MARK STRADER
This Power of Attorney revokes all previous powers issued on behalf of the attomey(s)-in-fact named above.
IN WITNESS WHEREOF the GREAT AMERICAN INSURANCE COMPANY has caused these presents to be signed and attested by its appropriate
officers and its corporate seal hereunto affixed this 1ST day of FEBRUARY 1 2021
Attest GREAT AMERICAN INSU ANCE COMPANY
0i."
Assistant Secretary Divisional Senior rice President
STATE OF OHIO, COUNTY OF HAMILTON - ss: MARK VICARIO (977-377-2405)
On this 1ST day of FEBRUARY 2021 , before me personally appeared MARK VICARIO, tome known,
being duly sworn, deposes and says that he resides in Cincinnati, Ohio, that he is a Divisional Senior Vice President of the Bond Division of Great American
Insurance Company, the Company described in and which executed the above instrument; that he knows the seal of the said Company; that the seal affixed to the
said instrument is such corporate seal; that it was so affixed by authority of his office under the By -Laws of said Company, and that he signed his name thereto
by like authority.
SUSAN A KOHORST
notary Pubilc
State Ohio
wm�"'
of
My Comm, Expires
May 18, 2025
This Power ofAttomey is granted by authority of the following resolutions adopted by the Board of Directors of GreatAmerican Insurance Company
by unanimous written consent dated June 9, 2008.
RESOLVED: That the Divisional President, the several Divisional Senior Vice Presidents, Divisional Vice Presidents and Divisonal Assistant Vice
Presidents, or any one of them, be and hereby is authorized, from time to time, to appoint one or more Attorneys -in -Fact to execute on behalf of the Company,
as surety, any and all bonds, undertakings and contracts of suretyship, or other written obligations in the nature thereof to prescribe their respective duties and
the respective limits of their authority; and to revoke any such appointment at any time.
RESOLVED FURTHER: That the Company seal and the signature of any of the aforesaid officers and any Secretary or Assistant Secretary of the
Company may be affixed by facsimile to any power of attorney or certificate of either given for the execution of any bond, undertaking, contract of suretyship,
or other written obligation in the nature thereof, such signature and seal when so used being hereby adopted by the Company as the original signature of such
officer and the original seal of the Company, to be valid and binding upon the Company with the same force and effect as though manually affixed
CERTIFICATION
I, STEPHEN C. BERAHA, Assistant Secretary of Great American Insurance Company, do hereby certify that the foregoing Power of Attorney and
the Resolutions of the Board of Directors of June 9, 2008 have not been revoked and are now in full force and effect.
Signed and sealed this 14th
day of December 2021
Assistant Secretary~�
C1029AH (03/20)
City of Fayetteville, Arkansas
Benson Mountain Elevated Water Storage Tank Improvements
DOCUMENT 00400-BID FORM
Contract Name: Benson Mountain Elevated Water Storage Tank Improvements
Bid Number: 21 - 80, Construction
BID TO:
Owner: The City of Fayetteville, Arkansas
113 West Mountain Street
Fayetteville, Arkansas 72701
BID FROM:
Bidder: Caldwell Tanks, Inc.
4000 Tower Road
Louisville, KY 40219
ARTICLE I- INTENT
1.01 The undersigned Bidder proposes an agrees, if this Bid is accepted, to enter into an agreement with
Owner in the form included in the Contract Documents to perform and furnish all Work as
specified or indicated in the Contract Documents for the Bid price and within the Bid time indicated
in this Bid and in accordance with the other terms and conditions of the Contract Documents.
ARTICLE 2- TERMS AND CONDITIONS
2.01 Bidder accepts all of the terms and conditions of the Invitation to Bid and Instructions to Bidders,
including without limitation those dealing with the disposition of Bid security. This Bid will
remain subject to acceptance for 90 days after the day of Bid opening. Bidder will sign and deliver
the required number of counterparts of the Agreement with the Bonds and other documents
required by the Bidding Requirements within 15 days after the date of Owner's Notice of Award.
2.02 The undersigned bidder, having examined the specifications and contract documents, and being
fully advised as to the extent and character of the work, propose to furnish all equipment and to
perform all labor and work necessary for the completion of the work described by and in
accordance with the specifications and contacts for the following prices.
00400-Bid Form 00400-1 November 2021
City of Fayetteville, Arkansas
Benson M011ntaln Elevated Water Storage Tank Improvements
DOCUMENT 00400-BID FORM (continued)
ARTICLE 3- BIDDER'S REPRESENTATIONS
3.01 In submitting this Bid, Bidder represents, as more fully set forth in the Agreement, that:
A. Bidder has examined and carefully studied the Bid Documents, and the following
Addenda, receipt of all which is hereby acknowledged:
Number Date
11/29/2021
12/6/2021
DOCUMENT 00400-BID FORM (continued)
B. Bidder has visited the Site, City or Utilities and become familiar with and is satisfied as to
the general, local, and Site conditions that may affect cost, progress, performance, and
furnishing of the Work.
C. Bidder is familiar with and is satisfied as to all federal, state, and local Laws and
Regulations that may affect cost, progress, performance, and furnishing of the Work.
D. Bidder has carefully studied all: (1) reports of explorations and tests of subsurface
conditions at or contiguous to the Site and all drawings of physical conditions in or
relating to existing surface or subsurface structures at or contiguous to the Site; and (2)
reports and drawings of a Hazardous Environmental Condition, if any, at the Site. Bidder
acknowledges that such reports and drawings are not Contract Documents and may not be
complete for Bidder's purposes. Bidder acknowledges that Owner and Engineer do not
assume responsibility for the accuracy or completeness of information and data shown or
indicated in the Bid Documents with respect to Underground Facilities at or contiguous to
the Site.
E. Bidder has obtained and carefully studied (or assumes responsibility for having done so)
all such additional or supplementary examinations, investigations, explorations, tests,
studies, and data concerning conditions (surface, subsurface, and Underground Facilities)
at or contiguous to the Site or otherwise which may affect cost, progress, performance, or
furnishing of sequences, and procedures of construction to be employed by Bidder and
safety precautions and programs incident thereto.
00400-Bid Form 00400-2 November 2021
City of Fayetteville, Arkansas
Benson Mountain Elevated Water Storage Tank Improvements
DOCUMENT 00400-BID FORM (continued)
F. Bidder does not consider that any additional examinations, investigations, explorations,
tests, studies, or data are necessary for the determination of this Bid for performing and
furnishing of the Work in accordance with the times, price, and other terms and conditions
of the Contract Documents.
G. Bidder is aware of the general nature of work to be performed by Owner and others at the
Site that relates to Work for which this Bid is submitted as indicated in the Contract
Documents.
H. Bidder has correlated the information known to Bidder, information and observations
obtained from visits to the Site, reports, and drawings identified in the Contract
Documents, and all additional examinations, investigations, explorations, tests, studies,
and data with the Contract Documents.
I. Bidder has given Engineer written notice of all conflicts, errors, ambiguities, or
discrepancies that Bidder has discovered in the Contract Documents, and the written
resolution thereof by Engineer is acceptable to Bidder.
J. The Contract Documents are generally sufficient to indicate and convey understanding of
all terms and conditions for performing and furnishing the Work for which this Bid is
submitted.
K. This Bid is genuine and not made in the interest of or on behalf of any undisclosed person,
firm, or corporation and is not submitted in conformity with any agreement or rules of any
group, association, organization, or corporation; Bidder has not directly or indirectly
induced or solicited any other Bidder to submit a false or sham bid; Bidder has not
solicited or induced any person, firm, or a corporation to retrain from bidding; and Bidder
has not sought by collusion to obtain for himself any advantage over any other Bidder of -
over Owner.
L. Bidder will perform the Work in compliance with all applicable trench safety standards set
forth in Occupational Safety and Health Administration (OSHA) Part 1926 — Subpart P —
Excavations.
00400-Rid Form 00400-3 November 2021
City olTayetteville. Arkansas
Benson Mountain Elevated Water Storage Tank Improvements
DOCUMENT 00400-BID FORM (continued)
ARTICLE 4- BID PRICE
Bidders are required to provide pricing for all line items.
The City intends to award this contract to the lowest qualified responsive responsible bidder based
on the total base bid as long as the base bid amount falls within the amount of funds certified for the
project plus 25%.
In the event no bid falls within the amount of funds certified for the project plus 25%, all bids shall
be rejected and become confidential.
Bidder shall complete the Work in accordance with the Contract Documents for the price(s)
indicated on the UNIT PRICE BID SCHEDULE. The UNIT PRICE BID SCHEDULE shall be
completed using the Bonfire software as directed in the Invitation to Bid.
The City intends to award to the lowest responsive responsible bidder based on the evaluation of the sum of
Schedule].
ARTICLE 5- CONTRACT TIMES
5.01 Bidder agrees that the Work will be substantially completed and completed and ready for final
payment within the number of calendar days indicated in the Agreement.
5.02 Bidder accepts the provisions of the Agreement as to liquidated damages in the event of failure to
complete the Work within the times specified in the Agreement.
ARTICLE 6- BID CONTENT
6.01 The following documents are attached to and made a condition of this Bid:
A. Required Bid security in the form of a cashier's check from a financial institution located
in the State of Arkansas or a Bid Bond and in the amount of
Five Percent of Total Bid Amount Dollars ($ 5% of Total Bid Amount )
B. A tabulation of Subcontractors and other persons and organizations required to be
identified in this Bid.
00400-Bid Form 00400-4 November 2021
City of Fayetteville. Arkansas
Benson Mountain Flevated Water Storage Tank Improvements
DOCUMENT 00400-BID FORM (continued)
ARTICLE 7- COMMUNICATIONS
7.01 Communications concerning this Bid shall be addressed to the Bidder as follows:
Caldwell Tanks, li
4000 Tower Road
Louisville, KY 40219
Email salesRcaldwelltanks.com
Phone No. (502)964-3361
Fax No. (502) 966-8732
ARTICLE 8- TERMINOLOGY
8.01 The terms used in this Bid which are defined in the GENERAL CONDITIONS or Instructions to
Bidders will have the meanings assigned to them.
ARTICLE 9- CONTRACTOR'S ASSURANCES AND EXECUTION/SIGNATURE
9.01 Contractor's Assurances.
As the authorized representative of the individual, incorporation, or corporation (hereinafter
referred to as the company) bidding on or participating in the project, I certify that I have read and
understand the requirements of the General and/or Supplemental Conditions and that the principles,
agents and employees of the company will comply with these requirements including all relevant
statutes and regulations issued pursuant thereto. I further certify as the authorized agent of the
company that:
EQUAL OPPORTUNITY I will comply with all requirements of 41 CFR Chapter 60 and
Executive Orders 11246 and 11375, including inclusion of all required equal opportunity clauses in
each sub -contract awarded in excess of $10,000 and I will furnish a similar statement fiom each
proposed subcontractor, when appropriate. I will also comply with all Equal Employment
Opportunity requirements as defined by Section 504 of the Rehabilitation Act of 1973; the Age
Discrimination Act of 1975; and Section 13 of the Federal Water Pollution Control Act
Amendments of 1972 regarding sex discrimination.
LABOR STANDARDS I will comply with the Labor Standards Provisions contained in the
Contract Documents and furnish weekly payrolls and certifications as may be required by the City
of Fayetteville to affirm compliance. I will also require that weekly payrolls be submitted to the
City of Fayetteville for all subcontracts in excess of $2.000.
00400-Bid Form 00400-5 November 2021
City of Fayetteville. Arkansas
Benson Mountain Elevated Water Storage Tank Improvements
DOCUMENT 00400-BID FORM (continued)
OSHA REQUIREMENTS I will comply with the Department of Labor Safety and Health
Regulations promulgated under Section 107 of the Contract Work Hours and Safety Standard Act
(40 U.S.C. 327-333) in the performance of the contract.
PROCUREMENT PROHIBITIONS As required by Executive Order 11738, Section 306 of
the Clean Air Act and Section 508 of the Clean Water Act, I certify that I will not procure goods
and services from persons who have been convicted of violations of either law if the goods or
services are to be produced by the facility that gave rise to the violation.
DEBARMENT AND SUSPENSION I certify that to the best of my knowledge and belief that
the company that I represent and its principals:
(a) Are not presently debarred, suspended, proposed for debarment, declared ineligible, or
voluntarily excluded from covered transactions by any Federal department or agency;
(b) Have not within a three year period preceding this proposal been convicted of or had a civil
judgement rendered against them for commission of fraud or a criminal offense in connection with
obtaining, attempting to obtain, or performing a public (Federal, State, or local) transaction or
contract under a public transaction; violation of Federal or State antitrust statutes or commission of
embezzlement, theft, forgery, bribery, falsification or destruction of records, making false
statements, or receiving stolen property;
(c) Are not presently indicted for or otherwise criminally or civilly charged by a government entity
(Federal, State, or local) with commission of any of the offenses enumerated in paragraph (b) of this
certification; and
(d) Have not within a three-year period preceding this application/proposal had one or more public
transactions (Federal, State, or local) terminated for cause or default.
understand that a false statement on this certification regarding debarment and suspension may be
grounds for rejection of this proposal or termination of the award. In addition, under 18 USC Sec.
1001, a false statement may result in a fine. I further certify that 1 will obtain a similar certification
for each subcontract awarded in excess of $25,000.
00400-Bid Form 00400-6 November 2021
City of Fayetteville, Arkansas
Benson Mowvnin Elevated Water Storage Tank Improvements
DOCUMENT 00400-BID FORM (continued)
9.02 Execution/Signatures for Contractor Assurances above. Bid and Bid Form:
SUBMITTED on December 14 , )0 21
Arkansas State Contractor License No. 0028840422
If Bidder is:
An Individual
Name (type or
(Individual's Signature)
Doing business
Business addre:
Phone
Email
A Partnership
Partnership Name :
(Signature of general partner -attach evidence of authority to sign)
Name (type or
Business addrl
Phone No: Fax No.
Email Address:
00400-Bid farm 00400-7 November 10? 1
City of Fayetteville, Arkansas
Benson Mountain Elevated Water Storage Tank Improvements
DOCUMENT 00400-BID FORM (continued)
A Corporation or Corporate entity including Limited Liability Company (LLC)
Corporation Name : Caldwell Tanks, Inc. (SEAL)
State of Incorporation: Kentucky
Type (General Business, Professional, Service, Limited Liability):
General Business
l/
(Signature -attach evidence of authority to sig%
Name (type or printed): Eric W. Mousse
Title: Sales Manager '
of Corporate Secretary)
E.
Business address: 4000 Tower Road
Louisville, KY 40219
Phone No: (502)964-3361 Fax No. (502)966-8732
Email Address: sales@caldwelltanks.com
END OF DOCUMENT 00400
stuunttq
`SELL 7,q'''•,,�
i C,ORPOPA '
rF :Z=
`A
00400-Rid Form 00400-8 November 1021
POWER OF ATTORNEY
KNOW ALL MEN BY THESE PRESENTS, that CALDWELL TANKS, INC., Louisville,
Kentucky, a Kentucky Corporation, has constituted and appointed, and does constitute and appoint the
persons named below as its true and lawful Attorneys -in -Fact, to execute proposals for the sale of
materials or the construction of work, to make contracts for same, and execute Surety Bonds to be used
in connection therewith:
KEVIN J. GALLAGHER WILLIAM A. STETZLER
PATRICK A. SMITH SHANNON MCKAMEY
ERIC W. MONSKE CONRAD R. SPANGLER, III
This appointment is made in accordance with Article V, Section 1 of the By -Laws of the
Corporation as amended January 16, 1986, and still in full force and effect.
�MI"JAT1'PIS�WHEREOF, CALDWELL TANKS, INC. has caused these presents to be
signed b �i j resident, ant'it�,corporate seal to be thereunto affixed and duly attested by its Secretary
this 4th dWf Iy�2g1r z
ATTEST: SEAL A TANKS, INC.
(SEAL) '%�/S V I L 1 E '`��\ BY: -
TK. an Harvey
STATE OF KENTUCKY ) Presi i
SS:
COUNTY OF JEFFERSON )
LOU* ,,,day of May, 2021, before me personally appeared K. Ryan Harvey, President
of CALDWEI,. a�,4VKS II�Sy avho being duly sworn, said he resides in the state of Kentucky; that he is
President at`CALiUWL�Is�RNK-5, INC., the Corporation described in and which executed the foregoing
instrument' that h�cr�" the Ckporate seal; that it was so affixeA by order of th Board of Directors of
said Corporation, aO that"he;sigied his name thereto as President of sa' Co ati n by like authority.
(SEAL) ��'� UB L IL -" � ? BY:
Caroly . E. Burke
STATE OF KE K`�����' Notary Public, State at Large
" " ) SS: MY COMMISSION EXPIRES 9/25/2023
COUNTY OF JEFFERSON )
I, David E. Bartley, Secretary of CALDWELL TANKS, INC. do hereby certify that the
above and foregoing i���� Ve and correct copy of the Power of Attorney executed by CALDWELL
TANKS, INC., wNctl�i�stl dfull force and effect.
fIVITNESB'WH EOF, I have signed this certificate at Louisville, K ntucky, this
day of- 7, AT02�
(SEAL) SEAL BY:
�0 •.' avid E. Bartley, Secret
/��'��ISVILC'-_ � Caldwell Tanks Inc.
City of Fayetteville, Arkansas
CITY OF Purchasing Division —Room 306
" FAY E T T E Y I L L E 113 W. Mountain
Fayetteville, AR 72701
/� R K k N 5 A5 Phone: 479.575.8258
.8258
1W TDD (Telecommunication Device for the Deaf): 479.521.1316
INVITATION TO BID: Bid 21-80, Construction — Benson Water Tank
DEADLINE: Tuesday, December 14, 2021 before 2:00 PM, Local Time
CCEPTABLE DELIVERY METHODS:
(1) City's third -party bidding platform, OR
(2) Sealed and delivered directly to the City of Fayetteville as instructed in the advertisement
PURCHASING AGENT: Jonathan Smith jonsmith@fayetteville-ar.gov
DATE OF ISSUE AND ADVERTISEMENT: 11/14/2021 & 11/21/2021
INVITATION TO BID
Bid 21-80, Construction — Benson Water Tank
No late bids will be accepted. Bids shall be submitted in one of the following methods: (1) through the City's
third -party electronic bidding platform, Bonfire, or (2) delivering in person via sealed envelope to the City of
Fayetteville Purchasing Division. Submitting through the City's electronic bidding platform is strongly
encouraged. All bids shall be submitted in accordance with the attached City of Fayetteville specifications and
bid documents attached hereto. Each bidder is required to fill in every blank and shall supply all information
requested; failure to do so may be used as basis of rejection.
The undersigned hereby offers to furnish & deliver the articles or services as specified, at the prices & terms stated herein, and in
strict accordance with the specifications and general conditions of bidding, all of which are made a part of this offer. This offer is not
subject to withdrawal unless upon mutual written agreement by the Proposer/Bidder and City Purchasing Manager.
Name of Firm: Caldwell Tanks, Inc.
Contact Person: Eric W. Monske
Title: Sales Manager
E-Mail: sales@caldwelltanks.com Phone: (502) 964-3361
Business Address: 4000 Tower Road
City: Louisville
Signature:
City of Fayetteville, AR
Bid 21-80, Construction — Benson Water Tank
Page 1 of 14
L TA
t.`......!mfilcky Zip:
40219
CORPORgT;�, 1•, �[�ate: December 14, 2021
SEAL .'
/S VI LLe s\s.
CITY OF
IjS FAYETTEVILLE
ffARKANSAs
Project Check List
This checklist is for the Bidder's use in preparing & submitting a bid. It is not intended to include all details necessary to prepare a
bid and shall not be used as a substitute for the requirements of the bid documents. Information is shown below only as a matter
of convenience. Use of this checklist does not relieve the Bidder from the responsibility of meeting all requirements of the
Specifications concerning the preparation of an acceptable bid. Bidders are welcome to use this form as a coversheet for a
sealed envelope; however, using this form itself is NOT a requirement.
Fq 5% Bid Bond of the amount bid accompanied by required documentation (Power of Attorney, etc.)
o In lieu of a bid bond, the bidder may submit a cashier's check from a bank located in the State of Arkansas for
at least five percent (5%) of the amount bid (inclusive of any deductive alternates). Cashier's checks shall be
made payable to the City of Fayetteville, AR and received prior to the bid deadline by making an in -person
delivery appointment with the City Purchasing Division.
X Upload 5% bid bond to the City's electronic bidding platform (preferred) OR attach bid bond with physical
submittal and setting up an in -person delivery appointment with the City Purchasing Division.
❑R
All addenda shall be signed, acknowledged, and submitted on the appropriate forms (submitting the actual addendums
or marking acknowledgement on other bid pages).
All line items shall be appropriately filled out and extended to reveal the line item price as well as the total bid price.
X-1.
Total base bid should be calculated in the provided space.
All pages provided with signature lines shall be appropriately signed, dated accordingly, and included with submitted
bid documents
All bids shall be received before the stated deadline utilizing the City's electronic bidding platform or submitting a
physical sealed bid to the location listed below. Submitting a bid electronically is strongly encouraged. A public bid
opening will be conducted shortly after the deadline at City Hall and livestreamed at
https://www.youtube.com/user/citvoffavetteviIlear. Late or misdirected bids shall not be accepted. The City of
Fayetteville shall not be responsible for lost or misdirected bids, or failure of bidder's technical equipment. All bid
documents shall be delivered in a sealed envelope to the address stated in the advertisement or updated deadline
issued via Addenda. All bids should be delivered with the name of the bidder (contractor) on the sealed envelope as
well as the bidders Arkansas Contractor's License Number.
City of Fayetteville, AR
Purchasing Division —Suite 306
113 W. Mountain
Fayetteville, AR 72701
Additional Information Required
• List of Subcontractors: Submit form on Bonfire or attach if submitting a physical bid
• AR Secretary of State Filing: 100058306 or submit on the City's electronic bidding platform
• Arkansas Contractor License#: 0028840422 or submit on the City's electronic bidding platform
• Pursuant Arkansas Code Annotated §25-1-503, the Contractor agrees and certifies that they do not currently
boycott Israel and will not boycott Israel during any time in which they are entering into, or while in contract,
with any public entity as defined in §25-1-503. If at any time during contract the contractor decides to boycott
Israel, the contractor must notify the contracted public entity in writing.
o Submit on City's electronic bidding platform (preferred), OR circle applicable answer: YES r NO
City of Fayetteville, AR
Bid 21-80, Construction— Benson Water Tank Page
2of14
City of Fayetteville, Arkansas
Benson Mountain Elevated Water Storage Tank Improvements
SECTION 00140 — BIDDER'S QUALIFICATION STATEMENT
Contract Name: Benson Mountain Elevated Water Storage Tank Improvements
Bid 21-80, Construction
Date: December 14 . 20 21
SUBMITTED TO:
The City of Fayetteville, Arkansas
113 West Mountain Street
Fayetteville, Arkansas 72701
SUBMITTED BY:
Company Caldwell Tanks, Inc.
Name _ Eric W. Monske, Sales Manager
Address — _ 4000 Tower Road, Louisville, KY 40219
Principal Office 4000 Tower Road, Louisville, KY 40219
Corporation, LLC, partnership, individual, joint
venture, other Corporation
Arkansas State General Conti -actor's License Number
0028840422
(Type or legibly print)
For a Bidder (Contractor) to be considered as Qualified, the Contractor mast satisfy all insurance,
financial, and bonding requirements of the City of Fayetteville.
The Contactor must also provide documentation with the bid to document:
The Contractor's successful completion of five contracts similar in scope to this City of
Fayetteville Bid.
The Contractor shall have executed work for municipalities operating water distribution facilities
with a minimum of three (3) projects equaling or exceeding five hundred thousand dollars
($500,000) for installation of the product(s) bid. Work for developers and commercial site work
will not be considered as permissible work experience. Acceptable documentation of these
minimum installations must be submitted to the City of Fayetteville attached to this section. In
accordance with Arkansas Procurement Law, a Contractor may use the combined experience of
its owners or senior executive staff to satisfy the experience requirement, or the combined amount
of experience of the key personnel that will be responsible for satisfying the experience
requirement.
00140-Bidder Qualifications 00140-1 November 2021
Ciq' of Fayetteville, Arkansas
Benson Mountain Elevated Water Storage Tank lrnprovements
SECTION 00140 — BIDDER'S QUALIFICATION STATEMENT (continued)
EXPERIENCE STATEMENT MANDATORY
1. Bidder has been engaged as a General Contractor in construction for 134 years and
has performed work of the nature and magnitude of this Contract for 134 years.
Bidder has been in business under its present name for 52 years.
2, The Contactor must also provide documentation with the bid to document the
Contractor's successful experience with the following:
a. The Contactor must also provide documentation with the bid to document the
Contractor's successful completion of five contracts similar in scope to this City
of Fayetteville Bid.
3. Bidder now has the following bonded projects under contract: (On a separate sheet,
list project name, owner, name of owner contact, engineer / architect, name of
engineer/architect contact, amount of contract, surety, and estimated completion
date.)
4. Bidder has completed the following (list minimum of 3) contracts consisting of work
similar to that proposed by this Contract: (On a separate sheet, list project name,
owner, name of owner contact, engineer / architect, name of engineer/architect
contact, amount of contract, surety, and date of completion and percentage of the cost
of the Work performed with Bidder's own forces.)
5. Has Bidder ever failed to complete any project? if so, state when, where, and why. No
6. Bidder normally performs the following work with his own forces:
The design, fabrication and erection of an elevated water storage tank.
7. Construction experience of key individuals in the organization is as follows
(continued on attached sheets if needed):
See attached
8. In the event the Contract is awarded to Bidder, the required surety Bonds will be
furnished by the following surety company and name and address of agent:
Surety: Great American Insurance Company, 301 East Fourth Street, Cincinnati„ OH 45202
Agent: Sterling Thompson Company, 3006 EastPoint Parkway, Louisville, KY 40223
00140-Bidder Qualifications 00140-2 November 202E
City of Fayetteville. At
Benson Mountain Elevated Water Storage Tank Improvements
SECTION 00140 — BIDDER'S QUALIFICATION STATEMENT (continued)
9. Bidder's Workmen's Compensation Experience Modifier Factor is:
FINANCIAL STATEMENT (IF REQUESTED)
A. If requested by the City of Fayetteville during the evaluation of bids the bidder shall provide
to the City of Fayetteville the following additional information:
Bidder possesses adequate financial resources as indicated by the following:
I. Assets and Liabilities: Attach a financial statement, audited if available, including
Bidder's latest balance sheet and income statements showing the following items:
a. Current assets (cash, joint venture accounts, accounts receivable, notes
receivable, accrued income, deposits, materials inventory, and prepaid expenses).
b. Net fixed assets.
c. Other assets.
d. Current liabilities (accounts payable, notes payable, accrued expenses, provision
for income taxes, advances, accrued salaries, and accrued payroll taxes).
e. Other liabilities (capital, capital stock, authorized and outstanding shares par
values, earned surplus, and retained earnings).
f. Name of firm preparing financial statement and date thereof:
If financial statement is not for identical organization named herein, explain
relationship and financial responsibility of the organization furnished.
2. Current Judgments: The following judgements are outstanding against Bidder:
Judpment Creditors Where Docketed and Date Amount
a. See attached $
b. g
00140-Bidder Qualifications 00140-3 November 2021
City of Fayetteville. Arkansas
Benson Mountain Elevated Water Storage Tank Improvements
SECTION 00140 — BIDDER'S QUALIFICATION STATEMENT (continued)
Bidder hereby represents and warrants that all statements set forth herein are true and correct.
Date: December 14 2021
Name of Organization:
Caldwell Tanks, Inc.
By Eric W. Monske
((Type or lea' Fy prin
(Signature)
Title Sales Manager
(Type or legibly print)
(OFFICIAL SEAL)
\\1LL 1Uuuttii
ate..• ••'�'�rs,':
r) J pORPQ/t gr� , Z
i(A.
SQL
:y
�.�:
/'�tt/11111111��
If Bidder is a partnership, the partnership name shall be signed, followed by the signature of at least one
of the partners. If Bidder is a corporation or LLC, the corporate name shall be signed, followed by the
signature of a duly -authorized officer and with the corporate seal affixed.
Contractor shall attach evidence of authority of signature. If Contractor is a corporation, corporate entity
or LLC, Contractor shall attach Corporate Resolution authorizing Contractor's signature and authority to
sign.
END OF SECTION 00140
00140-Bidder Qualifications 00140-4 November 2021
2
2
CAIDWEU
Since 1887
Water - Energy - Industrial
BIDDER'S QUALIFICATION STATEMENT
Similar Proiects:
See attached listing of Double Ellipsoidal style tanks completed by Caldwell Tanks.
Projects under Contract:
See attached listing of Contracts under Construction for Double Ellipsoidal style tanks.
See attached listing of Double Ellipsoidal style tanks completed by Caldwell Tanks.
Construction Experience of Key Individuals:
K. Ryan Harvey
President
23 years
Admin/Engineering
Kevin J. Gallagher
Vice President
26 years
Sales/Engineering
Tony Burke
Director -Engineering
33 years
Engineering
David Francis
Director -Operations
29 years
Civil Construction
Michael R. Shaffer
Director -Steel Construction
24 years
Steel Construction
Wilson Frazier
Director -Environmental Health & Safety
32 years
Safety
Scott McIntire
Director -Quality Assurance
40 years
Project Management
Quality Assurance
Resumes available
upon request
Judgements, Claims, Arbitration/Lawsuits:
Acting as a general contractor, Caldwell Tanks completes approximately two hundred (200)
construction projects annually. In the course of completing these contracts, we issue approximately
700 subcontracts and will engage subcontractors for about 25% of the work such as electrical,
foundation, fencing, site work, etc. On occasions, disputes and claims arise. On very rare
occasions, arbitration or other legal remedies will settle disputes and claims.
At the present time, there are approximately a dozen active claims or disputes pending settlement
through legal channels or otherwise. For the past five years, the total dollar amount of disputed
claims has never exceeded 1/2 of 1 percent of annual dollar volume.
4000 Tower Road Louisville, KY 40219 P: 502-964-3361 F: 502-966-8732
57 East Broad Street Newnan, GA 30263 P: 770-253-3232 F: 770-251-9253
CAIDWEU
CCA2 ��
DOUBLE ELLIPSOIDAL ELEVATED WATER TANKS
DATE
CAPACITY
LOCATION/OWNER
ENGINEER
COMPLETED
100M Elevated
City of Kermit
Parkhill, Smith & Cooper
10/21
165' HWL
Kermit, TX
Lubbock, TX
$433,000.00
(432) 586-3468
Zack Dawson
(806) 473-2200
100M Elevated
Madison County PWSD No. 1
Taylor Engineering, LLC
06/21
65' HWL
Fredericktown, MO
Farmington, MO
$537,000.00
(573) 783-3460
Timothy D. Robbs
(573)756-9226
100M Elevated
Long Creek Water Association
Engineering Service
8/20
120' HWL
Meridian, MS
Richland, MS
$453,000.00
Meridian, MS
Scott Litchfield
Sheila Williams, PE
(601)693-3096
(601)939-8737
100M Elevated
Rattlesnake Ridge Water Dist.
Kentucky Engineering Group, PLLC
5/20
81' HWL
3563 State Hwy. 1661 (OFF SR 7)
161 North Locust Street
$485,000.00
Grayson, KY 41143
Varsailles, KY 40383
Bill Gilbert
James C. Thompson, PE
(606)474-7570
(859)251-4127
100M Elevated
Edinburg Domestic Water System
Calvert-Spradling Engineers
8/19
144'6" HWL
Carthage, MS
West Point, MS
$428,000.00
Leake Co., MS
Todd Thorton
Stanley Spradling, PE
(601)267-0355
(662)494-7101
100M Elevated
Buffalo Trail Water Association
Cann -Tech, LLC
6/18
111'6" HWL
Mays Lick, KY
Lawrenceburg, KY
$509,000.00
Sardis, KY
Dick Clary
Matt Baker, PE
(606)763-6516
(502)859-0907
100M Elevated
Southern Iowa Rural Water Assoc.
Garden & Associates, Ltd.
11/17
100'3" HWL
Creston, IA
Oskaloosa, IA
$448,000.00
Adair Co., IA
Dan McIntosh
Mark J. Fincel, PE
(641)782-5744
(641)672-2526
100M Elevated
Big V Water Association
Cook Coggin Engineers, Inc.
2/17
153' HWL
Booneville, MS
Tupelo, MS
$474,000.00
Jurgen Hellriegel
Nick Brawner
(662)728-6901
(662)842-7396
100M Elevated
Eastern Heights Water Works
Professional Engineering
11/16
178' HWL
Amite, LA
Baton Rouge, LA
$786,000.00
Jonathan Watts
David Colson, PE
(985)748-8488
(225)769-2810
100M Elevated
Red River County WSC
Hayter Engineering, Inc.
10115
141'6"
Clarksville, TX
Paris, TX
$572,000.00
John Ragsdill
Moses Ogolla
(903)427-2891
(903)785-0303
CONFIDENTIAL
SAL-FRM-05 SIMILAR PROJECTS
Approved: 9/6/2018
Page 4 of 7
Rev 0
Contracts under construction
CAL- V%T
Since 1887
Water - Energy - Industrial
Capacity/Tank/HWL Owner Engineer
75000
DE
100' HWL
RATTLESNAKE RIDGE WATER DISTRICT
E-8757
GRAYSON KY
75000
DE
118' HWL
TOWN OF TAYLORTOWN
E-9048
PINEHURST NC
75000
DE
130' HWL
EMERALD COAST UTILITY SERVICES, INC.
E-9006
EGLIN AFB FL
75000
DE
130' HWL
CORNA KOKOSING CONSTRUCTION COMPANY
E-9007
WESTERVILLE OH
75000
DE
143' HWL
CITY OF MINNETONKA BEACH
E-8987
MINNETONKA BEACH MN
100000
DE
114'3" HWL
PATOKA WATER COMPANY, INC.
E-9069
TASWELL IN
Completion/Amount
KENTUCKY ENGINEERING GROUP, PLLC
VERSAILLES KY
$460,000.00
(859) 251-4127
LKC ENGINEERING, PLLC
ABERDEEN NC
$859,000.00
(910)420-1437
AMERICAN STATES UTILITY SERVICES, IN
EGLIN AFB FL
$925,000.00
(770)528-3881
SANDS DECKER ENGINEERS & SURVEYOR
COLUMBUS OH
$720,000.00
STANTEC
MINNEAPOLIS MN
$1,127,000.00
(651)636-4600
MIDWESTERN ENGINEERS, INC.
LOOGOOTEE IN
$608,020.00
(812) 295-2800
C(Ch1LDDVWEU
Since 1887
Water Energy - Industrial
Capacity/Tank/HWL Owner Engineer
100000
DE
129' HWL
CITY OF DUDLEY
E-9084
DUDLEY GA
100000
DE
163'6" HWL
SOUTH LOWNDES WATER ASSOCIATION, INC.
E-9114
CRAWFORD MS
100000
DE
96' HWL
CITY OF LOGAN
E-8693
LOGAN OH
125000
DE
139' HWL
CITY OF PAVO
E-9009
PAVO GA
150000
DE
105'3" HWL
VILLAGE OF SANDOVAL
E-9083
SANDOVAL IL
150000
DE
124' HWL
NORTH LEE COUNTY WATER ASSOCIATION
E-9062
SALTILLO MS
Monday, December 13, 2021
Completion/Amount
T.R. LONG ENGINEERING, PC
HINESVILLE
GA
$662,000.00
(912)352-0005
CALVERT-SPRADLING ENGINEERS, INC.
WEST POINT
MS
$694,000.00
(662)494-7101
STANTEC CONSULTING SERVICES, INC.
LOGAN
OH
$614,000.00
(740)380-2828
WATKINS & ASSOCIATES, LLC
TIFTON
GA
$687,000.00
(229)388-8823
J.T. BLANKINSHIP, INC.
MURPHYSBORO
IL
$1,273,000.00
(618)687-1771
COOK COGGIN ENGINEERS, INC.
TUPELO
MS
$813,000.00
(662)842-7381
C(Ch1LDDVWEU
Since 1887
Water Energy - Industrial
Capacity/Tank/HWL Owner
Engineer
Completion/Amount
150000
DE
140' HWL
VILLAGE OF LA RUE
GPD ASSOCIATES
E-8999
LA RUE
OH
AKRON OH
$990,000.00
(330)572-2193
150000
DE
140' HWL
MOUNT OLIVE WATER ASSOCIATION
WGK, INC.
E-8630
BOLTON
MS
CLINTON MS
$716,000.00
(601)925-4444
150000
DE
170' HWL
MUD CREEK WATER ASSOCIATION
PRECISION ENGINEERING CORPORATION
E-9060
PONTOTOC
MS
OXFORD MS
$647,000.00
(662)234-8539
150000
DE
75'6" HWL
MONROE COUNTY WATER DISTRICT
STIGALL ENGINEERING ASSOCIATES, INC.
E-8384
TOMPKINSVILLE
KY
NASHVILLE TN
$474,634.00
(615)460-7515
POWER OF ATTORNEY
KNOW ALL MEN BY THESE PRESENTS, that CALDWELL TANKS, INC., Louisville,
Kentucky, a Kentucky Corporation, has constituted and appointed, and does constitute and appoint the
persons named below as its true and lawful Attorneys -in -Fact, to execute proposals for the sale of
materials or the construction of work, to make contracts for same, and execute Surety Bonds to be used
in connection therewith:
KEVIN J. GALLAGHER WILLIAM A. STETZLER
PATRICK A. SMITH SHANNON MCKAMEY
ERIC W. MONSKE CONRAD R. SPANGLER, III
This appointment is made in accordance with Article V, Section 1 of the By -Laws of the
Corporation as amended January 16, 1986, and still in full force and effect.
�MI"JAT1'PIS�WHEREOF, CALDWELL TANKS, INC. has caused these presents to be
signed b �i j resident, ant'it�,corporate seal to be thereunto affixed and duly attested by its Secretary
this 4th dWf IycP2g1r z
ATTEST: SEAL A TANKS, INC.
(SEAL) '��/SVIL1 E' BY: -
"'// �t'�` K. an Harvey
STATE OF KENTUCKY ) Presi i
SS:
COUNTY OF JEFFERSON )
LOU* ,,,day of May, 2021, before me personally appeared K. Ryan Harvey, President
of CALDWEI,. a�,4VKS II�Sy avho being duly sworn, said he resides in the state of Kentucky; that he is
President at`CAL•�UWL�Is�RNK-5, INC., the Corporation described in and which executed the foregoing
instrument' that h�cr�" the Ckporate seal; that it was so affixeA by order of th Board of Directors of
said Corporation, aO that"he;sigied his name thereto as President of sa' Co ati n by like authority.
(SEAL) ��'� UB L \( -" � ? BY:
Caroly . E. Burke
STATE OF KE K`�����' Notary Public, State at Large
" " ) SS: MY COMMISSION EXPIRES 9/25/2023
COUNTY OF JEFFERSON )
I, David E. Bartley, Secretary of CALDWELL TANKS, INC. do hereby certify that the
above and foregoing i���� Ve and correct copy of the Power of Attorney executed by CALDWELL
TANKS, INC., wNctl�i�stl dfull force and effect.
(IVITNESS'WH�EOF, I have signed this certificate at Lq 2I—Z
(SEAL) % , . SEAL BY:
avid E. Bartley, Secret
��'�.,ISVIL�-"c;��`` Caldwell Tanks, *Inc.,
30'-0" TANK DIAMETER
100,000 GALLON CAPACITY
BALCONY
"R2"
w w "R1"
z 0
zQ
o "S1„
w I �
-04
Q N
w
"63"
c�
_ " 62"
"RR2"
MATERIAL THICKNESS
o
~
CONTAINER:
"CO2"
"BR2"
0o J
»R2„ 1/4„
z w "ST1"
"RR1"
„R1„ 1/4"
Ld
"sill 1/4"
o
U
"BY 1 /4„
w o
O
» B2" 1/4"
IL O
~
"BR1„
RISER 1/4"
0
o
TOWER:
ul
COLUMNS
DIAMETER: 20"
"CO2": 1/4" (THICKNESS)
"C01 ": 1 /4" (THICKNESS)
48" DIA. WET RISER
STRUT
ELEVATION
„ST1: W6x2o
BRACE RODS
"BR2": 1"
"BR1
DESIGN PARAMETERS
DESIGN PER AWWA D100-11 AND PROJECT SPECIFICATIONS.
ALL ACCESSORIES TO BE INCLUDED PER SPECIFICATIONS.
SIZES AND THICKNESSES SUBJECT TO CHANGE WITH
CALDiWELL
FINAL DESIGN.
Since 1887
SITE CLASS: C
Water - Energy - Industrial
SEISMIC LOAD - SS=22.0% Si =9.6%
GOSHEN, AR
100,000 GALLON DOUBLE ELLIPSOIDAL TANK
WIND LOAD - 90 MPH
4 BATTERED COLUMNS (0.75" IN 12")
BY. BRK TITLE: BID SKETCH
DIAMETER AT TOP OF FOUNDATION - 37'-8 3/8"
DATE: DRAWING NO.:
12/01 /21 BID 228
QUANTITIES:
(TOTAL FOR 4 COLUMNS)
o 3'-2" x 3'-11"
TAN. x RAID. WIDTH
CONCRETE — 15 CU. YDS.
REINFORCEMENT — 1,200 LBS.
#5 DOWELS
�(16)
w �(6) #4
TIES
LL
`9 � o
w
( 5) #4 BARS
Q n
EQ. SPA. EA. WAY
O
O Y
I � U
(5) #6 BARS
EQ. SPA. EA. WAY
6'-3" SQUARE FOOTING
PEDESTAL SECTION
NOTES:
THE PROJECT GEOTECHNICAL ENGINEER SHALL INSPECT AND
APPROVE
SUBGRADE PRIOR TO STEEL OR CONCRETE PLACEMENT.
FOUNDATION IS SUBJECT TO CHANGE WITH FINAL DESIGN.
SUBGRADE PREPARATION AND BACKFILL PER PROJECT
GEOTECHNICAL REPORT AND SPECIFICATIONS.
REINFORCING STEEL QUANTITIES DO NOT ACCOUNT FOR
LAPS, BENDS, HOOKS, ETC.
DESIGN PARAMETERS
DESIGN PER AWWA D100-11 AND
PROJECT SPECIFICATIONS.
ANCHOR BOLT CIRCLE DIA. — 37'-8 318"
SUBJECT TO CHANGE WITH FINAL DESIGN.
SEISMIC LOAD — SS= 18.0% Si = 9.8%
CALDMVELL
BASIC WIND SPEED — 90 MPH
Water - Energy5 inee tr87 - Industrial
NET ALLOWABLE BEARING CAPACITY — 6,500 PSF
GOSHEN, AR
100,000 GALLON DOUBLE ELLIPSOIDAL TANK
CONCRETE STRENGTH — 4,000 PSI
BY: TITLE:
BRK COLUMN PIER DETAIL
REINFORCING STEEL PER ASTM A615 GR. 60.
DATE:12/8/21 DRAWING NO.:
BID 228
0 5'-2" SQ. SLAB
QUANTITIES:
CONCRETE — 4 CU. YDS.
o Q Y
REINFORCEMENT — 300 LBS.
C.
W ~
=
(6) ##4 BARS
w
0 0 w
EA. FA. EQ. SPA.
J
( 6) ##4 BARS
z Q
EA. FA. EQ. SPA.
J
Q
o
( 6) ##5 BARS
EA. FA. EQ. SPA.
o CD
�T
• • e o 0
6'-2" SQUARE FOOTING
CENTER PIER SECTION
( 2 ) WALLS REQUIRED
NOTES:
THE PROJECT GEOTECHNICAL ENGINEER SHALL INSPECT AND APPROVE
SUBGRADE PRIOR TO STEEL OR CONCRETE PLACEMENT.
FOUNDATION IS SUBJECT TO CHANGE WITH FINAL DESIGN.
SUBGRADE PREPARATION AND BACKFILL PER PROJECT
GEOTECHNICAL REPORT AND SPECIFICATIONS.
REINFORCING STEEL QUANTITIES DO NOT ACCOUNT FOR
LAPS, BENDS, HOOKS, ETC.
DESIGN PARAMETERS
DESIGN PER AWWA D100-11 AND
PROJECT SPECIFICATIONS.
SUBJECT TO CHANGE WITH FINAL DESIGN.
SEISMIC LOAD — SS= 18.0% Sl = 9.8%
� v= LWELL
BASIC WIND SPEED — 90 MPH
Water - Energys,t
-Indduu strriaig l
NET ALLOWABLE BEARING CAPACITY — 6,500 PSF
GOSHEN, AR
100,000 GALLON DOUBLE ELLIPSOIDAL TANK
CONCRETE STRENGTH — 4,000 PSI
BY: TITLE:
BRK CENTER PIER DETAIL
REINFORCING STEEL PER ASTM A615 GR. 60.
DATE:12/8/21 DRAWING NO.:
BID 228
City of Fayetteville, Arkansas
Benson Mountain Elevated Water Storage Tank t,nprovements
SECTION 00430 — LIST OF SUBCONTRACTORS
In compliance with the Instructions to Bidders and other Contract Documents, the undersigned submits
the following names of Subcontractors to be used in performing the Work for:
Benson Mountain Elevated Water Storage Tank Improvements, Bid 21-80, Construction.
Bidder certifies that all Subcontractors listed are eligible to perform the Work.
Subcontractor's Work
Subcontractor's Name
Expected Percentage
and Address
or Value
Designate Work
Ozark MTN. Construction
1002 Artis Lane
Civil Construction
Conway, AR 72034
$300,000
Viking Industrial Painting
8790 F St., Suite 629
Field Coatings
Omaha, NE 68127
$110,000
Brothers Electric
Electrical
16649 Payne Road
Conroe, Texas 77302
$90,000
Iseler Demolition, Inc.
Demolition
6996 Ronjoy PI
PO B_ox 185
$30,000
Port Hope, MI 48468
NOTE: This form must be submitted in accordance with the Instructions to Bidders.
Caldwell Tanks, Inc.
1idder's name (type or print)
Bidder's name (signature) Eric W. Monske, Sales Manager
December 14, 2021
Date
END OF SECTION 00430
V4.: pORPORq, Z
=;<o.SEAL
GAS .......••• Nl' ,:
00430-List of Subcontractors 00430-1 November 2021
Responses
Success: All data is valid!
Bid 21-80, Total Base Bid
Success:
All values
provided
#1-1
Performance and Payment Bond
1
LS
$ 4,400.00
$ 4,400.00
LS
$ 55,000.00
$ 55,000.00
Success:
All values
provided
#1-2
Mobilization
1
LS
$ 1,500.00
$ 1,500.00
Success:
All values
provided
#1-3
Construction Erosion Control
1
LS
$ 3,500.00
$ 3,500.00
Success:
All values
provided
#1-4
Site Preparation and Grading
1
LS
$ 3,000.00
$ 3,000.00
Success:
All values
provided ■
#15
Clearing and Grubbing
1
LS
$ 2,000.00
$ 2,000.00
Success:
All values
provided
#1-6
OSHA Trench Safety
1
Construction of the 100,000-Gallon Benson
Success:
All values
provided
#1-7
Mountain Elevated Water Storage Tank
Improvements as shown in the Plans and stated
1
LS
$ 1,019,870.00
$ 1,019,870.00
in the Specifications
LS
$ 30,000.00
$ 30,000.00
Success:
All values
provided
#1-8
Demolish Existing 35,0000-Gallon Benson
Mountain Standpipe
1
SY
$ 16.00
$ 19,680.00
Success:
All values
provided
#1-9
Construct Gravel Access Drive (8" Thickness)
1230
CY
$ 33.00
$ 8,250.00
Success:
All values
provided
#1.10
Undercut Gravel Access Drive and Backfill with
Oversize Rock
250
SY
$ 9.00
$ 6,300.00
Success:
All values
provided
#1-11
Remove Gravel Access Drive and Restore with
Seed, Fertilize, and Mulch
700
EA
$ 1,500.00
$ 1,500.00
Success: All values provided #1.12 Install Temporary 20' Gate Assembly and Remove 1
following Construction
12/15/21, 9:06 AM
Back to Project
Proposal Data
Bid 21-80, Construction - Benson Water Tank - Proposal Data
Show/Hide 4 Search
Supplier AR Secretary of State Arkansas Contractor's Pursuant Arkansas Code Annotated §25-1-503, the
Filing # License # currently boycott Israel and will not boycott Israel r
or while in contract, with any public entity as define
contractor decides to boycott Israel, the contractor
writing.
Caldwell Tanks, Inc. 0028840422 Yes
Scorecard Open...
Maguire Iron, Inc. 0130400521 Yes
Scorecard Open...
Phoenix Fabricators and Erectors, LLC 0034100421 Yes
Scorecard Open...
6
https://fayettevi I I e-a r. bonfi rehu b.com/projects/54718/proposal Data
l rtN nt I a%ettc\ille. Xrkansa.+
Ben mill %t,runtam I Iexatcd %later's1ora_c lank Impro\ement-
SECTION 00500 — AGREEMENT
BET Y' EEN OWNER AND CONTR.:CTOR
Contract Name. Title: Benson Mountain Elegy aced Water Storage 1 ank Iill proyements
Contract No.: 2 1-80. Construction
THiS AGREEMEN f is dated as of the q day of lanW4in the year 20vby and
bet-,Neen The Cith of Fayetteville, Arkansas and C'ald\%ell Tanks. Inc. (hereinafter called
Contractor).
ARTICLE I - WORK
LM Contractor shall complete all Work as specified or indicated in the Contract Documents. The
x�,ork under this Agreement includes. but is not limited to:
A. Construction of the 100.000-gallon Benson Mountain Multi -Column Elevated Water
Storage Tank Aith related site improvements and demolition of the existing 35,000-
gallon Benson Mountain Standpipe.
1.0' The Contractor agrees to perform the x+ork described in the Contract Documents and comply
\kith the terms therein for the amounts shown in the Bid Proposal. Refer to Section 00400-
Bid Form for quantifies.
1.03 Any use o1' a third party dumpster or roll off container shall be procured from the City of
Fayetteville Recycling and Trash Collection Division. Use of a Non -City dumpster or roll off
container is not allowed.
1.04 Contractor is responsible for obtaining: all applicable permits. The fees for Cit} of
Fayetteville (only) issued permits shall be vvaived.
1.05 The Contract may include \�ork in City of Fayetteville right-of-wav, ARDOT (State) right-
of-way, railroad right-ol-way and in General or Utility Easements.
ARTICLE 2 - ENGINEER
-01 The Contract Documents have been prepared by tla\\kins-\k'eir Engineers, Inc. Ha\ykins-
Weir Engineers. Inc. assumes all duties and responsibilities, and has the rights and authority
assigned to Engineer in connection x%ith completion of the Work in accordance \pith the
Contract Documents.
00500-Agreement 0000-1 Nmcmhcr 20-11
City of Fayetteville, Arkansas
Benson Mountain Elevated Water Storage Tank Improvements
SECTION 00500 — AGREEMENT
BETWEEN OWNER AND CONTRACTOR (continued)
2.02 The City of Fayetteville assumes all duties and responsibilities, and has the rights and
authority assigned to The City of Fayetteville as Owner in connection with completion of the
Work in accordance with the Contract Documents.
ARTICLE 3 - CONTRACT TIME
3.01 TIME OF THE ESSENCE:
A. All time limits for milestone, if any, Substantial Completion and completion and
readiness for final payment as stated in the Contract Documents are of the essence of
the Contract.
3.02 DATES FOR COMPLETION AND FINAL PAYMENT:
A. The Work shall be substantially completed within 330 calendar days after the date
when the Contract Times commence to run as provided in the GENERAL
CONDITIONS, and final completion and ready for final payment within 30 calendar
days after the date when the Contract Times commence to run as provided in the
GENERAL CONDITIONS.
3.03 LIQUIDATED DAMAGES:
A. Owner and Contractor recognize that time is of the essence of this Agreement and
that The City of Fayetteville will suffer financial loss if the Work is not completed
within the time specified above, plus any extensions thereof allowed in accordance
with the GENERAL CONDITIONS. The parties also recognize the delays, expense,
and difficulties involved in proving the actual loss suffered by The City of
Fayetteville if the Work is not Substantially Completed on time. Accordingly,
instead of requiring any such proof, The City of Fayetteville and Contractor agree
that as liquidated damages for delay (but not as a penalty) Contractor shall pay The
City of Fayetteville Seven Hundred and Fifty Dollars ($750.00) for each calendar day
that expires after the time specified above in Paragraph 3.02 for Substantial
Completion until the Work is Substantially Complete. After Substantial Completion,
if Contractor shall neglect, refuse, or fail to complete the remaining Work within the
time specified in Paragraph 3.02 for completion and readiness for final payment or
any proper extension thereof granted by The City of Fayetteville, Contractor shall
pay The City of Fayetteville Seven Hundred and Fifty Dollars ($750.00) for each
00500-Agreement 00500-2 November 2021
City of Fayetteville, Arkansas
Benson Mountain Elevated Water Storage Tank Improvements
SECTION 00500 — AGREEMENT
BETWEEN OWNER AND CONTRACTOR (continued)
calendar day that expires after the time specified for completion and readiness for
final payment.
ARTICLE 4 - CONTRACT PRICE
4.01 The CITY OF FAYETTEVILLE agrees to pay, and the CONTRACTOR agrees to accept, as
full and final compensation for all work done under this agreement, the amount based on the
unit prices bid in the Proposal (BID FORM) which is hereto attached, for the actual amount
accomplished under each pay item, said payments to be made in lawful money of the United
States at the time and in the manner set forth in the Specifications.
4.02 As provided in the Contract estimated quantities are not guaranteed, and determinations of
actual quantities and classifications are to be made by ENGINEER as provided in the General
Conditions. Unit prices have been computed as provided in the Contract Documents.
4.03 Changes, modifications, or amendments in scope, price or fees to this contract shall not be
allowed without a prior formal contract amendment approved by the Mayor and the City
Council in advance of the change in scope, cost or fees.
Further, there shall be no changes to the scope and/or contract documents
without prior written approval of the Engineer of Record and the City's
designated Professional Engineer.
ARTICLE 5 - PAYMENT PROCEDURES
5.01 SUBMITTAL AND PROCESSING OF PAYMENTS:
A. Contractor shall submit Applications for Payment in accordance with the GENERAL
CONDITIONS. Applications for Payment will be processed by Engineer as provided
in the GENERAL CONDITIONS.
5.02 PROGRESS PAYMENTS, RETAINAGE:
A. The City of Fayetteville shall make progress payments on account of the Contract
Price on the basis of Contractor's Applications for Payment as recommended by
Engineer, on or about the 15th day of each month during construction. All such
payments will be measured by the schedule of values established in the GENERAL
CONDITIONS (and in the case of Unit Price Work based on the number of units
00500-Agreement 00500-3 November 2021
City of Fayetteville, Arkansas
Benson Mountain Elevated Water Storage Tank Improvements
SECTION 00500 — AGREEMENT
BETWEEN OWNER AND CONTRACTOR (continued)
completed) or, in the event there is no schedule of values, as provided in the General
Requirements.
1. Prior to Substantial Completion, progress payments will be made in an
amount equal to the percentage indicated below, but, in each case, less the
aggregate of payments previously made and less such amounts as Engineer
shall determine, or The City of Fayetteville may withhold, in accordance
with the GENERAL CONDITIONS.
a. 95% of Work Completed (with the balance being retainage). If Work
has been 50% completed as determined by Engineer, and if the character
and progress of the Work have been satisfactory to The City of
Fayetteville and Engineer, The City of Fayetteville on recommendation
of Engineer, may determine that as long as the character and progress of
the Work subsequently remain satisfactory to them, there will be no
additional retainage on account of Work subsequently completed, in
which case the remaining progress payments prior to Substantial
Completion will be an amount equal to 100% of the Work Completed
less the aggregate of payments previously made; and
b. 100% of Equipment and Materials not incorporated in the Work but
delivered, suitably stored, and accompanied by documentation
satisfactory to The City of Fayetteville as provided in the GENERAL
CONDITIONS.
5.03 FINAL PAYMENT:
A. Upon final completion and acceptance of the Work in accordance with the
GENERAL CONDITIONS, The City of Fayetteville shall pay the remainder of the
Contract Price as recommended by Engineer and as provided in the GENERAL
CONDITIONS.
ARTICLE 6 - CONTRACTOR'S REPRESENTATIONS
6.01 In order to induce The City of Fayetteville to enter into this Agreement, Contractor makes the
following representations:
A. Contractor has examined and carefully studied the Contract Documents including the
Addenda and other related data identified in the Bid Documents.
00500-Agreement 00500-4 November 2021
City of Fayetteville, Arkansas
Benson Mountain Elevated Water Storage Tank Improvements
SECTION 00500 — AGREEMENT
BETWEEN OWNER AND CONTRACTOR (continued)
B. Contractor has visited the Site(s) and become familiar with and is satisfied as to the
general, local, and Site conditions that may affect cost, progress, performance, and
furnishing of the Work.
C. Contractor is familiar with and is satisfied as to all federal, state, and local Laws and
Regulations that may affect cost, progress, performance, and furnishing of the Work.
D. Contractor has carefully studied all:
(1) Reports of explorations and tests of subsurface conditions at or contiguous to
the Site and all drawings of physical conditions in or relating to existing
surface or subsurface structures at or contiguous to the Site; and
(2) Reports and drawings of a Hazardous Environmental Condition, if any, at the
Site. Contractor acknowledges that The City of Fayetteville and Engineer do
not assume responsibility for the accuracy or completeness of information
and data shown or indicated in the Contract Documents with respect to
Underground Facilities at or contiguous to the Site.
E. Contractor has obtained and carefully studied (or assumes responsibility of having
done so) all such additional supplementary examinations, investigations,
explorations, tests, studies, and data concerning conditions (surface, subsurface, and
Underground Facilities) at or contiguous to the Site or otherwise which may affect
cost, progress, performance, and furnishing of the Work or which relate to any aspect
of the means, methods, techniques, sequences, and procedures of construction to be
employed by Contractor and safety precautions and programs incident thereto.
F. Contractor does not consider that any additional examinations, investigations,
explorations, tests, studies, or data are necessary for the performing and furnishing of
the Work at the Contract Price, within the Contract Times, and in accordance with
the other terms and conditions of the Contract Documents.
G. Contractor is aware of the general nature of work to be performed by The City of
Fayetteville and others at the Site that relates to the Work as indicated in the Contract
Documents.
H. Contractor has correlated the information known to Contractor, information and
observations obtained from visits to the Site, reports and drawings identified in the
Contract Documents, and all additional examinations, investigations, explorations,
tests, studies, and data with the Contract Documents.
00500-Agreement 00500-5 November 202I
City of Fayetteville, Arkansas
Benson Mountain Elevated Water Storage Tank Improvements
SECTION 00500 — AGREEMENT
BETWEEN OWNER AND CONTRACTOR (continued)
I. Contractor has given Engineer written notice of all conflicts, errors, ambiguities, or
discrepancies that Contractor has discovered in the Contract Documents and the
written resolution thereof by Engineer is acceptable to Contractor.
J. The Contract Documents are generally sufficient to indicate and convey
understanding of all terms and conditions for performance and furnishing of the
Work.
ARTICLE 7 - CONTRACT DOCUMENTS
7.01 CONTENTS:
A. The Contract Documents which comprise the entire Agreement between The City of
Fayetteville and Contractor concerning the Work consist of the following and may
only be amended, modified, or supplemented as provided in this Agreement and in
the GENERAL CONDITIONS:
l . This Agreement.
2. Exhibits to this Agreement (enumerated as follows):
a. Notice to Proceed.
b. Contractor's Bid.
c. Documentation submitted by Contractor prior to Notice of Award.
3. Performance, Payment, and other Bonds.
a. The Performance and Payment Bond shall be one hundred percent
(100%).
b. The Contractor shall file the Performance, Payment and Warranty Bonds
at the Washington County Clerk's office prior to providing a file marked
copy of the filed Performance, Payment and Warranty Bonds to the
Owner or Engineer.
4. General Conditions.
5. Supplementary Conditions.
6. Specifications consisting of divisions and sections as listed in Table of
Contents of Project Manual.
00500-Agreement 00500-6 November 2021
l ih of Fa%cttc%i11c. ),rkan;a,
IIensaIII Moumam I Ic�etcd %\ aucr Storai.�c I ank Impr++:cm.m,
SECTION 00500 — AGREEMENT
BETWEEN (:!'.'NER AND CONTRACTOR (continued)
7. DraN\ings consisting of a covet' sheet and sheets as listed in the Table of'
Contents thereof (Drawings). with each sheet bearing the tollo\\inL+ general
title:
Benson Mountain Elevated Water Storace Tank Improvement11/7
8. Addenda numbers -44— inclusive.
9. The foIlo\\int' which ma\ be delivered or issued after the Effective Date of
the Agreement and are not attached hereto: All Written Amendments and
other documents amending, modifying, or supplementing the Contract
Documents pursuant to the GENERAL CONDITIONS.
ARTICLE 8 - MISCELLANEOUS
8.01 TERMS:
A. Terms used in this Agreement which are defined in the GENERAL CONDITIONS
shall have the meanings stated in the GENERAL CONDITIONS.
8.02 ASSIGNMENT OF CONTRACT:
A. No assignment bN a pane hereto of any rights under or interests in the Contract
Documents will be binding on another party hereto without the written consent of the
part sought to be bound: and specifically but without limitation, moneys that may
become due and moneys that are due may not be assigned without such consent
(except to the extent that the effect of this restriction may be limited by Law), and
unless specifically stated to the contrary in any written consent to an assignment. no
assignment will release or discharge the assignor from any duty or responsibility
under the Contract Documents.
8.03 SUCCESSORS AND ASSIGNS:
A. The City of Fayetteville and Contractor each binds himself, his partners, successors.
assigns, and legal representatives to the other part, hereto, its partners. successors.
assigns. and legal representatives in respect to all covenants, agreements. and
obligations contained in the Contract Documents.
8.04 SEVERABILITY:
A. Art\ provision or part of the Contract Documents held to be void or unenforceable
under am Law or Regulation shall be deemed stricken, and all remaining pro\ isions
shall continue to be valid and binding, upon The Citv of Fayetteville and Contractor.
(10500-Agrcement 00500-7 \o cnaher 202 1
City of Fayetteville, Arkansas
Benson Mountain Elevated Water Storage Tank Improvements
SECTION 00500 — AGREEMENT
BETWEEN OWNER AND CONTRACTOR (continued)
who agree that the Contract Documents shall be reformed to replace such stricken
provision or part thereof with a valid and enforceable provision that comes as close
as possible to expressing the intention of the stricken provision.
8.05 FREEDOM OF INFORMATION ACT:
A. City contracts and documents prepared while performing city contractual work are
subject to the Arkansas Freedom of Information Act. If a Freedom of Information
Act request is presented to the City of Fayetteville, the contractor will do everything
possible to provide the documents in a prompt and timely manner as prescribed in the
Arkansas Freedom of Information Act (A.C.A. §25-19-101 et. seq.). Only legally
authorized photocopying costs pursuant to the FOIA may be assessed for this
compliance.
8.06 LIENS:
A. No liens against this construction project are allowed. Arkansas law
(A.C.A. §§18-44-501 through 508) prohibits the filing of any mechanics' of
materialmen's liens in relation to this public construction project. Arkansas law
requires and the contractor promises to provide and file with the Circuit Clerk of
Washington County a bond in a sum equal to the amount of this contract. Any
subcontractor or materials supplier may bring an action for non-payment or labor or
material on the bond. The contractor promises to notify every subcontractor and
materials supplier for this project of this paragraph and obtain their written
acknowledgement of such notice prior to commencement of the work of the
subcontractor or materials supplier.
00500-Agreement 00500-8 November 2021
City of Fayetteville, Arkansas
Benson Mountain Elevated Water Storage Tank Improvements
SECTION 00500 — AGREEMENT
BETWEEN OWNER AND CONTRACTOR (continued)
IN WITNESS WHEREOF, The City of Fayetteville and Contractor have signed this Agreement in
quadruplicate. One counterpart each has been delivered to Contractor. Three counterparts each has been
retained by The City of Fayetteville. All portions of the Contract Documents have been signed, initialed,
or identified by The City of Fayetteville and Contractor.
This Agreement will be effective on (iCtCt 20Z?—which is the Effective
Date of the Agreement.
CONTRACTOR: Caldwell Tanks, Inc. CITY OF FAYETTEVILLE
By: Kevin J. Galla her By: Liorwld Jo
(Type or leg' print) „ / (Type egibly
(S
®,aZX'107 L' lipM
(Signature)
Title: Vice President Title: Mayor
Contractor shall attach evidence of authority to sign.
If Contractor is a corporation, corporate entity or LLC, Contractor shall attach Corporate Resolution
authorizing Contractor's signature and execution of Agreement.
Further if Contractor is a corporation, corporate entity or LLC, Contractor shall also attach a copy of the
Contractor's Articles of Incorporation and a copy form the Arkansas State Secretary of State to document
that the corporation, corporate entity or LLC is in current "Good Standing" with the State of Arkansas and
6,ipft,work
ttttttsuch entity is petr>t1bin the State of Arkansas.��Ro�,�•'GAS Y 0A •sG��;:
fkp
(�YJTTEVILLE1-0
;
`
Attest '���`VIL Attest
David E. Bartley. &tt k
00500-Agreement 00500-9 November 2021
City of Fayetteville, Arkansas
Benson Mountain Elevated Water Storage Tank Improvements
SECTION 00500 — AGREEMENT
BETWEEN OWNER AND CONTRACTOR (continued)
Address for giving notices Address for giving notices
4000 Tower Road 113 W. Mountain St.
Louisville, KY 40219
License No. #0028840412
Agent for Service of process
Cogency Global, Inc.
1215 Twin Lakes Drive
Little Rock, AR 72205
(Type or legibly print)
(Signature)
Fayetteville, AR 72701
Contractor shall attach evidence of authority of Agent for Service process to sign. If Contractor is a
corporation, corporate entity or LLC, Contractor shall attach Corporate Resolution authorizing Agent for
Service process authority to sign.
(If Contractor is a corporation, corporate entity Approved as to Form:
or LLC, attach evidence of authority to
sign.) By:
Attorney For:
END OF SECTION 00500
00500-Agreement 00500-10 November 2021
City of Fayetteville, Arkansas - Budget Adjustment Form (Legistar)
Budget Year Division Adjustment Number
WATER SEWER (720)
2022 (BY) /Org2
Requestor: Cheryl Partain
BUDGET ADJUSTMENT DESCRIPTION / JUSTIFICATION:
A Budget Adjustment is needed in the Benson Mountain Pressure Plane project for costs associated with the
construction contract for the Benson Mountain Elevated Water Storage Tank Improvements. Contract includes
construction of a new elevated water storage tank, associated site improvements and demolition of the existing tank.
Budgeted Impact Fee Funds will be utilized for this project. Budgeted funds from the Impact Fee Project are being
moved to cover the cost for the construction of the tank, associated site improvements and the demolition of the old
tank
COUNCIL DATE: 1 /4/2022
LEGISTAR FILE ID#: 2021-1040
}f o-ll y 31ac1�
12/21 /2021 9:20 AM
Budget Director Date
TYPE: D - (City Council)
JOURNAL #:
RESOLUTION/ORDINANCE
I
GLDATE:
CHKD/POSTED:
1/4/2022
TOTAL
Account Number
2,772,000 2,772,000
Increase / (Decrease)
Expense Revenue
Proiect.Sub#
Project Sub.Detl AT
v.20211122
Account Name
5400.720.5600-5808.00
1,386,000
-
10006
1 EX
Improvements - Water Line
5400.720.5600-6602.30
2300.720.9300-7602.40
-
1,386,000
1,386,000
-
10006
07002
1 RE
2001.1 EX
Transfer from Fund - Impact Fee
Transfers To Funds - Water & Sewer Func
2300.720.9300-4999.99
-
1,386,000
RE
Use Fund Balance - Current
H:\BudgetAdjustments\2022-Budget\CITY COUNCIL\01-04-22\2021-1040 BA Benson Mtn Water Tank Caldwell contractAsm 1 of 1