Loading...
HomeMy WebLinkAbout10-22 RESOLUTIONOF FAY ETTF V � q,gKANS PS 113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 Resolution: 10-22 File Number: 2021-1037 HAWKINS-WEIR ENGINEERS, INC. AMENDMENT NO. 5: A RESOLUTION TO APPROVE AMENDMENT NO. 5 TO THE PROFESSIONAL ENGINEERING SERVICES AGREEMENT WITH HAWKINS-WEIR ENGINEERS. INC. IN AN AMOUNT NOT TO EXCEED $1 10.710.00 FOR CONSTRUCTION OBSERVATION AND PROJECT MANAGEMENT SERVICES ASSOCIATED WITH THE BENSON MOUNTAIN PRESSURE PLANE IMPROVEMENTS PROJECT WHEREAS, on October 3, 2017, the City Council passed Resolution No. 206-17 approving a Professional Engineering Services Agreement with Hawkins -Weir Engineers, Inc. for the engineering services related to the Goshen and Benson Water Tank Improvements; and WHEREAS, Amendment No. 5 to the contract with Hawkins -Weir Engineers, Inc. will provide the funds necessary for Hawkins -Weir to oversee the contractor's work in the field, provide help with change orders as necessary, conduct quality control testing, and properly survey and certify the completed work. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville. Arkansas hereby authorizes Mayor Jordan to sign Amendment No. 5 to the Professional Engineering Services Agreement with Hawkins -Weir Engineers, Inc. in an amount not to exceed $1 10,710.00 for construction observation and project management services associated with the Benson Mountain Pressure Plane Improvements Project. PASSED and APPROVED on 1/4/2022 Page 1 Printed on 115122 Resolution: 10-22 File Number: 2021-1037 Attest: �-RK, •T'Q �'�' g�w;��'���• CITY • F •�� Kara Paxton. City Clerk Treasury y•9 /ON '01 ,-O Page 2 Printed on 115122 City of Fayetteville, Arkansas 113 West Mountain Street Fayetteville, AR 72701 (479)575-8323 Text File File Number: 2021-1037 Agenda Date: 1/4/2022 Version: 1 Status: Passed In Control: City Council Meetinq File Type: Resolution Agenda Number: A.11 HAWKINS-WEIR ENGINEERS, INC. AMENDMENT NO. 5: A RESOLUTION TO APPROVE AMENDMENT NO. 5 TO THE PROFESSIONAL ENGINEERING SERVICES AGREEMENT WITH HAWKINS-WEIR ENGINEERS, INC. IN AN AMOUNT NOT TO EXCEED $110,710.00 FOR CONSTRUCTION OBSERVATION AND PROJECT MANAGEMENT SERVICES ASSOCIATED WITH THE BENSON MOUNTAIN PRESSURE PLANE IMPROVEMENTS PROJECT WHEREAS, on October 3, 2017, the City Council passed Resolution No. 206-17 approving a Professional Engineering Services Agreement with Hawkins -Weir Engineers, Inc. for the engineering services related to the Goshen and Benson Water Tank Improvements; and WHEREAS, Amendment No. 5 to the contract with Hawkins -Weir Engineers, Inc. will provide the funds necessary for Hawkins -Weir to oversee the contractor's work in the field, provide help with change orders as necessary, conduct quality control testing, and properly survey and certify the completed work. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby authorizes Mayor Jordan to sign Amendment No. 5 to the Professional Engineering Services Agreement with Hawkins -Weir Engineers, Inc. in an amount not to exceed $110,710.00 for construction observation and project management services associated with the Benson Mountain Pressure Plane Improvements Project. City of Fayetteville, Arkansas Page 1 Printed on 11512022 Tim Nyander Submitted By City of Fayetteville Staff Review Form 2021-1037 Legistar File ID 1/4/2022 City Council Meeting Date - Agenda Item Only N/A for Non -Agenda Item 12/16/2021 WATER SEWER (720) Submitted Date Division / Department Action Recommendation: Staff recommends the approval of Amendment No. 5 to the Professional Engineering Services Agreement with Hawkins -Weir Engineers, Inc. in an amount not to exceed $110,710.00 for construction observation and project management services associated with the Benson Mountain Water Storage Tank Improvements project. Budget Impact: 5400.720.5600-5314.00 Water and Sewer Account Number Fund 10006.1 Benson Mountain Pressure Plane Upgrades Project Number Budgeted Item? Yes Does item have a cost? Yes Budget Adjustment Attached? No Current Budget Funds Obligated Current Balance Item Cost Budget Adjustment Remaining Budget Project Title $ 681,152.00 $ 521,595.82 $ 159,556.18 $ 110, 710.00 48,846.18 V20210527 Purchase Order Number: Previous Ordinance or Resolution # Change Order Number: Original Contract Number: Comments: Approval Date: CITY OF FAYETTEVILLE ARKANSAS MEETING OF JANUARY 4, 2022 TO: Mayor and City Council THRU: Susan Norton, Chief of Staff Tim Nyander, Utilities Director FROM: Corey Granderson, Utilities Engineer CITY COUNCIL MEMO DATE: December 16, 2021 SUBJECT: Hawkins -Weir Engineers, Inc. Amendment No. 5 — Construction Phase Services for the Benson Mountain Water Storage Tank Improvements Project RECOMMENDATION: Staff recommends the approval of Amendment No. 5 to the Professional Engineering Services Agreement with Hawkins -Weir Engineers, Inc. in an amount not to exceed $110,710.00 for construction observation and project management services associated with the Benson Mountain Water Storage Tank Improvements project. BACKGROUND: The Benson Mountain Water Storage Tank Improvements Project consists of the replacement of an aging water storage standpipe and constructing a new 100,000-gallon elevated water storage tank. This construction project is being publicly bid as Bid# 21-80. DISCUSSION: This contract amendment will provide the funds necessary for Hawkins -Weir to oversee the contractor's work in the field, provide help with RFI's or change orders as necessary, conduct quality control testing, and properly survey and certify the completed work. The overall engineering contract will increase to $391,200.00 with this amendment. BUDGET/STAFF IMPACT: Funds are available within the Benson Mountain Pressure Plane Upgrade account (10006). Attachments: Amendment No. 5 Mailing Address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 AMENDMENT NO.5 To THE AGREEMENT For PROFESSIONAL ENGINEERING SERVICES BETWEEN CITY OF FAYETTEVILLE, ARKANSAS AND HAWKINS-WEIR ENGINEERS, INC. In accordance with the AGREEMENT For PROFESSIONAL ENGINEERING SERVICES for the Goshen Ground Water Storage Tank and Benson Pressure Plane Improvements (HW Project No. 2017076), dated October 3, 2017, between the City of Fayetteville, Arkansas (hereinafter called Owner) and Hawkins - Weir Engineers, Inc. (hereinafter called Engineer), Owner hereby authorizes Engineer to proceed with engineering services as modified by this Amendment No. 5. SECTION 1— SCOPE OF SERVICES 1.1 Amendment No. 5 is for construction management services for the Benson Mountain Elevated Water Storage Tank Improvements (Task 9) associated with Owner's Project No. 21-80. Task 9 services are detailed in the Engineer's attached Scope of Services dated December 1, 2021. SECTION 2 — TIME OF SERVICE 2.1 The scope of services as defined above is based on addressing the Task 9 services within a 360- calendar day construction Contract Time in 2022 for the Owner's Project No. 21-80. Engineer will proceed with providing the services set forth herein immediately upon execution of this Authorization by all parties. Amendment No. 5 Page 1 of 2 December 1, 2021 SECTION 3 — COMPENSATION 3.1 Owner shall compensate Engineer for providing the services set forth herein in accordance with the terms of the Agreement. Total payment for Scope of Services described herein shall not exceed One Hundred Ten Thousand Seven Hundred Ten and 00/100 Dollars $110.710.00) without written approval of Owner. These additional services adjust the Agreement's not to exceed fee to $357,280.00, and adjusts the not to exceed reimbursable expenses to $33,920.00. Attachments: Scope of Services dated December 1, 2021 Fee Proposal dated December 1, 2021 Standard Hourly Billing Rate Structure, effective August 15, 2021 Certificate of Liability Insurance (2 Pages) AUTHORIZATION BY: Date: ��_V_ 22 ACCEPTED BY: HAWKINS-WEIR ENGINEERS, INC. By: V kLt b . ` Brett D. Peters, P.E. President and CEO Date: `2 / 2 / 20 21 ARKANSAS Amendment No. 5 Page 2 of 2 December 1, 2021 Appendix A Amendment No. 5 Scope of Services Win to Goshen Ground Water Storage Tank and Benson Pressure Plane Improvements CITY OF City of Fayetteville, Arkansas FAYETTEVILLE City of Fayetteville Project No. 21-80 ARKANSAS December 1, 2021 Task Description Task 9 — Construction Management — Benson Mountain Elevated Water Storage Tank Improvements 1. Conduct Pre -Construction Conference with the Owner and Contractor a. Prepare Meeting Summary b. Field survey to reestablish control monumentation and stake easement limits 2. Provide periodic observation during construction 3. Conduct up to two (2) progress meetings a. Prepare Meeting Summaries 4. Prepare, review, and coordinate the dissemination of construction documentation including material submittals, testing results, field orders, and change orders as directed by the Owner 5. Review the Contractor's constructed quantities and prepare monthly pay requests for the Owner's approval 6. Conduct as -built surveys of the complete water system improvements 7. Coordinate and conduct a final inspection with the Contractor and the Owner, and prepare a punch list of deficient construction items for the Contractor to address 8. Prepare record drawings of the completed project and provide one (1) reproducible hard copy and one (1) electronic copy for the Owner's archives 2017076\Appendix A Amendment 5 Scope of Services 120121.docx Page 1 of 1 HN Amendment No. 5 - Fee Proposal Goshen Ground Water Storage Tank and Benson Pressure Plane Improvements City of Fayetteville, Arkansas Project No. 2017076 December 1, 2021 Task 9 - Construction Management - Benson Mountain Elevated Water Storage Tank Improvements Task 1. Conduct Pre -Construction Conference with the Owner and Contractor a) Prepare Meeting Summary b) Field survey to reestablish control monumentation and stake easement limits 2. Provide periodic observation during construction 3. Conduct up to two (2) progress meetings a) Prepare Meeting Summaries 4. Prepare, review, and coordinate the dissemination of construction documentation including material submittals, testing results, field orders, and change orders as directed by the Owner 5. Review the Contractor's constructed quantities and prepare monthly pay requests for the Owner's approval 6. Conduct as -built surveys of completed water system improvements 7. Coordinate and conduct a final inspection with the Contractor and the Owner, and prepare a punch list of deficient construction items for the Contractor to address 8. Prepare record drawings of the completed project and provide one (1) reproducible hard copy and one (1) electronic copy for the Owner's archives TOTAL HOURS= SUBTOTALCOST= Engr VII Engr V Engr III Insp I Surveyor Tech III Tech I GPS Survey Total Hours 4 2 2 2 10 2 4 6 2 8 10 8 24 24 800(1) 856 4 8 4 4 20 8 8 16 4 72 16 8 24 124 24 24 48 4 8 2 8 22 4 8 2 4 4 22 8 8 16 32 24 160 48 834 4 16 64 16 1,166 $4,680 $25,600 $6,240 $54,210 $360 $1,200 $3,520 $2,800 $98,610 (1) Based on 360-calendar day Contract Time (330-calendar days until substantial completion, and 30-calendar days until final completion thereafter). Periodic construction observation is based on 8-hours per day (Monday through Friday) during the construction of the below grade improvements (assumed at 60-calendar days) and based on approximately 2-hours per day (Monday through Friday) for the remaining 300-calendar days through the final completion date. Reimbursable Expenses and Subconsultant Fees Item Description I Total 1. JOutside Services Mid -South Tank Consultants - Critical Phase Tank Inspection 1 $12,100 Engineering Services Summary Task 9 - Construction Management - Benson Mountain Elevated Water Storage Tank Improvements $98,610 Reimbursable Expenses and Subconsultant Fees $12,100 Total Engineering Fee - Not To Exceed $110,710 .' CITY OF FAYETTEVILLE ARKANSAS 2017076\Scope of Services and Fee Proposal - Benson Tank Improvements Construction Management 120121.xlsx Engineer Standard Billing Rate Structure For Hourly Fee Based Contracts Hawkins -Weir Engineers, Inc. Effective August 15, 2021 through August 13, 2022"' Engineer VII $ 195 Per Hour Engineer VI $ 175 Per Hour Engineer V $ 160 Per Hour Engineer IV $ 145 Per Hour Engineer III $ 130 Per Hour Engineer II $ 115 Per Hour Engineer I $ 90 Per Hour Engineering Technician Designer II $ 110 Per Hour Designer I $ 75 Per Hour Technician IV $ 85 Per Hour Technician III $ 75 Per Hour Technician II $ 65 Per Hour Technician I $ 55 Per Hour Field Technician - Field Inspector Resident Project Representative (RPR) Inspector II Inspector I Field Surveying GPS Survey Surveyor Administrative Business Manager Expert Witness Preparation Testimony, less than 1/2 day Testimony, per Day $ 120 Per Hour $ 75 Per Hour $ 65 Per Hour $ 175 Per Hour $ 90 Per Hour $ 85 Per Hour At Engineer's Hourly Rate $1,000 $ 2,000 Expenses Reimbursable Expenses and upcharges are determined by the Client Agreement/Contract Subconsultants/Outside Services Express Delivery, Field Supplies, Testing, Review/Filing Fees and Advertising Travel: Hotel and meals Actual Cost Vehicle(2) $0.56 per mile effective 1/1/21 Reproduction: Outside printing service Actual Cost In-house printing Letter Copy - B&W $ 0.10 Per Copy Letter Copy - Color $ 0.75 Per Copy 22 x 34 Size Copy - B&W $ 3.00 Per Copy 22 x 34 Size Copy - Color $10.00 Per Copy 11 x 17 Size Copy - B&W $ 1.50 Per Copy 11 x 17 Size Copy - Color $ 5.00 Per Copy CD Copy $ 5.00 Per Copy Binding $ 1.00 Each (1) Billing Rates are reviewed and adjusted annually in August. Regardless, any adjustment in Billing Rates will not impact previously negotiated Not To Exceed (NTE) fee amounts without a formal Contract Amendment. (2) To be adjusted periodically to current IRS mileage rate. All Billings are due upon receipt unless prior arrangements for payment have been made. Client#: 53866 nAVVr%VVCIr% ACORD CERTIFICATE OF LIABILITY INSURANCE D10/032021ATE YY) 10l03/2021 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer any rights to the certificate holder in lieu of such endorsement(s). PRODUCER ONTI NAMEACT Trudy Henry Greyling Ins. Brokerage/EPIC PHONE 770-552-4225 FAx 866-550-4082 3780 Mansell Rd. Suite 370 E-MAIL accceficates re lin ADDRESS: erti@g y gcom Alpharetta, GA 30022 INSURER(S) AFFORDING COVERAGE NAIC p INSURER A: Sentinel Insurance Company 11000 INSURED INSURER B : Hartford Ins Co of the Midwest 37478 Hawkins -Weir Engineers, Inc. INSURER C P.O. Box 648 INSURER D : Van Buren, AR 72957 INSURER E INSURER F : COVERAGES CERTIFICATE NLIMRER: 21-22 REVISION NLIMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED, NOTWITHSTANDING ANY REQUIREMENT TERM OR CONDITION OF ANY CONTRACTOR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR LTR TYPE OF INSURANCE ADDL INSR SUBR WVD POLICY NUMBER POLICY EFF MM/DD/YYYY POLICY EXP MM/DDfYYY LIMITS A X COMMERCIAL GENERAL LIABILITY CLAIMS -MADE IX OCCUR 20SBWZM2676 11/01/2021 11/0112022 EACH $1000000 �,OCCURRENCE POEMISESOEaE�r ence $1,000,000 MED EXP (Any one person) $10,000 PERSONAL & ADV INJURY $1,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: PRO - POLICY X JECT LOC OTHER: GENERAL AGGREGATE $2,000,000 PRODUCTS - COMPIOP AGG $ 2,000,000 $ A AUTOMOBILE LIABILITY ANY AUTO OWNED SCHEDULED AUTOS ONLY AUTOS HIRED ONLY X NON-0NMED AUTOS ONLY 20UEGNM6289 20SBWZM2676 11/01/2021 11/01/202 11/01/2021 i 11/01/202 EOMaNdEenDtSINGLELIMIT $1,000,000 X BODILY INJURY (Per person) $ BODILY INJURY (Per accident) $ X PROPERTY DAMAGE Per accident $ $ A X UMBRELLA LIAB EXCESS LIAB X OCCUR CLAIMS -MADE EACH OCCURRENCE s2,000,000 AGGREGATE $2 00O 000 DED I X RETENTION $10000 $ B WORKERS COMPENSATION AND EMPLOYERS' LIABILITY YIN ANY PROPRIETOR/PARTNER/EXECUTIVE OFFICERIMEMBER EXCLUDED? � (Mandatory in NH) If yes, describe under DESCRIPTION OF OPERATIONS below N I A 20WEGPV0830 11/01/2021 11/01/202 X PTR OTH- E.L. EACH ACCIDENT $500000 E.L. DISEASE - EA EMPLOYEE $500,000 E.L. DISEASE - POLICY LIMIT $500000 DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required) Project# 2017076, Goshen Water Storage Tank & Pump Station/Benson Standpipe City of Fayetteville, Arkansas is named as an Additional Insured on the above referenced liability policies with the exception of workers compensation where required by written contract. Waiver of Subrogation is applicable where required by written contract & allowed by law. City of 113 WE Favettt Arkansas AR 72701-0100 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE xgol / ©1988-2015 ACORD CORPORATION. All rights reserved. ACORD 25 (2016/03) 1 f /iThe ACORD name and logo are registered marks of ACORD ftC909170d/M9RR� 7A T14F=N9 7E,(MM1DDffYYY) A'r✓o�®®CERTIFICATE OF LIABILITY INSURANCE�� /16/2021 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT NAME: Amanda Palmer BXS Insurance PHONE FAX PO Box 251510 A/c Na,Ext: 501-614-1571 (AIC,No):501-614-1447 Little Rock AR 72225- ADDRESS: amanda.palmer(Mbxsi.com INSURED Hawkins -Weir Engineers, Inc. P.O. Box 648 Van Buren AR 72957 INSURERS AFFORDING COVERAGE I NAIC # INSURERA: Hartford Insurance Company ofMidW 37478 HAWKENG-01 INSURER B : INSURER C : INSURER D : F: COVERAGES CERTIFICATE NUMBER: 11(1..SS4FRgR REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR ADDL SUBR POLICY EFF POLICY EXP TYPE OF INSURANCE LTR POLICY NUMBER MM/DD/YYYY MM/DD/YYYY LIMITS COMMERCIAL GENERAL LIABILITY EACH OCCURRENCE $ DAMAGE TO RENTED CLAIMS -MADE L OCCUR PREMISES Ea occurrence) $ MED EXP (Any one person) $ PERSONAL & ADV INJURY $ GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $ PRO ❑ POLICY JECT LOC PRODUCTS - COMP/OP AGG $ OTHER: $ AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT Ea accident $ BODILY INJURY (Per person) $ ANY AUTO OWNED SCHEDULED BODILY INJURY (Per accident) $ AUTOS ONLY H AUTOS PROPERTYDAMAGE Per accident $ HIRED NON -OWNED I AUTOS ONLY AUTOS ONLY $ UMBRELLA LIAB OCCUR EACH OCCURRENCE $ AGGREGATE $ EXCESS LIAR CLAIMS -MADE DIED RETENTION $ $ WORKERS COMPENSATION PER OTH- AND EMPLOYERS' LIABILITY YIN STATUTE ER ANYPROPRIETOR/PARTNER/EXECUTIVE E.L. EACH ACCIDENT $ OFF ICER/MEMBEREXCLUDED? ❑ NIA I (Mandatory in NH) E.L. DISEASE - EA EMPLOYEE $ If yes, describe under DESCRIPTION OF OPERATIONS below E.L. DISEASE - POLICY LIMIT $ A I Professional Liability 380HO38729221 7/11/2021 7/11/2022 Each Claim Limit $1,000,000 Aggregate $2,000,000 DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required) Project # 2017076, Goshen Water Storage Tank 8 Pump Station / Benson Standpipe CFRTIFICATF Hnl nFRr/ / N A CANCFi I ATInN SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE ��. THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. Ci of Fayettev e 113 West Moun in eet Fayetteville AR 7 1 AUTHORIZED REPRESENTATIVE2. ©1988-2015 ACORD CORPORATION. All rights reserved. ACORD 25 (2016103) The ACORD name and logo are registered marks of ACORD