Loading...
HomeMy WebLinkAbout339-21 RESOLUTION113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 Resolution: 339-21 File Number: 2021-0908 BID #21-78 NEC, INC.: A RESOLUTION TO AWARD BID 421-78 AND AUTHORIZE A CONTRACT WITH N.E.C., INC. IN THE AMOUNT OF S4.316,631.10 FOR CONSTRUCTION OF THE MISSOURI CREEK DRAINAGE IMPROVEMENTS PROJECT, TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF 5319.600.00, AND TO APPROVE A BUDGET ADJUSTMENT - 2019 DRAINAGE IMPROVEMENT BOND PROJECT BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby awards Bid #21-78 and authorizes Mayor Jordan to sign a contract with N.E.C., Inc. in the amount of $4,316,631.10 for construction of the Missouri Creek Drainage Improvements Project, and further approves a project contingency in the amount of $319,600.00. Section 2: That the City Council of the City of Fayetteville. Arkansas hereby approves a budget adjustment, a copy of which is attached to this Resolution. PASSED and APPROVED on 12/21/2021 Page 1 Printed on 12122121 Resolution: 339-21 Fite !Number: 2021-0908 Attest: �p1111 � _A• FAYE Kara Paxton, City Clerk Treasurer 1-y� (sle-5 s `ny' kAN�P,.����` j Nca xnw %%%% Page 2 Printed on 12/22/21 City of Fayetteville, Arkansas 113 West Mountain Street Fayetteville, AR 72701 (479)575-8323 Text File File Number: 2021-0908 Agenda Date: 12/21/2021 Version: 1 Status: Passed In Control: City Council Meetinq File Type: Resolution Agenda Number: A.30 BID #21-78 NEC, INC.: A RESOLUTION TO AWARD BID #21-78 AND AUTHORIZE A CONTRACT WITH N.E.C., INC. IN THE AMOUNT OF $4,316,631.10 FOR CONSTRUCTION OF THE MISSOURI CREEK DRAINAGE IMPROVEMENTS PROJECT, TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $319,600.00, AND TO APPROVE A BUDGET ADJUSTMENT - 2019 DRAINAGE IMPROVEMENT BOND PROJECT BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby awards Bid #21-78 and authorizes Mayor Jordan to sign a contract with N.E.C., Inc. in the amount of $4,316,631.10 for construction of the Missouri Creek Drainage Improvements Project, and further approves a project contingency in the amount of $319,600.00. Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment, a copy of which is attached to this Resolution. City of Fayetteville, Arkansas Page 1 Printed on 1212212021 City of Fayetteville Staff Review Form 2021-0908 Legistar File ID 12/21/2021 City Council Meeting Date - Agenda Item Only N/A for Non -Agenda Item Chris Brown 11/29/2021 ENGINEERING (621) Submitted By Submitted Date Division / Department Action Recommendation: Approval of a contract in the amount of $4,316,631.10 with NEC, Inc. for the construction of the Missouri Creek Drainage Improvements Project, approval of a project contingency of $319,600. (7.4%) and approval of a budget adjustment. Budget Impact: 46040.860.7410-5817.00 4604 Drainage Bond Projects Account Number Fund 46040.7410.1000 Missouri Creek/Rolling Hills Drainage Project Number Budgeted Item? Yes Does item have a cost? Yes Budget Adjustment Attached? Yes Purchase Order Number: Change Order Number: Original Contract Number: Comments: Current Budget Funds Obligated Current Balance Item Cost Budget Adjustment Remaining Budget Project Title $ 6,420,836.00 $ 1,806,598.54 ? 4,614,237.46 $ 4,636,231.10 $ 65,623.00 43,629.36 V20210527 Previous Ordinance or Resolution # Approval Date: CITY OF FAYETTEVILLE ARKANSAS MEETING OF DECEMBER 21, 2021 TO: Mayor and City Council THRU: Susan Norton, Chief of Staff Chris Brown, Public Works Director CITY COUNCIL MEMO FROM: Alan Pugh, Staff Engineer DATE: 11 /29/2021 SUBJECT: Approval of a contract in the amount of $4,316,631.10 with NEC, Inc. for the construction of the Missouri Creek Drainage Improvements Project, approval of a project contingency of $319,600. (7.4%) and approval of a budget adjustment. RECOMMENDATION: Approval of a contract in the amount of $4,316,631.10 with NEC, Inc. for the construction of the Missouri Creek Drainage Improvements Project, approval of a project contingency of $319,600. (7.4%) and approval of a budget adjustment. BACKGROUND: This project will consist of drainage improvements associated with helping to alleviate flooding within the Missouri Creek Drainage Basin including, but not limited to, improvements along Stanton Avenue between N Elizabeth Avenue and Rolling Hills Drive, on E Briarcliff Street and capacity improvements to Missouri Creek between Rolling Hills Drive and Stubblefield Road. This project was identified as a priority project by City Council after the April 2017 flooding event. DISCUSSION: This project has been identified as one of the projects to be funded by the first phase of the 2019 Drainage Bond Program to help alleviate the flooding of multiple structures within the drainage basin. BUDGET/STAFF IMPACT: The drainage improvements are funded by the 2019 Drainage Bond Program. Attachments: Section 0500 Agreement Bid Submittal Bid Tab Vicinity Map Mailing Address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 DOCUMENT 00500 — AGREEMENT BETWEEN OWNER AND CONTRACTOR Contract Name/Title: Missouri Creek Drainage Improvements Contract No.: 21-78, Construction THIS AGREEMENT is dated as of the 21 st day of December in the year 2021 by and between The City of Fayetteville, Arkansas and NEC, Inc (hereinafter called Contractor). ARTICLE 1- WORK 1.01 Contractor shall complete all Work as specified or indicated in the Contract Documents. The work under this Contract includes, but is not limited to: The construction of an underground drainage system along Stanton Avenue between E Woodbrook Dr and Rolling Hills Drive with a settling basin near Rolling Hills Drive, drainage improvements at the E. Briarcliff St. cul-de-sac, and capacity improvements to Missouri Creek between Rolling Hills Drive and Stubblefield Road. Any use of a third -party dumpster or roll off container shall be procured from the City of Fayetteville Recycling and Trash Collection Division. Use of a Non -City dumpster or roll off container is not allowed. Open burning is not allowed on City projects. Contractor is responsible for obtaining all applicable permits; however, fees for the City issued permits shall be waived. The Contract includes work in City of Fayetteville Right-of-way and in General Utility Easements. Refer to Section 00400-Bid Form for quantities. ARTICLE 2 - ENGINEER 2.01 The Contract Documents have been prepared by the City of Fayetteville Engineering Division. City of Fayetteville Engineering Division assumes all duties and responsibilities, and has the rights and authority assigned to City of Fayetteville Engineering Division in the 00500 Agreement 00500- 1 DOCUMENT 00500 — AGREEMENT continued Contract Documents in connection with completion of the Work in accordance with the Contract Documents. ARTICLE 3 - CONTRACT TIME 3.01 TIME OF THE ESSENCE: A. All time limits for milestones, if any, Substantial Completion, and completion and readiness for final payment as stated in the Contract Documents are of the essence of the Contract. 3.02 DATES FOR SUBSTANTIAL COMPLETION AND FINAL PAYMENT: A. The Work shall be Substantially Completed within 360 calendar days after the date when the Contract Times commence to run as provided in the GENERAL CONDITIONS, and final completion and ready for final payment in accordance with the GENERAL CONDITIONS within 390 calendar days after the date when the Contract Times commence to run. 3.03 LIQUIDATED DAMAGES: A. Owner and Contractor recognize that time is of the essence of this Agreement and that The City of Fayetteville will suffer financial loss if the Work is not completed within the time specified above, plus any extensions thereof allowed in accordance with the GENERAL CONDITIONS. The parties also recognize the delays, expense, and difficulties involved in proving the actual loss suffered by The City of Fayetteville if the Work is not Substantially Completed on time. Accordingly, instead of requiring any such proof, The City of Fayetteville and Contractor agree that as liquidated damages for delay (but not as a penalty) Contractor shall pay The City of Fayetteville Seven Hundred Fifty Dollars ($750.00) for each calendar day that expires after the time specified above in Paragraph 3.02 for Substantial Completion until the Work is Substantially Complete. After Substantial Completion, if Contractor shall neglect, refuse, or fail to complete the remaining Work within the time specified in Paragraph 3.02 for completion and readiness for final payment or any proper extension thereof granted by The City of Fayetteville, Contractor shall 00500 Agreement 00500-2 DOCUMENT 00500 — AGREEMENT continued pay The City of Fayetteville Five Hundred Dollars ($500.00) for each calendar day that expires after the time specified for completion and readiness for final payment. ARTICLE 4 - CONTRACT PRICE 4.01 The CITY OF FAYETTEVILLE agrees to pay, and the CONTRACTOR agrees to accept, as full and final compensation for all work done under this agreement, the amount based on the unit prices bid in the Proposal (BID FORM) less deductive alternates 1 and 2 which is hereto attached, for the actual amount accomplished under each pay item, said payments to be made in lawful money of the United States at the time and in the manner set forth in the Specifications. 4.02 As provided in the General Conditions, estimated quantities are not guaranteed, and determinations of actual quantities and classifications are to be made by ENGINEER as provided in the General Conditions. Unit prices have been computed as provided in the General Conditions. 4.03 Changes, modifications, or amendments in scope, price or fees to this contract shall not be allowed without a prior formal contract amendment approved by the Mayor and the City Council in advance of the change in scope, cost or fees. 1. There shall be no changes without prior written approval of the Engineer of Record and/or the City's designated Professional Engineer. ARTICLE 5 - PAYMENT PROCEDURES 5.01 SUBMITTAL AND PROCESSING OF PAYMENT'S: A. Contractor shall submit Applications for Payment in accordance with the GENERAL CONDITIONS. Applications for Payment will be processed by Engineer as provided in the GENERAL CONDITIONS. 5.02 PROGRESS PAYMENTS RETAINAGE: A. The City of Fayetteville shall make progress payments on account of the Contract Price on the basis of Contractor's Applications for Payment as recommended by 00500 Agreement 00500-3 DOCUMENT 00500 — AGREEMENT (continued) Engineer, on or about the 15th day of each month during construction. All such payments will be measured by the schedule of values established in the GENERAL CONDITIONS (and in the case of Unit Price Work based on the number of units completed) or, in the event there is no schedule of values, as provided in the General Requirements. 1. Prior to Substantial Completion, progress payments will be made in an amount equal to the percentage indicated below, but, in each case, less the aggregate of payments previously made and less such amounts as Engineer shall determine, or The City of Fayetteville may withhold, in accordance with the GENERAL CONDITIONS. a. 95% of Work Completed (with the balance being retainage). If Work has been 50% completed as determined by Engineer, and if the character and progress of the Work have been satisfactory to The City of Fayetteville and Engineer, The City of Fayetteville on recommendation of Engineer, may determine that as long as the character and progress of the Work subsequently remain satisfactory to them, there will be no additional retainage on account of Work subsequently completed, in which case the remaining progress payments prior to Substantial Completion will be an amount equal to 100% of the Work Completed less the aggregate of payments previously made; and b. 100% of Equipment and Materials not incorporated in the Work but delivered, suitably stored, and accompanied by documentation satisfactory to The City of Fayetteville as provided in the GENERAL CONDITIONS. 5.03 FINAL PAYMENT: A. Upon final completion and acceptance of the Work in accordance with the GENERAL CONDITIONS, The City of Fayetteville shall pay the remainder of the Contract Price as recommended by Engineer and as provided in the GENERAL CONDITIONS. 00500 Agreement 00500-4 .DOCUMENT 00500 -- AGREEMENT continued ARTICLE 6 - CONTRACTOR'S REPRESENTATIONS 6.01 In order to induce The City of Fayetteville to enter into this Agreement, Contractor makes the following representations: A. Contractor has examined and carefully studied the Contract Documents including the Addenda and other related data identified in the Bid Documents. B. Contractor has visited the Site and become familiar with and is satisfied as to the general, local, and Site conditions that may affect cost, progress, performance, and furnishing of the Work. C. Contractor is familiar with and is satisfied as to all federal, state, and local Laws and Regulations that may affect cost, progress, performance, and furnishing of the Work. D. Contractor has carefully studied all: (1) Reports of explorations and tests of subsurface conditions at or contiguous to the Site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the Site; and (2) Reports and drawings of a Hazardous Environmental Condition, if any, at the Site. Contractor acknowledges that The City of Fayetteville and Engineer do not assume responsibility for the accuracy or completeness of information and data shown or indicated in the Contract Documents with respect to Underground Facilities at or contiguous to the Site. E. Contractor has obtained and carefully studied (or assumes responsibility of having done so) all such additional supplementary examinations, investigations, explorations, tests, studies, and data concerning conditions (surface, subsurface, and Underground Facilities) at or contiguous to the Site or otherwise which may affect cost, progress, performance, and furnishing of the Work or which relate to any aspect of the means, methods, techniques, sequences, and procedures of construction to be employed by Contractor and safety precautions and programs incident thereto. 00500 Agreement 00500-5 DOCUMENT 00500 — AGREEMENT(con tinited F. Contractor does not consider that any additional examinations, investigations, explorations, tests, studies, or data are necessary for the performing and furnishing of the Work at the Contract Price, within the Contract Times, and in accordance with the other terms and conditions of the Contract Documents. G. Contractor is aware of the general nature of work to be performed by The City of Fayetteville and others at the Site that relates to the Work as indicated in the Contract Documents. H. Contractor has correlated the information known to Contractor, information and observations obtained from visits to the Site, reports and drawings identified in the Contract Documents, and all additional examinations, investigations, explorations, tests, studies, and data with the Contract Documents. I. Contractor has given Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Contractor has discovered in the Contract Documents and the written resolution thereof by Engineer is acceptable to Contractor. J. The Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work. ARTICLE 7 - CONTRACT DOCUMENTS 7.01 CONTENTS: A. The Contract Documents which comprise the entire Agreement between The City of Fayetteville and Contractor concerning the Work consist of the following and may only be amended, modified, or supplemented as provided in the GENERAL CONDITIONS: 1. This Agreement. 2. Exhibits to this Agreement (enumerated as follows): a. Notice to Proceed. 00500 Agreement 00500-6 DOCUMENT 00500 — AGREEMENT continued b. Contractor's Bid. c. Documentation submitted by Contractor prior to Notice of Award. 3. Performance, Payment, and other Bonds. 4. General Conditions. 5. Supplementary Conditions. 6. Specifications consisting of divisions and sections as listed in table of contents of Project Manual. 7. Drawings consisting of a cover sheet and sheets as listed in the table of contents thereof, with each sheet bearing the following general title: MISSOURI CREEK DRAINAGE IMPROVEMENTS 8. Addenda numbers I inclusive. 9. The following which may be delivered or issued after the Effective Date of the Agreement and are not attached hereto: All Written Amendments and other documents amending, modifying, or supplementing the Contract Documents pursuant to the GENERAL CONDITIONS. ARTICLE S - MISCELLANEOUS 8.01 TERMS: A. Terms used in this Agreement which are defined in the GENERAL CONDITIONS shall have the meanings stated in the GENERAL CONDITIONS. 8.02 ASSIGNMENT OF CONTRACT: A. No assignment by a party hereto of any rights under or interests in the Contract Documents will be binding on another party hereto without the written consent of the party sought to be bound; and specifically but without limitation, moneys that may become due and moneys that are due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by Law), and 00500 Agreement 00500-7 DOCUMENT 00500 — AGREEMENT continued! unless specifically stated to the contrary in any written consent to an assignment, no assignment will release or discharge the assignor from any duty or responsibility under the Contract Documents. 8.03 SUCCESSORS AND ASSIGNS: A. The City of Fayetteville and Contractor each binds himself, his partners, successors, assigns, and legal representatives to the other party hereto, its partners, successors, assigns, and legal representatives in respect to all covenants, agreements, and obligations contained in the Contract Documents. 8.04 SEVERABILITY: A. Any provision or part of the Contract Documents held to be void or unenforceable under any Law or Regulation shall be deemed stricken, and all remaining provisions shall continue to be valid and binding upon The City of Fayetteville and Contractor, who agree that the Contract Documents shall be reformed to replace such stricken provision or part thereof with a valid and enforceable provision that comes as close as possible to expressing the intention of the stricken provision. 8.05 FREEDOM OF INFORMATION ACT: A. City contracts and documents prepared while performing city contractual work are subject to the Arkansas Freedom of Information Act. If a Freedom of Information Act request is presented to the City of Fayetteville, the contractor will do everything possible to provide the documents in a prompt and timely manner as prescribed in the Arkansas Freedom of Information Act (A.C.A. §25-19-101 et. seq.). Only legally authorized photocopying costs pursuant to the FOIA may be assessed for this compliance. 8.06 LIENS: A. No liens against this construction project are allowed. Arkansas law (A.C.A. §§18-44-501 through 508) prohibits the filing of any mechanics' of materialmen's liens in relation to this public construction project. Arkansas law 00500 Agreement 00500-8 DOCUMENT 00500 — AGREEMENT (continued) requires and the contractor promises to provide and file with the Circuit Clerk of Washington County a bond in a sum equal to the amount of this contract. Any subcontractor or materials supplier may bring an action for non-payment or labor or material on the bond. The contractor promises to notify every subcontractor and materials supplier for this project of this paragraph and obtain their written acknowledgement of such notice prior to commencement of the work of the subcontractor or materials supplier, IN WITNESS WHEREOF, The City of Fayetteville and Contractor have signed this Agreement in quadruplicate. One counterpart each has been delivered to Contractor. 'Three counterparts each has been retained by The City of Fayetteville. All portions of the Contract Documents have been signed, initialed, or identified by The City of Fayetteville and Contractor. This Agreement will be effective on December 21 , 2021, which is the Effective Date of the Agreement. CONTRACTOR: CITY OF FAYETTEVILLE By: Kevin Necessary /I By: Lioneld Jordan ("Type orygibly (Signature) (Signature Title: President Title: Mayor 00500 Agreement 00500-9 DOCUMENT 00500 — AGREEMENT (continued) Contractor shall attach evidence of authority to sign. If Contractor is a corporation, corporate entity or LLC, Contractor shall attach Corporate Resolution authorizing Contractor's signature and execution of Agreement. Further if Contractor is a corporation, corporate entity or LLC, Contractor shall also attach a copy of the Contractor's Articles of Incorporation and a copy form the Arkansas State Secretary of State to document that the corporation, corporate entity or LLC is in current "Good Standing" with the State of Arkansas and such entity is permitted to perform work in the State of Arkansas. (SEAL) Attest PA % GH A L. f►1 I; L te. Y (SEAL) G._ER K CITY Attest _ F ;vv„ J . ' % 00500 Agreement 00500 - 10 DOCUMENT 00500--AGREEMENT continued Address for giving notices Address for giving notices 2425 S 5' Place 113 W. Mountain St. Roizers, AR 72758 Fayetteville AR 72701 License No. 0148780422 Agent for Service of process Michael Necessary (Type or legibly print) Contractor shall attach evidence of authority of Agent for Service process to sign. If Contractor is a corporation, corporate entity or LLC, Contractor shall attach Corporate Resolution authorizing Agent for Service process authority to sign. (If Contractor is a corporation, corporate entity or LLC, attach evidence of authority to sign.) END OF DOCUMENT 00500 00500 Agreement 00500 - 11 CITY OF FAYETTEVILLE ARKANSAS BID TABULATION BID 21-78, CONSTRUCTION - MISSOURI CREEK DEADLINE: TUESDAY, NOVEMBER 2, 2021 BEFORE 2 PM, LOCAL TIME CERTIFICATION OF FUNDS Certified Funds $ 4,452,786.00 25% Additional Allowance Allowed per State Law $ 1,113,196.50 Maximum Award Amount $ 5,565,982.50 SUMMARY OF ALL BID SCHEDULES NEC Inc Sweetser Construction, Inc. TOTAL BASE BID (All Bid Schedules) $ 5,075,520.20 $ 7,824,589.80 Total -Bid Schedule 1 $ 4,142,119.60 $ 6,681,635.30 Total -Bid Schedule 2 (Deductive Alternate 1 of 3) $ 200,397.50 $ 211,473.40 Total -Bid Schedule 3 (Deductive Alternate 2 of 3) $ 558,491.50 $ 758,537.00 Total -Bid Schedule 4 (Deductive Alternate 3 of 3) $ 174,511.50 $ 172,944.00 DETAILS OF BID SCHEDULES BID SCHEDULE 1(DRAINAGE, WATER AND SEWER WORK FROM WOODBROOK TO STANTON TO OAKCLIFF TO ROLLING HILLS DRIVE, MISSOURI CREEK CLEARING, AND DRAINAGE WORK ON BRIARCLIFF ST. CUL-DE-SAC) Bid Sch.# Line Item Description NEC Inc Sweetser Construction, Inc. 1 Insurance and Bonding $ 72,123.00 $ 85,060.00 1 Roadway Construction Control $ 33,001.00 $ 33,600.00 1 Trench and Excavation Safety Systems $ 1.00 $ 30,000.00 1 Clearing, Grubbing, and Demolition $ 110,677.00 $ 40,000.00 1 Missouri Creek Brush and Tree Clearing $ 78,676.00 $ 55,000.00 1 Unclassified Excavation (Plan Quantity) $ 16,640.50 $ 72,350.00 1 Embankment (Plan Quantity) $ 747.00 $ 8,300.00 1 Rock Excavation $ 76,000.00 $ 75,000.00 1 4" Topsoil Placement (Yard Areas) $ 28,193.00 $ 30,756.00 1 18" Class III R.C. Pipe $ 38,665.00 $ 27,170.00 1 24" Class III R.C. Pipe $ 3,117.00 $ 582.00 1 42" Class III R.C. Pipe $ 208,639.50 $ 305,853.00 1 23"x14" Class III R.C. Elliptical Pipe $ 7,087.50 $ 5,535.00 1 30"x19" Class III R.C. Elliptical Pipe $ 7,159.50 $ 6,364.00 1 45"x29" Class III R.C. Elliptical Pipe $ 27,607.50 $ 37,800.00 1 60"x38" Class III R.C. Elliptical Pipe $ 4,882.50 $ 5,880.00 1 68"x43" Class III R.C. Elliptical Pipe $ 14,300.00 $ 20,400.00 1 45"x29" R.C.Elliptical Flared End Section $ 3,636.00 $ 3,300.00 1 53"04" R.C.Elliptical Flared End Section $ 7,130.00 $ 3,900.00 1 60"08" R.C.Elliptical Flared End Section $ 8,386.00 $ 8,600.00 1 6' Curb Inlet $ 7,936.00 $ 7,650.00 1 4'x4.5' Reverse Throat Inlet $ 13,436.00 $ 11,000.00 1 4'x8' Reverse Throat Inlet $ 8,431.00 $ 8,250.00 1 4'x8.5' Reverse Throat Inlet $ 8,431.00 $ 8,600.00 1 4'x10.5' Reverse Throat Inlet $ 25,036.00 $ 37,600.00 1 4'xll'Reverse Throat Inlet $ 13,914.00 $ 19,800.00 1 4'xl3' Reverse Throat Inlet $ 44,550.00 $ 63,000.00 1 6'x10.5' Reverse Throat Inlet $ 15,111.00 $ 11,000.00 1 6'x11'Reverse Throat Inlet $ 18,302.00 $ 28,000.00 1 7'x10.5' Reverse Throat Inlet $ 14,721.00 $ 16,000.00 1 3'x3' Grate Inlet (Type ST Special) $ 45,275.00 $ 27,500.00 1 3'x4.5' Grate Inlet (Type ST Special) $ 10,394.00 $ 6,100.00 1 3'x6' Grate Inlet (Type ST Special) $ 87,512.00 $ 56,000.00 1 Trench Grate (26 L.F. Neenah# R-4999-1-9) $ 22,191.00 $ 14,000.00 1 Trench Grate (28 L.F. Neenah# R-4999-1-9) $ 25,394.00 $ 15,100.00 1 Trench Grate (30 L.F. Neenah# R-4999-1-9) $ 24,152.00 $ 16,200.00 1 4'Junction Box $ 7,839.00 $ 4,700.00 1 6'x7' Junction Box $ 8,131.00 $ 13,000.00 1 4'x6' Junction Box $ 15,678.00 $ 15,200.00 1 8.5'xll' Junction Box $ 10,655.00 $ 15,000.00 1 13'x9.5' Junction Box $ 10,655.00 $ 18,000.00 1 Special Junction Box $ 16,086.00 $ 21,600.00 1 4' Drop Inlet Extension $ 8,868.00 $ 8,400.00 1 8' Drop Inlet Extension $ 18,744.00 $ 22,400.00 1 Manhole Lid and Frame $ 315.00 $ 2,000.00 1 6'x4' Precast Concrete Box Culvert $ 1,020,048.00 $ 1,516,800.00 Bid 21-78 Page 1 of 3 1 9'x4' Precast Concrete Box Culvert $ 411,956.00 $ 651,600.00 1 Wingwalls & Appurtenances (9'x4' R.C.B.) $ 29,913.00 $ 24,000.00 1 Concrete Ditch Paving $ 12,512.00 $ 20,240.00 1 Native Sandstone Rip Rap (D50=12") (27" Min. Thickness) $ 118,950.00 $ 42,000.00 1 Asphalt Concrete Hot Mix Surface Course (ACHMSC) $ 296,650.00 $ 432,760.00 1 Asphalt Concrete Hot Mix Patching for Maintenance of Traffic $ 33,900.00 $ 350,000.00 1 Concrete Curb and Gutter $ 22,939.50 $ 10,071.00 1 4" Thick Concrete Sidewalk $ 14,204.00 $ 8,308.00 1 Seeding and Mulching $ 25,380.00 $ 15,600.00 1 Solid Sod $ 12,864.50 $ 14,034.00 1 Additional Watering $ 345.00 $ 600.00 1 Mailbox Supports (single) $ 686.00 $ 10.00 1 Mailboxes $ 2,290.00 $ 10.00 1 Street Sign Installation $ 1,600.00 $ 17.70 1 Erosion Control $ 9,802.00 $ 9,000.00 1 Traffic Control and Maintenance $ 40,428.00 $ 383,100.00 1 Mobilization(not to exceed 5% of contract price) $ 25,297.00 $ 889,466.00 1 4' Wood Rail Fence (Remove, Salvage, and Reinstall) $ 5,812.50 $ 4,005.00 1 6' Wood Privacy Fence (Remove, Salvage, and Reinstall) $ 6,318.00 $ 6,247.80 1 6' Wood Privacy Fence $ 7,020.00 $ 10,756.80 1 4' Decorative Handrail $ 8,416.00 $ 9,600.00 1 4' Chainlink Fence $ 23,085.00 $ 34,371.00 1 Cast -in -Place Tactile Panel $ 2,394.00 $ 1,520.00 1 Handicap Ramp Concrete $ 3,977.50 $ 5,550.00 1 Project Sign $ 1,832.00 $ 1,440.00 1 Cold Milling Asphalt Pavement $ 58,275.00 $ 55,944.00 1 Tree Protection Fencing $ 2,000.00 $ 11,100.00 1 Anchored Erosion Control Mat $ 2,775.00 $ 55,500.00 1 Wetland Seeding, 6" Amended Soil, and Biodegradable Erosion Control Mat $ 10,355.00 $ 40,875.00 1 Construction Staking for Water & Sewer $ 17,197.00 $ 5,000.00 1 Traffic Control and Maintenance for Water & Sewer $ 10,107.00 $ 100,000.00 1 Wastewater Bypass Pumping $ 22,015.00 $ 25,000.00 1 Trench and Excavation Safety Systems for Water & Sewer $ 1.00 $ 25,000.00 1 Erosion Control for Water & Sewer $ 4,045.00 $ 6,000.00 1 Mitigation Dam $ 3,990.00 $ 10,000.00 1 Clearing, Grubbing, and Demolition for Water & Sewer $ 6,495.00 $ 500.00 1 Undercut and Backfill for Water & Sewer $ 28,210.00 $ 7,000.00 1 Rock Excavation for Water & Sewer $ 53,235.00 $ 21,000.00 1 Flowable Fill for Abandoned Pipelines $ 12,800.00 $ 38,000.00 1 Connect Sewer Service $ 25,560.00 $ 52,000.00 1 8" PVC Sewer Line $ 164,952.00 $ 102,384.00 1 8" Epoxy -Lined Ductile Iron Sewer Line $ 9,823.00 $ 6,580.00 1 4' ID Manhole (0'to 6' Deep) $ 27,696.00 $ 31,200.00 1 4" ID Manhole Additional Depth, Over 6' $ 3,018.60 $ 1,215.00 1 Adjust Manhole to Grade $ 27,300.00 $ 16,000.00 1 12" Split Steel Encasement by Open Cut $ 8,352.00 $ 10,080.00 1 16" Steel Encasement by Open Cut $ 9,522.00 $ 17,480.00 1 16" Split Steel Encasement by Open Cut $ 14,880.00 $ 14,880.00 1 New Water Meter Set/Box and Service Relocation, per house, including Pipe Sleeve and Reu $ 109,512.00 $ 124,800.00 1 Fire Hydrant Assembly $ 14,126.00 $ 15,000.00 1 8" Ductile Iron Water Line $ 26,180.00 $ 24,640.00 1 6"x6" Tapping Sleeve and Valve $ 15,096.00 $ 15,300.00 1 8"x8" Tapping Sleeve and Valve $ 21,888.00 $ 24,000.00 1 8" Gate Valve $ 6,030.00 $ 10,500.00 1 Ductile Iron Fittings $ 34,800.00 $ 43,200.00 1 Cut & Cap 6" Water Line $ 7,236.00 $ 2,400.00 1 Cut & Cap 8" Water Line $ 10,428.00 $ 4,000.00 1 Salvage Fire Hydrant $ 7,174.00 $ 2,400.00 TOTAL COST FOR BID SCHEDULE 1 $ 4,142,119.60 $ 6,681,635.30 BID SCHEDULE 2 (DRAINAGE WORK FROM CENTURY DRIVE TO ELIZABETH) - Deductive Alternate # 1 of 3 Bid Sch.# Line Item Description NEC Inc Sweetser Construction, Inc. 2 Roadway Construction Control $ 20,451.00 $ 3,000.00 2 Trench and Excavation Safety Systems $ 1.00 $ 9,000.00 2 Clearing, Grubbing, and Demolition $ 6,495.00 $ 12,000.00 2 4" Topsoil Placement (Yard Areas) $ 9,912.50 $ 9,516.00 2 30" Class III R.C. Pipe $ 6,080.00 $ 5,920.00 2 30" H.D.P.E. Pipe $ 18,032.00 $ 27,324.00 2 36" H.D.P.E. Pipe $ 12,510.00 $ 14,400.00 2 5'Junction Box $ 11,662.00 $ 18,000.00 2 5' Circular Drop Inlet $ 5,831.00 $ 5,000.00 2 7'x7' Grate Inlet (Type ST With 4 Neenah # R-1878-A8G Grates) $ 10,807.00 $ 14,400.00 2 Trench Grate (28 L.F. Neenah# R-4999-HX) $ 26,175.00 $ 15,800.00 2 Asphalt Concrete Hot Mix Surface Course (ACHMSC) $ 6,856.00 $ 7,584.00 2 Concrete Curb and Gutter $ 5,858.00 $ 2,828.00 2 4" Thick Concrete Sidewalk $ 3,042.00 $ 1,170.00 2 6" Thick Concrete Sidewalk $ 1,742.00 $ 962.00 2 Concrete Driveway Aprons $ 1,792.00 $ 1,120.00 2 Concrete Driveway $ 12,298.00 $ 15,480.00 Bid 21-78 Page 2 of 3 2 Solid Sod $ 8,326.50 $ 4,758.00 2 Additional Watering $ 115.00 $ 200.00 2 Mailbox Supports (single) $ 343.00 $ 500.00 2 Mailboxes $ 801.00 $ 500.00 2 Erosion Control $ 8,276.00 $ 5,000.00 2 Traffic Control and Maintenance $ 9,344.00 $ 20,000.00 2 Mobilization(not to exceed 5% of contract price) $ 2,024.00 $ 6,200.00 2 4' Wood Privacy Fence (Remove, Salvage, and Reinstall) $ 4,615.00 $ 3,791.40 2 6' Wood Decorative Fence (Remove, Salvage, and Reinstall) $ 1,630.00 $ 1,068.00 2 Cold Milling Asphalt Pavement $ 5,378.50 $ 5,952.00 TOTAL COST FOR BID SCHEDULE 2 $ 200,397.50 $ 211,473.40 BID SCHEDULE 3 (ETON STREET BOX CULVERT) Deductive Alternate # 2 of 3 Bid Sch.# Line Item Description NEC Inc Sweetser Construction, Inc. 3 Roadway Construction Control $ 5,609.00 $ 3,000.00 3 Trench and Excavation Safety Systems $ 1.00 $ 8,000.00 3 Clearing, Grubbing, and Demolition $ 15,206.00 $ 15,000.00 3 Embankment (Plan Quantity) $ 2,510.00 $ 1,000.00 3 Rock Excavation $ 70,750.00 $ 75,000.00 3 4" Topsoil Placement (Yard Areas) $ 6,206.00 $ 5,136.00 3 4' Drop Inlet Extension $ 3,996.00 $ 2,800.00 3 10'x3' Precast Concrete Box Culvert $ 213,200.00 $ 374,400.00 3 Wingwalls & Appurtenances (Quadruple 10'x3' R.C.B.) $ 52,387.00 $ 25,000.00 3 Channel Excavation (Plan Quantity) $ 8,250.00 $ 10,000.00 3 Concrete Channel Paving $ 2,598.00 $ 660.00 3 Rip Rap (D50=12") (27" Min. Thickness) $ 72,864.00 $ 57,600.00 3 8" Aggregate Base Course $ 6,450.00 $ 13,500.00 3 Asphalt Concrete Hot Mix Surface Course (ACHMSC) $ 12,045.00 $ 52,140.00 3 Asphalt Concrete Hot Mix Patching for Maintenance of Traffic $ 10,175.00 $ 37,500.00 3 Concrete Curb and Gutter $ 8,148.00 $ 5,044.00 3 4" Thick Concrete Sidewalk $ 6,358.00 $ 2,860.00 3 Concrete Driveway Aprons $ 3,239.50 $ 1,520.00 3 Solid Sod $ 3,210.00 $ 2,568.00 3 Additional Watering $ 69.00 $ 120.00 3 Mailbox Supports (single) $ 171.50 $ 250.00 3 Mailboxes $ 400.50 $ 250.00 3 Street Sign Installation $ 320.00 $ 354.00 3 Erosion Control $ 7,225.00 $ 3,000.00 3 Traffic Control and Maintenance $ 3,475.00 $ 2,000.00 3 Mobilization(not to exceed 5% of contract price) $ 2,024.00 $ 22,095.00 3 4' Decorative Handrail $ 39,788.00 $ 34,800.00 3 Project Sign $ 916.00 $ 720.00 3 Tree Protection Fencing $ 900.00 $ 2,220.00 TOTAL COST FOR BID SCHEDULE 3 $ 558,491.50 $ 758,537.00 BID SCHEDULE 4 (STANTON AVE. TRAFFIC CALMING AND NEW 6-FT SIDEWALK) Deductive Alternate # 3 of 3 Bid Sch.# Line Item Description NEC Inc Sweetser Construction, Inc. 4 Roadway Construction Control $ 5,732.00 $ 3,800.00 4 Clearing, Grubbing, and Demolition $ 11,190.00 $ 22,000.00 4 4" Topsoil Placement (Yard Areas) $ 9,050.50 $ 9,444.00 4 Concrete Curb and Gutter $ 14,212.50 $ 9,854.00 4 Concrete Curb and Gutter (Type Special) $ 1,672.00 $ 1,064.00 4 4" Thick Concrete Sidewalk $ 36,570.00 $ 42,780.00 4 6" Thick Concrete Sidewalk $ 12,967.50 $ 9,842.00 4 Concrete Driveway Aprons $ 9,570.00 $ 8,800.00 4 Solid Sod $ 6,689.50 $ 4,722.00 4 Additional Watering $ 115.00 $ 200.00 4 Mailbox Supports (single) $ 3,430.00 $ 5,000.00 4 Mailboxes $ 8,010.00 $ 5,000.00 4 Street Sign Installation $ 320.00 $ 354.00 4 Erosion Control $ 26,918.00 $ 4,000.00 4 Traffic Control and Maintenance $ 17,429.00 $ 27,500.00 4 Mobilization(not to exceed 5% of contract price) $ 2,024.00 $ 5,040.00 4 Cast -in -Place Tactile Panel $ 756.00 $ 480.00 4 Handicap Ramp Concrete $ 1,566.00 $ 1,440.00 4 Decorative Gravel (6" Depth) $ 1,709.50 $ 624.00 4 Remove, Salvage, and Reconstruct Brick Mailbox $ 4,580.00 $ 11,000.00 TOTAL COST FOR BID SCHEDULE 4 $ 174,511.50 11 $ 1 172,944.00 11 Bid 21-78 Page 3 of 3 CITY OF .� FAYETTEVILLE ARKANS ARKANSAS Bid 21-78, Construction - Missouri Creek - Bid 21-78, Construction - Missouri Creek Project Overview Project Details Reference ID Bid 21-78, Construction - Missouri Creek Project Name Bid 21-78, Construction - Missouri Creek Project Owner Andrea Foren Project Type ITB Department Purchasing Budget $0.00 - $0.00 The City of Fayetteville, Arkansas is seeking qualified vendors to construct an underground drainage system along Rolling Hills Drive, drainage improvements on E. Briarcliff Street cul-de-sac, and capacity Project Description improvements to Missouri Creek between Rolling Hills Drive and Stubblefield Road including a box culvert crossing replacement on Eton Street. Questions should be addressed to Jonathan Smith, Sr. Purchasing Agent, at jonsmith@fayetteville-ar.gov. Open Date Oct 03, 2021 12:00 AM CDT Close Date Nov 02, 2021 2:00 PM CDT Highest Scoring Supplier Score NEC Inc 100 pts CITY OF .� FAYETTEVILLE ARKANS ARKANSAS Seal status Requested Information Required Signature Forms AR Secretary of State Filing # Arkansas Contractor's License Pursuant Arkansas Code Annotated §25-1-503, the Contractor agrees and certifies that they do not currently boycott Israel and will not boycott Israel during any time in which they are entering into, or while in contract, with any public entity as defined in §25- 1-503. If at any time during contract the contractor decides to boycott Israel, the contractor must notify the contracted public entity in writing. Unsealed on Nov 02, 2021 2:02 PM CDT Nov 02, 2021 2:02 PM CDT Nov 02, 2021 2:02 PM CDT Nov 02, 2021 2:02 PM CDT Nov 02, 2021 2:02 PM CDT Bid 21-78 Bid Table (BT-29PX) Nov 02, 2021 2:02 PM CDT Conflict of Interest Unsealed by Jonathan Smith Jonathan Smith Jonathan Smith Jonathan Smith Jonathan Smith Jonathan Smith # Declaration of Conflict of Interest You have been chosen as a Committee member for this Evaluation. Please read the following information on conflict of interest to see if you have any problem or potential problem in serving on this committee. ## Code of Conduct All information related to submissions received from Suppliers or Service Providers must be kept confidential by Committee members. ## Conflict of Interest No member of a Committee shall participate in the evaluation if that Committee member or any member of his or her immediate family: * has direct or indirect financial interest in the award of the contract to any proponent; * is currently employed by, or is a consultant to or under contract to a proponent; * is negotiating or has an arrangement concerning future employment or contracting with any proponent; or, * has an ownership interest in, CCTV OF .� FAYETTEVILLE ARKANSKAAS or is an officer or director of, any proponent. Please sign below acknowledging that you have received and read this information. If you have a conflict or potential conflict, please indicate your conflict on this acknowledgment form with information regarding the conflict. I have read and understood the provisions related to the conflict of interest when serving on the Evaluation Committee. If any such conflict of interest arises during the Committee's review of this project, I will immediately report it to the Purchasing Director. Name Date Signed Has a Conflict of Interest? Jonathan Smith Nov 02, 2021 2:03 PM CDT No CITY OF FAYETTEVILLE ARKANS ARKANSAS Questions and Answers No messages CITY OF FAYETTEVILLE ARKANS ARKANSAS Public Notices Bid 21-78, Addendum 1 Jonathan Smith, Oct 18, 2021 3:23 PM CDT Addendum 1 has been posted. This addendum was used to provide a complete list of individuals that attended the Pre -Bid meeting and we answered all questions submitted to the Purchasing Division. Project Details Have Changed Jonathan Smith, Oct 27, 2021 2:58 PM CDT Good afternoon everyone, Addendum 2 has been posted on Bonfire. A typo was found on page 1 of the Project Manual. The typo referenced this bid as Bid 21-70. This is not correct. The bid number for this bid is Bid 21-78, Construction — Missouri Creek Drainage Improvements. CITY OF FAYETTEVILLE ARKANS ARKANSAS Internal Discussions No messages CITY OF .� EVILLE ARKANSRKANSAS Approvals No approval requests CITY OF .� EVILLE ARKANSRKANSAS Submissions Supplier Date Submitted Sweetser Construction, Nov 02, 2021 12:44 PM Inc. CDT NEC Inc Nov 02, 2021 1:27 PM CDT Name Email Charlie Miller charlie@sweetserconstruction.com Colin Necessary cbnecessary@nec- contractors.com Confirmation Code MTcxMjMO MTcxMjYz CITY OF .� FAYETTEVILLE ARKANS ARKANSAS Project Criteria Criteria Total Lump Sum Bid Price Within Certified Funds Points Description 100 pts Total Lump Sum Bid Pass/Fail Total base bid must be within 125% of certified funds. Total 100 pts CITY OF .� FAYETTEVILLE ARKANS ARKANSAS Scoring Summary Active Submissions Total I Total Lump Sum Bid Price Within Certified Funds Supplier / 100 pts I / 100 pts Pass/Fail NEC Inc 1 100 pts 1 100 pts ($4,316,631.10) 1 Pass Sweetser Construction, Inc. 1 55.17 pts 1 55.17 pts ($7,824,589.70) 1 Fail CITY OF .� EVILLE ARKANSRKANSAS Proposal Scores Sweetser Construction, Inc. - Scoring Summary Evaluation Group 1 - Main Evaluation Total Total Lump Sum Bid Price Within Certified Funds Reviewer / 100 pts / 100 pts Pass/Fail Amanda Beilfuss - - - Andrea Foren - - - Jonathan Smith 55.17 pts $7,824,589.70 Fail Fail 1 Average: $7,824,589.70 1 Calculated: 55.17 pts 55.17 pts ($7,824,589.70) Fail C I TV OF .� FAYETTEVILLE ARKANS A RKANSAS CITY OF .� EVILLE ARKANSRKANSAS NEC Inc - Scoring Summary Evaluation Group 1 - Main Evaluation Total Total Lump Sum Bid Price Within Certified Funds Reviewer / 100 pts / 100 pts Pass/Fail Amanda Beilfuss Andrea Foren Jonathan Smith Calculated: - - 100 Pts Average: 100 pts - - $4,316,631.10 $4,316,631.10 J. 100 pts ($4,316,631.10) - - Pass Pass 1 Pass CITY OF .� FAYETTEVILLE ARKANS ARKANSAS Proposal Score Comments Sweetser Construction, Inc. - Scoring Comments Total Lump Sum Bid Price - Reviewer Scores Reviewer Score Jonathan Smith 55.17 pts ($7,824,589.70) Within Certified Funds - Reviewer Scores Reviewer I Score Reason Reason Comments Response is greater than the certified amount. Comments Jonathan Smith Fail Does not meet the requirement(s) Total base bid was greater than the certified amount. CITY OF .� FAYETTEVILLE ARKANS ARKANSAS NEC Inc - Scoring Comments Total Lump Sum Bid Price - Reviewer Scores Reviewer Score Jonathan Smith 100 pts ($4,316,631.10) Within Certified Funds - Reviewer Scores Reviewer Score Jonathan Smith Pass Reason Meets the requirement(s) Comments Department elected to use deductive alternates 1 and 2. Deductive alternate 1 totaled $200,397.50. Deductive 2 totaled $558,491.50. Comments Bid is within the certified amount. E 2049 E. Joyce BIW., Ste. 400 Fayetteville, AR ]2]03 (479)527-9100 MISSOURI CREEK DRAINAGE IMPROVEMENTS CITY OF FAYETTEVILLE FAYETTEVILLE, ARKANSAS VICINITY MAP No SCILE FAYETTEVILLE, ARKANSAS SITE GARVER PROJECT NO. 19T21080 SEPTEMBER, 2021 ARKANSAS ONE CALL 15- Know what's below. call before you dig. SEE GENERAL NOTE 2, SHEET G-0W OF THESE PLANS. STATE MAP ARKANSAS HIGHWAY DIST. 4 CITY OF �4._ FAYETTEVILLE ARKANSAS �` z W W J , W W� e► W> W Wa Qa UW LLw LL Ow OZ >k N� ULL �O COVER SHEET DATE: SEPT.2021 DESIGNED BY: DJW DRAWN BY: TWM DRAWING NUMBER G-001 City of Fayetteville, Arkansas - Budget Adjustment Form (Legistar) Budget Year Division Adjustment Number /Org2 ENGINEERING (621) 2021 Requestor: Kevin Springer BUDGET ADJUSTMENT DESCRIPTION / JUSTIFICATION: Approval of a contract in the amount of $4,316,631.10 with NEC, Inc. for the construction of the Missouri Creek Drainage Improvements Project, approval of a project contingency of $319,600. (7.4%) and approval of a budget adjustment. This adjustment recognizes $65,623 in unallocated interest earnings for this bond issue. RESOLUTION/ORDINANCE COUNCIL DATE: 12/7/2021 LEGISTAR FILE ID#: 2021-0908 KeA/ �YvSpv' r 1111712021 4:59 PM Budget Director Date TYPE: D - (City Council) JOURNAL #: GLDATE: CHKD/POSTED: TOTAL Account Number 65,623 65,623 Increase / (Decrease) Expense Revenue Proiect.Sub# Project Sub.Detl AT v.20211011 Account Name 4604.860.7410-5817.00 982,332 - 46040 7410.1000 EX Improvements - Bridge & Drainage 4604.860.7410-5911.99 4604.860.7999-5899.00 319,600 - (1,165,964) - 46040 46040 7410.1000 7999 EX EX Contingency -Capital Project Unallocated - Budget 4604.860.7000-4999.99 - 65,623 RE Use Fund Balance - Current 4604.860.7425-5817.00 (22,764) - 46040 7425 EX Improvements - Bridge & Drainage 4604.860.7425-5860.04 4604.860.7425-5911.99 (2,303) - (23,680) - 46040 46040 7425 7425 EX EX Capital Prof Svcs - Contra (Engineering) Contingency -Capital Project 4604.860.7427-5860.04 4604.860.7410-5805.00 (2,590) - (19,008) - 46040 46040 7427 7410.1000 EX EX Capital Prof Svcs - Contra (Engineering) Land - Acquisition H:\Budget Adjustments\2021_Budget\City Council\12-07-2021\2021-0908 BA Missouri Creek NEC Contractxlsm 1 of 1 Missouri Creek Drainage Improvements projects Chris Brown Submitted By City of Fayetteville Staff Review Form 2022-0807 Legistar File ID N/A City Council Meeting Date - Agenda Item Only N/A for Non -Agenda Item 8/29/2022 ENGINEERING (621) Submitted Date Division / Department Action Recommendation: Staff recommends approval of Change Order #1 for the Missouri Creek Drainage Improvements projects which will increase the contract amount by $23,170 and 5 days. The Mayors signature is requested on the change order document. Budget Impact: 4604.860.7410- 5817.00 4604 Drainage Bond Funds Account Number Fund 46040.7410.1000 Missouri Creek/Rolling Hills Drainage Project Number Budgeted Item? Yes Does item have a cost? Yes Budget Adjustment Attached? No Current Budget Funds Obligated Current Balance Item Cost Budget Adjustment Remaining Budget Project Title $ 4,636,231.10 $ 4,316,631.10 $ 319,600.00 $ 23,170.00 S 296,430.00 V20210527 Purchase Order Number: 2021-00000091 Previous Ordinance or Resolution # 339-21 Change Order Number: Original Contract Number: Comments: 1 2021-00000058 Approval Date: 09/01/22 CITY OF _ FAYETTEVILLE ARKANSAS TO: Mayor Lioneld Jordan THRU: Susan Norton, Chief of Staff Chris Brown, Public Works Director FROM: Alan Pugh, Staff Engineer DATE: August 29, 2022 STAFF MEMO SUBJECT: Approval of Change Order #1 for the Missouri Creek Drainage Improvements projects which will increase the contract amount by $23,170 and 5 days. The Mayors signature is requested on the change order document RECOMMENDATION: Staff recommends approval of Change Order #1 for the Missouri Creek Drainage Improvements projects which will increase the contract amount by $23,170 and 5 days. The Mayors signature is requested on the change order document. BACKGROUND: On December 21, 2021, the City Council approved a contract with NEC, Inc for the construction of drainage improvements to alleviate flooding associated with Missouri Creek. Construction of the project began in March of this year and is expected to take approximately one year to construct. DISCUSSION: Part of the work included in this project is the relocation of water mains to accommodate the installation of a large box culvert down Stanton Ave. This water relocation was originally shown to be partially behind the sidewalk. However, this would require the removal of two large trees at the intersection of Stanton Ave and Hilldale. To accommodate the trees, staff worked with the engineer of record and the contractor to develop a solution that would allow them to remain. This results in more of the relocated line being placed within the roadway and increases the cost of installation due to the depth of the line and the need for aggregate base backfill. The contractor has provided a cost of $23,170.00 in order to perform the work. BUDGET/STAFF IMPACT: The drainage improvements are funded by the 2019 Drainage Bond Program which includes the relocation of the water line. The City Council approved a construction contingency of $319,600.00 for this project and would be the source of the proposed additional funding. Attachments: Change Order #1 Revised Waterline Plan Mailing Address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 CHANGE ORDER C T V OF FAYETTEVILLE ARKANSRKAAS Change Order No To Contractor: NEC, Inc. The Contract is changed as follows: Contract Title: Missouri Creek Drainage Improvements Date of Issuance August 26, 2022 ORDINA NC F/RFSOLUTION: 339-21 Effective December 21. 2021 Bid Bid Previous Unit Contract Revised Revised Original Revised Contract Item Item Estimated of Unit Estimated Unit Estimated Estimated Changes No. Description Quantity Measure Price Quantity Price Cost Cost Clas1-105 �kfill Aggregate Base 0 Ton $0.00 300 $92.26 - S24.(,'3 �1n 1-101 Ductile Iron Fittings 2400 LB $14.50 2296 $14.50 34.800.00 S33,292 00 stinus ittenefCat 34,800.00 S57,970.00 Net Coat for this Change Order S23, l 70.00 the The original Contract Price was S 4,316,631.10 Net change by previously authorized change orders S " ...--....._.._..._.._..._..._.._._.. The Contract Price prior to this Change Order was _. ._...____ __ S 4,316,631.10 The Contract Price will be adjusted by S 23,170.00 _ — The new Contract Price including this Change Order will be _ S 4,339,901.10 _ The Contract Time(s) will be increased by 5 calendar days Required dates of Completion as of the date of this Change Order therefore are Substantial Completion 7-Mar-23 Final Completion ..._ 6-Apr-23 NOTE: This summary does not reflect changes in the Contract Price or Tirne(s) which have been authorized by Work Change Directives not incorporated in this or previous Change Orders. NEC, Inc. CIT OF FAY 7EILLE A,, 09ro1/22 Y DA'I li BY DATE ' mp >0 j > $ �$yp� 4 � F zv°1 z a, > A yDyj�y�y��m➢ �z9mZ. > 8 mm m > Am> w Z m yam{ n�• E. HILI.QALE DR. z Ha ... :V Y .....}... - 4iT i> o ypBL '2�mAi T m ri R."di .546 X FFL ^�+ „ iIagqy Gff N - -- --y / R/W zf. °° m �Jm J o- r.0m/I ,e C R/WR/W —1 Zym� m0� 10% �m"N �� Y„ F� =§p 'Sp„ ��gm� >' F� YyAmr n m w 08 12z:�> zma• L�oz�S ffl vv rn" Z $p� ou mS I � N F'w - y o ® R,W YS Of N. STANTON AVE. vS N J'~ .... •• J"•,r�.•.+...................................................... ._ r t jmm vow n mV r mUt m5m:m No. mya Az° ow - _ �n A'< i € j{ I m8 om m tea,Q1 .' "1 \.f.;f } _ aOa?._. eOm�=e Ei H'�➢N p f \`'t X /y Nnm'8 a,�mo m .,.. ,�`'•' fix• �y p I°1D � •.� _ O n y9A Ais ` s Z. mR �� I B\ _I ' '� ak =coo�OHi Z. .0gm NT*Fp. •••jam•• a c`� 4�\ ° r9tiA� yo 7-0-S"T og a m _ . c- 0 is g g A IWO[ CITY OF FAYETTEVILLE- FAYETTEVILLE ARKANSAS Y Heana•s ror wamlre i RA- ¢c i q _ MISSOURI CREEK DRAINAGE IMPROVEMENTS Change Order #2 for the Missouri Creek Drainage Improvements Project City of Fayetteville Staff Review Form 2022-1061 Legistar File ID N/A City Council Meeting Date - Agenda Item Only N/A for Non -Agenda Item Chris Brown 11/15/2022 ENGINEERING (621) Submitted By Submitted Date Division/Department Action Recommendation: Staff recommends approval of Change Order #2 in the amount of $3,111.00 in the Missouri Creek Drainage Improvements projects to lower a water service line. Funding for this change order will come from previously approved project contingency. The Mayor's signature is requested on the change order document. Budget Impact: 4604.860.7410-5817.00 4604 Drainage Band Funds Account Number 46040.7410.1000 Project Number Fund Missouri Creek/Rolling Hills Drainage Project Title Budgeted Item? Yes Current Budget Funds Obligated Current Balance Does item have a cost? Yes Item Cost Budget Adjustment Attached? No Budget Adjustment Remaining Budget $ 4,685,265.00 $ 4,365,157.91 $ 320,107.09 $ 3,111.00 $ 316,996.09 W0210527 Purchase Order Number: 2021-00000091 Previous Ordinance or Resolution# 339-21 Change Order Number: 1 Approval Date: 11/17/2022 Original Contract Number: 2021-00000058 Comments: CITY OF FAYETTEVILLE STAFF MEMO ARKANSAS TO: Mayor Lioneld Jordan THRU: Susan Norton, Chief of Staff Chris Brown, Public Works Director FROM: Alan Pugh, Staff Engineer DATE: November 15, 2022 SUBJECT: Staff recommends approval of Change Order #2 for the Missouri Creek Drainage Improvements projects which will increase the contract amount by $3,111.00 for lowering a water service line. The Mayors signature is requested on the change order document. RECOMMENDATION: Staff recommends approval of Change Order #2 for the Missouri Creek Drainage Improvements projects which will increase the contract amount by $3,111.00 for lowering a water service line. The Mayors signature is requested on the change order document. BACKGROUND: On December 21, 2021, the City Council approved a contract with NEC, Inc for the construction of drainage improvements to alleviate flooding associated with Missouri Creek. Construction of the project began in March of this year and is expected to take approximately one year to construct. DISCUSSION: A portion of the work includes the installation of a trench grate drain and associated storm drain near the cul-de-sac of E Briarcliff St to alleviate localized flooding. During construction, it was discovered that there is a conflict with the proposed storm drain and an existing water service line. The water service line will need to be lowered by a licensed plumber. The contractor has provided a cost of $3,111.00 in order to perform the work. BUDGET/STAFF IMPACT: The drainage improvements are funded by the 2019 Drainage Bond Program which includes the relocation of the water line. The City Council approved a construction contingency of $319,600.00 for this project and would be the source of the proposed additional funding. Attachments: Change Order #2 Mailing Address: 113 W. Mountain Street www.fayetteville-argov Fayetteville, AR 72701 Adaft CrTY OF ARKANS FAYETEVILLE CHANGE ORDER Contract Title: Missouri Creek Drainage Improvements Change Omer No 2 nmeoflssoame November 15,2022 to Chage. NFC, E. ORDINANCHRESOLLrt10IN 33421 The Comxt is elsinged as follows: EDxtive December 21, 2021 Ba Bid IReviaus Unit Cmllmd I Revised I Rao.d I Uri rue Revisal Con. It ItAn Fslima0.d of Unit I Elematetl Unit I FstimeLLM I EmanWM CM1an s No. Dmcn puumi Measure Rice Qmnti Price it Cast 1-IW Adlust venter serviceline 0 EA MW 1 $3,11 I.W St,111W hammering ii Cmr - 53,111man Net Cost for this Ck Order 51111.00 Net change by previously aalloriictl change moms t Amou The Canrmn Price ptlme ,he Charge Order was S 9 1.10 The CornowC rt.1 will be lamog by t jilil2.91LIq The now Conlmctiwill he Change Order will he-------�-- -�-----�" t dardsr 10 theeired Cannot ev,-fiCa)willbe in tMstat da 0 olCMer daw Respired Substantial letion edam ofMis Change Ober dmref ere'. Sisal Co al Completion T,gyr-iT FinelCanplmion 6A r-D NOTE: Thn mummry.4e mnRe�Jmpin Je Canuw gc wTnmlaJ mkeg Frw hxn amlvvsdg qah CM1uge Doeanv mr�eopneW in An crier ioua Over ONers. NEC,I DATE CITY FFAYFT . H.U." 17�2U22 Y DATC