HomeMy WebLinkAbout2021-12-28 - Agendas - FinalCITY OF
! _! FAYETTEVILLE
\.� ARKANSAS
MEETING AGENDA
City Council Transportation Committee
Tuesday, December 28, 2021
5:30 pm or Immediately Following Agenda Session
NOTICE: THE TRANSPORTATION COMMITTEE WILL BE HELD VIRTUALLY WITH NO
PHYSICAL LOCATION TO ATTEND
VIDEO CONFERENCING BY ZOOM WILL BE USED FOR THIS MEETING. TO REGISTER
FOR THE MEETING GO TO THIS Registration Link
Members: Sarah Bunch, Committee Chair; Sonia Gutierrez; Holly Hertzberg
City Staff: Chris Brown, Public Works Director/City Engineer; Terry Gulley, Asst. PW Director
for Operations/Transportation Services Director
Agenda:
1. New Business:
A. NORTH STREET CORRIDOR: Review of plans and public comments on the North
Street Corridor -Garland Avenue to Mission Blvd. This information is presented for
preliminary review and discussion with the Committee. Plans and public survey
attached.
B. WEST AVENUE AND DICKSON STREET INTERSECTION: Review of the schematic
design for the intersection at Dickson Street and West Avenue. This intersection is
planned for pedestrian improvements as part of The Upper Ramble. This information is
presented for preliminary review and discussion by the Committee. (Schematic
drawings to be presented at the committee meeting).
C. 2022/2023 SIDEWALK CONSTRUCTION PLAN: Review of proposed 2022/2023
Transportation Division Workplan for sidewalk construction. Project list is attached. For
a map of the plan follow this LINK. (Staff requests a recommendation from the
Committee to the City Council for this item.)
D. 2022/2023 PAVEMENT MANAGEMENT AND ASPHALT OVERLAY PLAN: Review of
the proposed 2022/2023 Transportation workplan for pavement management. Project
lists are attached. For a map of the plan follow this LINK. (Staff requests a
recommendation from the Committee to the City Council for this item.)
E. SQUARE LIGHTING IMPROVEMENTS: Review of proposed contract and budget for
the lighting improvements around the Downtown Square. Funding for the improvements
are proposed to be funded from Parks Bonds, Transportation Bonds, and other Parks
funding. (Staff requests a recommendation from the Committee to the City Council
for this item.)
Mailing Address:
113 W. Mountain Street www.fayetteville-ar.gov
Fayetteville, AR 72701
F. CITYWIDE SPEED LIMITS: Review of planned speed limit changes to implement the
recent speed limit ordinance amendment and to align speed limits more closely with
street classifications. For a map of the plan follow this LINK. Memo and map
navigation instructions attached.
G. TRAFFIC CALMING PROJECTS: Review of traffic calming requests, and staff
recommendations for installation at various locations. Detailed information to be
provided at the Committee meeting.
2. Adjourn
Lu
lid
�.HQ
Q v3 _
w Jn3
` Ln w k
>
iA—
• f
--- _—-- = PRELIMINARY
• •� ~y- NOT FOR
CONSTRUCTION
-
r
- - ORIGINAL SIGNATURE ON FILE
Y s'.
Lu
Lu
Uj
ry
N
.� x 441111,1
/ r Ire a
f J'� IAS
HWY 112/ N �•r..�_ r� e
GARLAND AVE
J • F
y J > ` -i PLAN SCALM: `
g K
ant. IN FEET
�! lGr tY f m aor . d
..L � � � i•'�' l J , Ibr�rrl�ibBIOYIL
t �, f 1 CtlIMM�V=dl&
y1J o
y ` _ u
•01— w
0
w
_ o
>
Ir
LLJ
w �. , ii NORTH ST
J a� �CORRIDOR
`' - F��.� ! > WEST
/ ' F' br8ii Q
:.: �.. W aI -
•- Y �,'~ �� �� DESIGNED BY : DRAWN BY
` �� - — I •.w....w �,�. <A•'f -.I• . _ ; .• ELA ELA
A ' - ~- - } ( ✓ W 1 DATE: REVISION:
a
10/11/2021 REV. 30%
JOB NUMBER:
mw
1 20-2179
Lu
U)
----------
-- =�
J LA
7.
ji►-' Z Z
...
P Na.,xo.,No V H Z z z M
a N u
Ir.,. a c MU
-- - - lww
Lu LLJ
Un
w
r
PRELIMINARY
NOT FOR
CONSTRUCTION
' S • -„Y ', s _ _,,�11. • • • y {7■y1{��1 ORIGINAL SIGNATURE ON FILE
o
J t / cC
LLUJ
Id
-A
Lu
CZJ
lb
PLAN SCALE
IL
1 a, 1 '. �• �N y �a 1 �,K ' Ns�ln.�_ �� d tF I ( IN FEET10
A I . a
A. I As >
djo
Lu
LLJ
Lu
I
------------------------
Lu let
> I
r QLLJ
r
a ,,� Z,�••-_ L
* r— -1 1 LU
LLI
'A� t
l� 1 v• V a e a 'i• -1~' i 41 ��5+
,e I sr.
-fir'
•''ram � �^ .. F 'C �.� � � y � � y _ • } -
u
U
V)
N
Z
O
0
NORTH ST
CORRIDOR
CENTRAL -
EST
DESIGNED BY: BY
ELA ELA
DATE: REVISION:
10/5/2021 REV. 30
SCALE: ]OB NUMBER:
1"=40' 20-2179
EX-2
Lu
J.
I t7,
' ' ► ''��''! x.. oz
f a far
3
J •
y" 4 7—I f,
r
J
.=r..m
w
>
a
' z
a
J
S �
1
J � '
r
9
6i
M
2 N
d n¢^°
ZM?
u Z Y N U
„ MIUdWul
w �3
a 0-1co
n 3
w F
= LLI
� LL
oo
• PRELIMINARY
NOT FOR
CONSTRUCTION
R }
w
>
-
'
~� �:♦
}
PLAN SCALE
.�
I
r
~` ►,I A4
( ]N FEET, ;-
I rn =40et'
r
- `
>
' ` e z
o
rapok
z
a
' z
nor
— i
w \
>
Q ..
J
J
O
a
ORIGINAL SIGNATURE ON FILE
0 0
O
m
- z
� O Q
O J
U J
O >
� w
u j
O Q
c<
z
8�1
NORTH ST
CORRIDOR
CENTRAL -
EAST
HWY 71 B/ COLLEGE AVE
DESIGNED BY: DRAWN 8V
ELA ELA
DATE: REVISION:
10/5/2021 REV. 30
SCALE: ]OB NUMBER:
1„=40' 20-2179
EX-3
y m
i w Zt9Z o
Z
N
w {Q/�I Ax, T., -�
+4`j ' Q w • VNIZzaN
uu,
•� F� ( w ---- J " �, .l r r V Z H Q V 3
z Lu Ld
ti Lu F
i �e L _
/ „ }
L¢L
Jim . rd
,r
AIR im
i
PRELIMINARY
., .�•- - — — - NOT FOR
CONSTRUCTION
Ira' •-�- r ' Yl 4 1't 1.1}„ R--j7.1� r 4�� �i f ► - _ r r
-I �� A - 1..•i. '`tom ,� _ _ i4�! rA.
` �• +1 ,� ' I 7, ORIGINAL SIGNATURE ON FILE
• :.-4 _ j.• �¢ ► .w �%.3� 1 III V, 1 Ia� � � �' •r,�i .�/.!] ' ' � LL � c
..+ .ji 1.. .�s , 1 7! n'YrNf'f,lsy}}} ,j't _ (I. r _ 1. 1 .. fir). r.7, .r. ,d!'>•"�' ��t f� JET 1�, h. Q m O
cl
i1 *� 4i�:f • +t i 1 �Z" • d Lu
4
^� :#
r i
_ 1 jr J✓� ! �-,1Qyr�,�J� `(: r f ti,r 7 'J �' a+.t.` a () Oui
J
?j,•d� u� r""' '� ,.�c. l f •', �� /i` t1 ��� •aj,. � �
y., PLAN SCALE c (n >
�� !�'a� J:`- � -,l R� i .'�j� `C '•'�' �. n'�111 i1 4�Tk � � �. fir. � � ' -''��` _ � Q
z
.� 1 .. `.y 't •/' 1 f • , ,I!{ , ( IN FEET) ElfLL Q
^ 1t •�, � t / �, ° �= :.i „`r'1' I� .. �� � i / ' � �1 h � � , .•r �:i ;-� '' � ,ll � 1 inch = 40k. z (a7
l�-
F � r�; J `�� i— R � •' �'1� �.: •fit �I .. •,'•` • - ,
ai
r W ' Jt �2 p �r - k i Km L
III behrs d
Lu
Lu
ul
Lu
- - - - - - - - - - -- - - - - -
14
7 wv
0,
i 5 .- '
o !•.'. I a 'll .�j:a r Si r. l �,yl ,
•, I r `•.ry�,1� I ;� ' r � n 7ii.. 1.
aw
l 2C : f' , ~ NORTH ST
CORRIDOR
EAST
Z / Il. i•T - 4 r t • ' ,� , - , ( . - DESIGNED BY: DRAWN BY:
_ r4 ELA ELA
�- DATE: REVISION:
10/5/2021 REV. 30%
O 1 , - I S., t Y ._. �t , Y _ r - _ , 1 ♦ SCALE: JOB NUMBER:
i ` ,f a .. a. . , i.. ,.. _ . 3•? - -•Y - 1"=40' 20-2179
EX-4
North Street Corridor
Improvements
Questionnaire
SURVEY RESPONSE REPORT
08 August 2018 - 15 December 2021
PROJECT NAME:
North Street Corridor Improvements
BANG THE TABLE
.�� engagementHQ.
North Street Corridor Improvements Questionnaire : Survey Report for 08 August 2018 to 15 December 2021
Page 1 of 40
North Street Corridor Improvements Questionnaire : Survey Report for 08 August 2018 to 15 December 2021
Q1 How supportive are you of the design of the Intersection of North Street and Garland
Avenue?
38 (11.4%)
165 (49.5%)
Question options
1 Not at all Supportive 2 3 4 5 Highly Supportive
Optional question (333 response(s), 8 skipped)
Question type: Radio Button Question
14 (4.2%)
88 (26.4%)
28 (8.4%)
Page 2 of 40
North Street Corridor Improvements Questionnaire : Survey Report for 08 August 2018 to 15 December 2021
Q2 How supportive are you of the design of the sidewalk and trail from Garland Ave. to
Leverett Ave.?
-1- >4io)
184 (56.4%)
Question options
• 1 Not at all Supportive 2 3 4 5 Highly Supportive
Optional question (326 response(s), 15 skipped)
Question type: Radio Button Question
23 (7.1 %)
k 0
23 (7.1 %)
71 (21.8%)
Page 3 of 40
North Street Corridor Improvements Questionnaire : Survey Report for 08 August 2018 to 15 December 2021
03 North Street Improvements from Leverett to GreggHow supportive are you of the design
of the sidewalk and trail from Leverett Ave. to Gregg Ave? Click here to view larger image.
o)
158 (47.6%)
.0%)
Question options
1 Not at all Supportive 02 40 3 04 0 5 Highly Supportive
Optional question (332 response(s), 9 skipped)
Question type: Radio Button Question
24 (7.2%)
27 (8.1 %)
Page 4 of 40
North Street Corridor Improvements Questionnaire : Survey Report for 08 August 2018 to 15 December 2021
Q4 North Street Improvements from Gregg to CollegeHow supportive are you of the design
of the sidewalk from Gregg Ave to College Ave.? Click here to view larger image.
159 (47.9%)
67 (20.2%)
Question options
• 1 Not at all Supportive 2 3 4 5 Highly Supportive
Optional question (332 response(s), 9 skipped)
Question type: Radio Button Question
0 (9.0%)
35 (10.5%)
Page 5 of 40
North Street Corridor Improvements Questionnaire : Survey Report for 08 August 2018 to 15 December 2021
Q5 Lane Reconfiguration on Gregg Ave. How supportive would you be of incorporating a
Road Diet or lane reconfiguration on Gregg Ave to add a center turn lane and add on -street
parking from North Ave to Poplar Street as part of this project? Click here...
90 (26.9%)
r91
6J
49 (14.7%)
46 (13.8%)
Question options
1 Not at all Supportive 2 3 4 5 Highly Supportive
Optional question (334 response(s), 7 skipped)
Question type: Radio Button Question
38 (11.4%)
111 (33.2%)
Page 6 of 40
North Street Corridor Improvements Questionnaire : Survey Report for 08 August 2018 to 15 December 2021
Q6 North Street Improvements from College to MissionHow Supportive are you of the design
for the sidewalk on connection from College Avenue to Mission Blvd? Click here to view
larger image.
(15.3%)
168 (50.5%)
52 (15.6%)
Question options
1 Not at all Supportive 2 3 4 5 Highly Supportive
Optional question (333 response(s), 8 skipped)
Question type: Radio Button Question
20 (6.0%)
42 (12.6%)
Page 7 of 40
North Street Corridor Improvements Questionnaire : Survey Report for 08 August 2018 to 15 December 2021
Q7 What other comments do you have about this project?
Anonymous Definitely support need for better pedestrian access at the point
11/10120�_ where North meets Mission.
Anonymous The only thing that keeps me from being fully supportive of #4 is the
11/10/2021 12:53 PM sidewalk switching sides of the street. It seems that crosswalk will be
hazardous for pedestrians.
Anonymous Any plans for a bike lane?
11/10/2021 01:05 PM
Anonymous These are major connecting streets in Fayetteville that are very, very
congested. I think walk ways should be in areas that are not so
congested so people feel safer walking. On every street you have
listed at rush hour these streets are backed up. If anything put the
sidewalks somewhere else and widen all these streets!
Anonymous Extended the multi -use trail all the way out to Mission. Greg is too
busy already to reduce down to only 2 lanes and a turn lane. If you
take away a lane, you should add a bike lane or multi use trail. Right
now it is safe to bike on only because it has 4 lanes.
Anonymous Further congesting Gregg St by removing two lanes is moronic.
11/10/2021 01:29 PM Builders and developers can add parking for their new projects
instead of taking a lane away for parking.
Anonymous With a growing population, and therefore growing traffic demands, it
11/10/2021 01:30 PM is safe to say that "road diets" to create on -street parking are of the
devil, and an exorcist should be called. Thank you!
Anonymous There are more important things to spend money on.
11/10/2021 01:35 PM
Anonymous Looks very good! Of course a wide trail the entire way would be nice
but just not ;possible with the space restrictions. And I think all of this
was addressed very well and thought out, including the mini -
roundabout. I hope this plan goes forward as it is and look forward to
it.
Page 8 of 40
North Street Corridor Improvements Questionnaire : Survey Report for 08 August 2018 to 15 December 2021
Anonymous This entire project looks like it would be very beneficial to people on
foot, bike, mobility aids, cars, etc. I'm especially pleased to see the
plans to connect the sidewalk on the south side of North between
Garland and Leverett. Perhaps it's pie -in -the -sky, but I wish there
would be a bike elevator of some kind for the climb up North between
Mission and College! I suspect that stretch will be protested because
of how steep and unpleasant it is.
Anonymous Needs 4 lanes for automobiles.
11/10/2021 02:02 PM
Anonymous Fayetteville has such a lack of dedicated right turn lanes, I feel like it
11/10/2021 02:20 PM would cause more traffic backups at Garland by removing the right
turn swoops.
Anonymous Excited to see emphasis taken away from cars.
11/10/2021 02:53 PM
Anonymous Don't use the term "road diet" in public marketing. No one likes being
on a diet. They're miserable, even though this is great. 6 lanes of
traffic is a LOT to cross on foot (North @ Garland) even with a signal
and pedestrian refuge. Imagine having to use that refuge and
spending two whole light cycles to get across!
Anonymous Why is there no 4-lane east -west road between Joyce and MILK? FIX
11/10/2021 04:51 PM THIS!
Anonymous This project will be very beneficial to downtown Fayetteville and can't
11/10/2021 05:04 PM begin soon enough. The 8'sidewalk with some lamps or down lighting
would be helpful especially helpful between College Ave and Mission
for pedestrian safety. The proposed roundabout or light at Hillcrest is
very important along with possible other traffic calming strategies to
reduce the speed of vehicles descending the hill going westbound.
Many accidents and near misses occur in this area due to the steep
grade and limited visibility approaching College. A big thank you to
planning and trails staff for their work on this proposal!
Anonymous For No. 5 - with the improvements of side path from Garland to Gregg
11/10/2021 05:18 PM and the future Midtown Corridor improvements down Poplar, why
wouldn't we consider a side path along the west side of Gregg from
North to Poplar and create reallv solid connectivitv between the two
Page 9 of 40
North Street Corridor Improvements Questionnaire : Survey Report for 08 August 2018 to 15 December 2021
projects? Scrap the parking lane on Gregg (while keeping the road
diet to slow speeds) and add a separated side path with green space
buffer between the future Midtown Trail and North Street
improvements all along the west side of Gregg.
Anonymous We don't need on street parking on North not Gregg. They are too
11/10/2021 06:24 PM busy.
Anonymous I think that the access road between NWA Gyro and Sabor could be
11/10/2021 06:26 PM eliminated to allow for a much longer right turn lane westbound on
North. Losing the cutoff will result in a lot more traffic turning right at
that intersection
Anonymous I like most of this. It would be nice to only add wide shared use trails
11/10/2021 08:01 PM instead of just sidewalks, but space is limited I'm sure. And if
roundabouts could be possible at Leverett/North and
Sycamore/Gregg in addition to all this, then that'd be great. Fewer
traffic lights and more roundabouts are always good. All of Gregg
should be roundabouts honestly.
Anonymous The place in this vicinity where I see pedestrians walking in the street
11/10/2021 08:12 PM in unsafe conditions is not actually on North St but on a short section
of Sycamore between Garland and Leverett St. The cost would be
minimal to put a sidewalk on at least one side of this section of
Sycamore. UA students & other residents walk this block to reach the
bus stops.
Anonymous I am generally very supportive of the changes. Not sure jf major
intersections will be as pedestrian and bicyvle friendly as they need to
be. Blocking the Mt Comfort intersection should have been done long
ago. It is dsngerous. The Gregg St intersection is dangerous for
pedestrians and uncomfortable for bicycles. The intersection at North
and Woolsley is not aligned with the sidewalk going south on
Woolsey. After crossing North St, walkers then have to cross
Woolsey to get on the only sidewalk on Woolsey. The traffic circle
idea at North and Hillside might work, however westbound traffic has
limited line of sight coming up the steep hill. Top considerations
should be slowing traffic and continuity of sidewalks so pedestrians
do not have to cross North St when sidewalks end.
Anonymous This is incredible! Lighting is always very appreciated, even when it's
11/10/2U21 U8:3U HIM just the 8-foot sidewalk section. I've had my bike light die mid -ride and
Page 10 of 40
North Street Corridor Improvements Questionnaire : Survey Report for 08 August 2018 to 15 December 2021
it's so nice to have the trail lighting to keep things safe. I would LOVE
to see something similar on Township at some point, too! With more
and more people getting e-bikes, I think the hills will be less
problematic and people will really be wanting to ride there more.
Township will make a great east -west thoroughfare for cyclists and
pedestrians. It's kind of scary to bike or walk there now because of
the lack of lighting and the fact that the sidewalk is not continuous
(and it abuts the road). Thank you, thank you, thank you for seeking
public input, and for making active transportation such an integral part
of growth plans. This is the best city EVER!!!!
Anonymous Some designs have previously shown a roundabout at north and
11/10/2021 09:11 PM mission, would support highly
Anonymous Great, but Needed west of Garland also, along Wedington
Anonymous The proposed design on question 3 that shows the direction of traffic
on North going from Gregg to Leverett going down to one lane seems
like it would increase traffic congestion. There are businesses that
require left turns from that direction of traffic that could be impacted,
and if not, those left turns would cause traffic on that section of the
road if people couldn't go around.
Anonymous Eliminating the extra lane between Gregg and Leverett is going to
11/11/2021 06:01 AM cause congestion due to left turns at Columbus House and
Fayetteville Funky Yard Sale. Parking on Gregg seems highly
unnecessary— parking for what?? If it's for the new apartment
complexes being built, they should be responsible for their own
parking rather than expecting the city to step in. A turn lane would be
nice to have but not overly necessary.
Anonymous Concerning the design of the sidewalk and trail from Leverett Ave. to
11/11/2021 07:13 AM Gregg Ave, this would be a traffic choke point as it is already terribly
congested. I drive this every single day and the traffic there is
absolutely terrible. I'm not sure why the study would conclude that it
wouldn't effect traffic as this area is already a choke point. If anything,
we need more lanes not fewer in this area.
Anonymous North from college to mission is quite a step grade, if possible, find
11/11/2021 alternate route to allow the option of lower grade travel.
Page 11 of 40
North Street Corridor Improvements Questionnaire : Survey Report for 08 August 2018 to 15 December 2021
Anonymous Concerned about damage/removal of existing trees. Also concerned
that the "green spaces" mentioned will not be of adequate size to
support street tree planting. It was mentioned that back of curb
sidewalks do not provide separation between pedestrians and
motorists, however, the best solution is to increase this space to
provide growing space for street trees. Light poles alone do not offer
the same feeling of protection.
Anonymous As has been the case in the past several ears, the City is FAR too
11/11/2021 07:54 AM focused on bicycles. It has become ridiculous. Yes, there definitely
needs to be improvements at Hillcrest Intersection (roundabout is
best option) and there needs to be a normal width sidewalk on North -
not an 8ft one that is to accommodate bikes. Neighbors are not being
consulted (other than these questionnaires). Not every neighborhood,
esp older established historic neighborhoods, believe that bike trails
bring value to the surrounding area.
Anonymous I think it's about time to increase walk ability and bike safety. Streets
11/11/2021 08:12 AM are too wide as is, causing people to ignore speed limits.
Anonymous I am disappointed that we aren't addressing the race for position that
occurs between Leverett and Greg going East. As two lane traffic
collapses to left and right turn only on Greg and one lane forward on
North. This is a constant location for road -rage as people jockey for
position and refuse to allow merging. Long lines in the middle lane as
local drivers know what is coming but others are left stranded and
force to drive to Wilson Park.:P I don't know the solution but
something like signing about police zipper merging could help. The
other issue is on North and College, going East. Where a long line of
cars going right or straight prevent anyone from entering the left turn
lane, which is empty. And Pollard Ave should have "no left turn sign"
where it meets North.
Anonymous Please continue the connection to the east sidewalk side of Mission
Ave. The termination point just short of Mission as drawn requires
multiple street crossings in an awkward manner. A drawing of the
extents of the Gregg Avenue Road diet would be needed in order to
provide any meaningful feedback.
Anonymous The proposed sidewalk on North between Gregg and College would
be better if it could be located on the same side of the street for the
length of the street. The road diet for Gregg Avenue between North
and Poplar would be better if a protected bike lane were included
Page 12 of 40
North Street Corridor Improvements Questionnaire : Survey Report for 08 August 2018 to 15 December 2021
instead of a parking lane between the sidewalk and the main vehicle
lanes.
Anonymous It all sounded great on the video! I like the roundabout to replace the
11/11/2021 01:11 PM stop sign and save the tree. Thank you for your work to keep the city
pedestrian friendly!
Anonymous Squeezing North to make space for a bike lane between Leverett and
11/11/2021 03:28 PM Gregg will cause more congestion. It's already backed up during my
daily commutes.
Anonymous I live off North and east of Garland. This plan will make walking that
11/11/2021 03:49 PM corridor so much more pleasant and feel safer. I just hope it can done
soon!
Anonymous I have concerns for North going to one lane west bound between
Gregg and levrett. Turning left into funky yard sale and Columbus
House Brewery will be difficult and stop traffic.
Anonymous The title of the project is somewhat misleading as this is a plan to
enhance pedestrian mobility. As an owner and operator of a motor
vehicle as means for a primary form of transportation, you can quit
wasting money on sidewalks and trails until the flow of traffic is
improved. Seriously the software used in our traffic light system has
to be compatible with Windows 98
Anonymous Street trees in (min 5' wide) planter strips should be included along
the entire length of the project. Also highly recommend narrowing
North St, travel lanes and including sidewalk on both sides of North
Street between Gregg and College Ave.
Anonymous We need more sidewalks and increased walkability on this section. I
strongly appreciate having separation between the road and a
sidewalk - when a sidewalk is immediately adjacent to a road with no
separation it feels sketchy and I am more on edge walking my dog.
Anonymous Any changes must be kept at an absolute minimum in the section on
11/12/2021 12:18 PM North St from College to Mission.
Page 13 of 40
North Street Corridor Improvements Questionnaire : Survey Report for 08 August 2018 to 15 December 2021
Anonymous This is an extremely dangerous design. Most car/bicycle/pedestrian
accidents happen at intersections. Having a totally separate trail for
bicycles/pedestrians is dangerous for pedestrians and gives the
impression that serious bicycle commuters are not allowed on the
road. Having to look out not only for oncoming traffic, but pedestrians
and bikes while turning left (as well as looking out for parked cars
which obscure visibility of the pedestrians) makes intersections and
left turns all the more dangerous, too many things to look out for. Bike
lanes next to on street car parking is a recipe for disaster.
Anonymous There is nothing in here for the improved intersection for North and
11/13/2021 01:14 PM College
Anonymous These are all great solutions that address the safety regarding
11/13/2021 10:39 PM pedestrian and vehicular interaction. However, a major concern is the
comfortability that citizens feel in using these civic projects. We need
to feel that we are in a safe environment when we are on these
sidewalks and trails. However, women specifically feel uneasy using
any of these amenities by themselves. A sense of comfort and safety
needs to be established through community based efforts rather than
infrastructural ones. As a woman, I would never feel safe using any of
these after dark. How is that being addressed?
Anonymous I have lived on North Street for 15 years, previously around the
corner on West Lakeridge for 10. There is little to no foot traffic on
this stretch of North. It is steep both ways from Hillcrest up and down.
It isn't because of no sidewalk, it is not walkable for the majority of
residents, save the occasional drunk college student walking home
from Dickson. Also, the question asks about the sidewalk and does
not mention the roundabout being proposed at North & Hillcrest - a
terrible solution. Few stop at the stop sign now, it is dangerous and a
roundabout will make it even more so for the residents that have to
exit on to North, either way. I am especially affected by this problem
at my home - 311 E. North. I would love to see numbers re: the
amount of foot traffic someone imagines will suddenly arise.
Anonymous The improvements at the intersection of Gregg and North are helpful,
but there are sidewalks on most of the south side of North, and the
East side of Gregg (even if there are not in good shape) Can we have
crosswalks on all four sides of this intersection? Can the sidewalk on
the S side of North be connected to the E side of this intersection?
The proposed redesign of Gregg is great: the sidewalk situation at
that corner and to the N & S, is pretty bad, with a forced mid -block
crossing on Gregg, mailboxes in the middle of narrow sidewalks, etc.
Page 14 of 40
North Street Corridor Improvements Questionnaire : Survey Report for 08 August 2018 to 15 December 2021
It would be nice if the work could extend south of North St, too,
repairing the damage inflicted on the sidewalk over the last 15 years.
Thanks
Anonymous Living on North street (615 W. North), anything to give more public
11/15/2021 09:35 AM access would be amazing. Thank you for the work you are doing. I
would be in favor of taking North down to 2 lanes for its entire length
to allow more trails and a green space divider.
Anonymous This is amazing! Great work!
11/15/2021 12:21 PM
Anonymous Thank you for improving this street!
Anonymous The city needs to stop removing lanes from full streets. I'd love to see
a trial but removing a lane from north street is not how to do it. Also
removing the turn offs at Wedington/north and Garland will only tie up
traffic more. Eastbound North needs a dedicated right turn to College.
Anonymous 1. Do not remove access to Oakland from North St. Drivers will start
congesting surrounding, narrow streets like Storer to access it. 2.
North St WB between Scull Creek trail crossing and Gregg needs 2
lanes. Folks making left turns into the brewery and yard sale will back
traffic up to Gregg/North. 3. North/Woolsey is going to be unsafe
having that trail cross to the south side of the road here. 4. 1 like the
idea of a turn lane on Gregg, but sidewalks are needed on both sides
of Gregg.
Anonymous I love all of this except the idea of parking on Gregg between North
and Poplar! Looking forward to seeing consistently improved
sidewalks from Mission all the way to Garland. Big improvement!
Anonymous I am 100% supportive for the foot and bike paths, but I don't feel the
project addresses auto traffic. North St. will remain a traffic choke
point from Mission to Gregg and continue to put more strain on
Township and Lafayette for east -west travel, which are the toughest
directs to move in the city.
Anonymous Not sure about the roundabout, maybe instead, more warning signs
11/15/2021 02:54 PM about the upcoming stop sign, but otherwise loving all of the
Page 15 of 40
North Street Corridor Improvements Questionnaire : Survey Report for 08 August 2018 to 15 December 2021
proposed sidewalk plans to help me utilize these streets as a
pedestrian.
Anonymous This is a much needed project for those of us that work and live in the
11/15/2021 04:15 PM area! Please consider starting right away.
Anonymous I don't think the roundabout is necessary. Remove the stops sides
11/15/2021 04:31 PM except for the side street.
Anonymous On the north street corridor from college to mission, I worry about
11/15/2021 04:49 PM taking up too much space from the homes that already have little to
no parking as is. I like the idea of a sidewalk but making it too big
could take away the homeowners parking spots.
Anonymous My main complaint about the current plan is the proposed roundabout
at the top of E. North St. The stop signs don't appear to cause any
issues as things are configured currently. I feel that it is attempting to
solve an issue that doesn't exist. Living on the mission side of the E
North St. hill, I am also curious about how much of the sidewalk's
footprint will come from narrowing the roadway or making use of the
existing right of ways. In general, I think that a narrow roadway on
North St. would encourage slower travel speeds. Everytime that I
brake to pull into my driveway or back out, I worry about someone
coming flying down the hill and not noticing how much slower I am
moving.
Anonymous Disappointed in the section from Gregg to College that the sidewalk is
not on the South side of the street. This is the side Wilson Park is on
and it seems like it would be safer for the folks living on the south
side of North. Or both sides could have sidewalks. This section is
neighborhood and not pedestrian friendly, and if this much work is
being completed let's do it all.
Anonymous 1) 1 very much support closing off that unnecessary cutthrough from
North St to Oakland. 2) 1 am happy to see that westbound North is
proposed to be reduced to one downhill lane approaching the
Greenway crosswalk. However, I wish that rather than a painted
median, the City would consider additional beautification features
such as a median of native shrubs and small plants. This road and
this trail section receive considerable motor and pedestrian traffic. It
would be a good look for the City - especially in this area. 3) I'm not
against road diets ... but is there a demand for parking in this area?
Page 16 of 40
North Street Corridor Improvements Questionnaire : Survey Report for 08 August 2018 to 15 December 2021
Will these spaces remain empty? If so, should on -street bike lanes be
considered rather than parallel parking?
Anonymous I get that the stop sign at the top of North st and Hillcrest isn't
working. But I don't see how a roundabout is necessarily going to
help either. Are there no other options? I used to livein that
neighborhood and loved it, except for the lack of adequate sidewalks
and that stop sign that most of the time gets ignored. Can we try out
a flashing stop sign sign or something like that before we go leveling
out people's yards? I feel like there's too much traffic up there for a
little roundabout.
Anonymous Both blocking off the old segment of Mt Comfort & removal of slip
11/15/2021 09:34 PM lanes at Garland intersection at the same time will lead to large traffic
backups that will not be able to be cleared efficiently at the current
traffic -prone signalized intersection. I would instead propose installing
pedestrian -triggerable hazard lights like those currently used on
campus, & at the Pedestrian crossing where the clabber creek trail
crosses Rupple at the cross walks of the slip lanes for the garland
intersection. I would also recommend speed bumps if allowed at the
entrance to the slip lanes , but Botz dots or a rough pattern ground
into the road surface could also suffice in getting the attention of the
driver to indicate they should slow down. This, combined with flashing
lights, should allow pedestrians to cross more safely while also not
reducing the vehicular throughout of the intersection. If this were to
be implemented, the old segment of Mt comfort could be removed
with no issue. Reducing westbound north street to 1 lane as it
approaches the intersection with Gregg, while well intentioned, is
short sighted. The 2 lanes there currently serves as extra capacity to
"hold" for lack of a better turn traffic that would instead back up onto
Gregg and North at their intersection. Reducing to 1 lane would also
make access for emergency vehicles more difficult, as in the current
configuration they can weave if they need to head westbound. If the
road was reduced to one lane, emergency vehicles would either have
to drive through the green space, drive into oncoming eastbound
traffic, or be stuck. To provide protection for the trail to be installed, I
would instead implement a concrete barrier that should be painted,
beautified, & tied into elements such as the lamps that will be
installed, similar to what is done to the trail that runs along the Rupple
road bridge over Hamestring Creek. This will provide the shielding for
the trail that is granted in the current plan by green space separation.
I do not believe implementing a road diet across Gregg ave to be
wise. However, I do believe that lane reduction could be done to its
intersection with North street as the 5 lanes are excessive. The right
turn lane that allows S bound Gregg traffic onto W bound north does
not see high enough traffic to justify an exclusive lane, and thus could
Page 17 of 40
North Street Corridor Improvements Questionnaire : Survey Report for 08 August 2018 to 15 December 2021
be converted to offer on -street parallel parking. My only complaint on
the proposed improvements on north street between Gregg and
college is that I believe reducing the width of the lanes of the current
2 lane configuration by the entrances to the VA complex could cause
problems with emergency vehicles. Otherwise, I think the intersection
improvements with college are excellent. I have no comments on the
segment of north street after the intersection with college. In some
closing thoughts, it must be recognized that North street, when
combined with wedington and mission, is a major E-W corridor for
vehicular traffic in Fayetteville. Making it less suitable for vehicular
traffic without a plan for the creation of an alternate E-W route with
adequate capacity is short sighted, and will shift traffic through
neighborhoods and exacerbate current traffic problems faced by the
city's 4-lane arterial network. I believe a compromise can be reached
through the recommendations I have promoted that will allow for
adequate protection for pedestrians while not reducing the efficiency
of the road's vehicular throughput.
Anonymous I would like to see a road diet on North Street between Gregg and
Garland. I see that there is a reduction in lane on westbound North
Street, but why not eastbound? I would prefer to see two travel lanes
and more space for trees or bikes. Also, I would like to see
streetlights on the entirety of this route. I recently moved to
Fayetteville and the thing I notice is how dark the city is. There are
very few streetlights and adding them (and trees!) helps with
economic development, safety, property values, and beauty.
Anonymous Gregg ave should provide green space between drive lanes and
sidewalk. It would provide more value than a turn lane. Mt comfort
and north intersection closure should remain open, that leg of mt
comfort reduces pressure on the intersection at garland and provides
better access to oak plaza than the proposed design. The proposed
plan appears to remove an enormous oak tree at hill rest and north,
which i find unnecessary and unacceptable.
Anonymous I'm wondering why the sidewalk on North near Mission is on the south
11/16/2021 08:08 F side of the road when the north side of the road has far fewer trees
that would be disturbed. But anyway --a sidewalk is essential. I have
walked this stretch and dodged traffic many times! Not cool.
Anonymous These changes are all needed and will benefit many. My husband
11/17/2021 04:59 AM bikes across North and uphill to Washington just above College, and
has to walk his bike on a grass lawn to be safe. This is crazy, and the
sidewalk there will be a big improvement. The other changes are all
Page 18 of 40
North Street Corridor Improvements Questionnaire : Survey Report for 08 August 2018 to 15 December 2021
well thought-out.
Anonymous I bike on my local errands and often use or cross North and the
11/17/2021 05:27 AM streets that intersect with it. I think all of the changes that you plan are
needed and will make life safer, not just for bikers and pedestrians
but for all.
Anonymous Please do not do the round -a -bout. It is not needed. Do not allow
11/17/2021 07:07 AM parking on this project. Some trail widths could be lessened when in
tight areas near trees. Add bosk of trees at the triangle land created
by closing street.
Anonymous With sections that have a wider sidewalk/trial section, ensure full
width carries through intersections.
Anonymous
Add more street trees whenever/wherever possible!
11 /17/2021 08:44 AM
Anonymous
Please think about an alternative to allowing parking on Gregg Ave.
11/17/2021 12:17 PM
The question and the illustration in the questionnaire is misleading
and does not show how parking would work. If it's parallel parking
forget it or if it's pull in to the spot and back out forget it. Too many
rises and blind spots on Gregg and no one does the speed limit.
Anonymous Desperately need more road capacity for automobiles. You're falling
11/17/2021 12:51 PM way behind.
Anonymous Not at all supportive of no. 3 & 5. It would be terrible for traffic to
11/17/2021 12:54 PM create a choke point by going to 1 lane at this particular intersection.
Anonymous All bike paths need to have strong dividers between them and cars.
11/17/2021 01:01 PM
Anonymous None!
Anonymous Traffic gets backed up severely during afternoon rush hour both at
11/17/202 north Street going east at the College intersection, and North Street
going west at the Gregg intersection. Something needs to be done
about that so we are not sitting through multiple lights. One fix at the
Page 19 of 40
North Street Corridor Improvements Questionnaire : Survey Report for 08 August 2018 to 15 December 2021
Gregg/North intersection is to not give so much turn lane stop light
time to the turnlane turning onto Gregg from North. I am in favor of
better sidewalks in this corridor but not reducing traffic lanes. I wish
we could continue the 4 lane for North all the way to at least College
street from Gregg. Ideally that 4 lane would go all the way to Mission
and then Mission be 4 lane all the way to Crossover. This would
create a 4 lane corridor from Crossover to Double Springs road
through the heart of Fayetteville which is badly wanted and needed.
Anonymous We really need to input a turning lane on North street. It is way over
11/17/2021 01:20 PM due and Fayetteville is growing to fast to ignore the issue of not
having one.
Anonymous Ramps for trail are not adequate at intersections Placing the trail on
11/17/2021 01:28 PM the opposite side of where people area too often Crossing at Woolsey
is dangerous
Anonymous Crosswalk on W. North St & Vanventer. There is not a safe cross-
walk to access Wilson Park after passing through the North and Greg
intersection.
Anonymous Going from 4 or 3 lanes to 2 or 3 makes no sense. Those of us on
the East side have no quick way to get across town.
Anonymous The light at college and north is stupid at night. It has no sensor or
doesn't see you when coming down to hill from mission.
Anonymous Inclusion of barriers between car lane and bike lane
11/17/2021 02:14 PM
Anonymous Please do not push for a roundabout at the intersection of Hillcrest
11/17/2021 02:17 PM and North. Hillcrest has very little traffic.
Anonymous Those roads are heavily trafficked. Doubtful any room for bicycle lane
but if so would like an area bikes are indicated to go
Anonymous I live at 243 e north st. This would take up a significant portion of my
11/17/202 property it appears. A simple sidewalk would be plenty due to how
narrow the road is currently. Also, absolutely no one will be riding
their bike up that hill. I'm an avid biker and I've only needed to learn
Page 20 of 40
North Street Corridor Improvements Questionnaire : Survey Report for 08 August 2018 to 15 December 2021
that lesson once. Also, the round about at hill crest seems like overkill
for that intersection.
Anonymous Lane Reconfiguration on Gregg Ave (North to Poplar): I can only
11/17/2021 02:29 PM guess that the proposed parking lane is in anticipation of additional
apartment/townhouses along Gregg. As a Wilson Park resident, I am
well aware of the amount of traffic flowing along this stretch
throughout the day and am concerned about reducing the street to
single lanes with a center turn lane. Also, which side of Gregg will the
sidewalk be installed? As for the improvement from College to
Mission - I do think we need sidewalks that are wide enough to
support pedestrians and scooters, but I'm uneasy about a roundabout
at the Hillcrest intersection. This is a treacherous intersection on a
good day, and I don't see how someone turning onto North can do so
safely UNLESS the roundabout is raised enough that traffic on North
are forced to slow down when driving over it - because they will.
Anonymous Overall, these designs are nice. However, a consistent sidewalk on
one or both sides of North from Gregg to College could be safer for
pedestrians, as they wouldn't have to cross North to get to the rest of
the sidewalk at Woolsey. A crossing a Woolsey would be valuable,
but the necessity of pedestrians to cross there to get to the rest of the
sidewalk seems cumbersome. Consistent sidewalks could also be
better for traffic congestion as drivers would not have to stop for
pedestrians crossing at Woolsey as often. A consistent sidewalk all
the way from Leverett to College on the south side of North could add
an additional transit option for pedestrians, as well as eliminate the
need for pedestrians to cross North to get to another sidewalk. This
would reduce overall pedestrian crossings on North, thus potentially
improving safety and traffic congestion. All in all, more uniformity
(sidewalks on both sides of North) could make the area more easily
accessible by pedestrians and create a more walkable, urban
streetscape. The Gregg Avenue reconfiguration seems nice. My only
concern is will reducing drive lanes from four to two increase traffic
congestion? Gregg is one of the few major streets running parallel
with College and as the city grows it is important for it to be able to
accommodate the likely increase in north -south traffic that comes with
that growth.
Anonymous Really need a turn lane at college and north street going west. It's
impossible to get thru this intersection because of traffic back ups.
People wait easily 3 light cycles as it is now. I love the trails but traffic
is only getting worst and no regard is given to this important east
west corridor.
Page 21 of 40
North Street Corridor Improvements Questionnaire : Survey Report for 08 August 2018 to 15 December 2021
Anonymous This needs to happen. Will connect more affordable housing with
walkability to key destinations! I live on North and hate walking with
my baby, it's so loud and so many accidents outside our house.
Anonymous My only comment is FOCUS ON a direct connection from Joyce to
11/17/2021 02:51 PM the express way!!!! Forget everything else around town!!! Joyce &
college intersection is FAR TOO CONGESTED @ several times of
the day! It's a living nightmare!!! Traffic gets backed up for nearly half
a mile down the road daily!!
Anonymous This city is ridiculous. Turning one of the only four lane roads in town
11/17/2021 03:08 PM into two in order to add a parking lane and sidewalk? Absolutely
absurd. There won't be anyone walking the street when everyone
moves outside of town where they can get from A to B without waiting
in traffic jams while not a soul is walking or riding a bicycle.
Anonymous At this time, immediate attention should be given to streets
11/17/2021 03:16 PM intersecting with North St. between Greg and College. There is on
dangerous intersection where shrubs are blocking a driver's view of
cars traveling north on North St. just south of Highland Ave.
Anonymous It's a mystery to me why city planners hope to encourage pedestrian
traffic on one of the major east -west arteries in the city, rather than in
inherently lower -traffic neighborhoods or on pedestrian/cycling trails. I
walk 10-15 miles per week in Fayetteville and always avoid heavily-
trafficed streets that are dominated by vehicular traffic. More noise,
more exhaust, more risk --who needs it? Taking the North Street
stretch from College to Mission as an example, why would anyone
choose to climb up and down that steep hill rather than using
Rebecca or Prospect. That's what I do. I really think that high altitude
planning like this is out of touch with how people actually move about
on foot and is wasteful of taxpayer's dollars. This project seems an
expensive boondogle that may make supporters feel warm and fuzzy,
but will be used relatively little and waste money that could better be
spent elsewhere. However, I don't expect anyone to listen. Once a
project reaches this stage, it will be implemented no matter what.
Anonymous A cross -walk across North street from the sidewalk side (North side)
across to Vandeventer would slow traffic and provide better crossing
opportunities for those headed to Wilson Park or campus from this
side of North. Thank you for considering our opinions!
Page 22 of 40
North Street Corridor Improvements Questionnaire : Survey Report for 08 August 2018 to 15 December 2021
Anonymous I think it is a bad idea to take Gregg from 4 lanes to two lanes and
don't see a need for street parking on Gregg. I think adding street
parking on Gregg will cause accidents and is potentially dangerous. I
also don't think a roundabout is needed at the intersection of College
and Hillcrest. That intersection works fine as is and doesn't need to
be messed with.
Anonymous I think North Street needs to be 4 lanes or 2 lanes with a turning lane
11/17/2021 03:44 PM until it hits College. I think Sycamore from Garland to Gregg also
needs to be 4 lanes. I also have concerns about feasibility of a
roundabout at North & Hillcrest.
Anonymous From College to Gregg, I wish there was a way for pedestrians to not
11/17/2021 03:53 PM need to cross the street to travel that length. Love the reconfiguration
of Gregg -- hope to see improvements all the way down that street
too. I cannot wait to get to use these. I would regularly bike and/or
walk down to businesses near the intersection of Garland and North,
but that stretch of North is incredibly unfun as a pedestrian currently.
I'll be glad to be one less car off the street!
Anonymous Keep up the good work!
11/17/2021
Anonymous The trail moving from one side of the street to the other seems like a
11/17/2021 04:36 PM hastle for pedestrians and motorists alike for having to cross North,
especially with how busy of a street it is.
Anonymous We have plenty of trails and other corridors that could be less costly
11/17/2021 04:40 PM to the city...
Anonymous Hillcrest resident. Currently drivers blow through the one stop sign at
11/17/2021 05:57 PM the top of the hill, which makes turning feel unsafe. Biggest priority is
creating a sidewalk/trail for anyone living on north street hill to get off
the hill.
Anonymous Don 't put parking on North and don't do the round -a -about. Leave
room for trees and reduce impacts to existing trees.
Anonymous More plants and lights on Leverett. That street is ugly
11/17/2021 06:28 PM
Page 23 of 40
North Street Corridor Improvements Questionnaire : Survey Report for 08 August 2018 to 15 December 2021
Anonymous North Street needs to be classified as a Major Arterial .
Anonymous Filling in the pot holes on the street is the improvement I'd like to see.
11/17/2021 06:58 PM Upkeep of streets are poor in this area.
Anonymous Why is this area even a focus when the west side has major traffic
11/17/2021 07:33 PM issues. Also, the light at North/College is a horrible design and should
have a designated right turning lane, that's an issue not the side walk.
Anonymous Gregg needs to be three lanes at least to Poplar. Maybe even to Elm.
11/17/2021 07:35 PM or Township. bigger sidewalks and parallel parking along that area
would help pedestrians, and a turn lane would make the street safer
overall.
Anonymous I am not in support of blocking off access to Mt Comfort road from
11/17/2021 07:47 PM north st. That access allows a lot of west bound traffic turning north
on garland to easily and efficiently avoid an already congested
intersection.
Anonymous Question 5 (Lane Reconfiguration): Though I love the idea of a way
to calm traffic and providing a middle lane, a parking lane (which
appears in the photo to be parallel parking) seems dangerous at the
current speed limit with only one lane of traffic going in one direction.
I also worry about the possibility of congestion having only 2 active
lanes. I most definitely support the sidewalks 100%.
Anonymous Need a right turn lane East bound at intersection of North St &
College Ave
Anonymous I believe the sidewalks along Mission would be a great improvement
but the roundabout at the top of Mission would likely cause more
confusion than the current setup.
Anonymous More bike space and real sidewalks on both sides of the street
Anonymous I would like to see the bike trail extended on North / Wedington all the
way from Mission to Sang avenue. Why is the sidewalk / trail ending
at Garland to the west rather than continuing on to Sang Avenue?
Page 24 of 40
North Street Corridor Improvements Questionnaire : Survey Report for 08 August 2018 to 15 December 2021
Thanks for all the hard work!
Anonymous Why does the trail crossing at Leverett narrow down? It should the
same width as the other crossings to provide plenty of safety to bikers
and pedestrians. Between Leverett and Gregg, North should only be
two lane with a center turn lane, start the right turn lane onto Gregg at
the same place as the left turn lane instead of having two full east
bound lanes from Leverett to Gregg. On the section between Garland
and Leverett have a tree planted median.
Anonymous I want there to be space for extra activities where appropriate but 1
11/17/2021 10:51 PM live near this area and I never see anyone really uses this for walking
around except near the trail where improvements could be used but
traffic in this area can be high during peak time and the week and
taking space away for walking that will hardly be used is not a good
use of money and will only make things worse for this area. I would
love for this City to be bike and walking friendly but it is not laid out in
a way that it can be in certain areas and just like the bike add in off
rolling hills is never used. I have never seen a biker in that space but
driving space was taken for it. Walkways and bike areas work well in
parts of the city and in this area it would be a waste of city money to
place there that I can guarantee will not be used. The area is not a
walking area most families are low income and while they do walk it's
not for the fun of it to enjoy the space and taking a lane away from
Gregg is not a good use that road is heavily tracked and needs all
lanes for driving it would lead to back ups and congestion everyday
but Sunday.
Anonymous As a cyclist, I am most concerned about the transitions around
intersections. It appears -in numerous places- that a cyclist is
expected to make a 30' turn within a 5' radius (?!) for instance while
going north on Leverett and then making a right (east) onto the trail?
Likewise simply going west across Leverett while on the trail: WHAT
IS THAT?? And what is the mangled mess at Woolsey going east
from Gregg to College? It seems that cyclists are expected to
dismount and walk around turn after turn while attempting to traverse
the "trail". This is already a problem in many places where the button
to halt traffic is inaccessible from a bike or on the wrong side of the
pole, or even the street in some places. It's like you want to *look
like' you're building bike infrastructure, but will end up wondering why
no one wants to use it. It would be like stopping and getting out of
your vehicle at every intersection, walking to the corner to push a
button for a stoplight, and then getting back in your car. I believe
people on bicycles (and scooters) need to go slowly at intersections,
but expecting them to get off and walk at every corner is going to
Page 25 of 40
North Street Corridor Improvements Questionnaire : Survey Report for 08 August 2018 to 15 December 2021
frustrate, and it will ultimately cause the rider to choose to be in the
road instead. People want to 'commute' on a bike.
Anonymous I know the city loves connectivity, but we have nicer wider sidewalks
11/18/2021 12:59 AM and bike trails than we do toads. With all the bad drivers in NWA do
more roundabouts make sense? Oh wait, this is Fayetteville where
we don't use common sense. Just like the city council tried to explain
to me we don't like larger lots and cul-de-sacs. But you won't find
smaller lots and less green space in the council members own places
of residence. Time to start voting new people in!
Anonymous North street already gets backed up with traffic everyday. The lane
11A8/2021 03:40 AM reconfiguration will only make it worse
Anonymous Thanks!
Anonymous The traffic is so bad along this road, especially going east on North
getting to college. I can not imagine that your plans would not include
fixing the traffic problems on this roads first especially with the rate
Fayetteville is growing.
Anonymous This town is getting more and more bikes. I think there needs to be a
11/18/2021 04:56 AM way for them to safely ride near every major road for accessibility and
to support our environmental futures.
Anonymous
For a very busy intersection like north and garland it would be nice to
11/18/2021 05:48 AM
have a tunnel for the multi use trail. Especially considering the trail
crosses diagonally. Could be similar to the one at the intersection of
8th and J in Bentonville. The extra room gained from removing the
right turn yield could provide the room for it.
Anonymous
Please quit making our city streets more dangerous by making them
11/18/2021 05:58 AM
more narrow.
Anonymous I don't see any major traffic issues on Gregg and don't understand
why we would disrupt that now for a turn lane
Anonymous I would prefer two lanes for traffic RATHER the parking lane on
11/18/2021 06:23 AM Gregg. Turn lane, however, will be VERY helpful.
Page 26 of 40
North Street Corridor Improvements Questionnaire : Survey Report for 08 August 2018 to 15 December 2021
Anonymous It's ridiculous to take away two lanes so that there can be a center
11A8/2021 06:30 AM turn lane and a PARKING lane!! It's already a narrow road. I do not
support this.
Anonymous I'm not an expert on pedestrian crossings, but I did used to live next
11/18/2021 06:35 AM to the Garland/North intersection and that crosswalk is not fun to
cross. The layout pictured is a massive upgrade, but to me, it seems
like the intersection needs more features to make it pedestrian
friendly. It needs all the help it can get.
Anonymous I am unable to gain sufficient information from the drawings provided
11/18/2021 06:58 AM to answer these questions.
Anonymous Adding parking on Gregg Avenue will make my morning commute
unusable, especially with how dense apartments are becoming along
the street.
Anonymous North and Garland: There is already not enough space in the
westbound North Ave lane to turn left/south on to Garland. This lane
regularly blocks westbound through traffic back to El Sabor
Guacamole restaurant. Gregg westbound to Poplar: Please don't use
on street parking to subsidize the awkward housing being built
between Gregg and the railroad track. Cars pulling in and out of
street parking will only make through travel more difficult, and Gregg
is supposed to be an artery, not a neighborhood street.
Anonymous Add a right turn lane on North Street at Gregg intersection. A
roundabout at Hillcrest is unnecessary.
Anonymous I don't think the roundabout is needed. A flashing stop sign or
something like that.
Anonymous Accommodating pedestrians on this side of town is absolutely
needed. As a student at U of A 20 years ago without a car and
walking from the intersection of Garland and North to Gulley Park
along North Street was a painful experience. I may do it again when
this is all completed. Thank you for all your work on this and all the
pedestrian infrastructure plans in town.
Page 27 of 40
North Street Corridor Improvements Questionnaire : Survey Report for 08 August 2018 to 15 December 2021
Anonymous North to Garland improvements: suggesting putting pedestrians on
the MOST traveled side of the road for cars -NO; putting the sidewalk
on the SOUTH side of the road would make more sense= LESS
roads/intersections to pay to change and LESS opportunity for
accidents in pedestrians crossing streets less traveled. Same goes
for Leverett to Gregg; move the sidewalk on the opposite side of the
road, LESS opportunity for Accidents just by number of driveways a
pedestrian would have to cross. And changing said driveways that
have the LESS amount of traffic flowing in and out of them makes
more sense than forcing people to walk in more dangerous
intersections. Drivers are NOT getting any more 'aware' of their
surroundings, this puts pedestrians at risk by putting them in harms
way more often. Gregg PARKING LANE?! Absolutely not. One of the
most traveled roads to bypass College Ave. and you want to take 2
lanes away and add parking-- for what? Parking for the Train Tracks?
And single family residential with private driveways? The *roads* are
meant to free up traffic and provide alternate routes to DIVERT traffic,
roads are not meant for PARKING and placing difficult traffic patterns
for drivers to navigate through. Putting parking on such a heavily
used intersection and stretch of road would be a mistake, because it
is better used as an extra lane to help with traffic flow. Good grief
please do not slim down Gregg! :'(
Anonymous Many of these areas need both a good side walk / trail, and more
drive lanes - not less. I'm glad that the city recognizes that something
needs done along this corridor, but sad that you have missed the
mark by so far. A round -about between college and mission is not the
answer. Especially where shown - this would cause more accidents
here, not less.
Anonymous The North - College intersection seems like its ripe for additional
work. East to West travel in Fayetteville is so difficult (as we all know).
Peak times North, Ash, Township & Rolling Hills are so bogged down.
It seems we need additional turn lanes coming down the hill on North,
going left & right & straight. (maybe that's in the plan and I missed it)
Anonymous The westbound lanes at the Garland Intersection have to be adjusted
because the 40mph speed can cause damage into the front end
bumper from the design of the street asphalt. You can see the
scratches if you go out there from the cars hitting it when driving
faster than 30mph. The Lindell Avenue connection to North Street to
be closed. It is close to the intersection and not a good place or
length to support for good left turn. Improve pedestrian and bicyclist
safety in the North street Leverett intersection especially provide a
blue light for blind people. Since this is a heavily used intersection
Page 28 of 40
North Street Corridor Improvements Questionnaire : Survey Report for 08 August 2018 to 15 December 2021
from the university students. Provide speed bumps approaching the
Scull Creek trail crossing to increase safety of pedestrians using the
crosswalk. If you want to increase pedestrian safety then make sure
you extend the south side sidewalk from scull creek trail towards
Gregg avenue in both sides of North Street. The city has to focus on
having sidewalks in both sides of the road. At the end of the day these
interventions are done once every couple of years and it is a great
opportunity to complete the work at once. Would the Gregg street
parking mean you close the 3 lane approaching North Street? That
would mean you have the left lane of Gregg on the intersection to
turn left and straight and the right lane to turn right? Is this being done
to help the real estate developers who have build to the maximum
square footage allocated for their building and the parking
requirements have been abandoned? That can be a good idea for
density, and maybe the street parking would shift the neighborhood to
somewhat of a walkable neighborhood. That would help more if 1 or
2 more bus stops would be added from the transit operators. The
section from Gregg to College has the opportunity to be way more
pedestrian friendly. The lanes are wider than usual. If the city has the
opportunity to provide sidewalks in the both sides of the street and
street lighting they can increase the pedestrian score and the
connection loop for walkability with the Wilson Park. At the same time
a speed bump is necessary and would help as you approach the
UAMS campus since there is pedestrian crossing because of the
parking and the residents around that areas. The replacement of the
stop sign at the North and Hillcrest intersection with a roundabout will
significantly improve traffic flow. I would love to provide more insight if
necessary. Ask Jonathan Curth for my contact Korab V
Anonymous Where are the bike lanes? Very frustrating to use infrastructure that
just abruptly ends without warning. The piece -meal manner in which
the bike lanes and Greenways are constructed throughout NWA
create a hazard for cyclists who have no warning when/where the
lane/paved trail ends.
Anonymous Bad idea to lessen traffic lanes on an already busy east west
thoroughfare. There are plenty of other trails for pedestrians to use
including the existing sidewalk.
Anonymous I like the addition of the mulit-use trail, but I'm interested to see how
many people will use it between College and Mission where the road
is very steep.
Anonymous There are a number of blind hills and blind drops on North running
Page 29 of 40
North Street Corridor Improvements Questionnaire : Survey Report for 08 August 2018 to 15 December 2021
11 '18/2021 09:38 Af\,, from Gregg to College. There has to be a measured and enforced
way to keep pedestrians safe when they are crossing the road on
Woolsey or anywhere else on that street. Lower park -area speed
limits could be a solution. Warning flashes with an activated sensor
for pedestrians attempting to cross could be another. It's not the
highest traffic area for folks on foot and on bikes but there must be
the proper precautions.
Anonymous I love the removal of the slip lanes on garland & north intersection. 1
11/18/2021 10:06 AM feel like I will get hit every time I walk there. Also I love the proposed
Gregg configuration. Having parked cars shielding pedestrians will be
much safer and hopefully calm traffic on that steep hill.
Anonymous North Street Improvements from College to Mission - I understand
that roundabouts act as a speed buffer but the massive hill there
does that as well. Just not sure what we gain. The expanded sidewalk
is very needed.
Anonymous As somebody that frequently walks and bikes as a mode of
transportation, I'm disappointed with the removal of the slip lanes at
North and Garland. This makes me feel less safe as I have lost my
refuge island separating the traffic movements conflicting with my
path of travel. It would be nice to instead see the slip lanes remain
and instead signalize them to make the crossing overall safer and
more comfortable. If the city is set on removing the slip lanes, please
also remove the right turn only lanes. The proposal as -is makes
things worse at the intersection. As somebody that also drives the
route, the rounabout (and current stop sign) at Hillcrest seems
unnecessary, as there is never any traffic on Hillcrest that would
seemingly justify it.
Anonymous Keep up the good work!
Anonymous Same old stuff we always see. Just don't make it look like Old Wire.
1 1 /18/2021 1 1 :18 AM
Anonymous Garland Avenue to Leverett Ave.: Hard lane dividers stick out way to
far in the intersection at Garland & North. Leverett Ave to Gregg Ave.:
Dropping westbound traffic to 1 lane is a BAD idea. That will greatly
reduce the flow of traffic. College Ave. to Mission: Looks nice. The
roundabout is a great idea to replace the stop sign.
Page 30 of 40
North Street Corridor Improvements Questionnaire : Survey Report for 08 August 2018 to 15 December 2021
Anonymous Traffic flow from the east side to the west side of Fayetteville is
horrendous, and while this plan does a lot to support non -vehicular
transportation, it also removes crucial second lanes that will inevitably
impede traffic flow. We need easier routes to go from east -west and
the removal of second lanes and expansion of infrastructure without
center turn lanes does not help the cause. I fully support sidewalk and
trail improvements across the city, but not at the expense of vehicular
flow.
Anonymous It would help if there are descriptions to the improvements to be made
11/18/2021 01:30 PM on each section. There is not even a legend provided. Leverett to
Gregg section is missing the sidewalk on the south side, in front of
housing. Sidewalk on the southside should be continuous from
Leverett to Gregg. College to Mission -- spending a lot of money for a
few houses there. Could use the money on College Ave to connect all
the fragmented sidewalk.
Anonymous I don't see many pedestrians electing to take North Street from
11/18/2021 01:38 PM College Ave to Mission; it's a very steep hill and there are less steep
streets to the south that would take them to the same place. I can't
imagine the need is big enough to justify adding a sidewalk on this
section of North St.
Anonymous No room for a roundabout at hill crest
11/18/2021 01:56 PM
Anonymous Please add more sidewalks and trails (especially if they are separated
11/18/2021 02:17 PM from the road). A major reason I don't walk/ride places is that it is not
safe nor pleasant.
Anonymous Please consider replacing the parking lane in the Gregg Avenue road
11/18/2021 02:20 PM diet reconfiguration with a protected bike line or a wider, more
noticeable bike lane . Please also consider creating raised
crosswalks or intersections.
Anonymous Stop with those wide sidewalks and back in parking spots
11/18/2021 06:59 PM
Anonymous I'm against all of these so called improvements. We don't need street
nnui2u�_ side parking, that's not an improvement. Who would be parking
there? Perhaps there's not enough parking for all the well to do
college students who are renting the expensive new townhouses
Page 31 of 40
North Street Corridor Improvements Questionnaire : Survey Report for 08 August 2018 to 15 December 2021
along Gregg. I now refer to Fayetteville as "Dallas East" and it is not a
compliment.
Anonymous With the expanding population density of the of the metroplex a road
11/18/2021 07:10 PM diet is contraindicated for getting traffic safely and efficiently through
town. Potential reducing first responders particularly if lanes are
blocked due to weather, wreck, ballgames, drive time, etc.. Bike
pedestrian friendly is supported. But not an either or situation. Road
diets like other fad diets are not are healthy and block our already
blocked traffic arteries.
Anonymous While I'm supportive of more trails, reducing the capacity of Gregg
11/18/2021 07:28 PM from four lanes to two seems like a terrible idea. Lots of folks, myself
included, use Gregg to avoid the congestion of College Ave.
Anonymous Gregg street lane sift is a disaster. No. Just absolutely no. Who even
thought this might be a good idea?!?!? NO.
Anonymous My family lives in Waneetah Heights and this is greatly needed. I do
think however that the roundabout is ambitious for the limited space
available. We'll have people plowing through the roundabout and
could be a safety issue for pedestrians on the sidewalk.
Anonymous Regarding the lane reconfiguration on Gregg Ave, I highly support a
road diet. However, what is needed is a cycle track. Currently there is
not need for on -road parking.
Anonymous Parking on Gregg is an awful idea at this point in time. Something like
that will add to traffic on college in the morning. Keep in mind the old
gas building is now full of University employees who frequently
commute from campus and use Gregg. They may shift and use the
already unsafe congested college avenue. As nice as it would be for
this to be a walkable city ... it won't be at the rate it is growing. In
addition, the lack of a light rail or paid city bus system really makes it
hard for those with mobility challenges to get places when you make
it harder to drive. Fayetteville is trying to be a safer city with less car
traffic and it can be but we have got to do it in the right order. Let's
look at public transportation and then eliminate roads ... or propose
both at the same time. Solutions are not meant to create more
problems.
Page 32 of 40
North Street Corridor Improvements Questionnaire : Survey Report for 08 August 2018 to 15 December 2021
Anonymous I have lived on Gregg, reducing the number of lanes between North
St and Township or even to Joyce Blvd would be a logistics
nightmare. Gregg is heavily used as a north/south corridor. Gregg
Ave needs to be 4 lanes with an additional center turn lane at the
intersection of Sycamore and Poplar. Add a sidewalk/trail similar that
on Old Wire between Township and Mission.
Anonymous We have needed more sidewalks in this area north of the U of A FOR
11/19/2021 05:02 AM YEARS!!!!! Do many U of A students, lower wage earning adults , and
children walking everywhere with NO SIDEWALKS!!!! Thank you
thank you. MOST needed also on Mount Comfort Road from N.
Addington to Garland!!!!
Anonymous Garland to Leverett: 1. Has there been an analysis/consideration on
11/19/2021 05:57 AM the impact of Westbound traffic on North St backing up and
preventing Eastbound traffic on North Ave from turning left on the
road between the Gyro restaurant and Sabor Guacamole? I'm
assuming so since there is a left turn lane. Is the length of the left turn
lane sufficient to prevent left turning traffic from backing up into the
through traffic lanes? Leverett to Gregg: I do not like the reduction to
one lane for the Westbound traffic. This seems like it could be a
serious issue for capacity. Is there enough capacity for the Eastbound
right turn lane at Gregg to justify a separate right turn lane? Could we
drop the right turn lane to gain an additional lane Westbound? It
seems like there is plenty of greenspace near the RR tracks to
accommodate the lane. There is also unused median space near the
trail crossing that could be utilized. Also prevents westbound traffic
from doing a lot of unnecessary shifting. As a cyclist, the sudden,
tight, curves at Leverett Ave would be a huge pain to navigate.
Please consider realigning this to be a straight crossing for the trail.
Gregg to College: Not a fan of requiring pedestrians to cross the road
at an unsignalized intersection or installing a HAWK signal unless it is
necessary. I would prefer sidewalks on both sides. Gregg Road Diet: I
while current use might be low, As Fayetteville continues to grow,
Gregg could continue to serve as a solid alternative route for traffic
starting or ending along College Ave. I know that I have personally
used Gregg for this purpose numerous times. I would hate to lose that
high capacity corridor. Also, what would the LOS on this road be once
the road diet was complete? Would we be going from an A to a C or
D? Is a road diet worth the reduction in LOS? College to Mission:
What does the trail tie-in to on the east end? Looks like nothing. How
do pedestrians from the North side of the corridor access the trail?
Build a box culvert tunnel at a straight grade from end to end. That'd
be pretty sweet. It'd be like 20 feet underground and expensive as all
get out, but it'd be pretty cool and might get some national
recognition.
Page 33 of 40
North Street Corridor Improvements Questionnaire : Survey Report for 08 August 2018 to 15 December 2021
Anonymous Making the road narrower is NOT an improvement. Improve the roads
not sidewalks. There isn't a good way to travel East-West in
Fayetteville. Obviously this plan won't fix that.
Anonymous For the Gregg St 'diet' I like all of it except for the addition of a parking
lane. With the way that people drive on that street, it seems primed
for a lot of accidents. Perhaps if it was reduced to 1 lane each way,
that would be improved, but I would much rather see sidewalks on
BOTH sides than so much space for parking.
Anonymous I live at 1309 W Wedington and ride my bike to work downtown.
There is not really a safe way for me to get to the trail from my house
currently because car traffic at North/Garland is incredibly dangerous
and not pedestrian/bike friendly. I hope that this work will make my
ride from my house to the trail much safer in the future. Thanks for
taking care of this!
Anonymous My only concern for reducing the section going west bound from
Gregg to Leverett to one lane is will it cause a bottleneck for vehicle
traffic. Otherwise, as someone who commutes by bike a lot, I'm glad
to see these improvements.
Anonymous This project doesn't do nearly enough to I'm price traffic or to improve
11/19/2021 08:20 AM bike access. This would be wasted money with no discernable long
term improvement
Anonymous I drive this route every day, and there are rarely bikers or walkers on
11/19/2021 08:40 AM this route. I'm frustrated that so much time and expense goes into
biking and walking trails with little improvement for vehicles. In fact,
the roads often get narrowed it seems in some of the places where
we've added a bike path. We need more multi -lane roads and
improvements in water culverts and drainage rather than bike paths
which only benefit less than 5% of the population. I'd love for there to
be usage studies published to the public on the sidewalks and bike
paths, and determine how much money we're investing in roads and
drainage vs sidewalks and bike paths.
Anonymous It is really unclear what the changes are in many cases, the design
maps have no key or description of what is changing. This makes a
call for public comment feel more like a box -ticking exercise than a
genuine attempt to get feedback. Do better.
Page 34 of 40
North Street Corridor Improvements Questionnaire : Survey Report for 08 August 2018 to 15 December 2021
Anonymous I have made a public comment to the planners and city council about
11/19/2021 08:58 AM this roundabout issue at Hillcrest and North. It doesn't solve any
safety concerns the residents in the area have.
Anonymous The roads are terrible, fix the roads then add sidewalks. I like the
11/19/2021 09:19 AM focus on improvements.
Anonymous Please continue to place more emphasis on pedestrians and bike
11/19/2021 09:20 AM traffic. Based off projected populations for our area we need to make
the city more navigable by bike or foot or we'll end up with a traffic
nightmare.
Anonymous
Is taking what works and replacing it with something costly and like
11/19/2021 09:53 AM
the trees that were planted on 71 b that then were removed???? If the
city wants to waste tax payers money start with short streets like E.
Lafayette that lacks sidewalks between Mission and Dogwood (frost
heave have sidewalk at a precarious angle).
Anonymous
Please consider sidewalks on both sides of the street from gregg to
college
Anonymous
Please don't make Gregg 2 lanes. We drive down it almost everyday
and traffic is always difficult.
Anonymous On -street parallel parking is dangerous.
11/19/2021 08:05 PM
Anonymous Please DO NOT reduce the number of traffic lanes on Gregg!
11/19/2021 11:01 PM
Anonymous You guys are dumb ... car traffic is not going to just vanish, so how are
you proposing to make the east/west vehicle movement any better.
And have you not studied the growth projections? Again, dumb.
Anonymous Some aspects of this plan are wonderful modifications of this street. I
uZU/ZUZ I un:uu , do have many concerns about certain aspects of these proposals.
The road between North Street and Mission is very steep and I
cannot see most pedestrians/bicyclists using that steep grade for
Page 35 of 40
North Street Corridor Improvements Questionnaire : Survey Report for 08 August 2018 to 15 December 2021
connectivity. There is already a proposed Razorback -Mission
connector that more easily connects these areas. The corner of North
and College is already congested and dangerous for not only
pedestrians but also vehicles. I do not agree with making a trail from
Gregg to Mission along North Streets, although sidewalks can be
helpful and practical along North Street for safety of residents that
would like to walk. I understand switching to the south side of North
Street for continuation of the trail between Woolsey and College, but
am concerned about the invasion of traffic for the homes along that
stretch of road. Along that span I would expect the city to preserve the
integrity of the historic stone wall bordering the private property at the
corner of North and Park. I would highly object to losing that wall, as
we are experiencing more and more of our city's historic footprint
being lost. As I have stated already, I do think that the proposed plan
between Gregg and Mission may be unnecessary and redundant, as
it echoes the Razorback -Mission connector. I am concerned that
traffic will increase in the north -south running streets that connect
North Street and Prospect between Gregg and College Avenue, thus
increasing crime and affecting children's safety in the Wilson Park
neighborhood. On the way to work this morning, I saw several
mailboxes on Gregg Street between North and Cleburn that have
been totally destroyed by apparent vandalism. This area is already
having difficulty with increased crime. Please think very hard about
protecting the residential areas between Gregg and College , and the
practicality of parallel routes only a few blocks apart. Thank you.
Anonymous I completely disagree with the "Road Diet" on Gregg between North
and Poplar. This appears to be proposed for the sole purpose of
providing parking for the horrendous apartments recently built and
currently being built on Gregg Street. This is a major corridor that
already has excessive traffic. If the city had been concerned about
traffic and parking access for these apartments, it should have never
approved the apartment plans in the first place. I do not want to have
a very slow and congested 2 lane road on this thoroughfare. These
apartments are already an eyesore for our city, for all to see.
Anonymous (1) The issue is the width of the parkway which needs to be wider all
over the City (Min. needs to be 6' clear so trees can be planted; 5'
clear is too narrow). Many tree species need more than 6'. Space can
be gained by placing the back of walk on the property line - this
allows more width in the parkway. Please do this whenever possible.
It looks like there is a missed opportunity to gain this space in the
entire improvement project. and the parkway is not large enough for
trees. (2) On -street parking on such an important east -west corridor is
not a good idea at all. Use the space for trees instead or for a wider
driving lane. More residents in Fayetteville will slow traffic without
Page 36 of 40
North Street Corridor Improvements Questionnaire : Survey Report for 08 August 2018 to 15 December 2021
making the drive lanes more narrow. (3) The same comments apply
to North St from Gregg to College. (4) Please inject pedestrian quality
of experience to these plans as well as function. This has been done
to a large degree - now the challenge is not to build the first diagram
but really look at what is needed to add trees in the future in the
parkway. Trees will also help hide some of the ugly, old development
that will not change for a while.
Anonymous Anything that helps take cars off the road helps.
11/20/2021 02:26 PM
Anonymous The crosswalk at the intersection of North and Woolsey is currently
dangerous and I suspect will still be dangerous unless there is a
speed bump or table at this crosswalk. I live on the South side of
North Street and regularly attempt to cross the street at this
intersection. When I push the button to cross, I can't tell if the lights
are blinking and I have no audial indicator that the lights are blinking.
Cars do not stop at this intersection even when I press the crosswalk
button, presumably because there is a blind hill going East on North
Street just prior to this crosswalk and people are frequently going
above the speed limit and don't see the lights in time to slow down for
pedestrians. This intersection is also quite dangerous for people
driving North on Woolsey due to bushes that make it difficult to see
Eastbound traffic on North Street. I would like to see a speedbump or
raised crosswalk at this intersection to slow the flow of traffic. Ideally,
I'd love to see a sidewalk on Southside stretch of North Street from
Gregg on up to College (we have lots of people that walk through our
yard and it is not safe so close to vehicles), but I understand this is a
tight and congested area. I plan on having kids here and am
concerned, however, with the safety of them walking places if there is
not a sidewalk on the South end of North Street. My nephew is also
small and it is difficult to even walk to Wilson park from our house
because there is no sidewalk on the South end of North Street near
our house. I'm happy to talk more if you're interested. My email is
Byers205@gmail.com. Thanks so much for making these
improvements. It's much needed. -Lee Byers
Anonymous I live at 233 W North St, in between Vandeventer and Woolsey on
North Street on the south side of the street. While I love the rest of
the plans to improve walkability, I notice there is no sidewalk
proposed for the south side of the street where I live. I would LOVE a
sidewalk on our side of the street and it seems that there is a good
amount of room to add this at least on our stretch of the road. It's a
little patchy and sidewalks start and stop all over. We have many
people walking through our bumpy yard all the time, making for a very
unsafe situation and it would improve their (and our) ability to walk
Page 37 of 40
North Street Corridor Improvements Questionnaire : Survey Report for 08 August 2018 to 15 December 2021
tremendously if there's a way to add it. I also find that, although the
speed limit says 25, no one goes that speed and in fact go upwards
to 50 mph down our stretch of the road sometimes. The current
crosswalk at Woolsey and North is difficult to use currently because
people do not slow down, even when the lights are flashing. I've
almost been hit countless times. I think speed humps and raised
crosswalks would improve this and make it much safer. I think any
way that the city can try to slow down drivers on North throughout the
entire route would improve safety and walkability. Again, if there's any
way to add sidewalks to our stretch of the street, it would be
incredibly helpful and I'd be happy to speak further about this with Mr.
Casey or whomever might be interested. It doesn't look like there are
any structures in the way of this, just some bushes here and there.
Thanks so much for all of the planning thus far and for asking our
opinion. I look forward to a safer, more walkable road. -Danny Baskin
Anonymous Too expensive. When we drive by road projects, there is seldom
anyone actually working. A lot of guys standing around talking.
Anonymous Continuous center turn lanes are a bad idea anywhere. Is on street
parking necessary on Gregg? Why not do a boulevard with trees to
slow traffic. Don't understand the reason for 3 lanes emptying on to
Gregg in one direction.
Anonymous
I live on Willow st. I look forward to there being a safe east west
corridor for bikes and pedestrians from mission to Gregg.
Anonymous
The crime around leverret and Gregg would not make walking a safe
option. Clean up the crime there and then it's more walkable
Anonymous
Really pleased to see the sidewalks, trails and bike lanes in the plan.
People avoid walking along North because it is dangerous and
unpleasant for pedestrians. Providing a safe non -car option will
reduce automobile traffic and help knit the city together.
Anonymous
I would prefer full sidewalks on both sides of the road. Having to cross
to continue on the sidewalk path in areas is a slight inconvenience
but also adds some risk by having to cross traffic.
Anonymous These changes will obstruct enormous amounts of traffic. Not a good
idea...
Page 38 of 40
North Street Corridor Improvements Questionnaire : Survey Report for 08 August 2018 to 15 December 2021
Anonymous Fix the traffic now before it gets out of hand. We are already straining
under the current traffic
Anonymous
Prioritize!
11 /22/2021 09:17 AM
Anonymous
I am not in favor of the proposed changes to the cross walk at North
11/22/2021 05:51 PM
St. and Woolsey. I own the property on the south west corner of the
intersection where the new proposed cross walk will take out a large
chunk of my front yard. The existing improved cross walk with the
blinking led lights is on the east side of Woolsey. The east side is
completely undeveloped at the intersection which would make it
much more favorable to acquiring the additional land needed to
create the widened crossing. In fact my corner is the only developed
corner of the entire intersection so it doesn't make any sense to use
the developed property and not use the undeveloped which already
has the North St. cross walk. My proposed change is to continue the
improved side walk on the north side of North St. across Woolsey to
the North East corner and then cross North St. at the existing cross
walk to the south side of North st. and continue on the new proposed
side walk east to Collage. in 1997 1 went before the planning
commission and was granted a conditional use permit to use my
property at 1041 N Woolsey as my residence and a photography
studio. Again In 1999 1 went before the planning commission and was
granted a change of zoning for my property at 1041 N Woolsey on
the south west corner of North and Woolsey to Limited Commercial in
a residential Area. Taking commercial property for the proposed side
walk instead of unimproved property doesn't make sense to me. I
look forward to discussing this with you at your convenience. You can
contact me at 479-283-5035 Terrell Rohrbach
Anonymous Queue length Eastbound at North/College is frequently too short. Car
will bypass the backed up right/through land traffic to get into the left
turn lane by veering into the oncoming lane. This coupled with the
sag in the road and the high speeds of vehicles travelling westbound
could lead to serious accidents. If the turn lanes along this
intersection are being narrowed to accommodate the trail, I'd prefer
that we didn't build the trail at all.
Anonymous
11/25/2021 02:05 AM
I think keeping design simple as possible is important for safety .
People get confused easy
Page 39 of 40
North Street Corridor Improvements Questionnaire : Survey Report for 08 August 2018 to 15 December 2021
Anonymous You should add a key to your maps that show different colors for
sidewalks, bike paths, bike lanes, etc.
Anonymous For College to Mission: I have concerns for the neighbors who have
11/30/2021 08:52 PM their yard cut into for this update when there's not enough evidence
that pedestrians will use this section. The hill is too steep for most.
Also not certain about the roundabout at the top of a hill, have never
seen this. I don't know if the FedEx trucks could even cut the curve of
the tiny roundabout. Will there still be a stop sign? Please do not do
anything to the tree at the top of the hill and do try other solutions so
that the neighbors are safe and whatever is done needs to think
about the housing values of the neighborhood. I'm just very skeptical
about this section, the only reasonable ask I see here is adding
another lane by college but then will there be more traffic since that
will make it easier to cut through?
Optional question (202 response(s), 139 skipped)
Question type: Essay Question
Page 40 of 40
Proposed 2022 Sidewalk Projects
x
11/10/2021 Sidewalk Ramps Drives Curb Pipe Drain Bx R. Wall R. Wall Street Need Eng
Ward Street From To Placement Type Length Width Each Each Feet Feet Each L Ft. Ht. Repair R/W Comments
17.5
21.6
NR
25.7
24.5
20.6
NR
NR
17.0
13.1
NR
NR
Const. Est. Material
Time Cost
1
Happy Hollow Rd.
Acacia Crossing
Fourth St.
West
New
1 950
6
1
4
950
950
6
0
0
950
Yes
Yes
Complete sidewalk connection.
74
$165,533
1
Hollywood Ave.
MLK Jr. Blvd.
Parnell Dr.
West
New
380
8
2
5
800
380
6
0
0
800
No
Yes
Complete sidewalk connection with curb and drainage
57
$112,710
2
Dickson St.
Arkansas Ave.
College Ave.
Both
Rep
250
8
10
5
350
0
0
0
0
0
No
Yes
Repair deteriorated areas of sidewalk and curbs
21
$63,853
2
Leverett Ave.
Sycamore St.
Hazel St.
West
Rep
1,600
8
3
17
1,850
0
3
0
0
1,850
Yes
Yes
Turn key contract project
0
$440,907
2
Lewis Ave.
Deane St.
Wedington Dr.
West
New
1,370
6
4
10
940
450
4
0
0
940
No
Yes
Fill gaps in sidewalk connection
73
$187,170
2
Mountain St.
West Ave.
School Ave.
South
Rep
300
8
21
1
0
0
0
0
0
0
No
No
Brick border and sidewalk in poor condition
6
$31,660
2
Spring St. (Phase 1)
West Ave.
Church Ave.
Both
Rep
350
8
9
7
200
0
0
0
0
200
No
Yes
Improve walkability in conjunction with lighting improvements.
25
$60,915
3
College Ave.
at
Sunbridge Dr.
East
Rep
100
10
1
2
100
0
0
0
0
100
No
Yes
Install pedestrian crossing with access ramps
7
$23,268
3
Old Missouri Rd.
Frazier Terrace
Stearns St.
West
New
650
8
2
5
690
400
4
0
0
690
No
Yes
Complete sidewalk connection
51
$127,431
4
Salem Rd.
Clearwood Dr.
Mt. Comfort Rd.
West
New
500
8
0
3
500
500
2
0
0
500
Yes
Yes
Complete sidewalk connection
36
$96,659
4
Vanike Dr.
at
Deane Solomon Rd.
Both
New
120
6
2
0
20
01
0
0
0
20
No
No
Install ramps, complete sidewalk
2
$9,468
Ramps / Maintenance
Various
Locations
Any
Rep
1,500
6
101
5
250
01
0
0
0
250
No
No
Repairs as needed
33
$130,193
8,070 46 64 6,650 2,680 25 0 0 6,300
Proposed 2023+ Sidewalk Projects
11/1012021 Sidewalk Ramps Drives Curb Pipe Drain Bx R. Wall R. Wall Street Need Eng
Ward Street From To Placement Type Length Width Each Each Feet Feet Each L Ft. Ht. Repair R/W Comments
25.3
24.5
22.6
26.1
25.6
22.6
22.6
23.0
NR
25.3
16.5
16.8
NR
385 $1,449,765
Const. Est. Material
Time Cost
2
Center St.
Gregg Ave.
School Ave.
Both
Rep
920
8
4
9
0
0
0
700
3
0
Yes
Yes
Replace deteriorated sidewalk
43
$155,888
2
Cleveland St.
Leverett Ave.
Whitham Ave.
North
New
300
6
3
4
300
150
1
0
0
300
No
Yes
Complete sidewalk connection
24
$51,704
2
Lindell Ave.
Douglas St.
Maple St.
East
Rep
500
6
2
1
0
0
0
250
3
0
No
Yes
Grade problems. Current sidewalk has steps.
13
$53,764
2
Lindell Ave.
Hughes St.
Cleveland St.
West
Gap
1,075
6
7
8
1,150
1,000
10
0
0
1,150
No
Yes
Fill gaps in sidewalk connection
106
$211,303
2
Oakland Ave.
Cleveland St.
Existing sidewalk
West
New
475
6
1
2
475
300
3
0
0
475
Yes
Yes
Complete sidewalk connection.
34
$76,729
2
Reagan St.
Arkansas Ave.
Gregg Ave.
South
Rep
450
81
2
3
450
0
0
0
0
450
No
No
Replace deteriorated sidewalk
18
$64,999
2
Rebecca St.
College Ave.
Mission Blvd.
North
New
2,260
6
9
9
2,260
950
10
200
4
2,260
Yes
Yes
Connect College Ave. to Mission Blvd.
140
$345,890
2
School Ave.
Spring St.
Center St.
West
Rep
680
8
8
5
680
0
3
0
0
680
No
No
Replace deteriorated sidewalk
42
$112,880
2
Spring St. (Phase 2)
Church Ave.
College Ave.
Both
Rep
300
8
7
5
150
0
0
0
0
150
No
Yes
Improve walkability in conjunction with lighting improvements.
19
$48,559
2
Watson St.
Campbell Ave.
Thompson Ave.
South
Rep
300
8
4
2
300
0
0
0
0
300
No
No
Replace deteriorated sidewalk
13
$43,799
3
Mission Blvd.
Winwood Dr.
Libby Ln.
North
New
225
8
1
1
0
100
1
120
8
0
No
Yes
Fill gap. Extend box culvert, Arpot R/W
17
$56,227
3
Mission Blvd.
Libby Ln.
Lisa Ln.
North
New
320
81
1
3
0
0
0
0
0
0
No
Yes
Fill gaps in sidewalk connection
10
$43,667
4
Salem Rd.
Fairfax St.
Wedington Dr.
Both
Rep
200
8
24
0
250
0
0
0
0
250
No
No
Install ADA access ramps
17
$30,557
8,005 73 52 6,015 2,500 28 1,270 18 6,015 493 $1,295,965
Superseg Desc & Street
From Street
To Street
Classification Text
Rehab Text
Forced Selection
Total Cost
Begin PCI
Post PCI if
Rehabbed
Post PCI
no Rehab
Length
Rehab
Group
1990 - RAY AVE
Local
EM+Thin Overlay 1.5-2.0
True
$29,057.00
61.7
92
60.3
1788.6
30
S RAY AVE
S RAY AVE
S RAY AVE
53.9
218.7
S RAY AVE
S RAY AVE
E 4TH ST
60.3
74.7
S RAY AVE
E 4TH ST
E HUNTSVILLE RD
63.5
1495.2
1340 -
Local
EM+Thin Overlay 1.5-2.0
True
$29,331.00
68.7
2
67
30
W ILA ST
N PARK AVE
N LINCOLN AVE
77.2
272.5
W ILA ST
N VANDEVENTER AVE
N WILSON AVE
55.1
476.7
W ILA ST
N SHADY AVE
N VANDEVENTER AVE
74.1
348.4
W ILA ST
N LINCOLN AVE
N SHADY AVE
77.1
424.3
4350 - CHARLESTON XING
Local
EM/FWM+Mod Overlay 2.0-3.0
True
$31,502.00
44.1
94
42.2
931.1
40
N CHARLESTON XING
EOP
E FREDRICKSBURG CIR
44.4
931.1
11600 - BEECHWOOD AVENEW-
Minor Arterial
EM+Thin Overlay 1.5-2.0
True
$58,685.00
59.6
92
57.3
2959.3
30
S BEECHWOOD AVE
W FARMINGTON ST
W CAPELLA ST
62.1
57
S BEECHWOOD AVE
W ARVADA LOOP
W BAUM DR
58.3
251
ROUNDABOUT
W 15TH ST
S BEECHWOOD AVE
53.2
30.9
S BEECHWOOD AVE
S BEECHWOOD AVE
ROUNDABOUT
54
65.4
W 15TH ST
W 15TH ST
ROUNDABOUT
53.2
74.9
S BEECHWOOD AVE
W BAUM DR
S BEECHWOOD AVE
59
769.1
S BEECHWOOD AVE
W BEECH PL
W ARVADA LOOP
64.3
483.1
S BEECHWOOD AVE
W CAPELLA ST
W PERIMETER DR
66.9
202.6
S BEECHWOOD AVE
W PERIMETER DR
W DIAMOND DR
58.9
92.9
S BEECHWOOD AVE
W SAN GABRIEL CIR
W BEECH PL
79.7
265.2
S BEECHWOOD AVE
W DIAMOND DR
S BEECHWOOD AVE
48.9
236.9
S BEECHWOOD AVE
S LEWIS AVE
W FARMINGTON ST
45.3
173
S BEECHWOOD AVE
S BEECHWOOD AVE
W LODGE WAY
54.3
257.3
12410 - HILL AVE
Minor Collector
EM+Thin Overlay 1.5-2.0
True
$127432.
51.4
987
30
S HILL AVE
W STONE ST
S HILL AVE
55
652.1
S HILL AVE
S HILL AVE
W MARTIN LUTHER KING JR BLVD
51
334.9
9640 - OAK BAILEY DR + Others
Minor Collector
Super Thin 3/4" Overlay+SP
True
$29,098.00
67.9
90
66.4
1924.5
20
N OAK BAILEY DR
N OLD WIRE RD
N STRAWBERRY DR
66.9
368.8
N OAK BAILEY DR
N OAK BAILEY DR
N WARWICK DR
73.3
312.7
N KATHERINE AVE
N OAK BAILEY DR
N WROXTON CT
58.3
585.1
N OAK BAILEY DR
N STRAWBERRY DR
N OAK BAILEY DR
76.2
365.2
N OAK BAILEY DR
N WARWICK DR
N KATHERINE AVE
74.8
242.5
N OAK BAILEY DR
N WARWICK DR
N WARWICK DR
79.2
50.2
11720 - BROOKS AVE + Others
Major Collector
EM+Thin Overlay 1.5-2.0
True
$48,974.00
67.8
92
66.3
2843.2
30
S GARLAND AVE
W PETTIGREW ST
W CATO SPRINGS RD
73.4
1048.1
S BROOKS AVE
W 15TH ST
W WALKER ST
63.5
436.6
S BROOKS AVE
W WALKER ST
S GARLAND AVE
63.8
656.4
S GARLAND AVE
W BOONE ST
S GARLAND AVE
67.1
440.6
S GARLAND AVE
W SUNCHASE CT
W PETTIGREW ST
79.4
103.3
S GARLAND AVE
S GARLAND AVE
W SUNCHASE CT
58.6
158.2
4720 - HUNTSVILLE RD + Others
Major Collector
EM+Thin Overlay 1.5-2.0
True
$35,776.00
65.3
92
63.8
1939.4
30
E HUNTSVILLE RD
ALLEY 399
S MASHBURN AVE
76
566
E HUNTSVILLE RD
S COMBS AVE
S WILLOW AVE
69.2
184.2
S MASHBURN AVE
E MARTIN LUTHER KING JR BLVD
E HUNTSVILLE RD
48.5
152.8
E HUNTSVILLE RD
S MILL AVE
ALLEY 267
68
549.7
E HUNTSVILLE RD
S BARTON AVE
S WOOD AVE
59.3
300.2
E HUNTSVILLE RD
S WOOD AVE
ALLEY 399
57.3
39.9
E HUNTSVILLE RD
S WILLOW AVE
S BARTON AVE
56.6
362.7
E HUNTSVILLE RD
ALLEY 267
S COMBS AVE
77.3
83.9
6190 - ROCK STNow-
Major Collector
EM+Thin Overlay 1.5-2.0
True
$9,151.00
84.3
92
83.2
549.3
30
E ROCK ST
ALLEY 119
S WASHINGTON AVE
84.3
215.5
E ROCK ST
S WASHINGTON AVE
S MILL AVE
79.3
114..2
E ROCK ST
S COLLEGE AVE
ALLEY 119
87.5
219.6
5750 - OAKS MANOR DR
Local
EM+Thin Overlay 1.5-2.0
True
$40,630.00
76
2002.4
30
E OAKS MANOR DR
E ROLLING HILLS DR
E GLENN LN
78.7
352.5
E OAKS MANOR DR
E BONNIE LN
N SHERYL AVE
76.1
1305.3
E OAKS MANOR DR
E GLENN LN
E BONNIE LN
80.1
344.6
2300 - ANSON ST+ Others
Local
EM+Thin Overlay 1.5-2.0
True
$47,021.00
63.7
92
62.3
2760.7
30
E ANSON ST
N RUTH AVE
EOP
58.7
693.7
E CLARK ST
EOP
N RUTH AVE
60.2
523.4
E CLARK ST
N RUTH AVE
N AINSWORTH AVE
4.5
599.5
E ANSON ST
EOP
N RUTH AVE
65.1
697
E CLARK ST
N AINSWORTH AVE
EOP
59.4
247.1
90170 - WEST AVE
Major Collector
EM/FWM+Mod Overlay 2.0-3.0
True
$45,961.00
32.5
94
30.4
1494.7
40
S WEST AVE
W MOUNTAIN ST
S WEST AVE
35.1
372.9
S WEST AVE
W SOUTH ST
W PRAIRIE ST
32.9
519.8
S WEST AVE
S WEST AVE
W SOUTH ST
31.6
602
12290 - SOUTH ST
Local
EM/FWM+Mod Overlay 2.0-3.0
True
$11,174.00
20
94
18.4
351.1
40
W SOUTH ST
S SCHOOL AVE
ALLEY 417
16.9
178.1
W SOUTH ST
ALLEY 417
S WEST AVE
23.6
173
12280 - GREGG AVE
Local
EM/FWM+Mod Overlay 2.0-3.0
True
$38,373.00
43.8
94
42
1887.8
40
S GREGG AVE
N GREGG AVE
S UNIVERSITY AVE
39.5
1578.4
S GREGG AVE
S UNIVERSITY AVE
W PRAIRIE ST
69.4
309.4
12320 - PRAIRIE ST + Othe
Local
EM/FWM+Mod Overlay 2.0-3.0
True
$41,819.00
60.6
94
59.2
1463.1
40
S GREGG AVE
W PRAIRIE ST
W MARTIN LUTHER KING JR BLVD
53.9
499
W PRAIRIE ST
S GREGG AVE
S GOVERNMENT AVE
36.7
67.5
W PRAIRIE ST
S GREGG AVE
S GREGG AVE
77.4
252.2
W PRAIRIE ST
ALLEY 417
S WEST AVE
69.2
160.7
W PRAIRIE ST
S SCHOOL AVE
ALLEY 417
47.7
188.4
W PRAIRIE ST
W PRAIRIE ST
S GREGG AVE
71.5
169.4
W PRAIRIE ST
S WEST AVE
W PRAIRIE ST
59
125.9
13840 - PROSPECT ST
Minor Collector
EM+Thin Overlay 1.5-2.0
True
$25,745.00
58.8
92
56.9
1564.8
30
W PROSPECT ST
N VANDEVENTER AVE
N W ILSON AVE
47.2
475.5
W PROSPECT ST
N PARK AVE
N WOOLSEY AVE
61
405.5
W PROSPECT ST
N WOOLSEY AVE
N VANDEVENTER AVE
66.5
683.8
10705 - CARDWELL LN
Local
FWM+Thick Overlay>2.0-3.0
True
$13,854.00
50
96
48.2
421.5
50
W CARDWELL LN
N RAZORBACK RD
N OLIVER AVE
50.3
421.5
6185 - MILL AVE
Major Collector
EM+Thin Overlay 1.5-2.0
True
$7,460.00
58.2
92
56.3
409.8
30
S MILL AVE
E ROCK ST
E SOUTH ST
58.5
409.8
4765 - WOOD AVE
Local
EM+Thin Overlay 1.5-2.0
True
$21,643.00
58.5
92
56.7
1443.8
30
S WOOD AVE
E MARTIN LUTHER KING JR BLVD
E 7TH ST
62
318.3
S WOOD AVE
E 7TH ST
E MCCLINTON ST
58
1125.5
10305 - MOUNT COMFORT RD
Local
EM+Thin Overlay 1.5-2.0
True
$17,979.00
62.7
92
61.4
1010.3
30
W MOUNT COMFORT RD
N GARLAND AVE
W JAMES ST
72
142.1
W MOUNT COMFORT RD
W JAMES ST
N ADDINGTON AVE
60.8
868.2
9845-SHADY AVE +OTHERS
Local
FWM+Thick Overlay>2.0-3.0
True
$43,104.00
49.8
96
48.1
1299.3
50
N SHADY AVE
W MAPLE ST
W ILA ST
50.7
323.2
N LINCOLN AVE
W MAPLE ST
W ILA ST
47.7
325.3
N SHADY AVE
W ILA ST
W LOUISE ST
48
320.5
N LINCOLN AVE
W ILA ST
W LOUISE ST
54.6
330.3
12900 - STADIUM DR + Others
Minor Collector
FWM+Thick Overlay >2.0-3.0 +SP
True
$69,881.00
36.8
96
34.9
1 .9
50
S STADIUM DR
W CARLSON DR
W MARTIN LUTHER KING JR BLVD
36.2
727.6
S STADIUM DR
W BULLDOG DR
W CARLSON DR
39.9
370.3
3900 - DICKSON ST + Others
Major Collector
EM/FWM+Mod Overlay 2.0-3.0
True
$125,525.00
56.6
94
54.7
3175.2
40
W DICKSON ST
W DICKSON ST
N POWERHOUSE AVE
48.1
133.8
W DICKSON ST
ALLEY 150
N CHURCH AVE
49.4
185.6
W DICKSON ST
N BLOCK AVE
N SAINT CHARLES AVE
72.2
91
W DICKSON ST
N HIGHLAND AVE
N EAST AVE
43.1
170.3
W DICKSON ST
N HIGHLAND AVE
ALLEY 21
42.6
111.4
W DICKSON ST
ALLEY 21
N COLLEGE AVE
53.1
234.1
W DICKSON ST
N EAST AVE
N BLOCK AVE
49.1
271.8
W DICKSON ST
N UNIVERSITY AVE
N ARKANSAS AVE
71.9
117.8
W DICKSON ST
N POWERHOUSE AVE
N UNIVERSITY AVE
51.9
426.5
W DICKSON ST
N WEST AVE
W DICKSON ST
78.1
215.7
W DICKSON ST
N SCHOOL AVE
N WEST AVE
57.3
367.9
W DICKSON ST
N SHIPLEY ALY
N SCHOOL AVE
67.8
184.8
W DICKSON ST
N LOCUST AVE
N CAMPBELL AVE
62.3
133.7
W DICKSON ST
N THOMPSON AVE
N LOCUST AVE
64.7
208.2
W DICKSON ST
N CHURCH AVE
N THOMPSON AVE
1
54.4
169.2
W DICKSON ST
N CAMPBELL AVE
N SHIPLEY ALY
75.1
36.8
W DICKSON ST
N SAINT CHARLES AVE
ALLEY 150
63.1
92.3
W DICKSON ST
W DICKSON ST
W DICKSON ST
39.3
24.3
2400 - APPLEBY RD
Minor Collector
EM/FWM+Mod Overlay 2.0-3.0 +SP
True
$121,878.00
56.1
511W
40
E APPLEBY RD
E JASON DR
E CYDNEE ST
58.7
453.1
E APPLEBY RD
E CYDNEE ST
E APPLEBY RD
56.9
502.9
E APPLEBY RD
E BISHOP DR
COUNTRY LN
43.3
97.8
E APPLEBY RD
COUNTRY LN
COUNTRY LN
46
180.4
E APPLEBY RD
COUNTRY LN
N FIESTA DR
50
430.8
E APPLEBY RD
N FIESTA DR
N WAYNE DR
57.8
148.2
E APPLEBY RD
E APPLEBY RD
E APPLEBY RD
60.9
329.5
E APPLEBY RD
N WAYNE DR
N MCKEE CIR
55.2
636.3
E APPLEBY RD
N MCKEE CIR
E APPLEBY RD
64.5
165.5
E APPLEBY RD
E APPLEBY RD
N COLLEGE AVE
60.3
206
8600 - DOUBLE SPRINGS RD
Minor Arterial
EM/FWM+Mod Overlay 2.0-3.0 +SP
True
$95,657.00
73.5
94
71.9
2207
40
N DOUBLE SPRINGS RD
W NICOLE LN
W WEDINGTON DR
1
1 53.6
1
336.8
N DOUBLE SPRINGS RD
W GREENS CHAPEL RD
W ABILENE DR
76
1025.1
N DOUBLE SPRINGS RD
W EL PASO DR
W COPPER RIDGE LN
76.2
383.6
N DOUBLE SPRINGS RD
W SUMTER DR
W EL PASO DR
75.1
35.9
N DOUBLE SPRINGS RD
W ABILENE DR
W SUMTER DR
78.3
348.1
N DOUBLE SPRINGS RD
W COPPER RIDGE LN
W NICOLE LN
78.8
177.5
3205 - MOUNTAIN ST
Major Collector
EM/FWM+Mod Overlay 2.0-3.0 +SP
True
$23,401.00
58.9
94
57
527.5
40
E MOUNTAIN ST
W MOUNTAIN ST
ALLEY 36
55.6
208
E MOUNTAIN ST
ALLEY 36
S COLLEGE AVE
62.1
319.5
13485 - LAFAYETTE ST
Major Collector
EM/FWM+Mod Overlay 2.0-3.0 +SP
True
$21,495.00
46.1
94
44
549.7
40
W LAFAYETTE ST
N GREGG AVE
ALLEY 624
49.4
1
274.8
W LAFAYETTE ST
ALLEY 624
N ARKANSAS AVE
43.3
274.9
13620 - MOUNT COMFORT RD
Major Collector
EM/FWM+Mod Overlay 2.0-3.0
True
$263,820.00
47.8
94
45.7
1 4588.1
40
W MOUNT COMFORT RD
N WOODLARK LN
N GOOSEBERRY LN
42.7
441.8
W MOUNT COMFORT RD
N SALEM RD
N RUFFLE RD
52.9
1430.3
W MOUNT COMFORT RD
N HATTERLY LN
N SALEM RD
49.8
684.1
W MOUNT COMFORT RD
N GOOSEBERRY LN
N KENSWICK AVE
44.9
409.8
W MOUNT COMFORT RD
N KENSWICK AVE
N HATTERLY LN
47.4
576.3
W MOUNT COMFORT RD
N RAVEN LN
N ELDERBERRY RD
49.9
248.5
W MOUNT COMFORT RD
N ELDERBERRY RD
N WOODLARK LN
44.1
797.3
10405 - OLD WIRE RD 111lF
Minor Arterial
EM/FWM+Mod Overlay 2.0-3.0
True
$40,315.00
58.9
94
56.8
1347.4
40
N OLD WIRE RD
N OAK BAILEY DR
N CROSSOVER RD
59.2
1347.4
10420 - OLD WIRE RD WC 87
Major Collector
EM/FWM+Mod Overlay 2.0-3.0 +SP
True
$71,689.00
47.6
94
45.5
4 .
1 40
N OLD WIRE RD
N OLD WIRE RD
N OLD WIRE RD
48
2490.3
4460 - GOFF FARM RD WC 170 + Others
Minor Collector
EM+Thin Overlay 1.5-2.0
True
$92,018.00
64.7
92
63.3
5059.3
30
E GOFF FARM RD
S RIVER MEADOWS DR
E GOFF FARM RD
53
212.1
E GOFF FARM RD
E GOFF FARM RD
E GOFF FARM RD
45.5
209.1
E GOFF FARM RD
S DEAD HORSE MOUNTAIN RD
S SPRINGLAKE DR
47.2
1828.1
E GOFF FARM RD
S SPRINGLAKE DR
E SPYGLASS HILL DR
77.1
1083.4
E GOFF FARM RD
E SPYGLASS HILL DR
S CHERRY HILLS DR
85.3
329.2
E GOFF FARM RD
S CHERRY HILLS DR
E SPYGLASS HILL DR
83.6
467.5
E GOFF FARM RD
E SPYGLASS HILL DR
S RIVER MEADOWS DR
79.1
1
532.1
S ROBERTS RD
E GOFF FARM RD
S ROBERTS RD
69.5
397.8
99995 - RAZORBACK RD
Minor Arterial
EM/FWM+Mod Overlay 2.0-3.0
True
$197,054.00
1
94
0
5219.9
40
S RAZORBACK RD
W MARTIN LUTHER KING JR BLVD
W INDIAN TRL
N/A
331.5
S RAZORBACK RD
W INDIAN TRL
S RAZORBACK RD
N/A
408.5
S RAZORBACK RD
S RAZORBACK RD
S RAZORBACK RD
N/A
640.7
S RAZORBACK RD
S RAZORBACK RD
S RAZORBACK RD
N/A
453.8
S RAZORBACK RD
S RAZORBACK RD
S RAZORBACK RD
N/A
283.9
S RAZORBACK RD
S RAZORBACK RD
W 15TH ST
N/A
321
S RAZORBACK RD
S RAZORBACK RD
S RAZORBACK RD
N/A
453.1
S RAZORBACK RD
S RAZORBACK RD
S RAZORBACK RD
N/A
640.5
S RAZORBACK RD
S RAZORBACK RD
W INDIAN TRL
N/A
408.9
S RAZORBACK RD
S RAZORBACK RD
S RAZORBACK RD
N/A
221.3
S RAZORBACK RD
S RAZORBACK RD
W BAUM DR
N/A
43.5
S RAZORBACK RD
W BAUM DR
S RAZORBACK RD
N/A
43.8
S RAZORBACK RD
S RAZORBACK RD
W BAUM DR
N/A
43.8
S RAZORBACK RD
W BAUM DR
S RAZORBACK RD
N/A
43.4
S RAZORBACK RD
S RAZORBACK RD
W ATHLETIC DR
N/A
40
S RAZORBACK RD
W ATHLETIC DR
S RAZORBACK RD
N/A
59.1
S RAZORBACK RD
S RAZORBACK RD
W ATHLETIC DR
N/A
59.1
S RAZORBACK RD
W ATHLETIC DR
S RAZORBACK RD
N/A
40.2
S RAZORBACK RD
S RAZORBACK RD
S RAZORBACK RD
N/A
310.7
S RAZORBACK RD
S RAZORBACK RD
S RAZORBACK RD
N/A
373.1
12425 - HOLLYWOOD AVE
Major Collector
EM/FWM+Mod Overlay 2.0-3.0
True
$38,126.00
94
40.9
1332
40
S HOLLYWOOD AVE
W PASADENA LNK
W PARNELL DR
1 47.1
1
446.1
11
S HOLLYWOOD AVE
S HOLLYWOOD AVE
W BEST WAY ST
82.8
75.4
S HOLLYWOOD AVE
W PARNELL DR
S HOLLYWOOD AVE
45.1
355.7
S HOLLYWOOD AVE
W MARTIN LUTHER KING JR BLVD
W PASADENA LINK
36.6
454.8
4000 - KATHERINE AVE
Minor Collector
EM+Thin Overlay 1.5-2.0
True
$53,782.00
67.2
92
65.7
2394.6
30
N KATHERINE AVE
N WARW ICK DR
E SHARON ST
76.2
640.1
N KATHERINE AVE
E FARR LN
N WARWICK DR
79.7
236.3
N KATHERINE AVE
E SHARON ST
E ELAINE AVE
75.5
303.6
N KATHERINE AVE
E CHARING CRS
E FARR LN
67
152.5
N KATHERINE AVE
EOP
N TARTAN WAY
53.8
443.6
N KATHERINE AVE
N TARTAN WAY
N OAK BAILEY DR
76.3
211.5
N KATHERINE AVE
N WROXTON CT
E CHARING CRS
52.4
407
10080- MCCONNELL AVE +Others
Minor Collector
FWM+Thick Overlay >2.0-3.0 +SP
True
$174,645.00
29.2
96
27.5
3 .3
50
N MCCONNELL AVE
W KNAPP ST
W BURR OAK DR
25.5
1709.4
N MCCONNELL AVE
W BURR OAK DR
W RED TIP DR
28.6
406
W DRAKE ST
N GARLAND AVE
N MCCONNELL AVE
36.2
837.2
N MCCONNELL AVE
W RED TIP DR
N MCCONNELL AVE
33.6
293
N MCCONNELL AVE
N MCCONNELL AVE
W DRAKE ST
33.1
293.7
10640 - PORTER RD
JJWMajor
Collector
EM/FWM+Mod Overlay 2.0-3.0 +SP
True
$103,134.00
50.7
94
48.6
3038.8
40
N PORTER RD
W CORNERSTONE PL
W MEGAN DR
48.2
342.4
N PORTER RD
W LAWSON ST
W CORNERSTONE PL
47.6
168.8
N PORTER RD
W MEGAN DR
W SKYLER DR
55.6
275.8
N PORTER RD
W SKYLER DR
W HOUSTON ST
50.1
508.1
N PORTER RD
W SYCAMORE ST
W DEANE ST
54.6
396.8
N PORTER RD
W WEDINGTON DR
W VALLEY DR
46.9
418.2
N PORTER RD
W HATFIELD ST
W HOLLY ST
37.5
358
N PORTER RD
W HOUSTON ST
W SYCAMORE ST
71.9
334.4
N PORTER RD
W HOLLY ST
W LAWSON ST
51.4
181.6
N PORTER RD
W VALLEY DR
W HATFIELD ST
27.8
54.6
11620 -15TH ST
Major Collector
EM/FWM+Mod Overlay 2.0-3.0 +SP
True
$39,738.00
52.3
94
50.4
1205.8
40
W 15TH ST
S DEBRIYN DR
W 15TH ST
50.2
332
W 15TH ST
S RAZORBACK RD
S DEBRIYN DR
54.2
795.5
W 15TH ST
W 15TH ST
ROUNDABOUT
48.7
78
11980 - STONE ST
Local
Super Thin 3/4" Overlay +SP
True
$7,649.00
72
90
70.6
354.8
20
W STONE ST
S EASTERN AVE
S LEWIS AVE
72.3
354.8
12660 - ROBERTS RD WC 170
Minor Collector
EM/FWM+Mod Overlay 2.0-3.0 +SP
True
$52,271.00
52.9
94
51
1 .3
40
S ROBERTS RD
E HUNTSVILLE RD
S ROBERTS RD
53.8
727.3
S ROBERTS RD
S ROBERTS RD
S ROBERTS RD
45.1
334.4
S ROBERTS RD
E EASTPOINT DR
S ROBERTS RD
58.1
136.5
S ROBERTS RD
S ROBERTS RD
E EASTPOINT DR
66.7
145.4
S ROBERTS RD
S ROBERTS RD
S ROBERTS RD
48
264.1
S ROBERTS RD
S ROBERTS RD
S ROBERTS RD
54.9
104.5
S ROBERTS RD
S ROBERTS RD
S SAG HARBOR AVE
82.1
63.1
13040 - APPLEBY RD
Minor Collector
EM/FWM+Mod Overlay 2.0-3.0 +SP
True
$43,555.00
53.5
94
51.7
1609
40
W APPLEBY RD
N QUAIL CREEK DR
N DORCHESTER DR
62.7
597.7
W APPLEBY RD
N DORCHESTER DR
W APPLEBY RD
53.7
438.6
W APPLEBY RD
N BOB YOUNKIN DR
N QUAIL CREEK DR
47.1
275.2
W APPLEBY RD
W APPLEBY RD
N GREGG AVE
42.6
297.5
8620 -DOUBLE SPRINGS
N DOUBLE SPRINGS RD
W LIMERICK WAY
W MESA ST
Minor Arterial
EM/FWM+Mod Overlay 2.0-3.0 +SP
True
$81,522.00
42.8
49.1
2103.3
117.2
40
N DOUBLE SPRINGS RD
W PERSIMMON ST
W GREENS CHAPEL RD
60.9
619.11
N DOUBLE SPRINGS RD
W MESA ST
W PERSIMMON ST
47.9
479.4
N DOUBLE SPRINGS RD
W SILVERTHORNE RD
W LIMERICK WAY
43.4
589.1
N DOUBLE SPRINGS RD
W DOT TIPTON RD
W SILVERTHONE RD
48.1
298.6
90080000651ER RD WC 411 1w
Major Collector
EM/FWM+Mod Overlay 2.0-3.0 +SP
True
$127,934.00
52
94
49.9
3541.4
40
S FINGER RD
W MARTIN LUTHER KING JR BLVD
S FINGER RD
62.3
344.3
S FINGER RD
S FINGER RD
S PLUMBEROSA DR
62.7
414.6
S FINGER RD
S PLUMBEROSA DR
W FINGER RD
49.6
2782.5
2385 - APPLEBY RD
Major Collector
PCC Localized Rhb
True
$74,984.00
61.2
85
60.1
1165.8
520
E APPLEBY RD
N NORTHHILLS BLVD
E JASON DR
64
484
E APPLEBY RD
N NORTHHILLS BLVD
N BOB YOUNKIN DR
59
681.8
10040 - MCMILLAN DR + Others
Local
Microsurface/Chip Seal
True
$23,268.00
80.1
88
79.1
2079.1
10
W MCMILLAN DR
N MARINONI DR
N PAM ANGUS DR
82
822.4
N MARINONI DR
W MCMILLAN DR
W WEDINGTON DR
80
211
N PAM ANGUS DR
EDP
W MCMILLAN DR
83.8
352.4
W MCMILLAN DR
N PAM ANGUS DR
N FUTRALL DR
76.3
693.3
7460 - VANIKE DR + Others
Local
Microsurface/Chip Seal
True
$59,728.00
80.1
88
79.1
5862.3
10
W TOPAZ DR
W TIGER EYE DR
N RAVEN LN
78.9
768.4
W TOPAZ DR
W VANIKE DR
W TIGER EYE DR
81.6
516.8
W VANIKE DR
N NEVERMORE LN
W TOPAZ DR
84.3
380.6
W VANIKE DR
W TOPAZ DR
EOP
67.1
225.2
N NEVERMORE LN
W VANIKE DR
EOP
85.8
118.9
N VERONA LN
W MIRAMAR DR
W VERONA LN
84.7
812.1
N AZURE AVE
W MIRAMAR DR
W IKA LN
86.1
564.3
W VERONA LN
N BENTLEY RDG
W IKA LN
79.6
623.5
W MIRAMAR DR
N BENTLEY RDG
N AZURE AVE
82.4
369.1
W MIRAMAR DR
N AZURE AVE
N VERONA LN
77.7
346.1
N BENTLEY RDG
W MIRAMAR DR
W IKA LN
79.8
551.1
N BENTLEY RDG
W IKA LN
W VERONA LN
80.4
288.8
W MIRAMAR DR
N VERONA LN
N RAVEN LN
72.3
297.4
7580 - DOWNS AVE + Others
Local
Microsurface/Chip Seal
True
$40,208.00
80.4
88
79.4
4036.1
10
W CRYSTAL DR
N SALEM RD
N HAY MEADOWS AVE
85.4
169.1
N HAY MEADOWS AVE
W CRYSTAL DR
W GROUSE RD
77
78.6
W GROUSE RD
N HAY MEADOWS AVE
N DOWNS AVE
79.2
266.6
W BENTGRASS RD
N SALEM RD
N HAY MEADOWS AVE
85.7
168.9
N HAY MEADOWS AVE
W BENTGRASS RD
W CRYSTAL DR
79.2
556.1
W SWEETGRASS RD
N DOWNS AVE
N BERMUDA AVE
81.5
429.2
N HAY MEADOWS AVE
W MARSH ST
W BENTGRASS RD
80.2
88.3
W MARSH ST
N HAY MEADOWS AVE
N DOWNS AVE
84.8
263.6
W MARSH ST
N DOWNS AVE
N BERMUDA AVE
81.1
422.2
N BERMUDA AVE
W MARSH ST
W SWEETGRASS RD
83.6
457.8
N BERMUDA AVE
W SWEETGRASS RD
W GROUSE RD
84.2
277.7
N DOWNS AVE
W MARSH ST
W SWEETGRASS RD
77.8
470.8
N DOWNS AVE
W SWEETGRASS RD
W GROUSE RD
68.5
278.3
N DOWNS AVE
EOP
W MARSH ST
80
108.9
8240 - HOSTA DR + Others
Local
Microsurface/Chip Seal
True
$71,143.00
80.1
88
79.1
6396.5
10
W MORNING MIST DR
N HOSTA DR
N SILK ROSE AVE
73
315.8
N HOSTA DR
W MORNING MIST DR
EOP
83
463.2
N HOSTA DR
W MOUNT COMFORT RD
W WATER LILLY CT
83.1
240.6
W WATER LILLY CT
EDP
N HOSTA DR
68.3
205.2
N HOSTA DR
W WATER LILLY CT
N CONEFLOWER PL
84.4
354.1
W CONEFLOWER PL
EDP
N HOSTA DR
62
207.9
N HOSTA DR
W CONEFLOWER PL
W BLUE MIST CT
86.7
314.3
W BLUE MIST CT
EOP
N HOSTA DR
78.7
200.5
N HOSTA DR
W BLUE MIST CT
W MORNING MIST DR
89
330.3
N MONTANA AVE
N MONTANA AVE
W SILVERMIST PL
84.9
172.9
N MONTANA AVE
W SILVERMIST PL
W WYOMING DR
82.6
307.1
N MONTANA AVE
W WYOMING DR
W TUPELO WAY
77.6
210.2
N MONTANA AVE
W TUPELO WAY
W MORNING MIST DR
79.8
442.8
W SILVERMIST PL
EOP
N MONTANA AVE
85.9
326.3
W SILVERMIST PL
N MONTANA AVE
N CORNWALL AVE
83.5
304.5
N CORNWALL AVE
W SILVERMIST PL
W TUPELO WAY
83
466.9
W WYOMING DR
EOP
N MONTANA AVE
82.2
322.1
W TUPELO WAY
N MONTANA AVE
N CORNWALL AVE
78.9
365.E
N SILK ROSE AVE
EDP
W MORNING MIST DR
79.3
529.2
W MORNING MIST DR
N SILK ROSE AVE
N MONTANA AVE
74.7
317
$2,753,189.00 101400.5
19.2 MILES
Superseg Desc & Street
From Street
To Street
Classification Text
Rehab Text
Forced Selection
Total Cost
Begin PCI
Post PCI if
Rehabbed
Post PCI
no Rehab
Length
Rehab
Group
10065 - TAHOE PL
Local
EM/FWM+Mod Overlay 2.0-3.0 +SP
False
$17,711.43
50
94
48.3
287.5
40
N TAHOE PL
W WEDINGTON DR
PUBLIC 1180
50
287.5
1080-ALLEY 13
Alley
FWM+Thick Overlay >2.0-3.0 +SP
False
$8,412.16
28.5
96
27
494.7
50
ALLEY 13
E MAPLE ST
E DAVIDSON ST
30.5
494.7
11160 - TIMBERLINE DR + Others
Local
EM/FWM+Mod Overlay 2.0-3.0 +SP
False
$92,234.01
53.3
94
51.5
2294.4
40
N TIMBERLINE DR
N SALEM RD
N COLORADO DR
63.5
139.1
N TIMBERLINE DR
W ANNE ST
W WOODFIELD WAY
53
265.9
N TIMBERRIDGE CT
N TIMBERLINE DR
EOP
46.4
313.5
N TIMBERLINE DR
N COLORADO DR
W ANNE ST
59.4
427.4
N TIMBERLINE DR
W WOODFIELD WAY
N TIMBERRIDGE CT
57.3
295.2
N WEATHERWOOD CT
EOP
W ANNE ST
61
231.6
N TIMBERLINE DR
N TIMBERRIDGE CT
W OAKFIELD ST
47.1
329.2
W ANNE ST
N WEATHERWOOD CT
N TIMBERLINE DR
60.9
292.5
11780 - BULLDOG BLVD + Others
Local
EM/FWM+Mod Overlay 2.0-3.0 +SP
False
$74,524.78
51.1
94
49.3
2050.6
40
W BULLDOG BLVD
W BULLDOG BLVD
S STADIUM DR
53.7
348.3
W BULLDOG BLVD
S BUCHANAN AVE
W BULLDOG BLVD
52.4
650.8
S BUCHANAN AVE
W BULLDOG BLVD
S DUNCAN AVE
54.7
950.2
S DUNCAN AVE
S DUNCAN AVE
W MARTIN LUTHER KING JR BLVD
40.3
101.3
11860 - CENTENNIAL PARK LN + Others
Local
Super Thin 3/4" Overlay +SP
False
$23,596.78
70.5
90
69.1
1432.E
20
W SCOTTSWOOD PL
ALLEY 2900
EOP
79.5
81.3
S GREEN POINT TRCE
W OLD FARMINGTON RD
EOP
72.6
432
W SCOTTSWOOD PL
W OLD FARMINGTON RD
ALLEY 2900
82.1
176
S MOUNT MILLSAP LN
EOP
EOP
65.4
743.3
1200 - ALLEY 172
Alley
EM+Thin Overlay 1.5-2.0
False
$2,606.78
60.5
92
59.2
253.9
30
ALLEY 172
N WASHINGTON AVE
N TRENT AVE
62.1
253.9
12000 - CUNNINGHAM LN + Others
Local
EM/FWM+Mod Overlay 2.0-3.0 +SP
False
$15,532.55
51.1
94
49.3
711.7
40
S JARNAGAN ST
S JARNAGAN ST
E HUNTSVILLE RD
66.2
353.4
S CUNNINGHAM LN
S CUNNINGHAM LN
E HUNTSVILLE RD
41.8
358.3
12120 - DUNN AVE + Others
Local
EM/FWM+Mod Overlay 2.0-3.0 +SP
False
$77,222.97
51.6
94
49.8
2166.5
40
S LT COL LEROY POND AVE
PUBLIC 987
W NATIONAL ST
44.2
35.3
W 11TH ST
S SCHOOL AVE
W 11TH ST
64.5
172.6
W NATIONAL ST
S DUNN AVE
S LT COL LEROY POND AVE
47.8
248
S DUNN AVE
W 11TH ST
W 13TH ST
56
685.9
W 11TH ST
W 11TH ST
S WEST AVE
69.1
201.4
W 11TH ST
S WEST AVE
S DUNN AVE
63
357.5
S DUNN AVE
W NATIONAL ST
W 11TH ST
39.8
465.8
12220 - MITCHELL ST+Others
Local
FWM+Thick Overlay >2.0-3.0 +SP
False
$68,354.16
29.9
96
28.3
1448.1
50
S GABBARD DR
W MITCHELL ST
W KAYWOOD LN
38.3
242.6
S GABBARD DR
W KAYWOOD LN
EOP
29.5
149
W MITCHELL ST
S PHILLIP DR
S SANG AVE
52.7
216.7
S LEWIS AVE
W STONE ST
W MITCHELL ST
25.9
573.3
W KAYWOOD LN
EOP
S GABBARD DR
24.4
266.5
13860 - RIDGEWAY DR
Local
EM/FWM+Mod Overlay 2.0-3.0 +SP
False
$42,745.56
52
94
50.2
1807.7
40
W RIDGEWAY DR
N CRESTWOOD DR
E RIDGEWAY DR
63.1
519.2
W RIDGEWAY DR
N VIEWPOINT DR
N CRESTWOOD DR
50.8
1288.5
1620 - ALLEY 624
Alley
EM+Thin Overlay 1.5-2.0
False
$1,888.32
61.6
92
60.3
294.3
30
ALLEY 624
W LAFAYETTE ST
W REAGAN ST
63.2
294.3
1660 - ALLEY 697
Alley
ACP Full Depth Reconstruction
False
$35,059.50
11.4
100
10.3
371
70
ALLEY 697
E DOGWOOD LN
EOP
12.6
371
1960-WILLOW AVE +Others
Local
EM/FWM+Mod Overlay 2.0-3.0+SP
False
$56,656.27
50
94
48.3
2229.5
40
S WILLOW AVE
S WALKER RD
E HUNTSVILLE RD
53.5
170.2
S COMBS AVE
E HUNTSVILLE RD
E 4TH ST
46.7
572.8
S WASHINGTON AVE
E SOUTH ST
E 4TH ST
41.7
553.3
E 4TH ST
S WASHINGTON AVE
S COMBS AVE
62.7
192.4
E 4TH ST
S COMBS AVE
S WILLOW AVE
66
167.9
S WILLOW AVE
E ROCK ST
S WALKER RD
57
572.9
2020 - 9TH ST
Local
PCC Mod Pnl Rep <20%
False
$35,066.00
53.2
90
52
337.7
540
E 9TH ST
S COLLEGE AVE
S WASHINGTON AVE
1 54.6
337.7
2060 - HILLCREST AVE
Local
EM/FWM+Mod Overlay 2.0-3.0 +SP
False
$40,260.55
53.3
94
51.5
1408.2
40
N HILLCREST AVE
E ASHBIER DR
E WOODCREST DR
45.3
399.6
N HILLCREST AVE
E WOODCREST DR
E NATURAL WAY
51.5
600
N HILLCRESTAVE
EOAKWOOD ST
EASHBIER DR
72.6
408.6
2080 - ABSHIER DR
Local
EM/FWM+Mad Overlay 2.0-3.0 +SP
False
$13,764.63
53.3
94
51.6
536.3
40
E ASHBIER DR
E NOBLE LN
N HILLCREST AVE
55.3
536.3
2340 T+Others
m
Local
EM/FWM+Mod Overlay 2.0-3.0+SP
False
$130,449.55
52.2
94
50.4
3798.9
40
E APPLEBURY DR
E HOPE ST
EOP
34.9
311.5
E HOPE ST
N KINGS DR
N EASTWOOD DR
48.9
406.5
N EASTWOOD DR
E HOPE ST
E MISSION BLVD
57.1
691.2
E COLUMBUS PL
E COLUMBUS BLVD
EOP
57
440.1
E HOPE ST
N EASTWOOD DR
E APPLEBURY DR
55.1
1491
E COLUMBUS BLVD
E COLUMBUS PL
N EASTWOOD DR
64.1
458.6
2560 - CLEBURN ST + Others
Local
EM/FWM+Mod Overlay 2.0-3.0 +SP
False
$52,712.99
50.7
4
48.9
2285.4
40
E BAXTER LN
N WILLOW AVE
EOP
38
790.1
E CLEBURN ST
N WILLOW AVE
N FRITZ DR
48.5
404.9
N WILLOW AVE
E CLEBURN ST
E BAXTER LN
51.5
303.3
E CLEBURN ST
N COLLEGE AVE
N WILLOW AVE
67.8
787.1
3120-CAROLYN DR+Others
Local
EM/FWM+Mod Overlay 2.0-3.0+SP
False
$50,731.34
50jjjj�48.2
1718.2
40
E CAROLYN DR
N LUNSFORD AVE
N CAROLYN DR
54.3
664.9
N CAROLYN DR
E CAROLYN DR
E HAMMOND ST
52.3
452.6
E VIEWPOINT DR
N VIEWPOINT DR
E MISSION BLVD
50.1
600.7
3280 - ROCK ST + Others
Local
EM/FWM+Mod Overlay 2.0-3.0 +SP
False
$74,599.91
53.7
94
51.9
E ROCK ST
S EAST AVE
ALLEY 36
74.7
199.7
W ROCK ST
S BLOCK AVE
S CHURCH AVE
39.3
370.4
W ROCK ST
S EAST AVE
S BLOCK AVE
75.2
270.6
E ROCK ST
S WILLOW AVE
S WALKER RD
49.3
894.4
E ROCK ST
S WALKER RD
S KNERR DR
60.2
812.4
E ROCK ST
ALLEY 36
S COLLEGE AVE
58.3
304.1
4120 - EMERSON LN +
Local
EM/FWM+Mod Overlay 2.0-3.0 +SP
False
ENKA
N THOREAU LN
E EMERSON LN
E BRYAN LN
45.8
224.6
E EMERSON LN
N MISSION BLVD
N THOREAU LN
57.9
519.4
N WOODLAWN DR
E ROCKWOOD TRL
E WOODLAWN DR
50.7
461.4
4420-SHILOH DR+Others
N SHILOH DR
PUBLIC 3887
E JOYCE BLVD
MENwi_
EM/FWM+Mod Overlay 2.0-3.0+SP
False
56.6
52
371.7
N SHILOH DR
E JOYCE BLVD
E GEORGETOWNE SQUARE DR
28.9
476.2
N SHILOH DR
E GEORGETOWNE SQUARE DR
EOP
49.2
390.2
N SHILOH DR
EOP
PUBLIC 3887
75.4
756.5
E GEORGETOWNE SQUARE DR
N SHILOH DR
N COLLEGE AVE
83.6
103.3
PUBLIC 3887
N SHILOH DR
N COLLEGE AVE
39.3
96.7
5520 - MEADOWCLIFF DR
Local
PCC Mod Pnl Rep <20 %
False
$44,249.91
51.2
90
50
293.9
540
E MEADOWCLIFF DR
N ELIZABETH AVE
N CENTERWOOD RD
52.6
293.9
5760 - #N/A
Local
EM/FWM+Mod Overlay 2.0-3.0 +SP
False
$64,461.65
50.8
94
49
2445.4
40
N HILLCRESTAVE
E NORTH ST
E OAKWOOD ST
45.4
541.4
N WASHINGTON AVE
E NORTH ST
E OAKWOOD, ST
53
534
N WANEETAH AVE
E NORTH ST
E OAKWOOO ST
52.5
540.6
E OAKWOOD ST
N HILLCREST AVE
W LAKERIDGE DR
61.3
348.5
W LAKERIDGE DR
E NORTH ST
E OAKWOOD ST
56.9
480.9
6140 - RIDGEWAY DR + Others
Local
EM/FWM+Mod Overlay 2.0-3.0 +SP
False
$78,
48.4
3199.5
40
E RIDGEWAY DR
PUBLIC 1350
W RIDGEWAY DR
53.8
1202.9
E RIDGEWAY DR
E SHADOWRIDGE DR
PUBLIC 1350
56.4
1331.8
E RIDGEWAY DR
W RIDGEWAY DR
E SHADOWRIDGE DR
37.2
517.7
PUBLIC 1350
E RIDGEWAY DR
E SHADOWRIDGE DR
61.6
147.1
7100 - NEW BRIDGE RD + Others
Major Collector
EM/FWM+Mod Overlay 2.0-3.0 +SP
False
$143,940.44
5
40
N 51 STAVE
W WEDINGTON DR
N SUNSHINE RD
60.5
643
W NEW BRIDGE RD
N CANNONDALE DR
N BATSFORD DR
59.8
576.5
W NEW BRIDGE RD
N DESARC WAY
N COLONY WAY
53.6
568
W NEW BRIDGE RD
N FALLBROOK WAY
N SUNSHINE RD
67.1
190.4
W NEW BRIDGE RD
N COLONY WAY
N CANNONDALE DR
51.2
325.4
W NEW BRIDGE RD
N BATSFORD DR
N FALLBROOK WAY
52.2
401.8
W NEW BRIDGE RD
N SETTLEMENT LN
N INDEPENDENCE PL
52.6
271.3
W NEW BRIDGE RD
N INDEPENDENCE PL
N DESARC WAY
57.7
176.6
W NEW BRIDGE RD
N TRILLIUM LN
N SETTLEMENT LN
53.6
645
7440-ARCHER DR+Others
Local
EM/FWM+Mod Overlay 2.0-3.0+SP
False
$117,721.89
50.9
94
49.1
3694.3
40
N WATERMAN AVE
W ARCHER DR
W CLEVELAND ST
50.5
432.3
W ARCHER DR
N SAMARA CIR
N SANG AVE
50.8
588.9
N ASHWOOD AVE
W CLEVELAND ST
EOP
65.4
241.4
N LEWIS AVE
W CLEVELAND ST
N LEWIS AVE
28.8
437.8
W ARCHER DR
N WATERMAN AVE
N SAMARA CIR
80.9
248.8
W BERRY ST
W BERRY ST
N SANG AVE
53.8
654.5
N SAMARA CIR
W ARCHER DR
EDP
50.9
249.7
N FOWLER AVE
W CLEVELAND ST
EDP
60.8
424.6
N CEDARWOOD AVE
W CLEVELAND ST
EOP
51.4
416.3
7780 - BOX AVE
Local
EM/FWM+Mod Overlay 2.0-3.0 +SP
False
$30,047.27
51.4
94
49.6
124
40
N BOX AVE
E MISSION BLVD
EOP
53.5
1242.2
8660 - DUNCAN AVE + OthM
Local
EM/FWM+Mod Overlay 2.0-3.0 +SP
False
$27,368.88
51.4
94
49.6
807.8
40
W CENTER ST
N DUNCAN AVE
S HARMON AVE
39.6
348.5
N HARMON AVE
W CLINTON DR
W FAIRVIEW ST
91.4
161.4
N HARMON AVE
S HARMON AVE
W CENTER ST
55.2
297.9
8740 - SHERYL AVE + Others
Local
EM/FWM+Mod Overlay 2.0-3.0 +SP
False
$101,732.95
53.9
94
52.1
2821.2
40
N ELIZABETH AVE
E CORTLAND ST
E BRIARCLIFF ST
63.3
277.7
N ELIZABETH AVE
E ROLLING HILLS DR
E ETON ST
62.2
710.2
N ELIZABETH AVE
E ETON ST
E CORTLAND ST
53.9
283.8
N SHERYL AVE
E ROLLING HILLS DR
E HAROLD ST
52.2
1549.5
9020 - TACKETT DR + Others
Local
EM/FWM+Mod Overlay 2.0-3.0 +SP
False
$27,998.85
51.9
94
50.1
1463.5
40
W TACKETT DR
N GENEVIEVE AVE
EOP
43.6
742.2
N GENEVIEVE AVE
EOP
W TACKETT DR
62.3
721.3
9240 - REAGAN ST + Others
Local
EM/FWM+Mod Overlay 2.0-3.0 +SP
False
$27,552.69
51.1
94
49.3
7.7
40
W REAGAN ST
ALLEY 624
N ARKANSAS AVE
43.4
279.2
N GREGG AVE
W REAGAN ST
W MAPLE ST
61.8
358.2
W REAGAN ST
N GREGG AVE
ALLEY 624
53.9
210.3
$1,698,845.74 52792.3
10.00 MILES
Model Details with Selected Supersegments/Subsegments by Year 121612021
9:12 AM
Model Description:
17 2022 5yr w/forced 1.7M
Budget Table:
2022 5-year Plan (test)
Planning Table:
2022 Known Projects
Misc. Cost Table:
Fayetteville Misc Costs
User 1:
User 7:
User 2:
User 8:
User 3:
User 9:
User 4:
User 10:
User 5:
User 11:
User 6:
User 12:
User 13:
❑
User 14: ❑
User 15:
Year -End Summary Results:
Network
Selected
Model Year:
Avg Network PCI: Count:
Total Cost: Count:
Total Cost:
2,022
74.01 728
$36,450,620.00 47
$2,753,189.00
2,023
74.67 728
$35,825,617.00 32
$1,698,845.00
■❑
Backlog Cost:
$9,695,520.02
$10,219,569.05
2,024 74.14 728 $36,931,295.00 23 $1,699,714.00 $8,311,503.77
2,025 73.59 728 $37,826,505.00 20 $1,699,653.00 $6,788,137.05
2,026 73.07 728 $38,189,318.00 23 $1,698,787.00 $7,495,997.31
Page: 1
Model Details with Selected Supersegments/Subsegments by Year
121612021
9:12 AM
Selected Supersegments
Model Year: 2022
Superseq Code:
Superseq Desc:
Rehab: Pavement:
Classification:
Area:
Begin PCI:
Total Cost:
10305
10305 - MOUNT COMFORT RD
EM+Thin Overlay 1.5-2.Oasphalt
Local
2,876.71
62.70
$17,979.00
Subsea Code:
Street:
From Street.
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-2555-1
W MOUNT COMFORT RD
W JAMES ST
N ADDINGTON AVE
868.20
23.00
2,329.64
60.80
STR-37859-1
W MOUNT COMFORT RD
N GARLAND AVE
W JAMES ST
142.10
33.00
547.07
72.00
11600
11600 - BEECHWOOD AVE
EM+Thin Overlay 1.5-2.Oasphalt
Minor Arterial
9,028.49
59.60
$58,685.00
Subsea Code:
Street:
From Street.
To Street:
Lenoth:
Width:
Total Area:
Current PCI:
STR-48773-1
S BEECHWOOD AVE
W PERIMETER DR
W TOWNE VILLAGE DR
92.90
19.00
205.94
58.90
STR-65853-1
S BEECHWOOD AVE
W DIAMOND DR
S BEECHWOOD AVE
236.90
25.00
690.98
48.90
STR-48774-1
S BEECHWOOD AVE
W SAN GABRIEL CIR
W BEECH PL
265.20
27.00
835.35
79.70
STR-579-1
S BEECHWOOD AVE
S BEECHWOOD AVE
W LODGE WAY
257.30
26.00
780.43
54.30
STR-573-1
S BEECHWOOD AVE
W MARTIN LUTHER KING JR BLV
W FARMINGTON ST
173.00
30.00
605.50
45.30
STR-3818-1
S BEECHWOOD AVE
W BEECH PL
WARVADA LOOP
483.10
26.00
1,501.64
64.30
STR-3781-1
S BEECHWOOD AVE
W CAPELLA ST
W PERIMETER DR
202.60
25.00
590.97
66.90
STR-4154-1
S BEECHWOOD AVE
W BAUM DR
S BEECHWOOD AVE
769.10
26.00
2,353.00
59.00
STR-66273-1
ROUNDABOUT
W 15TH ST
S BEECHWOOD AVE
30.90
26.00
93.75
53.20
STR-66255-1
S BEECHWOOD AVE
S BEECHWOOD AVE
ROUNDABOUT
65.40
26.00
198.32
54.00
STR-66257-1
W 15TH ST
W 15TH ST
ROUNDABOUT
74.90
26.00
227.21
53.20
STR-29234-1
S BEECHWOOD AVE
W FARMINGTON ST
W CAPELLA ST
57.00
28.00
186.20
62.10
STR-1506130-1
S BEECHWOOD AVE
WARVADA LOOP
W BAUM DR
251.00
26.00
759.20
58.30
11720
11720 - BROOKS AVE + Others
EM+Thin Overlay 1.5-2.04sphalt
Major Collector
7,534.48
67.80
$48,974.00
Subsea Code:
Street:
From Street:
To Street:
Lenoth:
Width:
Total Area:
Current PCI:
STR-4197-1
S BROOKS AVE
W 15TH ST
W WALKER ST
436.60
22.00
1,120.41
63.50
STR-4235-1
S BROOKS AVE
W WALKER ST
W BOONE ST
656.40
23.00
1,761.29
63.80
STR-4315-1
S GARLAND AVE
W PETTIGREW ST
W CATO SPRINGS RD
1,048.10
22.00
2,690.11
73.40
STR-5733-1
S GARLAND AVE
W BOONE ST
S GARLAND AVE
440.60
23.00
1,182.33
67.10
STR-7636-1
S GARLAND AVE
W SUNCHASE CT
W PETTIGREW ST
103.30
28.00
337.40
79.40
STR-5740-1
S GARLAND AVE
S GARLAND AVE
W SUNCHASE CT
158.20
24.00
442.94
58.60
12410
12410 - HILL AVE
EM+Thin Overlay 1.5-2.04.sphalt
Minor Collector
1,989.19
53.30
$12,432.00
Subsea Code:
Street:
From Street.
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-1505854-1
S HILL AVE
S HILL AVE
W MARTIN LUTHER KING JR BLL
334.90
17.00
664.23
51.00
STR-3751-1
S HILL AVE
W STONE ST
S HILL AVE
652.10
17.00
1,324.96
55.00
13400
13400 - ILA ST
EM+Thin Overlay 1.5-2.Oasphalt
Local
4,693.00
68.70
$29,331.00
Subsea Code:
Street:
From Street.
To Street:
Lenoth:
Width:
Total Area:
Current PCI:
STR-3075-1
W ILA ST
N VANDEVENTER AVE
N WILSON AVE
476.70
29.00
1,612.88
55.10
STR-3083-1
W ILA ST
N LINCOLN AVE
N SHADYAVE
424.30
24.00
1,188.00
77.10
Page: 2
Model Details with Selected Supersegments/Subsegments by Year
121612021
9:12 AM
Model Year: 2022
Superseq Code:
Superseq Desc:
Rehab: Pavement:
Classification:
Area:
Begin PCI:
Total Cost:
STR-3078-1
W ILA ST
N SHADYAVE
N VANDEVENTER AVE
348.40
27.00
1,097.40
74.10
STR-3088-1
W ILA ST
N PARKAVE
N LINCOLN AVE
272.50
25.00
794.72
77.20
13840
13840 - PROSPECT ST
EM+Thin Overlay 1.5-2.0asphalt
Minor Collector
4,119.26
58.80
$25,745.00
Subseq Code:
Street:
From Street.,
To Street:
Length:
Width:
Tota/Area:
Current PCI:
STR-2950-1
W PROSPECT ST
N WOOLSEYAVE
N VANDEVENTER AVE
683.80
22.00
1,755.11
66.50
STR-2944-1
W PROSPECT ST
N PARK AVE
N WOOLSEYAVE
405.50
23.00
1,088.16
61.00
STR-2947-1
W PROSPECT ST
N VANDEVENTER AVE
N WILSON AVE
475.50
23.00
1,275.99
47.20
1990
1990 - RAY AVE
EM+Thin Overlay 1.5-2.04sphalt
Local
4,649.17
61.70
$29,057.00
Subseg Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-3729-1
S RAYAVE
S RAYAVE
E 4TH ST
74.70
37.00
322.52
60.30
STR-3720-1
S RAYAVE
S RAYAVE
S RAYAVE
218.70
26.00
663.43
53.90
STR-3864-1
S RAYAVE
E 4TH ST
E HUNTSVILLE RD
1,495.20
21.00
3,663.22
63.50
2300
2300 - ANSON ST + Others
EM+Thin Overlay 1.5-2.(Asphalt
Local
7,523.38
63.70
$47,021.00
Subseq Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-1590-1
EANSON ST
N RUTH AVE
EOP
693.70
25.00
2,023.33
58.70
STR-3028-1
E CLARK ST
NAINSWORTHAVE
EOP
247.10
21.00
605.38
59.40
STR-3056-1
E CLARK ST
N RUTH AVE
N AINSWORTH AVE
599.50
22.00
1,538.66
74.50
STR-2345-1
E CLARK ST
EOP
N RUTHAVE
523.40
23.00
1,404.41
60.20
STR-3135-1
EANSONST
EOP
NRUTHAVE
697.00
24.00
1,951.60
65.10
4000
4000 - KATHERINE AVE
EM+Thin Overlay 1.5-2.0asphalt
Minor Collector
8,605.16
67.20
$53,782.00
Subseq Code:
Street:
From Street.,
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-994-1
N KATHERINEAVE
E SHARON ST
E ELAINEAVE
303.60
29.00
1,027.24
75.50
STR-1098-1
N KATHERINEAVE
N WROXTON CT
E CHARING CRS
407.00
29.00
1,377.02
52.40
STR-221-1
N KATHERINEAVE
N WARWICK DR
E SHARON ST
640.10
30.00
2,240.33
76.20
STR-1083-1
N KATHERINE AVE
EOP
N TARTAN WAY
443.60
33.50
1,733.65
53.80
STR-1096-1
N KATHERINEAVE
N TARTAN WAY
N OAK BAILEY DR
211.50
30.00
740.33
76.30
STR-1059-1
N KATHERINE AVE
E CHARING CRS
E FARR LN
152.50
37.08
659.59
67.00
STR-898-1
N KATHERINEAVE
E FARR LN
N WARWICK DR
236.30
30.00
827.00
79.70
4460
4460 - GOFF FARM RD WC 170 + Other<.
EM+Thin Overlay 1.5-2.04sphalt
Minor Collector
14,722.97
64.70
$92,018.00
Subseq Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-1026-1
E GOFF FARM RD
S DEAD HORSE MOUNTAIN RD
S SPRINGLAKE DR
1,828.10
24.00
5,118.67
47.20
STR-9682-1
E GOFF FARM RD
S CHERRY HILLS DR
E SPYGLASS HILL DR
467.50
27.00
1,472.70
83.60
STR-9683-1
E GOFF FARM RD
E SPYGLASS HILL DR
S RIVER MEADOWS DR
532.10
27.00
1,676.10
79.10
STR-9680-1
E GOFF FARM RD
S SPRINGLAKE DR
E SPYGLASS HILL DR
1,083.40
24.00
3,033.47
77.10
STR-10005-1
S ROBERTS RD
S MONARCHAVE
S ROBERTS RD
397.80
26.00
1.206.69
69.50
Page: 3
Model Details with Selected Supersegments/Subsegments by Year
121612021
9:12 AM
Model Year: 2022
Superseq Code:
Superseq Desc:
Rehab: Pavement:
Classification:
Area:
Begin PCI:
Total Cost:
STR-9681-1
E GOFF FARM RD
E SPYGLASS HILL DR
S CHERRY HILLS DR
329.20
24.00
921.73
85.30
STR-6025-1
E GOFF FARM RD
E GOFF FARM RD
E GOFF FARM RD
209.10
27.00
650.25
45.50
STR-5996-1
E GOFF FARM RD
S RIVER MEADOWS DR
E GOFF FARM RD
212.10
26.00
643.36
53.00
4720
4720 - HUNTSVILLE RD + Others
EM+Thin Overlay 1.5-2.04.sphalt
Major Collector
5,504.15
65.30
$35,776.00
Subseg Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-3689-1
E HUNTSVILLE RD
S WILLOW AVE
S BARTON AVE
362.70
22.00
930.97
56.60
STR-3714-1
E HUNTSVILLE RD
S BARTON AVE
S WOOD AVE
300.20
22.00
770.49
59.30
STR-117-1
E HUNTSVILLE RD
ALLEY 399
S MASHBURN AVE
566.00
27.00
1,782.90
76.00
STR-3242-1
E HUNTSVILLE RD
S COMBS AVE
S WILLOWAVE
184.20
22.00
472.76
69.20
STR-30159-1
E HUNTSVILLE RD
ALLEY 267
S COMBS AVE
83.90
22.00
215.36
77.30
STR-3718-1
E HUNTSVILLE RD
S WOOD AVE
ALLEY 399
39.90
22.00
102.42
57.30
STR-3773-1
S MASHBURN AVE
E MARTIN LUTHER KING JR BLVC
E HUNTSVILLE RD
152.80
33.00
588.32
48.50
STR-3665-1
E HUNTSVILLE RD
E SOUTH ST
ALLEY 267
249.70
22.00
640.93
68.00
4765
4765 - WOOD AVE
EM+Thin Overlay 1.5-2.04sphalt
Local
3,462.95
58.50
$21,643.00
Subseq Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-3250-1
S WOOD AVE
E MARTIN LUTHER KING JR BLVI
E 7TH ST
318.30
19.00
705.53
62.00
STR-3910-1
S WOOD AVE
E 7TH ST
E MCCLINTON ST
1,125.50
21.00
2,757.42
58.00
5750
5750 - OAKS MANOR DR
EM+Thin Overlay 1.5-2.0asphalt
Local
6,500.90
77.00
$40,630.00
Subseq Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-1160-1
E OAKS MANOR DR
E GLENN LN
E BONNIE LN
344.60
27.00
1,085.55
80.10
STR-1179-1
E OAKS MANOR DR
E BONNIE LN
N SHERYL AVE
1,305.30
28.00
4,263.93
76.10
STR-1132-1
E OAKS MANOR DR
E ROLLING HILLS DR
E GLENN LN
352.50
28.00
1,151.42
78.70
6185
6185 - MILL AVE
EM+Thin Overlay 1.5-2.Nsphalt
Major Collector
1,147.73
58.20
$7,460.00
Subseq Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-5601-1
S MILL AVE
E ROCK ST
E SOUTH ST
409.80
24.00
1,147.73
58.50
6190
6190 - ROCK ST
EM+Thin Overlay 1.5-2.(Asphalt
Major Collector
1,407.87
84.30
$9,151.00
Subseq Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-3599-1
E ROCK ST
S COLLEGEAVE
ALLEY 119
219.60
22.00
562.83
87.50
STR-3601-1
E ROCK ST
ALLEY 119
S WASHINGTONAVE
215.50
22.00
553.91
84.30
STR-3602-1
E ROCK ST
S WASHINGTON AVE
S MILL AVE
114.20
22.00
291.13
79.30
10405
10405 - OLD WIRE RD
EM/FWM+Mod Overlay 2:lsphalt
Minor Arterial
3,933.19
58.90
$40,315.00
Subseq Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-240-1
N OLD WIRE RD
N OAK BAILEY DR
N CROSSOVER RD
1,347.40
25.00
3,933.19
59.20
12280
12280 - GREGG AVE
EM/FWM+Mod Overlay Alsphalt
Local
4,148.44
43.80
$38,373.00
Page: 4
Model Details with Selected Supersegments/Subsegments by Year
121612021
9:12 AM
Model Year: 2022
Superseq Code:
Superseq Desc:
Rehab: Pavement:
Classification:
Area:
Begin PCI:
Total Cost:
Subseg Code:
Street:
From Street.
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-3230-1
S GREGG AVE
W CENTER ST
S UNIVERSITYAVE
1,578.40
19.00
3,498.74
39.50
STR-3685-1
S GREGG AVE
S UNIVERSITYAVE
W PRAIRIE ST
309.40
18.00
649.70
69.40
12290
12290 - SOUTH ST
EM/FWM+Mod Overlay Asphalt
Local
1,208.06
20.00
$11,174.00
Subseq Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-3643-1
W SOUTH ST
ALLEY 417
S WEST AVE
173.00
30.00
605.50
23.60
STR-3646-1
W SOUTH ST
S SCHOOL AVE
ALLEY 417
178.10
29.00
602.56
16.90
12320
12320 - PRAIRIE ST + Others
EM/FWM+Mod Overlay Alsphalt
Local
4,521.03
60.60
$41,819.00
Subseq Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-3687-1
W PRAIRIE ST
S GREGG AVE
S GREGG AVE
252.20
27.00
794.70
77.40
STR-3697-1
W PRAIRIE ST
ALLEY 417
S WESTAVE
160.70
28.00
525.00
69.20
STR-3759-1
S GREGG AVE
W PRAIRIE ST
W MARTIN LUTHER KING JR BLL
499.00
24.00
1,397.20
53.90
STR-3686-1
W PRAIRIE ST
S GREGG AVE
S GOVERNMENT AVE
67.50
26.00
204.39
36.70
STR-3699-1
W PRAIRIE ST
S SCHOOL AVE
ALLEY 417
188.40
28.00
615.38
47.70
STR-3692-1
W PRAIRIE ST
W PRAIRIE ST
S GREGG AVE
169.40
29.00
573.07
71.50
STR-65868-1
W PRAIRIE ST
S WESTAVE
W PRAIRIE ST
125.90
28.00
411.29
59.00
12425
12425 - HOLLYWOOD AVE
EM/FWM+Mod Overlay A5phalt
Major Collector
3,812.68
43.00
$38,126.00
Subseq Code:
Street:
From Street.
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-65849-1
S HOLLYWOOD AVE
S HOLLYWOOD AVE
W BEST WAY ST
75.40
15.00
131.92
82.80
STR-6214-1
S HOLLYWOOD AVE
W PASADENA LNK
W PARNELL DR
446.10
21.00
1,092.93
47.10
STR-348-1
S HOLLYWOOD AVE
W MARTIN LUTHER KING JR BLV
W PASADENA LNK
454.80
30.00
1,591.83
36.60
STR-2431-1
S HOLLYWOOD AVE
W PARNELL DR
S HOLLYWOOD AVE
355.70
24.00
996.00
45.10
13620
13620 - MOUNT COMFORT RD
EM/FWM+Mod Overlay Asphalt
Major Collector
26,382.07
47.80
$263,820.00
Subseq Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-1525-1
W MOUNT COMFORT RD
N WOODLARK LN
N GOOSEBERRY LN
441.80
50.00
2,577.22
42.70
STR-1670-1
W MOUNT COMFORT RD
N SALEM RD
N RUPPLE RD
1,430.30
48.00
8,009.60
52.90
STR-6209-1
W MOUNT COMFORT RD
N HATTERLYLN
N SALEM RD
684.10
50.00
3,990.56
49.80
STR-6210-1
W MOUNT COMFORT RD
N GOOSEBERRY LN
NKENSWICKAVE
409.80
49.00
2,342.74
44.90
STR-6211-1
W MOUNT COMFORT RD
NKENSWICKAVE
N HATTERLYLN
576.30
50.00
3,361.67
47.40
STR-7299-1
W MOUNT COMFORT RD
N RAVEN LN
N ELDERBERRY RD
248.50
50.00
1,449.45
49.90
STR-7300-1
W MOUNT COMFORT RD
N ELDERBERRY RD
N WOODLARK LN
797.30
50.00
4,650.83
44.10
3900
3900 - DICKSON ST + Others
EM/FWM+Mod Overlay Alsphalt
Major Collector
12,552.59
56.60
$125,525.00
Subseq Code:
Street:
From Street.
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-3324-1
W DICKSON ST
N POWERHOUSEAVE
N UNIVERSITYAVE
426.50
31.00
1,542.59
51.90
STR-3340-1
W DICKSON ST
N BLOCK AVE
N SAINT CHARLES AVE
91.00
26.00
276.03
72.20
Page: 5
Model Details with Selected Supersegments/Subsegments by Year
121612021
9:12 AM
Model Year: 2022
Superseq Code:
Superseq Desc:
Rehab: Pavement:
Classification:
Area:
Begin PCI:
Total Cost:
STR-3342-1
W DICKSON ST
N EASTAVE
N BLOCKAVE
271.80
20.00
634.22
49.10
STR-3331-1
W DICKSON ST
N SHIPLEYALY
N SCHOOL AVE
184.80
38.00
819.32
67.80
STR-3333-1
W DICKSON ST
N LOCUST AVE
N CAMPBELL AVE
133.70
39.00
608.40
62.30
STR-3335-1
W DICKSON ST
N THOMPSON AVE
N LOCUST AVE
208.20
22.00
534.36
64.70
STR-2515-1
W DICKSON ST
N UNIVERSITYAVE
NARKANSASAVE
117.80
39.00
536.03
71.90
STR-3326-1
W DICKSON ST
N WESTAVE
W DICKSON ST
215.70
25.00
629.17
78.10
STR-3329-1
W DICKSON ST
N SCHOOL AVE
N WESTAVE
367.90
50.00
2,146.11
57.30
STR-3336-1
W DICKSON ST
N CHURCH AVE
N THOMPSON AVE
169.20
39.00
769.82
54.40
STR-65879-1
W DICKSON ST
W DICKSON ST
N GREGG AVE
133.80
29.00
456.59
48.10
STR-3344-1
W DICKSON ST
N HIGHLAND AVE
N EAST AVE
170.30
36.00
715.20
43.10
STR-3347-1
E DICKSON ST
ALLEY 21
N COLLEGE AVE
234.10
37.00
1,010.51
53.10
STR-3338-1
W DICKSON ST
ALLEY 150
N CHURCH AVE
185.60
38.00
822.91
49.40
STR-3345-1
E DICKSON ST
N HIGHLAND AVE
ALLEY 21
111.40
37.00
480.79
42.60
STR-30148-1
W DICKSON ST
N CAMPBELL AVE
N SHIPLEYALY
36.80
36.00
154.60
75.10
STR-1506004-1
W DICKSON ST
W DICKSON ST
W DICKSON ST
24.30
29.00
82.17
39.30
STR-30143-1
W DICKSON ST
N SAINT CHARLES AVE
ALLEY 150
92.30
31.00
333.77
63.10
4350
4350 - CHARLESTON XING
EM/FWM+Mod Overlay Atphalt
Local
3,405.68
44.10
$31,502.00
Subseq Code:
Street:
From Street.,
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-1404-1
N CHARLESTON XING
EOP
E FREDRICKSBURG CIR
931.10
31.26
3,405.68
44.40
90170
90170 - WEST AVE
EM/FWM+Mod Overlay Asphalt
Major Collector
4,596.15
32.50
$45,961.00
Subseq Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-3642-1
S WESTAVE
S WESTAVE
W SOUTH ST
602.00
27.00
1,852.05
31.60
STR-3691-1
S WESTAVE
W SOUTH ST
W PRAIRIE ST
519.80
27.00
1,596.60
32.90
STR-3579-1
S WESTAVE
W MOUNTAIN ST
S WESTAVE
372.90
27.00
1,147.50
35.10
99995
99995 - RAZORBACK RD
EM/FWM+Mod Overlay Alsphalt
Minor Arterial
19,224.86
1.00
$197,054.00
Subsea Code:
Street:
From Street.
To Street:
Length:
Width:
Total Area: Current PCI:
STR-2373-1
S RAZORBACK RD
W MARTIN LUTHER KING JR BLV
W INDIAN TRL
331.50
64.00
2,357.33
STR-1506235-1
S RAZORBACK RD
EOP
EOP
321.00
65.00
2,318.33
STR-1506237-1
S RAZORBACK RD
S RAZORBACK RD
S RAZORBACK RD
453.10
28.00
1,409.64
STR-1506238-1
S RAZORBACK RD
S RAZORBACK RD
S RAZORBACK RD
640.50
29.00
2,063.83
STR-1506255-1
S RAZORBACK RD
S RAZORBACK RD
WATHLETIC DR
40.00
32.50
144.44
STR-9453-1
S RAZORBACK RD
S RAZORBACK RD
S RAZORBACK RD
640.70
29.00
2,064.48
STR-1506246-1
S RAZORBACK RD
S RAZORBACK RD
W BAUM DR
43.50
31.00
149.83
STR-1506247-1
S RAZORBACK RD
W BAUM DR
S RAZORBACK RD
43.80
31.00
150.87
STR-1506260-1
S RAZORBACK RD
S RAZORBACK RD
S RAZORBACK RD
310.70
28.00
966.62
STR-1506261-1
S RAZORBACK RD
S RAZORBACK RD
S RAZORBACK RD
373.10
25.00
1,036.39
Page: 6
Model Details with Selected Supersegments/Subsegments by Year
121612021
9:12 AM
Model Year: 2022
Superseq Code: Superseq
Desc:
Rehab: Pavement:
Classification:
Area:
Begin PCI:
Total Cost:
STR-1506249-1
S RAZORBACK RD
W BAUM DR
S RAZORBACK RD
43.40
31.00
149.49
STR-1506256-1
S RAZORBACK RD
WATHLETIC DR
S RAZORBACK RD
59.10
32.50
213.42
STR-1506258-1
S RAZORBACK RD
WATHLETIC DR
S RAZORBACK RD
40.20
32.50
145.17
STR-6082-1
S RAZORBACK RD
W INDIAN TRL
S RAZORBACK RD
408.50
25.00
1,134.72
STR-9454-1
S RAZORBACK RD
S RAZORBACK RD
S RAZORBACK RD
453.80
25.00
1,260.56
STR-1505996-1
S RAZORBACK RD
S RAZORBACK RD
S RAZORBACK RD
283.90
34.00
1,072.51
STR-1506239-1
S RAZORBACK RD
S RAZORBACK RD
W INDIAN TRL
408.90
31.00
1,408.43
STR-1506241-1
S RAZORBACK RD
S RAZORBACK RD
S RAZORBACK RD
221.30
38.00
934.38
STR-1506248-1
S RAZORBACK RD
S RAZORBACK RD
W BAUM DR
43.80
0
31.00
STR-1506257-1
S RAZORBACK RD
S RAZORBACK RD
WATHLETIC DR
59.10
32.50
213.42
10420 10420 - OLD WIRE RD WC 87
EM/FWM+Mod Overlay Atphalt
Major Collector
6,101.20
47.60
$71,689.00
Subseq Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-1148-1
N OLD WIRE RD
N OLD WIRE RD
N OLD WIRE RD
2,490.30
21.00
6,101.20
48.00
10640 10640 -
PORTER RD
EM/FWM+Mod Overlay 2�lsphalt
Major Collector
8,777.40
50.70
$103,134.00
Subseq Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-5496-1
N PORTER RD
W SKYLER DR
W HOUSTON ST
508.10
26.00
1,541.22
50.10
STR-2491-1
N PORTER RD
W HOLLY ST
W LAWSON ST
181.60
26.00
550.91
51.40
STR-2565-1
N PORTER RD
W VALLEY DR
W HATFIELD ST
54.60
22.00
140.19
27.80
STR-5352-1
N PORTER RD
W LAWSON ST
W CORNERSTONE PL
168.80
26.00
512.06
47.60
STR-2095-1
N PORTER RD
W SYCAMORE ST
W DEANE ST
396.90
23.00
1,065.03
54.60
STR-5495-1
N PORTER RD
W MEGAN DR
W SKYLER DR
275.80
26.00
836.62
55.60
STR-4082-1
N PORTER RD
W CORNERSTONE PL
W MEGAN DR
342.40
26.00
1,038.56
48.20
STR-1568-1
N PORTER RD
W HATFIELD ST
W HOLLY ST
358.00
25.00
1,044.17
37.50
STR-1583-1
N PORTER RD
W WEDINGTON DR
W VALLEY DR
418.20
22.00
1,073.36
46.90
STR-1973-1
N PORTER RD
W HOUSTON ST
W SYCAMORE ST
334.40
25.00
975.28
71.90
11620 11620 - 15TH ST
EM/FWM+Mod Overlay Atphalt
Major Collector
3,382.00
52.30
$39,738.00
Subseq Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-51175-1
W 15TH ST
S DEBRIYN DR
W 15TH ST
332.00
24.00
935.33
50.20
STR-4153-1
W 15TH ST
S RAZORBACK RD
S DEBRIYN DR
795.50
24.00
2,227.47
54.20
STR-66259-1
W 15TH ST
W 15TH ST
ROUNDABOUT
78.30
24.00
219.20
48.70
12660 12660 - ROBERTS RD WC 170
EM/FWM+Mod Overlay Atphalt
Minor Collector
4,545.34
52.90
$52,271.00
Subseq Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-6002-1
S ROBERTS RD
E HUNTSVILLE RD
S ROBERTS RD
727.30
19.00
1,612.15
53.80
STR-6016-1
S ROBERTS RD
S ROBERTS RD
S ROBERTS RD
334.40
27.00
1,029.30
45.10
STR-6027-1
S ROBERTS RD
S ROBERTS RD
E EASTPOINT DR
145.40
22.00
373.14
66.70
STR-6028-1
S ROBERTS RD
S ROBERTS RD
S ROBERTS RD
264.10
27.00
812.40
48.00
Page: 7
Model Details with Selected Supersegments/Subsegments by Year
121612021
9:12 AM
Model Year: 2022
Superseq Code:
Superseq Desc:
Rehab: Pavement:
Classification:
Area:
Begin PCI:
Total Cost:
STR-6029-1
S ROBERTS RD
S ROBERTS RD
S ROBERTS RD
104.50
19.00
231.69
54.90
STR-6000-1
S ROBERTS RD
S ROBERTS RD
S SAG HARBOR AVE
63.10
25.00
184.03
82.10
STR-6026-1
S ROBERTS RD
E EASTPOINT DR
S ROBERTS RD
136.50
19.00
302.63
58.10
13040
13040 - APPLEBY RD
EM/FWM+Mod Overlay Atphalt
Minor Collector
3,787.45
53.50
$43,555.00
Subseg Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-7307-1
WAPPLEBYRD
N BOB YOUNKIN DR
N QUAIL CREEK DR
275.20
20.00
642.12
47.10
STR-1505985-1
WAPPLEBYRD
WAPPLEBYRD
NGREGGAVE
297.50
20.00
694.22
42.60
STR-1057-1
WAPPLEBYRD
N DORCHESTER DR
WAPPLEBYRD
438.60
20.00
1,056.44
53.70
STR-1065-1
WAPPLEBYRD
N QUAIL CREEK DR
N DORCHESTER DR
597.70
20.00
1,394.67
62.70
13485
13485 - LAFAYETTE ST
EM/FWM+Mod Overlay Asphalt
Major Collector
1,829.43
46.10
$21,495.00
Subseq Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-3167-1
W LAFAYETTE ST
N GREGG AVE
ALLEY 624
274.80
30.00
961.83
49.40
STR-2672-1
W LAFAYETTE ST
ALLEY 624
N ARKANSAS AVE
274.90
27.00
867.60
43.30
2400
2400 - APPLEBY RD
EM/FWM+Mod Overlay 2llsphalt
Minor Collector
10,598.11
56.10
$121,878.00
Subseq Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-10321-1
EAPPLEBYRD
N MCKEE CIR
E APPLEBY RD
165.50
28.00
540.71
64.50
STR-66145-1
EAPPLEBYRD
EAPPLEBYRD
NCOLLEGE AVE
206.00
28.00
672.93
60.30
STR-1123-1
EAPPLEBYRD
ECYDNEEST
EAPPLEBYRD
502.90
29.00
1,701.49
56.90
STR-1126-1
EAPPLEBYRD
E BISHOP DR
COUNTRY LN
97.80
28.00
319.51
43.30
STR-1131-1
EAPPLEBYRD
E APPLEBY RD
E APPLEBY RD
329.50
28.00
1,108.49
60.90
STR-1127-1
EAPPLEBYRD
COUNTRY LN
COUNTRY LN
180.40
29.00
610.29
56.00
STR-1128-1
EAPPLEBYRD
COUNTRYLN
NFIESTA DR
430.80
29.00
1,457.57
50.00
STR-1130-1
EAPPLEBYRD
N FIESTA DR
N WAYNE DR
148.20
29.00
501.38
57.80
STR-1135-1
EAPPLEBYRD
N WAYNE DR
N MCKEE CIR
636.30
29.00
2,152.77
55.20
STR-902-1
EAPPLEBYRD
E JASON DR
E CYDNEE ST
453.10
29.00
1,532.97
58.70
3205
3205 - MOUNTAIN ST
EM/FWM+Mod Overlay Atphalt
Major Collector
1,991.60
58.90
$23,401.00
Subseq Code:
Street:
From Street:
To Street:
Length:
Width:
Tota/Area:
Current PCI:
STR-3543-1
E MOUNTAIN ST
W MOUNTAIN ST
ALLEY 36
208.00
36.00
873.60
55.60
STR-3546-1
E MOUNTAIN ST
ALLEY 36
S COLLEGE AVE
319.50
30.00
1,118.00
62.10
8600
8600 - DOUBLE SPRINGS RD
EM/FWM+Mod Overlay Atphalt
Minor Arterial
7,808.81
73.50
$95,657.00
Subseq Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-1688-1
N DOUBLE SPRINGS RD
W GREENS CHAPEL RD
WABILENE DR
1,025.10
37.00
4,424.99
76.00
STR-2654-1
N DOUBLE SPRINGS RD
W SUMTER DR
W EL PASO DR
35.90
27.00
113.10
75.10
STR-1559-1
N DOUBLE SPRINGS RD
W NICOLE LN
W WEDINGTON DR
336.80
23.00
903.77
53.50
STR-2636-1
N DOUBLE SPRINGS RD
W EL PASO DR
W COPPER RIDGE LN
383.60
27.00
1.208.40
76.20
Page: 8
Model Details with Selected Supersegments/Subsegments by Year
121612021
9:12 AM
Model Year: 2022
Superseq Code:
Superseq Desc:
Rehab: Pavement:
Classification:
Area:
Begin PCI:
Total Cost:
STR-2692-1
N DOUBLE SPRINGS RD
WABILENE DR
W SUMTER DR
248.10
25.00
723.61
78.30
STR-7296-1
N DOUBLE SPRINGS RD
W COPPER RIDGE LN
W NICOLE LN
177.50
21.00
434.94
78.80
8620
8620 - DOUBLE SPRINGS RD
EM/FWM+Mod Overlay Asphalt
Minor Arterial
6,654.93
51.40
$81,522.00
Subseq Code:
Street:
From Street.,
To Street:
Length:
Width:
Tota/Area:
Current PCI:
STR-3021-1
N DOUBLE SPRINGS RD
W MESA ST
W PERSIMMON ST
479.40
22.00
1,230.41
47.90
STR-1687-1
N DOUBLE SPRINGS RD
W PERSIMMON ST
W GREENS CHAPEL RD
619.00
37.00
2,672.02
60.90
STR-3110-1
N DOUBLE SPRINGS RD
W SILVERTHORNE RD
W LIMERICK WAY
589.10
23.00
1,580.74
43.40
STR-3139-1
N DOUBLE SPRINGS RD
W DOT TIPTON RD
W SILVERTHORNE RD
298.60
25.00
870.97
48.10
STR-65903-1
N DOUBLE SPRINGS RD
W LIMERICK WAY
W MESA ST
117.20
22.00
300.79
42.80
90080
90080 - FINGER RD WC 411
EM/FWM+Mod Overlay Alsphalt
Major Collector
10,888.05
52.00
$127,934.00
Subseg Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-9484-1
S FINGER RD
S FINGER RD
S PLUMBEROSA DR
414.60
27.00
1,277.25
62.70
STR-9483-1
S FINGER RD
W MARTIN LUTHER KING JR BLV
S FINGER RD
344.30
27.00
1,057.20
62.30
STR-4402-1
S FINGER RD
S PLUMBEROSA DR
W FINGER RD
2,782.50
27.00
8,553.60
49.60
10705
10705 - CARDWELL LN
FWM+Thick Overlay >2.Asphalt
Local
1,130.96
50.00
$13,854.00
Subseq Code:
Street:
From Street:
To Street:
Lenqth:
Width:
Total Area:
Current PCI:
STR-3008-1
W CARDWELL LN
N RAZORBACK RD
N OLIVER AVE
421.50
23.00
1,130.96
50.30
9845
9845 - SHADY AVE + OTHERS
FWM+Thick Overlay >2.fdksphalt
Local
3,518.73
49.80
$43,104.00
Subseq Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-3077-1
N SHADYAVE
W ILA ST
W LOUISE ST
320.50
25.00
934.72
48.00
STR-3082-1
N LINCOLN AVE
W ILA ST
W LOUISE ST
330.30
18.00
693.60
54.60
STR-1600-1
N LINCOLN AVE
W MAPLE ST
W ILA ST
325.30
21.00
796.95
47.70
STR-1592-1
N SHADYAVE
W MAPLE ST
W ILA ST
323.20
29.00
1,093.46
50.70
10080
10080 - MCCONNELLAVE + Others
FWM+Thick Overlay >2.Qtsphalt
Minor Collector
10,124.40
29.20
$174,645.00
Subseq Code:
Street:
From Street:
To Street:
Lenqth:
Width:
Total Area:
Current PCI:
STR-814-1
N MCCONNELL AVE
W KNAPP ST
W BURR OAK DR
1,709.40
25.00
4,985.69
25.50
STR-939-1
N MCCONNELL AVE
W BURR OAK DR
W RED TIP DR
406.00
24.00
1,136.80
28.60
STR-1176-1
W DRAKE ST
N GARLAND AVE
N MCCONNELL AVE
837.20
21.00
2,051.12
36.20
STR-5663-1
N MCCONNELL AVE
W RED TIP DR
N MCCONNELL AVE
293.00
29.00
991.32
33.60
STR-5664-1
N MCCONNELL AVE
N MCCONNELL AVE
W DRAKE ST
293.70
28.00
959.47
33.10
12900
12900 - STADIUM DR + Others
FWM+Thick Overlay >2.Asphalt
Minor Collector
4,051.11
36.80
$69,881.00
Subseq Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-965-1
S STADIUM DR
W BULLDOG BLVD
W CARLSON DR
370.30
25.00
1,080.00
39.90
STR-3736-1
S STADIUM DR
W CARLSON DR
W MARTIN LUTHER KING JR BLL
727.60
35.00
2,971.11
36.20
10040
10040 - MCMILLAN DR + Others
Microsurface/Chip Seal Asphalt
Local
6,463.61
80.10
$23,268.00
Page: 9
Model Details with Selected Supersegments/Subsegments by Year
121612021
9:12 AM
Model Year: 2022
Superseq Code:
Subseq Code:
STR-5231-1
STR-5232-1
STR-5019-1
STR-5018-1
Superseq Desc:
Street:
N PAMANGUS DR
W MCMILLAN DR
N MARINONI DR
W MCMILLAN DR
Rehab: Pavement:
From Street.
EOP
N PAMANGUS DR
W MCMILLAN DR
N MARINONI DR
Classification:
To Street:
W MCMILLAN DR
N FUTRALL DR
W WEDING TON DR
N PAMANGUS DR
Area:
Length:
352.40
693.30
211.00
822.40
Width:
27.00
25.00
34.00
26.00
Begin PCI:
Total Area:
1,110.00
2,022.08
836.97
2,494.56
Total Cost:
Current PCI:
83.80
76.30
80.00
82.00
7460
7460 - VANIKE DR + Others
Microsurface/Chip Seal Asphalt
Local
16,591.17
80.10
$59,728.00
Subseq Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-12957-1
N VERONA LN
W MIRAMAR DR
W IKA LN
812.10
23.00
2,179.13
84.70
STR-12958-1
NAZUREAVE
W MIRAMAR DR
W IKA LN
564.30
20.00
1,316.67
86.10
STR-12959-1
W VERONA LN
N BENTLEY RDG
W IKA LN
623.50
20.00
1,454.78
79.60
STR-7598-1
N NEVERMORE LN
W VANIKE DR
EOP
118.90
23.00
320.98
85.80
STR-12962-1
W MIRAMAR DR
N BENTLEY RDG
N AZURE AVE
369.10
26.00
1,119.59
82.40
STR-12970-1
N BENTLEY RDG
W MIRAMAR DR
W IKA LN
551.10
25.00
1,607.36
79.80
STR-30197-1
W MIRAMAR DR
N VERONA LN
N RAVEN LN
297.40
25.00
867.36
72.30
STR-7596-1
W VANIKE DR
N NEVERMORE LN
W TOPAZ DR
380.60
25.00
1,110.14
84.30
STR-7597-1
W VANIKE DR
W TOPAZ DR
EOP
225.20
35.72
940.82
67.10
STR-7355-1
W TOPAZ DR
W TIGER EYE DR
N RAVEN LN
768.40
25.00
2,241.11
78.90
STR-7356-1
W TOPAZ DR
W VANIKE DR
W TIGER EYE DR
516.80
25.00
1,507.36
81.60
STR-12969-1
W MIRAMAR DR
NAZUREAVE
N VERONA LN
346.10
26.00
1,049.82
77.70
STR-12971-1
N BENTLEY RDG
W IKA LN
W VERONA LN
288.80
26.00
876.05
80.40
7580
7580 - DOWNS AVE + Others
Microsurface/Chip Seal Asphalt
Local
11,169.01
80.40
$40,208.00
Subsea Code:
Street:
From Street.
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-5536-1
W MARSH ST
N DOWNS AVE
N BERMUDA AVE
422.20
26.00
1,280.64
81.10
STR-2116-1
W CRYSTAL DR
N SALEM RD
N HAY MEADOWS AVE
169.10
23.00
453.74
85.40
STR-5533-1
W SWEETGRASS RD
N DOWNS AVE
N BERMUDA AVE
429.20
20.00
1,001.44
81.50
STR-5534-1
N HAY MEADOWS AVE
W MARSH ST
W BENTGRASS RD
88.30
24.00
247.20
80.20
STR-5467-1
W BENTGRASS RD
N SALEM RD
N HAY MEADOWS AVE
168.90
24.00
472.93
85.70
STR-5468-1
N HAY MEADOWS AVE
W BENTGRASS RD
W CRYSTAL DR
556.10
26.00
1,686.82
79.20
STR-5539-1
N BERMUDA AVE
W MARSH ST
W SWEETGRASS RD
457.80
24.00
1,281.87
83.60
STR-5540-1
N BERMUDA AVE
W SWEETGRASS RD
W GROUSE RD
277.70
27.00
874.80
84.20
STR-5541-1
N DOWNSAVE
W MARSH ST
W SWEETGRASS RD
470.80
22.00
1,208.41
77.80
STR-5542-1
N DOWNS AVE
W SWEETGRASS RD
W GROUSE RD
278.30
21.00
681.80
68.50
STR-4102-1
N HAY MEADOWS AVE
W CRYSTAL DR
W GROUSE RD
78.60
26.00
238.48
77.00
STR-4103-1
W GROUSE RD
N HAY MEADOWS AVE
N DOWNS AVE
266.60
24.00
746.53
79.20
STR-5535-1
W MARSH ST
N HAY MEADOWS AVE
N DOWNS AVE
263.60
24.00
738.13
84.80
STR-5544-1
N DOWNS AVE
EOP
W MARSH ST
108.90
20.00
256.22
80.00
Page: 10
Model Details with Selected Supersegments/Subsegments by Year
121612021
9:12 AM
Model Year: 2022
Superseq Code:
Superseq Desc:
Rehab: Pavement:
Classification:
Area:
Begin PCI:
Total Cost:
8240
8240 - HOSTA DR + Others
Microsurface/Chip Seal Asphalt
Local
19,762.13
80.10
$71,143.00
Subseg Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-5605-1
W CONEFLOWER PL
EOP
N HOSTA DR
207.90
35.88
876.09
62.00
STR-5607-1
W BLUE MIST CT
EOP
N HOSTA DR
200.50
37.27
877.95
78.70
STR-10413-1
W TUPELO WAY
N MONTANA AVE
N CORNWALL AVE
365.60
21.00
895.77
78.90
STR-10414-1
N SILK ROSE AVE
EOP
W MORNING MIST DR
529.20
27.00
1,674.15
79.30
STR-10415-1
W MORNING MIST DR
N SILK ROSE AVE
N MONTANA AVE
317.00
25.00
924.59
74.70
STR-6018-1
N MONTANA AVE
N MONTANA AVE
W SILVERMIST PL
172.90
25.00
504.31
84.90
STR-10406-1
N MONTANA AVE
W SILVERMIST PL
W WYOMING DR
307.10
25.00
895.70
82.60
STR-10407-1
N MONTANA AVE
W WYOMING DR
W TUPELO WAY
210.20
24.00
588.53
77.60
STR-5608-1
N HOSTA DR
W BLUE MIST CT
W MORNING MIST DR
330.30
27.00
1,040.40
89.00
STR-4351-1
N HOSTA DR
W MORNING MIST DR
EOP
463.20
31.65
1,713.82
83.00
STR-5602-1
N HOSTA DR
W MOUNT COMFORT RD
W WATER LILLY CT
240.60
26.00
729.88
83.10
STR-5603-1
W WATER LILLY CT
EOP
N HOSTA DR
205.20
36.97
890.84
68.30
STR-10409-1
W SILVERMIST PL
EOP
N MONTANA AVE
326.30
28.76
1,102.48
85.90
STR-10411-1
N CORNWALL AVE
W SILVERMIST PL
W TUPELO WAY
466.90
20.00
1,089.45
83.00
STR-10408-1
N MONTANA AVE
W TUPELO WAY
W MORNING MIST DR
442.80
24.00
1,239.87
79.80
STR-10410-1
W SILVERMIST PL
N MONTANA AVE
N CORNWALL AVE
304.50
20.00
710.56
83.50
STR-10412-1
W WYOMING DR
EOP
N MONTANA AVE
322.10
29.00
1,096.04
82.20
STR-5604-1
N HOSTA DR
W WATER LILLY CT
W CONEFLOWER PL
354.10
26.00
1,074.09
84.40
STR-5606-1
N HOSTA DR
W CONEFLOWER PL
W BLUE MIST CT
314.30
26.00
953.34
86.70
STR-4350-1
W MORNING MIST DR
N HOSTA DR
N SILK ROSE AVE
315.80
24.00
884.27
73.00
2385
2385 - APPLEBY RD
PCC Localized Rhb Concrete
Major Collector
4,917.02
61.20
$74,984.00
Subseq Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-1066-1
EAPPLEBYRD
N NORTHHILLS BLVD
E JASON DR
484.00
42.00
2,371.60
64.00
STR-7306-1
EAPPLEBYRD
N NORTHHILLS BLVD
N BOB YOUNKIN DR
681.80
32.00
2,545.42
59.00
11980
11980 - STONE ST
Super Thin 3/4" Overlay Mphalt
Local
1,366.02
72.00
$7,649.00
Subseq Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-3623-1
W STONE ST
S EASTERN AVE
S LEWIS AVE
354.80
33.00
1,366.02
72.30
9640
9640 - OAK BAILEY DR + Others
Super Thin 3/4" Overlay A!sphalt
Minor Collector
6,466.33
67.90
$29,098.00
Subseq Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-911-1
N OAK BAILEY DR
N WARWICK DR
N WARWICK DR
50.20
28.00
163.96
79.20
STR-1151-1
N OAK BAILEY DR
N STRAWBERRY DR
N OAK BAILEY DR
365.20
28.00
1,192.96
76.20
STR-910-1
N OAK BAILEY DR
N WARWICK DR
N KATHERINE AVE
242.50
28.00
792.24
74.80
STR-1102-1
N KATHERINEAVE
N OAK BAILEY DR
N WROXTON CT
585.10
30.00
2,047.83
58.30
STR-65867-1
N OAK BAILEY DR
N OAK BAILEY DR
N WARWICK DR
312.70
28.00
1.021.53
73.30
Page: 11
Model Details with Selected Supersegments/Subsegments by Year
Model Year: 2022
121612021
9:12 AM
Superseq Code: Superseq Desc: Rehab: Pavement: Classification: Area: Begin PCI: Total Cost:
STR-241-1 N OAK BAILEY DR N OLD WIRE RD N STRAWBERRYDR 368.80 29.00 1,247.81 66.90
Page: 12
Model Details with Selected Supersegments/Subsegments by Year
121612021
9:12 AM
Model Year: 2023
Superseq Code:
Superseq Desc:
Rehab: Pavement:
Classification:
Area:
Begin PCI:
Total Cost:
1660
1660 - ALLEY 697
ACP Full Depth ReconstAisphalt
Alley
779.10
11.40
$35,059.50
Subseg Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-3315-1
ALLEY 697
E DOG WOOD LN
EOP
371.00
18.00
779.10
12.60
1200
1200 - ALLEY 172
EM+Thin Overlay 1.5-2.0asphalt
Alley
473.96
60.50
$2,606.78
Subseq Code:
Street:
From Street.
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-29692-1
ALLEY 172
N WASHINGTON AVE
N TRENTAVE
253.90
16.00
473.96
62.10
1620
1620 - ALLEY 624
EM+Thin Overlay 1.5-2.0asphalt
Alley
343.33
61.60
$1,888.32
Subseq Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-28224-1
ALLEY 624
W LAFAYETTE ST
W REAGAN ST
294.30
10.00
343.33
63.20
10065
10065 - TAHOE PL
EM/FWM+Mod Overlay 2llsphalt
Local
1,610.13
50.00
$17,711.43
Subseq Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-491-1
N TAHOE PL
W WEDINGTON DR
PUBLIC 1180
287.50
48.00
1,610.13
52.00
11160
11160 - TIMBERLINE DR + Others
EM/FWM+Mod Overlay 2llsphalt
Local
8,384.91
53.30
$92,234.01
Subseq Code:
Street:
From Street.
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-2272-1
N TIMBERLINE DR
N SALEM RD
N COLORADO DR
139.10
35.00
567.97
63.50
STR-2233-1
N TIMBERLINE DR
WANNEST
W WOODFIELD WAY
265.90
30.00
930.67
53.00
STR-2133-1
N TIMBERRIDGE CT
N TIMBERLINE DR
EOP
313.50
36.52
1,341.98
46.40
STR-2266-1
N TIMBERLINE DR
N COLORADO DR
WANNE ST
427.40
29.00
1,445.97
59.40
STR-337-1
N TIMBERLINE DR
W WOODFIELD WAY
N TIMBERRIDGE CT
295.20
30.00
1,033.17
57.30
STR-566-1
N WEATHERWOOD CT
EOP
WANNE ST
231.60
36.57
995.81
61.00
STR-2132-1
N TIMBERLINE DR
N TIMBERRIDGE CT
W OAKFIELD ST
329.20
29.00
1,113.76
47.10
STR-2239-1
WANNEST
N WEATHERWOOD CT
N TIMBERLINE DR
292.50
28.00
955.58
60.90
11780
11780 - BULLDOG BLVD + Others
EM/FWM+Mod Overlay Alsphalt
Local
6,774.98
51.10
$74,524.78
Subseq Code:
Street:
From Street.
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-3630-1
W BULLDOG BLVD
W BULLDOG BLVD
S STADIUM DR
348.30
20.00
812.67
53.70
STR-3632-1
W BULLDOG BLVD
S BUCHANAN AVE
W BULLDOG BLVD
650.80
35.00
2,657.47
52.40
STR-2117-1
S BUCHANAN AVE
W BULLDOG BLVD
S DUNCAN AVE
950.20
28.00
3,103.96
54.70
STR-7208-1
S DUNCANAVE
S DUNCAN AVE
W MARTIN LUTHER KING JR BLL
101.30
17.00
200.88
40.30
12000
12000 - CUNNINGHAM LN + Others
EM/FWM+Mod Overlay 2llsphalt
Local
1,412.05
51.10
$15,532.55
Subseq Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-5427-1
S JARNAGAN ST
S JARNAGAN ST
E HUNTSVILLE RD
353.40
16.00
659.65
66.20
STR-5428-1
S CUNNINGHAM LN
S CUNNINGHAM LN
E HUNTSVILLE RD
358.30
18.00
752.40
41.80
12120
12120 - DUNN AVE + Others
EM/FWM+Mod Overlay Alsphalt
Local
7,020.27
51.60
$77,222.97
Subseq Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
Page: 13
Model Details with Selected Supersegments/Subsegments by Year
121612021
9:12 AM
Model Year: 2023
Superseq Code:
Superseq Desc:
Rehab: Pavement:
Classification:
Area:
Begin PCI:
Total Cost:
STR-8978-1
S LT COL LEROY POND AVE
PUBLIC 987
W NATIONAL ST
35.30
27.00
111.15
44.20
STR-3916-1
W 11 TH ST
S SCHOOL AVE
W 11 TH ST
172.60
25.00
503.47
64.50
STR-2420-1
W NATIONAL ST
S DUNN AVE
S LT COL LEROY POND AVE
248.00
32.00
925.87
47.80
STR-3992-1
S DUNN AVE
W 11TH ST
W 13TH ST
685.90
29.00
2,320.64
56.00
STR-3912-1
W 11TH ST
W 11TH ST
S WESTAVE
201.40
23.00
540.37
69.10
STR-3914-1
W 11 TH ST
S WEST AVE
S DUNN AVE
357.50
25.00
1,042.78
63.00
STR-3909-1
S DUNN AVE
WNATIONAL ST
W 11TH ST
465.80
29.00
1,575.99
39.80
13860
13860 - RIDGEWAY DR
EM/FWM+Mod Overlay Alsphalt
Local
3,885.96
52.00
$42,745.56
Subsea Code:
Street:
From Street.,
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-2468-1
W RIDGEWAY DR
N CRESTWOOD DR
E RIDGEWAY DR
519.20
17.00
1,029.73
63.10
STR-2678-1
W RIDGEWAY DR
N VIEWPOINT DR
N CRESTWOOD DR
1,288.50
19.00
2,856.23
50.80
1960
1960 - WILLOW AVE + Others
EM/FWM+Mod Overlay Alsphalt
Local
5,150.57
50.00
$56,656.27
Subseq Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-3241-1
S WILLOWAVE
S WALKER RD
E HUNTSVILLE RD
170.20
22.00
436.82
53.50
STR-5277-1
S COMBS AVE
E HUNTSVILLE RD
E 4TH ST
572.80
23.00
1,537.04
46.70
STR-3705-1
S WASHINGTON AVE
E SOUTH ST
E 4TH ST
553.30
15.00
968.25
41.70
STR-3706-1
E 4TH ST
S WASHINGTON AVE
S COMBS AVE
192.40
24.00
538.67
62.70
STR-3712-1
E 4TH ST
S COMBS AVE
S WILLOWAVE
167.90
17.00
333.01
66.00
STR-3660-1
S WILLOWAVE
E ROCK ST
S WALKER RD
572.90
20.00
1,336.78
57.00
2060
2060 - HILLCRESTAVE
EM/FWM+Mod Overlay Alsphalt
Local
3,660.05
53.30
$40,260.55
Subseq Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-2579-1
N HILLCRESTAVE
EABSHIER DR
E WOODCREST DR
399.60
24.00
1,118.93
45.30
STR-2513-1
N HILLCRESTAVE
E WOODCREST DR
E NATURAL WAY
600.00
22.00
1,540.00
51.50
STR-2644-1
N HILLCRESTAVE
E OAKWOOD ST
EABSHIER DR
408.60
21.00
1,001.12
72.60
2080
2080 -ABSHIER DR
EM/FWM+Mod Overlay Alsphalt
Local
1,251.33
53.30
$13,764.63
Subsea Code:
Street:
From Street.,
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-2580-1
EABSHIER DR
E NOBLE LN
N HILLCRESTAVE
536.30
20.00
1,251.33
55.30
2340
2340 - HOPE ST + Others
EM/FWM+Mod Overlay Alsphalt
Local
11,859.05
52.20
$130,449.55
Subseq Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-5269-1
E APPLEBURY DR
E HOPE ST
EOP
311.50
27.32
992.91
34.90
STR-490-1
E HOPE ST
N KINGS DR
N EASTWOOD DR
406.50
25.00
1,185.56
48.90
STR-489-1
N EASTWOOD DR
E HOPE ST
E MISSION BLVD
691.20
28.00
2,257.89
57.10
STR-458-1
E COLUMBUS PL
E COLUMBUS BLVD
EOP
440.10
24.70
1,267.96
57.00
STR-2661-1
E HOPE ST
N EASTWOOD DR
EAPPLEBURYDR
1,491.00
28.00
4,870.60
55.10
STR-2684-1
E COLUMBUS BLVD
E COLUMBUS PL
N EASTWOOD DR
458.60
24.00
1,284.13
64.10
Page: 14
Model Details with Selected Supersegments/Subsegments by Year
121612021
9:12 AM
Model Year: 2023
Superseq Code:
Superseq Desc:
Rehab: Pavement:
Classification:
Area:
Begin PCI:
Total Cost:
2560
2560 - CLEBURN ST + Others
EM/FWM+Mod Overlay Atphalt
Local
4,792.09
50.70
$52,712.99
Subseg Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-2828-1
E BAXTER LN
N WILLOWAVE
EOP
790.10
15.00
1,382.67
38.00
STR-2868-1
E CLEBURN ST
N WILLOWAVE
N FRITZ DR
404.90
24.00
1,133.73
48.50
STR-2864-1
N WILLOWAVE
E CLEBURN ST
E BAXTER LN
303.30
15.00
530.75
51.50
STR-2865-1
E CLEBURN ST
N COLLEGE AVE
N WILLOWAVE
787.10
19.00
1,744.94
67.80
3120
3120 - CAROLYN DR + Others
EM/FWM+Mod Overlay Atphalt
Local
4,611.94
50.00
$50,731.34
Subseq Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-2551-1
E CAROLYN DR
N L UNSFORD AVE
N CAROLYN DR
664.90
21.00
1,629.02
54.30
STR-2548-1
N CAROLYN DR
E CAROLYN DR
E HAMMOND ST
452.60
18.00
950.50
52.30
STR-2194-1
E VIEWPOINT DR
N VIEWPOINT DR
E MISSION BLVD
600.70
29.00
2,032.42
50.10
3280
3280 - ROCK ST + Others
EM/FWM+Mod Overlay A5phalt
Local
6,781.81
53.70
$74,599.91
Subseq Code:
Street:
From Street.
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-3596-1
E ROCK ST
S EAST AVE
ALLEY 36
199.70
22.00
512.60
74.70
STR-3591-1
W ROCK ST
S BLOCKAVE
S CHURCH AVE
370.40
28.00
1,209.91
39.30
STR-3594-1
W ROCK ST
S EAST AVE
S BLOCK AVE
270.60
22.00
694.59
75.20
STR-4711-1
E ROCK ST
S WILLOWAVE
S WALKER RD
894.40
18.00
1,878.20
49.30
STR-3620-1
E ROCK ST
S WALKER RD
S KNERR DR
812.40
18.00
1,706.00
60.20
STR-3598-1
E ROCK ST
ALLEY 36
S COLLEGEAVE
304.10
22.00
780.51
58.30
4120
4120 - EMERSON LN + Others
EM/FWM+Mod Overlay Atphalt
Local
3,751.30
51.00
$41,264.30
Subseq Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-2729-1
N THOREAU LN
E EMERSON LN
E BRYAN LN
224.60
25.00
655.14
45.80
STR-2733-1
E EMERSON LN
N MISSION BLVD
N THOREAU LN
519.40
28.00
1,696.64
57.90
STR-2981-1
N WOODLAWN DR
E ROCKWOOD TRL
E WOODLAWN DR
461.40
26.00
1,399.52
50.70
4420
4420 - SHILOH DR + Others
EM/FWM+Mod Overlay Atphalt
Local
7,218.40
53.80
$79,402.40
Subseq Code:
Street:
From Street.
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-667-1
N SHILOH DR
PUBLIC 3887
E JOYCE BLVD
371.70
25.00
1,084.17
56.60
STR-439-1
N SHILOH DR
E JOYCE BLVD
E GEORGETOWNE SQUARE DR
476.20
27.00
1,500.00
28.90
STR-407-1
N SHILOH DR
E GEORGETOWNE SQUARE DR
EOP
390.20
32.00
1,456.71
49.20
STR-674-1
N SHILOH DR
EOP
PUBLIC 3887
756.50
27.00
2,387.25
75.40
STR-7637-1
E GEORGETOWNE SQUARE DR
N SHILOH DR
N COLLEGE AVE
103.30
30.00
361.50
83.60
STR-668-1
PUBLIC 3887
N SHILOH DR
N COLLEGE AVE
96.70
38.00
428.77
39.30
5760
#N/A
EM/FWM+Mod Overlay A5phalt
Local
5,860.15
50.80
$64,461.65
Subseq Code:
Street:
From Street.
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-2745-1
N HILLCRESTAVE
E NORTH ST
E OAKWOOD ST
541.40
22.00
1,389.54
45.40
Page: 15
Model Details with Selected Supersegments/Subsegments by Year
121612021
9:12 AM
Model Year: 2023
Superseq Code:
Superseq Desc:
Rehab: Pavement:
Classification:
Area:
Begin PCI:
Total Cost:
STR-452-1
N WASHINGTON AVE
E NORTH ST
E OAKWOOD ST
534.00
22.00
1,370.60
53.00
STR-2738-1
N WANEETAH AVE
E NORTH ST
E OAKWOOD ST
540.60
20.00
1,261.44
52.50
STR-2664-1
E OAKWOOD ST
N HILLCRESTAVE
W LAKERIDGE DR
348.50
19.00
772.56
61.30
STR-2750-1
W LAKERIDGE DR
E NORTH ST
E OAKWOOD ST
480.90
19.00
1,066.01
56.90
6140
6140 - RIDGEWAY DR + Others
EM/FWM+Mod Overlay Alsphalt
Local
7,179.48
50.20
$78,974.28
Subseq Code:
Street:
From Street.,
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-486-1
ERIDGEWAYDR
PUBLIC 1350
WRIDGEWAYDR
1,202.90
20.00
2,806.78
53.80
STR-2797-1
ERIDGEWAYDR
E SHADOWRIDGE DR
PUBLIC 1350
11331.80
18.00
2,796.80
56.40
STR-2800-1
ERIDGEWAYDR
WRIDGEWAYDR
E SHADOWRIDGE DR
517.70
21.00
1,267.00
37.20
STR-2609-1
PUBLIC 1350
E RIDGEWAY DR
E SHADOWRIDGE DR
147.10
18.00
308.90
61.60
7100
7100 - NEW BRIDGE RD + Others
EM/FWM+Mod Overlay 2llsphalt
Major Collector
12,250.25
53.90
$143,940.44
Subseq Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-2534-1
N 51 ST AVE
W WEDING TON DR
N SUNSHINE RD
643.00
27.00
2,025.45
60.50
STR-1764-1
W NEW BRIDGE RD
N CANNONDALE DR
N BATSFORD DR
576.50
28.00
1,883.16
59.80
STR-1939-1
W NEW BRIDGE RD
N DESARC WAY
N COLONY WAY
568.00
27.00
1,789.20
53.60
STR-5564-1
W NEW BRIDGE RD
N FALLBROOK WAY
N SUNSHINE RD
190.40
27.00
599.70
67.10
STR-532-1
W NEW BRIDGE RD
N COLONY WAY
N CANNONDALE DR
325.40
26.00
986.99
51.20
STR-1765-1
W NEW BRIDGE RD
N BATSFORD DR
N FALLBROOK WAY
401.80
27.00
1,265.70
52.20
STR-1924-1
W NEW BRIDGE RD
N SETTLEMENT LN
N INDEPENDENCE PL
271.30
28.00
886.20
52.60
STR-1940-1
W NEW BRIDGE RD
N INDEPENDENCE PL
N DESARC WAY
176.60
27.00
556.35
57.70
STR-1850-1
W NEW BRIDGE RD
N TRILLIUM LN
N SETTLEMENT LN
645.00
30.00
2,257.50
53.60
7440
7440 - ARCHER DR + Others
EM/FWM+Mod Overlay Alsphalt
Local
10,701.99
50.90
$117,721.89
Subseq Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-2970-1
N WATERMANAVE
WARCHER DR
W CLEVELAND ST
432.30
29.00
1,462.57
50.50
STR-2972-1
WARCHER DR
N SAMARA CIR
N SANG AVE
588.90
27.00
1,855.05
50.80
STR-2887-1
N ASHWOOD AVE
W CLEVELAND ST
EOP
241.40
20.00
563.22
65.40
STR-13330-1
N LEWIS AVE
W CLEVELAND ST
N LEWIS AVE
437.80
22.00
1,123.71
28.80
STR-2973-1
WARCHER DR
N WATERMANAVE
N SAMARA CIR
248.80
28.00
812.78
80.90
STR-2810-1
W BERRY ST
W BERRY ST
N SANG AVE
654.50
19.00
1,450.86
53.80
STR-2971-1
N SAMARA CIR
WARCHER DR
EOP
249.70
38.81
1,130.75
50.90
STR-2876-1
N FOWLERAVE
W CLEVELAND ST
EOP
424.60
21.00
1,040.32
60.80
STR-2881-1
N CEDARWOOD AVE
W CLEVELAND ST
EOP
416.30
26.00
1,262.73
51.40
7780
7780 - BOX AVE
EM/FWM+Mod Overlay Asphalt
Local
2,731.57
51.40
$30,047.27
Subseq Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-2064-1
N BOXAVE
E MISSION BLVD
EOP
1,242.20
19.00
2,731.57
53.50
8660
8660 - DUNCAN AVE + Others
EM/FWM+Mod Overlay 2l1sphalt
Local
2,488.08
51.40
$27,368.88
Page: 16
Model Details with Selected Supersegments/Subsegments by Year
121612021
9:12 AM
Model Year: 2023
Superseq Code:
Superseq Desc:
Rehab: Pavement:
Classification:
Area:
Begin PCI:
Total Cost:
Subseg Code:
Street:
From Street.
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-3423-1
W CENTER ST
N DUNCAN AVE
S HARMON AVE
348.50
28.00
1,138.36
39.60
STR-3419-1
N HARMON AVE
W CLINTON DR
W FAIRVIEW ST
161.40
20.00
376.56
91.40
STR-24534-1
S HARMON AVE
S HARMON AVE
W CENTER ST
297.90
28.00
973.16
55.20
8740
8740 - SHERYL AVE + Others
EM/FWM+Mod Overlay 2llsphalt
Local
9,248.45
53.90
$101,732.95
Subseq Code:
Street:
From Street.
To Street:
Lenqth:
Width:
Total Area:
Current PCI:
STR-1074-1
N ELIZABETH AVE
E CORTLAND ST
E BRIARCLIFF ST
277.70
29.00
939.60
63.30
STR-1133-1
N ELIZABETHAVE
E ROLLING HILLS DR
E ETON ST
710.20
28.00
2,319.96
62.20
STR-1100-1
N ELIZABETH AVE
E ETON ST
E CORTLAND ST
283.80
28.00
927.11
53.90
STR-792-1
N SHERYL AVE
E ROLLING HILLS DR
E HAROLD ST
1,549.50
28.00
5,061.78
52.20
9020
9020 - TACKETT DR + Others
EM/FWM+Mod Overlay Zlsphalt
Local
2,545.35
51.90
$27,998.85
Subseq Code:
Street:
From Street.
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-2735-1
W TACKETT DR
N GENEVIEVE AVE
EOP
742.20
13.00
1,125.66
43.60
STR-2837-1
N GENEVIEVE AVE
EOP
W TACKETT DR
721.30
17.00
1,419.69
62.30
9240
9240 - REAGAN ST + Others
EM/FWM+Mod Overlay Zlsphalt
Local
2,504.79
51.10
$27,552.69
Subseq Code:
Street:
From Street.
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-2614-1
W REAGAN ST
ALLEY 624
N ARKANSAS AVE
279.20
27.00
881.25
43.40
STR-3131-1
N GREGG AVE
W REAGAN ST
W MAPLE ST
358.20
23.00
961.14
61.80
STR-30172-1
W REAGAN ST
N GREGG AVE
ALLEY 624
210.30
27.00
662.40
53.90
1080
1080 - ALLEY 13
FWM+Thick Overlay >24tsphalt
Alley
634.88
28.50
$8,412.16
Subseq Code:
Street:
From Street.
To Street:
Lenqth:
Width:
Total Area:
Current PCI:
STR-3115-1
ALLEY 13
E MAPLE ST
E DAVIDSON ST
494.70
11.00
634.88
30.50
12220
12220 - MITCHELL ST + Others
FWM+Thick Overlay >2.%sphalt
Local
4,206.41
29.90
$68,354.16
Subseq Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-3695-1
S GABBARD DR
W MITCHELL ST
W KAYWOOD LN
242.60
20.00
566.11
38.30
STR-3710-1
S GABBARD DR
W KAYWOOD LN
EOP
149.00
21.00
365.05
29.50
STR-3240-1
W MITCHELL ST
S PHILLIP DR
S SANG AVE
216.70
27.00
682.65
52.70
STR-3671-1
S LEWIS AVE
W STONE ST
W MITCHELL ST
573.30
29.00
1,939.62
25.90
STR-3700-1
W KAYWOOD LN
EOP
S GABBARD DR
266.50
21.00
652.98
24.40
2020
2020 - 9TH ST
PCC Mod Pnl Rep <20%Concrete
Local
788.00
53.20
$35,066.00
Subseq Code:
Street:
From Street.
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-652-1
E 9TH ST
S COLLEGE AVE
S WASHINGTON AVE
337.70
20.00
788.00
54.60
5520
5520 - MEADOWCLIFF DR
PCC Mod Pnl Rep <200/.Concrete
Local
994.38
51.20
$44,249.91
Subseq Code:
Street:
From Street.
To Street:
Lenqth:
Width:
Total Area:
Current PCI:
Page: 17
Model Details with Selected Supersegments/Subsegments by Year 121612021
9:12 AM
Model Year: 2023
Superseq Code: Superseq Desc:
STR-961-1 E MEADOWCLIFF DR
Rehab: Pavement: Classification: Area: Begin PCI: Total Cost:
N ELIZABETH AVE N CENTERWOOD RD 293.90 29.00 994.38 52.60
11860 11860 - CENTENNIAL PARK LN + Others
Super Thin 3/4" Overlay ksphalt
Local
4,213.71
70.50
$23,596.78
Subseg Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-9817-1
W SCOTTSWOOD PL
ALLEY 2900
EOP
81.30
63.61
614.10
79.50
STR-3784-1
S GREEN POINT TRCE
W OLD FARMINGTON RD
EOP
432.00
34.99
1,771.16
72.60
STR-9816-1
W SCOTTSWOOD PL
W OLD FARMINGTON RD
ALLEY 2900
176.00
21.00
431.20
82.10
STR-1505812-1
S MOUNT MILLSAP LN
EOP
EOP
743.30
15.00
1,397.25
65.40
Page: 18
Model Details with Selected Supersegments/Subsegments by Year
121612021
9:12 AM
Model Year: 2024
Superseq Code:
Superseq Desc:
Rehab: Pavement:
Classification:
Area:
Begin PCI:
Total Cost:
9660
9660 - LAKE SEQUOYAH SPUR
ACP Full Depth ReconstAisphalt
Local
3,029.57
14.90
$151,478.50
Subseq Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-5736-1
N LAKE SEQUOYAH SPUR
N LAKE SEQUOYAH SPUR
EOP
1,025.70
12.00
1,436.00
4.40
STR-6052-1
N LAKE SEQUOYAH SPUR
E ETHEL AVE
N LAKE SEQUOYAH SPUR
718.90
19.00
1,593.57
29.30
11920
11920 - SELLE DR + Others
EM/FWM+Mod Overlay At phalt
Local
4,262.49
52.20
$46,887.39
Subseq Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-4457-1
W LAURA LEE ST
S EMMA AVE
S COLEMAN AVE
340.60
26.00
1,033.21
62.10
STR-4455-1
W LAURA LEE ST
S COLEMAN AVE
EOP
166.00
26.00
503.53
50.70
STR-4466-1
S COLEMAN AVE
W LAURA LEE ST
EOP
144.60
28.00
472.42
58.90
STR-3481-1
W SELLE DR
W CATO SPRINGS RD
S EMMA AVE
772.70
25.00
2,253.33
53.90
13580
13580 - MOUNT COMFORT RD + Others
EM/FWM+Mod Overlay Alsphalt
Minor Collector
4,620.28
53.10
$53,133.22
Subseq Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-483-1
W MOUNT COMFORT RD
N STEPHENS AVE
N LEWIS AVE
1,128.40
22.00
2,896.18
54.70
STR-2460-1
W MOUNT COMFORT RD
N ADDINGTON AVE
N STEPHENS AVE
703.70
21.00
1,724.10
60.70
1440
1440 - ALLEY 4105
EM/FWM+Mod Overlay Alsphalt
Alley
2,138.25
53.30
$20,313.38
Subseq Code:
Street:
From Street.
To Street:
Lenqth:
Width:
Total Area:
Current PCI:
STR-8438-1
ALLEY 4105
ALLEY 650
N MEADOWLANDS DR
217.20
20.00
506.78
56.80
STR-8439-1
ALLEY 4105
ALLEY 620
ALLEY 650
142.50
20.00
332.45
45.20
STR-8440-1
ALLEY 4105
ALLEY 590
ALLEY 620
270.10
20.00
630.22
64.00
STR-8441-1
ALLEY 4105
ALLEY 509
ALLEY 590
301.70
19.00
668.80
55.10
2180
2180 - ADOBE ST + Others
EM/FWM+Mod Overlay Alsphalt
Local
5,301.28
52.50
$58,314.08
Subseq Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-930-1
E ADOBE ST
N ARROYO AVE
N SIERRA AVE
268.60
28.00
877.49
64.20
STR-794-1
N VALENCIA AVE
EADOBE ST
E DRAKE ST
494.90
32.00
1,847.64
55.70
STR-920-1
NARROYOAVE
EADOBE ST
E DRAKE ST
526.80
28.00
1,720.91
51.80
STR-921-1
E ADOBE ST
N VALENCIA AVE
N ARROYO AVE
261.80
28.00
855.24
59.40
3260
3260 - MOUNTAIN ST + Others
EM/FWM+Mod Overlay Alsphalt
Local
7,632.59
52.50
$83,958.49
Subseq Code:
Street:
From Street:
To Street:
Lenqth:
Width:
Total Area:
Current PCI:
STR-3542-1
E MOUNTAIN ST
S WASHINGTON AVE
S WILLOWAVE
537.90
18.00
1,129.60
42.80
STR-3541-1
S WILLOWAVE
E CENTER ST
E MOUNTAIN ST
208.00
22.00
533.87
48.20
STR-3556-1
E MOUNTAIN ST
E MOUNTAIN ST
S COUNTYAVE
113.80
15.00
198.92
39.10
STR-3603-1
S WILLOWAVE
E MOUNTAIN ST
E ROCK ST
433.60
22.00
1,112.96
60.40
STR-3529-1
E CENTER ST
S COUNTYAVE
N MILL AVE
159.10
18.00
334.10
60.50
STR-1997-1
N COUNTYAVE
E CENTER ST
E MEADOW ST
166.60
24.00
466.53
41.70
STR-1998-1
E CENTER ST
N COLLEGE AVE
N COUNTYAVE
222.30
32.00
829.87
50.30
Page: 19
Model Details with Selected Supersegments/Subsegments by Year
121612021
9:12 AM
Model Year: 2024
Superseq Code:
Superseq Desc:
Rehab: Pavement:
Classification:
Area:
Begin PCI:
Total Cost:
STR-625-1
S COUNTYAVE
E CENTER ST
E MOUNTAIN ST
250.50
17.00
496.87
80.60
STR-3470-1
N COUNTYAVE
E CENTER ST
E CENTER ST
48.70
24.00
136.40
52.70
STR-3538-1
E CENTER ST
S WILLOWAVE
N WALNUTAVE
443.60
20.00
1,035.11
64.70
STR-3540-1
E MOUNTAIN ST
E MOUNTAIN ST
S WASHINGTON AVE
212.90
18.00
447.10
64.90
STR-3600-1
S WASHINGTONAVE
E MOUNTAIN ST
E ROCK ST
411.10
19.00
911.26
60.20
7380
7380 - APPLEBURY DR + Others
EM/FWM+Mod Overlay Assphalt
Local
3,803.02
53.40
$41,833.22
Subseg Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-3035-1
N ANNA PL
EOP
E ROCKWOOD TRL
349.80
20.00
816.22
40.90
STR-2956-1
NAPPLEBURYDR
N TANGLEBRIAR LN
N TANGLEBRIAR LN
1,066.70
24.00
2,986.80
61.80
7860
7860 - BOXWOOD DR + Others
EM/FWM+Mod Overlay Asphalt
Local
5,834.34
52.80
$64,177.74
Subseq Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-801-1
N BOXWOOD DR
E JUNIPER ST
N OLD WIRE RD
767.60
30.00
2,686.67
54.10
STR-1265-1
N RAINTREE DR
N SUMAC DR
N OLD WIRE RD
392.60
30.00
1,374.17
58.90
STR-1296-1
N BOXWOOD DR
E MAGNOLIA DR
E JUNIPER ST
105.90
30.00
370.67
56.20
STR-931-1
N RAINTREE DR
E JUNIPER ST
N SUMAC DR
400.80
30.00
1,402.83
59.70
8920 8920 - FRISCO AVE + Others
EM/FWM+Mod Overlay 2llsphalt
Local
11,842.62
52.20
$130,268.82
Subseq Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-2937-1
N FRISCO AVE
W PROSPECT ST
WADAMS ST
947.10
18.00
1,988.90
55.20
STR-2835-1
N WOOLSEYAVE
W CLEBURN ST
WADAMS ST
284.70
24.00
797.20
52.80
STR-2787-1
WADAMS ST
N MOLLY CT
N FRISCO AVE
74.10
25.00
216.11
54.80
STR-2788-1
N VANDEVENTER AVE
WADAMS ST
WNORTH ST
346.60
25.00
1,010.97
51.50
STR-2789-1
WADAMS ST
N VANDEVENTER AVE
N GREGG AVE
671.60
37.00
2,899.16
57.20
STR-2842-1
N VANDEVENTER AVE
W HAWTHORN ST
WADAMS ST
351.20
24.00
983.33
56.20
STR-2792-1
N WOOLSEYAVE
WADAMS ST
W NORTH ST
345.00
23.00
925.75
61.60
STR-2843-1
W HAWTHORN ST
N VANDEVENTER AVE
N GREGG AVE
665.60
26.00
2,019.04
58.10
STR-2786-1
WADAMS ST
N GREGGAVE
N MOLLY CT
330.40
26.00
1,002.16
52.70
90000 90000 - RUPPLE RD + Others
EM/FWM+Mod Overlay Asphalt
Major Collector
11,709.35
52.20
$137,584.86
Subsea Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-57182-1
N RUPPLE RD
N BEST FRIEND LN
WALBATROSS LOOP
542.70
35.00
2,164.17
64.20
STR-1505980-1
N RUPPLE RD
N RUPPLE RD
N RUPPLE RD
535.90
27.00
1,688.10
41.90
STR-9937-1
N RUPPLE RD
WALBATROSS LOOP
N BEST FRIEND LN
548.60
35.00
2,186.33
82.20
STR-9563-1
N RUPPLE RD
W STARRY NIGHT VW
N RUPPLE RD
579.70
27.00
1,963.95
44.00
STR-1505981-1
N RUPPLE RD
N RUPPLE RD
N RUPPLE RD
183.80
27.00
579.00
41.90
STR-66191-1
N RUPPLE RD
N RUPPLE RD
W MOUNT COMFORT RD
531.80
27.00
1,675.20
41.90
STR-28590-1
N RUPPLE RD
WALBATROSS LOOP
W STARRY NIGHT VW
460.50
27.00
1,452.60
65.10
1220 1220 - ALLEY 1861 + Others Microsurface/Chip Seal Asphalt
Page: 20
Alley
1,042.01 81.40 $3,334.43
Model Details with Selected Supersegments/Subsegments by Year
121612021
9:12 AM
Model Year: 2024
Superseq Code:
Superseq Desc:
Rehab: Pavement:
Classification:
Area:
Begin PCI:
Total Cost:
Subseg Code:
Street:
From Street.
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-7430-1
ALLEY 1861
EOP
ALLEY 1776
76.90
17.00
152.53
89.10
STR-7431-1
ALLEY 1861
ALLEY 1776
W CREEKMORE DR
220.90
16.00
412.35
82.40
STR-7426-1
ALLEY 1861
W CREEKMORE DR
EOP
106.20
15.00
185.83
80.10
STR-7427-1
ALLEY 1776
ALLEY 1861
W CREEKMORE DR
138.70
18.00
291.30
83.80
9940
9940 - EAGLE ST
PCC Ext Pnl Rep <33% Concrete
Local
2,058.59
42.00
$124,544.70
Subseq Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-2861-1
W EAGLE ST
N OAKLAND AVE
N LINDELL AVE
348.90
28.00
1,139.76
45.20
STR-2863-1
W EAGLE ST
N STORER AVE
N OAKLAND AVE
262.50
30.00
918.83
43.70
1120
1120 - ALLEY 150 + Others
PCC Mod Pnl Rep <200/oConcrete
Alley
1,560.31
53.60
$53,050.54
Subseq Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-28216-1
ALLEY 150
W CENTER ST
W MOUNTAIN ST
269.30
14.00
439.83
62.90
STR-28228-1
ALLEY 150
W MEADOW ST
W SPRING ST
372.30
12.00
521.20
64.00
STR-28217-1
ALLEY 150
W CENTER ST
W MEADOW ST
366.90
14.00
599.28
43.80
11700
11700 - BLOCK AVE + Others
PCC Mod Pnl Rep <200/oConcrete
Local
2,683.18
51.40
$119,401.51
Subseq Code:
Street:
From Street.
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-3588-1
W ROCK ST
S CHURCH AVE
S LOCUST AVE
368.60
26.00
1,118.14
45.60
STR-3635-1
S BLOCKAVE
W ROCK ST
S ARCHIBALD YELL BLVD
479.10
28.00
1,565.04
60.00
6120
6120 - BENTWOOD LN + Others
PCC Mod Pnl Rep <201/oConcrete
Local
5,908.21
52.10
$262,915.35
Subseq Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-409-1
N BENTWOOD LN
E RIDGEWOOD LN
EOP
724.80
33.00
2,790.52
59.20
STR-419-1
E RIDGEWOOD LN
N BENTWOOD LN
EOP
460.10
32.00
1,717.69
53.40
STR-415-1
N BENTWOOD LN
N OLD MISSOURI RD
E RIDGEWOOD LN
375.00
32.00
1,400.00
47.10
10800
10800 - SALEM RD
Super Thin 3/4" Overlay Mphalt
Major Collector
12,713.98
70.10
$75,012.48
Subseq Code:
Street:
From Street.
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-6192-1
N SALEM RD
PRIVATE 3400
W MICA ST
403.20
30.00
1,411.17
81.90
STR-2267-1
N SALEM RD
N TIMBERLINE DR
W VASSAR ST
94.70
30.00
331.50
74.00
STR-2037-1
N SALEM RD
W ESSEX DR
W FAIRFAX ST
273.70
28.00
894.13
49.00
STR-6191-1
N SALEM RD
W WEDING TON DR
PRIVATE 3400
376.80
48.00
2,110.13
80.90
STR-2234-1
N SALEM RD
W CORNELL ST
W PRINCETON ST
271.80
30.00
951.33
81.80
STR-2078-1
N SALEM RD
W HARVARD ST
W BUCKEYE ST
273.00
28.00
891.80
78.30
STR-2128-1
N SALEM RD
W YALE ST
W HARVARD ST
268.30
28.00
876.40
75.20
STR-1546-1
N SALEM RD
W MICA ST
N TIMBERLINE DR
653.50
29.00
2,211.09
75.20
STR-291-1
N SALEM RD
W FAIRFAX ST
EOP
105.10
28.00
343.31
57.10
STR-335-1
N SALEM RD
W PRINCETON ST
W YALE ST
269.50
28.00
880.44
72.40
Page: 21
Model Details with Selected Supersegments/Subsegments by Year
121612021
9:12 AM
Model Year: 2024
Superseq Code: Superseq Desc:
Rehab: Pavement:
Classification:
Area:
Begin PCI:
Total Cost:
STR-563-1
N SALEM RD
W VASSAR ST
W CORNELL ST
268.60
30.00
940.17
79.70
STR-306-1
N SALEM RD
W BUCKEYE ST
W ESSEX DR
267.10
28.00
872.51
48.90
11730 11730 - CATO SPRINGS RD
Super Thin 3/4" Overlay Asphalt
Major Collector
6,366.92
70.50
$37,564.83
Subseq Code:
Street:
From Street:
To Street:
Length:
Width:
Tota/Area:
Current PCI:
STR-4438-1
W CATO SPRINGS RD
S VALEAVE
S RAZORBACK RD
773.10
27.00
2,435.25
68.80
STR-4441-1
W CATO SPRINGS RD
S GARLAND AVE
W CATO SPRINGS RD
1,258.10
25.00
3,681.39
77.00
STR-1506021-1
W CATO SPRINGS RD
W CATO SPRINGS RD
W CATO SPRINGS RD
16.90
25.00
49.31
75.90
STR-1506020-1
W CATO SPRINGS RD
W CATO SPRINGS RD
S VALEAVE
54.60
25.00
159.31
75.90
STR-1506022-1
W CATO SPRINGS RD
W CATO SPRINGS RD
W CATO SPRINGS RD
14.30
25.00
41.66
75.90
12760 12760 - SANG AVE
Super Thin 3/4" Overlay Asphalt
Minor Collector
2,089.33
71.70
$12,118.11
Subseq Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-5573-1
S SANG AVE
W OLD FARMINGTON RD
W MARTIN LUTHER KING JR BLL
186.50
35.00
761.44
79.70
STR-3239-1
S SANG AVE
W STONE ST
W MITCHELL ST
569.10
20.00
1,327.89
72.20
13960 13960 - VAN ASCHE DR + Others
Super Thin 3/4" Overlay Asphalt
Minor Arterial
12,521.44
71.10
$76,380.78
Subseq Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-4932-1
W VANASCHE DR
N STEELE BLVD
N INVESTMENT DR
710.30
25.00
2,071.67
76.50
STR-28181-1
W VANASCHE DR
W VAN ASCHE DR
W VAN ASCHE DR
434.60
40.00
2,028.23
70.50
STR-404-1
W VANASCHE DR
W VAN ASCHE DR
W VAN ASCHE DR
297.00
56.00
1,940.40
71.10
STR-65926-1
W VANASCHE DR
W VANASCHE LOOP
W VAN ASCHE DR
71.60
46.00
384.36
69.20
STR-54392-1
W VANASCHE DR
N INVESTMENT DR
W VANASCHE LOOP
226.30
26.00
686.40
75.40
STR-187-1
W VANASCHE DR
W VAN ASCHE DR
W VAN ASCHE DR
472.90
28.00
1,544.82
72.80
STR-54393-1
W VANASCHE DR
W VANASCHE LOOP
N STEELE BLVD
482.00
26.00
1,462.06
83.50
STR-6023-1
W VANASCHE DR
N INVESTMENT DR
W VANASCHE LOOP
339.30
55.00
2,177.08
76.30
STR-65927-1
W VANASCHE DR
W VAN ASCHE DR
W VAN ASCHE DR
42.20
46.00
226.42
69.10
2200 2200 - ZION RD WC 92 + Others
Super Thin 3/4" Overlay Asphalt
Major Collector
8,404.20
70.40
$49,584.78
Subseq Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-498-1
E ZION RD
E ZION RD
E ZION RD
28.40
36.00
119.20
70.30
STR-1505761-1
E ZION RD
EOP
N CROSSOVER RD
22.10
36.00
92.80
70.30
STR-3006-1
S GEORGE ANDERSON RD
S GEORGE ANDERSON RD
S GEORGE ANDERSON RD
646.00
21.00
1,582.70
80.20
STR-5670-1
EALBRIGHT RD
EALBRIGHT RD
EALBRIGHT RD
330.00
21.00
808.50
82.30
STR-4835-1
E ZION RD
N CROSSOVER RD
E ZION RD
1,378.80
36.00
5,801.00
71.10
5700 5700
- NORTH ST
Super Thin 3/4" Overlay Asphalt
Minor Arterial
7,908.37
72.40
$48,241.06
Subseq Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-30177-1
E NORTH ST
ALLEY 250
N WANEETAH AVE
169.40
26.00
513.79
70.00
STR-2763-1
E NORTH ST
E LAKEFRONT DR
E LAKEFRONT DR
383.40
25.00
1.118.19
68.90
Page: 22
Model Details with Selected Supersegments/Subsegments by Year
121612021
9:12 AM
Model Year: 2024
Superseq Code: Superseq
Desc:
Rehab: Pavement:
Classification:
Area:
Begin PCI:
Total Cost:
STR-2746-1
E NORTH ST
N WANEETAH AVE
N HILLCRESTAVE
331.00
26.00
1,004.03
80.80
STR-2751-1
E NORTH ST
N HILLCRESTAVE
W LAKERIDGE DR
344.60
25.00
1,005.14
80.80
STR-2765-1
E NORTH ST
E LAKEFRONT DR
E LAKERIDGE DR
128.10
26.00
388.56
78.60
STR-2769-1
E NORTH ST
E LAKERIDGE DR
N MISSION BLVD
263.00
35.00
1,073.92
75.30
STR-2739-1
E NORTH ST
N WASHINGTON AVE
ALLEY 250
173.80
26.00
527.22
64.90
STR-2759-1
E NORTH ST
W LAKERIDGE DR
E LAKEFRONT DR
405.50
25.00
1,182.78
85.60
STR-453-1
E NORTH ST
N COLLEGE AVE
N WASHINGTON AVE
360.90
26.00
1,094.74
70.40
6540 6540 - HILLSIDE
TER + Others
Super Thin 3/4" Overlay Asphalt
Local
2,377.31
71.40
$13,312.94
Subseg Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-1505758-1
E STERLING CT
EOP
N CROSSOVER RD
22.20
27.00
69.90
70.40
STR-1505992-1
W DRAKE ST
N GREGG AVE
W DRAKE ST
68.40
20.00
159.56
53.50
STR-118-1
E STERLING CT
E STERLING CT
E STERLING CT
205.40
27.00
646.95
75.70
STR-119-1
E STERLING CT
E STERLING CT
E STERLING CT
272.70
27.00
859.05
77.40
STR-1192-1
E STERLING CT
N CROSSOVER RD
E STERLING CT
202.70
27.00
641.85
74.80
7040 7040 - CLINTON DR + Others
Super Thin 3/4" Overlay Asphalt
Major Collector
6,153.06
70.50
$36,303.05
Subseq Code:
Street:
From Street.
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-65622-1
LEROY POND/STADIUM RAB
S STADIUM DR
W NOLAN RICHARDSON DR
55.90
16.00
104.36
81.90
STR-65625-1
LEROYPOND/STADIUM RAB
S STADIUM DR
S STADIUM DR
103.00
16.00
192.27
80.70
STR-65624-1
LEROY POND/STADIUM RAB
W NOLAN RICHARDSON DR
S STADIUM DR
46.80
16.00
87.38
76.60
STR-3533-1
W CLINTON DR
N HARMON AVE
ROUNDABOUT
1,189.30
25.00
3,468.75
67.00
STR-3615-1
S STADIUM DR
ROUNDABOUT
LEROYPOND/STADIUM RAB
476.10
28.00
1,555.24
84.00
STR-6248-1
S STADIUM DR
LEROY POND/STADIUM RAB
W BULLDOG BLVD
290.30
22.00
745.06
80.90
Page: 23
Model Details with Selected Supersegments/Subsegments by Year
121612021
9:12 AM
Model Year: 2025
Superseq Code:
Superseq Desc:
Rehab: Pavement:
Classification:
Area:
Begin PCI:
Total Cost:
4440
4440 - GLEN WING LN + Others
ACP Full Depth ReconstAisphalt
Local
1,519.38
14.90
$75,969.00
Subseg Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-2903-1
E GLEN WING LN
E CLEBURN ST
N POLLARD AVE
531.50
17.00
1,054.09
9.80
STR-2341-1
W GECKO LN
ALLEY 48
N PARK AVE
209.90
19.00
465.29
37.40
4880
4880 - VILLAGE DR + Others
EM/FWM+Mod Overlay At phalt
Local
5,897.26
52.90
$64,869.86
Subseq Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-1068-1
E JASON DR
EAPPLEBYRD
E VILLAGE DR
395.20
28.00
1,290.96
62.60
STR-1045-1
E VILLAGE DR
N BUTTERNUT DR
E MARGARET PL
309.60
27.00
975.30
66.50
STR-218-1
E VILLAGE DR
EOP
E MALINDA DR
155.80
27.00
490.80
46.30
STR-916-1
E VILLAGE DR
E JASON DR
N WANNE DR
961.30
28.00
3,140.20
56.30
9120
9120 - TIMBERCREST AVE + Others
EM/FWM+Mod Overlay Alsphalt
Local
10,835.18
53.60
$119,186.98
Subseq Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-342-1
W WOODFIELD WAY
W OAKFIELD ST
N TIMBERLINE DR
892.70
28.00
2,916.20
53.00
STR-561-1
N GREENLEAF DR
W MULBERRY ST
WANNE ST
441.90
30.00
1,546.67
64.30
STR-565-1
N TIMBERCREST AVE
W MULBERRY ST
WANNEST
655.50
29.00
2,217.86
56.20
STR-567-1
W MULBERRY ST
N TIMBERCREST AVE
N GREENLEAF DR
268.50
30.00
939.83
62.40
STR-2150-1
N TIMBERCRESTAVE
WANNEST
W OAKFIELD ST
371.30
29.00
1,256.18
67.50
STR-2097-1
W OAKFIELD ST
N TIMBERCREST AVE
W WOODFIELD WAY
273.50
27.00
861.60
60.70
STR-2089-1
W OAKFIELD ST
N WOODFIELD WAY
N TIMBERLINE DR
324.20
29.00
1,096.84
62.10
9980
9980 - BERRY ST + Others
EM/FWM+Mod Overlay 2llsphalt
Local
5,737.01
53.20
$63,107.11
Subseq Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-2860-1
N OAKLAND AVE
W EAGLE ST
W BERRY ST
351.20
30.00
1,229.17
52.60
STR-30181-1
W BERRY ST
N LEVERETT AVE
ALLEY 848
168.60
21.00
413.12
57.70
STR-30183-1
W BERRY ST
N OAKLAND AVE
ALLEY 970
169.80
29.00
574.52
65.00
STR-2749-1
W HUGHES ST
N STORER AVE
N OAKLAND AVE
267.10
20.00
623.22
54.60
STR-2818-1
W BERRY ST
N STORER AVE
N OAKLAND AVE
266.50
20.00
621.89
63.80
STR-2822-1
W BERRY ST
ALLEY 848
N STORER AVE
183.70
18.00
385.80
44.00
STR-2812-1
W BERRY ST
ALLEY 970
N LINDELL AVE
178.80
28.00
584.11
70.00
STR-2915-1
N LINDELL AVE
W CLEVELAND ST
W EAGLE ST
350.90
20.00
818.78
60.40
STR-2744-1
W HUGHES ST
N OAKLAND AVE
ALLEY 970
173.70
24.00
486.40
64.40
12800
12800 - SHILOH DR
FWM+Thick Overlay >2.Gksphalt
Minor Collector
10,787.66
29.30
$186,087.14
Subseq Code:
Street:
From Street:
To Street:
Lenqth:
Width:
Total Area:
Current PCI:
STR-3955-1
S SHILOH DR
S RAMP 62
W 15TH ST
1,029.10
30.00
3,601.83
38.40
STR-4251-1
S SHILOH DR
W 15TH ST
W KEITH PL
2,053.10
30.00
7,185.83
34.80
13540
13540 - MELMAR DR
FWM+Thick Overlay >2.&sphalt
Local
3,985.26
29.00
$64,760.48
Page: 24
Model Details with Selected Supersegments/Subsegments by Year
121612021
9:12 AM
Model Year: 2025
Superseq Code:
Superseq Desc:
Rehab: Pavement:
Classification:
Area:
Begin PCI:
Total Cost:
Subseg Code:
Street:
From Street.
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-280-1
W MELMAR DR
N LEVERETT AVE
W PEACHTREE DR
535.20
23.00
1,436.09
49.00
STR-274-1
W MELMAR DR
W PEACHTREE DR
N GARLAND AVE
950.00
23.00
2,549.17
27.10
3020
3020 - CADBERRY TER
PCC Jnt Rhb & Crk SealConcrete
Local
343.22
87.80
$2,230.93
Subseq Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-20532-1
E CADBERRY TER
N CANTERBURY RD
E CADBERRY TER
147.10
20.00
343.22
89.70
13160
13160 - CENTER ST
PCC Mod Pnl Rep <201/oConcrete
Major Collector
1,202.44
53.60
$60,723.22
Subseq Code:
Street:
From Street.
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-1991-1
W CENTER ST
N SCHOOL AVE
S WESTAVE
368.10
28.00
1,202.44
58.10
11680
11680 - MASHBURN AVE + Others
PCC Partial Reconstructfdoncrete
Local
4,865.14
29.00
$401,374.05
Subseq Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-3778-1
S BLAIR AVE
EOP
E HUNTSVILLE RD
531.50
24.00
1,488.27
19.10
STR-2359-1
S MASHBURNAVE
EOP
E HUNTSVILLE RD
690.30
22.00
1,771.73
51.50
STR-639-1
S LYTTON AVE
EOP
E HUNTSVILLE RD
625.40
22.00
1,605.14
24.90
10480
10480 - PARK AVE
Super Thin 3/4" Overlay Asphalt
Minor Collector
3,495.42
71.40
$20,273.44
Subseq Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-2776-1
N PARKAVE
W GECKO LN
W NORTH ST
245.50
24.00
687.33
86.00
STR-2838-1
N PARKAVE
W CLEBURN ST
W GECKO LN
391.40
24.00
1,095.87
83.10
STR-2943-1
N PARKAVE
W PROSPECT ST
W CLEBURN ST
638.10
23.00
1,712.22
66.90
11660
11660 - BEECHWOOD AVE
Super Thin 3/4" Overlay Asphalt
Major Collector
4,305.20
71.50
$25,400.68
Subseq Code:
Street:
From Street.
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-5480-1
S BEECHWOOD AVE
W CROWNE DR
W RICHMOND DR
356.50
31.00
1,289.43
77.50
STR-4108-1
S BEECHWOOD AVE
W RICHMOND DR
W 18TH ST
498.10
30.00
1,743.33
79.20
STR-4112-1
S BEECHWOOD AVE
S BEECHWOOD AVE
W CROWNE DR
314.20
28.00
1,042.84
70.90
STR-66264-1
S BEECHWOOD AVE
ROUNDABOUT
S BEECHWOOD AVE
70.30
28.00
229.60
64.50
1240
1240 - ALLEY 4360 + Others
Super Thin 3/4" Overlay Asphalt
Alley
3,474.86
72.30
$17,721.79
Subseq Code:
Street:
From Street.
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-9607-1
ALLEY 2460
ALLEY 4360
E FRONTIER ELM DR
131.60
18.00
276.40
88.90
STR-9608-1
ALLEY 4360
N BEGONIA LN
ALLEY 2460
275.10
19.00
609.80
77.40
STR-9601-1
ALLEY 2650
E RIVER BIRCH DR
E FRONTIER ELM DR
380.30
21.00
931.70
80.20
STR-9597-1
ALLEY 4360
N LANTANA LN
N CANNA LN
380.60
21.00
932.52
70.80
STR-9606-1
ALLEY 4360
ALLEY 2460
N LANTANA LN
310.50
20.00
724.44
71.20
12585
12585 - MORNINGSIDE DR
Super Thin 3/4" Overlay Mphalt
Major Collector
7,039.03
70.30
$41,530.28
Subseq Code:
Street:
From Street.
To Street:
Length:
Width:
Total Area:
Current PCI:
Page: 25
Model Details with Selected Supersegments/Subsegments by Year
121612021
9:12 AM
Model Year: 2025
Superseq Code:
Superseq Desc:
Rehab: Pavement:
Classification:
Area:
Begin PCI:
Total Cost:
STR-4714-1
S MORNINGSIDE DR
E 15TH ST
E PUMP STATION RD
2,413.40
25.00
7,039.03
75.10
13140
13140 - CATO SPRINGS RD
Super Thin 3/4" Overlay ,asphalt
Major Collector
10,935.56
71.70
$64,519.80
Subseg Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-4030-1
W CATO SPRINGS RD
S COLEMAN AVE
S LAVERNE AVE
568.50
31.00
2,056.16
80.50
STR-4032-1
W CATO SPRINGS RD
S COLEMAN AVE
S COLEMAN AVE
84.20
32.00
314.31
72.40
STR-4033-1
W CATO SPRINGS RD
S EMMA AVE
S COLEMAN AVE
261.30
32.00
975.11
82.30
STR-4034-1
W CATO SPRINGS RD
W SELLE DR
S INNOVATION WAY
336.20
33.00
1,296.17
79.50
STR-3505-1
W CATO SPRINGS RD
S SCHOOL AVE
W SELLE DR
421.00
33.00
1,619.02
71.50
STR-4027-1
W CATO SPRINGS RD
W CATO SPRINGS RD
S GARLAND AVE
557.30
25.00
1,668.19
74.50
STR-4029-1
W CATO SPRINGS RD
S LAVERNE AVE
S CLINE AVE
159.10
31.00
575.57
83.80
STR-1505876-1
W CATO SPRINGS RD
S FLORIDA WAY
W CATO SPRINGS RD
156.30
25.00
455.83
64.60
STR-1505877-1
W CATO SPRINGS RD
W CATO SPRINGS RD
W CATO SPRINGS RD
151.60
25.00
442.22
64.60
STR-10048-1
W CATO SPRINGS RD
S CLOVER DR
S FLORIDA WAY
165.50
33.00
637.26
77.40
STR-18128-1
W CATO SPRINGS RD
S INNOVATION WAY
S EMMA AVE
108.10
31.00
391.28
78.30
STR-4028-1
W CATO SPRINGS RD
S CLINE AVE
S CLOVER DR
139.50
31.00
504.44
72.50
13380
13380 - GOOSE CREEK RD + Others
Super Thin 3/4" Overlay RSphalt
Major Collector
8,332.43
71.80
$49,161.34
Subseq Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-9837-1
W GOOSE CREEK RD
S 85THAVE
S LITTLE ELM RD
2,069.80
22.00
5,312.51
76.60
STR-6167-1
W GOOSE CREEK RD
GOOSE CREEK RD
S 85THAVE
1,232.60
21.00
3,019.92
75.40
1820
1820 - 13TH ST + Others
Super Thin 3/4" Overlay R'sphalt
Local
3,048.70
70.00
$17,072.72
Subseq Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-4177-1
S WARFORD DR
E 13TH ST
EOP
212.60
22.00
545.72
69.00
STR-4152-1
E 13TH ST
S HAPPY HOLLOW RD
S WARFORD DR
501.00
25.00
1,461.25
74.00
STR-4158-1
S HAPPYHOLLOW RD
E 15TH ST
E 13TH ST
171.70
52.00
1,041.73
78.10
5680
5680 - NORTH ST + Others
Super Thin 3/4" Overlay ,asphalt
Principal Arterial
10,592.37
72.20
$65,672.69
Subseq Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-2720-1
W NORTH ST
N SHADY LN
N VANDEVENTER AVE
202.70
34.00
804.10
81.90
STR-2715-1
W NORTH ST
N VANDEVENTER AVE
N GREGG AVE
551.20
34.00
2,186.39
78.80
STR-2717-1
W NORTH ST
N VANDEVENTER AVE
N VANDEVENTER AVE
105.70
34.00
419.33
81.60
STR-2727-1
W NORTH ST
N PARKAVE
N WOOLSEYAVE
413.20
27.00
1,301.55
73.10
STR-2731-1
W NORTH ST
N HIGHLAND AVE
N PARK AVE
414.00
34.00
1,641.63
81.30
STR-1587-1
E NORTH ST
N POLLARD AVE
N COLLEGE AVE
186.80
42.00
915.37
80.10
STR-2724-1
W NORTH ST
N WOOLSEYAVE
N SHADY LN
458.70
30.00
1,605.50
76.00
STR-2734-1
E NORTH ST
N HIGHLAND AVE
N POLLARD AVE
420.70
35.00
1,718.50
71.20
6700
6700 - GREGG AVE + Others
Super Thin 3/4" Overlay ,asphalt
Minor Arterial
33,720.01
72.20
$205,692.06
Page: 26
Model Details with Selected Supersegments/Subsegments by Year
121612021
9:12 AM
Model Year: 2025
Superseq Code: Superseq
Subseq Code:
STR-1492-1
STR-2258-1
STR-1496-1
STR-1795-1
STR-2170-1
STR-1337-1
STR-1511-1
STR-263-1
Desc:
Street:
W TOWNSHIP ST
N GREGG AVE
E TOWNSHIP ST
N GREGG AVE
N GREGG AVE
N DRAKE ST
E TOWNSHIP ST
N GREGG AVE
Rehab: Pavement:
From Street.
E TOWNSHIP ST
W SPRUCE ST
W TOWNSHIP ST
PUBLIC 2401
W SYCAMORE ST
N COLLEGE AVE
N GREEN ACRES RD
W ELM ST
Classification:
To Street:
N GREGG AVE
W SYCAMORE ST
N GREEN ACRES RD
W TOWNSHIP ST
WASH ST
N VILLA BLVD
N COLLEGE AVE
PUBLIC 2401
Area:
Length:
599.20
722.40
394.10
1,356.10
783.10
1,266.40
1,360.10
445.40
Width:
35.00
44.00
35.00
47.00
43.00
45.00
35.00
46.00
Begin PCI:
Total Area:
2,446.69
3,708.22
1,609.22
7,435.92
3,928.53
6,647.50
5,553.72
2,390.21
Total Cost:
Current PCI:
79.70
84.10
86.80
76.90
82.00
63.60
72.90
86.70
7020 7020 - ZION RD
Super Thin 3/4" Overlay Asphalt
Major Collector
10,083.60
72.90
$59,493.24
Subseq Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-1505760-1
E ZION RD
N CROSSOVER RD
EOP
19.70
30.00
69.00
76.60
STR-9618-1
E ZION RD
N LANTANA LN
N HARBOR ISLE
342.90
22.00
880.12
74.90
STR-1356-1
E ZION RD
N VALLEY LAKE DR
N CROSSOVER RD
1,070.00
30.00
3,748.33
77.50
STR-10388-1
E ZION RD
N HARBOR ISLE
E RANDAL PL
310.10
24.00
868.26
71.50
STR-1505664-1
E ZION RD
EOP
N CROSSOVER RD
23.40
30.00
81.33
76.60
STR-9617-1
E ZION RD
N TALIESIN LN
N LANTANA LN
281.90
26.00
855.11
70.50
STR-364-1
E ZION RD
N OLD MISSOURI RD
N TALIESIN LN
658.10
36.00
2,764.00
78.90
STR-351-1
E ZION RD
E RANDAL PL
E ZION RD
63.30
29.00
214.12
77.30
STR-353-1
E ZION RD
E ZION RD
N VALLEY LAKE DR
172.40
30.00
603.33
83.30
7140 7140 - PERSIMMON ST + Others
Super Thin 3/4" Overlay Mphalt
Major Collector
16,068.92
72.60
$94,806.63
Subsea Code:
Street:
From Street.
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-65719-1
W PERSIMMON ST
N 54TH AVE
N SNYDERS BLUFF DR
408.10
26.00
1,237.89
86.80
STR-65720-1
W PERSIMMON ST
W CANE HILL DR
N DRYWOOD CREEK DR
286.80
27.00
903.45
80.90
STR-5982-1
W PERSIMMON ST
N DRYWOOD CREEK DR
N REEDS BRIDGE DR
287.00
28.00
937.53
78.90
STR-65775-1
N 54THAVE
W PERSIMMON ST
W PERSIMMON ST
233.50
23.00
626.49
54.20
STR-65740-1
W PERSIMMON ST
N LONE JACK DR
W CANE HILL DR
290.20
27.00
914.10
84.70
STR-65718-1
W PERSIMMON ST
N SNYDERS BLUFF DR
N LONE JACK DR
264.20
29.00
893.84
84.60
STR-65776-1
N 54THAVE
W POISON SPRINGS DR
W PERSIMMON ST
532.70
21.00
1,305.15
59.00
STR-992-1
N 54THAVE
W DOT TIPTON RD
W POISON SPRINGS DR
665.90
21.00
1,631.47
61.50
STR-9498-1
W PERSIMMON ST
N REEDS BRIDGE DR
N COLD HARBOR AVE
310.20
26.00
940.91
81.10
STR-9496-1
W PERSIMMON ST
N DREWRYS BLUFF DR
N SABINE PASS RD
329.10
27.00
1,036.65
78.60
STR-1689-1
W PERSIMMON ST
N MONROE STATION DR
N DOUBLE SPRINGS RD
224.30
26.00
680.33
76.50
STR-1706-1
W PERSIMMON ST
N ROCKYXING
N MONROE STATION DR
982.00
26.00
2,978.73
79.90
STR-6070-1
W PERSIMMON ST
N SABINE PASS RD
N ROCKYXING
314.70
27.00
991.35
82.00
STR-9497-1
W PERSIMMON ST
N COLD HARBOR AVE
N DREWRYS BLUFF DR
326.70
26.00
991.03
82.20
Page: 27
Model Details with Selected Supersegments/Subsegments by Year
121612021
9:12 AM
Model Year: 2026
Superseq Code:
Superseq Desc:
Rehab: Pavement:
Classification:
Area:
Begin PCI:
Total Cost:
11360
11360 - HOLLY ST + Others
EM/FWM+Mod Overlay 2llsphalt
Local
10,678.98
53.50
$117,468.78
Subsea Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-2510-1
W HOLLY ST
N SANG AVE
N PORTER RD
1,313.10
23.00
3,523.47
60.50
STR-2575-1
W HATFIELD ST
N SANG AVE
N PORTER RD
1,293.60
19.00
2,867.52
63.70
STR-1567-1
N WEST END AVE
W VALLEY DR
N WEST END AVE
204.40
21.00
500.73
41.80
STR-1569-1
N WEST END AVE
W WEDINGTON DR
W VALLEY DR
422.00
21.00
1,033.90
64.80
STR-2566-1
W VALLEY DR
N PORTER RD
N WEST END AVE
1,026.10
23.00
2,753.36
59.00
12020
12020 - HADDON AVE + Others
EM/FWM+Mod Overlay 2llsphalt
Local
10,516.40
53.90
$115,680.40
Subsea Code:
Street:
From Street.
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-4536-1
W CHERRY ST
S HADDON AVE
S SCHOOL AVE
759.20
16.00
1,417.16
66.30
STR-4537-1
W CHERRY ST
EOP
S HADDON AVE
401.70
16.00
749.87
58.90
STR-4043-1
W PEACH ST
S HADDON AVE
S SCHOOL AVE
223.70
16.00
417.60
66.10
STR-4044-1
S DENVER AVE
W 26TH ST
W PEACH ST
1,162.40
17.00
2,305.39
52.30
STR-4045-1
W PEACH ST
S DENVER AVE
S HADDON AVE
184.30
21.00
451.50
67.20
STR-3802-1
S HADDON AVE
W LESTER ST
EOP
340.80
18.00
715.70
81.60
STR-4506-1
W 26TH ST
S HADDON AVE
S SCHOOL AVE
207.60
28.00
678.22
57.70
STR-4509-1
W 26TH ST
S DENVER AVE
S HADDON AVE
103.30
32.00
385.60
83.90
STR-4042-1
S HADDON AVE
W 26TH ST
W PEACH ST
1,182.60
20.00
2,759.44
55.70
STR-3793-1
W LESTER ST
S HADDON AVE
S SCHOOL AVE
363.40
15.00
635.92
63.40
12600
12600 - ONE MILE RD + Others
EM/FWM+Mod Overlay A5phalt
Local
7,491.87
53.70
$82,410.57
Subsea Code:
Street:
From Street.
To Street:
Lenath:
Width:
Total Area:
Current PCI:
STR-656-1
S ONE MILE RD
W VELDA CT
W SANDRA ST
187.00
17.00
370.88
71.20
STR-587-1
W RUTLEDGE LN
S OAK RD
EOP
252.50
20.00
589.22
47.80
STR-583-1
W RUTLEDGE LN
EOP
S OAK RD
394.20
19.00
873.79
59.90
STR-3266-1
S ONE MILE RD
W OLD FARMINGTON RD
W VELDA CT
178.20
17.00
353.41
72.60
STR-3265-1
W VELDA CT
EOP
S ONE MILE RD
350.10
23.00
939.42
61.30
STR-3277-1
W SANDRA ST
S ONE MILE RD
W OLD FARMINGTON RD
717.90
21.00
1,758.87
63.90
STR-2427-1
S OAK RD
W RUTLEDGE LN
W MARTIN LUTHER KING JR BLL
501.10
22.00
1,286.14
53.40
STR-3896-1
S ONE MILE RD
W SANDRA ST
W MARTIN LUTHER KING JR BLL
452.60
25.00
1,320.14
64.00
13700
13700 - NORTH ST
EM/FWM+Mod Overlay 2llsphalt
Principal Arterial
7,422.17
52.70
$94,632.67
Subseq Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-30179-1
W NORTH ST
ALLEY 848
N STORER AVE
172.80
49.00
987.89
63.50
STR-2690-1
W NORTH ST
N LINDELL AVE
N GARLAND AVE
344.30
59.00
2,369.83
57.40
STR-694-1
W NORTH ST
W MOUNT COMFORT RD
W MOUNT COMFORT RD
213.60
49.00
1,221.19
63.60
STR-2704-1
W NORTH ST
N LEVERETT AVE
ALLEY 848
180.50
43.00
905.39
59.50
STR-2323-1
W NORTH ST
W MOUNT COMFORT RD
N LINDELL AVE
329.90
39.00
1.501.07
65.40
Page: 28
Model Details with Selected Supersegments/Subsegments by Year
121612021
9:12 AM
Model Year: 2026
Superseq Code:
Superseq Desc:
Rehab: Pavement:
Classification:
Area:
Begin PCI:
Total Cost:
STR-2697-1
W NORTH ST
N STORER AVE
W MOUNT COMFORT RD
78.00
48.00
436.80
68.00
1480
1480 - ALLEY 4240 + Others
EM/FWM+Mod Overlay Alsphalt
Alley
3,580.00
52.30
$34,010.00
Subseg Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-8478-1
ALLEY 4180
W MARLOWE LN
N KEATS DR
769.40
18.00
1,615.70
59.10
STR-8477-1
ALLEY 4240
W MARLOWE LN
W BRADSTREET LN
935.40
18.00
1,964.30
59.70
1700
1700 - ALLEY 848
EM/FWM+Mod Overlay Alsphalt
Alley
1,331.18
53.00
$12,646.21
Subseq Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-28230-1
ALLEY 848
W HUGHES ST
W NORTH ST
286.90
19.00
635.97
44.00
STR-28231-1
ALLEY 848
W BERRY ST
W HUGHES ST
350.50
17.00
695.21
74.80
1940
1940 - LOCUST AVE + Others
EM/FWM+Mod Overlay Alsphalt
Local
6,580.56
52.90
$72,386.16
Subseq Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-3659-1
S EAST AVE
EOP
W SOUTH ST
171.10
16.00
319.38
62.60
STR-3722-1
W 5TH ST
S BLOCKAVE
S CHURCH AVE
372.50
23.00
999.61
60.60
STR-3478-1
W 4TH ST
S EASTAVE
S BLOCKAVE
271.10
16.00
506.04
62.50
STR-3719-1
S CHURCH AVE
W 4TH ST
W 5TH ST
328.60
22.00
843.46
52.20
STR-3676-1
S LOCUST AVE
W SOUTH ST
S ARCHIBALD YELL BLVD
313.80
24.00
878.67
58.60
STR-3244-1
S LOCUST AVE
W 5TH ST
W MARTIN LUTHER KING JR BLL
334.30
23.00
897.00
66.30
STR-3477-1
W 4TH ST
S BLOCKAVE
S CHURCH AVE
365.40
24.00
1,023.07
62.30
STR-3715-1
S LOCUST AVE
S ARCHIBALD YELL BLVD
W 5TH ST
381.70
25.00
1,113.33
57.40
3310
3310 - STANTON AVE
EM/FWM+Mod Overlay Alsphalt
Local
4,347.55
52.90
$47,823.05
Subseq Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-1429-1
N STANTON AVE
N ELIZABETHAVE
E WOODBROOK DR
331.20
24.00
927.33
74.80
STR-1462-1
N STANTON AVE
N OLD WIRE RD
N ELIZABETH AVE
286.20
24.00
801.33
60.80
STR-1409-1
N STANTON AVE
E WOODBROOK DR
E HILLDALE DR
897.90
25.00
2,618.89
55.10
3640
3640 - GOLDEN OAKS DR + Others
EM/FWM+Mod Overlay Alsphalt
Local
12,541.09
52.60
$137,951.99
Subseq Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-1802-1
E GOLDEN OAKS DR
N EAST OAKS DR
N CROSSOVER RD
1,355.50
30.00
4,744.33
61.90
STR-1808-1
E COPPER OAKS PLZ
EOP
N CROSSOVER RD
416.40
34.71
1,689.08
68.20
STR-1849-1
E KANTZ DR
N EAST OAKS DR
N CROSSOVER RD
1,252.30
30.00
4,383.00
56.20
STR-1786-1
E TWIN OAKS CT
EOP
N EAST OAKS DR
218.40
37.29
956.70
63.00
STR-1531-1
E GENTLE OAKS LN
N BIG OAKS DR
NAZALEA TER
235.10
28.00
767.98
50.40
3740
3740 - ARROWHEAD ST + Others
EM/FWM+Mod Overlay Alsphalt
Local
10,101.19
53.50
$111,113.09
Subseq Code:
Street:
From Street:
To Street:
Lenqth:
Width:
Total Area:
Current PCI:
STR-4316-1
W CUSTER LN
W 18TH ST
WARROWHEAD ST
843.80
24.00
2,362.67
65.40
STR-4389-1
WARROWHEAD ST
E CUSTER LN
W CUSTER LN
821.40
22.00
2,108.21
60.50
Page: 29
Model Details with Selected Supersegments/Subsegments by Year
121612021
9:12 AM
Model Year: 2026
Superseq Code:
Superseq Desc:
Rehab: Pavement:
Classification:
Area:
Begin PCI:
Total Cost:
STR-4410-1
E CUSTER LN
S CUSTER LN
WARROWHEAD ST
321.60
26.00
975.58
55.70
STR-4394-1
WARROWHEAD ST
SASHWOODAVE
E CUSTER LN
747.00
23.00
2,004.45
66.30
STR-4409-1
W CUSTER LN
WARROWHEAD ST
S CUSTER LN
370.60
22.00
951.26
62.30
STR-4418-1
S CUSTER LN
E CUSTER LN
W CUSTER LN
693.50
21.00
1,699.02
49.20
4200
4200 - MCCLINTON ST
EM/FWM+Mod Overlay Alsphalt
Local
2,895.47
52.60
$31,850.17
Subseq Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-3919-1
E MCCLINTON ST
S WOOD AVE
S JANELLEAVE
401.00
18.00
842.10
73.30
STR-3812-1
E MCCLINTON ST
S ELMHURSTAVE
S MORNINGSIDE DR
554.80
19.00
1,229.83
54.50
STR-3921-1
E MCCLINTON ST
S JANELLEAVE
S ELMHURSTAVE
371.50
19.00
823.54
55.00
4600
4600 - HELEN ST + Others
EM/FWM+Mod Overlay 2�lsphalt
Local
5,153.36
52.40
$56,686.96
Subseq Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-3976-1
E HELEN ST
S RAYAVE
S JERRYAVE
989.90
24.00
2,771.73
66.10
STR-3923-1
E LEE ST
S RAYAVE
S JERRYAVE
972.10
21.00
2,381.63
52.60
9540
9540 - JANICE AVE + Others
EM/FWM+Mod Overlay Alsphalt
Local
5,517.12
53.70
$60,688.32
Subseq Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-826-1
W ERNIE JACKS BLVD
EOP
N TULL AVE
165.40
22.00
424.48
72.20
STR-2138-1
N LYNNS PL
EOP
W DEANE ST
324.60
27.60
1,045.10
70.30
STR-1944-1
N JANICE AVE
W DEANE ST
N GARLAND AVE
1,399.60
18.00
2,939.20
56.30
STR-4953-1
W ERNIE JACKS BLVD
W BOB PL
W ERNIE JACKS BLVD
229.00
19.00
511.21
57.80
STR-1794-1
W ERNIE JACKS BLVD
N TULL AVE
W BOB PL
235.00
19.00
520.92
62.30
STR-1505884-1
W ERNIE JACKS BLVD
W ERNIE JACKS BLVD
N GARLAND AVE
34.40
19.00
76.21
53.20
9600
9600 - JOHN WAYNE DR + Others
EM/FWM+Mod Overlay Alsphalt
Local
6,306.08
53.20
$69,366.88
Subseq Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-1136-1
N JOHN WAYNE DR
EOP
N QUAIL CREEK DR
472.70
34.20
1,890.74
53.50
STR-913-1
N QUAIL CREEK DR
N JOHN WAYNE DR
WAPPLEBY RD
705.30
29.00
2,386.22
68.80
STR-914-1
N JOHN WAYNE DR
N QUAIL CREEK DR
EOP
480.30
36.21
2,029.12
56.60
11140
11140 - MOUNT COMFORT RD + Others
FWM+Thick Overlay >2.(ksphalt
Local
3,981.33
29.60
$64,696.61
Subseq Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-9744-1
N STORER AVE
N STORER AVE
W HAZEL ST
170.40
27.00
536.70
24.40
STR-1576-1
N STORER AVE
W HAZEL ST
W CAPITOL DR
232.60
22.00
597.06
24.40
STR-66114-1
N STORER AVE
W CAPITOL DR
W HOLLY ST
106.70
24.00
298.80
24.80
STR-2696-1
N STORER AVE
W NORTH ST
N STORER AVE
179.00
23.00
480.32
37.50
STR-2657-1
W MOUNT COMFORT RD
N LINDELL AVE
N GARLAND AVE
387.50
25.00
1,130.28
41.50
STR-2674-1
W MOUNT COMFORT RD
N OAKLAND AVE
N LINDELL AVE
309.30
26.00
938.17
49.20
12980
12980 - NONNAMAKER DR + Others
FWM+Thick Overlay >2.@�sphalt
Local
3,751.51
29.10
$60,962.04
Page: 30
Model Details with Selected Supersegments/Subsegments by Year
121612021
9:12 AM
Model Year: 2026
Superseq Code:
Superseq Desc:
Rehab: Pavement:
Classification:
Area:
Begin PCI:
Total Cost:
Subseg Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-3834-1
W 22ND ST
EOP
W CATO SPRINGS RD
966.00
14.00
1,577.41
23.90
STR-4439-1
W NONNAMAKER DR
EOP
S SCHOOL AVE
1,035.30
18.00
2,174.10
45.80
9280
9280 - WHITHAM AVE + Others
FWM+Thick Overlay >2.(Nsphalt
Local
1,167.14
28.70
$18,966.03
Subseq Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-3025-1
N WHITHAM AVE
W DOUGLAS ST
W TAYLOR ST
221.60
26.00
672.24
35.90
STR-2997-1
W TAYLOR ST
N GREGG AVE
N WHITHAM AVE
303.00
14.00
494.90
36.60
9840
9840 - LINCOLN AVE + Others
FWM+Thick Overlay >2.@�sphalt
Local
4,048.86
29.10
$65,793.98
Subseq Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-3004-1
N LOLLAR LN
W TRENTON BLVD
EOP
268.70
35.00
1,098.22
22.30
STR-3074-1
N VANDEVENTER AVE
W ILA ST
W LOUISE ST
328.00
22.00
841.87
45.30
STR-3015-1
W LOUISE ST
N VANDEVENTER AVE
N WILSON AVE
480.30
24.00
1,344.80
46.60
STR-3033-1
W LOUISE ST
EOP
N FOREST AVE
166.70
15.00
291.75
46.30
STR-3032-1
W LOUISE ST
N FORESTAVE
N PARK AVE
238.10
17.00
472.22
20.20
8860
8860 - FOREST HTS + Others
PCC Mod Pnl Rep <200/oConcrete
Local
5,491.97
53.40
$244,392.67
Subseq Code:
Street:
From Street.
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-2298-1
N FOREST HTS
EOP
W SYCAMORE ST
957.60
36.00
4,022.00
54.30
STR-2265-1
W SPRUCE ST
N VANDEVENTER AVE
N GREGG AVE
572.70
22.00
1,469.97
69.70
13220
13220 - CLEVELAND ST
Super Thin 3/4" Overlay ksphalt
Major Collector
3,735.06
72.90
$22,036.85
Subseq Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-2920-1
W CLEVELAND ST
N STORER AVE
N OAKLAND AVE
283.70
24.00
794.40
79.20
STR-2924-1
W CLEVELAND ST
N LEVERETT AVE
N STORER AVE
352.90
24.00
988.13
83.90
STR-1252-1
W CLEVELAND ST
N LINDELL AVE
N GARLAND AVE
346.50
24.00
972.80
69.40
STR-2918-1
W CLEVELAND ST
N OAKLAND AVE
N LINDELL AVE
330.70
24.00
926.00
80.10
STR-1505773-1
W CLEVELAND ST
N GARLAND AVE
EOP
19.20
24.00
53.73
65.60
5140
5140 - LAKE SEQUOYAH DR WC 50 + O
Super Thin 3/4" Overlay ,asphalt
Local
3,472.41
72.10
$19,445.50
Subseq Code:
Street:
From Street.
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-6051-1
S LAKE SEQUOYAH SPUR
E ETHEL AVE
S LAKE SEQUOYAH SPUR
223.90
20.00
522.45
79.90
STR-5846-1
E LAKE SEQUOYAH DR
S LAKE SEQUOYAH SPUR
E LAKE SEQUOYAH DR
1,031.70
19.00
2,286.97
79.90
STR-6055-1
S LAKE SEQUOYAH SPUR
S LAKE SEQUOYAH SPUR
S LAKE SEQUOYAH SPUR
299.10
19.00
662.99
65.20
6200
6200 - ROCKWOOD TRL
Super Thin 3/4" Overlay ksphalt
Major Collector
10,190.30
72.40
$60,122.77
Subseq Code:
Street:
From Street:
To Street:
Length:
Width:
Total Area:
Current PCI:
STR-2980-1
E ROCKWOOD TRL
N MISSION BLVD
N FALLIN AVE
234.30
26.00
710.67
74.90
STR-2982-1
E ROCKWOOD TRL
N FALLIN AVE
N WOODLAWN DR
248.50
26.00
753.71
74.90
STR-2989-1
E ROCKWOOD TRL
N JACKSON DR
N SEQUOYAH DR
486.00
26.00
1,474.20
78.30
Page: 31
Model Details with Selected Supersegments/Subsegments by Year
121612021
9:12 AM
Model Year: 2026
Superseq Code:
Superseq Desc:
Rehab: Pavement:
Classification:
Area:
Begin PCI:
Total Cost:
STR-2310-1
E ROCKWOOD TRL
N SEQUOYAH DR
N CREST DR
666.30
22.00
1,710.13
76.10
STR-2316-1
E ROCKWOOD TRL
N APPLEBURY DR
N RUTH AVE
258.20
22.00
662.69
79.60
STR-2319-1
E ROCKWOOD TRL
N RUTHAVE
N PEMBROKE RD
444.50
24.00
1,244.67
80.00
STR-2311-1
E ROCKWOOD TRL
N CREST DR
N KENILWORTH AVE
436.30
22.00
1,119.80
76.10
STR-2315-1
E ROCKWOOD TRL
N KENILWORTH AVE
N ANNA PL
292.20
22.00
749.96
76.90
STR-2985-1
E ROCKWOOD TRL
N WOODLAWN DR
N VINSON AVE
298.70
26.00
906.10
83.30
STR-2987-1
E ROCKWOOD TRL
N VINSON AVE
N JACKSON DR
250.40
26.00
759.49
73.20
STR-26538-1
E ROCKWOOD TRL
NANNA PL
NAPPLEBURYDR
38.50
22.00
98.88
79.00
90010
90010 - RUPPLE RD + Others
Super Thin 3/4" Overlay Mphalt
Minor Arterial
16,009.19
72.30
$97,656.06
Subseq Code:
Street:
From Street.,
To Street:
Length:
Width:
Tota/Area:
Current PCI:
STR-2429-1
N RUPPLE RD
N RUPPLE RD
N RUPPLE RD
218.30
35.00
900.27
69.80
STR-10490-1
N RUPPLE RD
W WEDING TON DR
W MALTA LN
586.60
35.00
2,394.97
89.20
STR-388-1
N RUPPLE RD
N RUPPLE RD
EOP
937.30
35.00
3,738.59
69.00
STR-57183-1
N RUPPLE RD
EOP
EOP
467.90
35.00
1,911.19
73.30
STR-2606-1
N RUPPLE RD
W MALTA LN
N RUPPLE RD
415.00
35.00
1,653.36
75.10
STR-2619-1
N RUPPLE RD
N RUPPLE RD
W MALTA LN
415.50
35.00
1,656.08
90.30
STR-2543-1
N RUPPLE RD
N GOLF CLUB DR
N RUPPLE RD
941.70
35.00
3,754.73
81.10
Comment:
Page: 32
CITY OF
FAYETTEVILLE
ARKANSAS
MEETING OF JANUARY 4, 2022
TO: Mayor and City Council
THRU: Susan Norton, Chief of Staff
Chris Brown, Public Works Director
Terry Gulley, Assistant Public Works Director
CITY COUNCIL MEMO
FROM: Byron Humphry, Park Maintenance Superintendent
DATE: December 16, 2021
SUBJECT: Square Lighting Improvements
RECOMMENDATION:
A resolution to approve a proposal from King Electrical Contractors, Inc. in the total amount of
$218,125, pursuant to Bid #20-58, for electrical services associated with the Square Lighting
and Electrical Improvements Project and the Downtown Walkability Project, to approve a project
contingency in the amount of $20,000, and to approve a budget adjustment.
BACKGROUND:
The Downtown Square lighting and electrical service was last renovated in 2008 and included
new streetlights on the exterior of the square, bollard lighting in gardens, and better distribution
of electrical service to accommodate the Lights of the Ozarks display.
Since that renovation, much has changed with the electrical and lighting requirements around
the square. The use of LED lighting for both Lights of the Ozarks and streetlights decreased the
amount of electrical service required in some areas whereas the popularity of food trucks and
street vendors has increased the demand for larger service in other areas. In addition, the Old
Post Office building has changed ownership and use, now as a restaurant, requiring better
pedestrian lighting and visibility for the interior sidewalks to create a safer and more inviting
nighttime environment.
The 2019 Parks Bond Program included $85,000 to upgrade the electrical service around the
square to accommodate food trucks and vendors, eliminating the need for noisy generators.
The project also called for enhanced lighting within the Square Gardens to highlight the gardens
and the Old Post Office building. Engineering Elements was selected to design the electrical
and lighting improvements for $8,000.
Phase 1 of this project, improving the electrical infrastructure for vendors, was completed in the
Spring of 2021 (Resolution 39-21). This included 16 power pedestals installed around the
exterior of the square with 50 amp and 20 amp services that are available for use by the public
and street vendors.
Mailing Address:
113 W. Mountain Street www.fayetteville-ar.gov
Fayetteville, AR 72701
DISCUSSION:
The second phase of the project will focus on the addition of lighting within the gardens and
along the interior sidewalk to increase safety and visibility for pedestrians. The Transportation
Committee met on December 29, 2020, to determine if the lighting of the sidewalk with
streetlights met the goals and funding of the Downtown Sidewalk/Walkability Improvements
Bond Project. The committee asked staff to investigate a more decorative lighting design with a
focus on highlighting the gardens and Old Post Office with lights in an artistic manner that
allows for color and brightness control which could vary based on seasons or events and also
provide ample lighting to accommodate safe pedestrian usage. Staff worked with Engineering
Elements and King Electric to modify the existing design to accommodate the committee
recommendation. The modified design was presented to the Transportation Committee on June
29, 2021. The Transportation Committee approved of the new design and voted to pay for the
direct lighting on the sidewalk (bollard lights) from the Transportation bond and to pay for half of
the indirect lighting (uplights).
BUDGET/STAFF IMPACT:
The total cost of phase two of this project, to add direct lighting on the sidewalk and indirect
lighting for the landscaping, with King Electric is $218,125 with a project contingency of
$20,000. The direct pathway bollard lighting ($48,839) will be funded from the Transportation
bond. The up lights for the landscaping with be split between the Transportation bond
($81,958), the Neighborhood Parks Square Lighting project ($80,000) and the Square Lighting
Park Bond Project ($7,328). A budget adjustment is included with this council item.
Purchase Order Detail
Account
Project
Amount
4602.860.7214-5809.00
46020.7214.3000
$130,797
4605.860.7520-5806.00
46050.7520.3000
$7,328
2250.520.9255-5806.00
02011.7520
$80,000
Total
$218,125
Attachments:
King Electric Proposal
Resolution 258-80
Resolution 39-21
KING ELECTRICAL CONTRACTORS, INC.
2145 WEST MOORE LANE
FAYETTEVILLE, AR 72704
479-443-0006 FAX 479-443-2594
Email: gordon@ckingelectric.net
PROPOSAL
TO:
PHONE
DATE
City Of Fayetteville
December 10, 2021
Attn: Byron Humphry
JOB NAME
Fayetteville
Square Garden Lighting Upgrade
Phase 2 Layout
#4
JOB DESCRIPTION
See attached scope sheet
We have seen Four (4) addendum(s) or revision(s) or clarification(s)
Contractor's License #0063870422
Bollard Lighting $47,890.00
U 1 Flood Lighting $166,000.00
ADD for payment and performance bond $4,235.00
PROPOSAL GOOD FOR 30 DAYS. MANUFACTURER PRICE
TOTAL BID DOLLARS:
INCREASES WILL REQUIRE RE -QUOTE. MATERIAL PRICE
$213,890.00
INCREASES GREATER THAN 10% WILL REQUIRE A RE -QUOTE.
TERMS: PAYMENT DUE UPON RECEIPT OF INVOICE
AUTHORIZED SIGNATURE
A FINANCE CHARGE WILL BE CHARGED ON ALL
PAST DUE ACCOUNTS OF .0833% PER MONTH. ALL
ATTORNEY FEES WILL BE COLLECTED ON PAST DUE
-
ACCOUNTS.
/
C
Gordon Ray
Project Mana er / Estimator
THE ABOVE PRICES SPECIFICATIONS AND CONDITIONS
ACCEPTANCE SIGNATURE
ARE SATISFACTORY AND ARE HEREBY ACCEPTED.
YOU ARE AUTHORIZED TO DO WORK AS SPECIFIED.
PAYMENT WILL BE MADE AS OUTLINED ABOVE.
KING ELECTRICAL CONTRACTORS
Scope Sheet
Fayetteville Square Garden Lighting Upgrade Phase 2 12/3/2021
Inclusions
1. Wiring per plans Division 26 electrical. No electrical specifications provided.
Lighting fixture wiring and installation per plans dated 4/29/2021 sheets E2.2,
and COF conduit pathway routing plan. COF will furnish and install all
conduit and junction boxes.
2. Furnish and install B1, B2, B3 and U1 landscape flood light fixtures per the
lighting fixture schedule on sheet E2.2.
3. Lighting contactor CT2 and controls.
4. Hoffman cabinet for Lumen touch controls and equipment.
5. Permit and inspection fees as required.
6. Hand digging for bollard bases and U1 pipe stanchions.
7. Excavations backfilled with existing dirt and tamped.
8. Equipment Connections: none.
9. Taxes.
10. Fire caulking.
11. Division 26 excavations dirt or spoils removal from site.
Exclusions
1. Payment, Bid or Performance Bond.
2. Overtime labor.
3. No additional panels, disconnects, or transformers.
4. No U1 light fixture building up lighting, U2 and no Al or LT building tape
lighting fixtures.
5. COF will furnish and install all conduit and junction boxes.
6. Any equipment, material, or labor delays due to COVID-19 infections,
government or CDC recommended or required quarantine, restrictions, or
policies.
7. Material price escalations greater than 10%. This will require a re -quote.
8. Any project delays or additional cost due to shipping, material, component
supply chain issues, shortages, and availability.
9. Manufactures quoted price escalations will require a re -quote.
10. Engineering services, stamps, or plans.
11. Liquidated damages.
12. Furnishing or installing wiring and equipment for Fire Alarm, Phone, Data,
CATV, VOIP, POS, Fiber Optic, CCTV, Security, Access control, Audio, and
Video systems.
13. Allowances or unit prices.
14. Electrical System coordination and/or Arc Flash investigation, studies,
calculations or reports.
15. Access panels for electrical equipment.
16. Demolition/debris or trash removal from site.
17. Cutting, painting, penetrations, backing or repair & patching of concrete,
asphalt, walls, ceiling, roof or floors for electrical conduit & equipment.
18. Back filling Division 26 excavations with classified rock.
2
19. Any type of rock excavation.
20. Landscaping or repair due to Division 26 excavation.
21. Seismic bracing for fixtures or gear.
22. Transformer or housekeeping pads.
23. Backboards.
24. Cutting millwork for electrical raceway, wiring or devices.
25. Formed or finished concrete.
26. Asbestos or hazardous material abatement.
3
{
of FaYEr'e
� • 7 i
i'PKaµS �S
113 West Mountain Street
Fayetteville, AR 72701
(479) 575-8323
Resolution: 258-20
File Number: 2020-0818
BID 420-58 AUSTIN KING, INC. D/BIA KING ELECTRICAL CONTRACTORS:
A RESOLUTION TO AWARD BID #20-58 AND AUTHORIZE A CONTRACT WITH AUSTIN
KING, INC. D/BIA KING ELECTRICAL CONTRACTORS FOR ELECTRICAL SERVICES
ON AN ON -CALL BASIS FOR A TERM OF ONE YEAR WITH AN AUTOMATIC
RENEWAL FOR UP TO FOUR ADDITIONAL ONE YEAR TERMS
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE,
ARKANSAS:
Section I: That the City Council of the City of Fayetteviile, Arkansas hereby authorizes awards
Bid #20-58 and authorizes a contract with Austin King, Inc. d/b/a King Electrical Contractors for
electrical services on an on -call basis for a term of one year with an automatic renewal for up to four
additional one year terms.
PASSED and APPROVED on 10/20/2020
Page 1
Attest:
`*,'rLERk
<<1n��trrrrrr
r0,-7
• G
Kara Paxton, City Clerk Treasurys .9 �FI•;r`AS
Printed on 10121120
City of Fayetteville, Arkansas 113 West Mountain Street
Fayetteville, AR 72701
(479) 575-8323
_1
_ Text File
File Number: 2020-0818
Agenda Date: 10/20/2020 Version: 1 Status. Agenda Ready
In Control: City Council Meeting File Type: Resolution
Agenda Number: A.7
BID #20-58 AUSTIN KING, INC. D/B/A KING ELECTRICAL CONTRACTORS:
A RESOLUTION TO AWARD BID #20-58 AND AUTHORIZE A CONTRACT WITH AUSTIN KING,
INC. D/B/A KING ELECTRICAL CONTRACTORS FOR ELECTRICAL SERVICES ON AN
ON -CALL BASIS FOR A TERM OF ONE YEAR WITH AN AUTOMATIC RENEWAL FOR UP TO
FOUR ADDITIONAL ONE YEAR TERMS
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby authorizes awards Bid
920-58 and authorizes a contract with Austin King, Inc. d/b/a King Electrical Contractors for electrical services
on an on -call basis for a term of one year with an automatic renewal for up to four additional one year teens.
City of Fayetteville, Arkansas Page ! Printed on 10/19/2020
113 West Mountain Street
Fayetteville, AR 72701
(479) 575-8323
Resolution: 39-21
File Number: 2020-1154
BID # 20-58 KING ELECTRICAL CONTRACTORS, INC. - 2019 PARK
IMPROVEMENT BOND PROJECT:
A RESOLUTION TO APPROVE A PROPOSAL FROM KING ELECTRICAL
CONTRACTORS, INC. IN THE TOTAL AMOUNT OF $50,050.00, PURSUANT TO BID #
20-58, FOR ELECTRICAL SERVICES ASSOCIATED WITH THE SQUARE LIGHTING AND
ELECTRICAL IMPROVEMENTS PROJECT, TO APPROVE A PROJECT CONTINGENCY IN
THE AMOUNT OF $5,005.00, AND TO APPROVE A BUDGET ADJUSTMENT - 2019 PARK
IMPROVEMENT BOND PROJECT
WHEREAS, on October 20, 2020, the City Council awarded Bid # 20-58 and authorized a contract
with Austin King, Inc. d/b/a King Electrical Contractors for electrical services on an on -call basis for
up to five years.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves a proposal from
King Electrical Contractors, Inc. in the total amount of $50,050.00, pursuant to Bid # 20-58, for
electrical services associated with Square Lighting and Electrical Improvements Project, and further
approves a contingency in the amount of $5,005.00.
Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget
adjustment, a copy of which is attached to this Resolution.
PASSED and APPROVED on 2/2/2021
Page 1 Printed on 213121
Resolution: 39-21
File Number. 2020-1154
Attest:
GOER K
���,��y' � • U T Y 0�;�9J,G
rri
Kara Paxton, City Clerk TreasureF FAYE�EV/t'
i`�y'•;�gNSAs ••' •�'
Page 2 Printed an 213121
City of Fayetteville, Arkansas 113 West Mountain Street
w Fayetteville, AR 72701
(479)575-8323
i
: Text File
File Number: 2020-1154
Agenda Date: 2/2/2021 Version: 1 Status: Passed
In Control: City Council Meeting File Type: Resolution
Agenda Number: A.2
BID # 20-58 KING ELECTRICAL CONTRACTORS, INC. - 2019 PARK IMPROVEMENT
BOND PROJECT:
A RESOLUTION TO APPROVE A PROPOSAL FROM KING ELECTRICAL CONTRACTORS, INC.
IN THE TOTAL AMOUNT OF $50,050.00, PURSUANT TO BID # 20-58, FOR ELECTRICAL
SERVICES ASSOCIATED WITH THE SQUARE LIGHTING AND ELECTRICAL IMPROVEMENTS
PROJECT, TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $5,005.00, AND TO
APPROVE A BUDGET ADJUSTMENT - 2019 PARK IMPROVEMENT BOND PROJECT
WHEREAS, on October 20, 2020, the City Council awarded Bid # 20-58 and authorized a contract with
Austin King, Inc. d/b/a King Electrical Contractors for electrical services on an on -call basis for up to five
years.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves a proposal from King
Electrical Contractors, Inc. in the total amount of $50,050.00, pursuant to Bid # 20-58, for electrical services
associated with Square Lighting and Electrical Improvements Project, and further approves a contingency in the
amount of $5,005.00.
Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment, a
copy of which is attached to this Resolution.
City of Fayetteville, Arkansas Page 1 Printed on 2/3/2021
Byron Humphry
Submitted By
City of Fayetteville Staff Review Form
2020-1154
Legistar File ID
2/2/2021
City Council Meeting Date - Agenda Item Only
N/A for Non -Agenda Item
1/12/2021
Submitted Date
Action Recommendation:
PARKS & RECREATION (520)
Division / Department
Staff recommends approval of a proposal, based on the City contract for electrical service established by Resolution No
258-20, from Austin King, Inc D/B/A King Electric in the amount of $50,050 with a project contingency in the total of
$5,005 for electrical services associated with the Square Lighting and Electrical Improvements project. Also, approval of
a subsequent budget adjustment.
Budget Impact:
4605.860.7520-5806.00 4605 - Parks Project 2019 Bonds
Account Number Fund
Neighborhood Park Impvs.
46050.7520.3000 Square Lighting & Electrical
Project Number
Budgeted Item? . Yes Current Budget
Funds Obligated
Current Balance
Does item have a cost? Yes Item Cost
Budget Adjustment Attached? Yes Budget Adjustment
Remaining Budget
Project Title
$ 10,888.00
$ 10,887.50
$ 0.50
$ 55,055.00
$ 55,055.00
$ 0.50
V20180321
Purchase Order Number: 2020-393 -Engineering Element!
Previous Ordinance or Resolution # 258-20: RFQ 20-01. #15
Change Order Number:
Original Contract Number:
Comments:
Approval Date:
CITY OF
ilk)
FAYETTEVILLE
ARKANSAS
MEETING OF FEBRUARY 2, 2021
TO: Mayor and City Council
CITY COUNCIL MEMO
THRU: Susan Norton, Chief of Staff
Connie Edmonston, Parks and .Recreation Director
FROM: Byron Humphry, Park Maintenance Superintendent
DATE: January 12, 2021
SUBJECT: Square Electrical Improvements
RECOMMENDATION:
Staff recommends approval of a proposal, based on the City contract for electrical service
established by Resolution No 258-20, from Austin King, Inc D/B/A King Electric in the amount of
$50,050 with a project contingency of $5,005 for a total of $55,055 for electrical services
associated with the Square Lighting and Electrical Improvements Park Bond Project. Also,
approval of a subsequent budget adjustment.
BACKGROUND:
The Downtown Square lighting and electrical service was last renovated in 2008 and included
new streetlights on the exterior of the square, bollard lighting in gardens, and better distribution
of electrical service to accommodate the Lights of the Ozarks display.
Since that renovation, much has changed with the electrical and lighting requirements around
the square. The use of LED lighting for both Lights of the Ozarks and streetlights decreased the
amount of electrical service required in some areas whereas the popularity of food trucks and
street vendors has increased the demand for larger service in other areas. In addition, the Old
Post Office building has changed ownership and use, now as a restaurant, requiring better
pedestrian lighting and visibility for the interior sidewalks to create a safer and more inviting
nighttime environment.
The 2019 Parks Bond Program included $85,000 to upgrade the electrical service around the
square to accommodate food trucks and vendors, eliminating the need for noisy generators.
The project also called for enhanced lighting within the Square Gardens to highlight the gardens
and the Old Post Office building. Engineering Elements was selected to design the electrical
and lighting improvements (RFQ 20-01, Selection #15) for $8,000.
DISCUSSION:
The Downtown Square Gardens project, to enhance the garden lighting and improve the
electrical infrastructure for vendors, will be split into two phases. This proposal is to complete
the first phase which is to install power receptacles around the exterior of the, square to
Mailing Address:
113 W. Mountain Street www.fayetteville-ar.gov
Fayetteville, AR 72701
accommodate vendors. Currently, the only power available for vendors is to utilize the same
power supply for the Lights of the Ozarks. This power supply is on a timer and is only active
when the lights are on at night. Allowing vendor use is very difficult for staff to manage and still
maintain ample power for the lighting supply which has resulted in vendors using noisy
generators or trying to share power with the light display. This project will provide new 50-amp
and 20-amp service for vendors that is on a separate power grid from the light display where
electricity will always be available.
The second phase of the project will focus on the addition of lighting within the gardens and
along the interior sidewalk to increase safety and visibility for pedestrians. The Transportation
Committee met on December 29, 2020to determine if the lighting of the sidewalk with
streetlights met the goals and funding of the Downtown Sidewalk/Walkability Improvements
Bond Project. The committee asked staff to investigate a more decorative lighting design with a
focus on highlighting the gardens and Old Post Office with lights in an artistic manner that
allows for color and brightness control which could vary based on seasons or events and also
provide ample lighting to accommodate safe pedestrian usage. Staff is currently working on the
electrical design for this phase.
BUDGET/STAFF IMPACT: `
11
The total cost of phase one of this project, to add vendor electrical power, with King Electric is
$50,050 with a project contingency of $5,005 and will be funded from the Neighborhood Parks
Square Lighting and Electrical Park Bond Project. A budget adjustment is included with this
council item.
Attachments:
King Electric Proposal
Resolution 258-80
Engineering Elements Agreement
KING ELECTRICAL CONTRACTORS
2145 WEST MOORE LANE
FAYETTEVILLE AR 72704
479-443-0006 FAX 479-443-1719
Email: tim@ckingelectric.net
PROPOSAL
TO:
PHONE
DATE
Byron Humphry
1-11-2021
JOB NAME
Fayetteville Square Power for Flower Beds
JOB DESCRIPTION
This price is to install power for the 50amp pedestals that are provided by the city and the 20amp
pedestals provided by the city. This includes pulling new wire and to separate the panels as per drawings
Mat. $28,050.00
Labor $22,000.00
PROPOSAL GOOD FOR 30 DAYS
DOLLARS:
$ 50,050.00
TERMS: PAYMENT DUE UPON RECEIPT OF INVOICE
AUTHORIZED SIGNATURE
A FINANCE CHARGE WILL BE CHARGED ON ALL
PAST DUE ACCOUNTS OF .0833% PER MONTH. ALL
Tim Edwards
ATTORNEY FEES WILL BE COLLECTED ON PAST DUE
ACCOUNTS.
THE ABOVE PRICES SPECIFICATIONS AND CONDITIONS
ACCE ANCE SI URE
ARE SATISFACTORY AND ARE HEREBY ACCEPTED.
YOU ARE AUTHORIZED TO DO WORK AS SPECIFIED.
PAYMENT WILL BE MADE AS OUTLINED ABOVE.
113 West Mountain Street
Fayetteville, AR 72701
(479) 575-8323
Resolution: 258-20
File (dumber: 2020-0818
BID #20-58 AUSTIN KING, INC. D/B/A KING ELECTRICAL CONTRACTORS:
A RESOLUTION TO AWARD BID #20-58 AND AUTHORIZE A CONTRACT WITH AUSTIN
KING, INC. D/B/A KING ELECTRICAL CONTRACTORS FOR ELECTRICAL SERVICES
ON AN ON -CALL BASIS FOR A TERM OF ONE YEAR WITH AN AUTOMATIC
RENEWAL FOR UP TO FOUR ADDITIONAL ONE YEAR TERMS
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE,
ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby authorizes awards
Bid #20-58 and authorizes a contract with Austin King, Inc. d/b/a King Electrical Contractors for
electrical services on an on -call basis for a term of one year with an automatic renewal for up to four
additional one year terms.
PASSED and APPROVED on 10/20/2020
Attest:
``,�1t1t111r1/r7��
GLERK,�!�,.
01.0
Kara Paxton, City Clerk Treasuret::; ; F`1, ;,�,,
Page 1 Printed on 10121120
City of Fayetteville, Arkansas
Text File
File Number: 2020-0818
113 West Mountain Street
Fayetteville, AR 72701
(479) 575-8323
Agenda Date: 10/20/2020 Version: 1 Status: Agenda Ready
In Control: City Council Meeting File Type: Resolution
Agenda Number: A.7
BID #20-58 AUSTIN KING, INC. D/B/A KING ELECTRICAL CONTRACTORS:
A RESOLUTION TO AWARD BID #20-58 AND AUTHORIZE A CONTRACT WITH AUSTIN KING,
INC. DB/A KING ELECTRICAL CONTRACTORS FOR ELECTRICAL SERVICES ON AN
ON -CALL BASIS FOR A TERM OF ONE YEAR WITH AN AUTOMATIC RENEWAL FOR UP TO
FOUR ADDITIONAL ONE YEAR TERMS
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby authorizes awards Bid
#20-58 and authorizes a contract with Austin King, Inc. d/b/a King Electrical Contractors for electrical services
on an on -call basis for a term of one year with an automatic renewal for up to four additional one year terms.
City of Fayetteville, Arkansas Page 1 Printed on 10/19/2020
Engineering Elements, PLLC
2458 E. Joyce Blvd; Suite I Fayetteville; Adonsas 72703
Phone (479) 695-1333 Fax: (479) 251-7982
April 28, 2020
Ms. Andrea Foren
City of Fayetteville
113 West Mountain Street
Fayetteville, AR 72701
Re: Square Garden Lighting and Power Improvements
Fayetteville, Arkansas
Ms. Foren,
I am pleased to propose electrical engineering services to you for the above referenced project.
This proposal is based on the preliminary information I received from Mr. Wade Abernathy and
from a conference call that occurred on April 28, 2020. It is my understanding that this project
will consist of new lighting at the interior of the Square including walkway lighting, garden
lighting and accent lighting on the Old Post Office.
Our services will include standard basic engineering services consisting of preliminary design
and design development, contract documents, bidding assistance, submittal review and
construction observation. This level of services will pertain to the following systems as our part
of the work. '
MEP Services:
Our services include the following standard engineering services:
a. Preliminary Design and Design Development. Two design review meetings are
planned to evaluate design and light fixture selections.
b. Contract Documents
c. Bidding Assistance
d. Value Engineering Process
e. Submittal Review and Construction Observation.
Scope of Systems Designed:
The above -listed services will apply to the electrical systems listed below.
Electrical:
i. Exterior site lighting systems including walkway lighting, landscape lighting
and building accent lighting. Specific care will be given to the selection of
fixture characteristics such as lamp color temperature, aesthetics, camera
mounting options and control systems. All new lighting shall feature LED
lamp technology.
ii. New lighting controls. Options will be explored and considered prior to final
specification such as astronomical clock timers and wireless apps. Controls
will include a hand -off -auto switch for manual override of lighting systems.
iii. Electrical power distribution system for all new fixtures including conduit,
wiring and overcurrent protection.
iv. Additional electrical service capacity and service panelboards as necessary.
V. General purpose power for vendor and food truck connection. Location and
amperage of new receptacles will be reviewed and defined with City.
vi. Empty conduit system for Owner furnished equipment where necessary. This
includes new cameras provided under a separate contract.
vii. Cost estimates for construction.
3. Fee:
The fee for the above described services is proposed as a Fixed Fee of Eight Thousand Dollars
($8,000) for our portion of the work plus any reimbursable expenses attributed to the project.
Additional services that you may request will be provided on an hourly basis utilizing the
following hourly rates:
Principal Engineer
$165
Project Engineer
$135
Designer
$80
Administration
$50
If this proposal is acceptable please sign in the space provided and return a copy for my files. If
you have any questions or need additional information, please contact me.
Sincerely,
Shane R. Lanning, P
Engineering Eleme s, PLLC
2
City of Fayetteville, Arkansas - Budget Adjustment Form (Legistar)
Budget Year Division PARKS & RECREATION (520)
/Org2
2021 (BY) I
Requestor: Byron Humphry
Adjustment Number
BUDGET ADJUSTMENT DESCRIPTION / JUSTIFICATION:
Staff recommends approval of a proposal, based on the City contract for electrical service established by Resolution No 258
20, from Austin King, Inc D/B/A King Electric in the amount of $50,050 with a project contingency in the total of $5,005 for
electrical services associated with the Square Lighting and Electrical Improvements project. Also, approval of a subsequent
budget adjustment.
COUNCIL DATE: 2/2/2021
LEGISTAR FILE ID#: 2020-1154
Ke'vi vL'Spr&nW-4"
1212312020 4:17 PM
Budget Director
TYPE:
JOURNAL #:
Date
D - (City Council)
RESOLUTION/ORDINANCE
GLDATE:
CHKD/POSTED:
2/2/2021
TOTAL
Account Number
- _
Increase / (Decrease)
Expense Revenue
Proiect.Sub#
Project Sub.Detl AT
v.20201112
Account Name
4605.860.7520-5806.00
50,050 -
46050
7520.3000 EX
Improvements - Park
4605.860.7520-5911.99
4605.860.7999-5899.00
5,005 -
(55,055) -
46050
46050
7520.3000 EX
7999 EX
Contingency - Capital Project
Unallocated - Budget
H:\Budget Adjustments\2021_Budget\City Council\02-02-2021\2020-1 154 BA Square Lighting 1 of 1
CITY OF
._ FAYETTEVILLE
ARKANSAS
TO: Chris Brown, Public Works Director
THRU: Matt Mihalevich, Trails Coordinator
FROM: Dane Eifling, Mobility Coordinator
DATE: December 7th, 2021
SUBJECT: City -Wide Speed Limit Adjustments
STAFF MEMO
RECOMMENDATION:
Staff recommends a city-wide review and adjustment of speed limits based on street
classification and usage.
BACKGROUND:
An ordinance amendment to lower the default residential speed limit from 25 to 20 miles per
hour (MPH) was passed unanimously by the Fayetteville City Council on Oct. 5, 2021 and went into
effect. effect Nov. 6, 2021. Prior to the amendment residential streets defaulted to 25 MPH while
business districts defaulted to 20 MPH. The change to the default speed limit only effects
streets that have no posted speed limit. During discussion of the amendment Counsel Members
requested that staff implement the new speed limits and provide adequate public information
and justification for changes.
DISCUSSION:
Following the passage of the ordinance amendment City staff conducted a review of speed
limits on all city streets with the goal of better aligning speed limits with street classifications and
desired operating speeds. Staff also created a GIS map of current and proposed speed limits for
all city streets. State highways, private drives and University of Arkansas controlled streets were
not included in the review.
Streets classified as Residential Link or Downtown Urban are to be lowered from 25 to 20 MPH
default. Exceptions were made for approximately 50 Residential Link and Downtown Urban
street segments to remain at 25 MPH based on each streets' design -speed, function and
capacity.
Speed Limits on 11 streets of the higher Neighborhood Link classification are recommended to
increase from 25 to 30 MPH. Speed limits on 5 neighborhood link street segments are
recommended to be lowered to improve consistency across corridors.
The University of Arkansans is implementing a campus -wide 20 MPH speed limit and UA staff
has requested lowering speed limits on some city streets around the campus which are listed in
the attachment.
BUDGET/STAFF IMPACT:
TBD
Attachments: Spreadsheet of street and changes; GIS Map
Mailing Address:
113 W. Mountain Street www.fayetteville-ar.gov
Fayetteville, AR 72701
peed i_im is F-e"n9wi3le,AR City Website GIS Maps Portal
it
.il.
allIm
• I I .� r
IF
LY\�
I A� '.::.i
-�— �i
Ll
i I i i i I �Iri NIP
_..
Win
'71
1 15
��f l�1J1�1
sit
peed Limits Fayetteville, AR City Website GIS Naps Portal � _ t � � a + � .y,
all
f��I
1f1�1
R In
Activate layers by
using the dropdown
r-
1k,
rF Layers
w
New Sped Limits
� F1 Increase
aDecrease
No Change
Unchanged Decreased Increased
'T ���= tll�rl � /eY'+ 14,� i r •-' ,. I,I�- •fl.�Yrr l� ' Z _ _ l/.:t kr/ � i � 2ti5 � _. � D ` I� -I .._, � i\.i't�vPY =4 fr � Y. �• 61a
� � I
lr, ✓
- i
Y I I i
I —
—kq St _ ■ v - i+ plakr St o .dr s
y arV l r i, luwi,sli�R 51
s R Mn��ir = M n IlFirl Ril RIl
F~ I n� art / � e �, � ��f.. L"• _ Wr
� M � Y/ �•O.._"sl ry � Ream: Sl 3` M�..inll fslrrl 1 � I Ut l O � , � t 11� "11 � ,N �.nllilrlto�� Dr • I'. I -
It II �NorIII St ` - r
J Il
t�l
71
l li�lilts Ntl _ 4jl'IIIIItM1 �1 f'� -r - I:ill �.... fi.. Rrf
1 , I
ITr -� � �� � _I � �� 1 �rZ � � r.1� �, '7•rt _ •_ _ .52' t • i•IH�51 I - i
_V N
- ;
� o
9
i
r,
sr_
I � I
99:
3 Layers indicate which streets speed limit will be increased,
decreased or left unchanged
Color indicates
proposed new speed
limit. Refer to legend.
■ Gu11rLY
k Park New Speed Limits
No Change
5 mph
x r
s w — 10 mph
a a ■ - �� — 15mph
r
c f "vn 6 ud � 20 mph
I 4 — 25 mph
..� 30 mph
35 mph
r ` � 40 mph
j — 45 mph
hLvrth St — 50 mph
— Not Controlled by City
r �
9 •_
J.
2 5
a
C Mount
a Sequoyah
m Woods
b
v
Huntsville Rd 1
C
333
337
4 j '3
309
4105
V3
m
T
Ln
M
382368 352. 330
ul
25 —20
25— 20-
m
I
LM
7
LLi
_j
01
61
404
2-9--.3o
6f) 1
600
Ld
r
G4 72
Ln
en
T
r
S.ARCHIMLI).YFLL
C)
1W
4.10
439
4
Ln
4Z4
420
507
In
502
510
514 515
M
Sib
t
2
521
Ln
522
260 250 523
53-1
192 1l1
Y.
ERJR DIV.
4KPG
157
231 205
64 0
643
in
GG2
(;er3egiS
-
Church
672 112
684
696
110 IU 8
S 20
W 7TH ST
69
—25-20.
.....
CITY OF
FAYETTEVILLE
ARKANSAS
CITY OF FAYETTEVILLE
TRANSPORTATION BOND PROGRAM
PROGRESS REPORT — DECEMBER 2021
The Transportation Bond Program consists of projects that will be designed, contracted, and
administered by City Staff or consultants/contractors working for the City. Funding for the Bond
Program includes $36 million in bonds for the first phase of the program.
UPCOMING CONSTRUCTION PROJECTS
PROJECT NAME
BID DATE
ESTIMATED CONST. COST
Center/Harmon Intersection
January 11,
2022
$1,800,000.00
Archibald Yell Blvd. Safety Improvements
January 11,
2022
$1,600,000.00
Midtown Corridor — Porter and Deane at
PD Site
In Process
$4,283,118.00
CURRENT CONSTRUCTION PROJECTS
PROJECT NAME
ESTIMATED
CONSTRUCTION
COMPLETION
CONTRACT
Zion Rd. (Vantage to Crossover)
February
$4,395,109.35
2022
Sain St. Extension
February
*$607,900.29
2022
Shiloh Fulbright Intersection
October
$1,680,751.00
2022
*Transportation Bond Program portion of the contract.
COMPLETED PROJECTS
PROJECT NAME
COMPLETION
YEAR
ORIGINAL BUDGET
FINAL PROJECT
COST
Rupple Road
2021
$3,000,000
$3,532,722.51
Steamboat Dr./Dorothy Jeanne
2021
$670,000
$410,979.35
Centennial Park Entrance Drive
2021
$1,000,000
$834,721.75
Mailing Address:
113 W. Mountain Street www.fayetteville-ar.gov
Fayetteville, AR 72701
For details regarding each of the Transportation Bond Projects, use the links provided below for
each project.
1) RUPPLE ROAD (TANYARD DR. TO WEIR RD.)
https://www.favetteville-ar.gov/3597/Rupple-Road-Extension
2) ZION ROAD PHASE II (VANTAGE DR TO CROSSOVER RD)
https://www.fayetteville-ar.gov/3586/Zion-Road-Improvements
3) STEAMBOAT / DOROTHY JEANNE CONNECTION
https://www.fayetteville-ar.gov/3596/SteamboatDorothy-Jean ne-St-Connection
4) SHILOH DR. / FULBRIGHT EXPRESSWAY INTERSECTION
https://www.fayetteville-ar.gov/3594/Shiloh-DrFuIbright-Expressway-I ntersecti
5) CENTER / HARMON INTERSECTION
https://www.favetteville-ar.gov/3595/CenterHarmon-Intersection
6) MIDTOWN CORRIDOR
https://www.favetteviIIe-ar.gov/3877/Midtown-Corridor-Prowect
7) SAIN STREET EXTENSION (FRONT ST. TO JOYCE BLVD.)
https://www.favetteville-ar.gov/3598/Sain-Street-Extension
8) MAPLE ST. CYCLE TRACK
https://www.favetteville-ar.gov/3581 /Maple -Street -Cycle -Track
9) 15t" ST. / RAZORBACK RD. INTERSECTION
https://www.favetteville-ar.gov/3592/15th Razorback -Intersection
10) HIGHWAY 71 B CORRIDOR
https://www.favetteville-ar.gov/3588/Highway-71 B-Corridor
11) APPLEBY / PLAINVIEW / ROLLING HILLS CONNECTION
https://www.favetteville-ar.gov/3771 /ApplebyPlainviewRolling-Hills-Connection
12) ARCHIBALD YELL BLVD. SAFETY IMPROVEMENTS
4
https://www.faVettevi I le-ar. gov/3584/Arch i ba Id -Yell -Blvd -Safety -Improvements
13) ROLLING HILLS IMPROVEMENTS (COLLEGE TO OLD MISSOURI)
https://www.faVettevilie-ar.gov/3585/Rolling-Hills-Improvements
14) JOYCE BLVD. SAFETY IMPROVEMENTS
https://www.faVettevi I le-ar. gov/3732/Joyce-B lvd-Safety-Improvements
15) NORTH ST. / MISSION BLVD. CORRIDOR
https://www.faVetteville-ar.gov/3589/North-Street-Corridor
16) OLD WIRE RD. CYCLE TRACK (EXTENSION)
https://www.fayetteville-ar.gov/3583/Old-Wire-Road-Cycle-Track
17) PAVEMENT MAINTENANCE / OVERLAYS
https://www.faVetteviIle-ar.gov/3600/Pavement-Maintenance0verlaVs
• 16.68 Miles of overlays have been completed as of December 2021
• $2,634,633.23 of the $2,700,00 has been spent or encumbered as of
December 2021.
18) TRAFFIC SIGNAL HARDWARE / UPGRADES
https://www.fayetteville-ar.gov/3599/Signal-HardwareSoftware-Upgrades
• 103 of 109 signal controllers and 53 of 66 Video Detectors have been
upgraded as of December 2021.
• $1,151,838.51 of the $1,400,000 has been spent or encumbered as of
December 2021.
2021 Overlay Projects
COMPLETED
Street
To
From
Length (ft)
Width (ft)
Tons
Plumberosa Dr.
Finger Rd.
City Limits
2890
18
942
85TH Ave.
Wedington Dr.
Goose Creek Rd.
6037
23
1698
Ravenswood Ln.
Country Club Dr.
Club Oak Dr.
419
24
123
Club Oak Dr.
Ravenswood Ln.
29th Ct.
1175
24
344
29th Ct.
Sand Trap Ln.
Cul de sac
577
26
183
Country Club Dr.
29th Circle
Sand Trap Ln.
345
24
102
28th Circle
Cul de sac
Country Club Dr.
401
26
128
27th Circle
Cul de sac
Country Club Dr.
300
25
92
West Ave.
11th
15th
1286
25
393
West Ave.
15th
Salvation Ln
421
30
155
Tally HO Dr.
Hunt Ln.
Cul de sac
922
30
338
Steeple Chase Dr.
Dead End
Hunt Ln.
550
30
202
Deane Solomon Rd.
Shiloh Dr.
112
8700
26
2765
Kings Dr.
Mission Blvd.
Arlington Ter.
1130
26
360
Old Dominion Way
Natchez Trace
Skillern Rd.
532
26
170
James Town
Natchez Trace
Cul de sac
346
26
110
Natehez Trce.
Williamsburg Ln.
Jamestown Rd.
503
28
173
Williamsburg
Natchez Trace
Cul de sac
295
28
101
Raliegh Circle
Charleston Xing
Cul de sac
286
27
95
Valerie Dr.
Hillside Ter.
Joyce St.
2300
22
619
Hillside Ter.
Dead End
Crossover Rd.
1488
24
437
Chestnut Ave.
Popular St.
Dead End
1065
30
391
Birch Ave.
Popular St.
Dead End
391
16
77
Old Farmington Rd.
Shiloh Dr.
One Mile Rd.
2187
27
722
Centinial
Old Farmington Rd
Centennnial Park
3901
18
1288
Persimmon St.
54TH St.
Broyles Ave.
2645
22
712
Maple St
Razorback Rd.
Oliver Ave.
399
26
127
Arbuckle Ln.
MLK
Dead End
308
23
87
Main St.
Eastern Ave.
Lewis Ave.
327
17
68
Neptune St.
Eastern Ave.
Dead End
295
18
65
Venus St.
Eastern Ave.
Dead End
322
21
83
Mitchell St.
Razorback Rd.
Gabbard Dr.
1154
30
424
Eastern Ave
Nettleship St.
MLK
1740
20
426
Palmer PI.
Palmer Ave.
Hartman Ave.
291
24
86
Palmer Ave.
Center St.
Palmer PI.
331
20
81
Hotz
Palmer PI.
Hartman Ave.
388
27
129
Hartman
Hotz Dr.
Nettleship St.
1300
27
429
Razorback Rd
Maple St.
Cleveland St.
1288
23
362
Sang Ave.
Cleveland St.
Wedington Dr.
1317
28
451
Leverette
Douglas St.
North St.
2060
24
605
Hughes
Leverette Ave.
jAlley
150
22
41
Hughes St.
jAlley
IGarland Ave.
1 1331
261
43
Oakland
Hughes St.
Dead End
142
20
35
Lindall
Eagle St.
Hughes St.
675
27
223
Church St.
Center St.
Spring St.
713
30
262
54th St.
Sellers Rd.
Woolsey Farm Rd.
1323
20
122
Woolsey Farm
Broyles Ave.
54TH
1265
21
122
Forest Hills Dr.
85th Ave.
Walnut Ridge Ln.
2569
45
530
Cedar Ridge
Cul de sac
Cul de sac
1065
30
165
Sand Trap Ln.
Country Club Dr.
Dead End
164
31
63
Holly St.
Leverette Ave.
Oakland Ave.
365
26
116
Holly St.
Oakland Ave.
Lindell Ave.
345
30
127
Lindall
Parking Lot
Holly St.
214
18
48
Double Springs Rd.
Dot Tippton
Shreve DR.
3261
21
837
Gravel Rd.
Double Springs
Dead End
868
19
303
Sellers
54TH St.
Double Springs Rd.
3976
21
672
Hill St.
Stone St.
RR Tracks
650
22
66
College Ave.
MILK
15TH
2919
28
375
Ash St.
Walnut Ave.
Old Wire Rd.
2687
25
308
Walnut
Sycamore St.
Walnut St.
690
24
76
Sycamore
College Ave.
Walnut St.
780
26
92
Katherine Ave.
Wroxton Ct.
Oak Bailey Dr.
615
32
91
Oak Bailey Dr.
Old Wire Rd.
Katherine Ave.
1307
30
180
Charlee Ave
Rutherford Ave
Mission Blvd.
1217
30
168
Walnut
Gunter St.
Prospect St.
1136
21
292
Johnson
Walnut Ave.
Oliver Ave.
432
20
106
Olive Ave.
Maple St.
Prospect St.
1482
20
363
Huntsville Rd.
Blair Ave.
Morningside Dr.
511
54
338
MLK
College Ave.
Blair Ave.
2140
28
733
College Ave.
Rock St.
MLK
1649
28
565
Total
88055
23605
UP NEXT
Cardwell Ln.
Razorback Rd.
Oliver Ave.
397
24
117
Wood Ave.
MILK
McClinton St
1445
21
140
Clark St.
Dead End
Dead End
1301
22
350
Anson St.
Dead End
Dead End
1390
26
442
Ray St
100 Ft. N of 4th
Huntsville Rd.
1780
22
479
Charston Xing
Fredricksburg Cir.
Cul de sac
933
26
297
Beechwood Ave.
MLK
15th
2785
28
953
Brooks
15th St.
Boone St.
1097
24
322
Garland Ave.
Boone St.
Cato Springs Rd.
1751
24
514
Prospect
Park Ave.
Wilson Ave.
1532
23
431
Ila
Park Ave.
Wilson Ave.
1502
28
514
Mt. Comfort
Garland Ave.
Addington Ave.
1008
26
321
Finger
MLK
City Limits
4372
20
1067
Huntsville Rd.
Mill Ave.
Mashburne Ave
1784
24
524
Mashburne Ave.
Huntsville Rd.
MLK
126
54
84
Mill
I Rock ST
ISouth St.
1 3381
22
91
Rock Ave.
College Ave.
Mill Ave.
538
24
158
West Ave.
Meadow St.
Prarie St.
2106
22
567
Prairie
School St.
Government
925
23
260
South St.
School St
West Ave.
327
30
120
Gregg Ave
Center St.
MLK
2333
22
628
Government
Dead End
MLK
540
28
185
School St.
South St.
Archibald Yell Blvd
424
30
156
Oaks Manor Dr.
Sheryl Ave
Rollig Hills
1968
30
722