HomeMy WebLinkAbout309-21 RESOLUTIONOF FAMETTP � A � m AKA ry5PS 113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 Resolution: 309-21 File Number: 2021-0916 NABHOLZ CONSTRUCTION CORPORATION CHANGE ORDER NO.8 - 2019 CULTURAL ARTS CORRIDOR BOND PROJECT: A RESOLUTION TO APPROVE CHANGE ORDER NO. 8 TO THE CONTRACT WITH NABHOLZ CONSTRUCTION CORPORATION IN THE AMOUNT OF $10,373,888.00 FOR THE GUARANTEED MAXIMUM PRICE RELATED TO THE CULTURAL ARTS CORRIDOR REPLACEMENT PARKING DECK PROJECT, AND TO APPROVE A BUDGET ADJUSTMENT - 2019 CULTURAL ARTS CORRIDOR BOND PROJECT WHEREAS, on October 2, 2018, the City Council passed Resolution 217-18 to approve a Construction Manager at Risk Services Contract with Nabholz Construction Corporation for the replacement parking deck associated with the Cultural Arts Corridor Project; and WHEREAS, Change Order No. 8 will adopt the City's guaranteed maximum price for the work to complete the parking deck including, but not limited to, concrete, masonry, structural steel, waterproofing, glass and glazing, metal stud, painting, mechanical/electrical/plumbing, and elevators. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves Change Order No. 8 to the Construction Manager at Risk Services Contract with Nabholz Construction Corporation, a copy of which is attached to this Resolution, in the amount of $10,373,888.00 for the guaranteed maximum price related to the replacement parking deck for the Cultural Arts Corridor Project. Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment, a copy of which is attached to this Resolution. Page 1 Printed on 12115121 City of Fayetteville, Arkansas 113 West Mountain Street Fayetteville, AR 72701 (479)575-8323 Text File File Number: 2021-0916 Agenda Date: 12/14/2021 Version: 1 Status: Passed In Control: City Council Meetinq File Type: Resolution Agenda Number: B.1 NABHOLZ CONSTRUCTION CORPORATION CHANGE ORDER NO.8 - 2019 CULTURAL ARTS CORRIDOR BOND PROJECT: A RESOLUTION TO APPROVE CHANGE ORDER NO. 8 TO THE CONTRACT WITH NABHOLZ CONSTRUCTION CORPORATION IN THE AMOUNT OF $10,373,888.00 FOR THE GUARANTEED MAXIMUM PRICE RELATED TO THE CULTURAL ARTS CORRIDOR REPLACEMENT PARKING DECK PROJECT, AND TO APPROVE A BUDGET ADJUSTMENT - 2019 CULTURAL ARTS CORRIDOR BOND PROJECT WHEREAS, on October 2, 2018, the City Council passed Resolution 217-18 to approve a Construction Manager at Risk Services Contract with Nabholz Construction Corporation for the replacement parking deck associated with the Cultural Arts Corridor Project; and WHEREAS, Change Order No. 8 will adopt the City's guaranteed maximum price for the work to complete the parking deck including, but not limited to, concrete, masonry, structural steel, waterproofing, glass and glazing, metal stud, painting, mechanical/electrical/plumbing, and elevators. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves Change Order No. 8 to the Construction Manager at Risk Services Contract with Nabholz Construction Corporation, a copy of which is attached to this Resolution, in the amount of $10,373,888.00 for the guaranteed maximum price related to the replacement parking deck for the Cultural Arts Corridor Project. Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment, a copy of which is attached to this Resolution. City of Fayetteville, Arkansas Page 1 Printed on 1211512021 Wade Abernathy City of Fayetteville Staff Review Form 2021-0916 Legistar File ID 12/7/2021 City Council Meeting Date - Agenda Item Only N/A for Non -Agenda Item 11/19/2021 FACILITIES MANAGEMENT (140) Submitted By Submitted Date Division / Department Action Recommendation: Approval of Change Order #8 to the Cultural Arts Corridor Contract Construction Management at Risk Contract RI 18-11 with Nabholz Construction Corporation in the amount of $10,373,888.00 for the GMP for the Replacement Parking Deck Project and approve a budget adjustment. This is a 2019 Arts Corridor Bond Project. Budget Impact: 4608.860.7820-5804.00 4608-Arts Project 2019 Bonds Account Number 46080.7820-Arts Corridor Parking Project Number Budgeted Item? Yes Does item have a cost? Yes Budget Adjustment Attached? Yes Fund Arts Corridor 2019 Bonds Current Budget Funds Obligated Current Balance Item Cost Budget Adjustment Remaining Budget Project Title $ 18,146,334.00 $ 9,735,677.07 $ 8,410,656.93 $ 10,373,888.00 $ 3,200,000.00 1,236,768.93 V20210527 Purchase Order Number: 2020-00000689 (request new po) Previous Ordinance or Resolution # 284-21 Change Order Number: 0 Original Contract Number: 2018-00000042 Approval Date: Comments: Original PO is 2020-00000689, however a new PO will be needed. C:\Users\wabernathy\Documents\Copy of 2021-0916 SRF NABHOLZ C08 CAC Parking Deck CITY OF FAYETTEVILLE ARKANSAS MEETING OF DECEMBER 7, 2021 TO: Mayor and City Council THRU: Susan Norton, Chief of Staff Paul Becker, Chief Financial Officer CITY COUNCIL MEMO FROM: Wade Abernathy, Director Bond and Building Construction DATE: November, 19,2021 SUBJECT: Approval of a Change Order #8 to RFQ-18-11 Contract with Nabholz Construction Corporation for Replacement Parking Deck Construction. RECOMMENDATION: Approval of change Order #8 to the Cultural Arts Corridor Contract Construction Management at Risk Contract RFQ-18-11 with Nabholz Construction Corporation for the Guaranteed Maximum Price related to the Replacement Parking Deck in the amount of $10,373,888.00 and approve a budget adjustment. This is a 2019 Bond project. BACKGROUND: January 2020: Council approved a resolution for engineering services with Olsson for the design of the replacement parking deck. June 2020: Council approved CM at risk services with Nabholz for the construction of the replacement parking deck. August 2020: Council approved a resolution of intention of the city council to agree and further detail all terms of the proposed contract between the City of Fayetteville, Bank of Fayetteville and Depot LLC. March 2020: Council approved an ordinance for the sale of the north plaza property, and real estate purchase contracts with Farmers and Merchants Bank, Fayetteville Depot, LLC, and Dickson and West Investments, LLC. March 2021: Council approved an amendment to Olsson's contract to include the Architectural Services for fagade treatments and PD Substation designs. November 21; Council approved change order #6 with Nabholz for the early site package. DISCUSSION: The scope of this work is the balance of the work to complete the parking deck, Including Concrete, Masonry, Structural Steel, Waterproofing, Glass & Glazing, Metal Stud, Painting, MEP, Elevators. Mailing Address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 BUDGET/STAFF IMPACT: A budget adjustment to appropriate funds from the Arts Corridor 2019 Bonds, Unallocated budget, General, and Street Improvement Funds. Attachments: Change Order #8 {l1SESR1►y '• I1 ' Prime Contract Change Order Fayetteville Cultural Arts Corridor Project # 02-19-2526 Nabholz Construction Corporation 113 W. Mountain St. Tel: Fax: Fayetteville, AR 72701 Date: 11/17/2021 To Contractor: Nabholz Construction Corporation 3301 N 2nd St (72756), PO Box 277 Rogers, AR 72757 The Contract is hereby revised by the following items: Fayetteville Downtown Parking Deck - City Costs Architect's Project No: Contract Date: 4/18/2018 Contract Number: 02-19-2526 Change Order Number: 008 PCO Description 056 Fayetteville Downtown Parking Deck - City Costs for Structure This Change Order incorporates the City of Fayetteville portion of the Downtown Parking Deck. Pricing is based off the following: 1) GMP Estimate dated November 17, 2021 2) Value Engineering Worksheet dated November 17, 2021 3) 100% CD Drawings dated August 13, 2021 and Specifications dated July 2021 4) Addendum 1 dated September 10, 2021 5) Addendum 2 dated September 17, 2021 Amount $10,373,888.00 Additional assumptions and clarifications to this change order: 6) Total project duration for the parking deck is 17 months from date of permitting approval for the early site scope of work or approval and signature of the early site change order, whichever comes later. The contract completion date for the overall Cultural Arts Corridor project will be extended to reflect the 17 month duration of both the Parking Deck early site scope of work and the work associated with this change order. 7) Reference Exhibit A for all inclusions, exclusions, estimated value engineering options, and allowances. 8) After an ASI is received from the design team, contingency may need to be adjusted to reflect any variances. 9) After Masonry and Steel supply bid packages are rebid, contingency may need to be adjusted to reflect any variances from the allowances carried. 10) Reasonable efforts will be made to keep the Arsaga's at the Depot accessible during construction. The original Contract Value was......................................................................................................................................... Sum of changes by prior Prime Contract Change Orders................................................................................................... The Contract Value prior to this Prime Contract Change Order was.................................................................................. The Contract Value will be changed by this Prime Contract Change Order in the amount of ............................................. The new Contract Value including this Prime Contract Change Order will be.................................................................... The Contract duration will be changed by........................................................................................................................... The revised Substantial Completion date as of this Prime Contract Chance Order is ........................................................ $80,000.00 $11, 875, 221.06 $11,955,221.06 $10,373,888.00 $22,329,109.06 517 days 5/21 /2023 PROJECT CONFIDENTIAL Property of Nabholz Construction Corporation Not for Duplication or Distribution This document includes data prepared in conjunction with the Project that is deemed trade secret or proprietary to Nabholz. This document is shared with the Project team solely for use on this Project consistent with the responsibilities of the Project team. The Recipients shall not duplicate, use, or disclose, in whole or in part, to any person, entity, or party outside the Project team without Nabholz' prior written authorization. Prolog Converge Printed on: 11/19/2021 Nabholz Page 1 Nabholz Construction Corporation City of Fayetteville CONTRACTOR 3301 N 2nd St (72756), PO Box 277 Rogers, AR 72757 Address BY Rob Dodd SIGNATURE DATE 1115-2021 - PROJECT CONFIDENTIAL OWNER 113 W. Mountain St. Fayetteville, AR 72701 Address BY L.ioneld Jorda SIGNATURE DATE -2 I Property of Nabholz Construction Corporation Not for Duplication or Distribution This document includes data prepared in conjunction with the Project that is deemed trade secret or proprietary to Nabholz. This document is shared will the Project team solely for use on this Project consistent with the responsibilities oft he Project team. The Recipients shall not duplicate, use, or disclose, in whole or in part, to any person, entity, or party outside the Project team without 'Nabholz' prior written authorization. Prolog Converge Printed on: 11/19/2021 Nabholz Page 2 TA I 1� �NTE6RIiy I Fayetteville Downtown Parking Deck Fayetteville, AR Exhibit A: Structure Package - Guaranteed Maximum Price November 17, 2021 Executive Summary Pricing Nabholz presents this Guaranteed Maximum Price dated November 17, 2021 for the Fayetteville Downtown Parking Deck Structure Package. Based on the Construction Documents provided by Olsson, we propose a Guaranteed Maximum Price of $10,373,888 for the portion of work identified by the City of Fayetteville Arkansas as their responsibility. This amount does not include the Developer identified costs which are required to complete the work in its entirety. A more detailed estimate is enclosed for your review. Scope of Work The following allowances have been included in the GMP: 1. An allowance of $473,935 has been included for the Masonry scope of work until this package can be re -bid. This allowance includes adjustments related to VE items. 2. An allowance of $476,604 has been included for the Structural Steel Supply scope of work until this package can be re -bid. This allowance includes adjustments related to VE items. 3. An allowance of $5,323 has been included for the Wall Panels scope of work until this package can be re -bid. This allowance includes adjustments related to VE items. 4. An allowance of $35,575 has been included for the Membrane Roofing scope of work until this package can be re -bid. This allowance includes adjustments related to VE items. 5. An allowance of $12,062 has been included for the Landscaping scope of work. This package will be re -bid with a later phase of streetscapes work. 6. An allowance of $64,352 for AEP underground wire installation. 7. Value Engineering savings of $863,359 has been included in the GMP which will need to be firmed up once further design direction is provided by the design team. The following are items which have been excluded from the GMP: 1. A Building Permit has not been included. TA I 1� �NTE6RIiy I Fayetteville Downtown Parking Deck Fayetteville, AR 2. Currently, Arsagas at the Depot building is unoccupied. No provisions for temporary water, sewer, and gas services to this building have been accounted for during construction. No public safety provisions or access has been accounted for in our pricing as none have been requested or shown on the documents. Bid Documents The Guaranteed Maximum Price is based upon the following Construction Bid Documents. • Drawings and specifications provided by Olsson, dated September 13, 2021. • Addendum #1 issued September 10, 2021. • Addendum #2 issued September 17, 2021. 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 Structure GMP City Cost PROJECT NAME Downtown Fayetteville Parking Deck PROJECT LOCATION Fayetteville, AR REVIEW DATE 11/17/2021 ARCHITECT Olsson ESTIMATED DURATION 19 Mo Location Description Takeoff Quantity Grand Total Amount 02 Structure Package Garage Costs 01-7423 Final Cleaning Final Cleaning 1.00 Isum 25,379 01-7423 Final Cleaning 25,379 03-0010 Concrete Garage Structrure (Lithko) 1.00 Isum 6,402,812 Tower Crane 1.00 Isum 355,302 Garage Structure Premium Deduct of 18% 1.00 Isum (1,152,506) VE #4 1.00 Isum (10,935) VE #18 1.00 Isum (62,939) 03-0010 Concrete 5,531,733 04-2000 Masonry Masonry Allowance 1.00 Isum 350,396 VE #13 1.00 Isum 130,719 04-2000 Masonry 481,115 05-1200 Structural Steel & Misc. Metals Supply Structural Steel Supply Allowance 1.00 Isum 517,964 Material Escallation Allowance 1.00 Isum 7,563 VE #4 Deduct 1.00 Isum (75,531) VE #4 Canopy Add 1.00 Isum 113,265 VE #8 1.00 Isum 16,540 VE #3 1.00 Isum 58,992 05-1200 Structural Steel & Misc. Metals Supply 638,792 05-1205 Structural Steel & Misc. Metals Install STI 1.00 Isum 228,353 VE #3 1.00 Isum 20,303 VE #4 1.00 Isum (23,856) 05-1205 Structural Steel & Misc. Metals Install 224,800 05-1210 Green Screen Assembly Green Screen Assembly on 1st Floor Developer Area 1.00 Isum 76,731 05-1210 Green Screen Assembly 76,731 07-1000 Waterproofing and Dampproofing Roberts McNutt 1.00 Isum 491,327 Garage Slab Waterproofing Coating Over Police Station 1.00 Isum 27,185 VE #12 1.00 Isum (204,045) 07-1000 Waterproofing and Dampproofing 314,467 07-4633 Wall Panels Wall Panels Allowance 1.00 Isum 222,087 Wall Panels Bond @1.5% 1.00 Isum 3,331 Material Escallation Allowance 1.00 Isum 2,005 VE #2 1.00 Isum (22,058) VE #4 1.00 Isum (25,066) VE #13 1.00 Isum (174,962) 07-4633 Wall Panels 5,337 07-5000 Membrane Roofing Roofing Allowance 1.00 Isum 105,278 Roofing Bond @1.5% 1.00 Isum 10,603 Material Escallation Allowance 1.00 Isum 2,005 VE #4 1.00 Isum (82,217) 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 Structure GMP City Cost PROJECT NAME Downtown Fayetteville Parking Deck PROJECT LOCATION Fayetteville, AR REVIEW DATE 11/17/2021 ARCHITECT Olsson ESTIMATED DURATION 19 Mo Location Description Takeoff Quantity Grand Total Amount 07-5000 Membrane Roofing 35,669 08-1113 Hollow Metal Frames and Doors (Supply) Felix Thomson 1.00 Isum 15,091 08-2000 08-1113 Hollow Metal Frames and Doors (Supply) Door & Hardware (Install) 15,091 Nabholz 1.00 Isum 2,798 08-2000 Door & Hardware (Install) 2,798 08-4100 Glass & Glazing Ace Glass 1.00 Isum 317,447 Material Escallation Allowance 1.00 Isum 8,771 VE #2 1.00 Isum (63,041) VE #3 1.00 Isum (263,177) 09-2116 Metal Stud Framing TCM 1.00 Isum 196,330 VE #2 1.00 Isum (20,303) VE #4 1.00 Isum (20,303) VE #13 1.00 Isum 7,648 09-2116 Metal Stud Framing 163,372 09-9100 Painting Paint Innovators 1.00 Isum 133,472 VE #4 1.00 Isum (6,395) VE #8 1.00 Isum (18,780) VE #9 1.00 Isum (24,364) 09-9100 Painting 83,933 10-1100 Garage Signage Signage Allowance 1.00 Isum 20,303 10-1100 Garage Signage 20,303 14-2000 Elevators Otis 1.00 Isum 331,192 14-2000 Elevators 331,192 21-0000 Fire Suppression Freedom Fire 1.00 Isum 98,926 Material Escallation Allowance 1.00 Isum 4,429 VE #15 1.00 Isum (58,284) 21-0000 Fire Suppression 45,072 22-0000 Plumbing & HVAC Johnson Mechanical 1.00 Isum 322,817 VE #10 1.00 Isum (28,830) VE #11 1.00 Isum (14,720) 22-0000 Plumbing & HVAC 279,268 26-1000 Electrical Arestar 1.00 Isum 854,708 Arestar Bond @3.5% 1.00 Isum 30,968 Material Escallation Allowance 1.00 Isum 22,109 Crane Electrical Equipment Allowance 1.00 Isum 30,079 VE #16 1.00 Isum (10,026) VE #17 1.00 Isum (10,026) 26-1000 Electrical 917,812 31-0000 Earthwork and Site Prep Oelke Structure Package Add 1.00 Isum 46,444 Gas Service Relocation Allowance (Black Hills) Reconciliation 1.00 Isum (6,892) 31-0000 Earthwork and Site Prep 39,552 32-1723 Pavement Markings and Signage 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 Structure GMP City Cost PROJECT NAME Downtown Fayetteville Parking Deck PROJECT LOCATION Fayetteville, AR REVIEW DATE 11/17/2021 ARCHITECT Olsson ESTIMATED DURATION 19 Mo Location Nabholz Description Takeoff Quantity Grand Total Amount 32-1723 Pavement Markings and Signage Custom Pavement 1.00 Isum 33,610 32-1723 Pavement Markings and Signage 33,610 32-4000 Laydown Area Parking Lot Repairs Allowance 1.00 Isum 41,637 Lot Rental 1.00 Isum 62,509 32-4000 Laydown Area 104,147 Garage Costs 9,370,171 GCs & GRs 00-1000 GCs & GRs GCs 1.00 Isum 565,732 GRs 1.00 Isum 238,077 00-1000 GCs & GRs 803,809 GCs & GRs 803,809 Streets 26-1000 Electrical Utility Electrical Conduit Installation (Arestar) 1.00 Isum 47,125 Chipotle/Arsagas Electrical Secondary (Arestar) 1.00 Isum 30,079 Arestar Bond @3.5% 1.00 Isum 2,702 Material Escallation Allowance 1.00 Isum 1,997 AEP Wire Allowance (Early Site Reconciliation) 1.00 Isum (69,797) Cox Relocation 1.00 Isum 11,821 Electrical Conduit Installation Allowance (Early Site Reconciliation) 1.00 Isum (253,787) 26-1000 Electrical (229,860) 32-9323 Landscaping Landscaping Allowance 1.00 Isum 12,245 32-9323 Landscaping 12,245 Streets (217,615) 02 Structure Package 9,956,364 Estimate Totals Cost of Work 9,956,364 9,956,364 Building Permit NIC Building Permit NIC 9,956,364 General Liability 88,178 Builder's Risk 19,710 Performance Payment Bond 50,289 Insurance & Bonds 158,177 10,114,541 Construction Contingency Contingency 10,114,541 Construction Managers Fee 259,347 2.500 Contractors Fee 259,347 10,373,888 Total 10,373,888 Value of streets related work = $300,000 Total garage cost with $1,255,595 Early Site Package = $11,629,483 Value of Developer identified scope of work is $2,779,899 and is not included in this change order but will be required to complete the scope of work in it's entirety. PROJECT CONFIDENTIAL Property of Nabholz Construction Corporation Not for Duplication or Distribution This document includes data that is deemed trade secret or proprietary to Nabholz and prepared in conjunction with the Project. This document is shared with the Project team solely for use on this Project consistent with the responsibilities of the Project team. The Recipients shall not duplicate, use, or disclose, in whole or in part, to any person, entity, or party outside the Project team without Nabholz' prior written authorization. VALUE ENGINEERING SUMMARY REPORT Fayetteville Parking Deck � O11/17/2021 DescriptionItem Omit 1 Floor Level $ (913,597.63) $ (913,597.63) M7� # Al A_2 Omit facade treatment at south east deck from 2nd floor up. $ (111,407.82) $ (111,407.82) A_3 Horizontal Slats in lieu of Mullion Assemblies $ (199,720.72) $ (199,720.72) A-4 Omit canopy and replace with lightweight suspended canopy 10' max depth. $ (133,236.69) $ (133,236.69) A-5 Omit canopy entirely. $ (252,644.25) $ (252,644.25) A_6 Omit precast cap at elevator tower. $ 1,578.55 $ 1,578.55 A_7 Green Screen System at East Fagade $ (310,065.84) $ (310,065.84) A-8 Galvanized Stairs & Railings in Lieu of Painted $ (3,745.70) $ (3,745.70) A_9 Remove painting of North Stair Tower $ (25,684.80) $ (25,684.80) A=10 PVC Piping Below Grade in lieu of Cast Iron $ (30,393.68) $ (30,393.68) A111 PVC Piping Above Grade in lieu of Cast Iron $ (15,517.90) $ (15,517.90) A_2 Remove Concrete Sealing on Deck $ (201,000.00) $ (201,000.00) A=13 Brick in Lieu of Metal Panels on East Fagade $ (63,198.00) $ (63,198.00) A=14 Green Screen Columns and Horizontal Slats $ (340,568.00) $ (340,568.00) A=15 Remove Fire Suppression Stand Pipes. Leave underground for future connections. $ (61,444.46) $ (61,444.46) A=16 Alternate Light Fixture Package $ (10,000.00) $ (10,000.00) A 17 Aluminum Feeders in lieu of Copper $ (10,000.00) $ (10,000.00) A=18 Concrete Testing Reduction $ (62'000.00) $ (62,000.00) A=19 Descope Adjustments Total Pending Items$ $ (413,6 00.00) (3,156,286.96) $ (413,640.00) $ (1,340,989.78) $ (1,815,297.18) Value Analysis/Constructability Suggestions are advisory only and not professional design services. Nabholz takes no responsibility for design. Page 1 of 1 City of Fayetteville, Arkansas - Budget Adjustment Form (Legistar) Budget Year Division Adjustment Number /Org2 FACILITIES MANAGEMENT (140) 2021 Requestor: Wade Abernathy BUDGET ADJUSTMENT DESCRIPTION / JUSTIFICATION: Approval of Change Order #8 to the Cultural Arts Corridor Contract Construmtion Management at Risk Contract RFQ-18- 11 with Nabholz Constrcution Corporation in the amount of $10,373,888.00 for the GMP for the Replacement Parking Deck Project and approve a budget adjustment. This is a 2019 Arts Corridor Bond Project. RESOLUTION/ORDINANCE COUNCIL DATE: 12/7/2021 LEGISTAR FILE ID#: 2021-0916 Hovy 3lack� 1111812021 12:54 PM Budget Director Date TYPE: D - (City Council) JOURNAL #: GLDATE: 12/7/2021 CHKD/POSTED: TOTAL Account Number 2,900,000 2,900,000 Increase / (Decrease) Expense Revenue Proiect.Sub# Project Sub.Detl AT v.20211011 Account Name 1010.090.6600-5804.00 2,900,000 - 46080 7820 EX Building Costs 4602.860.7820-5809.00 4608.860.7820-5804.00 300,000 - 7,173,888 - 46020 46080 7820 7820 EX EX Improvements - Street Building Costs 1010.001.0001-4999.99 - 2,900,000 RE Use Fund Balance - Current 4602.860.7999-5899.00 4608.860.7999-5899.00 (300,000) - (7,173,888) - 46020 46080 7999 7999 EX EX Unallocated - Budget Unallocated - Budget H:\BudgetAdjustments\2021-Budget\City Council\12-07-2021\2021-0916 BA C08 Nabholz CAC Parking Deck.xlsm 1 of 1 Received 12/14/21 8:49 AM Submit Public Comment This page is provided for efficient submission of public comment for City Council and Planning Commission meetings. All submissions must be directly related to a specific agenda item for the next meeting. Please ensure your comments conform to the Rules of Order and Procedure. RULES OF ORDER AND PROCEDURE OF THE FAYETTEVILLE CITY COUNCIL Full Name* Susan Raymond Address or Ward* Address Ward Locate Your Ward Number Address* 3052 N.Hughmount Rd, Fayetteville Ex. 113 W Mountain St Phone Number Email Meeting Body* City Council Agenda Item Parking Deck contract Number/Subject Please click the link below to navigate to the Agenda Page Locate City Council Agenda Item Locate Planning Commission Agenda Item Position Opposed Comments I believe a compromise should be reached -- downsize or eliminate some aspect, feature to reduce the cost, rather than accept such a large increase in cost. There are too many parking lots and decks already. I believe shuttle buses should be used so other parking decks can be used, especially ones not being used at night. Attachments PDF preferred Section from the RULES OF ORDER AND PROCEDURE OF THE FAYETTEVILLE CITY COUNCIL Adopted 01/07/2020 by Resolution #01-20 & Amended 06/16/2020 by Resolution #170-20: Public Comments. Public comment at a City Council meeting shall be allowed for all members of the audience who have signed up prior to the beginning of the agenda item they wish to address being opened for public comment. Speakers shall be limited to a maximum of five (5) minutes to be broken into segments of three and two minutes. Amendments may receive public comments only if approved by the City Council by unanimous consent or majority vote. If public comment is allowed for an amendment, speakers will only be allowed to speak for three (3) minutes. The City Council may allow both a speaker additional time and an unsigned -up person to speak by unanimous consent or majority vote Courtesy and Respect. All members of the public, all city staff and elected officials shall accord the utmost courtesy and respect to each other at all times. All shall refrain from rude or derogatory remarks, reflections as to integrity, abusive comments and statements about motives or personalities. Any member of the public who violates these standards shall be ruled out of order by the Mayor, must immediately cease speaking and shall leave the podium. Enter the text you want this field to display CHANGE ORDER #9 RFQ 18-11 NABHOLZ CONSTRUCTION City of Fayetteville Staff Review Form 2022-0233 Legistar File ID N/A City Council Meeting Date - Agenda Item Only N/A for Non -Agenda Item Wade Abernathy 3/9/2022 FACILITIES MANAGEMENT (140) Submitted By Submitted Date Division / Department Action Recommendation: Approval of Change Order #9 to RFQ-18-11 with Nabholz Construction in the amount of $34,490.89 for Additional Trees in Fay Jones Woods, Fiber Conduits @ West Ave., and Reconcilation of Construction Contingency on the Arts Corridor Phase 1 Bond Project. Budget Impact: Various Various Account Number Fund Various Various Project Number Budgeted Item? Yes Does item have a cost? No Budget Adjustment Attached? No Current Budget Funds Obligated Current Balance Item Cost Budget Adjustment Remaining Budget Project Title $ 4,421,620.00 $ 3,474,822.54 946,797.46 946,797.46 V20210527 Purchase Order Number: 2020-00000689 Previous Ordinance or Resolution # 309-21 Change Order Number: 9 Approval Date: 3-10-22 Original Contract Number: 2018-00000042 Comments: CITY OF FAYETTEVILLE ARKANSAS TO: Mayor Lioneld Jordan THRU: Susan Norton, Chief of Staff Paul Becker, Chief Financial Officer FROM: Wade Abernathy, Director Bond Projects DATE: March 9, 2022 STAFF MEMO SUBJECT: Change Order #9 to RFQ 18-11 with Nabholz Construction for the Arts Corridor Project. RECOMMENDATION: Staff recommends approval of change order #9 with Nabholz Construction on the Arts Corridor Project in the amount of $34,490.89 for additional trees at Fay Jones Woods, installation of fiber conduits at West avenue, and reconciliation of contingencies. BACKGROUND: Environmental Services has an ongoing project for planting trees in riparian areas and along trails. Our IT Division has an ongoing Fiber connectivity project thru out the city. The construction contract includes $300,000 in owner contingency and $138,000 in owner contingency to use towards the project to cover scope gaps, revisions, and unforeseen conditions. DISCUSSION: Native Trees are being planted as part of the ecological restoration in Fay Jones Woods. Additional conduits will help complete fiber connectivity to west avenue. Thru out the project, there have been additions and revisions requested by the city, along with some unforeseen conditions. This Change Order authorizes the use of construction and owner contingency funds for those items. Mailing Address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 BUDGET/STAFF IMPACT: Funds will be allocated from: 4470.170.8170-5315.00 09028.1 for the Fiber Conduits, 4470.090.8900-5220.00; 22004.1 for the additional trees, and the use of owner and construction contingencies included in the contract. Purchase Order Detail (PO# 2020-00000689) Account Project Amount Notes 4470.170.8170-5315.00 09028.1 10,479.38 IT Data Conduits (New) 4470.090.8900-5220.00 22004.1 32,875.25 Tree Replacement (New) Attachments: Change Order #9 Prime Contract Change Order NA1301Z Fayetteville Cultural Arts Corridor Project # 02-19-2526 Nabholz Construction Corporation 113 W. Mountain St Tel. Fax Fayetteville. AR 72701 Date: 2/25/2022 To Contractor: Architect's Project No: Nabholz Construction Corporation Contract Date: 4/18/2018 3301 N 2nd St (72756), PO Box 277 Contract Number: 02-19-2526 Rogers, AR 72757 Change Order Number: 009 The Contract is hereby revised by the following items: CORs #20-53 PCO Description Amount 054 Tree Replacement $ 32 875.25 022 Additional Water Meter at 127 & 203 $ 0.00 028 Additional Guardrails at Concrete Head Wall $ 0.00 029 Grading at South Street $ 0.00 034 SWEPCO Temp Pole at Mountain Street $ 0.00 039 Changes at 419 W Center St. $ 0.00 030 Additional Charges to Reroute Sewer at Overlook for COR #10 $ 0.00 032 RFI #47 Beam Rock Wall $ 0.00 035 RFI #50 Gregg Ave Utilities $ 0.00 036 12 West Ave. Sewer Extension $ 0_00 038 Large Boulders Ibison Stone $ 0.00 040 RFI 059 Concrete Turndown at Overlook $ 0.00 043 RFI 060 - 200 sq. ft. Additional Retaining Wall $ 0.00 044 RFIs 061, 062. and 063 Raised Crosswalks $ 0.00 048 West Ave. Planting Revisions $ 0.00 052 Additional Tree Removal $ 000 055 RFI 070 Demo and Utilities at Mountain St. $ 0.00 058 Relocate Two Light Pale Bases $ 0.00 059 Electrical Crossing at 7 West Ave. $ 0.00 062 Additional Fayetteville IT Data Conduits $ 10,479.38 064 Planter Drainage at 53-77 West Ave. $ 0.00 067 South St. Sidewalk and Curb/Gutter Replacement $ 0.00 071 Walkway C Handrail Lighting $ 0.00 074 Credit for COR #22, RFI 35 Grading at South Street ($ 8,863.74) 073 RFI 073 205 West Ave. Driveway 5 0.00 075 RFI 078 Trail Demo and Replacement $ 0.00 068 RFI 075 Gregg Ave. Retaining Wall Height Addition $ 0.00 PCCO 9 does not include any CORs that have not been approved for Construction Contingency or Owner Contingency. Pricing is based on the following: COR #20 - An additional meter was required, because of the water meter between 119 & 127 West Ave was needed for both units at 119. COR #21 - This COR is to add a guardrail at the concrete headwall at the tributary area. PROJECT CONFIDENTIAL Property of Nabholz Construction Corporation Not for Duplication or Distribution This document includes data prepared in conjunction with the Project that is deemed trade secret or proprietary to Nabhoiz. This document is shared with the Project team solely for use on this Project consistent with the responsibilities of the Project team. The Recipients shall not duplicate, use, or disclose, in whole or in part, to any person, entity, or parhoutside the Project team without Nabholz'prior written authorization. Prolog Manager Printed on 3/3/2022 Nabholz Page 1 Prime Contract Change Order Private Confidential a0a COR #22 - This COR is to correct the grading concerns at the South Street intersection. CDR #23 - The city has requested the sewer to be rerouted out from underneath the overlook structure. This PCO reflects the change in price from when this work was first priced. COR #24 - Additional work to be done at 419 W Center St. in order to install retaining wall. COR #25 - The allowance for SWEPCO was created back to the construction contingency. We had to set a temp pole. so we could install the West Ave retaining wall footings. COR #26 - The beam rock wall was reduced in PR #1 but grading in PR #1 would require three trees to be removed. The design team and the aty decided to add the wall back in to save the trees. COR #27 - RFI #50 nas added general conditions, insurance, bond, and fee since this will result in a prime contract change order. Note. Oelke has estimated this change will take approximately 6 weeks. Nabholz has added approximately 2 weeks of general conditions to this CDR. COR #28 - Cost to provide and install 9 additional boulders at the Tanglewood Scramble. COR #29 - Sewer service line at 12 West Ave is drawn to the south of the driveway In the field, the cleanout for the house is in the backyard. Sewer service line had to be rerouted and extended up the driveway a total of 601f. ,::OR #30 - Per NBW 's response to RFI 059. Nabholz Concrete has provided pricing for a turndown 18' in length COR #31 - 9/L2.32 shows the top -of -wall elevation to be 1352 at the NW comer and taper down to 1351.25 at the SW comer. However, the actual grade being retained is 1354. This is the price to add approximately 200 sq. ft. of block, mortar, veneer, and grout to meet the existing retained grade. COR #32 - Responses to RFIs 061, 062, and 063 changed the designs of the raised crosswalks. Nabholz as seen a three week schedule delay in paving activities, due to the multiple design changes and revisions to these crosswalks that has been ongoing since August 7th. We are requesting additional general conditions to help offset roughly a third of this lost time. COR #36 - Price to add topsoil and seed & straw to planting areas added on 7/30/21 in response to RFIs 030, 055. and 061. This will serve to stabilize the affected planting areas until plants can be added during the Phase II-- Civic Plaza scope of work. COR #38 - Peter Nierengarten and John Scott marked 74 trees for removal on 10111121. 55 of these trees were not previously tagged. COR #39 - 70 trees will be installed to replace the trees removed by COR 038. COR #40 - In order to install the conduit running down Mountain St. additional demo not included in the demo sheets will need to be done. According to the response to RFI 070, the conduit will be moved into the street as opposed to the sidewalk. As a result. extra measures will need to be taken in order to meet compaction requirements. COR #41 - Price to relocate two light pole bases that have already been drilled per plan. COR #42 - In order to relocate the overhead electrical service at 7 West Ave., a 5'x8' section of concrete will need to be demc'd and replaced. COR #43 - Cost to add two 2" conduits from the SE corner of West Ave./Mountain St. intersection to a pedestal further east on Mountain St. COR #45 - A homeowner at 53-77 West Ave. voiced concerns about rainwater being trapped against his house due to the elevated sidewalk. In order to drain water away from the affected houses, downspouts will be piped into the bioswale underdrains. Price includes demo, piping, and replacement concrete. COR #47 - After the sidewalk, curb, and gutter between the South St. trail entrance and the driveway of 301 West Ave. had been poured, Fayetteville Engineering deemed that the grades must be reworked in order to accomidate a landing in the South St. trail entrance. COR #48 - Due to discrepancies between the street grade of Gregg Ave. and the height of the boardform wall, the height of the wall needed to be increased by 6", the SS manhole needs to be lowered -6", and the grade of the street needs to be adjusted. COR #50 - Early designs of the Walkway C handrails did not extend the length of the walkway. The final design includes a fulNength handrail. but the handrail lighting was not extended to match. Cost includes the additional lighting, drivers, and labor necessary to extend the handrail lighting the length of the walkway. COR #51 - In order to retain the grade under the driveway of 205 West Ave., a turndown needs to be installed. Additionally, due to prior agreements between the City and developer of 203 West Ave.. a portion of driveway needs to be installed between the existing 205 West Ave. driveway and 203 West Ave.. Price does not include any additional grading or landscaping that is not already in the plans. COR #52 - This COR is a result of COR 22 originally being added to PCCO 7, with the understanding that the Street Department would pay for this. Later. Wade asked for this to come from Contingency. Since PCCO 7 was already created and linked to pay applications, the only way to reverse this add to the contract is to do a Prime Contract Deduct. which is what this COR accomplishes, canceling out the add for this same amount in PCCO 7. COR #53 - After the elevations for the south raised crosswalk were established by City of Fayetteville Engineering, the slope of the concrete path leading from West Ave. to the Overlook exceeds 6%. After an on -site meeting was held to discuss, Olsson provided a grading drawing in response to RFI 078 that added ramps and landings to this portion of the trail. PROJECT CONFIDENTIAL. Property of Nabholz Construction Corporation Not for Duplication or Distribution This document includes data prepared in conjunction with the Project that is deemed trade secret or proprietary to Nabholz. This document is shared with the Project team solely for use on this Project consistent with the responsibilities of the Project team. The Recipients shall not duplicate, use, or disclose, in whole or in part, to any person, entity, or party outside the Project team without Nabholz' prior written authorization. Prolog Manager Printed on: 3/3/2022 Nabholz Page 2 p1[oa 1 Prime Contract Change Order Private Confidential The original Contract Value was............................................................................................................ 3 80,000.00 Sum of changes by prior Prime Contract Change Orders.........._._............................................. ...... ... 5 11,875,221.06 The Contract Value prior to this Prime Contract Change Order was............................................................. 11,655,221.06 The Contract Value will be changed by this Prime Contract Change Order in the amount of ........................ 34,490.89 The new Contract Value including this Prime Contract Change Order will be ................................................. S 11,989,711.95 The Contract duration will be changed by _.................................................................................... 0 Days The revised Substantial Completion date as of this Prime Contract Change Order is ..................................... 5/21/2023 Nabholz Construction Corporation CONTRACTOR 3301 N 2nd St (72756). PO Box 277 Rogers, AR 72757 Address By Kyle Stout SIGNATURE DATE City of Fayetteville OWNER 113 W. Mountain St. Fayetteville, AR 72701 Address By Lioneldjordanh YZI SIGNATURE L DATE 3-10-22 PROJECT CONFIDENTIAL Property of Nabholz Construction Corporation Not for Duplication or Distribution This docunotnt includes data prepared In conjunction witlr the Project that is deensed trade secret or proprietary to Nabholz This document is shared with the Project team solely for use on this Project consistent with the responsibilities of the Project team. The Recipients shall not duplicate, use, or disclose, lot whole or In part, to any person, entity, or party outside the Project team without Nabholz' prior written authorization. Prolog Manager Printed on: 3/3/2022 Nabholz Page 3