Loading...
HomeMy WebLinkAbout291-21 RESOLUTIONOF FPYE7TE. L v \R! / q RKANS �S 113 West Mountain Street Fayetteville. AR 72701 (479) 575-8323 Resolution: 291-21 File Number: 2021-0872 GARVER, LLC AMENDMENT NO. 1 - 2019 TRANSPORTATION BOND: A RESOLUTION TO APPROVE AMENDMENT NO. I TO THE PROFESSIONAL ENGINEERING SERVICES AGREEMENT WITH GARVER, LLC IN THE AMOUNT OF $976,235.00 FOR ADDITIONAL DESIGN SERVICES ASSOCIATED WITH THE SOUTH SCHOOL AVENUE AND COLLEGE AVENUE CORRIDOR IMPROVEMENTS PROJECT, AND TO APPROVE A BUDGET ADJUSTMENT - 2019 TRANSPORTATION BOND WHEREAS, on July 7, 2020. the City Council passed Resolution No. 180-20 approving a Professional Engineering Services Agreement with Garver. LLC for the design of the South School Avenue and College Avenue Corridor Improvements: and WHEREAS, Amendment No. I will include detailed design for College Avenue between North Street and Township Street and School Avenue between 15th Street and Martin Luther King, Jr. Boulevard. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby authorizes Mayor Jordan to sign Amendment No. l to the professional engineering services agreement with Garver, LLC in the amount of $976,235.00 for additional design services associated with the South School Avenue and College Avenue Corridor Improvements Project. Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment, a copy of which is attached to this Resolution. Page 1 Printed on 1218121 Resolution. 291-21 File Number: 2021-0872 PASSED and APPROVED on 12/7/2021 Attest: i A NA Kara J�� io Page 2 Printed on 1218121 City of Fayetteville, Arkansas 113West Mountain Street Fayetteville, AR 72701 (479) 575-8323 Text File File Number: 2021-0872 Agenda Date: 12/7/2021 Version: 1 Status: Passed In Control: City Council Meeting File Type: Resolution Agenda Number: A.4 GARVER, LLC AMENDMENT NO. 1- 2019 TRANSPORTATION BOND: A RESOLUTION TO APPROVE AMENDMENT NO. I TO THE PROFESSIONAL ENGINEERING SERVICES AGREEMENT WITH GARVER, LLC IN THE AMOUNT OF $976,235.00 FOR ADDITIONAL DESIGN SERVICES ASSOCIATED WITH THE SOUTH SCHOOL AVENUE AND COLLEGE AVENUE CORRIDOR IMPROVEMENTS PROJECT, AND TO APPROVE A BUDGET ADJUSTMENT - 2019 TRANSPORTATION BOND WHEREAS, on July 7, 2020, the City Council passed Resolution No. 180-20 approving a Professional Engineering Services Agreement with Garver. LLC for the design of the South School Avenue and College Avenue Corridor Improvements; and WHEREAS, Amendment No. 1 will include detailed design for College Avenue between North Street and Township Street and School Avenue between 15th Street and Martin Luther King, Jr. Boulevard. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby authorizes Mayor Jordan to sign Amendment No. 1 to the professional engineering services agreement with Garver, LLC in the amount of $976,235.00 for additional design services associated with the South School Avenue and College Avenue Corridor Improvements Project. Section 2: That the City Council of the City of Fayetteville. Arkansas hereby approves a budget adjustment, a copy of which is attached to this Resolution. City of Fayetteville, Arkansas Page 1 Printed on 121812021 Matt Casey Submitted By City of Fayetteville Staff Review Form 2021-0872 Legistar File ID 12/7/2021 City Council Meeting Date - Agenda Item Only N/A for Non -Agenda Item 11/1/2021 ENGINEERING (621) Submitted Date Division / Department Action Recommendation: Approval of Contract Amendment #1 in the amount of $976,235.00 with Garver, LLC for design of the School/College Avenue Corridor Improvements, per RFQ 20-01, selection #3 and approval of a budget adjustment. Budget Impact: 4602.860.7221-5860.02 Streets Projects 2019 Bonds Account Number Fund 46020.7221.1020 Hwy 71B Corridor, North to Township Project Number Budgeted Item? Yes Does item have a cost? Yes Budget Adjustment Attached? Yes Current Budget Funds Obligated Current Balance Item Cost Budget Adjustment Remaining Budget Project Title $ 28,837,464.00 $ 12,906,584.80 $ 15,930,879.20 $ 976,235.00 $ 14,954,644.20 V20210527 Purchase Order Number: 2020-607 Previous Ordinance or Resolution # 180-20 Change Order Number: 1 Original Contract Number: 2020-53 Comments: Approval Date: 7/7/2020 —� CITY OF FAYETTEVILLE ARKANSAS MEETING OF DECEMBER 7, 2021 TO: Mayor and City Council THRU: Susan Norton, Chief of Staff Chris Brown, Public Works Director CITY COUNCIL MEMO FROM: Matt Casey, Engineering Design Manager DATE: November 1, 2021 SUBJECT: Approval of Contract Amendment #1 in the amount of $976,235.00 with Garver, LLC for design of the School/College Avenue Corridor Improvements, per RFQ 20-01, selection #3 and approval of a budget adjustment. RECOMMENDATION: Staff recommends approval of Contract Amendment #1 in the amount of $976,235.00 with Garver, LLC. to provide professional services for the design of the School/College Avenue Corridor Improvements Project and approval of a budget adjustment. BACKGROUND: The School Avenue and College Avenue Corridors serve as the major north -south route through the central part of the City and are major commercial and retail destination. Maintaining and improving the corridors will allow them to continue to serve mobility needs, and to continue to develop/redevelop as commercial corridors. Improvements to these corridors will include striping, widening and/or narrowing of the roadway, utility relocation (including burial of overhead utilities), sidewalk/trail installation, accommodations for transit systems, elimination or reconfiguration of driveways, additional traffic signals, medians, plazas, art installations, lighting, wayfinding, protected intersections, parking, and other corridor improvements to be identified in the design process. The starting point for corridor designs is the 71 B Corridor Plan recently completed by RDG Planning. Goals and aspirations of the Plan will be implemented to the greatest extent possible through the limits of the project segments selected for design and construction, which include College Ave. between North Street and Township Street, and School Ave. between Martin Luther King Jr. Blvd. and Cato Springs Road. On July 7, 2020, the City Council approved a contract with Garver, LLC for the programming phase of this project. The programming phase included meetings with stakeholders and city staff to review the plan goals and make decisions about how and where to include project elements identified in the 71 B Plan. Mailing Address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 DISCUSSION: On August 10, 2021, the findings of the programming phase were presented to the Transportation Committee with recommendations for more detailed designs. The committee recommended approval of the presentation and requested that Engineering staff and Garver develop a scope of work for the design. Staff has worked with Garver to develop a scope that will include detailed design for College Avenue between North Street and Township Street and School Avenue between 15t" Street and MILK Jr. Boulevard. Garver has provided a fee in the amount of $976,235.00 for this additional work. The contract will be paid based on hourly rates for work completed, up to the total contract amount. BUDGET/STAFF IMPACT: The design for this project will be paid for with the funds from the 2019 Transportation Bond Fund under the 71 B Corridor Project. The original contract with Garver for this project was $224,350.00. With this contract amendment, the new total for the project design is $1,200,585.00. The original allocation in Phase 1 of the Transportation Bond Program was $500,000. Attachments: Garver, LLC - Engineering Agreement Budget Adjustment CARVER AMENDMENT TO AGREEMENT FOR PROFESSIONAL SERVICES CITY OF FAYETTEVILLE Fayetteville, Arkansas Project No. 20T21050 CONTRACT AMENDMENT NO. This Contract Amendment No. 1, effective on the date last written below, shall amend the original contract between the City of Fayetteville (Owner) and GARVER, LLC (GARVER), dated July 7, 2020 referred to in the following paragraphs as the original contract. This Contract Amendment No. 1 adds professional design services for the: Improvements to School Avenue from MILK Jr. Boulevard to 15t" Street and College Avenue from North Street to Township Street. In General, Amendment No. 1 adds surveying, environmental services, design of the improvements as documented in the 2021 Programming Document, and bidding to the previous agreement that only contained the Programming Phase. More specifically, the original contract is hereby modified as follows: APPENDIX A — SCOPE OF SERVICES All items contained in the attached Amendment No. 1 Appendix A shall be added to the project Scope of Services. APPENDIX B — PROJECT FEE SPREADSHEETS The attached hourly rates, summary sheet, and fee spreadsheets shall be added to Appendix B as included in the original agreement. The Amendment No. 1 shall increase the maximum -not -to -exceed amount a sum of $976,235 from $224,350 to $1,200,585. Contract Amendment No. 1 1 of 2 School/College Avenue Corridor Improvements Garver Project No. 20T21050 G VER This Agreement may be executed in two (2) or more counterparts each of which shall be deemed an original, but all of which together shall constitute one and the same instrument. IN WITNESS WHEREOF, Owner and GARVER have executed this Amendment effective as of the date last written below. C IB Name: L l VYIQiUU D"A Printed Name Title: 614 K Date: / 2' -7 ^"Z' Attest: `���ttttt►►r���� • Y =�. FAY,. GARVER, LLC By: Signature Name: Ronald S. Petrie Printed Name Title: Sr. Project Manager Date: 11 /9/2021 Attest: 42��Ztjl& Contract Amendment No. 1 2 of 2 School/College Avenue Corridor Improvements Garver Project No. 20T21050 AMENDMENT NO. 1 APPENDIX A — SCOPE OF SERVICES General Generally, the scope of services for Amendment No. 1 includes surveying, environmental, design, preparation of property acquisition documents, and bidding services for improvements to School Avenue between MLK, Jr. Boulevard and 151" Street and College Avenue between North Street and Township Street. Improvements will consist primarily of enhancements to pedestrian & bicycle infrastructure, landscaping, signalization, drainage improvements as necessary, watershed BMPs, utility relocations, and access control improvements for 1.82 miles of the School/College Avenue corridor and the portion of Poplar Street from College Avenue to Green Acres Road. Improvements to the corridor will be consistent with the items identified in the 2021 School & College Avenues Programming document. A maximum of three (3) separate project plans will be developed for the improvements as described above. One (1) set of the project plans being prepared will utilize state/federal funds. Surveys 2.1. Design Surveys Garver will utilize the previously performed LIDAR survey for designing the project. The LIDAR survey included sufficient topography for modeling the existing ground, buildings & other structures, streets, trees, visible utilities, and parking lots. Garver will conduct additional field surveys along the project site as appropriate for locating underground utilities marked by their owners and/or representatives and any other pertinent drainage infrastructure that may be present at and/or along the project site. For the portion of the project between North Street and Township Street, Garver will utilize a survey provided by the City for the field location of utilities. Garver will establish control points for use during construction. 2.2. Property Surveys Garver will locate existing monumentation representing right of way and/or easements based on record data which will be provided by an abstractor under a subconsultant agreement with Garver for the portion of the project between North Street and Green Acres Road. For the remaining portion of the project, Garver will utilize City data and as -built plans to establish the existing right-of-way. 3. Geotechnical Services Geotechnical is not anticipated for the completion of the project and not included in this scope of services. 4. Coordination Garver will furnish plans to all known utility owners potentially affected by the project at preliminary & final stages of development. Garver will conduct individual coordination meetings as necessary among all known affected utility owners to enable them to coordinate efforts for any necessary utility relocations including the possibility of placing overhead utilities underground. Garver will include the surveyed locations of the observable and marked utilities in the construction plans. Garver will also include proposed and/or relocated utility information in the construction plans as provided by the utility companies. Appendix A - Scope of Services 1 of 7 20T21050 School/College Ave. Corridor Improvements — Amendment 1 Garver will furnish both preliminary and final plans to the following agencies depending on the specific project regulatory requirements: ARDOT, ADEQ, COE, USFWS, and Department of Arkansas Heritage for their review and comment In addition to the coordination meetings with the City and other regulatory agencies, the following public meetings will be prepared for and attended: • Two (2) public involvement meetings • Two (2) Transportation Committee meetings • One (1) Active Transportation Committee meeting • One (1) Arts Council meeting • Individual Stakeholder meetings as necessary 5. Environmental Services 5.1. Environmental Services Garver will prepare a small site construction Stormwater Pollution Prevention Plan (SWPPP) in accordance with DEQ standards for each of the three projects defined in this scope of services. Construction site notices of coverage for the three projects will be obtained. Preparation of the SWPPP includes reviews, addressing comments, and refinement of the SWPPP design sheets produced by the engineer to meet DEQ standard requirements for site plans. A Short -Term Activity Authorization (STAA) is required by DEQ for any project that might cause a violation of Arkansas water quality standards. Garver will complete the STAA request, which includes crossing location(s), point of contact, acreage of disturbance, schedule, and work to be performed. Garver will coordinate the issuance of a STAA with DEQ for one stream crossing. Garver will pay the required fee, which is $150 per stream crossing and seek reimbursement from the Client. Garver will perform wetland delineations for the portion of the project between North Street and Green Acres Road and also the area for the Nationwide Permit. Garver will work with the US Army Corps of Engineers to obtain a Section 404 Nationwide permit(s) for projects defined in this scope of services that require such permitting. An Individual permit and mitigation planning are not anticipated. 5.2. Environmental Services (Federal/State Funded Project Only) Preliminary environmental data associated with the proposed project area will be collected to assess impacts to the social, economic, and natural environments. Data related to the following impact areas should be included: 1. Air Quality 2. Cultural Resources 3. Economic 4. Endangered Species 5. Environmental Justice/Title VI 6. Fish and Wildlife 7. Floodplains 8. Forest Service Property 9. Hazardous Materials/Landfills 10. Land Use 11. Migratory Birds 12. Navigation/Coast Guard 13. Noise Levels 14. Prime Farmland 15. Protected Waters Appendix A - Scope of Services 2 of 7 20T21050 School/College Ave. Corridor Improvements — Amendment 1 16. Public Recreation Lands 17. Public Water Supply/WHPA 18. Relocatees 19. Section 4(f)/6(f) 20. Social 21. Underground Storage Tanks 22. Visual 23. Streams 24. Water Quality 25. Wetlands 26. Wildlife Refuges Preliminary environmental data collection is part of the initial scope of work's justification of costs and fees. 5.2.1. Environmental Constraints Map 1. All environmental data collected will be transferred to appropriately scaled aerial photographs and/or overlaid on the design plans to produce a map that indicates all known environmentally sensitive areas and other constraints prior to submittal of 30% plans. The approved map will be the basis for avoidance and minimization of environmental impacts during the design process and notations on the plans for restraining conditions on the Contractor, in accordance with Section 107.10 of the Standard Specifications for Highway Construction. Contract Special Provisions will be developed as necessary to provide protection for environmentally sensitive areas or features and to provide guidance to the Contractor. 2. Constraints Mapping shall include an on -site survey level of site reconnaissance to verify desktop -collected data. A Constraints Memo shall be developed that summarizes the results of mapping and data collection, and shall include avoidance recommendations. 5.2.2. Special Studies and Agency Coordination 1. Conduct a wetland delineation including GPS mapping of potentially jurisdictional aquatic features within the study area. 2. Conduct a Phase I Cultural Resources Survey including archaeological and historic resources. If any additional analyses or data collection are needed beyond a Phase I Cultural Resources survey, this service will be added through a supplemental agreement. 3. A Request for Technical Assistance (RTA) regarding buildings and structures 45 years or older that need to be included in the Constraints Mapping will be submitted to the Arkansas Department of Parks, Heritage, and Tourism (ADPHT) with the results of the Phase I Cultural Resources Survey. Any buildings or structures listed in the National Register of Historic Places (NRHP) or determined eligible for listing through SHPO review of the RTA will be displayed on the constraints maps. 4. Agency coordination shall include the US Army Corps of Engineers (USACE), US Fish and Wildlife Service (USFWS), Arkansas Division of Environmental Quality (DEQ), ADPHT, Arkansas Department of Health (ADH), and City of Conway staff. 5. Prepare and submit Tribal consultation letters to ARDOT and FHWA for consultation with the appropriate Tribes. 6. Hazardous materials database review. 5.2.3. Location and/or Desian Alternatives 1. Review conceptual design of all location and/or design alternatives, which will include but not be limited to major drainage structures and construction techniques. Development of the alternatives shall include early and continuous coordination with the design team, Appendix A - Scope of Services 3 of 7 20T21050 School/College Ave. Corridor Improvements — Amendment 1 Client, and appropriate resource agencies, if necessary. Electronic copies of the design shall be furnished to the Client in Bentley MicroStation "DGN" format. One alternative will be described in the Categorical Exclusion. 2. The Consultant shall work to avoid and/or minimize environmental impacts, as appropriate. If impacts cannot be avoided, then the impacts shall be minimized. Mitigation for impacts should occur as a last option. 3. Reasonable and feasible alternatives shall be submitted for review by the Client and a determination will be made as it pertains to impacts consistent with a Categorical Exclusion. 5.2.4. Environmental Public Involvement 1. Coordinate with the Client and ARDOT on timing of the virtual meeting or in -person meeting. 2. Prepare public involvement virtual displays and website creation for review by the Client and ARDOT. 3. All coordination necessary for a virtual public meeting including: a. Publishing the virtual public meeting website and meeting materials. b. Publish and pay for public notices and including newspaper display adds. c. Provide Spanish translation for the virtual public meeting website and outreach materials. 4. Prepare a synopsis of the public meeting; review and respond to public comments as needed; and submit Title VI report. 5.2.5. Environmental Document 1. Prepare a Tier 3 Categorical Exclusion (CE) that will meet ARDOT and Federal Highway Administration (FHWA) standards in accordance with the National Environmental Policy Act (NEPA). 2. Submit draft environmental documents in electronic format, submitting the document in Word and pdf forms for review by the Client and ARDOT. 3. Perform alterations necessary to respond to comments made in the Client and ARDOT reviews. 4. Submit final drafts to the Client, then ARDOT for FHWA review/approval. 5. An electronic copy of the approved environmental document in pdf form will be provided to the Client. 5.2.6. Construction Plan Review, Special Provisions, and Permitting 1. Coordinate and obtain appropriate federal and state permits and clearances (Section 106, Section 404, Section 401, STAA, Section 7, etc.) necessary for environmental clearance and to construct the proposed project in compliance design procedures. 2. Prepare special provisions related to environmental commitments and protection. 3. If an Individual Section 404 permit and mitigation planning is required, these services can be performed under a supplemental agreement. 4. Prepare and complete coordination with DEQ regarding approval of a construction stormwater pollution prevention plan. (NOTE: Close coordination should be maintained with the Environmental Division to ensure that all aspects of the environmental process meet the Department approval. This includes approval of deliverables and dates of delivery for each task). Appendix A - Scope of Services 4 of 7 20T21050 School/College Ave. Corridor Improvements — Amendment 1 6. Landscape Architecture and Lighting Garver will subcontract with RDG Planning & Design for Landscape Architecture and Lighting design. The specific scope for these services is included in the attached scope of services provided by RDG Planning & Design. These items shall be made a part of these Appendix A Scope of Services. 7. Conceptual Design The conceptual design phase submittal will include three separate construction plan sets. Plan sets will include typical sections, street plan & profiles, sidewalk/trail layouts, adjacent parking lot adjustments, drainage improvements, pavement markings, signal pole layouts, overhead utility relocation route alternative exhibit and an opinion of probable construction cost. A drainage study will be performed for the College Avenue portion of the project to determine improvements to meet current City standards. A drainage report will be prepared that summarizes the calculations and needed improvements. This conceptual submittal will be for the purpose of coordinating the proposed improvements with the City and the utility companies and developing an order of magnitude cost estimate for the project. Garver will incorporate comments from the Owner in the Preliminary Design. Garver will proceed with Preliminary Design after the Conceptual Design is approved by the Owner in writing. 8. Preliminary Design Upon receiving written approval from City on Conceptual Design, Garver will begin Preliminary Design. In addition to the specific items listed in the Conceptual Design, the Preliminary Design phase submittal will include the layout for any necessary retaining walls. In addition, an opinion of probable construction cost will be submitted with the Preliminary Phase submittal. The preliminary design phase will represent approximately 60 percent of final construction contract plans. This submittal will not include technical specifications or "front end" contract documents. Garver will incorporate comments from the Owner on the Preliminary Design in the Final Design. Garver will proceed with Final Design after the Preliminary Design is approved by the Owner in writing. 8.1. School Avenue Signal modifications and wheelchair ramp improvements at the existing School Avenue intersection at MLK, Jr. Intersection will include pedestrian signals for the west and south approaches and wheelchair ramp updates on all corners. At the Razorback Greenway, modifications to the existing HAWK signal include replacing one mast arm pole to accommodate lane shifts. Standard details and a plan sheet showing the solar powered RRFB near 11th Street will be provided. 8.2. College Avenue North of Green Acres Road A new traffic signal and wheelchair ramp improvements will be designed at the College Avenue at Poplar Street intersection. Pedestrian crossings with RRFB will be designed along College Avenue at the relocated Green Acres Road intersection. 8.3. College Avenue South of Green Acres Road Signalization and wheelchair ramp improvements as needed at the existing College Avenue signalized intersections at Evelyn Hills entrance (Memorial) and Sycamore Street. Pedestrian crossing with RRFB will be designed along College Avenue at the southern VA Hospital entrance. Appendix A - Scope of Services 5 of 7 20T21050 School/College Ave. Corridor Improvements — Amendment 1 9. Final Design Once Garver receives written approval from Owner on Preliminary Design, Garver will begin Final Design. During the final design phase of the project, Garver will conduct final designs to prepare construction plans and specifications, for three construction contracts, including final construction details and quantities, special provisions, and opinion of probable construction cost. Garver will also make any needed plan changes as a result of the final field inspection and/or special easement acquisition considerations, and prepare the construction documents as required to advertise for bids. Garver will also prepare, submit, and coordinate approval of three separate Stormwater Pollution Prevention Plans (SWPPP) with ADEQ. 10. Property Acquisition Documents Property acquisition document preparation is currently excluded from the scope of services and may be added at a later date once the level of effort has been determined based on the design. 11. Bidding Services During the bidding phase of the project, Garver will perform the following for a maximum of three (3) separate projects to be bid under this agreement: A. Prepare and submit Advertisement for Bids for publication as directed by the Owner. Owner will pay advertising costs outside of this contract. B. Support the contract documents by preparing addenda as appropriate. C. Participate in three (3) pre -bid meetings if necessary. D. Attend the bid openings. E. Prepare bid tabulations. F. Evaluate bids and recommend award. G. Prepare construction contracts. 12. Construction Phase Services Construction Phase services are currently excluded from the scope of services but may be added at a future date by amendment. 13. Project Deliverables The following will be submitted to the Owner, or others as indicated, by Garver: A. Digital copy of the Environmental NEPA Document. B. Public Involvement Exhibits. C. Digital copy of the Conceptual Designs with opinion of probable construction cost. D. Digital copy of the College Avenue Drainage Report E. Digital copy of the Preliminary Designs with opinion of probable construction cost. F. Digital copy of the Preliminary Plans to each potentially affected utility company. G. Digital copy of the Final Design with opinion of probable construction cost. H. Three hard copies of the revised Final Design with opinion of probable construction cost. I. Digital copy of the revised Final Plans to each potentially affected utility company. J. Three hard copies of the Final Plans and Specifications to the Contractor. K. Digital copies of the right-of-way and/or easement acquisition documents. L. Electronic files as requested. 14. Extra Work The following items are not included under this agreement but will be considered as extra work: Appendix A - Scope of Services 6 of 7 20T21050 School/College Ave. Corridor Improvements — Amendment 1 A. Redesign for the Owner's convenience or due to changed conditions after previous alternate direction and/or approval. B. Submittals or deliverables in addition to those listed herein. C. Geotechnical Services including pavement design. D. ARDOT Survey/Drawings. E. Design of any utilities relocation other than for minor water and sewer adjustments. F. Design of a new Sublett Creek Crossing of College Avenue. G. Construction phase services. H. Environmental Handling and Documentation beyond what is specified in the scope of services. I. Development of a HEC-RAS and HEC-HMS models for Sublett Creek. Coordination with FEMA and preparation/submittal of a CLOMR and/or LOMR. Extra Work will be as directed by the Owner in writing for an addition fee as agreed upon by the Owner and Garver. 15. Schedule Garver shall begin work under this Agreement within ten (10) days of a Notice to Proceed and shall complete the work in accordance with the schedule below: Phase Description Calendar Days Surveys — Utilities and Property 75 days from Notice to Proceed NEPA Documentation (Project portion 150 days from Notice to Proceed with State/Federal Funds only) Conceptual Design 120 days from Notice to Proceed Preliminary Design 90 days from approval of Conceptual Design Final Design 60 days from approval of Preliminary Design Property Acquisition Documents 60 days from approval of Final Design Appendix A - Scope of Services 7 of 7 20T21050 School/College Ave. Corridor Improvements — Amendment 1 Exhibit B City of Fayetteville School/College Avenue Corridor Improvements Garver Hourly Rate Schedule: July 2021 - June 2022 Classification Rates Engineers / Architects E-1.............................................................................. $ 114.00 E-2.............................................................................. $ 132.00 E-3.............................................................................. $ 160.00 E-4.............................................................................. $ 187.00 E-5.............................................................................. $ 228.00 E-6.............................................................................. $ 280.00 E-7.............................................................................. $ 373.00 Planners / Environmental Specialist P-1.............................................................................. $ 137.00 P-2.............................................................................. $ 172.00 P-3.............................................................................. $ 209.00 P-4.............................................................................. $ 239.00 P-5.............................................................................. $ 273.00 P-6.............................................................................. $ 316.00 P-7.............................................................................. $ 390.00 Designers $ - D-1.............................................................................. $ 106.00 D-2.............................................................................. $ 124.00 D-3.............................................................................. $ 148.00 D-4.............................................................................. $ 172.00 Technicians T-1............................................................................... $ 83.00 T-2............................................................................... $ 105.00 T-3............................................................................... $ 128.00 Surveyors S-1.............................................................................. $ 51.00 S-2.............................................................................. $ 68.00 S-3.............................................................................. $ 91.00 S-4.............................................................................. $ 130.00 S-5.............................................................................. $ 172.00 S-6.............................................................................. $ 196.00 2-Man Crew (Survey)....................................................... $ 208.00 3-Man Crew (Survey)....................................................... $ 259.00 2-Man Crew (GPS Survey) ................................................ $ 228.00 3-Man Crew (GPS Survey) ................................................ $ 279.00 Construction Observation C-1.............................................................................. $ 100.00 C-2.............................................................................. $ 129.00 C-3.............................................................................. $ 158.00 C-4.............................................................................. $ 194.00 C-5.............................................................................. $ 232.00 M a nagement/Ad m i n istratio n M-1.............................................................................. $ 381.00 X-1............................................................................... $ 65.00 X-2............................................................................... $ 89.00 X-3............................................................................... $ 123.00 X-4............................................................................... $ 157.00 X-5............................................................................... $ 193.00 X-6............................................................................... $ 238.00 X-7............................................................................... $ 287.00 X-8............................................................................... $ 359.00 X-9............................................................................... $ 433.00 Agreement for Professional Services School/College Avenue Corridor Improvements Garver Project No. 20T21050 Exhibit B City of Fayetteville School/College Avenue Corridor Improvements TOTAL FEE SUMMARY Title I Service Original Estimated Fees Amendment No.1 Estimated Fees Total Estimated Fees Programming $ 224,350.00 $ (19,200.00) $ 205,150.00 School Avenue (MILK Jr. Blvd. to 15th Street) $ - $ 306,660.00 $ 306,660.00 College Avenue (North St. to Green Acres Rd.) $ - $ 457,965.00 $ 457,965.00 College Avenue (Green Acres Rd. to Township St.) $ - $ 230,810.00 $ 230,810.00 Subtotal for Title I Service $ 224,350.00 $ 976,235.00 $ 1,200,585.00 L:\2020\20T21050 - Fayetteville College Avenue Improve ments\Contracts\Client\Draft\Amendment No. 1\Exhibit B - Garver Fee Spreadsheet - Amendment 1.xlsm Exhibit B City of Fayetteville School/College Avenue Corridor Improvements FEE SUMMARY - SCHOOL AVENUE (MLK JR. BLVD. TO 15TH ST.) Title I Service Amendment No. 1 Estimated Fees Utility Locates (ARKUPS) $ 7,520.00 Property Title (WACO) $ - Surveying $ 25,800.00 Environmental $ 2,850.00 Design Meetings $ 26,670.00 Garver $ 13,300.00 RDG $ 13,370.00 Conceptual Design $ 57,720.00 Civil Engineering (Garver) $ 32,970.00 Landscape Architecture, Lighting, Planning RDG $ 24,750.00 Si nalization Design $ 44,330.00 Preliminary Design $ 78,610.00 Civil Engineering (Garver) $ 48,230.00 Landscape Architecture, Lighting, Planning RDG $ 30,380.00 Final Design $ 55,170.00 Civil Engineering (Garver) $ 43,210.00 Landscape Architecture RDG $ 11,960.00 Property Acquisition - (EXCLUDED) $ - Bidding $ 7,990.00 Garver $ 3,250.00 RDG $ 4,740.00 Subtotal for School Avenue (MLK Jr. Blvd. to 15th Street) $ 306,660.00 L:\2020\20T21050 - Fayetteville College Avenue Improve ments\Contracts\Client\Draft\Am end ment No. 1\Exhibit B - Garver Fee Spreadsheet - Amendment 1.xlsm Exhibit B City of Fayetteville School/College Avenue Corridor Improvements SURVEYS - SCHOOL AVENUE (MLK JR. BLVD. TO 15TH STREET) WORK TASK DESCRIPTION E-3 S-5 S-4 S-3 2-Man Crew (Survey)GPS 2-Man Crew Survey) T 2 $160.00 $172.00 $130.00 $91.00 $208.00 $228.00 $105.00 hr hr hr hr hr hr hr 1. Project Management Administration and Coordination 2 Quality Control Review 2 Submittals to Client 1 1 Subtotal - Project Management 0 5 1 0 0 0 0 2. Topographic Survey Establish Horizontal and Vertical Control Points 2 2 2 8 Utility Locates 2 2 4 8 40 Topographic Surveys 1 1 2 8 Data Processing/Preparation 2 32 Subtotal - Topographic Survey 0 7 37 4 12 56 0 3. Property Survey Survey Layout Map Property Surveys Establish Existing Right of way 4 8 12 Data Processing/Preparation r:u;t�,ta-­roperty urvey 0 4 8 12 0 0 0 Hours 0 16 46 16 12 56 0 Salary Costs $0.00 $2,752.00 $5,980.00 $1,456.00 $2,496.00 $12,768.00 $0.00 SUBTOTAL - SALARIES: $25,452.00 DIRECT NON -LABOR EXPENSES Document Printing/Reproduction/Assembly $40.00 Survey Supplies $25.00 Travel Costs $283.00 SUBTOTAL - DIRECT NON -LABOR EXPENSES: $348.00 TOTAL FEE: $25,800.00 Exhibit B City of Fayetteville School/College Avenue Corridor Improvements ENVIRONMENTAL - SCHOOL AVENUE (MLK JR. BLVD. TO 15TH ST.) WORK TASK DESCRIPTION E-6 E-5 P-4 P-3 P-2 P-1 T-1 X-3 X-2 $280.00 $228.00 $239.00 $209.00 $172.00 $137.00 $83.00 $123.00 $89.00 hr hr hr hr hr hr hr hr hr 1. Project Management Administration and Coordination 1 Quality Control Review 1 1 Submittals to Client 1 Subtotal - Project Management 0 0 1 0 3 0 0 0 0 2. Environmental SWPPP 2 10 2 Subtotal - Environmental 0 0 0 0 2 10 2 0 0 Hours 0 0 Salary Costs $0.00 $0.00 SUBTOTAL - SALARIES: $2,635.00 DIRECT NON -LABOR EXPENSES Document Printing/Reproduction/Assembly $5.00 Postage/Freight/Courier $5.00 Permitting Fees (SWPPP) $200.00 Travel Costs $5.00 SUBTOTAL - DIRECT NON -LABOR EXPENSES: $215.00 TOTAL FEE: $2,850.00 1 0 5 10 2 0 0 $239.00 $0.00 $860.00 $1,370.00 $166.00 $0.00 $0.00 Exhibit B City of Fayetteville School/College Avenue Corridor Improvements DESIGN MEETINGS - SCHOOL AVENUE (MLK JR. BLVD. TO 15TH ST.) WORK TASK DESCRIPTION E-6 E-4 E-3 E-1 T-1 P-1 P-2 $280.00 $187.00 $160.00 $114.00 $83.00 $137.00 $172.00 hr hr hr hr hr hr hr 1. Public Involvement Kick -Off Meeting 1 1 Progress Meetings 2 4 1 4 Stakeholder Meetings (S. School- 11 property owner contacts) 1 2 22 Review Meetings 2 2 2 Transportation Committee Meetings (2 each) 1 1 2 2 2 Arts Council Meetings (1 each) 1 1 Public Involvement Meetings (2 each) 2 5 5 2 15 Active Transportation Committee Meeting (1 each) 2 Subtotal - Public Involvement 8 16 0 7 4 49 0 Hours 8 16 Salary Costs $2,240.00 $2,992.00 SUBTOTAL - SALARIES: $13,075.00 DIRECT NON -LABOR EXPENSES Document Printing/Reproduction/Assembly $200.00 Postage/Freight/Courier $0.00 Travel Costs $25.00 SUBTOTAL - DIRECT NON -LABOR EXPENSES: $225.00 SUBTOTAL: $13,300.00 SUBCONSULTANTS FEE: (RDG Planning & Design) $0.00 TOTAL FEE: $13,300.00 0 7 4 49 0 $0.00 $798.00 $332.00 $6,713.00 $0.00 Exhibit B City of Fayetteville School/College Avenue Corridor Improvements CONCEPTUAL DESIGN - SCHOOL AVENUE (MLK JR. BLVD. TO 15TH ST.) WORK TASK DESCRIPTION E-6 E-5 E-4 E-3 E-2 E-1 T-1 $280.00 $228.00 $187.00 $160.00 $132.00 $114.00 $83.00 hr hr hr hr hr hr hr 1. Project Management Administration and Coordination 6 8 Quality Control Review 5 4 Subtotal - Project Management 11 0 12 0 1 0 0 0 2. Civil Engineering Conceptual Plans Base Plan Setup 4 3 Typical Sections 2 8 3 Sidewalk/Parking Lot Layout Review 2 5 2 Street Improvements - Plan & Profiles 3 12 40 50 Driveways 2 2 1 School Avenue Drainage Modifications 1 3 12 4 Conceptual Pavement Markings 2 4 5 2 Utility Relocation Route Alternatives 1 6 2 Utility Companies Coordination 6 Coordination with ARDOT 4 Coordination with City 2 4 Quantities 2 5 Opinion of Probable Construction Cost 2 4 Subtotal - Civil Engineering 1 10 0 56 0 0 78 65 Hours Salary Costs 21 0 68 0 0 78 65 $5,880.00 $0.00 $12,716.00 $0.00 $0.00 $8,892.00 $5,395.00 SUBTOTAL - SALARIES: DIRECT NON -LABOR EXPENSES Document Printing/Reproduction/Assembly $70.00 Postage/Freight/Courier $0.00 Travel Costs $17.00 $32,883.00 SUBTOTAL - DIRECT NON -LABOR EXPENSES: $87.00 TOTAL FEE: $32,970.00 Exhibit B City of Fayetteville School/College Avenue Corridor Improvements SIGNALIZATION DESIGN - SCHOOL AVE (MLK JR. BLVD. TO 15TH ST.) WORK TASK DESCRIPTION E-6 E-5 E-4 E-3 E-2 E-1 T-1 $280.00 $228.00 $187.00 $160.00 $132.00 $114.00 $83.00 hr hr hr hr hr hr hr 1. Project Management Administration and Coordination 1 Quality Control Review 1 1 Submittals to Client 1 Subtotal - Project Management 1 0 1 3 0 0 1 0 0 2. Preliminary (1 Signal Mod, 1 HAWK Mod, 1 RRFB) Site Visit 4 Traffic Signal Notes 1 Street Name Signs 2 2 Signal Layout (Reference File) (Includes HAWK) 2 20 6 60 Scale Sheets 2 10 10 40 Scale Sheets 2 4 10 Wiring Diagrams 2 8 6 Charts Sheets 2 4 10 Wheelchair Ramp Layout and Details 2 4 12 8 RRFB Standard Details and Plan Sheet 1 1 Summary of Quantities 2 2 4 12 Conduit Capacity Calculations 2 2 Plan Check 10 10 8 Plan Submittal and Corrections 1 2 12 12 Subtotal - Preliminary (1 Signal Mod, 1 HAWK Mod, 1 RRFB) 15 0 1 31 0 84 1 84 0 3. Final (1 Signal Mod, 1 HAWK Mod, 1 RRFB) Signal Plan Updates 2 6 12 RRFBs Update 1 Quantity Updates 4 4 4 Special Provisions 2 2 Construction Cost Estimate 4 4 Plan Check 4 4 Plan Submittal and Corrections 4 4 4 8 Subtotal - Final (1 Signal Mod, 1 HAWK Mod, 1 RRFB) 1 16 1 0 1 20 0 16 1 21 1 0 Hours 32 0 54 0 100 105 Salary Costs $8,960.00 $0.00 $10,098.00 $0.00 $13,200.00 $11,970.00 $0.00 SUBTOTAL - SALARIES: DIRECT NON -LABOR EXPENSES Document Printing/Reproduction/Assembly $17.00 Postage/Freight/Courier $0.00 Travel Costs $85.00 $44,228.00 SUBTOTAL - DIRECT NON -LABOR EXPENSES: $102.00 TOTAL FEE: $44,330.00 Exhibit B City of Fayetteville School/College Avenue Corridor Improvements PRELIMINARY DESIGN - SCHOOL AVENUE (MLK JR. BLVD. TO 15TH ST.) WORK TASK DESCRIPTION E-6 E-5 E-4 E-3 E-2 E-1 T-1 $280.00 $228.00 $187.00 $160.00 $132.00 $114.00 $83.00 hr hr hr hr hr hr hr 1. Project Management Administration and Coordination 8 8 Quality Control Review 6 6 Subtotal - Project Management 14 0 14 0 0 0 0 2. Civil Engineering Preliminary Plans Typical Sections 1 3 1 Sidewalk/Parking Lot Layout & Grading 3 15 40 25 Street Plan & Profile Sheets 2 20 50 30 Driveways 4 6 8 Parking Lot Drainage Improvements 1 5 10 5 Drainage Modifications 4 10 5 Pavement Marking/Street Signage Plans 1 4 8 3 Address City/ARDOT Review Comments 1 6 10 6 Coordination with Utility Companies 1 6 Coordination with City 2 4 Coordination with ARDOT 1 4 Quantities 3 6 Opinion of Probable Construction Cost 1 1 3 Subtotal - Civil Engineering 13 0 77 0 0 146 83 Hours 27 0 91 0 0 146 83 Salary Costs $7,560.00 $0.00 $17,017.00 $0.00 $0.00 $16,644.00 $6,889.00 SUBTOTAL - SALARIES: $48,110.00 DIRECT NON -LABOR EXPENSES Document Printing/Reproduction/Assembly $100.00 Postage/Freight/Courier $0.00 Travel Costs $20.00 SUBTOTAL - DIRECT NON -LABOR EXPENSES: $120.00 TOTAL FEE: $48,230.00 Exhibit B City of Fayetteville School/College Avenue Corridor Improvements FINAL DESIGN - SCHOOL AVENUE (MLK JR. BLVD. TO 15TH ST.) WORK TASK DESCRIPTION E-6 E-5 E-4 E-3 E-2 E-1 T-1 $292.00 $238.00 $195.00 $167.00 $138.00 $119.00 $87.00 hr hr hr hr hr hr hr 1. Project Management Administration and Coordination 6 6 Quality Control Review 4 6 Subtotal - Project Management 10 0 12 0 0 0 0 2. Civil Engineering Final Plans Typical Sections 1 2 1 Sidewalks/Parking Lot Layout & Grading 1 3 20 10 Street Plan & Profile Sheets 1 10 20 20 Driveways 1 3 5 5 Parking Lot Drainage Improvements 1 3 6 2 Drainage Modifications 3 1 5 4 Pavement Markings & Signage Plans 1 2 5 4 Water & Sewer Adjustments 2 6 4 Typical Details 1 3 4 Special Details 1 2 5 5 Erosion Control Plans 2 8 6 Address City/ARDOT Review Comments 1 4 8 6 Coordination with Utility Companies 1 8 Coordination and Meetings with City 3 6 Coordination with ARDOT 1 5 Specifications/Contract Documents 1 10 8 Quantities 6 8 Opinion of Probable Construction Cost 2 4 Subtotal - Civil Engineering 13 1 0 73 0 0 113 71 Hours 23 85 113 71 Salary Costs $6,716.00 $0.00 $16,575.00 $0.00 $0.00 $13,447.00 $6,177.00 SUBTOTAL - SALARIES: $42,915.00 DIRECT NON -LABOR EXPENSES Document Printing/Reproduction/Assembly $75.00 ADH Review Fees $200.00 Postage/Freight/Courier $0.00 Travel Costs $20.00 SUBTOTAL - DIRECT NON -LABOR EXPENSES: $295.00 TOTAL FEE: $43,210.00 Exhibit B City of Fayetteville School/College Avenue Corridor Improvements BIDDING SERVICES - SCHOOL AVENUE (MLK JR. BLVD TO 15TH ST.) WORK TASK DESCRIPTION E-6 E-4 E-3 E-1 T-1 $292.00 $195.00 $167.00 $119.00 $87.00 hr hr hr hr hr 1. Civil Engineering Coordination with City Purchasing Division 4 Addend ums/Inquiries 4 Pre -Bid Meeting 2 Bid Opening 1.5 Prepare bid tabulation - Not Applicable Evaluate bids and recommend award 1 Prepare construction contracts 3 Notice to Proceed 1 Subtotal - Civil Engineering 0 16.5 0 0 0 Hours Salary Costs 0 16.5 0 0 0 $0.00 $3,217.50 $0.00 $0.00 $0.00 SUBTOTAL - SALARIES: $3,217.50 DIRECT NON -LABOR EXPENSES Document Printing/Reproduction/Assembly $32.50 Postage/Freight/Courier $0.00 Travel Costs $0.00 SUBTOTAL - DIRECT NON -LABOR EXPENSES: $32.50 TOTAL FEE: $3,250.00 Exhibit B City of Fayetteville School/College Avenue Corridor Improvements FEE SUMMARY - COLLEGE AVENUE (NORTH ST. TO GREEN ACRES RD. Title I Service Amendment No. 1 Estimated Fees Utility Locates (ARKUPS) $ 2,000.00 Property Title (WACO) $ 15,750.00 Surveying $ 85,550.00 Environmental $ 38,350.00 Design Meetings $ 33,060.00 Garver $ 18,800.00 RDG $ 14,260.00 Conceptual Design $ 68,020.00 Civil Engineering (Garver) $ 41,600.00 Landscape Architecture, Lighting, Planning RDG $ 26,420.00 Si nalization Design $ 44,330.00 Preliminary Design $ 90,660.00 Civil Engineering (Garver) $ 58,200.00 Landscape Architecture, Lighting, Planning RDG $ 32,460.00 Final Design $ 70,900.00 Civil Engineering (Garver) $ 58,150.00 Landscape Architecture, Lighting, Planning (RDG) $ 12,750.00 Property Acquisition - (EXCLUDED) $ - Bidding $ 9,345.00 Garver $ 4,340.00 RDG $ 5,005.00 Subtotal for College Avenue (North St. to Green Acres Rd.) $ 457,965.00 L:\2020\20T21050 - Fayetteville College Avenue Improvements\Contracts\Client\Draft\Amendment No. 1 \Exhibit B - Garver Fee Spreadsheet - Amendment 1.xlsm Exhibit B City of Fayetteville School/College Avenue Corridor Improvements SURVEYS - COLLEGE AVENUE (NORTH ST. TO GREEN ACRES RD.) WORK TASK DESCRIPTION E-3 S-5 S-4 S-3 an Crew (Survey)GPS 2-Man Crew Surve T 2 $160.00 $172.00 $130.00 $91.00 $208.00 $228.00 $105.00 hr hr hr hr hr hr hr 1. Project Management Administration and Coordination 2 Quality Control Review 2 Submittals to Client 1 1 Subtotal - Project Management 0 5 1 0 0 0 0 2. Topographic Survey Establish Horizontal and Vertical Control Points 2 2 2 8 Utility Locates (New Utilities not in McClelland Survey) 2 2 4 4 16 Topographic Surveys 1 1 2 8 Data Processing/Preparation 2 20 20 Subtotal - Topographic Survey 0 7 25 4 8 32 20 3. Property Survey Survey Layout Map 4 Property Surveys 10 10 20 120 Establish Existing Right of way 4 8 12 Data Processing/Preparation 60 140 Subtotal - Property Survey 0 78 158 0 32 120 0 Hours 0 90 184 Salary Costs $0.00 $15,480.00 $23,920.00 SUBTOTAL - SALARIES: $84,840.00 DIRECT NON -LABOR EXPENSES Document Printing/Reproduction/Assembly $40.00 Survey Supplies $25.00 Travel Costs $645.00 SUBTOTAL - DIRECT NON -LABOR EXPENSES: $710.00 TOTAL FEE: $85,550.00 4 40 152 20 $364.00 $8,320.00 $34,656.00 $2,100.00 Exhibit B City of Fayetteville School/College Avenue Corridor Improvements ENVIRONMENTAL - COLLEGE AVENUE (NORTH ST. TO GREEN ACRES RD.) WORK TASK DESCRIPTION E-6 E-5 P-4 P-3 P-2 P-1 T-1 X-3 X-2 $280.00 $228.00 $239.00 $209.00 $172.00 $137.00 $83.00 $123.00 $89.00 hr hr hr hr hr hr hr hr hr 1. Project Management Administration and Coordination 1 Quality Control Review 1 1 Submittals to Client 1 Subtotal - Project Management 0 0 1 0 3 0 0 0 0 2. Environmental Environmental Data Collection 2 6 Constraints mapping 32 6 Wetland delineation and report 2 10 Noise study (NA) Agency and Tribal Coordination/letters 2 8 Design Alternatives Coordination 2 2 2 4(f) De minimis evaluation & coordination (NA) Tier 3 CE Environmental Document Draft CE preparation and submittal 1 6 16 Revisions to CE draft 1 8 Final CE preparation and submittal 1 2 8 Construction Plan Review and Special Provisions 2 2 2 SWPPP 2 10 2 Subtotal - Environmental 0 0 2 0 53 76 6 0 0 3. Public Involvement Virtual public meeting preparation, websites (incl. Spanish), flyers, radio & newspaper ads 1 6 2 20 55 Coordination with Client and ARDOT 1 1 1 2 PI synopsis 1 1 8 2 4 Subtotal - Public Involvement 0 0 3 0 8 11 0 24 59 Hours 0 0 6 0 64 87 6 24 59 Salary Costs $0.00 $0.00 $1,434.00 $0.00 $11,008.00 $11,919.00 $498.00 $2,952.00 $5,251.00 SUBTOTAL - SALARIES: $33,062.00 DIRECT NON -LABOR EXPENSES Document Printing/Reproduction/Assembly $60.00 Postage/Freight/Courier $18.00 Legal Advertisements - Public Meeting Newspaper Ad $1,000.00 Permitting Fees (SWPPP) $200.00 Travel Costs $10.00 SUBTOTAL - DIRECT NON -LABOR EXPENSES: SUBTOTAL: SUBCONSULTANTS FEE: $1,288.00 $34,350.00 $4,000.00 Flat Earth - Cultural & Historic Resources TOTAL FEE: $38,350.00 Exhibit B City of Fayetteville School/College Avenue Corridor Improvements DESIGN MEETINGS - COLLEGE AVENUE (NORTH ST. TO GREEN ACRES RD.) WORK TASK DESCRIPTION E-6 E-4 E-3 E-1 T-1 P-1 P-2 $280.00 $187.00 $160.00 $114.00 $83.00 $137.00 $172.00 hr hr hr hr hr hr hr 1. Public Involvement Kick -Off Meeting 1 2 2 Progress Meetings 3 4 4 Stakeholder Meetings (N College 24 property owner contacts) 1 2 42 Review Meetings 2 2 2 Transportation Committee Meetings (2 each) 2 2 3 2 2 Arts Council Meetings (1 each) 1 1 1 Public Involvement Meetings (2 each) 3 6 6 3 15 Active Transportation Committee Meeting (1 each) 1 1 Subtotal - Public Involvement 1 14 1 19 0 9 5 69 1 0 Hours 14 19 0 9 5 69 0 Salary Costs $3,920.00 $3,553.00 $0.00 $1,026.00 $415.00 $9,453.00 $0.00 SUBTOTAL - SALARIES: $18,367.00 DIRECT NON -LABOR EXPENSES Document Printing/Reproduction/Assembly $400.00 Postage/Freight/Courier $0.00 Travel Costs $33.00 SUBTOTAL - DIRECT NON -LABOR EXPENSES: $433.00 SUBTOTAL: $18,800.00 SUBCONSULTANTS FEE: (RDG Planning & Design) $0.00 TOTAL FEE: $18,800.00 Exhibit B City of Fayetteville School/College Avenue Corridor Improvements CONCEPTUAL DESIGN - COLLEGE AVENUE (NORTH ST. TO GREEN ACRES RD.) WORK TASK DESCRIPTION E-6 E-5 E-4 E-3 E-2 E-1 T-1 $280.00 $228.00 $187.00 $160.00 $132.00 $114.00 $83.00 hr hr hr hr hr hr hr 1. Project Management Administration and Coordination 8 8 Quality Control Review 6 4 Subtotal - Project Management 14 0 12 0 1 0 0 0 2. Civil Engineering Conceptual Plans Base Plan Setup 4 3 Typical Sections 1 2 6 3 Sidewalk/Parking Lot Layout Review 2 6 3 Street Improvements - Plan & Profiles 3 16 40 60 Driveways 1 3 3 2 College Avenue Drainage Modifications 1 4 12 4 Conceptual Pavement Markings 1 4 6 3 Utility Relocation Route Alternatives 2 8 3 Utility Companies Coordination 1 8 Coordination with ARDOT 4 12 Coordination with City 2 4 Quantities 3 8 Opinion of Probable Construction Cost 1 2 1 4 Subtotal - Civil Engineering 19 1 0 76 0 0 82 78 Hours Salary Costs 33 0 88 0 0 82 78 $9,240.00 $0.00 $16,456.00 $0.00 $0.00 $9,348.00 $6,474.00 SUBTOTAL - SALARIES: DIRECT NON -LABOR EXPENSES Document Printing/Reproduction/Assembly $62.00 Postage/Freight/Courier $0.00 Travel Costs $20.00 $41,518.00 SUBTOTAL - DIRECT NON -LABOR EXPENSES: $82.00 TOTAL FEE: $41,600.00 Exhibit B City of Fayetteville School/College Avenue Corridor Improvements PRELIMINARY DESIGN - COLLEGE AVENUE (NORTH ST. TO GREEN ACRES RD.) WORK TASK DESCRIPTION E-6 E-5 E-4 E-3 E-2 E-1 T-1 $280.00 $228.00 $187.00 $160.00 $132.00 $114.00 $83.00 hr hr hr hr hr hr hr 1. Project Management Administration and Coordination 8 8 Quality Control Review 6 8 Subtotal - Project Management 14 0 16 0 0 0 0 2. Civil Engineering Preliminary Plans Typical Sections 2 3 2 Sidewalk/Parking Lot Layout & Grading 2 15 40 30 Street Plan & Profile Sheets 2 20 50 40 Driveways 1 4 8 8 Parking Lot Drainage Improvements 6 10 6 College Ave. Drainage Modifications 1 4 10 5 Pavement Marking/Street Signage Plans 2 4 8 4 Address City/ARDOT Review Comments 2 8 16 8 Coordination with Utility Companies 1 8 Coordination with City 2 4 Coordination with ARDOT 3 12 Quantities 3 8 Opinion of Probable Construction Cost 1 2 3 Subtotal - Civil Engineering 17 0 92 0 0 156 103 3. Structural Engineering Retaining Wall Layout 2 16 8 Subtotal - Structural Engineering 0 0 2 0 0 16 8 Hours 31 0 110 0 0 172 111 Salary Costs $8,680.00 $0.00 $20,570.00 $0.00 $0.00 $19,608.00 $9,213.00 SUBTOTAL - SALARIES: $58,071.00 DIRECT NON -LABOR EXPENSES Document Printing/Reproduction/Assembly $100.00 Postage/Freight/Courier $0.00 Travel Costs $29.00 SUBTOTAL - DIRECT NON -LABOR EXPENSES: $129.00 TOTAL FEE: $58,200.00 Exhibit B City of Fayetteville School/College Avenue Corridor Improvements SIGNALIZATION DESIGN - COLLEGE AVENUE (NORTH ST. TO GREEN ACRES RD.) WORK TASK DESCRIPTION E-6 E-5 E-4 E-3 E-2 E-1 T-1 $280.00 $228.00 $187.00 $160.00 $132.00 $114.00 $83.00 hr hr hr hr hr hr hr 1. Project Management Administration and Coordination 1 Quality Control Review 1 1 Submittals to Client 1 Subtotal - Project Management 1 0 3 0 0 0 0 2. Preliminary (2 Signal Mod, 1 RRFB) Site Visit 4 Traffic Signal Notes 1 Street Name Signs 2 2 Signal Layout (Reference File) 2 20 6 60 Scale Sheets 2 10 10 40 Scale Sheets 2 4 10 Wiring Diagrams 2 8 6 Charts Sheets 2 4 10 Wheelchair Ramp Layout and Details 2 4 12 8 RRFBs 1 1 Summary of Quantities 2 2 4 12 Conduit Capacity Calculations 2 2 Plan Check 10 10 8 Plan Submittal and Corrections 1 2 12 12 Subtotal - Preliminary 2 Signal Mod, 1 RRFB 15 0 31 0 84 84 0 3. Final (2 Signal Mod, 1 RRFB) Signal Plan Updates 2 6 12 RRFBs Update 1 Quantity Updates 4 4 4 Special Provisions 2 2 Construction Cost Estimate 4 4 Plan Check 4 4 Plan Submittal and Corrections 4 4 4 8 Subtotal - Final 2 Signal Mod, 1 RRFB 16 0 20 0 16 21 0 Hours 32 0 54 0 100 105 Salary Costs $8,960.00 $0.00 $10,098.00 $0.00 $13,200.00 $11,970.00 $0.00 SUBTOTAL - SALARIES: DIRECT NON -LABOR EXPENSES Document Printing/Reproduction/Assembly $17.00 Postage/Freight/Courier $0.00 Travel Costs $85.00 $44,228.00 SUBTOTAL - DIRECT NON -LABOR EXPENSES: $102.00 TOTAL FEE: $44,330.00 Exhibit B City of Fayetteville School/College Avenue Corridor Improvements FINAL DESIGN - COLLEGE AVENUE ( NORTH ST. TO GREEN ACRES RD.) WORK TASK DESCRIPTION E-6 E-5 E-4 E-3 E-2 E-1 T-1 $292.00 $238.00 $195.00 $167.00 $138.00 $119.00 $87.00 hr hr hr hr hr hr hr 1. Project Management Administration and Coordination 8 8 Quality Control Review 4 8 Subtotal - Project Management 12 0 16 0 0 0 0 2. Civil Engineering Final Plans Typical Sections 2 3 1 Sidewalks/Parking Lot Layout & Grading 2 3 20 10 Street Plan & Profile Sheets 2 10 20 20 Driveways 1 3 6 6 Parking Lot Drainage Improvements 1 3 8 3 Drainage Modifications 1 3 5 4 Pavement Markings & Signage Plans 2 2 6 4 Water & Sewer Adjustments 3 8 4 Typical Details 1 3 4 Special Details 1 3 6 6 Erosion Control Plans 3 8 8 Address City/ARDOT Review Comments 3 4 14 8 Coordination with Utility Companies 2 8 Coordination and Meetings with City 3 8 Coordination with ARDOT 3 15 Specifications/Contract Documents 1 10 6 Quantities 8 8 Opinion of Probable Construction Cost 1 3 4 Subtotal - Civil Engineering 23 0 92 0 0 125 78 3. Structural Engineering Retaining Wall Layout/Elevations 10 16 1 12 Subtotal - Structural Engineering 0 0 10 1 0 1 0 16 1 12 Hours 35 0 118 0 0 141 90 Salary Costs $10,220.00 $0.00 $23,010.00 $0.00 $0.00 $16,779.00 $7,830.00 SUBTOTAL - SALARIES: $57,839.00 DIRECT NON -LABOR EXPENSES Document Printing/Reproduction/Assembly $75.00 ADH Review Fees $200.00 Postage/Freight/Courier $0.00 Travel Costs $36.00 SUBTOTAL - DIRECT NON -LABOR EXPENSES: $311.00 TOTAL FEE: $58,150.00 Exhibit B City of Fayetteville School/College Avenue Corridor Improvements BIDDING SERVICES - COLLEGE AVENUE (NORTH ST. TO GREEN ACRES RD.) WORK TASK DESCRIPTION E-6 E-4 E-3 E-1 T-1 $292.00 $195.00 $167.00 $119.00 $87.00 hr hr hr hr hr 1. Civil Engineering Coordination with City Purchasing Division 4 Addend ums/Inquiries 6 Coordination with ARDOT 4 Pre -Bid Meeting 2 Bid Opening 1 Prepare bid tabulation - Not Applicable Evaluate bids and recommend award 1 Prepare construction contracts 3 Notice to Proceed 1 Subtotal - Civil Engineering 0 22 0 0 0 Hours Salary Costs SUBTOTAL - SALARIES: 0 22 0 0 $0.00 $4,290.00 $0.00 $0.00 DIRECT NON -LABOR EXPENSES Document Printing/Reproduction/Assembly $50.00 Postage/Freight/Courier $0.00 Travel Costs $0.00 SUBTOTAL - DIRECT NON -LABOR EXPENSES: $4,290.00 $50.00 TOTAL FEE: $4,340.00 0 $0.00 Exhibit B City of Fayetteville School/College Avenue Corridor Improvements FEE SUMMARY - COLLEGE AVENUE (GREEN ACRES RD. TO TOWNSHIP ST.) Title I Service Amendment No. 1 Estimated Fees Utility Locates (ARKUPS) $ 2,000.00 Property Title (WACO) $ - Surveying $ 21,510.00 Environmental $ 6,250.00 Design Meetings $ 22,180.00 Garver $ 15,500.00 RDG $ 6,680.00 Conceptual Design $ 45,640.00 Civil Engineering (Garver) $ 33,260.00 Landscape Architecture, Lighting, Planning RDG $ 12,380.00 Si nalization Design $ 22,990.00 Preliminary Design $ 59,380.00 Civil Engineering (Garver) $ 44,150.00 Landscape Architecture, Lighting, Planning RDG $ 15,230.00 Final Design $ 45,275.00 Civil Engineering (Garver) $ 39,300.00 Landscape Architecture, Lighting, Planning RDG $ 5,975.00 Property Acquisition - (EXCLUDED) $ - Bidding $ 5,585.00 Garver $ 3,250.00 RDG $ 2,335.00 Subtotal for College Avenue (Green Acres Rd. to Township St.) $ 230,810.00 L:\2020\20T21050 - Fayetteville College Avenue Improvements\Contracts\Client\Draft\Amendment No. 1\Exhibit B - Garver Fee Spreadsheet - Amendment 1.xlsm Exhibit B City of Fayetteville School/College Avenue Corridor Improvements SURVEYS - COLLEGE AVENUE (GREEN ACRES RD. TO TOWNSHIP ST.) WORK TASK DESCRIPTION E-3 S-5 S-4 S-3 2-Man Crew Surve 2-Man Crew GPS Survey) T 2 $160.00 $172.00 $130.00 $91.00 $208.00 $228.00 $105.00 hr hr hr hr hr hr hr 1. Project Management Administration and Coordination 3 Quality Control Review 2 Submittals to Client 1 1 Subtotal - Project Management 0 6 1 0 0 0 0 2. Topographic Survey Establish Horizontal and Vertical Control Points 2 2 2 8 Utility Locates (New Utilities not in McClelland Survey) 2 2 4 4 16 Topographic Surveys 1 1 2 8 Data Processing/Preparation 2 20 20 Subtotal - Topographic Survey 0 7 25 4 8 32 20 3. Property Survey Survey Layout Map Property Surveys Establish Existing Right of way 4 8 12 Data Processing/Preparation ,F u tota - roperty Survey 0 4 8 0 12 0 0 Hours 0 17 34 4 20 32 20 Salary Costs $0.00 $2,924.00 $4,420.00 $364.00 $4,160.00 $7,296.00 $2,100.00 SUBTOTAL - SALARIES: DIRECT NON -LABOR EXPENSES Document Printing/Reproduction/Assembly $40.00 Survey Supplies $25.00 Travel Costs $181.00 $21,264.00 SUBTOTAL - DIRECT NON -LABOR EXPENSES: $246.00 TOTAL FEE: $21,510.00 Exhibit B City of Fayetteville School/College Avenue Corridor Improvements ENVIRONMENTAL - COLLEGE AVENUE (GREEN ACRES RD. TO TOWNSHIP ST.) WORK TASK DESCRIPTION E-6 E-5 P-4 P-3 P-2 P-1 T-1 X-3 X-2 $280.00 $228.00 $239.00 $209.00 $172.00 $137.00 $83.00 $123.00 $89.00 hr hr hr hr hr hr hr hr hr 1. Project Management Administration and Coordination 1 Quality Control Review 1 1 Submittals to Client 1 Subtotal - Project Management 0 0 1 0 3 0 0 0 0 2. Environmental Wetland delineation and report 1 6 Environmental Permit Applications (404 NWP, STAA, SWPPP) 2 4 20 2 Subtotal - Environmental 0 0 2 0 5 26 2 0 1 0 Hours 0 0 3 0 8 26 2 0 0 Salary Costs $0.00 $0.00 $717.00 $0.00 $1,376.00 $3,562.00 $166.00 $0.00 $0.00 SUBTOTAL - SALARIES: DIRECT NON -LABOR EXPENSES Document Printing/Reproduction/Assembly $40.00 Postage/Freight/Courier $19.00 Legal Advertisements - Public Meeting Newspaper Ad $0.00 Permitting Fees (NWP, SWPPP, STAA) $350.00 Travel Costs $20.00 SUBTOTAL - DIRECT NON -LABOR EXPENSES: $5,821.00 $429.00 TOTAL FEE: $6,250.00 Exhibit B City of Fayetteville School/College Avenue Corridor Improvements DESIGN MEETINGS - COLLEGE AVENUE (GREEN ACRES RD. TO TOWNSHIP ST.) WORK TASK DESCRIPTION E-6 E-4 E-3 E-1 T-1 P-1 P-2 $280.00 $187.00 $160.00 $114.00 $83.00 $137.00 $172.00 hr hr hr hr hr hr hr 1. Public Involvement Kick -Off Meeting 1 1 1 Progress Meetings 3 4 4 Stakeholder Meetings (S. School- 11 property owner contacts, N College 41 property owner contacts) 2 36 Review Meetings 2 2 2 Transportation Committee Meetings (2 each) 1 1 3 2 2 Arts Council Meetings (1 each) 1 1 Public Involvement Meetings (2 each) 3 5 5 3 10 Active Transportation Committee Meeting (1 each) 1 1 Subtotal - Public Involvement 12 1 15 1 0 1 8 5 57 0 Hours 12 15 0 8 5 57 0 Salary Costs $3,360.00 $2,805.00 $0.00 $912.00 $415.00 $7,809.00 $0.00 SUBTOTAL - SALARIES: $15,301.00 DIRECT NON -LABOR EXPENSES Document Printing/Reproduction/Assembly $170.00 Postage/Freight/Courier $0.00 Travel Costs $29.00 SUBTOTAL - DIRECT NON -LABOR EXPENSES: $199.00 SUBTOTAL: $15,500.00 SUBCONSULTANTS FEE: (RDG Planning & Design) $0.00 TOTAL FEE: $15,500.00 Exhibit B City of Fayetteville School/College Avenue Corridor Improvements CONCEPTUAL DESIGN - COLLEGE AVENUE (GREEN ACRES RD. TO TOWNSHIP ST.) WORK TASK DESCRIPTION E-6 E-5 E-4 E-3 E-2 E-1 T-1 $280.00 $228.00 $187.00 $160.00 $132.00 $114.00 $83.00 hr hr hr hr hr hr hr 1. Project Management Administration and Coordination 6 8 Quality Control Review 5 4 Subtotal - Project Management 11 0 12 0 1 0 0 0 2. Civil Engineering Conceptual Plans Base Plan Setup 4 2 Typical Sections 2 6 2 Sidewalk/Parking Lot Layout Review 2 5 3 Street Improvements - Plan & Profiles 2 12 40 50 Driveways 1 3 3 1 College Avenue Drainage Modifications 1 3 12 4 Conceptual Pavement Markings 1 4 5 3 Utility Relocation Route Alternatives 1 6 3 Utility Companies Coordination 1 6 Coordination with City 2 4 Quantities 3 6 Opinion of Probable Construction Cost 1 2 1 4 Subtotal - Civil Engineering 12 0 1 54 0 0 1 79 1 65 Hours 23 0 66 0 0 79 65 Salary Costs $6,440.00 $0.00 $12,342.00 $0.00 $0.00 $9,006.00 $5,395.00 SUBTOTAL - SALARIES: $33,183.00 DIRECT NON -LABOR EXPENSES Document Printing/Reproduction/Assembly $60.00 Postage/Freight/Courier $0.00 Travel Costs $17.00 SUBTOTAL - DIRECT NON -LABOR EXPENSES: $77.00 TOTAL FEE: $33,260.00 Exhibit B City of Fayetteville School/College Avenue Corridor Improvements SIGNALIZATION DESIGN - COLLEGE AVENUE (GREEN ACRES RD. TO TOWNSHIP ST.) WORK TASK DESCRIPTION E-6 E-5 E-4 E-3 E-2 E-1 T-1 $280.00 $228.00 $187.00 $160.00 $132.00 $114.00 $83.00 hr hr hr hr hr hr hr 1. Project Management Administration and Coordination 1 Quality Control Review 1 1 Submittals to Client 1 Subtotal - Project Management 1 0 3 0 0 0 0 2. Preliminary (1 New Signals, 1 RRFB) Site Visit 2 Traffic Signal Notes 1 Street Name Signs 1 1 Signal Layout (Reference File) 1 10 3 60 Scale Sheets 1 5 5 40 Scale Sheets 1 2 5 Wiring Diagrams 1 4 3 Charts Sheets 1 2 5 Wheelchair Ramp Layout and Details 1 2 6 4 RRFBs 1 1 Summary of Quantities 1 1 2 6 Conduit Capacity Calculations 1 1 Plan Check 5 5 4 Plan Submittal and Corrections 1 1 6 6 Subtotal - Preliminary New Signals, 1 RRFB 8 0 16 0 42 43 0 3. Final (1 New Signals, 1 RRFB) Signal Plan Updates 1 3 6 RRFBs Update 1 Quantity Updates 2 2 2 Special Provisions 1 1 Construction Cost Estimate 2 2 Plan Check 2 2 Plan Submittal and Corrections 2 2 2 4 Subtotal - Final 1 New Signals, 1 RRFB 8 0 10 0 8 11 0 Hours 17 0 29 0 50 54 Salary Costs $4,760.00 $0.00 $5,423.00 $0.00 $6,600.00 $6,156.00 $0.00 SUBTOTAL - SALARIES: DIRECT NON -LABOR EXPENSES Document Printing/Reproduction/Assembly $9.00 Postage/Freight/Courier $0.00 Travel Costs $42.00 $22,939.00 SUBTOTAL - DIRECT NON -LABOR EXPENSES: $51.00 TOTAL FEE: $22,990.00 Exhibit B City of Fayetteville School/College Avenue Corridor Improvements PRELIMINARY DESIGN - COLLEGE AVENUE (GREEN ACRES RD. TO TOWNSHIP ST.) WORK TASK DESCRIPTION E-6 E-5 E-4 E-3 E-2 E-1 T-1 $280.00 $228.00 $187.00 $160.00 $132.00 $114.00 $83.00 hr hr hr hr hr hr hr 1. Project Management Administration and Coordination 8 8 Quality Control Review 4 6 Subtotal - Project Management 12 0 14 0 0 0 0 2. Civil Engineering Preliminary Plans Typical Sections 1 2 1 Sidewalk/Parking Lot Layout & Grading 3 10 40 25 Street Plan & Profile Sheets 2 20 40 30 Driveways 1 4 6 8 Parking Lot Drainage Improvements 1 5 10 5 College Ave. Drainage Modifications 1 4 10 5 Pavement Marking/Street Signage Plans 1 4 8 3 Address City/ARDOT Review Comments 1 6 10 6 Coordination with Utility Companies 6 Coordination with City 2 4 Coordination with ARDOT Quantities 2 6 Opinion of Probable Construction Cost 1 2 Subtotal - Civil Engineering 12 0 67 0 0 134 83 Hours 24 0 81 0 0 134 83 Salary Costs $6,720.00 $0.00 $15,147.00 $0.00 $0.00 $15,276.00 $6,889.00 SUBTOTAL - SALARIES: $44,032.00 DIRECT NON -LABOR EXPENSES Document Printing/Reproduction/Assembly $100.00 Postage/Freight/Courier $0.00 Travel Costs $18.00 SUBTOTAL - DIRECT NON -LABOR EXPENSES: $118.00 TOTAL FEE: $44,150.00 Exhibit B City of Fayetteville School/College Avenue Corridor Improvements FINAL DESIGN - COLLEGE AVENUE (GREEN ACRES RD. TO TOWNSHIP ST.) WORK TASK DESCRIPTION E-6 E-5 E-4 E-3 E-2 E-1 T-1 $292.00 $238.00 $195.00 $167.00 $138.00 $119.00 $87.00 hr hr hr hr hr hr hr 1. Project Management Administration and Coordination 6 6 Quality Control Review 4 6 Subtotal - Project Management 10 0 12 0 0 0 0 2. Civil Engineering Final Plans Typical Sections 1 2 Sidewalks/Parking Lot Layout & Grading 1 2 20 10 Street Plan & Profile Sheets 1 10 20 20 Driveways 2 5 5 Parking Lot Drainage Improvements 2 6 3 Drainage Modifications 1 3 5 4 Pavement Markings & Signage Plans 1 2 5 4 Water & Sewer Adjustments 2 6 4 Typical Details 2 4 Special Details 2 5 5 Erosion Control Plans 2 8 6 Address City/ARDOT Review Comments 4 8 6 Coordination with Utility Companies 1 8 Coordination and Meetings with City 2 6 Coordination with ARDOT Specifications/Contract Documents 10 4 Quantities 6 8 Opinion of Probable Construction Cost 1 2 4 Subtotal - Civil Engineering 8 0 64 0 0 108 71 Hours 18 76 108 71 Salary Costs $5,256.00 $0.00 $14,820.00 $0.00 $0.00 $12,852.00 $6,177.00 SUBTOTAL - SALARIES: $39,105.00 DIRECT NON -LABOR EXPENSES Document Printing/Reproduction/Assembly $75.00 ADH Review Fees $100.00 Postage/Freight/Courier $0.00 Travel Costs $20.00 SUBTOTAL - DIRECT NON -LABOR EXPENSES: $195.00 TOTAL FEE: $39,300.00 Exhibit B City of Fayetteville School/College Avenue Corridor Improvements BIDDING SERVICES - COLLEGE AVENUE (GREEN ACRES RD. TO TOWNSHIP ST.) WORK TASK DESCRIPTION E-6 E-4 E-3 E-1 T-1 $292.00 $195.00 $167.00 $119.00 $87.00 hr hr hr hr hr 1. Civil Engineering Coordination with City Purchasing Division 4 Addend ums/Inquiries 4 Pre -Bid Meeting 2 Bid Opening 1.5 Prepare bid tabulation - Not Applicable Evaluate bids and recommend award 1 Prepare construction contracts 3 Notice to Proceed 1 Subtotal - Civil Engineering 0 16.5 0 0 0 Hours Salary Costs 0 16.5 0 0 0 $0.00 $3,217.50 $0.00 $0.00 $0.00 SUBTOTAL - SALARIES: $3,217.50 DIRECT NON -LABOR EXPENSES Document Printing/Reproduction/Assembly $32.50 Postage/Freight/Courier $0.00 Travel Costs $0.00 SUBTOTAL - DIRECT NON -LABOR EXPENSES: $32.50 TOTAL FEE: $3,250.00 RDgeoe PLANNING • DESIGN Scope of Services College Avenue and South School Avenue Streetscape Fayetteville, Arkansas October 26tb, 2021 3004.140.01 This scope of services has been developed to assist the City of Fayetteville and Garver Engineering with the College Avenue and South School Streetscape project as outlined below and the attached time task analysis. This scope includes creating separate construction documentation packages based on federal funding. RDG will provide landscape architecture, planning, and lighting design services as required. TASK 1. General Project Meetings 1. Kick -Off a. Once notice to proceed has been received, RDG will attend a kick-off meeting with the design team and City staff. 2. Progress Meetings a. RDG will attend progress meetings as deemed necessary by Garver. These meetings will be done virtually. 3. Stakeholder Meetings a. RDG will attend up to 10 stakeholder meetings via videoconferencing. This includes meetings with transit providers. 4. Review Meetings a. RDG will attend review meetings to receive the City's review comments from the submittals. These meetings will be in person. RDG has included 3 review meetings in the scope. 5. Transportation and Arts Council committee meetings a. RDG will attend up to two Transportation Committee meetings and one Arts Council Committee meeting via videoconferencing RDG Planning & Design 1302 Howard St. Tel 402.392.0133 Omaha, Nebraska 68102 Fax402.392.0413 www.rdgusa.com RDG IA Inc page 2 TASK 2. Conceptual Design — 30% drawings During this project phase, the RDG team will: 1. Attend kickoff meeting in Fayetteville. 2. Prepare various design alternatives for the recommended improvements resulting from the programming phase and prepare a 30% complete plan set that illustrates the basis of the improvements to be made. 3. Assist the engineer with a 30% OPC. 4. Develop the conceptual landscape plan, and asses the need for green infrastructure along College Avenue and South School. 5. Prepare a 30% preliminary layout plan for all back of curb items including sidewalks, landscape areas, and site amenities. 6. Select streetscape amenities to be included along the street. This includes but is not limited to bus shelters, benches, trash receptacles, planters and gateway features. 7. Review street lighting alternatives. 8. Conduct a 30% complete QA/QC of the plan set and OPC. 9. Conduct a 30% complete review meeting and project walk-through with City staff to review the street layout and landscape plan. 10. Revise the 30% conceptual plans based on comments from the review meeting and project walk- through to be used for the stakeholder group meeting. 11. Attend public open house meeting RDG Planning & Design 1302 Howard Street Tel 402.392.0133 Omaha, Nebraska Fax 402.392.0413 www.rdgusa.com RDG IA Inc page 3 TASK 3. Preliminary Design Phase- 60% drawings During this project phase, the RDG team will: Objective: Review feedback from the plan -in -hand walk-through, City comments, and group stakeholder meeting comments to prepare a 60% complete plan set that illustrates the basis of the improvements to be made. Revise designs based on 30% complete comments received. 2. Assist Garver with the advancement of the street and sidewalk design into preliminary design. 3. Develop the landscape plan based on the selected alternative from the conceptual design. Develop green infrastructure plan if approved from the Concept phase. 4. Prepare a 60% preliminary layout plan for all back of curb items including sidewalks, landscape areas, and site amenities. 5. Select streetscape amenities to be included along the street. This includes but is not limited to bus shelters, benches, trash receptacles, planters and gateway features. 6. Create site details that are critical to understanding and price implications for both landscape and hardscape items. 7. Assist Garver with the selection of street lights and locations. 8. Assist Garver with the development of a grading plan. 9. Prepare an outline of technical specifications. 10. Provide to Garver an OPC of items documented by RDG to be included in a 60% complete engineer's OPC. 11. Conduct a 60% complete QA/QC of plans prepared by RDG. 12. Conduct a 60% complete review meeting with City staff to review the preliminary design documents. 13. Revise the 60% conceptual plans based on comments from the review meeting to be used for the public open house. 14. Attend 60% public open house meeting in Fayetteville. TASK 4. Final Design — 90% and 100% Drawings During this project phase the RDG team will: Objective: During the 90% and 100% complete design process we will incorporate any final comments and details into the project plans and prepare for final production. 1. Revise designs based on 60% complete comments received. 2. Finalize the design for the landscape architectural improvements. 3. Review constructability of improvements and design temporary measures to allow for the construction of the improvements at all project areas while keeping businesses and residences accessible. RDG Planning & Design 1302 Howard Street Tel 402.392.0133 Omaha, Nebraska Fax402.392.0413 www.rdgusa.com RDG IA Inc page 4 4. Prepare a 90% complete OPC. 5. Conduct an internal 90% complete QA/QC review of the plan set and OPC. 6. Attend a 90% complete review meeting with City staff to review the 90% complete plan set and OPC. Objective: The objective during this task is to finalize and sign and seal the plan by a Professional Engineer and specification documents in preparation for bidding and negotiation. 7. Deliverables: Deliverables for this task include three (3) sets of final plans on 11"x17" paper and electronically in pdf format. The drawing CAD files will be provided in *.dwg format. 8. Receive 90% complete comments and revise plans and specifications. 9. Create construction document set and sign and seal by engineers and landscape architect registered in the State of Arkansas. 10. Submit final drawing files in AutoCAD 2017 format (.dwg) to Garver for use by the City. TASK 5. Bidding Phase Objective: Solicit bidders and assist in obtaining construction bids according to state statutes. After written authorization to proceed with the Bidding phase, the RDG team will: 1. Provide clarifications throughout the bidding period on the back of curb items documents by the RDG team. 2. Attend a pre -bid meeting in Fayetteville if needed. RDG Planning & Design 1302 Howard Street Tel 402.392.0133 Omaha, Nebraska Fax 402.392.0413 www.rdgusa.com RDG IA Inc page 5 Fee for Services TASK 1 - Project Meetings — $32,690 Landscape Architecture $26,530 Lighting Design $ 3,300 Planning $ 2,860 Estimated reimbursable TASK 2 — Conceptual Design- 30% $61,930 Landscape Architecture $40,690 Lighting Design $15,000 Planning $ 6,240 TASK 3 — Preliminary Design — 60% $76,390 Landscape Architecture $61,630 Lighting Design $13,200 Planning $ 1,560 TASK 4 — Final Design — 90% and 100% $29,063 Landscape Architecture $25,313 Lighting Design $ 3,750 TASK 5 — Bidding $10,460 Landscape Architecture $9,260 Lighting Design $1,200 Estimated Reimbursables $ 8,162 --------------------------------------------------------- --------------------------------------------------------- School Avenue Fee - $85,200 College Avenue south of Green Acres Road - $90,895 College Avenue north of Green Acres Road - $42,600 Total fee $218,695 Project Schedule — As defined by Garver Engineering RDG Planning & Design 1302 Howard Street Tel 402.392.0133 Omaha, Nebraska Fax 402.392.0413 www.rdgusa.com RDG IA Inc page 6 Scope Exclusions Excluded from this scope of services are the following: 1. Permitting 2. LEED documentation services 3. Rezoning and/or zoning waivers deemed necessary by the planning department 4. Public utility extensions 5. Construction testing 6. Irrigation design (Performance specification will be provided) 7. Stormwater detention design 8. Arboriculture RDG Planning & Design 1302 Howard Street Tel 402.392.0133 Omaha, Nebraska Fax 402.392.0413 www.rdgusa.com RDG IA Inc 11 l�l��1�1�+'il: SOUTH SCHOOL & COLLEGE AVENUES RDg,aeo GARVER PLANNING • DESIGN PROGRAMMING THE STREET: SOUTH SCHOOL & COLLEGE AVENUES STAKEHOLDER MEETINGS After meeting with City staff the RDG/Garver team conducted stakeholder interviews with property owners along the corridor. The interviews included: 1. Review by the team of overarching concepts from the master planning phase 2. Introduction of the current project. 3. Consultation with stakeholders of potential program ideas for the streetscape project. See list at the end of this document. 4. Addressing and receiving input on a variety of issues including shared access, parking consolidation, amenities, outdoor dining spaces, and theming opportunities. Stakeholders also provided information on their current parking, access and other issues presented by the current street configurations. In general, stakeholders were positive about the project and supported improvements to the street and sidewalk environments. Some key takeaways from the stakeholder meetings are listed below: COLLEGE AVENUE • Walkability and micro -mobility should be the priority • Currently College prevents pulling any bike/ped/scooter traffic from the east to the Woodland Junior High School. • Dr. Slocum of Fayetteville Public Schools would prefer a trail and bicycle access on the south side of the track if possible to a Poplar alignment. School district is interested in providing a trail easement over that part of its property. • The new streetscape should provide a safer place for walking and add more public transportation amenity • Questions about location and overall use of medians • Safety concerns for pedestrians crossing from the VA at Memorial Drive to Evelyn Hills Shopping Center. Concerns over short pedestrian signal cycles and visibility • General concerns regarding the timing of the light at E Memorial Drive and College • Concerned about and general opposition to zoning changes • Overarching issue of College Avenue infrastructure. Necessary repairs or replacement of water lines should be coordinated with the streetscape project. • Both interest and skepticism regarding branding that corridor of College • The design should be flexible. • Support for flexible outdoor seating, with special interest in one centralized larger area. Could also be a series of outdoor spaces. • Considerable sign pollution • Relocate overhead wires as feasible • Need to develop ideas to encourage easy pedestrian access between businesses • Dickson Street and entertainment district have traditionally been the focus of branding. It would be wonderful to have some focus on branding/beautification in this part of town. The area has been called Midtown in the past- not sure if that is a good branding or not. Would be great to have nice lights and decorative street banners as well as larger investment/draw to the area • This area is an emerging district • Maintaining accessibility during construction is very important • Connect a drive from Green Acres to College Avenue along Colt Drive or north of Mermaids • Desire for an area for community style outdoor seating • Fewer driveways/curb cuts would improve trafficflow and safety • Enhance lighting along College Avenue SOUTH SCHOOL AVENUE • Do not change access • The apartments planned for South Yard anticipates future on -street parking • Poor lighting is an issue on this street • Intersection of 11th and South School is crash -prone • Cars run into the tree at the Farmer's Table with some frequency • Look for opportunities for interfaces between bike/micro mobility network. • ORT is not married to specific bus stop locations. Open to shifting things - but major boarding points are Seven Hills, the Research Park, and major intersections. A transit center with turnaround loop is desirable. • Ozark Regional Transit would determine bus stop design. Far side installation is safest • Build in flexibility for evolution to BRT. Eugene, OR is an example of such an evolution • South School Corridor -specific • Any on -street bike facility should be carefully coordinated for safe operation with buses • Preference for a multi -use a side path if possible - but open to the idea of either protected directional bike lanes or two-way cycle track on one side • This could be the beginning of a more regional vision that extends the bike infrastructure to West Fork and Greenland PROGRAMMING THE STREET: SOUTH SCHOOL & COLLEGE AVENUES PROGRAM SOUTH SCHOOL Roadway • Reallocation of right of way in certain locations • Road section: Three 11-12' travel lanes with two-way cycle track on west side • On -street parking: located as needed along South School • Access management - driveway containment, identify parking areas for modification and general approach Pedestrian refuge medians at high demand crossings Possible enhancement or higher visibility of entrance to Reserach Park Active Transportation • Bicycle facility: Two-way separated bicycle track on west side • Sidewalks: Five 6' sidewalk behind the curb separated by pavers or a minimum of six feet distance away from curb to allow for tree plantings. Back of curb sidewalks without edge buffer are acceptable adjacent to cycle track. • Colored concrete crosswalks at pedestrian crossings • 11th Street and South School - Modify alignment of 11th Street and South School and modify parking to allow for safer vehicular traffic, pedestrian and bicycle mobility. • Redesign of 11th Street strip center parking lot for improved safety and sidewalk continuity • Transit- Locate bus shelters where appropriate. Environment • Stormwater management - Locate stormwater management BMP's where appropriate • Use long lasting materials and LED lighting along South School • Plant native and adaptive species of street trees Enhancements • Denote districts along South School with integrated art Integrate art to denote bicycle and pedestrian crossings. • New lighting and poles Provide new street trees and landscaping along the corridor where space allows. Provide decorative fencing where there is no buffer between sidewalk and parking lots. NORTH COLLEGE Roadway • Road section: Five 11' travel lanes with 6' tree lawn and 6' sidewalk. In constrained area between North to Memorial, 5' concrete sidewalk and 1.5' paver edge adjacent to the curb to help separate cars from pedestrians. • Access management - driveway containment, identify parking areas for modification and general approach. • Medians in locations where they do not impede turns into businesses Intersection realignment at Green Acres Drive to create 90 degree intersection and green space; Colt Drive connection between Green Acres and College • Intersection redesign - Poplar and College • Utilities: Bury or move above ground utilities to reduce visual clutter Active Transportation • Sidewalks: Five 6' sidewalk behind the curb separated by pavers or a minimum of six feet of distance away from curb to allow for tree plantings. • Connection of Poplar Bikeway and future Sublett Creek Trail • Colored concrete crosswalks at pedestrian crossings Environment/Sustainability • Green Acres greenspace - reuse of vacated right-of-way for stormwater BMP's and open space • Daylight Sublett Creek east of College and Poplar to allow for stormwater management. • Use long lasting materials and LED lighting along South School • Plant native and adaptive species of street trees Districts • Restaurant District: district organization with shared access, interconnected parking and pedestrian access, branding, graphics, amenities, outdoor eating Enhancements Public Spaces: Green Acres, Sublett Drainage, Poplar Trailhead • Provide opportunities for art in public spaces • Denote restaurant district along College Avenue with integrated art and branding. Parking lot interconnection where possible • New Lighting and Poles • Provide new street trees and landscaping along the corridor where space allows. Provide decorative fencing where there is no buffer between sidewalk and parking lots. COLORED CONCRETE SIDEWALKS EXISTING OVERHEAD UTILITY LINES STREET TREES DECORATIVE FENCING LIGHTING RETAINING WALLS DISTRICT BRANDING 3 PROGRAMMING THE STREET: SOUTH SCHOOL & COLLEGE AVENUES INTEGRATING ART ALONG THE CORRIDOR The 71B corridor master plan discussed the proven role that public art can play in creating meaningful places along the street. Consequently, it should be a major part of the 71B development program. Potential art installations along the South School and College Avenue streetscapes include: • District gateways. These define the edges and themes of identifiable districts along the street, such as the University of Arkansas research campus and the emerging Mill District along South School and the Restaurant District along College north of Township. Integrated public art could be used to reflect local history, bring attention to specific sites and highlight local artists. • Bus shelters. At special intersections such as transit stops, art and function can be combined with thematically designed shelters. • Pedestrian and Trail crossings. Major pedestrian intersections such as the Greenway and Town Branch Trail crossings can be marked by placemaking elements that also increase safety and visibility. Similar treatments can be used to enhance safety at defined pedestrian crossings away from street intersections. • Open spaces such as those envisioned with a redesign of the Green Acres drive intersection, the gathering space at Poplar and College Avenue provide possibilities for major art installations. DISTRICT GATEWAY BUS SHELTER DISTRICT GATEWAY DISTRICT GATEWAY DISTRICT GATEWAY BUS SHELTER DISTRICT GATEWAY MAJOR ART INSTALLATION MAJOR ART INSTALLATION MAJOR ART INSTALLATION DISTRICT GATEWAY DISTRICT GATEWAY PROGRAMMING THE STREET: SOUTH SCHOOL & COLLEGE AVENUES STORMWATER MANAGEMENT BMP'S There will be opportunities along the corridors to incorporate stormwater management best management practices (BMP's). BMPS are structural, vegetative or managerial practices used to treat, prevent or reduce water pollution. This adds another layer of sustainability to the corridor. Some of the BMP's would include bioretention gardens, raingardens, porous pavements or water quality inlets. GATHERING SPACES AND TRAILHEADS There may be an opportunity to create gathering spaces and a trail head at the Poplar and College Avenue intersection. The gathering space could serve as an area for people to bring there take out meals from the restaurant district or serve as a space for community or district events. The trailhead would be associated with the proposed Sublett creek trail. This would include a parking lot and open space with picnic tables, benches and other amenities. The gathering space and trail head would also be areas to incorporate public art. PROGRAMMING THE STREET: SOUTH SCHOOL & COLLEGE AVENUES SOUTH SCHOOL SECTIONS EXISTING SOUTH SCHOOL CONDITION Five -lane configuration looking north from Town Branch Creek bridge SOUTH SCHOOL AVENUE - PARKING The illustration above shows the buffer modified to provide on -street parking. This section pertains to areas with demonstrated demand for on -street parking. The wider buffer can be modified over time to provide on -street parking that supports future rredevelopment projects. SOUTH SCHOOL AVENUE - TYPICAL SECTION The desirable typical section provides a three -lane section with two-way protected cycle track on the west side, separated by a buffer delineated with surface mounted rumble strips and raised pavement markers, consistemnt with the treatment planned for Archibald Yell. The buffer ranges from 4' to 14' with the ability to accommodate on -street parking where the demand exists. Sidewalk with is 5' minimum (6' preferred), set back 5 to 6' from the back of curb. SOUTH SCHOOL AVENUE - CONSTRAINED SECTION In some sections, a constrained right of way or topography makes a sidewalk setback difficult. In these situations, a back of curb sidewalk is most acceptable adjacent to the cycle track. Other options include adjustment of the curb line with reduction of the buffer between the cycletrack and travel lanes; or acquisition of a strip of right of way to permit a sidewalk setback. [: PROGRAMMING THE STREET: SOUTH SCHOOL & COLLEGE AVENUES III JII fl it I II� �j � • � TTEVILLE NATIONAL CEMETERY UNIVERSITY OF ARKANSAS ENGINEERING RESEARCH CENTER Zvi W. �5l _ST. '-, � (�� vv.RES _' , �6i774��� EARL �' CENTER 8(Vp .. AN.� 01 W ��St- --- Cl c S. SCHOOL AVENUE - DIAGRAM QUADRANT OVERVIEW NORTH PROGRAMMING THE STREET: SOUTH SCHOOL & COLLEGE AVENUES Ak wCAT OSPg�N�S90, CYCLE TRACK TO MERGE W/ TRAIL oil ` COLORED CONC. / CROSSWALKS it ap TWO-WAY CYCLE TRACK W/ BUFFERS PLANTED MEDIAN �♦ �♦ + INTEGRATED ART ♦♦;or``° /♦♦ 5 0 ♦19r l *0 '✓ 8 sr MID -BLOCK CROSSWALK N r ♦ pv�`°` .♦♦ PLANTED MEDIAN + fow CIF �i�A # 01F UtNj COLORED CONC. CROSSWALK 1 ENrER B�V V• 'REES �vu` • �\ y0 ,,;,�INTEGRATED ART ROADWAY REALIGNMENT ice, _.aCs�� fat t_ r W??No St. Q�� ,spr E m m M> «uuuuuuuu' S. SCHOOL AVENUE - QUADRANT 01 ROADWAY BUFFER AND/OR COLORED CONCRETE PEDESTRIAN TWO-WAY ADJUSTMENTS ON -STREET PARKING CROSSWALKS CIRCULATION CYCLE TRACK NORTH PROGRAMMING THE STREET: SOUTH SCHOOL & COLLEGE AVENUES ir lir �: �# �` p i CN'M�F EXISTING TOWN BRANCH TRAIL _* 11"r , 8� 0.0 ON -STREET PARKING W/ BUFFER MODIFIED STREET SECTION sAtLtA "to N tN. INTEGRATED ART OPPORTUNITY ON -STREET PARKING W/ BUFFER ♦,♦,,r.--11 .. ' ON l7r, 60 to ♦ STREET TREES PEDESTRIAN REFUGE MEDIAN r9rH sr S. SCHOOL AVENUE - QUADRANT 02 CYCLE TRACK AND BUFFER ♦'poi`° �� COLORED CONC. CROSSWALKS INTEGRATED ART OPPORTUNITY EXISTING TOWN �{ �r• BRANCH TRAIL� E m m M> «uuuuuuu1+ ROADWAY BUFFER AND/OR COLORED CONCRETE PEDESTRIAN TWO-WAY ADJUSTMENTS ON -STREET PARKING CROSSWALKS CIRCULATION CYCLE TRACK NORTH PROGRAMMING THE STREET: SOUTH SCHOOL & COLLEGE AVENUES JV 3TysI-Nwl r. CYCLE TRACK MERGES WITH CROSSWALK W. - 11rqsr z &TR Z( iv ON -STREET PARKING W/ BUFFER ON -STREET PARKING W/ BUFFER CYCLE TRACK AND BUFFER W. rsrN sr COLORED CONCRETE CROSSWALKS S. SCHOOL AVENUE - QUADRANT 03 V PARKING LOT IMPROVEMENTS � � ��x�j�x PEDESTRIAN REFUGE MEDIAN x .. 1� to ROADWAY BUFFER AND/OR COLORED CONCRETE PEDESTRIAN TWO-WAY ADJUSTMENTS ON -STREET PARKING CROSSWALKS CIRCULATION CYCLE TRACK NORTH � ,°� �f STREET TREES tt4 P����c` i� MODIFIED STREET SECTION PROGRAMMING THE STREET: SOUTH SCHOOL & COLLEGE AVENUES � EXISTING FRISCO TRAIL ,. IIWATER GEMENT FUTURE HOUSING EXISTING TRAIL CROSSING S� � ♦gyp. ��♦ of J'nST 7 4f, �ecvo STREET TREES TWO-WAY CYCLE TRACK W/ BUFFER MODIFIED STREET SECTION � �ON-STREET PARKING AND ����i,�r•�1t71�1tlx,L�r{ BUFFER AT CYCLE TRACKBHANCH C� TANGLEr 0 RE]EK li F7\ a S. SCHOOL AVENUE - QUADRANT 04 F___, «,,,,,,,,,,,1111+ ROADWAY BUFFER AND/OR COLORED CONCRETE PEDESTRIAN TWO-WAY ADJUSTMENTS ON -STREET PARKING CROSSWALKS CIRCULATION CYCLE TRACK lip STORMWATER MANAGEMENT NORTH PROGRAMMING THE STREET: SOUTH SCHOOL & COLLEGE AVENUES COLLEGE AVENUE SECTIONS I COLLEGE AVENUE - EXISTING Illustration shows existing five -lane section with back of curb sidewalk. Sidewalks are intermittent and vary in width and setback. COLLEGE AVENUE - NORTH TO MEMORIAL DRIVE College Avenue travel lanes are reduced to 11 feet, providing extra width between curb and property line. Topographic limitations require back of curb sidewalks, with a 1.5' paver buffer and 5.5' sidewalk width. Medians can be prov ided in some locations along this segment. COLLEGE AVENUE - MEMORIAL DRIVE TO TOWNSHIP Typical College Avenue section provides 511' lanes, with a desirable 6' sidewalk setback (4' minimum for short distances) and 6' to 6.5' sidewalk width. Wider sidewalk setback provides adequate space for street trees. PROGRAMMING THE STREET: SOUTH SCHOOL & COLLEGE AVENUES MCI (7) (&)� C-:�' E. T owNS S. "NONE EVELYN HILLS f� SHOPPING MALL w COLLEGE AVENUE - DIAGRAM QUADRANT OVERVIEW lem, NORTH 13 PROGRAMMING THE STREET: SOUTH SCHOOL & COLLEGE AVENUES E. NORTH ST COLORED CONCRETEloo CROSSWALKS STREET TREES i E. MEIIgpR1Al pR. if � STREET TREES ���� PLANTED MEDIAN]Af - -- - Sf E. ABSHIER DR. SPLANTED MEDIAN ot��� KWOOD n L FIED :T SECTION �� COLORED CONCRETE CROSSWALKS i COLLEGE AVENUE - QUADRANT 01 7 ROADWAY COLORED CONCRETE PEDESTRIAN PROPOSED STORMWATER ADJUSTMENTS CROSSWALKS CIRCULATION GREENSPACE MANAGEMENT NORTH PROGRAMMING THE STREET: SOUTH SCHOOL & COLLEGE AVENUES a i ntt i i rstta � �'— �♦♦ loo �00� E. NATURq� �Nqr to i� 00 E' UNORIqL p R COLORED CONCRETE CROSSWALKS 10,.1 '�♦ PLANTED MEDIAN + INTEGRATED ART COLLEGEAVENUE - QUADRANT 02 ROADWAY COLORED CONCRETE PEDESTRIAN PROPOSED STORMWATER ADJUSTMENTS CROSSWALKS CIRCULATION GREENSPACE MANAGEMENT NORTH PROGRAMMING THE STREET: SOUTH SCHOOL & COLLEGE AVENUES 1:i�� Lt� PLANTED MEDIAN + INTEGRATED ART FILAR ST. 'v # r 100 lop t / TNAILHEAO PARKING LOT POTENTIAL lire " Aft I GATHERING SPACE z III ddF me ,r i I * mm m> 0 COLLEGEAVENUE — QUADRANT 03 ROADWAY COLORED CONCRETE PEDESTRIAN PROPOSED STORMWATER ADJUSTMENTS CROSSWALKS CIRCULATION GREENSPACE MANAGEMENT NORTH PROGRAMMING THE STREET: SOUTH SCHOOL & COLLEGE AVENUES COLLEGE AVENUE - QUADRANT 04 —E' rowNsHIP ST % 'o ♦♦ ♦ r i♦ - -- STREET TREES WAX -- - up Ott 'tiF## F MEN MEN —> ROADWAY COLORED CONCRETE PEDESTRIAN ADJUSTMENTS CROSSWALKS CIRCULATION PROPOSED STORMWATER GREENSPACE MANAGEMENT NORTH PROGRAMMING THE STREET: SOUTH SCHOOL & COLLEGE AVENUES $4,800,141 Utility burial or relocation costs not included PROGRAMMING COST OPINION Streetscape - Within ROW Utilities - Bury or Relocate Utility Lines $5,068,210 or $1,900,562 Lighting $648,000 Roadway - including removals $6,388,000 Hardscape - sidewalks, pavers behind curbs, retaining walls, color concrete crosswalks $707,000 Landscaping $435,500 Site Amenities - Bus Shelters, Benches, Trash Receptacles, Bike Racks $453,000 10% General Conditions, 20% Contingency, Design and Survey $3,935,964 STREETSCAPE WITHIN ROW TOTAL: Streetscape - Outside of ROW $12,567,464 Utility burial or relocation costs not included Parking Lot Improvements $2,462,300 E Colt Dr. Extension $805,700 Public Spaces at Poplar and College $642,700 Integrated Art $500,000 10% General Conditions, 20% Contingency, and Design $2,261,043 STREETSCAPE - OUTSIDE OF ROW TOTAL: $6,671,743 Streetscape - Within ROW Utilities - Bury or Relocate Utility Lines $4,010,723 or $1,455,961 Lighting $544,000 Roadway - including removals $1,817,000 Hardscape - sidewalks, pavers behind curbs, retaining walls, color concrete crosswalks $413,800 Landscaping $131,800 Site Amenities - Bus Shelters, Benches, Trash Receptacles, Bike Racks $390,200 General Conditions, Contingency, and Design $1,503,341 STREETSCAPE WITHIN ROW TOTAL: Streetscape - Outside of ROW Parking Lot Improvements 7th St. Extension 10% Gpnpral Conditions. 700/n Contingpncv. and Dpsign $402.637 I STREETSCAPE - OUTSIDE OF ROW TOTAL: $1,189,037 6.". City of Fayetteville, Arkansas - Budget Adjustment Form (Legistar) Budget Year Division Adjustment Number /Org2 ENGINEERING (621) 2021 Requestor: Matt Casey BUDGET ADJUSTMENT DESCRIPTION / JUSTIFICATION: Approval of Contract Amendment #1 in the amount of $976,235.00 with Garver, LLC for design of the School/College Avenue Corridor Improvements, per RFQ 20-01, selection #3 and approval of a budget adjustment. RESOLUTION/ORDINANCE COUNCIL DATE: 12/7/2021 LEGISTAR FILE ID#: 2021-0872 }f oily 31ar1 11/1/2021 2:38 PM Budget Director Date TYPE: D - (City Council) JOURNAL #: GLDATE: 12/7/2021 CHKD/POSTED: TOTAL - - Increase / (Decrease) Account Number Expense Revenue Proiect.Sub# Project Sub.Detl AT v.20210831 Account Name 4602.860.7221-5860.02 976,235 - 46020 7221.1020 EX Capital Prof Svcs - Engineering/Architectu 4602.860.7999-5899.00 (976,235) - 46020 7999 EX Unallocated - Budget H:\Budget Adjustments\2021_Budget\City Council\12-02-2021\2021-0872 BA Hwy 71 B Garver.xlsm 1 of 1