Loading...
HomeMy WebLinkAbout273-21 RESOLUTIONOF FAYETTF T RKANSP 113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 Resolution: 273-21 File Number: 2021-0809 FLEET OFFICE EXPANSION PROJECT: A RESOLUTION TO APPROVE A BUDGET ADJUSTMENT REAPPROPRIATING FUNDS IN THE AMOUNT OF $10.000.00 FROM THE FLEET SHOP EXPANSION PROJECT TO THE FLEET OFFICE EXPANSION PROJECT WHEREAS, the funds currently appropriated for the Fleet Shop Expansion Project will not be needed until later in 2022; and WHEREAS. the original requested budget for the office expansion project was $20,000 but, after realizing the need to outsource portions of the project, the cost will be closer to $30,000; and WHEREAS. the funds from the Fleet Shop Expansion Project can be used to fund the Fleet Office Expansion Project. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment, a copy of which is attached to this Resolution, reappropriating funds in the amount of $10,000.00 from the Fleet Shop Expansion Project to the Fleet Office Expansion Project. PASSED and APPROVED on 1 1/2/2021 Page 1 Printed on 1113121 Resolution. 273-21 File Number: 2021-0809 Attest: • • T �I Kara Paxton, City Clerk Treasured 'fdjjON COO Page 2 Printed on 1113121 City of Fayetteville, Arkansas 113 West Mountain Street Fayetteville, AR 72701 (479)575-8323 Text File File Number: 2021-0809 Agenda Date: 11/2/2021 Version: 1 Status: Passed In Control: City Council Meetinq File Type: Resolution Agenda Number: A.16 FLEET OFFICE EXPANSION PROJECT: A RESOLUTION TO APPROVE A BUDGET ADJUSTMENT REAPPROPRIATING FUNDS IN THE AMOUNT OF $10,000.00 FROM THE FLEET SHOP EXPANSION PROJECT TO THE FLEET OFFICE EXPANSION PROJECT WHEREAS, the funds currently appropriated for the Fleet Shop Expansion Project will not be needed until later in 2022; and WHEREAS, the original requested budget for the office expansion project was $20,000 but, after realizing the need to outsource portions of the project, the cost will be closer to $30,000; and WHEREAS, the funds from the Fleet Shop Expansion Project can be used to fund the Fleet Office Expansion Project. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment, a copy of which is attached to this Resolution, reappropriating funds in the amount of $10,000.00 from the Fleet Shop Expansion Project to the Fleet Office Expansion Project. City of Fayetteville, Arkansas Page 1 Printed on 111312021 Sara Combs Submitted By City of Fayetteville Staff Review Form 2021-0809 Legistar File ID 11/2/2021 City Council Meeting Date - Agenda Item Only N/A for Non -Agenda Item 10/13/2021 FLEET OPERATIONS (770) Submitted Date Division / Department Action Recommendation: Staff recommends moving funds from the Fleet Shop Expansion project to the Fleet Office Expansion project through the approval of a budget adjustment. Budget Impact: 9700.770.1920-5804.00 Account Number 21007.1 Shop Fund Fleet - Office Expansion Project Number Budgeted Item? Yes Current Budget Funds Obligated Current Balance Does item have a cost? No Item Cost Budget Adjustment Attached? Yes Budget Adjustment Purchase Order Number: Change Order Number: Original Contract Number: Comments: Remaining Budget Project Title $ 20,000.00 $ 20,000.00 $ 10,000.00 30,0nn nn V20210527 Previous Ordinance or Resolution # Approval Date: CITY OF FAYETTEVILLE ARKANSAS MEETING OF NOVEMBER 2, 2021 TO: Mayor and City Council THRU: Terry Gulley, Director of Transportation FROM: Sara Glenn, Fleet Operations Superintendent DATE: October 13, 2021 CITY COUNCIL MEMO SUBJECT: Budget Adjustment between two Shop Projects RECOMMENDATION: Staff recommends moving funds from the Fleet Shop Expansion project to the Fleet Office Expansion project through the approval of a budget adjustment. BACKGROUND: The two shop projects in question were both presented and approved in the 2021-2025 CIP. When initially requested it was believed that Facilities Management would be able to perform the duties needed primarily in house. However, due to additional tasks and staffing changes, this is no longer the case. Both projects will need to be outsourced. DISCUSSION: Fleet's Shop Expansion project (21006.1) was approved to expand Fleet's workspace into the area where the old truck wash was at the end of the shop. It has now been realized that the scope of this project is larger than originally anticipated and the City has just selected an outside company to assist with this. The actual work for this construction is at the soonest going to be a 2022 project. Fleet's Office Expansion project (21007.1) was approved to place an actual office space in the shop. This is for the Shop Supervisor and Lead Mechanics to have a functional working space, where they can still see and be a part of the shop itself. Currently, all 4 staff members share one office and one computer. The scope of the Office Expansion has changed from what is in the original request form to be a simpler design of just a 10'x20' one story office that will be open with 4 desks. Many options were explored once it was established that Facilities Management would not be able to perform the construction. The most cost effective that will meet the goals and needs of Fleet is a modular office. Quotes have been gathered and the lowest was in the amount of $25,325.00. Mailing Address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 The office that is currently in use will be turned into a meeting area, as Fleet frequently meets with vendors and user departments and does not have a large enough space, especially when considering Covid restrictions. Facilities Management is able to make this small adjustment to the current office area. BUDGET/STAFF IMPACT: The original requested budget for the office expansion project was $20,000. However, after realizing the need to outsource, the cost will be closer to $30,000. The overall effect this expansion will have on Fleet Operations will be tremendous. As the Fleet itself continues to grow, our Leads and Supervisor requires the space to maintain their own organization and workflows. Having the increased budget will leave us with enough to allow for anything unforeseen and for Facilities Management to adjust the current office into a meeting space. We know that the Shop Expansion is going to be pushed off a while and will likely require additional funding. That can be evaluated at the time information is obtained. For the present, Fleet would like to have $10,000 of the Shop expansion budget moved to the Office Expansion so that one portion of the overall improvements can be completed. Attachments: CIP Budget Request form for Projects 21006.1 and 21007.1 Quotes for Modular Office Budget Adjustment CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2021-2025) Project Title: Fleet - Shop Expansion Division: Fleet Operations (770) project 21006.1 Funding: 9700 - Shop Category: Facilities Management Improvements Rank: 9 Project #: 00000 Project Cost 2021 $ 142,000 2022 - 2023 - 2024 - 2025 - Total $ 142,000 Description: This request is to bring the current Truck Wash located at the west end of the Fleet Shop into the Shop as additional work space. The Fleet itself continues to grow each year, but the shop does not. With the new Car/Truck Wash being complete in 2020, this is the only space for the Shop to expand. Scheduled Implementation: New Project Request Concrete Repair/Rail Crane pier - $15,000; Demolition - $20,000; Wall panel replacement - $30,000; Electrical & Lighting - $20,000; Radiant Heat & Fan - $20,000; Air/oil lines - $10,000; OH Door motors - $4,000; Big Ass Fan - $12,000; Contingency - $11,000 Effect on Operations: This will give the shop more space to work on the vehicles & equipment we currently have. Each technician will have their own bay to work in, allowing us to be more efficient, not forcing anyone outside. To be clear, this is expanding to fit our current needs, not expanding for the future. Master Plan(s) Addressed: 133 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2021-2025) Project Title: Fleet - Office Expansion Division: Fleet Operations (770) Project 21007.1 Funding: 9700 - Shop Category: Facilities Management Improvements Rank: 10 Project #: 00000 Description: Project Cost 2021 $ 20,000 2022 - 2023 - 2024 - 2025 - Total $ 20,000 This request is to build an additional office space in the shop area. This is to be a two story office 8'x10'. The purpose of this will be to allow the Fleet Shop Supervisor to be high enough to visibly see his staff and to be isolated enough to efficiently perform his paperwork. The lower office space will be for the Lead Technicians to use. Scheduled Implementation: New Project Request Elevated Office & Lower office: 160 sq. Ft x 80 $12,800 Stairs 3500 $16,300 Additional Computer $2,000 Subtotal $18,300 Contingency: $1,630 Total: $19,930 Effect on Operations: No effect on operations. Master Plan(s) Addressed: 134 .... approval subject to terms and conditions stated A 1 Starrco Modular Office - 4-Wall Office 10'W x 20'D x 9'H 5fi30tf iNall System 9` Ta1'I (Non -Load Bearing 20 Gauge Steel Door with Glass and Lever Lock (1 ) .... .... Labor (Includes travel expenses, assembly and installation) $3,690 00 Page 1 of 1 ATTENTIONI FOR STUD SPACING REFERENCE, FLOOR TRACK DOORS AND DOOR FRAMES MUST BE SPLICES COINCIDE WITH STUD CENTERLINES. INSTALLED AS A MATCHED SET. THEY ARE IMPORTANT: WALL PANELS INSERT INTO MATCHED AND LABELED AT THE FACTORY. 3 4" DO NOT REMOVE TEMPORARY DOOR FRAME VERTICAL EXTRUSIONS / —TYPICAL. IDENTIFICATION TAG UMIL DOOR AND ITS MATCHED FRAME ARE INSTALLED AS A SET. WINDOW WINDOW HVAC DED. WINDOW o 0 z 3 h z Z 3 4Y __ WINDOW WINDOW WINDOW GCB BOX j.. GENERAL NOTES: 1. PROJECT LOCATION: CITY OF FAYEfTEVILLE 1525 S. HAPPY HOLLOW ROAD FAYETTEVILLE, AR 72701 2. WALL SYSTEM: STARRSPACE 3000-DL 3. PANEL COLOR: T.B.A. 4. EXTRUSION COLOR: T.B.A. 5. SYSTEM HEIGHT: 9'-0" B. ALUMINUM EXTRUSIONS ARE 6063-T6 or T6005A-T61 ALLOY, 7. ROOF DECK IS DESIGNED FOR NON -LOAD BEARING. Revisions No. Date: Description/By: No.1 Date:l Description/By: No.1 loated Description/By: No. Date: Description/By: m E C N� a m 4 �O 1 'ry M V ohm o 8E Y b0 B a a �y �r«_e °�o yi a � c m B � v ; a CiiMN; U� G 2'.d ,'air n .. p LL s r r t _ • z ac,00 ow 0 J W ® I L W IT V Q LL O J o m Q m ❑ U Drawing Title Wall Panel Layout Job No.: Q139540 Checked By: Drawn By: MOM Date: 10/08/2021 Scale: N.T.S. Sheet No. Al 0 ALL -STORAGE PRODUCTS 1-501-666-8600 1701 E. ROOSEVELT RD 1-501-666-3986 FAX LITTLE ROCK, AR 72206 in length. Materials Sales Tax - 9.75% Sara Glenn Fleet Operations Fayetteville, AR T: 479-444-3494 F: sglenn@fayetteville-ar.gov DATE: 06/28/2021 'JOB: Fleet Operations Modular Office SHIP TO: Fayetteville, AR �CDTIE :' AfC 6Jlnits, clraain kits and support sheIfs not included' They can be ordered and installed for an additional $4700. $3,007.88 TAL $37,365.88 Thsnk you- for allowing us to provide this quotation. We Would appreciate receiving your order. This quotation is in effect for 30 days from above date. BY: ____-all -- -- -- Tim Ward MEZZANINES LOCKERS -- - SHELVING -- - - RIVET SHELVING CABINETS ----- MEZZANINE LIFTS PALLET RACK DRIVE. -IN RACK WORK BENCHES GUARD HOUSES MODULAR DRAWERS CANTILEVER RACK SHOP EQUIPMENT WIRE PARTITIONS IN -PLANT OFFICES Page I of 7 aowos-�-o-w cialized Products Group LLC PO Box 9302 - Fayetteville, AR 72703 - 479.236.7494 Company Name Phone/Fax Date City of Fayetteville Fleet Services 479-444-3485 8/17/2021 Address Terms: Salesperson 1525 S. Happy Hollow Rd Net 15 Erica Asfahl City, state &.zip code F.O.B. Salesperson phone Fayetteville, AR 72701 NA 479-236-7494 Attention Delivery Pages in document Sara Glenn and Les McGaugh Leadtime = 15-18 wks 3 CUSTOMER RESPONSIBILITIES: Any and all applicable sales taxes, unless otherwise specified. Any and all building permits, if necessary, by customer. Installation during normal business hours (M-F 7:00 AN to 5:00 P.M.) Offloading of product and transfer to assembly area by customer. Provide forklift and/or scissor for installation purposes (If required). If SPG must rent a forklift for installation, there will be additional charges which are not reflected in this quotation. Any obstructions to be removed by customer, unless purchased as an option. Any and all aspects of Electrical Installation (if required) by customer. If installation area is not prepared upon arrival of SPG crew, customer may be liable for additional installation charges. WE ARE PROUD TO SUBMIT ESTIMATES & SPECIFICATIONS FOR: BASE BID — 8'0" x 12'0" standard electric. structure-oniv installation included: 4-WALL, 2-STORY ENCLOSURE — Omniflex 300+ Fire & Sound Panels and extrusions for this system are to be champagne, white, or gray (please specify). Modular wall panel to be constructed of: '/2" vinyl gypsum interior face Polystyrene core '/2" vinyl gypsum exterior face Each floor: - 40 linear feet Omniflex 300+ Fire & Sound, 3" thick panels - 1st floor = 10' tall panels (drop ceiling 8'0" A.F.F.); 10'0" tall panels hide mezzanine structure - 2nd floor = 9' tall panels (drop ceiling 8'0" A.F.F.) - 4 each painted steel corner post for 3" system - 1 each 3'0" x 7'0" steel door w/ glass (standard hardware, door closer, kick plate) - 2 each standard 4'0" x 3'0" windows, '/4" thick clear tempered glass (see option on page 2 for additional window panels) - 96 ft2 acoustical ceiling 2x4, 8'0" ceiling height - 2 each recessed 2' x 4' troffer light, T8, 120V - 2 each standard duplex outlets + 2 each CAT-5 data port outlets - Standard electric package — requires certified electrician install by others - 1 each 11,600 BTU cool/11,400 BTU heat HVAC unit with 220V outlet - Standard electric package; electrical installation by others (certified electrician) - Modular Electric package not available at this time due to product shortages - Main facility power to be landed in Portafab electrical breaker box by others (certified electrician) - Stair and landing assembly not included; customer to supply self -supported, non-attached steel or wood stair and landing assembly (see option on page 3 for engineered welded steel stair assembly option) - Lift equipment included - This system cannot be purchased through cooperative commodity purchasing means such as SourceWell as this system is a custom -designed product. However, Portafab building systems qualify to be filed as "equipment" under Section 179. BASE BID Total project delivered & structure install only: $ 50,937.00 1,2 BASE BID Total project tax 10.0%, if applicable: $ 5,093.70 See next page for product options and installation options. Specializing In: Industrial Doors, Rack & Storage, Loading Dock, Modular Buildings & Certified Clean Rooms, HVLS Fans, Work Positioners, Mezzanines & Work Platforms, Vertical Material Lifts Thank you for the opportunity. Erica Asfahl - erica@spgmaterialhandling.com We hope to earn your business. Sales & Engineering 479.236.7494 2 IF SpacializE�d Products Group LLG PO Box 9302 - Fayetteville, AR 72703 - 479.23B.7494 ADD OPTION A — Turn -key installation, 8'0" x 12'0" (Modular Electric package in lieu of Standard Electric) - Modular Plug -and -Play Electric system not available at this time due to product shortages ADD OPTION A, delivered & installed: ADD TO BASE $ NA ADD OPTION A, tax 10.0%, if applicable: ADD TO BASE $ NA ADD OPTION B — 12'0" x 12'0" footprint with Portafab structure installation only (Standard Electric package) OmniFlex 300+ Fire & Sound - Panels and extrusions are to be champagne, white, or gray (please specify). Modular wall panel to be constructed of: '/2" vinyl gypsum interior face Polystyrene core '/2" vinyl gypsum exterior face Each floor: - 48 linear feet Omniflex 300+ Fire & Sound, 3" thick panels - 1st floor = 10' tall panels (drop ceiling 8'0" A.F.F.) - 2nd floor = 9' tall panels (drop ceiling 8'0" A.F.F.) - 144 ft2 acoustical ceiling 2x4, 8'0" ceiling height - 3 each recessed 2' x 4' troffer light, T8, 120V - Modular Plug -and -Play Electric Package not available at this time due to product shortages - All other items same as 8'0" x 12'0" footprint BASE BID on page 1 (windows, outlets/data, HVAC, doors, no stair assembly) - Portafab structure installation by SPG; All electrical by others (Standard Electrical package install by certified electrician) - Landing of main facility power in Portafab electrical breaker box by others (certified electrician) - Lift equipment included ADD OPTION B, Total project delivered & installed: ADD TO BASE $ 5,167.001 ADD OPTION B, Total project tax 10.0%, if applicable: ADD TO BASE $ 516.70 ADD OPTION C — PE STAMPED DRAWINGS AND CALCS - Include PE -stamped drawings with calculations to any structure (usually required if building permit is required) - Standard drawing package supplied with BASE BID and OPTION B, but without PE stamp and calculations ADD OPTION C, delivered & installed: ADD OPTION C, tax 10.0%, if applicable: ADD TO ANY $ 5,920.00 ADD TO ANY $ 592.00 ADD OPTION D — ADD ADDITION WINDOW PANELS - Unit price to add one each standard 4'0" x 3'0" windows, '/4' thick clear tempered glass ADD OPTION D, delivered & installed: ADD TO ANY $ 294.00 EA ADD OPTION D, tax 10.0%, if applicable: ADD TO ANY $ 29.40 EA See next page for product options and installation options. Specializing In: Industrial Doors, Rack & Storage, Loading Dock, Modular Buildings & Certified Clean Rooms, HVLS Fans, Work Positioners, Mezzanines & Work Platforms, Vertical Material Lifts Thank you for the opportunity. We hope to earn your business. Erica Asfahl — erica@spgmaterialhandling.com Sales & Engineering 479.236.7494 PAGE 2 3 IF141SIR 1b a Lm=i Specialized FPr-oducts Group LLC PO Box 9302 • Fayetteville, AR 72703 - 479.236.7494 ADD OPTION E — ADD ENGINEERED STEEL STAIR+LANDING ASSEMBLY - Add to either footprint fully -welded, engineered steel stair and landing assembly (All stair assemblies are self -supported, free-standing assemblies not to be attached to Portafab structure.) ADD OPTION E, delivered & installed: ADD OPTION E, tax 10.0%, if applicable: ADD TO ANY $ 19,389.00 ADD TO ANY $ 1,938.90 VOLATILE MARKET NOTE: Customer acknowledges that this quote is completed during a period of material and equipment price volatility. To provide the lowest feasible proposal to the customer, Specialized Products Group has included materials and equipment in the quote at prices available as of the date of this proposal, with little or no allowance for price escalation. Customer agrees that, if commercially -available prices for any type of material or equipment necessary for the goods increase by more than 3% from prices effective on the date of the quote until procurement and release for production by seller, based upon demonstrable industry price metrics, the quote shall be increase by the amount such documented price increase exceeds 3% for the affected materials and/or equipment that will be incorporated in the goods. NOTES: 1. Bid valid for 7 days due to extremely volatile market. 2. All lift equipment included. Specializing In: Industrial Doors, Rack & Storage, Loading Dock, Modular Buildings & Certified Clean Rooms, HVLS Fans, Work Positioners, Mezzanines & Work Platforms, Vertical Material Lifts Thank you for the opportunity. We hope to earn your business. Erica Asfahl — erica@spgmaterialhandling.com Sales & Engineering 479.236.7494 PAGE 3 City of Fayetteville, Arkansas - Budget Adjustment Form (Legistar) Budget Year Division Adjustment Number FLEET OPERATIONS (770) 2021 /Org2 Requestor: Sara Combs BUDGET ADJUSTMENT DESCRIPTION / JUSTIFICATION: Moving funds from the Fleet Shop Expansion project to the Fleet Office Expansion project. This will allow us to complete the Office Expansion, and because the Shop Expansion is going to be more involved than originally anticipated, those funds will not be required for quite some time. COUNCIL DATE: 1 1 /2/2021 LEGISTAR FILE ID#: 2021-0809 Hovy 3lack� 1011412021 10:00 AM Budget Director Date TYPE: D - (City Council) JOURNAL #: GLDATE: 11/2/2021 RESOLUTION/ORDINANCE CHKD/POSTED: TOTAL - - v.2021 1011 Increase / (Decrease) Proiect.Sub# Account Number Expense Revenue Project Sub.Detl AT Account Name 9700.770.1920-5804.00 (10,000) - 21006 1 EX Building Costs 9700.770.1920-5804.00 10,000 - 21007 1 EX Building Costs H:\Budget Adjustments\2021_Budget\City Council\11-02-2021\2021-0809 BA Fleet Office Expansion.xlsm 1 of 1