Loading...
HomeMy WebLinkAbout253-21 RESOLUTION113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 Resolution: 253-21 File Number: 2021-0756 JBZ, INC. D/B/A ELLINGSON CONTRACTING CHANGE ORDER #3: A RESOLUTION TO APPROVE CHANGE ORDER NO.3 TO THE CONTRACT WITH JBZ, INC. D/B/A ELLINGSON CONTRACTING IN THE AMOUNT OF $140,619.00 FOR CONSTRUCTION OF THE FRONT AND REAR PORCHES AND REPLACEMENT OF MISSING WINDOWS AND DOORS ASSOCIATED WITH THE WOOLSEY FARMSTEAD RESTORATION PROJECT AND TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $14,062.00 WHEREAS, on November 5, 2019, the City Council passed Resolution 245-19 to approve a contract with JBZ, Inc. d/b/a Ellingson Contracting for Phase I of the restoration and reconstruction of the Woolsey Farmstead; and WHEREAS, Change Order No. 3 includes the construction of the front and rear porches and replacement of missing windows and doors. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section I: That the City Council of the City of Fayetteville, Arkansas hereby authorizes Mayor Jordan to sign Change Order No. 3 to the contract with JBZ, Inc. d/b/a Ellingson Contracting in the amount of $140,619.00 for the construction of the front and rear porches and replacement of missing windows and doors associated with the Woolsey Farmstead Restoration Project, and further approves a project contingency in the amount of $14,062.00. PASSED and APPROVED on 10/19/2021 Page 1 Printed on 10/20/21 Resolution: 253-21 File Number 2021-0756 Attest: `s����....... i.. . rv; •�i FAYETTEVILLE Kara Paxton, City Clerk Treasurer, , . : �.�9S . MAPS . •�`�� Page 2 Printed on 10/2x21 City of Fayetteville, Arkansas 113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 Text File File Number: 2021-0756 Agenda Date: 10/19/2021 Version: 1 Status: Passed In Control: City Council Meetinq File Type: Resolution Agenda Number: A.7 JBZ, INC. D/B/A ELLINGSON CONTRACTING CHANGE ORDER #3: A RESOLUTION TO APPROVE CHANGE ORDER NO. 3 TO THE CONTRACT WITH JBZ, INC. D/B/A ELLINGSON CONTRACTING IN THE AMOUNT OF $140,619.00 FOR CONSTRUCTION OF THE FRONT AND REAR PORCHES AND REPLACEMENT OF MISSING WINDOWS AND DOORS ASSOCIATED WITH THE WOOLSEY FARMSTEAD RESTORATION PROJECT AND TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $14,062.00 WHEREAS, on November 5, 2019, the City Council passed Resolution 245-19 to approve a contract with JBZ, Inc. d/b/a Ellingson Contracting for Phase 1 of the restoration and reconstruction of the Woolsey Farmstead; and WHEREAS, Change Order No. 3 includes the construction of the front and rear porches and replacement of missing windows and doors. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby authorizes Mayor Jordan to sign Change Order No. 3 to the contract with JBZ, Inc. d/b/a Ellingson Contracting in the amount of $140,619.00 for the construction of the front and rear porches and replacement of missing windows and doors associated with the Woolsey Farmstead Restoration Project, and further approves a project contingency in the amount of $14,062.00. City of Fayetteville, Arkansas Page 1 Printed on 10/20/2021 City of Fayetteville Staff Review Form 2021-0756 Legistar File ID 10/19/2021 City Council Meeting Date - Agenda Item Only N/A for Non -Agenda Item Matthew Cabe Submitted By 9/27/2021 FACILITIES MANAGEMENT (140) Submitted Date Division / Department Action Recommendation: Staff recommends approval of change order #3 to the contract with Ellingson Contracting in the amount of $140,619 for construction of the front & rear porches and replacement of missing windows & doors, and a project contingency of $14,062. 4470.090.8900-5400 Account Number 15008.1 Project Number Budgeted Item? Yes Does item have a cost? Yes Budget Adjustment Attached? No Budget Impact: 4470 - Sales Tax Capital Improvement Fund Woolsey Homestead Historic Restoration Project Title Current Budget Funds Obligated Current Balance Item Cost Budget Adjustment Remaining Budget $ 195,962.00 $ 35,435.21 160,526.79 $ 140,620.00 19,906.79 V20210527 Purchase Order Number: 2019-00000782 Previous Ordinance or Resolution # 245-19 Change Order Number: Original Contract Number Comments: 3 2019-00000052 Approval Date: CITY OF FAYETTEVILLE ARKANSAS MEETING OF OCTOBER 19, 2021 TO: Mayor and City Council CITY COUNCIL MEMO THRU: Paul Becker, Chief Financial Officer Wade Abernathy, Director of Bond Projects and Facilities FROM: Matthew Cabe, Facilities and Building Maintenance Manager DATE: September 27, 2021 SUBJECT: Approval of Change Order #3 with JBZ, Inc. dba Ellingson Contracting for Restoration of the Woolsey Historic Farmhouse. RECOMMENDATION: Staff recommends approval of change order #3 to the contract with Ellingson Contracting in the amount of $140,619 for construction of the front & rear porches, replacement of missing windows & doors, and a project contingency of $14,062. BACKGROUND: In September 2014, Council approved Resolution # 165-14, which included the 2015-2019 CIP funding for the Woolsey Homestead Historic Restoration Project. It was based on Recommendations in a Condition Assessment Report submitted to the city in Jan. 2014 as prepared by Ruby Architects Inc. The Report identified a 3 -phase plan over the next 4 years for cleanup, temporary stabilization, master plan, and final stabilization of the Structure and Cemetery. Staff has completed all possible items in the 2015 phase 1 as well as several items budgeted for 2017 phase 2. A Historical Structures Report as well as a Master Plan prepared by Allison Architects was developed with direct input from the Woolsey Farmstead Visionary Committee. June 9, 2016 per RFQ 16-01 Selection 5: The selection committee voted to use Allison Architects for the programing and phasing as well as Architectural Services for final stabilization of the structure to begin phase 3 of the initial report. July of 2016, Council approved an Architectural Contract to include programing, development of a phasing and budget plan, and completion of Construction Drawings for Final Stabilization of the Woolsey House Structure. May 27, 2019 per RFQ 19-01, The selection committee voted to use Revival Architecture for the above listed scope of projects. Aaron Ruby has been the Architect that has provide all service since the first planning in 2014. He now is the principal Architect of Revival Architecture. the selection committee wanted continuity for the project, and to remain working with Aaron. June 7, 2019, Council approved Architectural Services with a fixed fee contract with Revival Mailing Address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 Architecture in the amount of $31,750.00 for permanent stabilization, interior finish and Cemetery restoration. November 2019, Council approved resolution 245-19 a contract with Ellingson Contracting in the amount of $279,099 for Phase 1 to include selective demolition, and permanent stabilization. July 7, 2020, Council approved Change Order #2 in the amount of $163,000 for roof framing, wood shingles, and exterior siding/trim. DISCUSSION: This change order will enable completion of the next phase of restoration and reconstruction at the Woolsey Farmstead. The building elements included in this phase will increase the building's weathertightness. Future phases of funding will complete the farmhouse and expand the reconstruction and restoration efforts to surrounding grounds and structures. BUDGET/STAFF IMPACT: Council has approved funding for this project via the CIP process. Attachments: Change Order #3 Change Order Request #5 CIP Funding (2018-2022) Floor Plans and Images REVIVAL ARCHITECTURE P.O. Box 400 Scott, AR 72142 501.951.3316 www.revivalarch.com Date: September 22, 202I Project: A Restoration of the Historic Woolsey Farmstead Subject: Change Order #3 To: Matthew Cabe, City of Fayetteville Cc: From: Aaron C. Ruby, AIA, LEED AP Matthew, Enclosed is CO#3 for your review and approval. This Change Order continues the next phase of work at the existing, historic structure, which is roughly summarized as nearly completing the exterior, with the exception of the chimneys, which are not included. This Change Order does include completion of the exterior windows and doors, the front and rear porches and completion of the installation of the exterior lap siding and trim. We recommend approval. If you have any questions at all, please let us know. Thank you! REVIVAL ARCHITECTURE P.O. Box 400 Scott, AR 72142 501.951.3316 www.revivalarch.com CHANGE ORDER PROJECT: A Restoration of the Historic Woolsey Farmstead OWNER: City of Fayetteville 113 W. Mountain St. Fayetteville, AR 72701 FROM ARCHITECT: Revival Architecture, Inc. 301 Main St. Suite 203 N. Little Rock, AR 72114 TO CONTRACTOR: Ellingson Contracting 108 E. University St. Siloam Springs, AR 72761 CHANGE ORDER NO: 3 ISSUE DATE: Sept. 22, 2021 CONTRACT DATE: Oct. 16, 2019 This Change Order is not valid until signed by the Architect, Contractor & Owner DESCRIPTION: The Contract is changed as follows: 1. ADD to contract "Phase 11" roughly consisting of new, exterior window & doors, front and rear porches and completion of exterior lop siding and trim. Reference attached documents listed below. This work follows existing drawings and specifications originally issued June 28, 2019 with subsequent addenda and supplemental information issued during "Phase I". The original Contract Sum was $ 329,299.00 The net change by previously authorized Change Orders $ 112,800.00 The Contract Sum prior to this Change Order was $ 442,099.00 The Contract Sum will be Increased / PeeFoased-by this Change Order in the amount of $ 140,619.00 The new Contract Sum including this Change Order will be $ 582,718.00 The Contract Time will be Increased Decreased Unchanged by 419 days. The date of Substantial Completion as of the date of this Change Order therefore is: May 1, 2022 ATTACHMENTS: 1.) "Change Order Request #5, Revision 3 dated 8/31/21 (1 page); 2.) Email from Chris Hobby dated 8/17/21 (1 page) Revival Architecture. Inc. Ellingson Contracting City of Fayetteville ARCHITECT (firm name) CONTRACTOR (firm name) OWNER (firm name) PO Box 400 Scott, AR 72142 PO Box 7202 11'. Siloam 5 rin SAR 72761 F Y /signature) BY Mr. David Ellingson, Owner L Cellingson contracting Ellingson Contracting PO Box 7202 Siloam Springs, AR 72761 CHANGE ORDER REQUEST #5 Revision 3 Date: 8/31/2021 To: Aaron Ruby Revival Architecture Re: Woolsey Historic Farmhouse Renovation 535 S. Broyles Ave, Fayetteville, AR Fayetteville, AR 72701 Description of Proposed Change: PR #2 - Items #1 & #2 - Partial Doors, Windows, and Patio Scope of Work: - Two exterior doors with Accoya lumber in lieu of River Recovered Pine - Six Windows with Accoya lumber in lieu of River Recovered Pine - Front and rear porches with rough cut pine roof deck boards in lieu of river recovered Cypress, and rough cut beams, rafters, and posts with markings to simulate hewing. Exclusions: - Interior doors - Beam and post hewing - Handrail and ramps Line Item Breakout Description Material Labor Equipment Sub/Other Total Doors S 5,278 $ 9,781 $ 180 $ 15,239 Windows $ 8,553 $ 18,775 $ 1,475 $ 28,803 Hardware Allowance $ 4,000 $ 4,000 Patio $ 27,053 $ 17,870 $ 4,220 $ 3,240 $ 52,383 General Conditions $ 975 $ 15,236 $ 3,400 $ 19,611 Subtotal $ 41,859 $ 61,662 $ 9,275 $ 120,036 Sales Tax(10°%) $ 4,186.00 $ 928.00 $ 5,114.00 Insurance (1.5%) $ 1,877.00 Bond (2.5%) $ 3,176.00 Fee (8%) $ 10,416.00 Lump Sum Total with Proposed Revisions $ 140,619.00 Upon your approval, we intend to make this change/addition immediately. If you have any questions please feel free to contact me. Sincerely, Chris Hobby Ellingson Contracting Director of Preconstruction Acceptance of Change Name 15 Signature Date In (32,/ From: Chris Hobby chris@eIIingsoncontracting.com Subject: RE: Woolsey Date: August 17, 2021 at 3:01 PM To: Aaron Ruby aaron@revivalarch.com, David Ellingson david@ellingsoncontracting.com Hi Aaron, For your consideration, please see the attached change order request for doors, windows, and porches on the Woolsey project. The proposal for $140,619.41 includes revisions to the plans and specs with a scope of work as follows: • Doors and windows include: o Six windows with Accoya lumber in lieu of River Recovered Pine o Two exterior doors with Accoya lumber in lieu of River Recovered Pine o $4,000 hardware allowance o Interior doors excluded • Front and Rear porches include: o Concrete foundations and installation of stone pilasters utilizing previously purchased stone stored on site o Floor framing with #2 treated yellow pine o Includes river recovered pine at the beams, rafters, and posts with markings to simulate hewing. Pricing includes rough cut members sized in dimensions per plans. o Includes rough sawn 3 -1/2 -in x 8 -ft pine boards at roof deck boards in lieu of Cypress deck boards o Includes river recovered T&G decking o Installation of remaining flashing and siding. Siding is stored on site. o Installation of previously purchased 18" cedar shakes o Steps at both front and rear porches o Hewing excluded o Handrail and ramps excluded Please let me know if the City of Fayetteville is interested in proceeding with this proposal. We would be happy to sit down and discuss items of concern. Thank you, Chris Hobby I Ellingson Contracting I Director of Preconstruction 479.644.2363 I chris@ellingsoncontracting.com Cellingson contracting CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2021-2025) Project Title: Woolsey Homestead Historic Restoration Division: Facilities Management (140) Funding: 4470 - Sales Tax Capital Improvement Category: Other Capital Improvements Rank: 1 Project #: 15008 Description: Project Cost 2021 $ 141,000 2022 150,000 2023 250,000 2024 200,000 2025 200,000 Total $ 941,000 This project is to reconstruct the Woolsey Homestead, surrounding outbuildings, and cemetery back to the 1840's era to allow tours and educational events. The overall project is to create a tourism, education, and historical preservation component. The property is in close proximity to the Woolsey Wet Prairie and trail system. In addition to the $941,000 funded in the 2021-2025 period, there is $50,000 requested in the unfunded list. Scheduled Implementation: Active Project 2021: Interior renovations 2022: Complete building exterior including rock chimney and fire place 2023: Reconstruction of the smokehouse and potato house 2024: Construction of barn and associated outbuildings 2025: Site improvements and gravel parking area. Effect on Operations: N/A Master Plan(s) Addressed: The City Council's Guiding Principles recommend "Educational, Research and Healthcare Excellence" and a "Fun City in Which to Live." Once completed, the restoration project will provide an educational and cultural experience offering a look at a mid -19th century farmstead in Northwest Arkansas. The homestead is located near trails and wetlands, providing a fun destination for all age groups. Restoring this structure also supports the initiative to provide "Well maintained City Infrastructure and Facilities." 59 NATURAL STONE FIREPLACE AND CHIMNEY GONFIC ORIG1,.,." ASSUMED LOCATION OF ORIGINAL WINDOW HORIZ 5" WD LAP SIDING OVER 2" X 4" ND STUDS AT 16" O.G.. TYP. @ PORCH ORIGINAL ND FLOOR NAS RANDOM WIDTH TBG (5"-7") OVER 2" X S" JOISTS @ 16" O.G. ORIGINAL STAIR TO LOFT ABOVE HORIZ 5" WD LAP SIDING OVER 3" X 4" WD STUDS @ 24-3O" O.G. 2" X 4" WD STUDS W/ 1" SHIP LAP ND FINISH EACH 51DE A RESTORATION OF THE 1843 WOOLSEY HOMESTEAD FAYETTEVILLE, ARKANSAS Allison Architects, Inc. 200 W. Capitol, Suite 1400 Little Rock, AR 72201 P: 501.376.0717 F: 501.376.1766 Left- Split rail fence (Reconstruction of 1840's era blacksmith shop in background) Right- Post & Rail fence Historic Arkansas Museum, Little Rock 221 N. East Ave. Fayetteville, AR 72701 P: 479.444.6972 F: 479.444.8197 i rr F 5 I. k V 'r )\\ i ' 4 1 17! Ie.•-�`''" fit!` � - �..t. i, III f I Tf ' ; ' .,.. V. LL'�.. Painting by Joseph M. Paret (1807-1872) 8/26/15 INTERPRETIVE POSSIBILITIES: PROPOSED FLOOR PLAN NORTH 1 SCALE: 1/8" = 1'-0" MODERN" RAMP & RAILINGS ROVIDING ADA ACCESSIBILITY 0 THE HOME FROM PAVED PATHWAY :ECONSTRUCTED SHED ADDITION ALL NEW WINDOW FRAMES, SASHES TO PERIOD ALL NEW DOORS, DOOR FRAMES & HARDWARE TO PERIOD DRIGINAL 1842-43 HAND HEWN WOOD FRAME TO REMAIN. NEW FRAMING LIKELY NECESSARY TO PERMANENTLY SHORE UP THE OLD FRAMING RECONSTRUCTED STONE CHIMNEY (NON-FUNCTIONING) ORIGINAL STAIRS TO REMAIN ALL NEW PORCH TO MATCH PERIOD 1.) CONSIDER COMPLETING THE INTERIOR OF THE WEST PEN, TO INCLUDE ALL FINISHES ON INTERIOR SURFACES, MANTLE, FURNISHINGS. THUS INTERPRETING THE WEST PEN AS A SNAPSHOT INTO HOW THE WOOLSEYS LIVED DURING PERIOD OF SIGNIFICANCE. 2.) CONSIDER EXPOSING THE ORIGINAL WOOD FRAME IN THE EAST PEN IN A MANNER THAT "PEELS AWAY" THE INTERIOR FINISHES AND EXPOSES THE BEST MORTISE & TENON JOINTS. THUS INTERPRETING THE EAST PEN AS A SNAPSHOT INTO CONSTRUCTION OF THE HOME. ALSO CONSIDER PEELING AWAY SOME SECOND FLOOR DECKING TO ALLOW VISITORS TO SEE REST OF FRAME FROM GROUND FLOOR LEVEL. 3.) CONSIDER MAKING THE SECOND FLOOR OFF LIMITS TO VISITORS. STAIRS ARE NOT PARTICULARLY SAFE, PLUS, OPENING THE SECOND FLOORTO SOME VISITORS INVITES QUESTIONS OF PROVIDVING EQUAL ACCESS TO THE DISABLED (ADA). """)OD SHAKE ROOF =W ROUGH SAWN )ARDS u Ii F c 1 )PROPOSED2 WALL SECTION SCALE: 3/411 = V-0" (8X6 TOP SILL OF JOISTS SET TO �L SLOPE 'OODTRIM. UNPAINTED YTHING SHOWN WITH SHADING IS ORIGINAL 34O'S AND TO BE KEPT 'ING T&G ATTIC ING TO REMAIN NAL ATTIC JOISTS :MAIN 4P SIDING. NTED IAL WOOD SHIPLAP )S TO REMAIN :EATER 2X FLOOR AND T&G DECK VOOD STUDS AAIN. INTERSPACE 'OOD STUDS WITHIN NG FRAME CE ORIG. WOOD ITH NEW TREATED STONE FOUNDATION JILT) iGRAPE 0 ti N >Q'N-QQ ) �w �vv Z )N- - U 4) o O 5..-N �o C QQo- 0 (Oti° C/)O M CO 0 o O o —IC) In Q No J LL w 20 LL w O(I) a z 2 z 0� LL Q Ow J J J w U w 0 w >- U - SHEET TITLE: PROPOSED FLOOR PLAN DATE: 2015.11.17 SCALE: DRAWN BY: ACR PROJECT NO: 340 SHEET NO.: A3.0 ,PROPOSED SOUTH ELEVATION RECONSTRUCTED STONE TO MATCH OPPOSITE. RECONSTRUCTED FRONT RECONSTRUCTED DOOR & FRAME TO PERIOD NEW STONE PIERS SCALE: 1/8" = 1'-0" PROPOSED NORTH ELEVATION NOOD SHAKE ROOF (THREE F USE #1 BLUE LABEL WESTER RED CEDAR OVER ROUGH SA' DECKING. NO UNDERLAYMEN RECONSTRCUTED WINDOW FRAME, SASHES TO PERIOD. SCALE: 1/8" = 1'-0" NEW LAP SIDING & FASCIA TRIM. I IMPAIMTFr) 2FFFI2 TO HIST()E'I(' PROPOSED EAST ELEVATION nHEATEINIn D"ATREARS H ED 2 "CHEATED" AT REAR SHED SCALE: 1 /8" - 1'-0" ADDITION TO MINIMIZE LENGTH OF NECESSARY ADA RAMP INtr 3. STONE RAIN 0 ti ('1 > !?' N- Q)) �w w Z ) N- N- - U - o U 5..- �o � � O QQo� O (0 (0 �/� NJ O M M j Q' O O O O - LU LU ON J !Z LL w 20 LL w O(I) a z 2 z 0� Q LL Q Ow J J w U 0 w mow/ L.L 0 >- U - SHEET TITLE: PROPOSED ELEVATIONS DATE: 2015.11.17 SCALE: DRAWN BY: ACR PROJECT NO: 340 SHEET NO.: A3.1 WOOLSEY HOMESTEAD RESTORATION CHANGE ORDER #4 City of Fayetteville Staff Review Form 2022-0337 Legistar File ID N/A City Council Meeting Date - Agenda Item Only N/A for Non -Agenda Item MATTHEW CABE 4/11/2022 FACILITIES MANAGEMENT (140) Submitted By Submitted Date Division / Department Action Recommendation: Approval of Change Order #4 to the contract with Ellingson Contracting in the amount of $13,725 for restoration of the Woolsey family cemetery plot. This change order includes cleaning and resetting the family marker and restoration of the decorative iron fence. This scope of work is funded by a grant from the Arkansas Historic Preservation Program (including City match) and project contingency. 1010.090.6600-5315.00 4470.090.8900-5315.00 Account Number 32103 15008.1 Project Number Budgeted Item? Yes Does item have a cost? Yes Budget Adjustment Attached? No Purchase Order Number: 2019-782 Change Order Number: Original Contract Number: 2019-52 Comments: Budget Impact: GENERAL FUND SALES TAX CAPITAL Fund AR Historic Preservation Woolsey Woolsey Homestead Historic Restoration Current Budget Funds Obligated Current Balance Item Cost Budget Adjustment Remaining Budget Project Title $ 323,091.00 $ 140,694.80 $ - 182,396.20 $ 13,725.00 $ 168,671.20 Previous Ordinance or Resolution # 253-21 Approval Date: 4-13-22 V20210527 CITY OF FAYETTEVILLE ARKANSAS TO: Mayor Lioneld Jordan THRU: Paul Becker, Chief Financial Officer Wade Abernathy, Director of Bond Projects and Facilities FROM: 'Matthew Cabe, Facilities and Building Maintenance Manager DATE: April 7, 2022 SUBJECT: Woolsey Homestead Restoration Change Order #4 STAFF MEMO RECOMMENDATION: Staff recommends approval of Change Order #4 to the contract with Ellingson Contracting for restoration of the Woolsey family cemetery plot. BACKGROUND: This change order includes cleaning and resetting the family marker and restoration of the decorative iron fence around the plot. This scope of work is funded by a grant from the Arkansas Historic Preservation Program, City matching funds, and project contingency. BUDGET/STAFF IMPACT: A Certified Local Government (CLG) grant plus City match is budgeted at $12,488 for this project. The remaining cost will be paid for from project contingency. Account Project Amount 1010.090.6600-5315.00 — Contract Services 32103 12,488 4470.090.8900-5315.00 — Contract Services 15008.1 1,237 TOTAL 13,726 Attachments: Change Order #4 Mailing Address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 PROJECT: A Restoration of the Historic Woolsey Farmstead OWNER: City of Fayetteville 113 W. Mountain St. Fayetteville, AR 72701 REVIVAL ARCHITECTURE P.O. Box 400 Scott, AR 72I42 50I.95I.33I6 www.revivalarch.com CHANGE ORDER FROM ARCHITECT: Revival Architecture, Inc. PO Box 400, Scott, AR 72142 TO CONTRACTOR: Ellingson Contracting 108 E. University St. Siloam Springs, AR 72761 CHANGE ORDER NO: 4 ISSUE DATE: March 9, 2022 CONTRACT DATE: Oct. 16, 2019 This Change Order is not valid until signed by the Architect, Contractor & Owner DESCRIPTION: The Contract is changed as follows: 1. ADD to contract restoration of the Cemetery, consisting of the fence and headstones, as described in Proposal Request ##3 dated 12121121, attached. The original Contract Sum was $ 329,299.00 The net change by previously authorized Change Orders $ 253,419.00 The Contract Sum prior to this Change Order was $ 582,718.00 The Contract Sum will be Increased / Per -reared by this Change Order in the amount of $13,725.00 The new Contract Sum including this Change Order will be $ 596,443.00 The Contract Time will be Increased /vkec'rea&ec/ wed by 60 days. The date of Substantial Completion as of the date of this Change Order therefore is: June 30, 2022 ATTACHMENTS: 1.) "Change Order Request #5, Revision 3 dated 8/31/21(1 page); 2.) Email from Chris Hobby dated 8/17/21(1 page) Revival Architecture, Inc. Ellingson Contracting City of Fayetteville ARCHITECT (firm name) CONTRACTOR (firm name) OWNER (firm name) PO Box 400 PO Box 7202 Scott, AR 72142 Siloam 5p4qgs, AR 72761 000, BY (signature) Mr. David Ellingson, Owner BY REVIVAL ARCHITECTURE P.O. Box 400 Scott, AR 72142 50I.95I.33I6 www.revivalarch.com Date: September 22, 202I Project: A Restoration of the Historic Woolsey Farmstead Subject: Cemetery Scope of Work To: Matthew Cabe, City of Fayetteville Cc From: Aaron C. Ruby, AIA, LEED AP Existing chain link fence shall remain in place until further notice. Keep locked at all times. Wrought Iron Fence & Gate a. All existing, original fence material shall remain. Discard none. Where possible, re -heat existing members to allow for some minor straightening out where severe bending or gaps are present. A perfectly square fence is not expected. Re -heating of existing members is expected to be minimal. i. Attempt re -heating on one select piece to determine the metal's capability in being bent in this manner. Relative brittleness of existing members is not known, but it is highly preferable to retain existing members to greatest extent possible and NOT replace with new. b. Fabricate new gate using new components matching existing (horizontal channels, vertical pickets). Assume a brace will be necessary. Use pintel type hinges that set into receiver pockets on hinge side. c. Replace missing pickets with new to match existing. d. Re -set existing braces e. No painting is anticipated. 2. Headstones a. Take note of locations of markers --do not move nor disturb. b. Reset headstone A by placing back onto base the toppled sections. Use type O mortar, lime based only, no cement. C. Headstones A, F, G, H are to be cleaned using Dawn detergent, potable water and soft brushes. Apply by hand and gently scrub. Rinse thoroughly. Pressure waters are not permitted. Harsher chemicals and cleaners may be permitted if difficult stains are present, but only accepted on case by case basis as permitted by the Architect. Remaining headstones -no work. 3. Grounds a. Remove/demo small trees and stumps shown in drawing to be removed. Take care not to damage adjacent materials. C ellingson contracting To CITY OF FAYETTEVILLE 113 W MOUNTAIN ST FAYETTEVILLE, AR 72701 Project: Woolsey Historic Renovation 535 E BROYLES RD FAYETTEVILLE, AR 72704 Change Order Request: Date: From: Ellingson Contracting PO Box 7202 Siloam Springs, AR 72761 Description of Proposed Change: Amount: $13,725.00 Cemetery Restoration Scope to include the following: 1. Repairs to existing iron fence. 2. Clean all existing headstones using D2 biological cleaner. 3. Resetting and leveling of large family marker stones. 4. Raking leaves and debris from trees inside chain link fence. Exclusions: - No new gate or finishing on iron fence. - No resetting of small marker stones. - No tree removal or stump removal. - No work to existing chain link fence. *** Work to be complete by May 13, 2022*"" If you have any other questions, please do not hesitate to contact me. Sincerely, Acce Ellingson Contracting By: A Title Dat( SHAWN ALEXANDER, Asst. Project Manager C 003 03/09/22 Page 1 of 1 i� N M EXISTING LARGE TREES AVE GROWN UP INTO IRON FENCING. TREES ARE TO REMAIN. � Sr rn F n ORIG. WROUGHT IRON FENCE IS SHOWN SQUARE FOR EASE OF DRAWING CEMETERY PLAN I SCALE: I/4" Sept. 22, 202I 36'-4" t r h ° DEMO TREES & STUMPS SHOWN WITH DASHED LINES r' r h I' i EXISTING GRAVE MARKERS. THIS CENTRAL MARKER HAS BEEN TOPPLED OVER. RESET INTO PLACE IN MORTAR. CLEAN HEADSTONE REVIVAL., ARCHITECTURE P.O. Box 400, Scott, Aft 72142 (501) 951-3316 tv-trriralatch.com t - ORIG. GATE IS MISSING S•_ 1 F'rajra N,vnr: A Reconstruction of the 1843 Woolsey Farmstead