Resolution: 250-21
File Number: 2021-0745
BUTTERFIELD TRAIL VILLAGE, INC. COST SHARE AGREEMENT:
A RESOLUTION TO APPROVE A COST SHARE AGREEMENT WITH BUTTERFIELD TRAIL
VILLAGE, INC. FOR BUTTERFIELD TRAIL'S REMOVAL AND RECONSTRUCTION OF A
PORTION OF DAMAGED CITY SIDEWALK ALONG OLD MISSOURI ROAD IN THE
AMOUNT OF $2,900.00 TO BE PAID BY THE CITY OF FAYETTEVILLE
WHEREAS, in the fall of 2019, the Development Services office received a request from Butterfield
Trail Village, Inc. for a new parking lot to be located along the west side of Old Missouri Road; and
WHEREAS, along with that new parking lot was the construction of a new sidewalk connection with
the public sidewalk along Old Missouri Road to existing private sidewalks on the Butterfield Trail's
site; and
WHEREAS, Butterfield Trail Village, Inc. has requested that the City share in the cost of removing
and reconstructing a portion of damaged City sidewalk along Old Missouri Road.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves and authorizes
Mayor Jordan to sign a cost share agreement with Butterfield Trail Village, Inc., a copy of which is
attached to this Resolution, for the removal and reconstruction of a portion of damaged city sidewalk
along Old Missouri Road in the amount of $2,900.00 to be paid by the City of Fayetteville.
Page 1 Printed on 10/20/21
Resolution: 250-21
File Number 2021-0745
PASSED and APPROVED on 10/19/2021
Attest:
-C)A'� G
Kara Paxton, City Clerk Treas�r�eS
Page 2 Printed on 10/20/21
City of Fayetteville, Arkansas 113 West Mountain Street
Fayetteville, AR 72701 (479) 575-8323
Text File
File Number: 2021-0745
Agenda Date: 10/19/2021 Version: 1 Status: Passed
In Control: City Council Meetinq File Type: Resolution
Agenda Number: A.4
BUTTERFIELD TRAIL VILLAGE, INC. COST SHARE AGREEMENT:
A RESOLUTION TO APPROVE A COST SHARE AGREEMENT WITH BUTTERFIELD TRAIL
VILLAGE, INC. FOR BUTTERFIELD TRAIL'S REMOVAL AND RECONSTRUCTION OF A PORTION
OF DAMAGED CITY SIDEWALK ALONG OLD MISSOURI ROAD IN THE AMOUNT OF $2,900.00 TO
BE PAID BY THE CITY OF FAYETTEVILLE
WHEREAS, in the fall of 2019, the Development Services office received a request from Butterfield Trail
Village, Inc. for a new parking lot to be located along the west side of Old Missouri Road; and
WHEREAS, along with that new parking lot was the construction of a new sidewalk connection with the
public sidewalk along Old Missouri Road to existing private sidewalks on the Butterfield Trail's site; and
WHEREAS, Butterfield Trail Village, Inc. has requested that the City share in the cost of removing and
reconstructing a portion of damaged City sidewalk along Old Missouri Road.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves and authorizes Mayor
Jordan to sign a cost share agreement with Butterfield Trail Village, Inc., a copy of which is attached to this
Resolution, for the removal and reconstruction of a portion of damaged city sidewalk along Old Missouri Road
in the amount of $2,900.00 to be paid by the City of Fayetteville.
City of Fayetteville, Arkansas Page 1 Printed on 10/20/2021
City of Fayetteville Staff Review Form
2021-0745
Legistar File ID
10/19/2021
City Council Meeting Date - Agenda Item Only
N/A for Non -Agenda Item
Jonathan Ely 9/17/2021 ENGINEERING (621)
Submitted By Submitted Date Division / Department
Action Recommendation:
Staff recommends approval of this cost share with Butterfield Trail Village, Inc. to pay $2,900.00 for removal and
reconstruction of damaged sidewalk along Old Missouri Rd.
Budget Impact:
4470.800.8820-5809.00 Sales Tax Capital Improvements
Account Number Fund
02116.1 Cost Share/ROW/Intersection/Street Calming
Project Number
Budgeted Item? Yes
Does item have a cost? Yes
Budget Adjustment Attached? No
Current Budget
Funds Obligated
Current Balance
Item Cost
Budget Adjustment
Remaining Budget
Project Title
$ 696,585.00
$ 257,860.24
$ 438,724.76
$ 2,900.00
435,824.76
V20210527
Purchase Order Number: N / A Previous Ordinance or Resolution # N/A
Change Order Number:
Original Contract Number:
Comments:
N/A
N/A
Approval Date:
P_ CITY OF
FAYETTEVILLE
ARKANSAS
MEETING OF OCTOBER 19, 2021
TO: Mayor and City Council
THRU: Susan Norton, Chief of Staff
Chris Brown, Public Works Director
CITY COUNCIL MEMO
FROM: Jonathan Ely, Development and Construction Manager
DATE: September 27, 2021
SUBJECT: Cost Share with Butterfield Trail Village, Inc. to remove and reconstruct a
portion of damaged city sidewalk in conjunction with their new parking lot project.
RECOMMENDATION:
Staff recommends approval of this cost share with Butterfield Trail Village, Inc. to pay $2,900.00
to remove and reconstruct a portion of damaged city sidewalk.
BACKGROUND:
In the fall of 2019, the Development Services office received a request from Butterfield Trail
Village, Inc. for a new parking lot to be located along the west side of Old Missouri Road. Along
with that new parking lot was a new sidewalk connection, to connection the public sidewalk
along Old Missouri Road, to existing private sidewalks on the Butterfield site.
DISCUSSION:
During construction and in preparation for completing the new sidewalk connection, it was
identified that the point of connection for the new sidewalk would occur in an area where the
existing city sidewalk had been damaged. The damage was caused either by tree roots or
expansion of the sidewalk and caused the sidewalk to heave up causing an irregular profile and
trip hazard. While the contractor could have simply connected to what was there, city staff
recommends a cost share with the developer to remove and replace these damaged sections of
city sidewalk to create an overall better pedestrian network and sidewalk that complies with
ADA.
BUDGET/STAFF IMPACT:
This project is funded by the Sales Tax Capital Improvements Fund
Attachments:
Contractual Agreement for Cost Share
Exhibit "A" Vicinity Map
Exhibit "B" Site Map
Mailing Address:
113 W. Mountain Street www.fayetteville-ar.gov
Fayetteville, AR 72701
CONTRACTUAL AGREEMENT FOR
COST SHARE OF SIDEWALK IMPROVEMENT COSTS
This Agreement, made and entered into on this it day of___________ l r 2021, by and
between the City of Fayetteville, Arkansas ("City") and Butterfield Trail Village Inc.
("Butterfield"), witnesseth:
WHEREAS, Butterfield has recently completed a new parking lot project along the west
side of Old Missouri Road; and
WHEREAS, the Butterfield development is required to provide a new sidewalk
connection from the public right of way and their site: and
WHEREAS, Butterfield has committed to completing these required sidewalk
improvements; and
WHEREAS, it is also necessary repair a section of existing city sidewalk to make a safe
and accessible connection: and
WHEREAS, the City of Fayetteville Engineering Division recommends a cost share to
pay for the removal and replacement of approximately 16ft of 8ft wide sidewalk to remove trip
hazards.
NOW, THEREFORE, the City of Fayetteville, Arkansas and Butterfield agree as follows:
1. The City of Fayetteville, Arkansas agrees to:
A. Reimburse Butterfield for $2,900.00 which represents the cost to remove and
replace approximately 16 linear feet of 8ft wide sidewalk as shown in Exhibit
"A", attached.
B. Payments due to Butterfield, shall be remitted within sixty (60) days after
receipt of valid invoices, and pending successful inspection and acceptance of
the completed work by the City of Fayetteville Engineering Division.
2. Butterfield agrees to:
A. Provide the necessary and normal project management, inspection, and testing
as necessary to complete the work shown on Exhibit "A", in accordance with
the City of Fayetteville Minimum Street Standards, and City Standard Details,
both of which are available at http://www.fayetteville-ar.gov/445/En ineering_
Specs -Details. .
B. Provide a copy of the invoices from the Contractor upon completion and City
approval of the street improvements described in Exhibit "A".
Page 1 of 2
C. Pay for the sidewalk improvements (with reimbursement of $2,900.00 of the
cost by the City of Fayetteville).
3. It is further understood that the contract for construction is between Butterfield and
their Contractor and that the City has no contractual obligation with either the
Contractor or any agent for Butterfield. The City's only obligation shall be to
participate in a contractual agreement with a not -to -exceed amount of $2,900.00 for
the sidewalk improvements.
IN AGREEMENT WITH ALL THE TERMS AND
SIGN BELOW:
BUTTERFIELD TRAIL VILLAGE INC
By.
,1✓fi1�/ %lA,,rnt// CG72
ATTEST:
t P -
ABOVE, WE
CITY OF FAYETTEVILLE,
ARKANSAS
ATTEST:
By: FAV'
Kara Paxton. Cit. Clerk = ErrEVILLE.
Page 2 of 2
EXHIBIT "A"
VICINITY MAP
Butterfield Trail
Village Parking
Lot
N
W E
S
Damaged
Sidewalk
EXHIBIT "B"
SITE MAP AND SIDEWALK REPLACEMENT
PARCEL:765-15677-EYLI J
OWNER: CBP REALTY
--
`- ---�
Oil ' _:E LEVEL ----R2,
LANDING ❑
_LC
LIV 010
R75' R75'
_ 20' SIDE SETBACK
R20'
5, g, 5
_ a'a, _
��
4. S' RANSIIION
� 'rPAI'VL,
r
FARGO -�lID
)
LL
_
ua
1B ..---/
RID
___—
---
__
0 20' 3D'1i]'
--
New sidewalk
<<��
-- ------�`` t r�� t
7
� y
y
____
__ __________ L LI± J SCALE IN FE.T
13iz�'::::.:
by Butterfield
d -------------
1/DRIVEWAY REMOVAL AND
may` - : .::.:....'
+
`
RCYCLE PARKING
+ { + REP1ACMEVT ONNECTION
OAK
ODOR' 018
+ TD DRPJh AGF
.
r P NEAREST =. iT
_ -- ;.�; •
VENT O
�
RIO' . ' �+
- -3
• �'�-�
Area of proposed
L. I
:...:.:.::'.
.,..:.. •,
removal and
J
J
_:_:__ ___ _
REPLACED FBROKENj;
damaged sidewalk (see
-
{TYP, ole
picture below)
�
J
OLD MISSOURI RD