Loading...
HomeMy WebLinkAbout236-21 RESOLUTION113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 Resolution: 236-21 File Number: 2021-0732 NABHOLZ CONSTRUCTION CORPORATION CHANGE ORDER NO. 7: A RESOLUTION TO APPROVE CHANGE ORDER NO. 7 TO THE CONTRACT WITH NABHOLZ CONSTRUCTION CORPORATION IN THE AMOUNT OF $109,156.32 FOR WATER AND SEWER RELOCATIONS ALONG GREGG AVENUE AND IN THE FAY JONES WOODS, AND TO APPROVE A BUDGET ADJUSTMENT - 2019 CULTURAL ARTS CORRIDOR BOND PROJECT WHEREAS, Change Order No. 7 will include the relocation of water and sewer lines along Gregg Avenue and a sewer line in the Fay Jones Woods as part of the Cultural Arts Corridor Project. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves Change Order No. 7 to the Construction Manager at Risk Services Contract with Nabholz Construction Corporation, a copy of which is attached to this Resolution, in the amount of $109,156.32 for water and sewer relocations along Gregg Avenue and in the Fay Jones Woods as part of the Cultural Arts Corridor Project. Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment, a copy of which is attached to this Resolution. PASSED and APPROVED on 10/5/2021 Page 1 Printed on 10/&21 Resolution. 236-21 File Number: 2021-0732 Attest: G� ,R K .`��y'•• OTY27 '•.y''. •G = FAYE�EVktc- Kara Paxton. CityClerk Treasurp��, c CO, Page 2 Primed on 1016121 City of Fayetteville, Arkansas 113 West Mountain Street Fayetteville, AR 72701 (479)575-8323 Text File File Number: 2021-0732 Agenda Date: 10/5/2021 Version: 1 Status: Passed In Control: City Council Meetinq File Type: Resolution Agenda Number: A.4 NABHOLZ CONSTRUCTION CORPORATION CHANGE ORDER NO. 7: A RESOLUTION TO APPROVE CHANGE ORDER NO. 7 TO THE CONTRACT WITH NABHOLZ CONSTRUCTION CORPORATION IN THE AMOUNT OF $109,156.32 FOR WATER AND SEWER RELOCATIONS ALONG GREGG AVENUE AND IN THE FAY JONES WOODS, AND TO APPROVE A BUDGET ADJUSTMENT - 2019 CULTURAL ARTS CORRIDOR BOND PROJECT WHEREAS, Change Order No. 7 will include the relocation of water and sewer lines along Gregg Avenue and a sewer line in the Fay Jones Woods as part of the Cultural Arts Corridor Project. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves Change Order No. 7 to the Construction Manager at Risk Services Contract with Nabholz Construction Corporation, a copy of which is attached to this Resolution, in the amount of $109,156.32 for water and sewer relocations along Gregg Avenue and in the Fay Jones Woods as part of the Cultural Arts Corridor Project. Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment, a copy of which is attached to this Resolution. City of Fayetteville, Arkansas Page 1 Printed on 101612021 Wade Abernathy City of Fayetteville Staff Review Form 2021-0732 Legistar File ID 10/5/2021 City Council Meeting Date - Agenda Item Only N/A for Non -Agenda Item FACILITIES MANAGEMENT (140) Submitted By Submitted Date Division / Department Action Recommendation: 9/15/2021 Staff Recomends approval of Change Order #7 to RFQ 18-11 Contract with Nabholz Construction for Water and Sewer Relocate at Gregg Avenue in the amount of $75,325.78 and Relocation of 8" Sewer line in Fay Jones woods in the amount of $33,830.54 for a total amount of $109,156.32 and approve a Budget Adjustment. Budget Impact: 5400.860.5700-5815.00 Water/Sewer Account Number Fund 11011.2019.7800 W/S Relocations - 2019 Bond Issue Projects, Arts Corridor Improvements Project Number Budgeted Item? Yes Does item have a cost? Yes Budget Adjustment Attached? Yes Current Budget Funds Obligated Current Balance Item Cost Budget Adjustment Remaining Budget Project Title $ 10,492,801.00 $ 9,967,745.20 525,055.80 $ 109,156.32 $ 75,332.00 $ 491,231.48 V20210527 Purchase Order Number: 2020-00000689 Previous Ordinance or Resolution # 223-20 Change Order Number: 7 Original Contract Number: 2018-00000042 Approval Date: Comments: Budget Adjustment amount reflects an existing $33,835 already available. CITY OF FAYETTEVILLE ARKANSAS MEETING OF OCTOBER 5, 2021 TO: Mayor and City Council THRU: Susan Norton, Chief of Staff Paul Becker, Chief Financial Officer Tim Nyander, Utilities Director CITY COUNCIL MEMO FROM: Wade Abernathy, Director Bond Construction Projects DATE: September 7, 2021 SUBJECT: Approval of Change Order #7 to RFQ 18-11 with Nabholz Construction for water and sewer line relocations for the Cultural Arts Corridor project RECOMMENDATION: Staff recommends approval of a change order with Nabholz Construction for additional water/sewer line replacement work necessary on Gregg Avenue in the amount of $75,325.78, and Sewer line replacement in Fay Jones Woods in the amount of $33,830.54. For the total change order amount of $109,156.32. BACKGROUND: Phase 1 of the Cultural Arts Corridor project included $718,585.00 of water and sewer line reconstruction and relocation. Much of this work was located along West Avenue, with a smaller portion on Gregg Avenue, west of the Fay Jones park land. The intent of the utility scope was to replace old lines in order to prevent future disturbances to the streetscape improvements with typical repairs on aging lines. Work planned on Gregg Avenue included 310-feet of sanitary sewer reconstruction and 270-feet of waterline reconstruction. There was no work planned for sewer relocates in Fay Jones Woods. DISCUSSION: During construction it was found that the sewer along Gregg Avenue would be in conflict with an existing natural gas line and would also impact many mature trees in adjacent property owners' yards. City Staff, Olsson Engineers, and the contractor met onsite to consider alternatives. The sewer is now planned to be constructed in the roadway, away from the gas line and trees. However, this will require the waterline to also be reconstructed for approximately 170-feet in order to maintain proper heath code separation distances from the sewer. The existing waterline is aging 6-inch cast iron and will benefit the utility to be replaced with 8-inch PVC. The sewer line in Fay Jones Woods was a sleeved clay pipe system that conflicted with the overlook structure. The relocation allows access for future maintenance. The line consist of approximately 80' of 8" SDR and 3 manholes. Mailing Address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 BUDGET/STAFF IMPACT: Funds are available in the Water/Sewer Relocations — Bond Projects account. Attachments: Nabholz Change Order Engineering Plans Prime Contract Change Order Fayetteville Cultural Arts Corridor Project C 02-19-2526 Nabhotz Construction Corporation 113 N! Mountain St Tel Fax Fayetteville, AR 72701 Date: 9/1 S12021 To Contractor: Nabholz Construction Corporation 3301 N 2nd St (72756) PO Box 27, Rogers, AR 72757 The Contract is hereby revised by the following items: PCO Description 045 Water and sewer changes This change order incorporates Change Order Request 33 Architect's Project No: Contract Date: 411 W2018 Contract Number: 02-19-2526 Change Order Number. 007 The pricing is based on the following: 1.) Oelke related costs for RR #50 to relocate the water and sewer along Gregg Avenue 2 ) Reroute 8" sewer at the Overtook per RFI 19 response Amount $109,156 32 The original Contract Value was.. ............... . ......................................... . .......... ......... ................. ............. $80,000 00 Sum of Changes by prior Prime Contract Change Orders...,.,..... — .... ....... ...................................... _..................... -...— $11,757,201 00 The Contract Value prior to this Prime Contract Change Order was ... ........ ............ ........... .......... ............................... _... $11,837,201 00 The Contract Value will be changed by this Prime Contract Change Order in the amount of ............ ........ .-............ .. $109,156 32 The new Contract Value including this Prime Contract Change Order will be...........:_... ........................... .............-........ $111,941111,357.31 The Contract duration will be changed by ......... ....... _.................... ...... .......... . ... ,................ .-..__ ..--_................. ..,.__-- 0 days The revised Substantial Completion date as of this Prime Contract Change Order is ................. ... _............................ - tZ W2021 Nabholz Construction Corporation CONTRACTOR 3301 N 2nd St (72756), PO Box 277 Ro4ern, AR 72751 Address BY Josh Lane SIGNATURE DATE MINIM City of Fayetteville OVIMER 113 W Mountain St. Fayetteville, AR 2701 Address BY SIGNATURE _ DATE 10 - !�—L • Z% PROJECT CONFIDENTIAL Property of .VAtshatz Constntctioa Corporation Not for Duplication or Distribution This document includes data prepared in conjunction with the Project that is deemed trade secret or proprietary to Nabhob:. This document is shared with the Project ten. solely ror au an Ibis Project consistent with the responsibilities of the Project team. The Recipients shail not duplicate, use, er disclose, in whole or in part, to any person, entity, or party ontside the Project team without Nabholz' prior written authorization. Prolog Converge Printed on: 9/1512021 Nabholz Page 1 Change Order Request NCC-Detail (with Breakdown of PCOs), Grp by Each 1zNumber -Confidential Fayetteville Cultural Arts Corridor Project # 02-19-2526 Nabholz Construction Corporation 113 W. Mountain St. Tel: Fax: Fayetteville, AR 72701 To: Wade Abernathy From: Josh Lane City of Fayetteville Nabholz Construction Corporation 113 W. Mountain St. 3301 N 2nd St (72756), PO Box 277 Fayetteville, AR 72701 Rogers, AR 72757 PROJECT CONFIDENTIAL Property of Nabholz Construction Corporation Not for Duplication or DistributionThis document includes data prepared in conjunction with the Project that is deemed trade secret or proprietary to Nabholz. This document is shared with the Project team solely for use on this Project consistent with the responsibilities of the Project team. The Recipients shall Description Category Status Gregg Street Utility Relocation Approved Reference Required By Days Req Amt Req 9/22/2021 0 109,156.32 Notes PCO No Date Reference Amt Prop Days Req Category Reason Description Notes 045 9/15/2021 109,166.32 0 Gregg Street Utility Relocation Item No Item Description Amt Prop Reference 001 Oelke related costs for RFI #50 to relocate the water 75,325.78 and sewer along Gregg Street. 002 Reroute 8" Sewer at Overtook per RFI 19 33,830.54 Approved By: Signature Name Date Oelke Construction Co. -Change Order Request Job Name: Fa}ctte,61le Cultural Arts Cor. Requested Days 30 Price Good For 10 Mys Change Order Request # 20R Date: 11-Aug-21 Description of Request: RFI #50 - Demo and Sewer Line at S Gregg .k e Description Material & Labor Quantity Unit Cost Unit Material Cost (fours T3 pe of Crew Man-hour Cost 8' \\'atcr Main 170 if S 3970 If S 6,74900 240 hr D IN S 6,24000 Add Water Meters 4 ea S 1,50000 ca S 6,00000 0 hr. hr S Cold Mix 30 ton S 166.67 ton S 5,00000 0 hr hr S Saw Cuumg drivewa • repair I Is S 6,77800 Is S 6,77800 0 hr hr. S Install drop 1 Is S 2,82000 Is S 2,82080 0 hr by S Street Plates 1 Is S 8.30800 Is 5 8,308.00 0 IV hr S Labor for cold mix and plates I Is I S 2,500.00 1 Is IS 2,50000 0 hr I hr. I S Full depth class 7 base 1 Is 5 14,644.00 Is 5 14,644.00 0 hr to S od l[aul Off 1 Is S 4,500.00 Is S 4,500.00 0 hr hr I S %III Backhoe 10% 1 Is I S 5,667.20 1 Is S 5,667.20 0 hr hr.I S 3UTERWLSUBTOLAL S 62,967.00 LABORSLCBfOTAI. S 6,240W TAX AS APPLICABLE 0 00% S LABOR BURDEN 12% S 748 80 CCCs' JIATERL\L TOTAL S 62,967.00 LABOR TOTAL S 6,98d.80 SUBCONT R \CCORS Description Sub Pricing S S S S S S Subcontractor Total I r S CREW BRILKDOWN n T e Cost Hr )perator A S 5000 2 Carpenters B S 60.00 or Operator C S 40.00 taxer / Flaggers D S 2600 OCC Direct Cost Description Quantity Unit Cost Unit Material Cost Hours Rate Labor Cost pful"tManager 0 S 0 SOW I hr S 42 91 hr S 42.91 Superintendent 0 0 S 0 50.00 24 hr S 42.91 to S 1,029.94 O%crtime Pav 0 0 S 0 50.00 enter ves, no 0 # Ves no error K Weeldy Clean Up Ex sedum ster 0 0 S 0 $0.00 0 hr S hr S Estintating & Cost Anala9s 0 0 S 0 5o.00 0 hr. S hr. S field Office E nse 0 0 S 0 SO 00 0 S S Jobsite TelephoneFax 0 0 S 0 SO.00 0 I S S Gas, Oil, Maintenance Ex nse 0 0 S 0 S0.00 0 S S Ternporary Utdiues 0 0 S 0 SO 00 0 S S Material Hand1mg 0 0 S 0 $000 0 hr. S hr S Pertnits, Licenses, Foes, Dues 0 0 S 0 SO.00 0 0 S S Revised as Built Drawings 0 0 S 0 S0.00 0 hr. 5 hr. S Safetv Expense 0 0 S 0 S0.00 0 hr S hr S Travel Pay Expense 5) Men 0 0 S 0 SO.00 0 hr. S hr 1 S Subsistence Expense 5) Men 0 0 S 0 50.00 0 S S truck Ex 0 0 S 0 S0.00 0 S S fool Expense 0 0 S 0 SON 0 S S 0 0 S 0 $0.00 0 S S .%L%TLRL%f,SUB1OFALj TAX AS APPLICABLE 0.00% CCCs'NIXTEREALTOTALI S LABOR SUBTOTALI S 1,072.73 LABOR BURDEN 0% S LABOR TOTAL S 1,072.73 S S OCC Material Total S 62,967 00 OCC's Labor Total S 6,98980 OCC Direct Cost Total S 1,072 75 Subcontract Total $ - SUBTOTAL S 71,028.55 OCC's Insurance it 1,00on S _ 710.29 OCCs' Bond a 0.00% S - Change -Order Fec it 5 00°0 $ 3,586.94 OFLKF TOTAL FOR CIIANGF S75,325.78 Clarifications to Chan Owner's 5ignant Change Order Request NCC-Detail (with Breakdown of PCOs), Grp by Each Number -Confidential Fayetteville Cultural Arts Corridor Project # 02-19-2526 Nabholz Construction Corporation 113 W. Mountain St. Tel: Fax: Favetteville. AR 72701 Change Order Request: 010 Date: 4/1912021 To: Wade Abernathy From: John Strack City of Fayetteville Nabholz Construction Corporation 113 W. Mountain St. 3301 N 2nd St (72756), PO Box 277 Fayetteville, AR 72701 Rogers, AR 72757 PROJECT CONFIDENTIAL Property of Nabholz Construction Corporation Not for Duplication or DistributionThis document includes data prepared in conjunction with the Project that is deemed trade secret or proprietary to Nabholz. This document is shared with the Project team solely for use on this Project consistent with the responsibilities of the Project team. The Recipients shall not duplicate, use, or disclose, in whole or in part, to any person, entity, or party outside the Project team without Nabholz' prior written authorization. Description Category Status Reroute Sewer at Overlook In Negotiation Reference Required By Days Req Ant Req RFI #19 4/26/2021 0 0.00 Notes PCO No Date Reference Amtproo Days R_eq Cateaanr Reason Description N otes 017 4/19/2021 RFI #19 Reroute Sewer at Overtook 0.00 0 Change Order Field Condition The city has requested the sewer to be rerouted out from underneath the overlook structure. Item No Item Description Amt Prop Reference 001 Reroute Sewer 33,412.88 002 SDI Insurance 417.66 003 Construction Contingency (33,830.54) Approved By: Signature Name Date Oelke Construction Co. -Change Order Request Job Name: Change Order Request # Date: Description of Request: Fayetteville Cultural Arts Cor. Requested Days 5 14-Apr-21 RFI#19 New sewer per U2.06 - Deduct valve U1.06 10 Price Good For 10 Days Description Material d Labor Quantit • Unit Cost Unit Material Cost [lours Tv a o(Crc% Man-hour Cost Provide and Insult Manholes 3 ea S 7,47690 ea S 22,430 70 0 hr hr S Providc and insult SDR 20 8" 79 If S 7300 If S 5,76700 0 hr hr S Deduct- 8" lee a,16" valve 1 Is S 1,596 OU Is S 1,586 00 0 hr. hr S Al Profit,'Overhead 1 % S 2,49230 S S 2,49230 0 h. hr S 0 S S 0 hu hr. s 0 S S 0 hr. hr. S NUTERIALSUBTOTAL S 29,10400 LABOR SUBTOTALI S TAX AS APPLICABLE ObO% S LABOR BURDEN 12% S CCCs' NIATERLU, TOTAL S 29,104.001 LABOR TOTALI S SUBCO]TK%CTORS Description Sub Pricing S - 5 s S S S Subcoetractor Iota] $ CREW BRYANDOW N" Type Cost, M Operwr VE4uipment A S 50.00 2 Cxpcnwfs B S 60.00 Cupewr or Operator C S 30.00 Laborer D S 20.00 OCC Direct Cost Description Quantity Unit Cost unit Material Case Doun Rate Labor Cost ProjoctManager 0 S 0 SO.00 2 hr. S 42-91 hr. S 85.92 superintea&nt 0 0 S 0 S0.00 12 hr S 42.91 hr. S 51492 Overtime Pa • 0 0 s 0 SO.00 erns yes no 0 0 •es'no error h WevEy Clean Up Expense-durapster S 0 SO 00 0 hr. S hr S Estunating & Cost Analysis 0 0 s 0 SO.00 0 hr. S hr S Field Office Expense 0 0 S 0 SO.00 0 s S Jobsite T Fax 0 s $000 0 S S Gas Oil, Maintaunce Expense 0 S SO.00 0 S S Tanpormy U61ities 0 0 S 0 S000 0 S S Material Handling 0 0 s 0 SO.00 0 hr. S hr. S Pemrits, Licenses, Fens, Dues 0 0 $ 0 s0.00 0 1 0 S S Rcviscd as Built Drain s o 0 S 0 SO.00 0 hr S hr, S s2fely Expense 0 0 S 0 s0.00 0 h S tw S Travel Pay Expense 5 Wen 0 0 S 0 SO.00 0 hr s hr. S Subsistence E nse 5 Men 0 0 s 0 $0.00 0 S S Truck Expense 0 0 S 0 S0.00 0 S s Tool Evpcnsc 0 0 s 0 S0.00 0 s S 0 0 s 0 S0.00 0 S S 0 0 S 0 Woo 0 5 S 0 0 S 0 so OO 0 S S 0 0 S 0 $0.00 0 S S 0 0 5 0 1 $0.00 0 1S S MATERIAL SUBTOTALI TAX AS APPLICABLE 0.00".1 CCCs',NIATERL%LTOTAI.1 S LABORSUBTOTALI LABOR BURDEN 12% LABORTOTALI S 600.74 S FS 72.09 S S 67L83 OCC Material Total $ 29,104 00 OCC's labor focal S - OCC Direct Cast total S 672.83 Subcontract Total S SUBTOTAL S 29,776.83 CXC's Insurance .0 1.00% S 297.77 OCCs' Bond'n 1.0000 $ 300.75 Change -Order Feed 10.0000 S 3,037,53 OF.LKE TOTAL FOR CIIAV;L S33,412.88 Clarifrcations to Ch, Owner's Si,na City of Fayetteville, Arkansas - Budget Adjustment Form (Legistar) Budget Year Division Adjustment Number Non -Departmental (800) 2021 /Org2 Requestor: Kevin Springer BUDGET ADJUSTMENT DESCRIPTION / JUSTIFICATION: Staff Recomends approval of Change Order #7 to RFQ 18-11 Contract with Nabholz Construction for Water and Sewer Relocate at Gregg Avenue in the amount of $75,325.78 and Relocation of 8" Sewer line in Fay Jones woods in the amount of $33,830.54 for a total amount of $109,156.32 and approve a Budget Adjustment. Budget is already available within the W/S Relocations for Bond Projects captial project. RESOLUTION/ORDINANCE COUNCIL DATE: 10/5/2021 LEGISTAR FILE ID#: 2021-0732 KP,vLwSpr � 911512021 4:11 PM Budget Director Date TYPE: D - (City Council) JOURNAL #: GLDATE: CHKD/POSTED: TOTAL Account Number - - Increase / (Decrease) Expense Revenue Proiect.Sub# Project Sub.Detl AT v.20210831 Account Name 5400.860.5700-5815.00 109,157 - 11011 2019.7800 EX Improvements - Sewer 5400.860.5700-5815.00 (33,835) - 11011 2019.7800 EX Improvements - Sewer 5400.720.5600-5808.00 (75,322) - 11011 1 EX Improvements - Water Line H:\Budget Adjustments\2021_Budget\City Council\10-05-2021\2021-0732 BA Arts Corridor C07 - WS.xlsm 1 of 1 ill N O N C- U N 0 Z i 0 N 00 O I LO O N 0 N I Z Q V� IL / 3 / 4- a� a- Ln 0 H / Q U 0 Q / .N 0 0 / O N Cb 0 / O O O cY D V / N 00 O N / 0' 5' 10' 20' SCALE IN FEET EXISTING f CLAY @ iRTIV MCTIV In In Lq N N 7 cR cV cD V Cq N 00 004 04N 0)N +� II +� II +— II V)Z O O Z O o z 0 I �» N I�» Q» It NZZ � NZZ NZZ 1300 1300 1295 1295 / EXISTING GRADE / 1290 1290 26 PVC I CLAY C �Fa / / % 6 Pvc 1285 6 1285 I —INCH 7.92% 1280 1280 1275 1275 LOr- d'rLO d'0 N NLO N� �c0 N� �00 CN p�� NN �� CN �LO NN A r l r l r A r ! r 29+90 30+00 30+89.03 8—INCH 7.92% v 0' 5' 10' 20' SCALE IN FEET GENERAL SANITARY SEWER NOTES: 1. ALL SEWER CONSTRUCTION AND MATERIALS SHALL CONFORM TO CITY OF FAYETTEVILLE'S 2017 EDITION — "STANDARD SPECIFICATIONS FOR DESIGN AND CONSTRUCTION OF WATER LINES AND SEWER LINES" 2. CONTRACTOR SHALL SEQUENCE CONSTRUCTION OF WATER AND SEWER IMPROVEMENTS TO MINIMIZE SERVICE INTERRUPTIONS 3. FIELD VERIFY EXISTING SEWER SERVICE LOCATIONS. LOCATIONS SHOWN ARE APPROXIMATE BASED ON BEST AVAILABLE INFORMATION. 4. NEW SEWER LATERALS (S15) SHALL BE PROVIDED FOR ALL EXISTING CONNECTIONS IN THE PROJECT AREA. PROVIDE MINIMUM SERVICE SIZE OF 4" U.N.O. AND CONNECT TO EXISTING SERVICE BEYOND SIDEWALK. PROVIDE CLEANOUT (S17) LOCATED 18" FROM EDGE OF SIDEWALK. NEW SERVICES ARE SHOWN ON PLAN ARE OFFSET FROM EXISTING SERVICE FOR CLARITY 5. PROVIDE STEEL ENCASEMENT (S21) ON ALL SEWER AND SEWER LATERALS CROSSING PAVERS OR BIORETENTION. STEEL ENCASEMENT SHALL EXTEND MINIMUM OF 3' BEYOND PAVERS OR BIORETENTION. 6. WATER VALVE LIDS AND MANHOLE COVERS SHALL BE ADJUSTED TO NEW GRADE IN ALL SCOPE AREAS OF THE PROJECT, TYPICAL. NELSON BY RDNo W O L T Z L A N D S C A P E ARCHITECTS 310 East Market Street Charlottesville VA 22902 T 434.984.1358 F 434.984.4158 www.nbwla.com flintlock ARCHITECTURE & LANDSCAPE olsson Nitsch Engineering T I L L E T T LIGHTI N G DESIGN A S S O C I A T E S FNSMAENGINEERING Hines Inc SITE WATER ENGINEERING SERVICES NO. Date Issues/Revisions 1 1 1-30-18 SD PRICING 2 07-05-19 75% D D 3 09-20-19 100% D D 4 02-07-20 50% CD 5 04-03-20 90% CD 6 04-24-20 100% CD 7 09-18-20 REV# 1 /ASI# 1 STAMP PROJECT NAME Cultural Arts Corridor Fayetteville, Arkansas 100 CONSTRUCTION DOCUMENTS PROJECT NO.: FVL1814 DRAWN BY: ELH/ZW/CJK CHECKED BY: CBD DRAWING TITLE SEWER LINE IMPROVEMENTS PLAN AND PROFILE DATE: SEPTEMBER 18, 2020 SCALE: 1 " = 10' DRAWING NUMBER U2,III06 O PROTECT EXISTING METER SETTING —old EXISTING 6" DIAM. CIP AND VAULT _ E;t—_ SD PRO — r — R-awE W \ W — W \ w I \ \ \ w 40 GAS � GAS \ \v' `` GAS \ TERMINATE WITH MJ CAP AND ANCHOR - - G GA COLLAR G — _ — G— SINGLE STICK OF PIPE (DIP) — — — FOR FUTURE CONNECTION G _ e I RO 0—WW ; \ I R W — \ \ \ \ ®\R I \ ROW I \ I 0 \ FURNISH AND INSTALL- 8" TEE, 8" GATE VALVE \ l SS GENERAL WATER NOTES: 1. ALL WATERLINE CONSTRU( CITY OF FAYETTEVILLE'S FOR DESIGN AND CONSTRUCTION OF WATER LINES AND SEWER LINES" 2. CONTRACTOR SHALL SEQUENCE CONSTRUCTION OF WATER AND SEWER IMPROVEMENTS TO MINIMIZE SERVICE INTERRUPTIONS. 3. ALL WATER SERVICE LINES, FROM MAIN TO METER, SHALL BE REPLACED IN AREA OF WATER MAIN REPLACEMENT. NEW METERS SHALL BE PROVIDED WHERE NOTED. 4. WATER SERVICE LINES SHALL BE SLEEVED UNDER ROADWAY AND LID FEATURES, SIMILAR CITY DETAIL W12. 5. ALL NEW PVC, 4-INCH TO 12-INCH, SHALL BE AWWA C900 DR 14. 6. ALL FITTINGS FOR PVC SHALL BE "FULL BODY" FITTINGS AND SHALL BE RESTRAINED. 7. ALL BOLTS AND FITTINGS FOR VALVES, FITTINGS AND RESTRAINTS SHALL BE STAINLESS STEEL (SP. 4000/2.14/A) 8. MINIMUM LENGTH OF A CUT SECTION OF PIPE SHALL BE FIVE (5) FEET. (SP. 4000/2.01 /F AND 4000/2.03/D) 9. WATER VALVE LIDS AND MANHOLE COVERS SHALL BE ADJUSTED TO NEW GRADE IN ALL SCOPE AREAS OF THE PROJECT, TYPICAL. 10. UPON REQUEST, ALL WATER MATERIALS NOTED TO BE REMOVED SHALL BE SALVAGED AND DELIVERED TO THE WATER/SEWER OPERATIONS AT 2435 INDUSTRIAL DRIVE. SALVAGED ITEMS SHALL INCLUDE BUT NOT LIMITED TO METER YOKES, METAL LIDS, FIRE HYDRANTS, VALVES, AND FITTINGS. 11. ALL NEW WATERLINE UNDER PAVEMENT SHALL HAVE FULL DEPTH GRANULAR BACKFILL ACCORDING TO DETAIL W2 - WATER TRENCH (UNDER PAVEMENT) 12. PER AWWA C605, TRACER WIRE SHALL BE INSULATED FOR PROTECTION FROM CORROSION AND BE AT LEAST 12 GAUGE OR LARGER. E n 4' 0- 0 co 0 N O 2 1 0 Q 0' N N > 0' 5' 10' 20' SCALE IN FEET 3 O N 00 0� 00 O I 0 Ln / 3 3 / N N V) Ln H Q U 0 Q 1-11 C_ .N N O O Iq 10 N ob 0 / O O O (y) O L0 N 1-11 00 O N 308 Ss Ss Ss ss BEGIN LINE 2 FURNISH AND INSTALL PROTECT EXISTING 6" TAPPING SLEEVE AND VALVE METER SETTING 8"X6" REDUCER 303 AND VAULT o CUT, CAP, AND ABANDON- Row EXISTING 6-INCH CIP nw �u _SD — —L _ R0- _C- _---- --_ L METER SETTING - Row _ SHALL HAVE 1" TAP-_ \ i AND SERVICE LINE \ U.N.O., TYPICAL \ W \ W W \ cn \ �(\ ( \ \ \ W \ 41 w 00 \�t S GREGG AVE. W - ROW OW RO _ RO R �� ss \ 1275 o� I c� FURNISH AND INSTALL 8" 45 BENDS D I� \ 61I-- �0 I \ \ 4 \ 1 FURNISH AND INSTALL \ 8"X6" TEE AND 6" 1 \ GATE VALVE TJ q\ O \ O OS + OS / I , o° l s � SS _ Ss COO) \ \ Ss I _CIO, o \ FURNISH AND INSTALL — — — 16" STEEL CASING — — CENTERED UNDER SEWER — FURNISH AND INSTALL 19. 4 _ — -TWO (2) 8" 45° BENDS WITH 24" COUPLING — FURNISH AND INSTALL ^\ \\\ 8 X6 TEE AND 6 FURNISH AND INSTALL — GATE VALVE — — \ - \ 8 X6 TEE AND 8 , LINE NO. 2 — PLAN AND PROFILE — \� GATE VALVE' \— \ 0' 5' 10' 20' SCALE IN FEET CUT, CAP, AND \ ABANDON 6" WATERLINE \ FURNISH AND INSTALL 6" TAPPING SLEEVE AND VALVE \\ �r \ EXISTING 6" CIP I\ WATERLINE \ SD SD SD SD—SD- — SD SSO ROW - + CN TERMINATE WITH MJ CAP AND ANCHOR COLLAR Ci \ \ � SINGLE STICK OF PIPE (DIP) FOR FUTURE CONNECTION � T _� FULL DEPTH � AGGREGATE BACKFILL Cn EXIS ING GRADE UNDER ROADWAY, >_ TYPICAL rr o �Jo o � 1280 Q 12 �vov ovJ o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0< 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 + c7 O o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 H x Z 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 � .-•.o 0 0 0 0 0 0 0 0 0 0 127 C FINISHED GRADE 127 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8 PVWA1ER��NE END — r Oo 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 V 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 00 000000000 000000 00000000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 00000000 000000 �00000000 0 1270 1270 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 � o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 0 0 0 0 0 o w o 0 0 0 0 0 0 0 0 0 0 0 4 0 0 0 0 0 0 0 o c ao Z�jo 0 0 0 0 0 0 0 0 0 0 0 m x o 0 0 0 0 0 0 0 0 0 0 0 0 z z m m — � � z c� m m G-) Zu Zu D < < cn n m m C -A >r 1265 1265 U)U) —i —i D(/) Dcn DD mcn zpD zpD DN zm ZD pD OD Or\j + O� zm z� Z -i Z -i z � I z� �� v z� J N I m0D oD D D + D PQ Z �,j -0 > zm D 00 0 m W+�+ (A +D D m + rW N mym P. Dr�NN o r y W ,Cn N� m m F_rn r� r O F-� N C ° N C C_3i C_Ji N 000 _T1 �Z7 ��7 X� C>1C p� D D ._l °� X � X T1 00 C co U)C O') C s� Z Z a)Z UD Wz W:U =Z7 m— N r�cn m= m m zz zz �— m �z 1260 r' I= I o o m= o= o z z _ = r� i= m= 1260 O O I L0I� vO O DO N d 00 N N N N N N N N N N NN N N 40+00 41+00 42+00 42+79.30 NELSON BYRDNo W O L T Z L A N D S C A P E ARCHITECTS 310 East Market Street Charlottesville VA 22902 T 434.984.1358 F 434.984.4158 www.nbwla.com flintlock ARCHITECTURE LANDSCAPE olsson Nitsch Engineering T I L L E T T LIGHTI N G DESIGN A S S O C I A T E S NSAENGINEERING sm 4A.V Hines Inc SITE TER ENGINEERING SERVICES NO. Date Issues/Revisions 1 1 1-30-18 SD PRICING 2 07-05-19 75% DID 3 09-20-19 100% DID 4 02-07-20 50% CD 5 04-03-20 90% CID 6 04-24-20 100% CID 7 09-18-20 REV# 1 /ASI# 1 STAMP PROJECT NAME Cultural Arts Corridor Fayetteville, Arkansas 100 CONSTRUCTION DOCUMENTS PROJECT NO.: FVL1814 DRAWN BY: ELH/ZW/CJK CHECKED BY: CBD DRAWING TITLE WATER LINE IMPROVEMENTS PLAN AND PROFILE DATE: SEPTEMBER 18, 2020 SCALE: 1 " = 10' DRAWING NUMBER 06 • FURNISH AND INSTALL 1— 8" TEE, 8" GATE VALVE, AND 8" PLUG FURNISH AND INSTALL 6X6 TAPPING SLEEVE AND VALVE, 6X8 REDUCER, I U) GENERAL WATER NOTES: 1. ALL WATERLINE CONSTRUCTION AND MATERIALS SHALL CONFORM TO CITY OF FAYETTEVILLE'S 2017 EDITION — "STANDARD SPECIFICATIONS FOR DESIGN AND CONSTRUCTION OF WATER LINES AND SEWER LINES" 2. CONTRACTOR SHALL SEQUENCE CONSTRUCTION OF WATER AND SEWER IMPROVEMENTS TO MINIMIZE SERVICE INTERRUPTIONS. 3. ALL WATER SERVICE LINES, FROM MAIN TO METER, SHALL BE REPLACED IN AREA OF WATER MAIN REPLACEMENT. NEW METERS SHALL BE PROVIDED WHERE NOTED. 4. WATER SERVICE LINES SHALL BE SLEEVED UNDER ROADWAY AND LID FEATURES, SIMILAR CITY DETAIL W12. 5. ALL NEW PVC, 4—INCH TO 12—INCH, SHALL BE AWWA C900 DR 14. 6. ALL FITTINGS FOR PVC SHALL BE "FULL BODY" FITTINGS AND SHALL BE RESTRAINED. 7. ALL BOLTS AND FITTINGS FOR VALVES, FITTINGS AND RESTRAINTS SHALL BE STAINLESS STEEL (SP. 4000/2.14/A) 8. MINIMUM LENGTH OF A CUT SECTION OF PIPE SHALL BE FIVE (5) FEET. (SP. 4000/2.01 /F AND 4000/2.03/D) 9. WATER VALVE LIDS AND MANHOLE COVERS SHALL BE ADJUSTED TO NEW GRADE IN ALL SCOPE AREAS OF THE PROJECT, TYPICAL. 10. UPON REQUEST, ALL WATER MATERIALS NOTED TO BE REMOVED SHALL BE SALVAGED AND DELIVERED TO THE WATER/SEWER OPERATIONS AT 2435 INDUSTRIAL DRIVE. SALVAGED ITEMS SHALL INCLUDE BUT NOT LIMITED TO METER YOKES, METAL LIDS, FIRE HYDRANTS, VALVES, AND FITTINGS. 11. ALL NEW WATERLINE UNDER PAVEMENT SHALL HAVE FULL DEPTH GRANULAR BACKFILL ACCORDING TO DETAIL W2 — WATER TRENCH (UNDER PAVEMENT) 12. PER AWWA C605, TRACER WIRE SHALL BE INSULATED FOR PROTECTION FROM CORROSION AND BE AT LEAST 12 GAUGE OR LARGER. E 0 CV 2' CV 11 0 0 � CV �� D >. 0' 5' 10' 20' SCALE IN FEET a) D 3 C5 0 1275 04 00 Iffit, CID 0 0 0 U- i 0 Q 0 1265 t D Q 0 0 0 CV K01 0 0 0 0 1260 0 L J CV 11-1 00 Q\1 04 1` n Row FURNISH AND INSTALL 8" 45 BENDS 043 00 0Ln V) W LO Ld / +� +� �U) W N — Sv W LiQ �w Cn z _ _ cn z z / I _ _ EXISTING GRADE _ — — — NEW 8" PVC WATERLINE — _ NEW 8" PVC WATERLINE zw w - �00 N J J O + Q ~ N �z Qo cn a O (WC14 .0 "am C � (W 0 /N 0 (W � (W I (0 K N � N04 Nr- �M �� ^ �M d ^r- �� N� �(6 ^ �o6 ^r- �00 a�a; ^r- 00 00 0000 00 N NN A Nr NN A NN Nr NN NN NN NN NN Nr NN NN NCI N S 1280 1275 1270 1265 1260 FURNISH AND INSTALL 8"X6" TEE AND 6" GATE VALVE I L NELSON BY RD:: WOLTZ osoAPE 310 East Market Street Charlottesville VA 22902 T 434.984.1358 F 434.984.4158 www.nbwla.com flintlock ARCHITECTURE & LANDSCAPE olsson Nitsch Engineering T I L L E T T LIGHTI N G DESIGN A S S O C I A T E S RESIAENGINEERING ,Aw,**o-vm Hines Inc SITE WATER ENGINEERING SERVICES NO. Date Issues/Revisions 1 1 1-30-18 SD PRICING 2 07-05-19 75% D D 3 09-20-19 100% D D 4 02-07-20 50% CD 5 04-03-20 90% CD 6 04-24-20 100% CD 7 09-18-20 REV# 1 /ASI# 1 8 07-15-21 R F 150 STAMP A.TE REGI ERE R F SI E�j4L N , *e y , No. 14497 ,SA, ,YYN '9l DOUGN�IMP PROJECT NAME Cultural Arts Corridor Fayetteville, Arkansas 100% CONSTRUCTION DOCUMENTS PROJECT NO.: FVL1814 DRAWN BY: ELH/ZW/CJK CHECKED BY: CBD DRAWING TITLE WATER LINE IMPROVEMENTS PLAN AND PROFILE DATE: SEPTEMBER 18, 2020 SCALE: 1" = 10' q\WING NUMBER U1*06 40+00 41+00 42+00 43+00 ,• 0 0 CN O N 0 N D 0 70 a i 70 0 N 00 0 0I 0 0 / 3 3 / 4- a� a- Ln 0 H Q U _o Q / .N 0 0 / 0 N a0 0 / 0 0 CD C7 O L0 N 1-11 00 O N 0' 5' 10' 20' SCALE IN FEET 1280 1275 1270 1265 1260 a 235, 237, & 249 INSTALL SING DER SEWER D WATERLINE INSTALL LEEVE AND VALVE INSTALL INSTALL /E SD — OF PIPE CONNECTION 1 B\ P,UG jr EXISTING 6" CIP WATERLINE W GG A VE TERMINATE WITH MJ CAP AND ANCHOR COLLAR G J d7 J 00 o(o \ �� +�' I" X � Ld H X (n W M W \EXISTING GRADE 0 \ FINISH D GRADE � I 1 I \ 1 I V z NEW 8" PVC WATERLINE Ld Ld > :2 W LLJ 0 0 Q Q 0 0 = w m = cn LU m = cn Ld � =0 cn Ld =0 cn = w w = m cn w m = cn Ld LLJ Z Ln Ln �w - i J of LLJ Ln Ln LL. LL- LL. X LL- Ld LL- Ld LL. LL. LL- X 00 __ 00 _. 00 U) U) _. oo 00 00 Q7 J CY) J 00 J CC _J Ln J +L J J U-i + + U + U + M + m + U + + 0 V V Q D Q 0 Q D Q 0 Q 0 Q 0 Q 0 Q 0 I— Z F-- Z I— Z F-- Z F-- Z I— Z I— Z � Z N Q cn Q V) Q Cn Q mn Q V) Q V) Q 0 Q (0 00 0000 cV NN NN NC4 C4 NN N 43+00 44+00 W :V 1280 1275 1270 1265 1260 44+61.65 ROW SD SD W \ p - \ W ,O O Iqwmmmmlbh.— N — 0' 5' 10' 20' SCALE IN FEET NELSON BY RDNo W O L T Z L A N D S C A P E ARCHITECTS 310 East Market Street Charlottesville VA 22902 T 434.984.1358 F 434.984.4158 www.nbwla.com flintlock ARCHITECTURE & LANDSCAPE olsson Nitsch Engineering T I L L E T T LIGHTI N G DESIGN A S S O C I A T E S GENERAL WATER NOTES: 1. ALL WATERLINE CONSTRUCTION AND MATERIALS SHALL CONFORM TO CITY OF FAYETTEVILLE'S 2017 EDITION — "STANDARD SPECIFICATIONS FOR DESIGN AND CONSTRUCTION OF WATER LINES AND SEWER LINES" NSAENGINEERING 2. CONTRACTOR SHALL SEQUENCE CONSTRUCTION OF WATER AND SEWER IMPROVEMENTS TO MINIMIZE SERVICE INTERRUPTIONS. 3. ALL WATER SERVICE LINES, FROM MAIN TO METER, SHALL BE REPLACED IN AREA OF WATER MAIN REPLACEMENT. NEW METERS 4. SHALL BE PROVIDED WHERE NOTED. WATER SERVICE LINES SHALL BE SLEEVED UNDER ROADWAY AND LID Hines Inc FEATURES, SIMILAR CITY DETAIL W12. 5. ALL NEW PVC, 4—INCH TO 12—INCH, SHALL BE AWWA C900 DR 14. SITE WATER ENGINEERING SERVICES 6. ALL FITTINGS FOR PVC SHALL BE "FULL BODY" FITTINGS AND SHALL :ZZ- ROW BE RESTRAINED. 7. ALL BOLTS AND FITTINGS FOR VALVES, FITTINGS AND RESTRAINTS —� SHALL BE STAINLESS STEEL (SP. 4000/2.14/A) 8. MINIMUM LENGTH OF A CUT SECTION OF PIPE SHALL BE FIVE (5) FEET. (SP. 4000/2.01 /F AND 4000/2.03/D) SS 9. ss WATER VALVE LIDS AND MANHOLE COVERS SHALL BE ADJUSTED TO NEW GRADE IN ALL SCOPE AREAS OF THE PROJECT, TYPICAL. 10. UPON REQUEST, ALL WATER MATERIALS NOTED TO BE REMOVED W SHALL BE SALVAGED AND DELIVERED TO THE WATER/SEWER OPERATIONS AT 2435 INDUSTRIAL DRIVE. SALVAGED ITEMS SHALL INCLUDE BUT NOT LIMITED TO METER YOKES, METAL LIDS, FIRE HYDRANTS, VALVES, AND FITTINGS. 11. ALL NEW WATERLINE UNDER PAVEMENT SHALL HAVE FULL DEPTH GRANULAR BACKFILL ACCORDING TO DETAIL W2 — WATER TRENCH (UNDER PAVEMENT) 12. PER AWWA C605, TRACER WIRE SHALL BE INSULATED FOR PROTECTION FROM CORROSION AND BE AT LEAST 12 GAUGE OR LARGER. NO. Date Issues/Revisions 1 1 1-30-18 SD PRICING 2 07-05-19 75% D D 3 09-20-19 100% D D 4 02-07-20 50% CD 5 04-03-20 90% CD 6 04-24-20 100% CD 7 07-15-21 RF150 STAMP A.TE REGI ERE R F SI E�j4L N , * y , No. 14497 ,SA, ,YYN '9l DOUGN�,I MP PROJECT NAME Cultural Arts Corridor Fayetteville, Arkansas 100% CONSTRUCTION DOCUMENTS PROJECT NO.: FVL1814 DRAWN BY: ELH/ZW/CJK CHECKED BY: CBD DRAWING TITLE WATER LINE IMPROVEMENTS PLAN AND PROFILE DATE: APRIL 24, 2020 SCALE: 1" = 10' WING NUMBER U1*07 IN 0 CID CID [T N O N 0 N D 0 N 3 0 NT N 00 0 i 0 N 0 N z Q V, / NT o� M r-i <L U Q Q E N — P-OH ROW _ROW P_oH - DISCONNECT AND EXISTING MH SEAL EXISTING - _ TIM = 12575.05' 00 — 6" SEWER LINE — — — — .. INV IN = 1269.30' (6" W) - ss ® — — INV IN = 1267.35' (6" N) n INV IN = 1262.21' (10" E) W / INV OUT = 1262.21' (10" S) \ ROW ROW � I c i- c / STA 30+00, BEGIN SEWER LINE NO. 3-- CONSTRUCT MH 3-1 — — ROW II 0 \ OVER EXISTING SEWERS i ow ow i 4' MANHOLE 3-1 STA: 30+10.74 _ i I RIM = 1272.17 n I N INV. IN = 1267.15 (8" PVC) I W INV. OUT = 1262.33 (10" EX) W INV. OUT = 1262.33 (10 EX) , I N: 635277.853 I E: 671738.477 N 304 EXISTING 10-INCH � EXISTING MH 306 SEWER. FIELD VERIFY RIM = 1267.87' MATERIAL TYPE. W INV. = 1263.17' EXISTING 8-INCH SEWER. FIELD VERIFY MATERIAL TYPE SS I ss ss GENERAL SANITARY SEWER NOTES: 1. ALL SEWER CONSTRUCTION AND MATERIALS SHALL CONFORM TO CITY OF FAYETTEVILLE'S 2017 EDITION - "STANDARD SPECIFICATIONS FOR DESIGN AND CONSTRUCTION OF WATER LINES AND SEWER LINES" 2. CONTRACTOR SHALL SEQUENCE CONSTRUCTION OF WATER AND SEWER IMPROVEMENTS TO MINIMIZE SERVICE INTERRUPTIONS 3. FIELD VERIFY EXISTING SEWER SERVICE LOCATIONS. LOCATIONS SHOWN ARE APPROXIMATE BASED ON BEST AVAILABLE INFORMATION. 4. NEW SEWER LATERALS (S15) SHALL BE PROVIDED FOR ALL EXISTING CONNECTIONS IN THE PROJECT AREA. PROVIDE MINIMUM SERVICE SIZE OF 4" U.N.O. AND CONNECT TO EXISTING SERVICE BEYOND SIDEWALK. PROVIDE CLEANOUT (S17) LOCATED 18" FROM EDGE OF SIDEWALK. NEW SERVICES ARE SHOWN ON PLAN ARE OFFSET FROM EXISTING SERVICE FOR CLARITY 5. PROVIDE STEEL ENCASEMENT (S21) ON ALL SEWER AND SEWER LATERALS CROSSING PAVERS OR BIORETENTION. STEEL ENCASEMENT SHALL EXTEND MINIMUM OF 3' BEYOND PAVERS OR BIORETENTION. 6. WATER VALVE LIDS AND MANHOLE COVERS SHALL BE ADJUSTED TO NEW GRADE IN ALL SCOPE AREAS OF THE PROJECT, TYPICAL. I I I 325 OPEN 309 FIELD LOCATE EXISTING SEWER SERVICES AND N , PROVIDE NEW SERVICE FIELD LOCATE EXISTING FOR ALL CONNECTIONS _ C SERVICES ON EXISTING-c� _ ON WEST SIDE OF J 6". CONNECT EXISTING — _ S GREGG AVE. SERVICE TO NEW 8" 41 +00 SEWER PRIOR TO DISCONNECTING GRE�G A\ U e G RO ROW PROTECT EXISTING GAS LINE G G ROW e f \ \ R W RO ROW 0 ®�1i W --- ------------ NOTE: EXISTIN SEWER SERVICES FOR 304, 306, AND 308 S GREGG AVE TO REMAIN ON EXISTING 8" SEWER 308 EXISTING SERVI E CONNECTIONS, TYPICAL JJ SS SS Io I FIELD VERIFY EXISTING CONNECTION LOCATIONS FOR 303 AND 309 S GREGG AVE. CAP AND ABANDON EXISTING SERVICES. I SS ss SS O SS 303 ROAP =OHH ROW SD EDW I 0' 5' 10' 20' SCALE IN FEET Ro \\ RO � R - FIELD VERIFY GAS LINE \ \ \ LOCATION. RELOCATE AS REQUIRED o O / 1275 0 o\ o \ \ \ 0 \ � o \C111 \ \ \ \ 0 !- OS os I \ \ 0 Os S \ \ s � O � \ SS `---- -0 OS SS -I-) o \ SS � _ Ss _ 30+00 31+00 32+00 33+00 NELSON BY RD:: W 0 L T Z osoaPE 310 East Market Street Charlottesville VA 22902 T 434.984.1358 F 434.984.4158 www.nbwla.com flintlock ARCHITECTURE &LANDSCAPE olsson Nitsch Engineering T I L L E T T LIG H T 1 N G DESIGN A S S O C I A T E S NSAENGINEERING Hines Inc SITE WATER ENGINEERING SERWCES NO. Date Issues/Revisions 1 1 1-30-18 SD PRICING 2 07-05-19 75% DID 3 09-20-19 100% DID 4 02-07-20 50% CD 5 04-03-20 90% CD 6 04-24-20 100% CD 7 07-15-21 RFI50 STAMP S� A�5 AR SAS REGI ERE R F SI]v-� N 'R .w y No. 14497 ,SA, YN DOUGN PROJECT NAME Cultural Arts Corridor Fayetteville, Arkansas 100% CONSTRUCTION DOCUMENTS PROJECT NO.: FVL1814 DRAWN BY: ELH/ZW/CJK CHECKED BY: CBD DRAWING TITLE SEWER LINE IMPROVEMENTS PLAN AND PROFILE DATE: APRIL 24, 2020 SCALE: 1 " = 10' DRAWING NUMBER 7 2,004 0' 5' 10' 20' SCALE IN FEET 0 Co Co D` N O N 0 N D 0 to 3 0 N 00 0 i 0 N 0 N z Q V)I / o- (y) <L U Q Q E N 4' MANHOLE 3-2 STA: 33+20.34 RIM= 1279.86 E INV. IN = 1268.80 (8" PVC) S INV. OUT = 1268.70 (8" PVC) N: 635586.830 E: 671758.042 FINI`. F AGGREGATE UNDER 'rn jn /1 FIELD VERIFY GAS LINE LOCATION 1 .76' 301 4' MANHOLE 3-3 STA: 34+12.59 RIM = 1273.63 N INV. IN = 1269.36 (EX. 8") W INV. OUT = 1269.26 (8" PVC) N: 635584.897 E: 671850.272 ROW — / l S GREGG AVE I GAS LINE TO BE RELOCATED AS REQUIRED FIELD LOCATE GAS LIN Ism —60 00 ROW o I II�IIII' I I II III � II II III � I I I II II III � II II IIII I OilIII � 18: IIII I III I /J II III // JJI III I 0 I III 10 0 \ O \ o CONSTRUCT MH 3-3 OVER EXISTING SEWER. FIELD — Row VERIFY ELEVATION OF SEWER PRIOR TO CONSTRUCTION / DISCONNECT AND SEAL EXISTING SEWER (S14) EXISTING 8—INCH / \ SEWER. FIELD VERIFY MATERIAL TYPE. 33+00 34+00 34+25 Il �M1i1ll � IIII L�J�J 0' 5' 10' 20' SCALE IN FEET GENERAL SANITARY SEWER NOTES: 1. ALL SEWER CONSTRUCTION AND MATERIALS SHALL CONFORM TO CITY OF FAYETTEVILLE'S 2017 EDITION — "STANDARD SPECIFICATIONS FOR DESIGN AND CONSTRUCTION OF WATER LINES AND SEWER LINES" 2. CONTRACTOR SHALL SEQUENCE CONSTRUCTION OF WATER AND SEWER IMPROVEMENTS TO MINIMIZE SERVICE INTERRUPTIONS 3. FIELD VERIFY EXISTING SEWER SERVICE LOCATIONS. LOCATIONS SHOWN ARE APPROXIMATE BASED ON BEST AVAILABLE INFORMATION. 4. NEW SEWER LATERALS (S15) SHALL BE PROVIDED FOR ALL EXISTING CONNECTIONS IN THE PROJECT AREA. PROVIDE MINIMUM SERVICE SIZE OF 4" U.N.O. AND CONNECT TO EXISTING SERVICE BEYOND SIDEWALK. PROVIDE CLEANOUT (S17) LOCATED 18" FROM EDGE OF SIDEWALK. NEW SERVICES ARE SHOWN ON PLAN ARE OFFSET FROM EXISTING SERVICE FOR CLARITY 5. PROVIDE STEEL ENCASEMENT (S21) ON ALL SEWER AND SEWER LATERALS CROSSING PAVERS OR BIORETENTION. STEEL ENCASEMENT SHALL EXTEND MINIMUM OF 3' BEYOND PAVERS OR BIORETENTION. 6. WATER VALVE LIDS AND MANHOLE COVERS SHALL BE ADJUSTED TO NEW GRADE IN ALL SCOPE AREAS OF THE PROJECT, TYPICAL. NELSON BY RD:: W 0 L T Z osoaPE 310 East Market Street Charlottesville VA 22902 T 434.984.1358 F 434.984.4158 www.nbwla.com flintlock ARCHITECTURE LANDSCAPE olsson Nitsch Engineering T I L L E T T LIG H T 1 N G DESIGN A S S O C I A T E S NAENGINEERING oweoo* Hines Inc SITETER ENGINEERING SERVICES NO. Date Issues/Revisions 1 1 1-30-18 SD PRICING 2 07-05-19 75% DID 3 09-20-19 100% DID 4 02-07-20 50% CD 5 04-03-20 90% CID 6 04-24-20 100% CID 7 09-18-20 REV# 1 /ASI# 1 8 07-15-21 RF150 STAMP A.TE REG.ERE R F SI g]v-� N * y No. 14497YN DOUGN PROJECT NAME Cultural Arts Corridor Fayetteville, Arkansas 100% CONSTRUCTION DOCUMENTS PROJECT NO.: FVL1814 DRAWN BY: ELH/ZW/CJK CHECKED BY: CBD DRAWING TITLE SEWER LINE IMPROVEMENTS PLAN AND PROFILE DATE: SEPTEMBER 18, 2020 SCALE: 1 " = 10' AWING NUMBER U2,005 City of Fayetteville, Arkansas - Budget Adjustment Form (Legistar) Budget Year Division Adjustment Number Non -Departmental (800) 2021 /Org2 Requestor: Kevin Springer BUDGET ADJUSTMENT DESCRIPTION / JUSTIFICATION: Staff Recomends approval of Change Order #7 to RFQ 18-11 Contract with Nabholz Construction for Water and Sewer Relocate at Gregg Avenue in the amount of $75,325.78 and Relocation of 8" Sewer line in Fay Jones woods in the amount of $33,830.54 for a total amount of $109,156.32 and approve a Budget Adjustment. Budget is already available within the W/S Relocations for Bond Projects captial project. RESOLUTION/ORDINANCE COUNCIL DATE: 10/5/2021 LEGISTAR FILE ID#: 2021-0732 KP,vLwSpr � 911512021 4:11 PM Budget Director Date TYPE: D - (City Council) JOURNAL #: GLDATE: CHKD/POSTED: TOTAL Account Number - - Increase / (Decrease) Expense Revenue Proiect.Sub# Project Sub.Detl AT v.20210831 Account Name 5400.860.5700-5815.00 109,157 - 11011 2019.7800 EX Improvements - Sewer 5400.860.5700-5815.00 (33,835) - 11011 2019.7800 EX Improvements - Sewer 5400.720.5600-5808.00 (75,322) - 11011 1 EX Improvements - Water Line H:\Budget Adjustments\2021_Budget\City Council\10-05-2021\2021-0732 BA Arts Corridor C07 - WS.xlsm 1 of 1