HomeMy WebLinkAbout219-21 RESOLUTIONOF t FAYEr,1' J ti u m 0 .y n 9RKANS PS 113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 Resolution: 219-21 File Number: 2021-0625 OLSSON, INC. AMENDMENT NO. 5: A RESOLUTION TO APPROVE AMENDMENT NO. 5 TO THE PROFESSIONAL ENGINEERING SERVICES AGREEMENT WITH OLSSON, INC. IN AN AMOUNT NOT TO EXCEED $312,000.00 FOR ENGINEERING SERVICES RELATED TO THE EAST FAYETTEVILLE WATER SYSTEM IMPROVEMENTS PROJECT WHEREAS. on January 2. 2018. the City Council passed Resolution 19-18 to approve a professional engineering services agreement with Olsson, Inc. for design work on the East Fayetteville Water System and Township Pressure Plane Improvements Project; and WHEREAS, four previous amendments have been approved increasing the scope of work related to this project; and WHEREAS, Amendment No. 5 will provide funding for construction phase services associated with the Township Tank construction and the Richland Creek waterline crossing. NOW, THEREFORE, BE IT RESOLVED BV THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves Amendment No. 5 to the Professional Engineering Services Agreement with Olsson, Inc., a copy of which is attached to this Resolution, in an amount not to exceed $312,000.00 for additional engineering services related to the East Fayetteville Water System Improvements Project. PASSED and APPROVED on 9/7/2021 Page 1 Printed on 918121 Resolution: 219-21 File Number.' 2021-0625 Attest 01 Kara Paxton. City Clerk TreasutFr, Page 2 Printed on 9/8/21 City of Fayetteville, Arkansas 113 West Mountain Street Fayetteville, AR 72701 (479)575-8323 Text File File Number: 2021-0625 Agenda Date: 9/7/2021 Version: 1 Status: Passed In Control: City Council Meetinq File Type: Resolution Agenda Number: A.8 OLSSON, INC. AMENDMENT NO. 5: A RESOLUTION TO APPROVE AMENDMENT NO. 5 TO THE PROFESSIONAL ENGINEERING SERVICES AGREEMENT WITH OLSSON, INC. IN AN AMOUNT NOT TO EXCEED $312,000.00 FOR ENGINEERING SERVICES RELATED TO THE EAST FAYETTEVILLE WATER SYSTEM IMPROVEMENTS PROJECT WHEREAS, on January 2, 2018, the City Council passed Resolution 19-18 to approve a professional engineering services agreement with Olsson, Inc. for design work on the East Fayetteville Water System and Township Pressure Plane Improvements Project; and WHEREAS, four previous amendments have been approved increasing the scope of work related to this project; and WHEREAS, Amendment No. 5 will provide funding for construction phase services associated with the Township Tank construction and the Richland Creek waterline crossing. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves Amendment No. 5 to the Professional Engineering Services Agreement with Olsson, Inc., a copy of which is attached to this Resolution, in an amount not to exceed $312,000.00 for additional engineering services related to the East Fayetteville Water System Improvements Project. City of Fayetteville, Arkansas Page 1 Printed on 91812021 Tim Nyander Submitted By City of Fayetteville Staff Review Form 2021-0625 Legistar File ID 9/7/2021 City Council Meeting Date - Agenda Item Only N/A for Non -Agenda Item 8/17/2021 WATER SEWER (720) Submitted Date Division / Department Action Recommendation: Staff recommends approval of Amendment No. 5 to the agreement with Olsson, Inc. in an amount not to exceed $312,000.00 for engineering services related to the East Fayetteville Water System Improvements Project. Budget Impact: 5400.720.5600-5314.00 Water and Sewer Account Number Fund 12009.1801 Water System Rehabilitation/Replacement Project Number Budgeted Item? Yes Does item have a cost? Yes Budget Adjustment Attached? No Current Budget Funds Obligated Current Balance Item Cost Budget Adjustment Remaining Budget Project Title $ 7,485,004.00 $ 6,493,464.62 $ 991,539.38 $ 312,000.00 $ 679,539.38 V20210527 Purchase Order Number: 2018-319 Previous Ordinance or Resolution # 239-20 Change Order Number: Original Contract Number: Comments: I 2018-6 Approval Date: CITY OF FAYETTEVILLE ARKANSAS MEETING OF SEPTEMBER 7, 2021 TO: Mayor and City Council THRU: Susan Norton, Chief of Staff Tim Nyander, Utilities Director Water & Sewer Committee FROM: Corey Granderson, Utilities Engineer DATE: August 17, 2021 CITY COUNCIL MEMO SUBJECT: Approval of Amendment No. 5 to the Agreement Between the City of Fayetteville and Olsson, Inc. for Engineering Services Related to the East Fayetteville Water System Improvements Project RECOMMENDATION: Staff recommends approval of Amendment No. 5 to the agreement between the City of Fayetteville and Olsson, Inc. for engineering services related to the East Fayetteville Water System Improvements Project in an amount not to exceed $312,000.00. BACKGROUND: On January 2, 2018, the City Council passed Resolution 19-18 to approve a professional engineering services agreement with Olsson, Inc. to begin design work on this project. The project consists of four sub -parts that will each be bid separately. Namely: Contract Sect. 1: Pressure Sustaining Valves Rehabilitation (Under Construction) Contract Sect. 2: Gulley Road Water Tank (Under Construction) Contract Sect. 3: Gulley & Goshen Pressure Plane Improv. (Esmt. Acquisition) Contract Sect. 4: Township Tank & Improvements (Bidding) Amendment No. 1 was passed administratively utilizing contingency dollars to adjust the project scope. Amendment No. 2 was passed via Res. 266-19 to account for engineering time related to permitting and re -design delays. Amendment No. 3 was passed via Res. 203-20 for construction phase services related to Contract Section 2, the elevated water storage tank. Amendment No. 4 was passed via Res. 239-20 for construction phase services related to Contract Section 1. DISCUSSION: Amendment No. 5 will provide funding for construction phase services associated with both the Township Tank construction (Phase 1 of Contract Section 4) and the Richland Creek waterline crossing (part of Contract Section 3). Both projects are in process for bid awards to start construction. Olsson will be involved with all project aspects during construction, including onsite daily observations and inspections per engineering best practices and state law. This Mailing Address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 amendment also provides additional engineering design fees for the preparation of plans and specifications pulled from the larger contracts into smaller bid packages. These separations allowed the Township Tank to bid separate from the waterline and pump station work, providing more competition. The Richland Creek waterline crossing was separated from the larger Contract Section 3 due to an April waterline blow-out in that vicinity that needed replacements expedited. The total costs for proposed Amendment No. 5 are based on Olsson's fee schedule and level of effort per task, not to exceed $312,000.00. This will raise the overall engineering project fees from $982,605.00 to $1,294,605.00. BUDGET/STAFF IMPACT: Funds for this amendment are budgeted and available from the Water System Rehabilitation/ Replacement account. The total costs for proposed Amendment No. 5 are not to exceed 312,000.00. Attachments: Engineering Services Agreement Amendment No. 5 Fee Schedule/Matrix AMENDMENT NO. 5 To AGREEMENT FOR PROFESSIONAL ENGINEERING SERVICES Between CITY OF FAYETTEVILLE, ARKANSAS And OLSSON, INC. (formerly McGOODWIN, WILLIAMS, AND YATES, a DIVISION OF OLSSON ASSOCIATES) EAST FAYETTEVILLE AND TOWNSHIP PRESSURE PLANE IMPROVEMENTS WHEREAS, on January 2, 2018, the City of Fayetteville, Arkansas (CITY OF FAYETTEVILLE) and Olsson (formerly McGoodwin, Williams and Yates, a Division of Olsson Associates) of Fayetteville, Arkansas (ENGINEER) entered into an Agreement for engineering services in connection with the East Fayetteville and Township Pressure Plane Improvements (the "Project"); and WHEREAS, on August 13, 2018, the CITY OF FAYETTEVILLE and the ENGINEER agreed to Amendment No.1 that included the ENGINEER providing services in connection with the evaluation, design and/or construction administration for a 12-inch waterline along Highway 45; and WHEREAS, on December 3, 2019, the CITY OF FAYETTEVILLE and the ENGINEER agreed to Amendment No.2 that included the ENGINEER providing additional services for the East Fayetteville and Township Pressure Plane Improvements. The work included meetings with Washington County Road Dept., Arkansas Department of Health, property owners, East Fayetteville Contract Section I redesign, geo-technical borings for the new Gulley Rd. and Township tanks, easement acquisition services, and miscellaneous analyses and infrastructure designs; and WHEREAS, on August 4, 2020, the CITY OF FAYETTEVILLE and the Engineer agreed to Amendment No.3 that included the Engineer providing Construction Administration services for the East Fayetteville Service Area Improvements, Contract Section II New Elevated Water Tank project. The work includes project management, onsite meetings with contractor, field survey staking, observation of construction, and field and lab material testing; and WHEREAS, on October 6, 2020, the CITY OF FAYETTEVILLE and the Engineer agreed to Amendment No.4 that included the Engineer providing Construction Administration services for the East Fayetteville Service Area Improvements, Contract Section I Existing Infrastructure Modifications project. The work shall include project management, onsite meetings with contractor, field survey staking, observation of construction, and field and lab material testing; and WHEREAS, the CITY OF FAYETTEVILLE now wishes to increase the scope of work to include Construction Administration services for the Township Pressure Plane Improvements — Phase 1 project as well as the Richland Creek Crossing. The work shall include project management, onsite meetings with contractor, field survey staking, observation of construction, and field and lab material testing. Scope of work to also include additional design services for the East Fayetteville Service Area Improvements, Contract Section III New Pump Station and Waterline Improvements, creation of standalone projects for the Township Pressure Plane Improvements and Richland Creek Crossing, survey and design of an 8-inch waterline along Sassafras Hill Road and geo-technical borings at Richland Creek; and WHEREAS, the current Agreement must now be amended to provide the additional scope and amount of compensation to the ENGINEER for the additional work; and NOW THEREFORE, in consideration of the mutual covenants and Agreements herein contained, CITY OF FAYETTEVILLE and the ENGINEER, the parties hereto, stipulate and agree that the Agreement for 018-0031 & 018-0032 Amendment No.5 Page 1 Engineering Services dated January 2, 2018, and amended on August 13, 2018, December 3, 2019, August 4, 2020 and October 6, 2020 is hereby amended in the following particulars: SECTION 5 — PAYMENTS TO ENGINEER 5.1 The maximum not -to -exceed amount authorized for this Agreement is $1,294,605.00. The CITY OF FAYETTEVILLE shall compensate ENGINEER based on a Unit Price or Lump Sum basis as described in Appendix A. APPENDIX A — SCOPE OF SERVICES Add the following Paragraphs: A.2.6 Construction Administration Services — Township Pressure Plane Improvements — Phase 1: Olsson shall provide a suitable staff to perform the Construction Administration services for the Township Pressure Plane Improvements. Work includes the following: Project Management — Includes submittals, RFI's, change orders, work change directives, review of contractors monthly pay estimates, etc. Services also include coordination with contractor, preparation and attending a kick-off meeting as well as monthly progress meetings and Engineer site visits. Survey — Includes constructing staking at the new tank site. Resident Project Representative (RPR) — Duties of RPR include project observation and reporting construction activity to Engineer, maintaining record of construction activity, performing field material testing including concrete slump, air content, etc. tests, making concrete cylinders for strength tests, and soil density testing. Scope based on RPR on site approximately four (4) hours per day during construction activities. 4. Material Lab Tests — Work includes concrete cylinder breaks, grout prisms, soil and aggregate proctors, gradation and Atterberg tests. Post Construction — Work includes creation of project close-out documents, site visit/final walk through, plans of record, etc. Work included separating plans and specifications to create two (2) standalone projects: a. Phase 1 — Township Tank b. Phase 2 — Pump Station and Waterline Improvements Compensation for these tasks are based on a construction timeline of 510 days to Substantial Completion and 540 days to Final Completion. If project construction runs longer that the aforementioned times, ENGINEER shall invoice CITY OF FAYETTEVILLE the standard hourly billing labor rate charged for those employees actually performing the work, plus reimbursable expenses if any. ENGINEER shall not commence work without CITY OF FAYETTEVILLE'S prior written approval. The staff shall consist of engineers, engineering technicians, and other assistants as may be necessary to carry on the work in an efficient and expeditious manner. A.2.7 Design Services — East Fayetteville Service Area Improvements, Contract Section III: 018-0031 & 018-0032 Amendment No.5 Page 2 Olsson shall provide a suitable staff to perform the Design services for the East Fayetteville Service Area Improvements, Contract Section III. Work includes the following: Design of new 8-inch waterline including connections into existing distribution system along Sassafras Hill Road and separating plans and specifications to create a new standalone Richland Creek Crossing project. A.2.8 Construction Administration Services — Richland Creek Crossing: Olsson shall provide a suitable staff to perform the Construction Administration services for the Richland Creek Crossing. Work includes the following: Project Management — Includes submittals, RFI's, change orders, work change directives, review of contractors monthly pay estimates, etc. Services also include coordination with contractor, preparation and attending a kick-off meeting as well as monthly progress meetings and Engineer site visits. Survey — Includes constructing staking. Resident Project Representative (RPR) — Duties of RPR include project observation and reporting construction activity to Engineer, maintaining record of construction activity, performing field material testing including concrete slump, air content, etc. tests, making concrete cylinders for strength tests, and soil density testing. Scope based on RPR on site approximately two (2) hours per day during construction activities. 4. Material Lab Tests — Work includes concrete cylinder breaks, grout prisms, soil and aggregate proctors, gradation and Atterberg tests. Post Construction — Work includes creation of project close-out documents, site visit/final walk through, plans of record, etc. Work included geotechnical borings (2 total) at Richland Creek. Compensation for these tasks are based on a construction timeline of 90 days to Substantial Completion and 120 days to Final Completion. If project construction runs longer that the aforementioned times, ENGINEER shall invoice CITY OF FAYETTEVILLE the standard hourly billing labor rate charged for those employees actually performing the work, plus reimbursable expenses if any. ENGINEER shall not commence work without CITY OF FAYETTEVILLE' S prior written approval. The staff shall consist of engineers, engineering technicians, and other assistants as may be necessary to carry on the work in an efficient and expeditious manner. A.4 Compensation Add the following Paragraphs: A.4.5 Construction Administration Services — Township Pressure Plane Improvements — Phase 1: The maximum not -to -exceed amount for services described in Section A.2.6 Construction Administration Services — Township Pressure Plane Improvements is $223,200.00. A.4.6 Design Services — East Fayetteville Service Area Improvements, Contract Section III: 018-0031 & 018-0032 Amendment No-5 Page 3 2. The maximum not -to -exceed amount for services described in Section A.2.7 Design Services— East Fayetteville Service Area Improvements is $16,300.00. A.4.7 Construction Administration Services — Richland Creek Crossing: 3. The maximum not -to -exceed amount for services described in Section A.2.6 Construction Administration Services — Township Pressure Plane Improvements is $72,500.00. For clarification purposes. Amendment No. 5 increases the maximum not -to -exceed amount of the project by $312,000.00. IN WITNESS WHEREOF, CITY OF FAYETTEVILLE, ARKANSAS by and through its N/ ayor, and ENGINEER, by its authorized officer have caused this Amendment to be duly executed this day of , 2021. CITY OF FAYETTEVILLE, ARKANSAS By; ATTEST; By : Ll� City Clerk OLSSON, INC. rda G� RK'::TIf ,��// W. Chris Hall, P.E. Team Leader x By: LJ -::Brad Hammond, Office Leader' (� ^81,6MENT NO. 5 TO AGREEMENT FOR PR6 ESSIONAL ENGINEERING SERVICES 018-0031 & 018-0032 Amendment No.5 Page 4 olsson 6 Date: 02-Aug-21 Job: East Service Area & Township Tank Improvements TOTALS Phase/ Task Description of Work Total Man -Days Total Labor Fee Total Expense Fee Total Fee 100 Township Improvements - Construction Administration Project Management 29.00 $ 32,100.00 $ $ 32,100.00 Submittals 6.25 $ 5,882.00 $ $ 5,882.00 Change Orders, RFI's & Work Change Directives 5.25 $ 5,572.00 $ 143.75 $ 5,715.75 Kick -Off and Progress Meetings 11.63 $ 13,305.00 $ 189.50 $ 13,494.50 Property Owner Meetings 3.50 $ 4,620.00 $ - $ 4,620.00 Survey - Construction Staking 2.50 $ 2,000.00 $ $ 2,000.00 Electrical - KCN 4.00 $ 5,000.00 $ $ 5,000.00 Instrument & Control - LNK 3.00 $ 3,500.00 $ $ 3,500.00 Inspection/Field Material Testing 140.00 $ 108,000.00 $ $ 108,000.00 Lab/Field Material Testing (Asphalt, Concrete, Subgrade) 8.00 $ 10,000.00 $ 7,980.00 $ 17,980.00 Project Closeout/Post Construction Services 8.25 $ 8,490.00 $ 189.50 $ 8,679.50 200 Township Plans & Specifications Separation Phase 1 -Tank 8.25 $ 8,500.00 $ - $ 8,500.00 Phase 2 - Pump Station & Waterlines 7.50 $ 7,732.00 $ $ 7,732.00 300 Richland Creek Crossing Richland Creek Borings 6.00 $ 6,450.00 $ $ 6,450.00 Plans & Specs. Separation 6.25 $ 6,590.00 $ $ 6,590.00 Bid & Preconstruction 6.50 $ 7,300.00 $ $ 7,300.00 Construction Admin. Project Management 20.25 $ 22,038.00 $ $ 22,038.00 Survey - Construction Staking 2.00 $ 2,000.00 $ $ 2,000.00 Inspection/Field Material Testing 27.00 $ 20,500.00 $ $ 20,500.00 Lab/Field Material Testing (Concrete, Subgrade) 2.50 $ 1,500.00 $ 500.00 $ 2,000.00 Project Closeout/Post Construction Services 5.50 $ 5,630.00 $ - $ 5,630.00 400 Sassafras Hill Rd. 8" Waterline Engineering Design 6.25 $ 5,838.00 $ $ 5,838.00 Survey 3.50 $ 4,000.00 $ $ 4,000.00 500 CSIII Pump Station & Waterlines Plans & Specs. Separation 6.00 $ 6,480.00 $ $ 6,480.00 GRAND TOTAL (rounded) 328.88 $ 303,027.00 $ 9,002.75 $ 312,000.00