HomeMy WebLinkAbout167-21 RESOLUTIONo` cnrfrr_.
ai.1 .aS,
113 West Mountain Street
Fayetteville, AR 72701
(479) 575-8323
Resolution: 167-21
File Number: 2021-0407
CH2M HILL ENGINEERS, INC.:
A RESOLUTION TO APPROVE AN ADDENDUM TO THE OUT -OF -SCOPE AGREEMENT
WITH CH2M HILL ENGINEERS, INC. IN AN AMOUNT NOT TO EXCEED $69,380.00 TO
COMPLETE THE SUPERVISORY CONTROL AND DATA ACQUISITION UPGRADE
PROJECT FOR THE CITY'S WASTEWATER TREATMENT FACILITY OPERATIONS, LIFT
STATION OPERATIONS AND WATER DISTRIBUTION SYSTEM OPERATIONS; AND TO
AUTHORIZE THE PURCHASE OF ADDITIONAL NETWORKING EQUIPMENT FROM
CONVERGEONE, INC. IN THE AMOUNT OF $43,303.42 PLUS APPLICABLE TAXES AND
FREIGHT CHARGES, PURSUANT TO RESOLUTION 110-17
WHEREAS, on October 1, 2019, the City Council approved Resolution No. 226-19 approving an
Out -Of -Scope Agreement with CH2M Hill Engineers, Inc. for software upgrades to the SCADA
System used by wastewater treatment facility operations, lift station operations, and water distribution
systems operations; and
WHEREAS, the Addendum to the Out -of -Scope Agreement will include additional upgrades beyond
the base implementation and for additional networking equipment required to have a secure SCADA
system.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves an addendum
to the out -of -scope agreement with CH2M Hill Engineers, Inc., a copy of which is attached to this
Resolution, in an amount not to exceed $69,380.00 to complete the software upgrades to the
Supervisory Control and Data Acquisition system used by the City's wastewater treatment facility
operations, lift station operations and water distribution system operations,
Page 1 Printed on 612121
Resolution: 167-21
File Number. 2021-0407
Section 2: That the City Council of the City of Fayetteville, Arkansas hereby authorizes the purchase of
additional network equipment from ConvergeOne, Inc. in the amount of $43,303.42 plus applicable
taxes and freight charges, pursuant to Resolution 1 10-17, that is required for the project.
PASSED and APPROVED on 6/l/2021
Attest:
% 'CLERA f���i
Kara Paxton, City Clerk Treasurer ; •'cqy� �'�•9c
N -�� 144F
�N4COU������`
Page 2 Printed on 612121
City of Fayetteville, Arkansas 113 West Mountain Street
Fayetteville, AR 72701
(479)575-8323
Text File
File Number: 2021-0407
Agenda Date: 6/1/2021 Version: 1 Status: Passed
In Control: City Council Meetinq File Type: Resolution
Agenda Number: A.22
CH2M HILL ENGINEERS, INC.:
A RESOLUTION TO APPROVE AN ADDENDUM TO THE OUT -OF -SCOPE AGREEMENT WITH
CH2M HILL ENGINEERS, INC. IN AN AMOUNT NOT TO EXCEED $69,380.00 TO COMPLETE
THE SUPERVISORY CONTROL AND DATA ACQUISITION UPGRADE PROJECT FOR THE
CITY'S WASTEWATER TREATMENT FACILITY OPERATIONS, LIFT STATION OPERATIONS
AND WATER DISTRIBUTION SYSTEM OPERATIONS; AND TO AUTHORIZE THE PURCHASE
OF ADDITIONAL NETWORKING EQUIPMENT FROM CONVERGEONE, INC. IN THE AMOUNT
OF $43,303.42 PLUS APPLICABLE TAXES AND FREIGHT CHARGES, PURSUANT TO
RESOLUTION 110-17
WHEREAS, on October 1, 2019, the City Council approved Resolution No. 226-19 approving an
Out -Of -Scope Agreement with CH2M Hill Engineers, Inc. for software upgrades to the SCADA System used
by wastewater treatment facility operations, lift station operations, and water distribution systems operations;
and
WHEREAS, the Addendum to the Out -of -Scope Agreement will include additional upgrades beyond the base
implementation and for additional networking equipment required to have a secure SCADA system.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves an addendum to the
out -of -scope agreement with CH2M Hill Engineers, Inc., a copy of which is attached to this Resolution, in an
amount not to exceed $69,380.00 to complete the software upgrades to the Supervisory Control and Data
Acquisition system used by the City's wastewater treatment facility operations, lift station operations and water
distribution system operations,
Section 2: That the City Council of the City of Fayetteville, Arkansas hereby authorizes the purchase of
additional network equipment from ConvergeOne, Inc. in the amount of $43,303.42 plus applicable taxes and
freight charges, pursuant to Resolution 110-17, that is required for the project.
City of Fayetteville, Arkansas Page 1 Printed on 61212021
Tim Nyander
Submitted By
City of Fayetteville Staff Review Form
2021-0407
Legistar File ID
6/1/2021
City Council Meeting Date - Agenda Item Only
N/A for Non -Agenda Item
5/13/2021 WASTEWATER TREATMENT (730)
Submitted Date Division / Department
Action Recommendation:
Staff recommends approval of a SCADA Software Upgrade Addendum to the Out -of -Scope Letter Agreement with
CH2M Hill Engineers, Inc. in an amount not to exceed $69,380.00, and approval of the purchase of additional
network equipment in the amount of $43,303.42 plus applicable taxes and freight charges from ConvergeOne, Inc.
to complete the SCADA Upgrade Project.
5400.720.5700-XXXX.00
Account Number
02017.1901
Project Number
Budgeted Item? Yes
Does item have a cost? Yes
Budget Adjustment Attached? No
Budget Impact:
Water and Sewer
Fund
Sanitary Sewer Rehabilitation
Project Title
Current Budget
Funds Obligated
Current Balance
Item Cost
Budget Adjustment
Remaining Budget
$ 6,482,469.00
$ 3,792,521.62
$ 2,689,947.38
$ 117,563.76
$ 2,572,383.62
V20180321
Purchase Order Number: Previous Ordinance or Resolution #
Change Order Number:
Original Contract Number:
Approval Date:
Comments: The addendum and additional network equipment is estimated in the total amount of $117,563.76, including
freight and taxes.
CITY OF
FAYETTEVILLE
ARKANSAS
MEETING OF JUNE 1, 2021
TO: Mayor and City Council
THRU: Susan Norton, Chief of Staff
FROM: Tim Nyander, Utilities Director
DATE: May 13, 2021
CITY COUNCIL MEMO
SUBJECT: Cost Overrun and Additional Equipment Purchase for Utility's SCADA
Project
RECOMMENDATION:
Staff recommends approval of a SCADA Software Upgrade Addendum to the Out -of -Scope
Letter Agreement with CH2M Hill Engineers, Inc. in an amount not to exceed $69,380.00, and
approval of the purchase of additional network equipment in the amount of $43,303.42 plus
applicable taxes and freight charges from ConvergeOne, Inc. to complete the SCADA Upgrade
Project.
BACKGROUND:
The Utilities supervisory control and data acquisition (SCADA) system monitors and provides
automated control and monitoring to the water distribution, wastewater treatment, lifts stations
and the Biosolids Management Site.
DISCUSSION:
In August 2018, the SCADA system was evaluated for reliability and security. The outcome of
the evaluation were as follows:
1. All the SCADA Human -Machine Interface (HMI) software, servers and PCs were either
obsolete, outdated, or did not have support from the manufacturer or vendor,
2. There was a mixture of brands of computer equipment with several running operating
systems that we no longer supported.
3. The system was made up of piecemeal, primarily consumer grade network equipment.
A systemwide approach was developed to (1) replace existing components with commercial
business grade components, (2) upgrade or replace the existing operating system with an up-to-
date system that can be periodically updated, and (3) improve cyber security of the system.
The upgrade was developed by the Jacobs team with input from the City. It included in -lab
configuration of updated hardware and software, and application and hardware development.
The cost estimate for the plan was $474,000. Additionally, the plan included replacing software
and hardware which was estimated at $458,000, for a total of $922,918. Additional network and
SCADA equipment has brought the project cost to date at $1,009,911.
Mailing Address:
113 W. Mountain Street www.fayetteville-ar.gov
Fayetteville, AR 72701
It was understood at the time that additional upgrades beyond the base implementation was not
scheduled to happen before the system was initially rolled out. Any additional work would be
beyond the scope of the agreement and would require additional funding. However, there were
activities performed beyond the original scope that were unavoidable due to changes that had to
be made as the base implementation was rolled out. The additional funding that was
anticipated to be required at a later date is being requested at this time as an amendment to the
original scope. That funding amount is in a not -to -exceed amount of $69,380.00.
As the SCADA project progressed, Jacobs staff identified 59 additional network switches that
needed to be purchased to complete the overhaul of the SCADA network. ConvergeOne
submitted a quote in the amount of $43,303.42 plus applicable taxes and freight charges.
Freight is estimated at $500 and taxes are estimated at $4,380.34, for a total estimated cost of
$48,183.76 for the additional network switches. ConvergeOne is an authorized reseller of
equipment for Cisco, per Resolution 110-17.
The end goal is to have a secure SCADA system that provides a foundation to provide
advanced monitoring, configuration, and reporting for both water and wastewater operations.
With continued scope -of -budget oversight we feel confident we will have a fully functional
SCADA system in the near future that meets or exceeds the City's needs.
BUDGET/STAFF IMPACT:
Funds are available in the Sanitary Sewer Rehabilitation account within the Water & Sewer
Fund.
Attachments:
SCADA Software Upgrade Addendum to the Out -of -Scope Letter Agreement
Quote from ConvergeOne, Inc.
Resolution 110-17
FAildcel��A
May 12, 2021
Mr. Tim Nyander
City of Fayetteville
113 West Mountain Street
Fayetteville, AR 72701
Subject: Out -of -Scope Letter Agreement
SCADA Software Upgrade Addendum
Dear Mr. Nyander:
9191 S. Jamaica Street
Englewood, CO 80211
ww.jacobs.com
CH2M Hill Engineers, Inc. (CH2M HILL) will provide the following out -of -scope services/materials as an
addendum to the previous out -of -scope agreement dated 3/3/2020:
What is being provided: Additional services in support of the SCADA Upgrade
Project, including:
1. Additional configuration activities associated with
Nutanix server configuration caused by an unknown
compatibility issue with the Nutanix server and VMWare
software versions.
2. Design changes associated with a change from a
hardware -based data concentrator to a software -based
data concentrator, including setup, testing, VTScada tag
database updates, and VTScada Application updates.
When it is being provided: All work under this agreement is expected to be complete by 6/30/21.
Price of services: The fee is calculated based on the hourly rates and the estimated Level of
Effort (LOE) for this Scope of Services. Compensation will be on a not -to -
exceed basis, and the compensation will not exceed a value of $69,380
without written authorization from the City of Fayetteville.
Payment terms: Invoices shall be paid in accordance with D.2.4 of Amendment 12 to the
Agreement dated January 5, 2021.
All other terms and conditions of the Agreement dated January 5, 2021 including all
Amendments 1 through 12, between CH2M HILL and the City of Fayetteville remains in full
force and effect.
If these terms are agreeable to you, please sign both copies of this letter. We will return one
fully executed original for your files.
CH2M HILL appreciates the opportunity to provide these additional services to the City of
Fayetteville.
Sincerely,
IlAl-
MontylSed ak
Both parties indicate their approval of the above described services by their signature below.
Authorized CH2M HILL:
Name: Greg Weeks
Title: Manager of Projects
Date: 5/17/21
CH2M HILL ENGINEERS INC CONFIDENTIAL
r.1 Converge0ne
Solution Summary
WWTP Industrial Switches
Date: 6/4/2021
Page #: 1 of 3
Documents #: OP-000611173
SO-000674363
Solution Name: WWTP Industrial Switches
Customer: CITY OF FAYETTEVILLE, AR
Customer: CITY OF FAYETTEVILLE, AR Primary Contact: Stefan Bachrodt
Ship To Address: 113 W Mountain St Email: sbachrodt@fayetteville-ar.gov
Fayetteville, AR 72701-6069 Phone: (479) 575-8245
Bill To Address: 113 W Mountain St National Account Manager: Danny Matthews
Fayetteville, AR 72701-6069
Customer ID: AOSZFAYE101 Email: DMatthews@convergeone.com
Customer PO: Phone: +14177990737
Solution Summary Current Due Next Invoice Due Remaining Total Project
Software $0.00 One -Time $0.00
Hardware $43,303.42 One -Time $43,303.42
Project Subtotal $43,303.42 $43,303.42
Estimated Tax NOT INCLUDED
Estimated Freight NOT INCLUDED
Project Total $43,303.42 $43,303.42
CONFIDENTIAL AND PROPRIETARY INFORMATION OF CONVERGEONE, INC.
r.1 Converge0ne
Date: 6/4/2021
Page #: 2 of 3
Documents #: OP-000611173
SO-000674363
Solution Name: WWTP Industrial Switches
Customer: CITY OF FAYETTEVILLE, AR
This Solution Summary summarizes the documents(s) that are attached hereto and such documents are incorporated herein by reference (collectively, this
"Order'. Customer's signature on this Order (or Customer's issuance of a purchase order in connection with this Order) shall represent Customer's agreement
with each document in this Order and acknowledgement that such attached document(s) are represented accurately by this Solution Summary.
Unless otherwise specified in this Order, this Order shall be subject to the following terms and conditions (the "Agreement"): (i) the Master Sales Agreement or
other applicable master agreement in effect as of the date hereof between Converge0ne, Inc. and/or its subsidiaries and affiliates (collectively, "Cl" or
"Converge0ne" or "Seller") and Customer; or (ii) if no such master agreement is currently in place between C1 and Customer, the Online General Terms and
Conditions currently found on the internet at: https://www.convergeone.com/online-general-terms-and-conditions/ . If Customer's Agreement is a master
agreement entered into with one of Converge0ne, Inc.'s predecessors, affiliates and/or subsidiaries ("Legacy Master Agreement"), the terms and conditions of
such Legacy Master Agreement shall apply to this Order, subject to any modifications, located at: https://www.convergeone.com/online-general-terms-and-
conditions/ . In the event of a conflict between the terms and conditions in the Agreement and this Order, the order of precedence shall be as follows: (i) this
Order (with the most recent and specific document controlling if there are conflicts between the Solution Summary and any applicable supporting document(s)
incorporated into this Order), (ii) Attachment A to the Agreement (if applicable), and (iii) the main body of the Agreement.
This Order may include the sale of any of the following to Customer: (a) any hardware, third party software, and/or Seller software (collectively, "Products"); (b)
any installation services, professional services, and/or third party provided support services that are generally associated with the Products and sold to customers
by Seller (collectively, "Professional Services'; (c) any Seller -provided vendor management services, software release management services, remote monitoring
services and/or, troubleshooting services (collectively, "Managed Services'; and/or (d) any Seller -provided maintenance services ordered by Customer to
maintain and service Supported Products or Supported Systems at Supported Sites to ensure that they operate in conformance with their respective
documentation and specifications (collectively, "Maintenance Services"). For ease of reference only, Professional Services, Managed Services and Maintenance
Services may be referred to collectively as "Services." Unless otherwise defined herein, capitalized terms used herein will have the same meanings as set forth in
the Agreement.
Products and/or Services not specifically itemized are not provided hereunder. This Order will be valid for a period of thirty (30) days following the date hereof.
Thereafter, this Order will no longer be of any force and effect.
This Order is a configured order and/or contains software.
ACCEPTED BY:
BUYER:
TITLE:
07e1111:11
SELLER:
TITLE:
Solution Quote
07
-All i1
# Item Number Description Public Sector Term Qty Unit List Price Extended List % Disc Unit Price Extended Price
Contract
1 IE-2000-4T-G-B IE2000 with 4 FE Copper ports & 2 GE Copper AR3227 51 $1,399.88 $71,393.88 50.00 % $699.94 $35,696.94
ports (Lan Base) 4600048977 SP-20
-0051
CONFIDENTIAL AND PROPRIETARY INFORMATION OF CONVERGEONE, INC.
r.1 ConvergeOne
Solution Quote
Date: 6/4/2021
Page #: 3 of 3
Documents #: OP-000611173
SO-000674363
Solution Name: WWTP Industrial Switches
Customer: CITY OF FAYETTEVILLE, AR
# Item Number Description Public Sector Term Qty I Unit List Price Extended List % Disc Unit Price Extended Price
Contract
2 IOT-OTHER
Not related to an IoT Solution; For tracking
AR3227
only.
4600048977 SP-20
-0051
3 NO-IOT-
Not related to an IoT Solution; For tracking
AR3227
SOLUTION
only.
4600048977 SP-20
-0051
4 IE-2000-8TC-G-B
IE2000 with 8FE Copper ports and 2GE uplinks
AR3227
(Lan Base)
4600048977 SP-20
-0051
5 IOT-OTHER
Not related to an IoT Solution; For tracking
AR3227
only.
4600048977 SP-20
-0051
6 NO-IOT-
Not related to an IoT Solution; For tracking
AR3227
SOLUTION
only.
4600048977 SP-20
-0051
51
$0.00
$0.00
0.00 %
51
$0.00
$0.00
0.00 %
8
$1,901.63
$15,213.04
50.00 %
8
$0.00
$0.00
0.00 %
8
$0.00
$0.00
0.00 %
Total: $86,606.92
$0.00
$0.00
$0.00
$0.00
$950.81
$7,606.48
$0.00
$0.00
$0.00
$0.00
$1,650.75 $43,303.42
CONFIDENTIAL AND PROPRIETARY INFORMATION OF CONVERGEONE, INC.
113 West Mountain Street
Fayetteville, AR 72701
(479) 575-8323
Resolution: 110-17
File Number: 2017-0240
CISCO SYSTEMS, INC.:
A RESOLUTION TO AUTHORIZE THE PURCHASE OF CISCO SYSTEMS, INC. DATA
COMMUNICATIONS PRODUCTS AND SERVICES THROUGH AUTHORIZED RESELLERS,
PURSUANT TO A STATE OF ARKANSAS AND WESTERN STATES CONTRACTING ALLIANCE
- NATIONAL ASSOCIATION OF PROCUREMENT OFFICIALS CONTRACT
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby authorizes the purchase of
Cisco Systems, Inc. data communications products and services through authorized resellers, pursuant to a
State of Arkansas and Western States Contracting Alliance - National Association of Procurement Officials
contract, a copy of which is attached to this Resolution.
PASSED and APPROVED on 5/16/2017
Attest:
� r /
Sondra E. Smith, City Clerk Treasure ,%o%1IIflip
T Re
Ile
�'4 . •C.'�� Y D� sG�`�
r
Pu• FAYETTEVILI-E; _
• .�
Page 1
Printed on 5/17/17
Mathis, Jeana
From: Pennington, Blake
Sent: Monday, June 7, 2021 10:25 AM
To: Mathis, Jeana
Subject: RE: SO-000674363 CITY OF FAYETTEVILLE, AR.pdf
Yes, that's fine. It took me a while to figure out what was different. Only two changes — the date and the public sector
contract reference number. No substantive changes at all.
Blake E. Pennington
Assistant City Attorney
Tele: (479) 575-8313
bpenn ingtonL fayettev i I le-ar gov
From: Mathis, Jeana <jmath is@fayetteville-ar.gov>
Sent: Monday, June 7, 2021 9:56 AM
To: Pennington, Blake <bpennington@fayetteville-ar.gov>
Subject: FW: SO-000674363 CITY OF FAYETTEVILLE, AR.pdf
Hey Blake,
Can you check this and make sure that it is ok to change out. Legistar 2021-0407
Thanks
Jeana
From: Fankhouser, Shea <kfankhouser@fayetteville-ar.gov>
Sent: Monday, June 7, 2021 9:14 AM
To: Mathis, Jeana <imathis@fayetteville-ar.gov>
Subject: FW: SO-000674363 CITY OF FAYETTEVILLE, AR.pdf
Hey Jeana,
Stefan got a new quote from ConvergeOne that will need to go into the Resolution because it has a different state
contract number. ConvergeOne will accept a signed PO in place of the signed quote, so there's no need to have the
Mayor sign the quote or have the "Seller" signature.
Can you send me the finalized Resolution with this new quote switched out or let me know when it's in Laserfiche?
Thanks!
Shea
From: Bachrodt, Stefan <sbachrodt@fayetteville-ar.gov>
Sent: Monday, June 7, 2021 9:08 AM
To: Fankhouser, Shea <kfankhouser@favetteville-ar.Rov>
Subject: FW: SO-000674363 CITY OF FAYETTEVILLE, AR.pdf
1
Ok, so long story short, the Arkansas St contract expired on Junelst and was had to be re -quoted with new contract
number. Price stayed the same, but I talked to Brad and he said that Converge One does not require the quote to be
signed and will accept a PO in place of the signed quote. So maybe my bad I didn't tell you this about them.
Good news though, you can just get your PO submitted and not have to worry about going through the agenda process
again.
From: Danny Matthews <DMatthews@convergeone.com>
Sent: Friday, June 4, 2021 1:59 PM
To: Bachrodt, Stefan <sbachrodt@fayetteville-ar.gov>
Subject: SO-000674363 CITY OF FAYETTEVILLE, AR.pdf
CAUTION: This email originated from outside of the City of Fayetteville. Do not click links or open attachments unless you recognize
the sender and know the content is safe.
Hi Stefan
Quote updated with new AR contract
Thanks
Danny Matthews
cp 417-343-1180
NOTICE: This email message and any attachments hereto may contain confidential
information. Any unauthorized review, use, disclosure, or distribution of such
information is prohibited. If you are not the intended recipient, please contact
the sender by reply email and destroy the original message and all copies of it.