HomeMy WebLinkAbout166-21 RESOLUTION113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 Resolution: 166-21 File Number: 2021-0389 BID #21-37 CROSSLAND HEAVY CONTRACTORS, INC.: A RESOLUTION TO AWARD BID #21-37 AND AUTHORIZE A CONTRACT WITH CROSSLAND HEAVY CONTRACTORS, INC. IN THE AMOUNT OF $996,617.00 FOR THE CONSTRUCTION OF AN 18-INCH SEWER LINE NEAR GREGG AVENUE AND THE FULBRIGHT EXPRESSWAY, TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $99,661.70, AND TO APPROVE A BUDGET ADJUSTMENT BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby awards Bid #21-37 and authorizes Mayor Jordan to sign a contract with Crossland Heavy Contractors, Inc. in the amount of $996,617.00 for construction related to the upsizing and rerouting of an 18-inch diameter gravity sewer line near Gregg Avenue and the Fulbright Expressway, and further approves a project contingency in the amount of $99,661.70. Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment, a copy of which is attached to this Resolution. PASSED and APPROVED on 6/1/2021 Page 1 Printed on 612121 Resolution: 166-21 File Number.' 2021-0389 Attest: R K ... T,Q ♦i 0— c!� Kara Paxton, City Clerk Treasure j: FAyE7'FV , Page 2 Printed on 0/2(21 City of Fayetteville, Arkansas 113 West Mountain Street Fayetteville, AR 72701 (479)575-8323 Text File File Number: 2021-0389 Agenda Date: 6/1/2021 Version: 1 Status: Passed In Control: City Council Meetinq File Type: Resolution Agenda Number: A.21 BID #21-37 CROSSLAND HEAVY CONTRACTORS, INC.: A RESOLUTION TO AWARD BID #21-37 AND AUTHORIZE A CONTRACT WITH CROSSLAND HEAVY CONTRACTORS, INC. IN THE AMOUNT OF $996,617.00 FOR THE CONSTRUCTION OF AN 18-INCH SEWER LINE NEAR GREGG AVENUE AND THE FULBRIGHT EXPRESSWAY, TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $99,661.70, AND TO APPROVE A BUDGET ADJUSTMENT BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby awards Bid #21-37 and authorizes Mayor Jordan to sign a contract with Crossland Heavy Contractors, Inc. in the amount of $996,617.00 for construction related to the upsizing and rerouting of an 18-inch diameter gravity sewer line near Gregg Avenue and the Fulbright Expressway, and further approves a project contingency in the amount of $99,661.70. Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment, a copy of which is attached to this Resolution. City of Fayetteville, Arkansas Page 1 Printed on 61212021 Tim Nyander Submitted By City of Fayetteville Staff Review Form 2021-0389 Legistar File ID 6/1/2021 City Council Meeting Date - Agenda Item Only N/A for Non -Agenda Item 5/12/2021 WATER SEWER (720) Submitted Date Division / Department Action Recommendation: Staff recommends awarding Bid #21-37 and approving a contract with Crossland Heavy Contractors, Inc. in the amount of $996,617.00 for construction related to the upsizing and rerouting of an 18-inch diameter gravity sewer line in the vicinity of Gregg Ave. and the Fulbright Expressway, to approve a project contingency in the amount of $99,661.70, and to approve a budget adjustment. 5400.720.5700-5815.00 Account Number 02017.2102 Project Number Budgeted Item? Yes Does item have a cost? Yes Budget Adjustment Attached? Yes Budget Impact: Water and Sewer Fund Sanitary Sewer Rehabilitation Project Title Current Budget Funds Obligated Current Balance Item Cost Budget Adjustment Remaining Budget $ 6,482,469.00 $ 3,792,521.92 $ 2,689,947.08 $ 1,096,278.70 $ 1,096,279.00 $ 2,689,947.38 V20180321 Purchase Order Number: Previous Ordinance or Resolution # Change Order Number: Original Contract Number: Comments: Approval Date: CITY OF FAYETTEVILLE ARKANSAS MEETING OF JUNE 1, 2021 TO: Mayor and City Council THRU: Susan Norton, Chief of Staff Tim Nyander, Utilities Director FROM: Corey Granderson, Utilities Engineer DATE: May 12, 2021 CITY COUNCIL MEMO SUBJECT: Bid #21-37, Crossland Heavy Construction, Inc. — Construction Contract for Gregg & Fulbright Sanitary Sewer Improvements RECOMMENDATION: Staff recommends awarding Bid #21-37 and approving a contract with Crossland Heavy Contractors, Inc. in the amount of $996,617.00 for construction related to the upsizing and rerouting of an 18-inch diameter gravity sewer line in the vicinity of Gregg Ave. and the Fulbright Expressway, to approve a project contingency in the amount of $99,661.70, and to approve a budget adjustment. BACKGROUND: The City's gravity sewer collection system in this location has a 15-inch and 12-inch diameter line joining into a single 16-inch diameter line crossing underneath the Fulbright Expressway. This creates a hydraulic bottleneck, identified in our most recent Sewer Collection System Master Plan. Hawkins -Weir Engineers studied the area and determined several alternative solutions, including boring the interstate, installing a pump station, and laying a bypass gravity line. The bypass gravity line is the most economical option and will help with long-term future capacity in this basin. DISCUSSION: On April 28, 2021 the City of Fayetteville accepted sealed competitive bids for the Gregg Avenue and Fulbright Expressway Sewer Improvements project. Crossland Heavy Contractors, Inc. submitted the lowest bid. All bids are shown here: Goodwin & Goodwin, Inc. $1,137,689.50 Crossland Heavy Contractors, Inc. $996, 617.00 KAJACS Contractors, Inc. $997,000.00 Mailing Address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 BUDGET/STAFF IMPACT: Budgeted Funds from the Wastewater Impact Fee Fund will be utilized for this project. Budgeted funds will be transferred to the Sanitary Sewer Rehabilitation project to cover the cost of this project. Attachments: Project Vicinity Map Agreement Hawkins -Weir Recommendation & Certified Bid Tab Budget Adjustment City of Fayetteville, Arkansas Gregg Avenue and Fulbright Expressway Relief Gravity Sewer SECTION 00500 — AGREEMENT BETWEEN OWNER AND CONTRACTOR Contract Name/Title: Gregg Avenue and Fulbright Expressway Relief Gravity Sewer Contract No.: 20- , Construction THIS AGREEMENT is dated as of the day of in the year 20t and between The City of Fayetteville, Arkansas and Crossland Heavy Contractors Inc (hereinafter called Contractor). ARTICLE I - WORK 1.01 Contractor shall complete all Work as specified or indicated in the Contract Documents. The work under this Agreement includes, but is not limited to: A. Construction of the Gregg Avenue and Fulbright Expressway Relief Gravity Sewer improvements including approximately 900 linear feet of 18-inch gravity sewer and seven (7) manholes. 1.02 The Contractor agrees to perform the work described in the Contract Documents and comply with the terms therein for the amounts shown in the Bid Proposal. Refer to Section 00400- Bid Form for quantifies. 1.03 Any use of a third party dumpster or roll off container shall be procured from the City of Fayetteville Recycling and Trash Collection Division. Use of a Non -City dumpster or roll off container is not allowed. 1.04 Contractor is responsible for obtaining all applicable permits. The fees for City of Fayetteville (only) issued permits shall be waived. 1.05 The Contract may include work in City of Fayetteville right-of-way, ARDOT (State) right-of- way, railroad right-of-way and in General or Utility Easements. ARTICLE 2 - ENGINEER 2.01 The Contract Documents have been prepared by Hawkins -Weir Engineers, Inc. Hawkins - Weir Engineers, Inc. assumes all duties and responsibilities, and has the rights and authority assigned to Engineer in connection with completion of the Work in accordance with the Contract Documents. 2.02 The City of Fayetteville assumes all duties and responsibilities, and has the rights and authority assigned to The City of Fayetteville as Owner in connection with completion of the Work in accordance with the Contract Documents. 00500-Agreement 00500-1 September 2020 City of Fayetteville, Arkansas Gregg Avenue and Fulbrigbt Expressway Relief Gravity Sewer SECTION 00500 — AGREEMENT BETWEEN OWNER AND CONTRACTOR (continued) ARTICLE 3 - CONTRACT TIME 3.01 TIME OF THE ESSENCE: A. All time limits for milestone, if any, Substantial Completion and completion and readiness for final payment as stated in the Contract Documents are of the essence of the Contract. 3.02 DATES FOR COMPLETION AND FINAL PAYMENT: A. The Work shall be substantially completed within 120 calendar days after the date when the Contract Times commence to run as provided in the GENERAL CONDITIONS, and final completion and ready for final payment within 30 calendar days after the date when the Contract Times commence to run as provided in the GENERAL CONDITIONS. 3.03 LIQUIDATED DAMAGES: A. Owner and Contractor recognize that time is of the essence of this Agreement and that The City of Fayetteville will suffer financial loss if the Work is not completed within the time specified above, plus any extensions thereof allowed in accordance with the GENERAL CONDITIONS. The parties also recognize the delays, expense, and difficulties involved in proving the actual loss suffered by The City of Fayetteville if the Work is not Substantially Completed on time. Accordingly, instead of requiring any such proof, The City of Fayetteville and Contractor agree that as liquidated damages for delay (but not as a penalty) Contractor shall pay The City of Fayetteville Seven Hundred and Fifty Dollars ($750.00) for each calendar day that expires after the time specified above in Paragraph 3.02 for Substantial Completion until the Work is Substantially Complete. After Substantial Completion, if Contractor shall neglect, refuse, or fail to complete the remaining Work within the time specified in Paragraph 3.02 for completion and readiness for final payment or any proper extension thereof granted by The City of Fayetteville, Contractor shall pay The City of Fayetteville Seven Hundred and Fifty Dollars ($750.00) for each calendar day that expires after the time specified for completion and readiness for final payment. 00500-Agreement 00500-2 September 2020 City of Fayetteville, Arkansas Gregg Avenue and Fulbright Expressway Relief Gravity Sewer SECTION 00500 — AGREEMENT BETWEEN OWNER AND CONTRACTOR (continued) ARTICLE 4 - CONTRACT PRICE 4.01 The CITY OF FAYETTEVILLE agrees to pay, and the CONTRACTOR agrees to accept, as full and final compensation for all work done under this agreement, the amount based on the unit prices bid in the Proposal (BID FORM) which is hereto attached, for the actual amount accomplished under each pay item, said payments to be made in lawful money of the United States at the time and in the manner set forth in the Specifications. 4.02 As provided in the Contract estimated quantities are not guaranteed, and determinations of actual quantities and classifications are to be made by ENGINEER as provided in the General Conditions. Unit prices have been computed as provided in the Contract Documents. 4.03 Changes, modifications, or amendments in scope, price or fees to this contract shall not be allowed without a prior formal contract amendment approved by the Mayor and the City Council in advance of the change in scope, cost or fees. 1. Further, there shall be no changes to the scope and/or contract documents without prior written approval of the Engineer of Record and the City's designated Professional Engineer. ARTICLE 5 - PAYMENT PROCEDURES 5.01 SUBMITTAL AND PROCESSING OF PAYMENTS: A. Contractor shall submit Applications for Payment in accordance with the GENERAL CONDITIONS. Applications for Payment will be processed by Engineer as provided in the GENERAL CONDITIONS. 5.02 PROGRESS PAYMENTS, RETAINAGE: A. The City of Fayetteville shall make progress payments on account of the Contract Price on the basis of Contractor's Applications for Payment as recommended by Engineer, on or about the 15t" day of each month during construction. All such payments will be measured by the schedule of values established in the GENERAL CONDITIONS (and in the case of Unit Price Work based on the number of units completed) or, in the event there is no schedule of values, as provided in the General Requirements. 00500 Agreement 00500-3 September 2020 City of Fayetteville, Arkansas Gregg Avenue and Fulbright Expressway Relief Gravity Sewer SECTION 00500 — AGREEMENT BETWEEN OWNER AND CONTRACTOR (continued) 1. Prior to Substantial Completion, progress payments will be made in an amount equal to the percentage indicated below, but, in each case, less the aggregate of payments previously made and less such amounts as Engineer shall detennine, or The City of Fayetteville may withhold, in accordance with the GENERAL CONDITIONS. a. 95% of Work Completed (with the balance being retainage). If Work has been 50% completed as determined by Engineer, and if the character and progress of the Work have been satisfactory to The City of Fayetteville and Engineer, The City of Fayetteville on recommendation of Engineer, may determine that as long as the character and progress of the Work subsequently remain satisfactory to them, there will be no additional retainage on account of Work subsequently completed, in which case the remaining progress payments prior to Substantial Completion will be an amount equal to 100% of the Work Completed less the aggregate of payments previously made; and b. 100% of Equipment and Materials not incorporated in the Work but delivered, suitably stored, and accompanied by , documentation satisfactory to The City of Fayetteville as provided in the GENERAL CONDITIONS. 5.03 FINAL PAYMENT: A. Upon final completion and acceptance of the Work in accordance with the GENERAL CONDITIONS, The City of Fayetteville shall pay the remainder of the Contract Price as recommended by Engineer and as provided in the GENERAL CONDITIONS. ARTICLE 6 - CONTRACTOR'S REPRESENTATIONS 6.01 In order to induce The City of Fayetteville to enter into this Agreement, Contractor makes the following representations: A. Contractor has examined and carefully studied the Contract Documents including the Addenda and other related data identified in the Bid Documents. B. Contractor has visited the Site(s) and become familiar with and is satisfied as to the general, local, and Site conditions that may affect cost, progress, perfonnance, and furnishing of the Work. 00500-Agreement 00500-4 September 2020 City of Fayetteville, Arkansas Gregg Avenue and Fulbright Expressway Relief Gravity Sewer SECTION 00500 — AGREEMENT BETWEEN OWNER AND CONTRACTOR (continued) C. Contractor is familiar with and is satisfied as to all federal, state, and local Laws and Regulations that may affect cost, progress, perfonmance, and furnishing of the Work. D. Contractor has carefully studied all: (1) Reports of explorations and tests of subsurface conditions at or contiguous to the Site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the Site; and (2) Reports and drawings of a Hazardous Environmental Condition, if any, at the Site. Contractor acknowledges that The City of Fayetteville and Engineer do not assume responsibility for the accuracy or completeness of information and data shown or indicated in the Contract Documents with respect to Underground Facilities at or contiguous to the Site. E. Contractor has obtained and carefully studied (or assumes responsibility of having done so) all such additional supplementary examinations, investigations, explorations, tests, studies, and data concerning conditions (surface, subsurface, and Underground Facilities) at or contiguous to the Site or otherwise which may affect cost, progress, performance, and furnishing of the Work or which relate to any aspect of the means, methods, techniques, sequences, and procedures of construction to be employed by Contractor and safety precautions and programs incident thereto. F. Contractor does not consider that any additional examinations, investigations, explorations, tests, studies, or data are necessary for the performing and furnishing of the Work at the Contract Price, within the Contract Times, and in accordance with the other terms and conditions of the Contract Documents. G. Contractor is aware of the general nature of work to be performed by The City of Fayetteville and others at the Site that relates to the Work as indicated in the Contract Documents. H. Contractor has correlated the information known to Contractor, information and observations obtained from visits to the Site, reports and drawings identified in the Contract Documents, and all additional examinations, investigations, explorations, tests, studies, and data with the Contract Documents. I. Contractor has given Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Contractor has discovered in the Contract Documents and the written resolution thereof by Engineer is acceptable to Contractor. 00500-Agreement 00500-5 September 2020 City of Fayetteville, Arkansas Gregg Avenue and Fulbright Expressway Relief Gravity Sewer SECTION 00500 — AGREEMENT BETWEEN OWNER AND CONTRACTOR (continued) J. The Contract Documents are generally sufficient to indicate and convey understanding of all tenns and conditions for perfonnance and furnishing of the Work. ARTICLE 7 - CONTRACT DOCUMENTS 7.01 CONTENTS: A. The Contract Documents which comprise the entire Agreement between The City of Fayetteville and Contractor concerning the Work consist of the following and may only be amended, modified, or supplemented as provided in this Agreement and in the GENERAL CONDITIONS: 1. This Agreement. 2. Exhibits to this Agreement (enumerated as follows): a. Notice to Proceed. b. Contractor's Bid. c. Documentation submitted by Contractor prior to Notice of Award. 3. Perfonnance, Payment, and other Bonds. a. The Perfonnance and Payment Bond shall be one hundred percent (100%). b. The Contractor shall file the Performance, Payment and Warranty Bonds at the Washington County Clerk's office prior to providing a file marked copy of the filed Performance, Payment and Warranty Bonds to the Owner or Engineer. 4. General Conditions. 5. Supplementary Conditions. 6. Specifications consisting of divisions and sections as listed in Table of Contents of Project Manual. 7. Drawings consisting of a cover sheet and sheets as listed in the Table of Contents thereof (Drawings), with each sheet bearing the following general title: Gregg Avenue and Fulbri ht Expressway Relief Gravity Sewer 8. Addenda numbers inclusive. 9. The following which may be delivered or issued after the Effective Date of the Agreement and are not attached hereto: All Written Amendments and 00500-Agreement 00500-6 September 2020 City of Fayetteville, Arkansas Gregg Avenue and Fulbright Expressway Relief Gravity Sewer SECTION 00500 — AGREEMENT BETWEEN OWNER AND CONTRACTOR (continued) other documents amending, modifying, or supplementing the Contract Documents pursuant to the GENERAL CONDITIONS. ARTICLE 8 - MISCELLANEOUS 8.01 TERMS: A. Terms used in this Agreement which are defined in the GENERAL CONDITIONS shall have the meanings stated in the GENERAL CONDITIONS. 8.02 ASSIGNMENT OF CONTRACT: A. No assignment by a party hereto of any rights under or interests in the Contract Documents will be binding on another party hereto without the written consent of the party sought to be bound; and specifically but without limitation, moneys that may become due and moneys that are due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by Law), and unless specifically stated to the contrary in any written consent to an assignment, no assignment will release or discharge the assignor from any duty or responsibility under the Contract Documents. 8.03 SUCCESSORS AND ASSIGNS: A. The City of Fayetteville and Contractor each binds himself, his partners, successors, assigns, and legal representatives to the other party hereto, its partners, successors, assigns, and legal representatives in respect to all covenants, agreements, and obligations contained in the Contract Documents. 8.04 SEVERABILITY: A. Any provision or part of the Contract Documents held to be void or unenforceable under any Law or Regulation shall be deemed stricken, and all remaining provisions shall continue to be valid and binding upon The City of Fayetteville and Contractor, who agree that the Contract Documents shall be reformed to replace such stricken provision or part thereof with a valid and enforceable provision that comes as close as possible to expressing the intention of the stricken provision. 8.05 FREEDOM OF INFORMATION ACT: A. City contracts and documents prepared while performing city contractual work are subject to the Arkansas Freedom of Information Act. If a Freedom of Information Act request is presented to the City of Fayetteville, the contractor will do everything possible to provide the documents in a prompt and timely manner as prescribed in the 00500-Agreement 00500-7 September 2020 City of Fayetteville, Arkansas Gregg Avenue and Fulbright Expressway Relief Gravity Sewer SECTION 00500 — AGREEMENT BETWEEN OWNER AND CONTRACTOR (continued) Arkansas Freedom of Information Act (A.C.A. §25-19-101 et. seq.). Only legally authorized photocopying costs pursuant to the FOIA may be assessed for this compliance. 8.06 LIENS: A. No liens against this construction project are allowed. Arkansas law (A.C.A. §§18-44-501 through 508) prohibits the filing of any mechanics' of materialmen's liens in relation to this public constriction project. Arkansas law requires and the contractor promises to provide and file with the Circuit Clerk of Washington County a bond in a sum equal to the amount of this contract. Any subcontractor or materials supplier may bring an action for non-payment or labor or material on the bond. The contractor promises to notify every subcontractor and materials supplier for this project of this paragraph and obtain their written acknowledgement of such notice prior to commencement of the work of the subcontractor or materials supplier. 00500-Agreement 00500-8 September 2020 City of Fayetteville, Arkansas Gregg Avenue and Fulbright Expressway Relief Gravity Sewer SECTION 00500 — AGREEMENT BETWEEN OWNER AND CONTRACTOR (continued) IN WITNESS WHEREOF, The City of Fayetteville and Contractor have signed this Agreement in quadruplicate. One counterpart each has been delivered to Contractor. Three counterparts each has been retained by The City of Fayetteville. All portions of the Contract Documents have been signed, initialed, or identified by The City of Fayetteville and Contractor. This Agreement will be effective on 204, which is the Effective Date of the Agreement. CONTRACTOR: By: Mark Sell (Type or legibly pn ) (Signature) Title President CyUli`l$M". '13lIM: "If twa- V By: Ligneld Jot (Type legibly Title: Mayor Contractor shall attach evidence of authority to sign. If Contractor is a corporation, corporate entity or LLC, Contractor shall attach Corporate Resolution authorizing Contractor's signature and execution of Agreement. Further if Contractor is a corporation, corporate entity or LLC, Contractor shall also attach a copy of the Contractor's Articles of Incorporation and a copy form the Arkansas State Secretary of State to document that the corporation, corporate entity or LLC is in current "Good Standing" with the State of Arkansas and such entity is permitted to perform work in the State of Arkansas. (SEAL) (SEAL) N ` =`may•' CITY•;`9 •�� G� • c1� Attest � � , � Attest �• G r .Q, 00500-Agreement 00500-9 Septetf ��� OV;;``���`� City of Fayetteville, Arkansas Gregg Avenue and Fulbright Expressway Relief Gravity Sewer SECTION 00500 — AGREEMENT BETWEEN OWNER AND CONTRACTOR (continued) Address for giving notices Address for giving notices P O Box 350 113 W. Mountain St. Columbus, KS 66725 License No. Agent for Service of process (Type or legibly print) (Signature) Fayetteville, AR 72701 Contractor shall attach evidence of authority of Agent for Service process to sign. If Contractor is a corporation, corporate entity or LLC, Contractor shall attach Corporate Resolution authorizing Agent for Service process authority to sign. (If Contractor is a corporation, corporate entity or LLC, attach evidence of authority to sign.) Approved as to Form: By: Attorney For:. END OF SECTION 00500 00500-Agreement 00500-10 September 2020 --4 0 1 ". 30 15 0 30 A, SCALE IN FEET SCALE ACCORDINGLY INII --------------------------------------------------------- 0 : -------------- ­Ll N l- Pc n Na Iv - ------------- ==—i® R'' rl ii 8 E, S'� -T - - ------------------------ 1& Qa a as------------------- --- A-1 ------ --- -- --- --- -- -- ------------------- -- 6100 W4 QI -------------------- EA-1 -------- i T" ---------- --------- MC—M ---------- ;-16 E-1 8 -1A -'I -AR1 E ii z LU ag 'Azs LU ------------------------------------------------ - - -- --- ----------- �j -Z PHA2 z 77- 5 NORTH GREGG A IENUE NORTH GREGG A ANUE PLAN ---------- ASE - zz, .................. I TAIT TT. IN 'TAIT. I ITA S-TA MJRECMA LA1011 EAT. a N U I E=1I1T1,A_1iE-RI MAII A�111 1 SIRUNIG.vnCES , _. All AT MCA-AACUV1.ET1ES NOT -F MAN TT T ­ 3 SM ­0 SM AEST A-1 1111 BEGINNING AITUIr. AU' -7, - 5- - AND TAW IZITCI�A,111.11 -11A'0".N"=" Al- A''-R -1.71 �,"-IA TAIT III (EAST ASE STA I- TCM A. A.C- MALVOT -F N_A MAN, I,ORIufwATMAN....... .. A- .1 ..T No 5 11 PANHAWKIN E N G I N E E May 10, 2021 Mr. Tim Nyander Utilities Director City of Fayetteville 113 West Mountain Street Fayetteville, Arkansas 72701 Re: Gregg and Fulbright Sewer Improvements Project No. 21-37 HWEI Project No. 2019102 Dear Mr. Nyander: S 6WEIR R S, I N C. Engineering Client Success Three (3) bids were received on Wednesday, April 28, 2021, for the referenced project. The low bid was submitted by Crossland Heavy Contractors, Inc. in the amount of $996,617.00. We have reviewed the Certified Bid Tabulation prepared by the City of Fayetteville, and recommend that the City of Fayetteville award a contract for the Gregg and Fulbright Sewer Improvements to the low bidder, Crossland Heavy Contractors, Inc., for a total contract price of $996,617.00. We have worked with Crossland Heavy Contractors on past projects and their performance to date has been satisfactory. We understand that you will present the bid tabulation and our recommendation to the City of Fayetteville Water, Sewer, and Solid Waste Committee for their consideration at the May 2021 meeting. We will attend the meeting and be available to answer any questions. If you have any questions or comments, please do not hesitate to call. Sincerely, HAWKINS-WEIR ENGINEERS, INC. Blake Peacock, P.E. BAP Enclosure: Certified Bid Tabulation cc: Mr. Corey Granderson, P.E., Utilities Engineer 110 So. 7th Street • P.O. Box 648 • Van Buren, AR 72957 • Ph: (479) 474-1227 • Fax: (479) 474-8531 211 Natural Resources Drive • Little Rock, AR 72205 • Ph: (501) 374-4846 438 East Nlillsap Road • Suite 200 • Fayetteville, AR 72703 Ph: (479) 455-2206 403 Garrison Avenue • Suite 101 • Fort Smith, AR 72901 • Ph: (479) 242-4685 2019102\TN051021 BAP.docx www.hazukins-weir.com CITE OF FAYETTEVILLE AHKANNd9 BID TABULATION BID 21-37, CONSTRUCTION - GREGG AND FULBRIGHT SEWER IMPROVEMENTS Deadline: Wednesday, April 28, 2021 at 2:00 PM, Local Time Certification of funds : $2, 000, 000. 00 25%Allowance: $500,000.00 Total Allowed: $2,500, 000. 00 Crossland Heavy Contractors, Kajacs Contractors Inc. Goodwin & Goodwin, Inc. Inc. $ 996,617.00 $ 1,137,689.50 $ 997,000.00 Total Cost Unit Quantity Unit Total Unit Total Unit Total Item # Items Description of Required Price Cost Price Cost Price Cost Bid 21-37, Base Bid Measure #1-1 Total (37) Mobilization - Shall not exceed 5% of Total Base Bid 1 LS $ 47,000.001 $ 47,000.00 $ 50,000.00 $ 50,000.00 EIIIIIIIIIII $ 49,750.00 $ 49,750.00 #1-2 Bonds &Insurance 1 LS $ 20,000.00 $ 20,000.00 $ 35,000.00 $ 35,000.00 $ 25,000.00 $ 25,000.00 #1-3 Site Preparation 1 LS $ 75,400.00 $ 75,400.00 $ 150,000.00 $ 150,000.00 $ 25,000.00 $ 25,000.00 #14 Excavation and Trench Safety 1 LS $ 35,000.00 $ 35,000.00 $ 25,000.00 $ 25,000.00 $ 12,280.00 $ 12,280.00 #1-5 Dewatering 1 LS $ 10,000.00 $ 10,000.00 $ 20,000.00 $ 20,000.00 $ 7,500.00 $ 7,500.00 #1-6 Construction Erosion Control 1 LS $ 10,000.00 $ 10,000.00 $ 8,000.00 61_ 8,000.00 $ 9,500.00 $ 9,500.00 #1-7 Traffic Control 1 LS $ 13,000.00 $ 13,000.00 $ 50,000.00 $ 50,000.00 $ 20,000.00 $ 20,000.00 #1-8 Remove and Dispose of Existing Manhole 2 EA $ 810.00 $ 1,620.00 $ 2,000.00 $ 4,000.00 $ 8,500.00 $ 17,000.00 #1-9 Furnish and Install Manhole, 5' Diameter (0-6' Deep) 6 EA $ 6,300.00 $ 37,800.00 $ 10,000.00 $ 60,000.00 $ 9,000.00 $ 54,000.00 #1-10 Furnish and Install Manhole, 6' Diameter (0-6' Deep) 1 EA $ 8,400.00 $ 8,400.00 $ 15,000.00 $ 15,000.00 $ 12,000.00 $ 12,000.00 #1-11 Additional Depth for Manhole, 5' Diameter 30 VF $ 514.00 $ 15,420.00 $ 500.00 $ 15,000.00 $ 600.00 $ 18,000.00 #1-12 Additional Depth for Manhole, 6' Diameter 5 VF $ 514.001 $ 2,570.00 $ 700.00 $ 3,500.00 $ 700.00 $ 3,500.00 #1-13 Furnish and Install Hinged, Locking Manhole Frame and Cover 7 EA $ 860.001 $ 6,020.00 $ 2,000.00 $ 14,000.00 $ 900.00 $ 6,300.00 #1-14 Connect to Existing Clay Sewer Pipe 2 EA $ 1,750.00 $ 3,500.00 $ 5,000.00 $ 10,000.00 $ 1,000.00 $ 2,000.00 #1-15 Granular Backfill (Trenches) 1300 CY $ 56.00 $ 72,800.00 $ 55.00 $ 71,500.00 $ 55.00 $ 71,500.00 #1-16 Select Backfill 2000 CY $ 34.00 $ 68,000.00 $ 26.00 $ 52,000.00 $ 45.00 $ 90,000.00 #1-17 Flowable Fill 250 CY $ 150.00 $ 37,500.00 $ 200.00 $ 50,000.00 $ 130.00 $ 32,500.00 #1-18 Rock Excavation (Trenches) 950 CY $ 100.00 $ 95,000.00 $ 0.01 $ 9.50 $ 165.00 $ 156,750.00 #1-19 Trenching and Backfilling, 8-12' Deep 860 LF $ 55.00 $ 47,300.00 $ 25.00 $ 21,500.00 $ 85.00 $ 73,100.00 #1-20 Trenching and Backfilling, 12-16' Deep 36 LF $ 75.00 $ 2,700.00 $ 50.00 $ 1,800.00 $ 125.00 $ 4,500.00 #1-21 Furnish and Install 18" PS 115 PVC Sewer Main w/ Bedding, Marking Tape 896 LF 183.00 163,968.00 225.00 $ 201,600.00 75.00 $ and Tracer Wire $ $ $ $ 67,200.00 #1-22 Furnish and Install Tracer Wire Junction Box 7 EA $ 252.00 $ 1,764.00 $ 150.00 $ 1,050.00 $ 500.00 $ 3,500.00 #1-23 Furnish and Install Sewer Line Marker Post 1 EA $ 336.00 $ 336.00 $ 150.00 $ 150.00 $ 250.00 $ 250.00 #1-24 Plug and Abandon Existing 8" Sewer Line 2 EA $ 502.00 $ 1,004.00 $ 1,500.00 $ 3,000.00 $ 1,750.00 $ 3,500.00 #1-25 Furnish and Install 30" Steel Encasement by Open Cut (including Restrained 130 LF $ 450.00 $ 58,500.00 $ 800.00 $ 104,000.00 $ 450.00 $ 58,500.00 Joints, Casing Spacers and End Seals) #1-26 Furnish and Install High -Flow Bypass Weir 1 LS $ 4,885.00 $ 4,885.00 $ 6,500.00 $ 6,500.00 $ 5,000.00 $ 5,000.00 #1-27 Remove and Replace 36" RCP 20 LF $ 207.00 $ 4,140.00 $ 225.00 $ 4,500.00 $ 150.00 $ 3,000.00 #1-28 Remove and Replace Concrete Driveway (6" Thickness) 310 Sy $ 70.001 $ 21,700.00 $ 80.00 $ 24,800.00 $ 70.00 $ 21,700.00 #1-29 Remove and Replace Concrete Sidewalk (4" Thickness) 440 Sy $ 54.001 $ 23,760.00 $ 70.00 $ 30,800.00 $ 60.00 $ 26,400.00 #1-30 Remove and Replace Asphalt Pavement (3" Thickness) 600 Sy $ 71.00 $ 42,600.00 $ 50.00 $ 30,000.00 $ 100.00 $ 60,000.00 #1-31 Remove and Replace Concrete Curb and Gutter 200 LF $ 27.00 $ 5,400.00 $ 40.00 $ 8,000.00 $ 25.00 $ 5,000.00 #1-32 Furnish and Install Concrete Deep Patch 600 Sy $ 63.00 $ 37,800.00 $ 65.00 $ 39,000.00 $ 35.00 $ 21,000.00 #1-33 Furnish and Install Tack Coat 100 GAL $ 5.00 $ 500.00 $ 6.00 $ 600.00 $ 4.50 $ 450.00 #1-34 Furnish and Install 2" Caliper Tree 2 EA $ 1,200.00 $ 2,400.00 $ 450.00 $ 900.00 $ 500.00 $ 1,000.00 #1-35 Remove and Replace Landscaping 1 LS $ 9,200.00 $ 9,200.00 1 $ 10,000.00 $ 10,000.00 $ 17,000.00 $ 17,000.00 #1-36 Furnish and Install Solid Sod 1150 Sy $ 6.00 $ 6,900.00 1 $ 8.00 $ 9,200.00 $ 10.00 $ 11,500.00 #1-37 IPost TV Inspection of New Sewer Main 1 910 1 LF $ 3.00 $ 2,730.00 $ 8.00 $ 7,280.00 $ 2.00 $ 1,820.00 *NOTICE: Bid award is contingent upon vendor meeting minimum specifications and formal authorization by City officials. CITY OF FAYETTEVILLE ARKANS ARKANSAS Bid 21-37, Construction - Gregg Avenue and Fulbright Expressway Sewer Improvements Project Overview Project Details Reference ID Bid 21-37, Construction - Gregg Avenue and Fulbright Expressway Sewer Improvements Project Name Bid 21-37, Construction - Gregg Avenue and Fulbright Expressway Sewer Improvements Project Owner Andrea Foren Project Type ITB Department Purchasing Certification of Funds 25% Allowance $2,000,000.00 $500,000.00 Total Allowed $2,500,000.00 The City of Fayetteville is accepting bids from properly licensed and authorized firms for the Gregg Avenue — Fulbright Expressway Relief Gravity Sewer project. The work includes but is not limited to the Project Description construction of approximately 900 linear feet of 18-inch sewer line as further defined in the Contract Documents. All questions during the bidding process shall be addressed to Andrea Foren, City Purchasing Manager at aforen@fayetteville-ar.gov. Open Date Apr 04, 2021 12:00 AM CDT Close Date Apr 28, 2021 2:00 PM CDT CITY OF FAYETTEVILLE ARKANS ARKANSAS Highest Scoring Supplier Score Crossland Heavy Contractors, Inc. 100 pts Seal status Requested Information Unsealed on Unsealed by Bid Bond Apr 28, 2021 2:02 PM CDT Adonis Bwashi Required Signature Form Apr 28, 2021 2:02 PM CDT Adonis Bwashi AR Secretary of State Filing # Apr 28, 2021 2:02 PM CDT Adonis Bwashi Arkansas Contractor's License Apr 28, 2021 2:02 PM CDT Adonis Bwashi Pursuant Arkansas Code Annotated §25-1-503, the Contractor agrees and certifies that they do not currently boycott Israel and will not boycott Israel during any time in which they are entering into, Apr 28, 2021 2:02 PM CDT Adonis Bwashi or while in contract, with any public entity as defined in §25- 1-503. If at any time during contract the contractor decides to boycott Israel, the contractor must notify the contracted public entity in writing. Bid 21-37, Bid Form (BT- Apr 28, 2021 2:02 PM CDT Adonis Bwashi 35HQ) CITY OF FAYETTEVILLE ARKANS ARKANSAS Conflict of Interest # Declaration of Conflict of Interest You have been chosen as a Committee member for this Evaluation. Please read the following information on conflict of interest to see if you have any problem or potential problem in serving on this committee. ## Code of Conduct All information related to submissions received from Suppliers or Service Providers must be kept confidential by Committee members. ## Conflict of Interest No member of a Committee shall participate in the evaluation if that Committee member or any member of his or her immediate family: * has direct or indirect financial interest in the award of the contract to any proponent; * is currently employed by, or is a consultant to or under contract to a proponent; * is negotiating or has an arrangement concerning future employment or contracting with any proponent; or, * has an ownership interest in, or is an officer or director of, any proponent. Please sign below acknowledging that you have received and read this information. If you have a conflict or potential conflict, please indicate your conflict on this acknowledgment form with information regarding the conflict. I have read and understood the provisions related to the conflict of interest when serving on the Evaluation Committee. If any such conflict of interest arises during the Committee's review of this project, I will immediately report it to the Purchasing Director. Name Date Signed Has a Conflict of Interest? Adonis Bwashi Apr 28, 2021 2:03 PM CDT No Andrea Foren Apr 28, 2021 3:18 PM CDT No CITY OF FAYETTEVILLE ARKANS ARKANSAS Questions and Answers Modern Fence Supply fence Jerry Foshe, Apr 09, 2021 8:41 AM CDT Is there temp fence or fence of any kind? Generated on May 06, 2021 9:23 AM CDT - Adonis Bwashi Page 5 of 12 CITY OF FAYETTEVILLE ARKANS ARKANSAS Public Notices Addendum 1 issued to Bid 21-37, Const - Gregg & Fulbright Sewer Imp (deadline modification) Andrea Foren, Apr 05, 2021 1:32 PM CDT Due to an error in the original advertisement, Addendum 1 has been issued to Bid 21-37, Construction - Gregg & Fulbright Expressway Improvements containing a modification to the bid deadline. This Addendum is available in the public files as "Bid 21-37, File 03 - Addendum 1". Please direct all questions to Andrea Foren at aforen@fayetteville-ar.gov. Project Detail Changed Adonis Bwashi, Apr 22, 2021 10:43 AM CDT Project Detail Changed Project Documents Changed Addendum 2 has been issued to Bid 21- 37, Construction — Gregg Avenue and Fulbright Expressway Sewer Improvements and is available in the public files as "Bid 21-37, File 04 - Addendum 2". Please be advised the bid form has been revised for each line item and the bid table has been modified. Please direct all questions to Andrea Foren at aforen@fayetteville-ar.gov. ( T Y -- ��FAYETTEVILLE ARKANSASAS Submissions Supplier Goodwin & Goodwin, Inc. Crossland Heavy Contractors, Inc. Kajacs Contractors Inc Date Submitted Apr 26, 2021 2:47 PM CDT Apr 28, 2021 1:44 PM CDT Apr 28, 2021 11:10 AM CDT Name David Garcia Email docryde@yahoo.com Kaylee Mann kmann@heavycontractors.com Michael Titsworth mtitsworth@kajacs.com Confirmation Code MTM3MjMy MTM3NzQw MTM3NjUw CITY OF .� FAYETTEVILLE ARKANSAS Project Criteria Criteria Total Lump Sum Bid Price Within Certified Funds Total Points Description 100 pts Total Lump Sum Bid Pass/Fail Total base bid must be within 125% of certified funds. 100 pts P CITY OF .� FAYETTEVILLE ARKANSAS Scoring Summary Active Submissions Total Total Lump Sum Bid Price Supplier I / 100 pts / 100 pts Crossland Heavy Contractors, Inc. 1 100 pts 1 100 pts ($996,617.00) Kajacs Contractors Inc. 1 99.96 pts 1 99.96 pts ($997,000.00) Goodwin & Goodwin, Inc. 1 87.6 pts 1 87.6 pts ($1,137,689.50) Page 9 of 12 Within Certified Funds Pass/Fail Pass Pass Pass A . 4. �VICE ARKAKfl NSA."i Proposal Score Comments Goodwin & Goodwin, Inc. - Scoring Comments Total Lump Sum Bid Price - Reviewer Scores Reviewer Score Adonis Bwashi 87.6 pts ($1,137,689.50) L Within Certified Funds - Reviewer Scores Review Adonis Reason Comments Highest total lump sum bid received. Reason Comments Total lump sum bid price received Other was within 125% of the certified amount. CITY OF IVFAYETTEVILLE ARKANSAS Crossland Heavy Contractors, Inc. - Scoring Comments Total Lump Sum Bid Price - Reviewer Scores Reviewer Score Reason Adonis Bwashi 100 pts ($996,617.00) - Within Certified Funds - Reviewer Scores Comments Lowest total lump sum bid price received. Reviewer Score Reason Comments Total Lump Sum Bid was within the Adonis Bwashi Pass Other 125% of the certified amount. CITY OF .� FAYETTEVILLE ARKANS ARKANSAS Kajacs Contractors Inc. - Scoring Comments Total Lump Sum Bid Price - Reviewer Scores Reviewer I Score I Reason � Comments Adonis Bwashi 99.96 pts ($997,000.00) _ Second lowest total lump sum bid price received. Within Certified Funds - Reviewer Scores Reviewer Score Reason Comments Total lump sum bid price submitted Adonis Bwashi Pass Other was within the 125% of the certified funds. CITY OF FAYETTEVILLE ARKANS ARKANSAS Signatures Name Andrea Foren (Project Owner) Andrea Foren Signatures Digitally signed by Andrea Foren Date: 2021.05.06 12:01:39-05'00' Adonis Bwashi Digitally signed by Adonis Bwashi DN: cn=Adonis Bwashi, (Evaluator) �� I�^' email=abwashi@fayetteville-ar.gov, c=US Date: 2021.05.06 11:35:10-05'00' Andrea Foren Andrea Digitally signed by Andrea Foren (Evaluator) Foren Date: 2021.05.06 12:02:44-05'00' City of Fayetteville, Arkansas - Budget Adjustment Form (Legistar) Budget Year Division Adjustment Number /Org2 WATER SEWER (720) 2021 Requestor: Cheryl Partain BUDGET ADJUSTMENT DESCRIPTION / JUSTIFICATION: A budget adjustment is needed within the Sanitary Sewer Rehabilitation project for the upsizing and rerouting of an 18 inch gravity sewer line at Gregg Ave. and the Fulbright Expressway. Budgeted funds for the Wastewater Impact Fee project will be transferred to the Sanitary Sewer Rehabilitation project for utilization for this project. This project meets the requirements to utilize impact fee monies. COUNCIL DATE: LEGISTAR FILE ID#: 6/1/2021 2021-0389 14ouy 3lack� 5/14/2021 10:09 AM Budget Director TYPE: JOURNAL #: Date D - (City Council) RESOLUTION/ORDINANCE GLDATE: I CHKD/POSTED: 6/1/2021 TOTAL Account Number 2,192,558 2,192,558 Increase / (Decrease) Expense Revenue Proiect.Sub# Project Sub.Detl AT v.20210309 Account Name 5400.720.5700-5815.00 1,096,279 - 02017 2102 EX Improvements - Sewer 5400.720.5700-6602.30 2300.730.9300-7602.40 1,096,279 1,096,279 - 02017 2102 RE 07004 2017.2102 EX Transfer from Fund - Impact Fee Transfers To Funds - Water & Sewer Fun( 2300.720.9300-4999.99 - 1,096,279 RE Use Fund Balance - Current H:\Budget Adjustments\2021_Budget\City Council\06-01-2021\2021-0389 BA Sewer Imp Gregg and Fulbright Exp 1 of 1 CROSSLAND HEAVY CONTRACTORS, INC. CHANGE ORDER NO. 1 Tim Nyander City of Fayetteville Staff Review Form 2022-0108 Legistar File ID N/A City Council Meeting Date - Agenda Item Only N/A for Non -Agenda Item WATER SEWER (720) Submitted By Submitted Date Division / Department Action Recommendation: 2/9/2022 Staff recommends approval of Change Order No. 1 to the contract with Crossland Heavy Contractors, Inc. which will increase the contract amount by $89,203.00. Budget Impact: 5400.720.5700-5815.00 Water and Sewer Account Number 02017.2102 Project Number Budgeted Item? Yes Does item have a cost? Yes Budget Adjustment Attached? No Fund Sanitary Sewer Rehabilitation Project Title Current Budget Funds Obligated Current Balance Item Cost Budget Adjustment Remaining Budget $ 6,538,476.00 $ 2,709,860.80 —3,828, 615.20 $ 89, 203.00 I $ 3,739,412.20 V20210527 Purchase Order Number: 2021-417 Previous Ordinance or Resolution # 166-21 Change Order Number: Original Contract Number: Comments: 1 2021-38 Approval Date: CITY OF FAYETTEVILLE ARKANSAS TO: Mayor Lioneld Jordan THRU: Susan Norton, Chief of Staff Tim Nyander, Utilities Director FROM: Corey Granderson, Utilities Engineer DATE: February 9, 2022 STAFF MEMO SUBJECT: Approval of Change Order No. 1 for the Gregg-Fulbright Gravity Sewer Bypass Project RECOMMENDATION: Staff recommends approval of Change Order No. 1 to the contract with Crossland Heavy Contractors, Inc. which will increase the contract amount by $89,203.00. BACKGROUND: In June 2021, the City Council approved a contract with Crossland Heavy Contractors, Inc. for the construction of 18-inch diameter gravity sewer to bypass a hydraulic bottleneck in the vicinity of the Gregg Avenue and Fulbright Expressway intersection (Res. 166-21). DISCUSSION: During construction, the rock anticipated for removal has required substantially more effort than anticipated. Consequentially, open -cut of Appleby Road is no longer a plausible option and City Staff has worked with Crossland to consider a bore of this roadway. The Appleby closure was originally planned for one weekend, but due to the hardness of the rock in this area would likely take an entire week. This route impacts ambulance traffic to Washington Regional, and is undesirable. Change Order No. 1 will adjust project quantities to match field measurements and forecasted projections to the end of project, adjust the contractor's unit price for rock removal based on actual effort (see contractor's explanation), and add a pay -item for boring Appleby, with quantities also adjusted down for savings on road -cut related pay items. It is noted that this change order increases the contractor's pay for rock removal, but does not pay the full increase, as the City and Contractor will share this burden. BUDGET/STAFF IMPACT: Funds for this change order are available in the approved project contingency. Attachments: Contractor Request Letter Change Order No. 1 Resolution 166-21 Mailing Address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 CROSSLAND HEAVY CONTRACTORS 501 S. East Ave, P.O. Box 350 Columbus, KS 66725 Tel: 620.429.1410 Fax: 620.429.2977 January 24, 2022 Mr. Corey W. Granderson, P.E. Utilities Engineer City of Fayetteville, Arkansas 113 West Mountain Street Fayetteville, AR 72701 Gregg Avenue and Fulbright Expressway Relief Gravity Sewer Re: COR 02 Rock Excavation Efforts Mr. Granderson, Per our conversations we have encountered harder rock conditions than we anticipated in the bid. Below is a breakdown of the basis of our bid and what we have actually experienced. Basis of Bid Regular OT Pipe Super $ 47.60 $ 71.40 Skilled Operator $ 33.60 $ 50.40 Skilled Operator $ 33.60 $ 50.40 Skilled Laborer $ 30.10 $ 45.15 Pipe Truck $ 7.53 $ 7.53 Cat 325 Ex $ 112.26 $ 112.26 Hammer (Cat H130ES) $ 101.03 $ 101.03 Total Cost $ 365.73 $ 438.18 Rock Ex Rate 20 CY/Day FAC QTY 576 CY Crew Costs $ 109,501.99 Highlights to our approach Actual Regular OT Pipe Super $ 47.60 $ 71.40 Skilled Operator $ 33.60 $ 50.40 Skilled Laborer $ 30.10 $ 45.15 Pipe Truck' $ 7.53 $ 7.53 Cat 335 Ex $ 154.45 $ 154.45 Hammer (NPK GH12) $ 139.01 $ 139.01 Total Cost $ 412.29 $ 467.94 Rock Ex Rate 10 CY/Day FAC QTY 576 CY Crew Costs $ 243,887.76 Predriller $ 17,482.85 Total Costs $ 261,370.61 • We reduced our crew size to mitigate undue costs. • We hired a driller to predrill the trench in hopes of improving production. • We also upsized the excavator and hammer to improve production. In total we will have incurred $151,868.62 in additional costs at the end of the job. With margin this total is $177,686.28. In addition to these costs we have incurred an additional 29 working days or 41 calendar days. Page 1 of 2 We appreciate your consideration of this change order. Should you have any questions or comments, please do not hesitate to contact me. Thank you, Digitally signed Stetson Beck by stetson Beck Date: 2022.01.24 09:36:47-06'00' Stetson Beck CROSSLAND HEAVY CONTRACTORS Project Manager 417.825.3159 sbeck(@heavycontractors. com Page 2 of 2 CHANGE ORDER CITY OF FAYETTEVILLE IA R KA N SA S Contract Title: Bid #21-37 - Construction, Gregg & Fulbright Sanitary Sewer Improvements Change Order Nc 1 Date of Issuance: February 2, 2022 To Contractor: Crossland Heavy Contractors, Inc. ORDINANCE/RESOLUTION: 166-21` Effective: June 1, 2021 The Contract is changed as follows: Bid Bid Previous Unit Contract Revised Revised Original Revised Item Item Estimated of Unit Estimated Unit Estimated Estimated No. Descrintion Quantity Measure Price Quantity Price cost cnct #I -I Mobilization 1 LS $ 47,000.00 1 $ 47,000.00 $ 47,000.00 $ 47,000.00 #1-2 Bonds & Insurance I LS $ 20,000.00 1 $ 20,000.00 $ 20,000.00 $ 20,000.00 #1-3 Site Preparation I LS $ 75,400.00 1 $ 75,400.00 $ 75,400.00 $ 75,400.00 #1-4 Excavation and Trench Safety 1 LS $ 35,000.00 1 $ 35,000.00 $ 35,000.00 $ 35,000.00 #1-5 Dewatering I LS $ 10,000.00 1 $ 10,000.00 $ 10,000.00 $ 10,000.00 91-6 lConstrUction Erosion Control I I-S $ 10,000.00 1 1 $ 10,000.00 $ 10,000.00 $ 10.000.00 #1-7 Traffic Control I I-S $ 13,000.00 1 $ 13,000.00 $ 13,000.00 $ 13,000.00 #1-8 Remove and Dispose or Existing Manhole 2 EA $ 810.00 2 $ 810.00 $ 1,620.00 $ 1,620.00 # 1-9 Furnish and Install Manhole, 5' Diameter (0- 6' Deep) 6 EA $ 6,300.00 5 $ 6,300.00 $ 37,800.00 $ 31,500.00 #1-10 Furnish and Install Manhole, 6' Diameter (0- 6' Deep) 1 EA $ 8,400.00 1 $ 8,400.00 $ 8,400.00 $ 8,400.00 #I-1 I Additional Depth for Manhole, 5' Diameter 30 VF $ 514.00 26 $ 514.00 $ 15,420.00 $ 13,364.00 #1-12 Additional Depth for Manhole, 6' Diameter 5 VF $ 514.00 5 $ 514.00 $ 2,570.00 $ 2,570.00 #1-13 Furnish and Install Hinged, Locking Manholc Frame and Cover 7 EA $ 860.00 6 $ 860.00 $ 6,020.00 $ 5,160.00 91-14 Connect to Existing Clay Sewer Pie 2 EA $ 1,750.00 2 $ 1,750.00 $ 3,500.00 $ 3,500.00 #1-15 Granular Backlill (Trenches) 1,300 CY $ 56.00 1263 $ 56.00 $ 72,800.00 $ 70,728.00 #1-16 Select Backfill 2,000 CY $ 34.00 1018 $ 34.00 $ 68,000.00 $ 34,612.00 #1-17 FlowableFill 250 CY $ 150.00 70.5 $ 150.00 $ 37,500.00 $ 10,575.00 #1-18 Rock Excavation (Trenches) 950 CY $ 100.00 620 $ 230.00 $ 95,000.00 $ 142,600.00 91-19 Trenching and Backfilling, 8-12' Deep 860 LF $ 55.00 759 $ 55.00 $ 47,300.00 $ 41,745.00 #1-20 Trenching and Backfilling, 12-16' Deep 36 LF $ 75.00 1 6 $ 75.00 $ 2,700.00 $ 450.00 # 1-21 Furnish and Install 18" PS 115 PVC Sewer Main w/ Bedding, Marking Tape and Tracer Wire 896 LF $ 183.00 875 $ 183.00 $ 163,968.00 $ 160,125.00 #1-22 Furnish and Install Tracer Wire Junction Box 7 EA $ 252.00 0 $ 252.00 $ 1,764.00 $ - #1-23 Furnish and Install Sewer Line Marker Post I EA $ 336.00 1 $ 336.00 $ 336.00 $ 336.00 #1-24 Plug and Abandon Existing 8" Sewer Line 2 EA $ 502.00 2 $ 502.00 $ 1,004.00 $ 1,004.00 #1-25 Furnish and Install 30" Steel Encasement by Open Cut (including Restrained Joints, Casing Spacers and End Seals) 130 LF $ 450.00 64 $ 450.00 $ 58,500.00 $ 28,800.00 #1-26 Furnish and Install High -Flow Bypass Weir I I.S $ 4,885.00 1 1 $ 4,885.00 1 $ 4,885.00 1 $ 4,885.00 Gregg Fulbright COI Revl Page 1 of 2 2/2120223:34 PM #1-27 Remove and Replace 36" RCP 20 LF $ 207.00 20 $ 207.00 $ 4,140.00 $ 4,140.00 #1-28 Remove and Replace Concrete Driveway (6" Thickness) 310 SY $ 70.00 270 $ 70.00 $ 21,700.00 $ 18,900.00 #1-29 Remove and Replace Concrete Sidewalk (4" Thickness) 440 SY $ 54.00 435 $ 54.00 $ 23,760.00 $ 23,490.00 #1-30 Remove and Replace Asphalt Pavement (3" Thickness) 600 SY $ 71.00 530 $ 71.00 $ 42,600.00 $ 37,630.00 #1-31 Remove and Replace Concrete Curb and Clutter 200 LF $ 27.00 75 $ 27.00 $ 5,400.00 $ 2,025.00 #1-32 Furnish and Install Concrete Deep Patch 600 SY $ 63.00 438 $ 63.00 $ 37,800.00 $ 27,594.00 #1-33 Furnish and Install Tack Coat I00 CAI. $ 5.00 100 $ 5.00 $ 500.00 $ 500.00 #1-34 Furnish and Install 2" Caliper Tree 2 FA $ 1,200.00 2 $ 1,200.00 $ 2,400.00 $ 2,400.00 #1-35 Remove and Replace Landscaping I LS $ 9,200.00 1 $ 9,200.00 $ 9,200.00 $ 9,200.00 #1-36 Furnish and install Solid Sod 1,150 S)' $ 6.00 1,150 $ 6.00 $ 6,900.00 $ 6,900.00 # 1-37 Post TV Inspection of New Sewer Main 910 LF $ 3.00 889 $ 3.00 $ 2,730.00 $ 2,667.00 COI . l Appleby Road 36" Steel Encasement via Bore 0 LS $ - 1 $ 178,000.00 $ - $ 178,000.00 i ne ongmai i,on[racr race was Net change by previously authorized change orders The Contract Price prior to this Change Order was The Contract Price will increase by The new Contract Price including this Change Order will be The Contract Time(s) will increase by Required dates of Completion as of the date of this Change Order therefore are: $ 996,617.00 $ 1,085,820.00 Net Cost for this Change Order $ 89,203.00 7.00 3.00 Substantial Completion ................ .-...... .... ...... ......................... ....Februa....,..................................... ry P 14, 2022 •------------------------------------------------------------------------------------------------------------------------------- Final Completion P March 16, 2022 NOTE This summary does not reflect changes in the Contract Price or Time(s) which have been authorized by Work Change Directives not incorporated in this or previous Change Orders. / rRecommended By: Hawkins -Weir Engineers Approved Ity of evill C�uL. 2/3/2022 2'%%' 2�i BY DATE e nAT Accepted By: Crossland Heavy Contractors, Inc. Stetson Beck BY Gregg Fulbright C01 Rev1 Page 2 of 2 2/2/20223:34 PM of fAY£rrE L V m a Iy ,'PKANS PS 113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 Resolution: 166-21 File Number: 2021-0389 BID #21-37 CROSSLAND HEAVY CONTRACTORS, INC.: A RESOLUTION TO AWARD BID #21-37 AND AUTHORIZE A CONTRACT WITH CROSSLAND HEAVY CONTRACTORS, INC. IN THE AMOUNT OF S996,617.00 FOR THE CONSTRUCTION OF AN 18-INCH SEWER LINE NEAR GREGG AVENUE AND THE FULBRIGHT EXPRESSWAY, TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF S99.661.70. AND TO APPROVE A BUDGET ADJUSTMENT BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section I: That the City Council ofthe City of Fayetteville, Arkansas hereby awards Bid.421-37 and authorizes Mayor Jordan to sign a contract with Crossland Heavy Contractors, Inc. in the amount of $996.617.00 for construction related to the upsizing and rerouting of an 18-inch diameter gravity sewer line near Gregg Avenue and the Fulbright Expressway, and further approves a project contingency in the amount of $99,661.70. Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment, a copy of which is attached to this Resolution. PASSED and APPROVED on 6/1/2021 Page 1 Printed on 6/2l21 Resolution_ 166-21 File Number 2021-0389 Attest: . I ,, .'` CI Tt`C��i G.. Kara Paxton. Cit, Clerk Treasurer r � � Page 2 Printed on 612121