Loading...
HomeMy WebLinkAbout152-21 RESOLUTIONOF FnYETT< 113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 Resolution: 152-21 File Number: 2021-0390 BID # 20-36 CROSSLAND HEAVY CONTRACTORS CHANGE ORDER #5: A RESOLUTION TO APPROVE CHANGE ORDER NO.5 WITH CROSSLAND HEAVY CONTRACTORS, INC. IN THE AMOUNT OF $694,110.00 FOR THE CONSTRUCTION OF A RESTROOM AND PAVILION STRUCTURE FOR THE CENTENNIAL PARK PROJECT, TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $40,000.00, AND TO APPROVE A BUDGET ADJUSTMENT WHEREAS, on April 7, 2020, the City Council passed Resolution 1 15-20 approving a contract with Crossland Heavy Contractors, Inc. for the construction of improvements to Centennial Park; and WHEREAS, Change Order No. 5 will include earthwork, sidewalks, utilities, foundations, slabs, framing, paint, plumbing and electrical necessary for the construction of a restroom and pavilion structure at Centennial Park. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby authorizes Mayor Jordan to sign Change Order No. 5 to the contract with Crossland Heavy Contractors, Inc. in the amount of $694,110.00 for the construction of a restroom and pavilion structure for the Centennial Park Project, and further approves a project contingency in the amount of $40,000.00. Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment, a copy of which is attached to this Resolution. Page 1 PNnted on 6=1 Resolution: 152-21 File Number. 2021-0390 PASSED and APPROVED on 6/1/2021 Attest: j ItItprrrrf i GOER KCITY ' q YETr V/ : m Kara Paxton, City Clerk Treasurer. E C(F: �; �.`pxx e- ;INSAs N i 0imW,N```�. Page 2 Printed on tiW 1 City of Fayetteville, Arkansas 113 West Mountain Street Fayetteville, AR 72701 (479)575-8323 Text File File Number: 2021-0390 Agenda Date: 6/1/2021 Version: 1 Status: Passed In Control: City Council Meetinq File Type: Resolution Agenda Number: A.7 BID # 20-36 CROSSLAND HEAVY CONTRACTORS CHANGE ORDER #5: A RESOLUTION TO APPROVE CHANGE ORDER NO. 5 WITH CROSSLAND HEAVY CONTRACTORS, INC. IN THE AMOUNT OF $694,110.00 FOR THE CONSTRUCTION OF A RESTROOM AND PAVILION STRUCTURE FOR THE CENTENNIAL PARK PROJECT, TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $40,000.00, AND TO APPROVE A BUDGET ADJUSTMENT WHEREAS, on April 7, 2020, the City Council passed Resolution 115-20 approving a contract with Crossland Heavy Contractors, Inc. for the construction of improvements to Centennial Park; and WHEREAS, Change Order No. 5 will include earthwork, sidewalks, utilities, foundations, slabs, framing, paint, plumbing and electrical necessary for the construction of a restroom and pavilion structure at Centennial Park. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby authorizes Mayor Jordan to sign Change Order No. 5 to the contract with Crossland Heavy Contractors, Inc. in the amount of $694,110.00 for the construction of a restroom and pavilion structure for the Centennial Park Project, and further approves a project contingency in the amount of $40,000.00. Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment, a copy of which is attached to this Resolution. City of Fayetteville, Arkansas Page 1 Printed on 61212021 Wade Abernathy Submitted By City of Fayetteville Staff Review Form 2021-0390 Legistar File ID 6/1/2021 City Council Meeting Date - Agenda Item Only N/A for Non -Agenda Item 5/14/2021 FACILITIES MANAGEMENT (140) Submitted Date Division / Department Action Recommendation: Approval of change order #5 to Bid# 20-36 Construction Contract with Crossland Heavy Contractors for the addition of a restroom and pavilion on the Centennial Park project in the amount of $694,110.00, approve a project contingency in the amount of 40,000.00 and approve a Budget Adjustment. Budget Impact: 2250.520.9255-5806.00 Account Number 46050.7501 2250 - Parks Development Project Number Budgeted Item? Yes Current Budget Funds Obligated Current Balance Does item have a cost? Yes Item Cost Budget Adjustment Attached? Yes Budget Adjustment Remaining Budget Fund Centennial Park Project Title $ 1,375,502.00 $ 952,570.56 422,931.44 $ 694,110.00 $ 734,110.00 462,931.44 V20180321 Purchase Order Number: 2020-00000426 Previous Ordinance or Resolution # 115-20 Change Order Number: Original Contract Number: Comments: 5 2020-00000030 Approval Date: CITY OF FAYETTEVILLE ARKANSAS MEETING OF JUNE 1, 2021 TO: Mayor and City Council CITY COUNCIL MEMO THRU: Susan Norton, Chief of Staff Paul Becker, Chief Financial Officer Connie Edmonston, Director Parks and Recreation FROM: Wade Abernathy, Director Bond and Construction Projects DATE: May 14, 2021 SUBJECT: Change Order #5 to Bid 20-36 Construction Contract for Centennial Park Restroom and Pavilion RECOMMENDATION: Approval of Change Order #5 to Bid 20-36 Construction Contract with Crossland Heavy Contractors for the addition of a restroom and pavilion on the centennial park project in the amount of $694,110, approve a project contingency in the amount of $40,000.00 and approve a budget adjustment. BACKGROUND: On July 2, 2019 the Fayetteville City Council approved a contract with CEI for design and construction administration services associated with Phase I development of Centennial Park at Millsap Mountain. In April 2020, Crossland Heavy Contractors was awarded the contract to construct basic park infrastructure and a new entry road from Old Farmington Rd. Construction on the infrastructure and entry road was completed in April 2021. In September 2021, Resolution 221-20 awarded a contract to Modus Studios for Architectural Services for the design and construction drawings for a new pavilion and restrooms. DISCUSSION: The scope of this change order includes earthwork, sidewalks, utilities, foundations and slabs, framing, paint, plumbing and electrical necessary for the construction of 2053 square foot structure that includes 3 Accessible Restrooms, and Pavilion space. BUDGET/STAFF IMPACT: A budget adjustement is attached that includes multiple funding sources. Attachments: Change Order document. Mailing Address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 CROSSLAND HEAVY CONTRACTORS 501 S. East Ave, P.O. Box 350 Columbus, KS 66725 Tel: 620.429.1410 Fax: 620.429.2977 May 14, 2021 Mr. Wade Abernathy City of Fayetteville Reference: Centennial Park —Add Public Pavilion Mr. Abernathy: CHC is pleased to present this proposal for the Additional Park Pavilion per the Drawings provided Modus Architects Dated 4.21.21. Supporting Documents: - Modus Documents Dated 4.21.21 - CEI Modified Sheet C2 Grading Plan Dated 5.4.21 General Clarifications: - Included Builders Risk and Bonds and all taxes. - Excluded building permit and city impact fees - Excluded V Party Testing - Excluded General Contingency included in price unless listed below. - Excluded any materials or products deviating from the supporting documents provided. Earthwork Clarifications: - No Geotech report was provided for area of pavilion. Included is 2ft undercut under building pad only and select fill under building pad only. All other general fill and fill used under site hardscapes to be existing stockpiled material. No additional imported fill or Soil Stabilization is included in pricing. - Construction Entrance has been excluded following the other contractors working in the area not under CHC scope have no Construction Entrances. Access onto site will be through the west access road to minimize track out. - Grading Per Revised Site Grading Plan C2 Dated 5.4. Scope of improvements shall only pertain to disturbed area which will be approximately half of the current civil plan area. - Landscaping shall consist of Topsoil and hydroseeding of disturbed area ONLY and we have included Sod for the 3:1 sloping to existing grades. All other Landscape Sheet have been excluded from Pricing. Framing Clarifications: - Material Lumber prices have only been held for 7 days from the Suppler to 5/21. We have included $10,000 as a framing contingency. - Alternate Deduct 1x4 Surface Mounted Exterior Siding included in lieu of 1x6 on 45 degree clips. - All exterior dimension lumber to be KDAT Treated - MP-01 Restroom Siding to be painted Smooth Hardi Panels in lieu of Steel plates. Roofing Clarifications: - Alt Deduct Roof Scupper Dump to grade included in lieu of Chain Leader downspout. Plumbing Clarifications: - Alt Deduct to use 1.5" Sch40 PVC included in lieu of Copper piping - Alt Deduct to Murdock Drinking fountain included in lieu of Elkay - Excluded water line tap and meter fees. It is assumed Water Line has been Taped and we are tying onto Existing Meter. Page 1 of 2 Site Concrete Clarifications: - Site Sidewalks and Hardscapes per revised C2 grading plan dated 5.4.21. - Included Concrete sidewalk on ramp to Crushed Gravel outside pavilion in lieu of sloped crushed gravel. Proposal Pricing: Centennial Park Pavilion CITY Unit Rate Total Cost Pavilion Base Bid 1 LS $694,110 $694,110.00 Total Base Bid= $694,110.00 Please feel free to call if you have any questions concerning this proposal. Respectfully. Ronald Edmond Sr. Project Manager 918.281.9182 redmond@heavvcontractors.com Crossland Heavy Contractors APPROVAL: City of Fayetteville Name: L!yla,11 11� Date: Sign Crossland Heavy Contractors Name: Ronald Edmond Date: 5.14 .21 Signature: �- 4k_ Page 2 of 2 Estimate Summary Project: Centennial Park Date: May 14, 2021 CROSSLAND CONSTRUCTION COMPANY, INC. Documents: 4.21 - Modus CD Set 5.4 - Revised Grading C2 Sheet Bid Pkg 03A rAmount Cast In Place Concrete CURRENT PRICING D PRICING 5/13/2021 VSF 47,612 03C Restroom Structure 0 �stroom & Siding In Carpentry below 05A Misc Metals & Railings 0 06A Carpentry 191,381 cludes Restroom Structure & Siding 07A Roofing 26,050 07B Joint Sealants & Waterproofing 0 08A Doors & Hardware 21,381 :hides Specialties 09C Painting & Wall Covering 29,061 10A Miscellaneous Specialties 0 )ove in Doors & Hardware 10B Signage 0 >ove in Doors & Hardware 22A Plumbing & Mechanical 69,355 cludes Site Water & Sewer 26A Electrical 58,400 28B Access Control 4,600 31A Earthwork 59,224 32A Site Hardscapes 39,369 32D Landscape, Irrigation & Plantings 0 iture Package 33A Site Utilities 0 uded in Plumbing and Mechanical Subtotal Direct Costs 546,432 $ General Conditions/Staffing 38,060 8.44 Project Requirements 29,670 14.38 Insurance - Builders Risk Only 3,071 Bldg Phase Fee TOTAL1 COST CHC Insurance / Bonds 43,206 660,440 11,822 320 6 CHC Fee (3.25%) 21,848 11 Contingency (Design + Construction) TOTAL• 0 0 Detailed Estimate Project: Centennial Park Date: May 14, 2021 CROSSLAND CONSTRUCTION COMPANY, INC. 03A CAST -IN -PLACE CONCRETE 4 Building Concrete -CCC 1 LS 47,612.00 47,612 03A CAST -IN -PLACE CONCRETE 47,612 06B Carpentry Structure - TH Rogers 1 2x8x12 KDAT 208 ea 37.26 7,750 1 2x8x16 KDAT 96 ea 50.30 4,829 1 2x12x24 KDAT 15 ea 188.67 2,830 1 2x12x20 KDAT 15 ea 154.76 2,321 1 2x12x18 KDAT 15 ea 131.36 1,970 1 2x12x16 KDAT 20 ea 117.70 2,354 1 2x12x14 KDAT 10 ea 100.94 1,009 1 2x12x12 KDAT 10 ea 87.22 872 1 2x12x10 KDAT 10 ea 72.09 721 1 2x12x8 KDAT 10 ea 58.85 589 1 6x6x12 KDAT POST 6 ea 112.41 674 1 6x6x14 KDAT POST 1 ea 137.30 137 1 4x8x12 KDAT POST 5 ea 112.64 563 Roof Decking 1x4 KDAT #2 = (TH ROGERS) 1 Framed Roof Battons -1 x4x12 KDAT #1 Treated - 6" OC 1.58LF/SF 600 ea 9.89 5,934 4 OSB Waferboard 4x8 7/16 - Roof Decking 80 ea 61.59 4,927 Siding 1 x6 KDAT #2 = TH Rogers 1 Siding -1x6x12ft KDAT#2 Treat e - EXCLUDE[ Siding 1x4 KDAT #2 - TH Rogers 1 Siding - 1 x4x12ft KDAT #2 Treated = 3 LF / SF 900 ea 9.89 8,901 Int. Framing & Sheathing = - TH Rogers 1 2x6 Doug Fir 150 ea 13.93 2,090 2 2x6x16 Doug Fir 20 ea 21.87 437 3 2x6x16 Treated Ground Contact 10 ea 26.35 264 4 OSB Waferboard 4x8 7/16 40 ea 61.59 2,464 5 Zip 4x8 7/16 Sheathing 40 ea 72.59 2,904 6 Zip System Tape 12 ea 30.75 369 8 Hardi Smooth Sheathing 4x9 Sheets - 50/unit 120 ea 52.79 6,335 MISC Bracing = - TH Rogers 2 Misc 2x4x18 Bracing 100 ea 20.35 2,035 Accessories 1 Anchor Bolts, Hangers, Misc Clips, Fasteners and Connections 1,700 sf 2.00 3,400 - 1/2' x 6" Titen HD Simpson Strong Tie Fasteners - 4, 10/S1.1 Sill 125 ea 2.42 303 - A23 Simpson Strong Tie Angle - 4/stud where no sill - 2/S1.11 50 ea 0.72 36 - HDQ11-SDS2.5 HOLD DOWN Simpson Strong Tie- 12/S1.1 Shear Walls 36 ea 118.63 4,271 -ABU66Z Pose Base -8/S1.1 7 ea 51.57 361 - H2.5A Simpson Strong Tie-1,3/S5.1 19 ea 0.34 6 - H2.5T Simpson Strong Tie- 4/S5.2 12 ea 0.39 5 - HU212 Joist Hangers - 5/S5.1 84 ea 9.26 778 - A34 Framing Angles- 240 ea 0.44 106 - HUS28 Joist Hanger 16 ea 4.15 66 - HGA10 Gusset Angle 38 ea 7.68 292 2 Nails / Screw etc 1,700 SF 2.50 4,250 3 Insulation - R19 Faced 1,800 sf 0.80 1,440 4 Insulation - R19 Unfaced 600 sf 0.75 450 1 Structural SO (Flitch Plates, Bench Angles, etc) - STI 1 LS 22,800.00 22,800 Shipping 1 Is 2,500.00 2,500 Material Escallation Contingency 0.10 % 104,342.67 10,434 MATERIAL SUBTOTAL W/ TAX 114,776.94 INSTALLATION - HOG Construction 1 Walls/Roof Framing - HOG Construction 1 Is 25,754.00 25,754 2 Exterior Siding Install - HOG Construction 30 square 450.00 13,500 2 Interior Restroom Framing & Insulation - HOG Construction 1 Is 3,700.00 3,700 2 Interior Hard! Siding Install - HOG Construction 31 square 450.00 13,950 3 Equipment 6 wk 1,200.00 7,200 4 Insurance 1 2,500.00 2,500 4 Misc Framing 1 10,000.00 10,000 INSTALLATION SUBTOTAL 76,604.00 06B Carpentry 191,381 07A ROOFING Pagel of 2 Detailed Estimate Project: Centennial Park Date: May 14, 2021 CROSSLAND CONSTRUCTION COMPANY, INC. 1 Standing Seam Roof with Chain Leader Downspouts - Coler Creek 1 LS 26,480.00 26,480 2 Alt Deduct - Scupper Dump in lieu of Chain Leaders - Coler Creek (1) LS 430.00 (430) 07A ROOFING 26,050 08A DOORS AND HARDWARE 1 Doors, Frames, Hardware & Specialties - CCC 1 LS 21,081.00 21,081 2 ADA Restroom Signage 1 Allow 300.00 300 08A DOORS AND HARDWARE 21,381 09C PAINTING & WALL COVERINGS 1 Painting - Paint Innovators 1 LS 29,060.50 29,061 09C PAINTING & WALL COVERINGS 29,061 22A PLUMBING & HVAC 1 Plumbing and HVAC - Fayetteville Mechanical 1 LS 75,250.00 75,250 2 - Alt Deduct - Use 1.5" PVC in lieu of 1.5 Copper (1) LS 2,650.00 (2,650) 3 -Alt Deduct- Use Murdock Drinking Fountain in lieu of Elkay (1) LS 3,245.00 (3,245) 22A PLUMBING & HVAC 69,355 26A ELECTRICAL 1 Electrical, Site - ArnoldBlevins 1 LS 58,400.00 58,400 26A ELECTRICAL 58,400 28B ACCESS CONTROL 1 Access Controls - Arnold Blevins 1 EA 4,600.00 4,600 28B ACCESS CONTROL 4,600 31A EARTHWORK 1 Earthwork&SWPPP -CCC 1 LS 44,218.00 44,218 JL2 Construction Entranc 3 Topsoil Replacement - SecondNature 350 CV 30.00 10,500 4 Hydroseeding - Second Nature 28,339 sf 0.065 1,842 5 Burmuda Sod 3:1 Slope Areas 666 Sy 4.00 2,664 31A EARTHWORK 59,224 32A SITE HARDSCAPES 1 Site Concrete - CCC 1 LS 10,444.00 10,444 2 Alt- Sidewalk Sloped Walk in lieu of Decomposed Granite- CCC 1 LS 4,324.00 4,324 3 SteelEdging- SecondNature 425 LF 6.50 2,763 4 Decomposed Granite Surfacing - Second Nature 1,963 SF 8.50 16,686 5 ALT - Deduct Decomposed Granite at Walk Slope- Second Nature (1) LS 5,647.00 (5,647) 6 BeamrockSteps- SecondNature 18 to 600.00 10,800 32A SITE HARDSCAPES 39,369 33A SITE UTILITIES 1 Site Water- Fayetteville Mechanical - Included in 22A - LF - - 2 Site Gas - Fayetteville Mechanical - Included in 22A - LF - - 33A SITE UTILITIES Page 2 of 2 City of Fayetteville, Arkansas - Budget Adjustment Form (Legistar) Budget Year Division Adjustment Number /Org2 FACILITIES MANAGEMENT (140) 2021 Requestor: Wade Abernathy BUDGET ADJUSTMENT DESCRIPTION / JUSTIFICATION: Approval of change order #5 to Bid# 20-36 Construction Contract with Crossland Heavy Contractors for the addition of a restroom and pavilion on the Centennial Park project in the amount of $694,110.00, approve a project contingency in the amount of 40,000.00 and approve a Budget Adjustment. COUNCIL DATE: LEGISTAR FILE ID#: 6/1/2021 2021-0390 Mattheaw Maddc -/-, VW2021 1:42 PM Budget Director TYPE: JOURNAL #: Date D - (City Council) RESOLUTION/ORDINANCE GLDATE: I CHKD/POSTED: 6/1/2021 TOTAL Account Number 334,110 334,110 Increase / (Decrease) Expense Revenue Proiect.Sub# Project Sub.Detl AT v.20210309 Account Name 2250.520.9255-5806.00 694,110 - 46050 7501 EX Improvements - Park 2250.520.9255-5911.99 2250.520.9255-5806.00 40,000 - (400,000) - 46050 7501 EX 13001 1 EX Contingency - Capital Project Improvements - Park 2250.520.9250-4999.99 - 334,110 RE Use Fund Balance - Current K:\Budget Adjustments\2021_Budget\City Council\06-01-2021\2021-0390 BA Centennial Park Change Order 5 1 of 1