HomeMy WebLinkAbout168-21 RESOLUTION113 West Mountain Street
Fayetteville, AR 72701
(479) 575-8323
Resolution: 168-21
File Number: 2021-0411
ARKANSAS DEPARTMENT OF TRANSPORTATION - RECREATIONAL TRAILS
PROGRAM GRANT:
A RESOLUTION TO EXPRESS THE WILLINGNESS OF THE CITY OF FAYETTEVILLE TO
APPLY FOR AND UTILIZE FEDERAL -AID RECREATIONAL TRAILS PROGRAM FUNDS
IN THE AMOUNT OF $100,000.00 FOR IMPROVEMENTS TO KESSLER MOUNTAIN
NATURAL SURFACE TRAILS, AND TO APPROVE A CITY MATCH OF $25,000.00 FOR
THE PROJECT
WHEREAS, the City of Fayetteville understands Federal -aid Arkansas Department of Transportation
- Transportation Alternatives Program Gran funds are available at 80% federal participation and 20%
local match to be used for improvements to the Kessler Mountain Natural Surface Trails; and
WHEREAS, the City of Fayetteville understands that Federal -Aid funds are available for this project
on a reimbursable basis, requiring work to be accomplished and proof of payment prior to actual
monetary reimbursement; and
WHEREAS, this project, using federal funding, will be open and available for use by the general
public and maintained by the Ozark off Road Cyclists.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas expresses its willingness to
participate in accordance with its designated responsibilities in this project, including maintenance of
this project and providing local matching funds in the amount of $25,000.00.
Page 1 Printed on 612121
Resolution. 168-21
File Number 2021-0411
Section 2: That the City Council of the City of Fayetteville, Arkansas hereby authorizes the Mayor to
execute all appropriate applications, agreements, and contracts necessary to expedite the construction
of the above stated project.
Section 3: That the City Council of the City of Fayetteville, Arkansas pledges its full support and
hereby authorizes the City of Fayetteville to cooperate with the Arkansas Department of
Transportation to initiate action to implement this project.
PASSED and APPROVED on 6/1/2021
Approved:
Li Id Jordan,
Attest:
�%\,ERKfffT�,z
.����.• CITYO
'9'
7 �'. cp
F .r
Kara Paxton, City Clerk Treagurer AYFr :m:
Page 2 Printed on 612121
City of Fayetteville, Arkansas 113 West Mountain Street
Fayetteville, AR 72701
(479)575-8323
Text File
File Number: 2021-0411
Agenda Date: 6/1/2021 Version: 1 Status: Passed
In Control: City Council Meetinq File Type: Resolution
Agenda Number: A.23
ARKANSAS DEPARTMENT OF TRANSPORTATION - RECREATIONAL TRAILS
PROGRAM GRANT:
A RESOLUTION TO EXPRESS THE WILLINGNESS OF THE CITY OF FAYETTEVILLE TO APPLY
FOR AND UTILIZE FEDERAL -AID RECREATIONAL TRAILS PROGRAM FUNDS IN THE
AMOUNT OF $100,000.00 FOR IMPROVEMENTS TO KESSLER MOUNTAIN NATURAL
SURFACE TRAILS, AND TO APPROVE A CITY MATCH OF $25,000.00 FOR THE PROJECT
WHEREAS, the City of Fayetteville understands Federal -aid Arkansas Department of Transportation -
Transportation Alternatives Program Gran funds are available at 80% federal participation and 20% local
match to be used for improvements to the Kessler Mountain Natural Surface Trails; and
WHEREAS, the City of Fayetteville understands that Federal -Aid funds are available for this project on a
reimbursable basis, requiring work to be accomplished and proof of payment prior to actual monetary
reimbursement; and
WHEREAS, this project, using federal funding, will be open and available for use by the general public and
maintained by the Ozark off Road Cyclists.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas expresses its willingness to participate in
accordance with its designated responsibilities in this project, including maintenance of this project and
providing local matching funds in the amount of $25,000.00.
Section 2: That the City Council of the City of Fayetteville, Arkansas hereby authorizes the Mayor to execute
all appropriate applications, agreements, and contracts necessary to expedite the construction of the above
stated project.
Section 3: That the City Council of the City of Fayetteville, Arkansas pledges its full support and hereby
authorizes the City of Fayetteville to cooperate with the Arkansas Department of Transportation to initiate
action to implement this project.
City of Fayetteville, Arkansas Page 1 Printed on 61212021
File Number: 2021-0411
City of Fayetteville, Arkansas Page 2 Printed on 61212021
Zach Foster
City of Fayetteville Staff Review Form
2021-0411
Legistar File ID
6/1/2021
City Council Meeting Date - Agenda Item Only
N/A for Non -Agenda Item
PARKS & RECREATION (520)
Submitted By Submitted Date Division / Department
Action Recommendation:
5/14/2021
Staff recommends approval of a resolution expressing the willingness to apply for federal -aid funds and allow staff
to submit an application of an 80 percent federal 20 percent local matching grant through the Arkansas
Department of Transportation - Recreational Trails Program (RTP) for an award of up to $100,000 and a City match
of up to $25,000. This $125,000 total project will be for improvements to Kessler Mountain natural surface trails.
Account Number
Project Number
Budgeted Item? No
Does item have a cost? NA
Budget Adjustment Attached? NA
Budget Impact:
Current Budget
Funds Obligated
Current Balance
Item Cost
Budget Adjustment
Remaining Budget
Fund
Project Title
S
S -
$
V20180321
Purchase Order Number:
Change Order Number:
Original Contract Number:
Previous Ordinance or Resolution #
Approval Date:
Comments: Notification of award is expected in November of 2021. No expenditures are expected in 2021.
CITY OF
FAYETTEVILLE
ARKANSAS
MEETING OF JUNE 1, 2021
TO: Mayor and City Council
CITY COUNCIL MEMO
THRU: Susan Norton, Chief of Staff
Connie Edmonston, Parks and Recreation Director
Ted Jack, Park Planning Superintendent
FROM: Zach Foster, Park Planner II
DATE: May 14, 2021
SUBJECT: 2021 Recreation Trails Program Grant Application
RECOMMENDATION:
Staff recommends approval of a resolution expressing the willingness to apply for federal -aid
funds and allow staff to submit an application of an 80 percent federal 20 percent local matching
grant through the Arkansas Department of Transportation - Recreational Trails Program (RTP)
for an award of up to $100,000 and a City match of up to $25,000. This $125,000 total project
will be for improvements to Kessler Mountain natural surface trails.
BACKGROUND:
Nearly 17 miles of soft surface trails have been constructed at Kessler Mountain between the
years 2000 and 2019. The trails receive heavy traffic due to year-round use from trail hikers,
runners, and mountain bikers. The Ozark Off Road Cyclists (OORC) have done an outstanding
job maintaining the trails. The scope of work included in this grant application builds on OORC's
efforts with the installation of wayfinding markers, trail armoring, boardwalks, sitting areas, and
overlooks and also includes a new trail head and trail connections. The main area of focus will
be Saddle Up trail and a new trail head and trail at the existing baseball field parking lot.
DISCUSSION:
Construction documents for all improvements will be developed in-house and the project will be
sent out for bid as required by the RTP and City's procurement requirements.
BUDGET/STAFF IMPACT:
If the project is approved for the full amount requested, the City will be responsible for $25,000
of the project construction cost. Award notices are expected in November 2021.This project is
not included in an existing budget and no expenditures are expected to occur in 2021 if we are
awarded into the program. Funding would be made available from Capital budgets dedication
funds in the 2022 budget.
Mailing Address:
113 W. Mountain Street www.fayetteville-ar.gov
Fayetteville, AR 72701
Attachments:
SRF and RTP Description
RTP Application
RTP Sample Resolution
Recreational Trail Program Description
This program, administered by the Arkansas Department of Transportation (ARDOT),
provides funding to local project sponsors (public and private/nonprofit agencies) to
construct and maintain motorized and non -motorized recreational trails and trail support
facilities. The ARDOT works closely with the Federal Highway Administration (FHWA) to
administer this Program. The enabling legislation for the program can be reviewed
at http://www.fhwa.dot.gov/environment/recreational—trails/.
Project sponsors apply for program funds through a competitive process with the
applications being reviewed by the Arkansas Recreational Trails Advisory
Committee. (ARTAC). ARTAC consists of ten members, nine of whom are appointed
by the Governor representing various types of trail users. Successful applicants must
submit plans and specifications for the project, provide proof of ownership of the
property on which the trail lies, obtain all necessary environmental clearances and
permits, and enter into a contract with ARDOT. These sponsors are then responsible
for performing the work described in the contract. As work on the project is
accomplished, sponsors are eligible to request reimbursement from ARDOT. No "up-
front" or "start-up" funds are available.
The Recreational Trails Program (RTP) is a reimbursement -type grant program. The
program provides for an 80 percent federal share and 20% non-federal share for each
project. The main priority in allocating funding is for the construction of new trails and
for major maintenance of existing trails. Support facilities such as restrooms, benches,
trailhead parking and lighting have been viewed by ARTAC as less important. In the
past, FHWA has approved the following as they specifically relate to recreational trails:
ARKANSAS
RECREATIONAL TRAILS PROGRAM (RTP)
NONMOTORIZED TRAILS
PROJECT APPLICATION -- IFFY 2021
The Arkansas Department of Transportation (ARDOT) administers Recreational Trails
Program funding for the purpose of building and performing major maintenance on
motorized, non -motorized, and multiple -use trails. Agencies of city, county, state, or
federal government and duly incorporated private/non-profit agencies, can apply for
these funds if access to the project by the general public is provided throughout the life
of the project.
A local sponsor must provide at least 20% of the eligible project costs. The local share
can be in the form of cash, donated funds, or the documented fair market value of any
donated materials or services that are accepted and incorporated into the project.
This is a reimbursable program, which means once the sponsor receives an official
Notice to Proceed from the ARDOT, up to 80% of the costs directly attributable to the
construction of the project can be reimbursed. The local sponsor is responsible for
maintaining records and proving that expenses are legitimate and directly related to the
project. This may be in the form of receipts, time sheets, etc.
**Please Note: A resolution from the Applicant's governing body is required to be
submitted with the application. A draft resolution should have been downloaded with
this application.
DEADLINE for this application is Tuesday, June 1, 2021 at 4:00pm (CDT).
Applications received after the deadline will not be reviewed or eligible for funding.
If submitting this application via email (preferred), please remit to:
LFPAAardot.gov
Be sure to attach the application and all additional attachments when submitting the email.
Your email Subject should include "2021 RTP Application" along with your Agency Name and
the Project Name. If more than one email will be required due to file sizes, include phrasing
such as "Email 1 of 2" in the Subject line.
------------
If submitting this application by mail or in person, please remit to:
Arkansas Department of Transportation
c/o Program Management Division
P.O. Box 2261
Little Rock, AR 72203-2261
Enclose one copy of the application and all necessary attachments in a manila envelope with
your Agency's name and the Project Name printed on the outside.
You should be able to fill out and save this form using Adobe Reader a free software for download.
If you are having trouble, please contact
Daniel Siskowski at (501) 560-2461 or Daniel. SIkow ki ar t, gov.
ARKANSAS
RECREATIONAL TRAILS PROGRAM (RTP)
NONMOTORIZED TRAILS
PROJECT APPLICATION -- IFFY 2021
General Information
Project Name:
Sponsor:
Applicant Agency Type:
If "Other":
----------- 7
Sponsor DUNS:
Primary Contact
Prefix: J Name -
Title:
Organization. -
Mailing Address:
Street Address and/or P.O. Box
City State Zip Code
Phone. Fax'
Email:
Legislative Information
U.S. Representative District
State Senator District:
State Representative Distric
(for reporting purposi
Project Priority
If submitting more than one application, what priority is this project?:
Page 1 of 13
ARKANSAS
RECREATIONAL TRAILS PROGRAM (RTP)
NONMOTORIZED TRAILS
PROJECT APPLICATION -- IFFY 2021
Sponsor:
Project Name:
Project Overview
Please provide a detailed project overview. Identify the project limits, including street/
facility name and dimensions of the project. This overview should concisely describe
the project such that someone could follow along on a map. Include connectivity to
existing or future infrastructure.
(3000 character limit)
Trail Information (if appiicable1-
Trail Width: Linear Feet Note: width should be at least 10 ft.
for multi -use trails.
Trail Length: [Select Units
Trail Surface Material:
Page 2 of 13
ARKANSAS
RECREATIONAL TRAILS PROGRAM (RTP)
NONMOTORIZED TRAILS
PROJECT APPLICATION -- FFY 2021
Sponsor:
Project Name
Project Location
County:
Metropolitan Planning Organization.
Nearest Municipality:
Beginning Latitude*: Ending Latitude*:
Beginning Longitude'`: Ending Longitude'
*Please use decimal degrees (i.e. 35.123456)
Property Ownership
Check all boxes that apply to your project.
❑ Within City or County right-of-way / no acquisition required
❑ Within State Highway right-of-way
❑ Within Federal lands right-of-way
❑ Within Railroad right-of-way - if yes, provide owner name:
❑ Private Property
❑ Other. Please describe:
If Right of Way Acquisition is anticipated:
Please note: "The Uniform Act' must be followed for acquisition of any property for federally -funded projects.
❑ Donation Expected ❑ Appraisal Completed
❑ Purchase Option
❑ Purchase Agreement
❑ Willing Seller
Page 3 of 13
ARKANSAS
RECREATIONAL TRAILS PROGRAM (RTP)
NONMOTORIZED TRAILS
PROJECT APPLICATION -- FFY 2021
Project Location Map(s)
Applicants must submit legible maps of the project location with this application. The map(s)
should be good enough quality to be easily -reproducible and should include the following:
• Project path. The map should clearly show where the project will be located.
• North arrow
• Pertinent landmarks
• If appropriate, a Legend identifying any other items on the map (i.e. existing paths or
sidewalks, previous phases of the project, etc.)
This map is an Example of a legible sketch. This sheet will be replaced
with the map submitted with this application.
Page 4 of 13
ARKANSAS
RECREATIONAL TRAILS PROGRAM (RTP)
NONMOTORIZED TRAILS
PROJECT APPLICATION -- FFY 2021
Sponsor:
Project Name:
Project Construction Estimate
This form is limited to 20 items. If you will have more than 20 items, please utilize the provided Excel
Sheet to submit the Project Construction Estimate. Please refer to the 2021 RTP FAQ for a list of
common items ineligible for reimbursement with these funds.
Item of Work
Quantity
Units
Unit Cost
Item Cost
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
Total Estimated Project Construction Cost
Requested RTP Funds $0.00
Minimum = $20,000, Maximum = $500,000
Local Match (20% minimum)
% Federal (80% maximum) � ]
Page 5 of 13
ARKANSAS
RECREATIONAL TRAILS PROGRAM (RTP)
NONMOTORIZED TRAILS
PROJECT APPLICATION -- IFFY 2021
Sponsor:
Project Name
Funding
Matching -Funds
What is the source of the required 20% match? If donated funds, materials, or services
will be used as all or part of the local 20% match, written commitments by the
donor(s) must be provided. (Check all that apply)
❑ Budget Item ❑ Donated Cash ❑ Donated Materials
❑ Donated Services, if so, source
❑ Force Account (in-house)
❑ Other, please explain
Pro'ect Scalabilit
❑ Volunteer Labor
If the entire requested amount of funding is not available and only partial funding is
received, will the sponsor still be able to move forward with this project by either
providing the additional funding or reducing the scope of the project?
LC' Yes C' No
Previous Federal Fundina
If this project (or a phase of this project) has received Federal RTP or TAP funds
previously, please describe the current status of the project(s). (500 character limit)
This Space for ARDOT Use Only
Page 6 of 13
ARKANSAS
RECREATIONAL TRAILS PROGRAM (RTP)
NONMOTORIZED TRAILS
PROJECT APPLICATION -- FFY 2021
Sponsor:
Project Name
Project Information
This Project will include:
Check all boxes that apply to best depict your project.
❑ New trail construction
❑ A relocated project
❑ Rehabilitation of an existing trail
❑ Trailside or trailhead facilities, parking, kiosks, restrooms, access ramps, etc.
❑ Educational publications, brochures, trail maps, safety programs, etc.
Intended users of this Project include:
❑ Bicyclists
❑ Walkers/joggers
❑ Overnight/long distance hikers
❑ Equestrians
❑ Aquatic users
❑ Motorcycles
❑ Four wheel drive, four wheel all terrain vehicles
Barrier free (if the project does not meet ADA guidelines, trail sponsors must not
❑ install barriers or other features that would make it more difficult for people with
disabilities to use the trail)
❑ Other, please explain
This Project is part of a designated:
❑ National Recreational Trail
❑ National Historic Trail
❑ Rails to Trails
❑ National Scenic Trail
❑ National Water Trail
Page 7 of 13
ARKANSAS
RECREATIONAL TRAILS PROGRAM (RTP)
NQNMOTORIZED TRAILS
PROJECT APPLICATION -- FFY 2021
Sponsor.
Project Name -
Project Benefits
How does this project provide an overall benefit to the community(ies)? What L
groups will be positively affected? If this project will provide safe routes to school
children, include which schools will benefit.
(3000 character limit)
Project Construction Method:
This project will be built by:
❑ Contractor (advertised for bids)
❑ In -House Labor (force account)
❑ Combination of Contractor and In -House Labor
Page 8 of 13
ARKANSAS
RECREATIONAL TRAILS PROGRAM (RTP)
NONIVIOTORIZED TRAILS
PROJECT APPLICATION -- FFY 2021
Sponsor:
Project Name:
Project Background
Please describe any planning or public input processes used in development of this
project. If the proposed project is in an existing bicycle/pedestrian plan, street plan,
master plan or other long range plan, please identify this as well.
(2500 character limit)
Page 9 of 13
ARKANSAS
RECREATIONAL TRAILS PROGRAM (RTP)
NONMOTORIZED TRAILS
PROJECT APPLICATION -- IFFY 2021
Sponsor:
Project Name:
Compliance
Statewide Comprehensive Outdoor Recreation Plan (SCORPI
Please describe how this project is in compliance with the current SCORP developed
by the Arkansas Department of Parks, Heritage and Tourism? (600 character limit)
View the SCORP: https:/larkansas.app. box. comlsls9lvzya37omys6lr9bzocrdk1174o51 v
Users with Disabilities
Please describe what accommodations will be made to provide access to this proj
for individuals with disabilities. (600 character limit)
Youth Service and Conservation Corps (YSCC)
Will YSCC be utilized during construction of the project? If so, verifying documentation
must be included with the application to receive credit. Please refer to this web page to
locate local and regional groups: http://www.corpsnetwork.or /g impact/corps-by-state
n Yes ('; No
Page 10 of 13
ARKANSAS
RECREATIONAL TRAILS PROGRAM (RTP)
NONMOTORIZED TRAILS
PROJECT APPLICATION -- FFY 2021
Sponsor:
Project Name:
Construction Plans and Maintenance
Are construction plans currently available for this project? (if Yes, please include a copy
with this application)
C, Yes C' No
If Yes, what level of plans?
❑ Preliminary Plans ❑ Partially Complete Plans ❑ Complete Final Plans
If No, provide a brief time line from approval of funds to signed construction contract:,
oesicin Engineer
,.All RTP projects that contain structural components (including concrete and asphalt
trails) will require design plans certified by a Registered Professional Engineer. Who
will develop plans and specifications for this project? (100 character limit)
Project Maintenance
A statement or letter from the party having maintenance jurisdiction must be submitted
with this application. In the statement/letter, describe how maintenance will be
accomplished after project completion. Include who will perform maintenance, a
maintenance schedule and checklist, and an inspection schedule.
Page 11 of 13
ARKANSAS
RECREATIONAL TRAILS PROGRAM (RTP)
NONIVIOTORIZED TRAILS
PROJECT APPLICATION -- IFFY 2021
Sponsor:
Project Name:
Environmental Clearance
Known Envilronmental Impacts Check all boxes that apply to your project.
❑ Endangered Species
❑ Relocatees
❑ Floodplain / Floodway
❑ State Park / National Forest Property
❑ Historic Structures
❑ Other, please explain
Ad'acent Property Im acts
❑ Lakes / Rivers / Streams
❑ Wetlands
❑ Landfills
❑ Public Recreational Lands
Does the project adjoin a:
❑ City Park ❑ National Forest
❑ State Park ❑ National Park
❑ Other Public Land
If yes to any of the above, please describe the impact and attach a permission letter
from the affected authority.
Page 12 of 13
ARKANSAS
RECREATIONAL TRAILS PROGRAM (RTP)
NONMOTORIZED TRAILS
PROJECT APPLICATION -- FFY 2021
Sponsor:
Project Name:
Sponsor Authorization and Certification
To be completed by the chief executive officer (Mayor, City Manager, County Judge,
Superintendent, President, etc.)
By checking the box below, I attest that the information contained in this
application is truthful and correct to the best of my knowledge and that the
provision of false or misleading Information can lead to the withdrawal of
Recreational Trails Program funding. I do hereby certify that I will comply with all
federal, state, and ARDOT regulations for submittal of plans and specifications.
Additionally, I certify that local matching funds are available for the project.
Authorized Signatory:
Prefix: II Name:
Title:
Mailing Address:
❑ I AGREE
Street Address and/or P.O. Box
City State Zip Code
Phone: Fax:
Email:
ARKANSAS DEPARTMENT OF TRANSPORTATION
NOTICE OF NONDISCRIMINATION
The Arkansas Department of Transportation (Department) complies with all civil rights provisions of federal statutes and related
authorities that prohibit discrimination in programs and activities receiving federal financial assistance. Therefore, the Department does
not discriminate on the basis of race, sex, color, age, national origin, religion (not applicable as a protected group under the Federal
Motor Carrier Safety Administration Title VI Program), disability, Limited English Proficiency (LEP), or low-income status in the
admission, access to and treatment in the Department's programs and activities, as well as the Department's hiring or employment
practices, Complaints of alleged discrimination and inquiries regarding the Department's nondiscrimination policies may be directed to
Joanna P. McFadden Section Head - EEO/DBE (ADA/504/Title VI Coordinator), P. O. Box 2261, Little Rock, AR 72203,
(501)569-2298, (Voice/TTY 711), or the following email address: jvAtt1i1ta1=5 add4nCr+�t,V
Free language assistance for Limited English Proficient individuals is available upon request
notice is available from the ADA/504/Title VI Coordinator in large print, on audiotape and in Braille.
Page 13 of 13
SAMPLE RESOLUTION
RESOLUTION NO.
A RESOLUTION EXPRESSING THE WILLINGNESS OF
SPONSOR NAME
TO UTILIZE FEDERAL -AID RECREATIONAL TRAILS PROGRAM FUNDS
WHEREAS, Sponsor Name understands Federal -aid Recreational Trails Program Funds are
available at 80% federal participation and 20% local match/in kind labor to develop or improve
Project Name, and
WHEREAS, Sponsor Name understands that Federal -aid Funds are available for this project on
a reimbursable basis, requiring work to be accomplished and proof of payment prior to actual
monetary reimbursement, and
WHEREAS, this project, using federal funding, will be open and available for use by the general
public and maintained by the applicant for the life of the project.
NOW THEREFORE, BE IT RESOLVED BY SPONSOR'S GOVERNING BODYTHAT:
SECTION I: Sponsor Name will participate in accordance with its designated responsibility,
including maintenance of this project.
SECTION II: Title of Sponsor's CEO/CAO is hereby authorized and directed to execute all
appropriate agreements and contracts necessary to expedite the construction of the above
stated project.
SECTION III: Sponsor's Governing Body pledges its full support and hereby authorizes the
Arkansas Department of Transportation to initiate action to implement this project.
THIS RESOLUTION adopted this day of )2021.
Signed:
ATTEST:
(SEAL)
Notes:
Name of Sponsor's CEO/CAO
• "Sponsor Name" is the name of the Agency (i.e. the City of Anywhere, Universal County,
the Arkansas Department of Trails)
• "Sponsor's Governing Body" is the group of individuals that make the final financial
decisions for the Agency (i.e. City Council, Quorum Court, Board of Directors,
Commission)
• "Sponsor's CEO/CAO" is the person in charge of the day-to-day activities at the agency
(i.e. Mayor, City Manager, County Judge, Executive Director, etc.)
• "Project Name" is the name of the project from the application
Kessler Park Trail Enhancements Proper Bid Concurrence Letter
City of Fayetteville Staff Review Form
2023-0204
Legistar File ID
N/A
City Council Meeting Date - Agenda Item Only
N/A for Non -Agenda Item
2ach Foster 2/7/2023 PARKS & RECREATION (520)
Submitted By Submitted Date Division Department
Action Recommendation:
Staff recommends the Mayor and City Attorney sign a required document stating the City followed proper
bidding procedures for Bid 22-47, Kessler Park Trail Enhancements.
Budget Impact:
N/A
N/A
Account Number
Fund
N/A
N/A
Project Number
Project Title
Budgeted Item? Yes
Current Budget
Funds Obligated
$ -
Current Balance
Does item have a cost? No
Item Cost
Budget Adjustment Attached? No
Budget Adjustment
Remaining Budget
$ -
V20210527
Purchase Order Number:
Previous Ordinance
or Resolution # 168-21 and 92-22
Change Order Number:
Approval Date:
02-08-2023
Original Contract Number:
Comments:
CITY OF
%PFFAYETTEVILLE
ARKANSAS
STAFF MEMO
TO: Mayor and City Attorney
THRU: Susan Norton, Chief of Staff
Alison Jumper, Director of Parks, Natural Resources and Cultural Affairs
Ted Jack, Park Planning superintendent
FROM: Zach Foster, Park Planner II
DATE: February 6, 2023
SUBJECT: Request for Concurrence in Award - Kessler Mountain RTP Grant
Staff recommends the Mayor and City Attorney sign a required document stating the City
followed proper bidding procedures for Bid 22-47, Kessler Park Trail Enhancements.
BACKGROUND:
The City was awarded a Recreational Trails Program grant to enhance the natural surface trail
system at Kessler Mountain Regional Park. This is an 80/20 matching grant where the City will
match the $75,000 Federal award with $18,750 for a total project cost of $93,750. Bid 22-47
was awarded to Rock Solid Trail Contracting, LLC.
DISCUSSION:
The RTP grant requires Fayetteville to submit certified tabulations of Bid 22-47 to ARCOT for
their review and concurrence. This review process is initiated by Form LPA-011, "Request for
Concurrence in Award", and must be signed by the Mayor and City Attorney. Form LPA-011
certifies the City followed all proper procedures throughout the bidding process of Bid 22-47.
This contract will go before City Council on February 21, 2023,
BUDGET/STAFF IMPACT:
Total project costs must reach $93,750 to fully use federally awarded RTP grant funds. Rock
Solid's bid falls below this amount. Additional work is anticipated via a change order based on
unit costs to increase total construction costs from $75,466 to $93,750 at a minimum and not to
exceed $113,370. City staff will provide construction administration
Attachments:
SRF
Bid Memo
Bid 22-47 Tabulation
Mailing Address:
113 W. Mountain Street wwwlayetteville-argov
Fayetteville, AR 72701
��
CITY OF
FAYETTEVILLE
ARKANSAS
TO: Kit Williams, City Attorney
FROM: Alison Jumper, Directorof Parks, Natural Resources and Cultural Affairs " 4
CC: Ted Jack, Park Planning Superintendent
Zach Foster, Park Planner II
Les McGaugh, Purchasing Director
Amanda Beilfuss, Purchasing Agent
DATE: February 6, 2023
SUBJECT: 040876 — Fayetteville Kessler Mountain Trail - Certification Letter
This is to confirm that Kessler Mountain Trail Improvements was advertised and bids for
the project were received in accordance with regulations governing Federal -aid projects,
and that the bid is being awarded to the lowest responsive and qualified bidder. No
negotiations have been held with the contractor or other bidders, nor will there be prior
to execution of the contract.
Rock Solid Trail Contracting, LLC is the apparent low bidder on the project. Their bid
submittal has been reviewed to verify that all certifications required of Federal -aid
projects (eg., DBE Participation, Anti -Collusion and Debarment, etc.) were properly
signed and submitted with the bid.
Mailing Address:
113 W. Mountain Street www.fayetteville-ar.gov
Fayetteville, AR 72701
LPA-011
�'
CITY OF
FAYETTEVILLE
ARKANSAS
2/6/2023
Mr. Rex Vines
Deputy Director and Chief Engineer
Arkansas Department of Transportation
P. O. Box 2261
Little Rock, AR 72203
Re: Job # 040876
Fayetteville Kessler Mountain Trail
Washington County
Dear Mr. Vines:
The following documents are submitted concerning the referenced project:
1. One set of bid tabulations.
I certify that the referenced project was advertised and bids were received in accordance with the
regulations governing Federal -aid projects and all other applicable state and federal regulations,
and that this process has been reviewed and approved by the City of Fayetteville's Attorney.
Additionally, I certify that the bid is being awarded to the lowest responsive and qualified bidder
and that there has not been, nor will there be, any negotiations with the contractor or other bidders
regarding the amount bid.
Your concurrence in the award of this contract to Rock Solid Trial Contracting, LLC for
$75,465.00 is requested.
Mayor
y Attorney
Enclosures
Mailing Address:
113 W. Mountain Street www.fayetteville-ar.gov
Fayetteville, AR 72701