HomeMy WebLinkAbout133-21 RESOLUTION113 West Mountain Street Fayetteville, AR 72701 (479)575-8323 Resolution: 133-21 File Number: 2021-0279 MCCLELLAND CONSULTING ENGINEERS, INC. - 2019 POLICE HEADQUARTERS BOND PROJECT: A RESOLUTION TO APPROVE A PROFESSIONAL ENGINEERING SERVICES AGREEMENT WITH MCCLELLAND CONSULTING ENGINEERS, INC. IN THE AMOUNT OF $29,515.00 FOR MATERIALS TESTING SERVICES ASSOCIATED WITH THE NEW POLICE HEADQUARTERS FACILITY, TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $6,000.00 AND TO APPROVE A BUDGET ADJUSTMENT - 2019 POLICE HEADQUARTERS BOND PROJECT BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAVETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby authorizes Mayor Jordan to sign a professional engineering services agreement with McClelland Consultirg Engineers, Inc. in the amount of $29,515.00 for materials testing services associated with the construction of the new Police Headquarters Facility, and further approves a project contingency in the amount of $6,000.00. Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment, a copy of which is attached to this Resolution. PASSED and APPROVED on 5/4/2021 Page 1 Printed on 515121 Resolution: 133-21 File Number.' 2021-0279 Attest: Kara Paxton, City Clerk T as FAYETTEVILLE; �''.�s''•�kANSP• J�`. SON,` Page 2 Printed on 515121 City of Fayetteville, Arkansas 113 West Mountain Street Fayetteville, AR 72701 —� (479) 575-8323 m Text File File Number: 2021-0279 Agenda Date: 5/4/2021 Version: 1 Status: Passed In Control: City Council Meeting File Type: Resolution Agenda Number: A.13 MCCLELLAND CONSULTING ENGINEERS, INC. - 2019 POLICE HEADQUARTERS BOND PROJECT: A RESOLUTION TO APPROVE A PROFESSIONAL ENGINEERING SERVICES AGREEMENT WITH MCCLELLAND CONSULTING ENGINEERS, INC. IN THE AMOUNT OF $29,515.00 FOR MATERIALS TESTING SERVICES ASSOCIATED WITH THE NEW POLICE HEADQUARTERS FACILITY, TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $6,000.00 AND TO APPROVE A BUDGET ADJUSTMENT - 2019 POLICE HEADQUARTERS BOND PROJECT BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby authorizes Mayor Jordan to sign a professional engineering services agreement with McClelland Consulting Engineers, Inc. in the amount of $29,515.00 for materials testing services associated with the construction of the new Police Headquarters Facility, and further approves a project contingency in the amount of $6,000.00. Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment, a copy of which is attached to this Resolution. City of Fayetteville,. Arkansas Page 1 Printed on 51512021 Wade Abernathy Submitted By City of Fayetteville Staff Review Form 2021-0279 Legistar File ID 5/4/2021 City Council Meeting Date - Agenda Item Only N/A for Non -Agenda Item 4/15/2021 Submitted Date Action Recommendation: FACILITIES MANAGEMENT (140) Division / Department Approval of RFQ# 21-01 Contract with McClelland Consulting Engineers, Inc. for materials testing services for the Police Headquarters Facility in the amount of $29,515.00 and a contingency of $6,000 and approve a budget adjustment. This is a 2019 Police Headquartes Bond Project. 4609.860.7900-5860.02 Account Number 46090.7900.8315 Project Number Budgeted Item? Yes Does item have a cost? Yes Budget Adjustment Attached? Yes Budget Impact: 4609 - Police Projects 2019 Bonds Fund Police Headquarters Building Materials Testing / Survey / Geotechnical Project Title Current Budget Funds Obligated Current Balance Item Cost Budget Adjustment Remaining Budget $ 19,787.00 $ 17,787.00 $ 2,000,00 $ 35,515.00 $ 35,515.00 $ 2,000.00 V20180321 Purchase Order Number: Previous Ordinance or Resolution # Change Order Number: Approval Date: Original Contract Number: Comments: CITY OF Q FAYETTEVILLE ARKANSAS MEETING OF MAY 4, 2021 TO: Mayor and City Council THRU: Susan Norton, Chief of Staff Paul Becker, Chief Financial Officer Mike Reynolds, Chief of Police CITY COUNCIL MEMO FROM: Wade Abernathy, Director Bond and Building Construction Projects DATE: April 15, 2021 SUBJECT: RFQ# 21-01 Contract with McClelland Consultant Engineers, Inc. for Materials Testing for Police Headquarters Facilities Project. RECOMMENDATION: Staff recommend approval of RFQ# 21-01 Contract with McClelland Engineers, Inc. for the Materials testing at the Police Headquarters Facility in the amount of $29,515.00, approve a project contingency in the amount of $6,000 and a budget adjustment. This is a part of 2019 Police Headquarters Bond. BACKGROUND: In April of 2021, Resolution 116-21 authorized approval of Change Order #2 with Flintco LLC., for foundations, masonry, and structural steel. DISCUSSION: This contract will enable materials testing for the items approved in CO #2, in addition to testing of asphalt placement to ensure components are installed in accordance with Plans and Specifications. BUDGET/STAFF IMPACT: A budget adjustment is included. A contingency is requested in the amount of $6,000. Attachments: Proposal Letter Mailing Address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 McCLELLAND 1580 E. Stearns St. CONSULTING Fayetteville, 47-3- 72703 479-443-2377 O 479-443-9241 F ENGINEERS, INC. www.mce.us.com March 19, 2021 CITY OF 10 FAYETTEVILLE ARKANSAS 113 West Mount Street Fayetteville, AR 72701 ATTN: Mr. Wade Abernathy Director of Bond Projects and Facilities RE: Proposal for Construction Materials Testing and Special Inspections PDHQ Fayetteville, Arkansas Dear Mr. Abernathy, We are pleased to present a Proposal for the Construction Materials Testing and Special Inspections relevant to the planned new Police Department Headquarters (PDHQ) project to be located in Fayetteville, Arkansas. The information on the following pages provides further detail regarding the anticipated testing scope on the project which includes several trips for each service, time spent on -site for each service, and other znticipations which were integral in arriving at the lump sum fee amount. Project Description The current project scope consists of the construction of a new PDHQ building at 2300 West Deane Street in Fayetteville, Arkansas. The proposed PDHQ structure has a footprint of approximately 35,000 square -feet (sf). The PDHQ building is a multi -level structure expected to include lobby/gathering areas, offices, conference rooms, and an additional16,500 sf firing range to the south. Additional site improvements are expected tc consist of paved access drives and parking areas as well as utility improvements across the site. Scope of Work It is anticipated that services for construction -materials testing and special inspections for the project will include coarse aggregate base density testing, reinforcing bar observations, cast -in -place concrete testing and continuous placement observations, grout and mortar testing, drill -and -epoxy observations, asphalt testing, and structural steel inspections. It should be noted that at the time of preparing this proposal, proof roll/subgrade observations, select fill/soil density testing, and floor flatness and levelness inspections are not expected to be required. It is our understanding that observations during earthwork operations along with select fill/soil density testing (not including aggregate PDHQ— Fayetteville, AR Mr. Wade Abernathy — City of Fayetteville March 19, 2021 Page 12 base course) will be conducted by another Geotechnical/testing firm. MCE would be happy to provide these services should they be requested, with the understanding that inspection and documentation of these items would be in addition to the scope and fee services presented in this proposal, if requested. To better your understanding of our associated fees, we presented an estimated per -trip price for the services we anticipate providing on this project. The provided per -trip prices assume the following factors: • A certified technician spending 30 minutes onsite for each base density testing trip - Four (4) density tests being conducted per trip - Travel time, mileage, and report writing is factored into the unit trip price • A Geotechnical Engineer or Engineering Technician spending one (1) hour onsite for the observation of reinforcing elements. - Travel time, mileage, and report writing is factored into the unit trip price • A certified technician spending one (1) hour onsite for each cast -in -place concrete testing trip. MCE assumes that one (1) set of five (5) lab -cured 4" x 8" cylinders being sampled for every 50 cubic yards of concrete will satisfy testing frequency for the project based on project specifications. Additional cylinders and onsite technician time may be required for large monolithic concrete placements exceeding 50 yd3 - Travel time, mileage, and reporting fees are included in the per -trip amount for this service • A certified technician spending two (2) to six (6) hours performing continuous observations for the placement of concrete • A certified technician spending 30 minutes on -site for each grout testing trip. - Four (4) 4"x8" grout samples being conducted each trip - Travel time, mileage, and reporting fees are included in the per -trip amount for this service. • A certified technician spending 30 minutes on -site for each mortar testing trip. - Three (3) 2"x2" mortar cube samples being conducted each trip - Travel time, mileage, and reporting fees are included in the per -trip amount for this service • A Geotechnical Engineer or Engineering Technician spending two (2) hours onsite for the observation of drill -and -epoxy anchor bolt installation. - Travel time, mileage, and reporting fees are included in the per -trip amount for this service • A certified technician spending one (1) hour on -site to assist with establishing a rolling pattern during the placement of asphalt in pavement improvement areas. Additional time spent on -site may be required if asphalt placement operations require rolling patterns at intervals per the project specifications or if the contractor requests a technician remain on -site to assist until daily placement operations conclude PDHQ— Fayetteville, AR March 19, 2021 Mr. Wade Abernathy — City of Fayetteville P a g e 13 - Travel time, mileage, and reporting fees are included in the unit price • A certified technician spending two (2) hours on -site coring asphalt samples for laboratory testing. - Travel time, mileage, and reporting fees are included in the per -trip amount for this service • A Certified Welding Inspector (CWI) spending two (2) hours on -site for each periodic structural steel and/or welding inspection trip. Site visits relevant to continuous inspections, where applicable, may require up to eight (8) hours on -site. We also expect that the project duration will be approximately nine (9) months. From the assumptions and project details referenced above, we estimated the following per -trip prices and subtotals for each service anticipated being required: Base Course Density Testing $120.00 per trip • PDHQ Pavement Improvements (Base Course).................................................................................. 5 trips • Utility Backfill and Additional Sitework (Base Course).................................................................... 3 trips Subtotal: $960.00 Reinforcing Bar Observations $155.00 per trip Police Department Headquarters • West Perimeter Footings (Continuous and Spread).......................................................................... 3 trips • West Interior Footings (Spread)............................................................................................................ 2 trips • East Perimeter Footings (Continuous and Spread)........................................................................... 2 trips • East Interior Footings (Spread)................................................................................................................1 trip • Range Footings (Continuous and Spread)........................................................................................... 2 trips • West Wing Elevator Pit Foundations.................................................................................................... 2 trips • West Wing Elevator Pit Walls................................................................................................................. 2 trips • East Wing Elevator Pit Foundation.........................................................................................................1 trip • East Wing Elevator Pit Walls....................................................................................................................1 trip • West Wing Slab-on-Grade........................................................................................................................1 trip • East Wing Slab-on-Grade......................................................................................................................:..1 trip • Range Slab-on-Grade............................................................................................................................. 2 trips • West Wing CMU Walls, Stairwells, and Elevator Cores..................................................................... 5 trips • East Wing CMU Walls, Stairwells, and Elevator Core....................................................................... 4 trips • Range Ramp -Down and Perimeter CMU Walls.................................................................................. 8 trips PDHQ — Fayetteville, AR Mr. Wade Abernathy— City of Fayetteville March 19, 2021 Page 14 • West Wing Level 2 Deck............................................................................................................................1 trip • East Wing Level 2 Deck.............................................................................................................................1 trip • West Wing Roof Level Deck......................................................................................................................1 trip • East Wing Roof Level Deck.......................................................................................................................1 trip Subtotal: $6,35S.00 Cast -in -Place Concrete Testing Police Department Headquarters $240.00 per trip • West Perimeter Footings (Continuous and Spread)............................................................................ 3 trips • West Interior Footings (Spread).............................................................................................................. 2 trips • East Perimeter Footings (Continuous and Spread)............................................................................. 2 trips • East Interior Footings (Spread).................................................................................................................1 trip • Range Footings (Continuous and Spread)............................................................................................ 2 trips • West Wing Elevator Pit Foundations..................................................................................................... 2 trips • West Wing Elevator Pit Waits .................................................................................................................. 2 trips • East Wing Elevator Pit Foundation..........................................................................................................1 trip • East Wing Elevator Pit Walls.....................................................................................................................1 trip • West Wing Slab-on-Grade.........................................................................................................................1 trip - Additional fees applied for large monolithic pours of all project slabs • East Wing Slab-on-Grade..........................................................................................................................1 trip • Range Slab-on-Grade..........................................................................................._.................................. 2 trips • West Wing Level 2 Deck..............................................................................................................................1 trip - Additional fees applied for large monolithic pours of at[ project decks • East Wing Level 2 Deck...............................................................................................................................1•trip • West Wing Roof Level Deck.......................................................................................................................1 trip • East Wing Roof Level Deck........................................................................................................................1 trip Subtotal: $5,760.00 PDHQ — Fayetteville, AR Mr. Wade Abernathy— City of Fayetteville Continuous Concrete Placement Observations March 19, 2021 Page 15 • The unit price will reflect an observer being onsite during all structural concrete placements to verify that concrete conveyance and depositing avoid segregation and contamination, as well as proper consolidation per IBC Table 1705.3 under special inspections. The subtotal presented below also includes report writing and administrative fees. The below subtotal estimates that project concrete placements will generally require between two (2) and six (6) hours on -site for this service, which is likely a conservative estimate. Subtotal: $4,500.00 Concrete Cylinder Pick -Up $105.00 per trip • A charge for concrete cylinder pick-up will only be applied in the event that it is the sole reason for the site visit on days where no other testing is scheduled. We have assumed that this will be required for approximately one-half (0.5) of the total concrete placements. Subtotal: $1,260.00 Grout & Mortar Police Department Headquarters $200.00 per trip • West Wing CMU Walls, Stairwells, and Elevator Cores (Grout)....................................................... 3 trips • West Wing CMU Walls, Stairwells, and Elevator Cores (Mortar) ..................................................... 2 trips • East Wing CMU Walls, Stairwells, and Elevator Core (Grout).......................................................... 2 trips • East Wing CMU Walls, Stairwells, and Elevator Core (Mortar)........................................................1 trip • Range Ramp -Down and Perimeter CMU Walls (Grout)................................................................. 4 trips • Range Ramp -Down and Perimeter CMU Walls (Mortar)................................................................. 2 trips Subtotal: $2,800.00 Grout/Mortar Pick -Up $105.00 per trip • A charge for grout/mortar sample pick-up will only be applied in the event that is the sole reason for the site visit on days where no other testing is scheduled. We have assumed that one-half (0.5) of the total grout/mortar testing trips will be needed for this service. Subtotal: $735.00 PDHQ— Fayetteville, AR Mr. Wade Abernathy— City of Fayetteville Drill -and -Epoxy March 19, 2021 Page 16 $245.00 per trip Based on the provided project documents, we anticipate that a Geotechnical Engineer or Engineering Intern will be required to make approximately five (5) trips to observe the proper installation of 3/4-inch drilled - and -epoxied anchor bolts at roof -level angle connections within the planned PDHQ structure. Subtotal: $1,225.00 Asphalt Rolling Pattern $120.00 per trip A certified technician conducting asphalt rolling patterns during asphalt placement operations., It is anticipated that two (2) trips will be required for this service. Subtotal: $240.00 Asphalt Coring $680.00 per trip A certified technician coring asphalt samples for final laboratory acceptance testing. It is anticipated that up to six (6) cores will be required for laboratory testing. The cores will be tested for bulk -specific gravity and thickness verification. It is anticipated that one (1) trip will be conducted for this service. Subtotal: $680.00 Structural5teel & Welding Inspections Based on current project documents and specifications, MCE can provide Structural Steel inspection services, with the following factors taken into account: . • The referenced project documents require special inspections per IBC Chapter 17 and AWS D1.1. • We anticipate that approximately five (5) site visits will be necessary for the periodic inspection of embed plates, structural bolt -ups, and other structural steel connections relevant to the structures. • We also anticipate that approximately three (3) site visits will be necessary for continuous observation of complete joint penetrations and fillet welds greater than 5/16" within the planned PDHQ structure. Subtotal: $5,000.00 PDHQ— Fayetteville, AR March 19, 2021 Mr. Wade Abernathy— City of Fayetteville P a g e 17 Estimated Budget Based on the assumptions detailed in the foregoing proposal, we can provide construction materials testing and special inspections on this project for a Not -To -Exceed Without Approval amount as detailel below: • Base Course Density Testing................................................................................................_...................... $960.00 • Reinforcing Observations.............................................................................................................................. $6,355.00 • Cast -in -Place Concrete Testing.....................................................................................:.........._..:................: $5,760.00 • Continuous Concrete Placement Observation............................................................................................ $4,500.00 • Concrete Cylinder Pick-Up............................................................................................................................. $1,260.00 • Grout & Mortar Testing................................................................................................................................... $2,800.00 • Grout & Mortar Pick-Up............................................................................................................__....................... $735.00 • Drill -and -Epoxy Observations..................................................................................................._.................... $1,225.00 • Asphalt Rolling Pattern.............................................................................................................__...................... $240.00 • Asphalt Coring.................................................................................................................................................... $680.00 • Structural Steel & Welding Inspections.................................................................................................... $5,000.00 Total Lump Sum Fee: $29,515.00 Our estimated number of trips for each testing service is based on our experience on projects in the area with similar scope and size. Our fees are directly related to the number of trips made for each service and -Jme spent on site. If the project scope varies after the submittal of this document and prior to construction, please allow for the review/revision of this document. We appreciate the opportunity to submit this proposal for construction materials testing relevant to the PDHQ project located in Fayetteville, Arkansas. If this Proposal is acceptable, please sign the Work Authorization Agreement at the end of this document and return a copy to our office. If there are any questions regarding this Proposal, please do not hesitate to contact us. Sincerely, <teP.E. f�oger?a�hena Principal I Geotechnical Department Head Materials Testing Supervisor PDHQ— Fayetteville, AR Mr. Wade Abernathy — City of Fayetteville Work Authorization Agreement March 19, 2021 Page 18 McClelland Consulting Engineers, Inc., is authorized to proceed in accordance with this Letter of Proposal, consisting of eight (8) pages. or v SignaKre Title d Date City of Fayetteville, Arkansas - Budget Adjustment Form (Legistar) Budget Year Division FACILITIES MANAGEMENT (140) Adjustment Number 2021 /Org2 Requestor: Wade Abernathy BUDGET ADJUSTMENT DESCRIPTION / JUSTIFICATION: Approval of RF4# 21-01 Contract with McClelland Consulting Engineers, Inc. for materials testing services for the Police Headquarters Facility in the amount of $29,515.00 and a contingency of $6,000 and approve a budget adjustment. This is a 2019 Police Headquartes Bond Project. COUNCIL DATE: LEGISTAR FILE ID#: 5/4/2021 2021-0279 MattheAv Ma.dd o%, 411212021 12:25 PM. Budget Director TYPE: JOURNAL #: Date D - (City Council) RESOLUTION/ORDINANCE I GLDATE: CHKD/POSTED: 5/4/2021 TOTAL Account Number - - Increase / (Decrease) Expense Revenue Proiect.Sub# Project Sub.Defl AT v.20210309 Account Name 4609.860.7900-5860.02 29,515 - 46090 7900.8315 EX Capital Pro- Svcs - Engineering/Architects 4609.860.7900-5911.99 4609.860.7999-5899.00 6,000 - (35,515) - 46090 46090 7900.8315 EX 7999 EX Contingency -Capital Project Unallocated - Budget KABudget Adjustments\2021_Budget\City Council\05-04-2021\2021-0279 BA PDHQ Materials Testing 1 of 1 MCCLELLAND CONSULTANT ENGINEERS FOR POLICE HEADQUARTERS Wade Abernathy Submitted By City of Fayetteville Staff Review Form 2022-0345 Legistar File ID N/A City Council Meeting Date - Agenda Item Only N/A for Non -Agenda Item 4/12/2022 FACILITIES MANAGEMENT (140) Submitted Date Division / Department Action Recommendation: Approval of Amendment #2 TO RFQ # 21-01 Contract with McClelland Consultant Engineers for Materials Testing Services for the Police Headquarters Facility in the amount of $5,990.95 funded from the approved contingency and 2019 bond funds. 4609.860.7900-5860.02 Account Number 46090.7900.8315 Project Number Budgeted Item? Yes Budget Impact: 4609-Police Projects 2019 Bonds Fund PDHQ Materials Testing/Survey/Geotech Project Title Current Budget Funds Obligated Current Balance Does item have a cost? Yes Item Cost Budget Adjustment Attached? No Budget Adjustment Remaining Budget $ 24,320,387.00 $ 24,279,082.96 $ 41,304.04 $ 5990.95 $ 35,313.09 V20210527 Purchase Order Number: 2021-330 Previous Ordinance or Resolution # 133-21 Change Order Number: Original Contract Number: Comments: 9 2021-25 Approval Date: CITY OF FAYETTEVILLE ARKANSAS TO: Mayor Lioneld Jordan THRU: Susan Norton, Chief of Staff Paul Becker, Chief Financial Officer FROM: Wade Abernathy, Director Bond Construction Projects DATE: April 11, 2022 STAFF MEMO SUBJECT: Amendment #2 to RFQ#21-01 Contract with McClelland Consultant Engineers, Inc. for Materials Testing for Police Headquarters Facility. RECOMMENDATION: Staff recommend approval of an amendment to RFQ# 21-01 Contract with McClelland Engineers, Inc. for the Materials testing at the Police Headquarters Facility in the amount of $5,990.95 to be funded with approved contingency. This is a part of 2019 Police Headquarters Bond Project. BACKGROUND: In April of 2021, Resolution 116-21 authorized approval of Change Order #2 with Flintco LLC., for foundations, masonry, and structural steel. In May of 2021, Resolution 133-21 authorized a material testing service contract with McClelland. In November of 2021, Resolution 281-21 approved an amendment to the contract. DISCUSSION: This amendment includes additional testing for Asset buildings earthwork, and concrete testing. It also includes asphalt base compaction and core sample testing. BUDGET/STAFF IMPACT: Approved Contingency to be used to fund the amendment. Attachments: McClelland Amendment 2 Mailing Address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 McCLELLAND CSt ONSULTING 15te E. Stearns 03 Fayetteville, AR 72703 479-443-2377/Fax 479-443-9241 ENGINEERS, INC. www.mce.us.com April 8, 2022 Aft CITY OF FAYETTEVILLE ARKANS ARKANSAS 113 West Mount Street Fayetteville, AR 72701 ATTN: Mr. Wade Abernathy Director of Bond Projects and Facilities RE: Police Department Headquarters (PDHQ) Request for Change Order #2 for CMT Services Fayetteville, Arkansas Dear Mr. Abernathy, This document will serve as a request for Change Order #2 to our current Amendment to RFQ# 21-01 Contract, executed May 41h, 2021, and our Change Order #1 document dated October 251h, 2021. ,The current agreement details a sum of $48,665.00 for professional engineering services regarding materials testing and special inspection. Through the end of December 2021, MCE has invoiced a total of $48,572.45 for services provided on the project, which nearly exhausts the current contract amount. During the months of January and February 2022, MICE has continued responding to requests for services onsite, while also coordinating with the Contractor and relevant Subcontractors to estimate the remaining services that will be requested and required for the remainder of the project. Services provided through the, months of January and February total a sum of $6,603.50. At the date of this document, some of the provided services have exceeded those that were outlined as expectations in the Change Order #1 agreement. The following items provide detail towards services already performed beyond those expected by Change Order #1, as well as a comprehensive list of expected remaining services through the end of construction on the project: o Proof Roll Observation and Recommendations. Through coordination with onsite representatives, the below provides a best -estimate of remaining inspection trips for this service relevant to proof rolling observations and corresponding recommendations: • Police Mesh Yard —1 trip • Asset Buildings 1 & 2 —1 trip • Pavement - Parking Lot — 1 trip ■ Subtotal = $645.00 The above items result in a fee of $645.00 for a total of three (3) trips. This Fee includes the evaluation of soils in locations that were not anticipated after Change Order #1. It should be noted that the number of trips that exceeded Change Order #1 has resulted in a difference of one (1) additional proof rolling observation trip which has been performed as of the date of this document. This is a result of winter weather conditions and heavy construction traffic that occurred during project operations. PDHQ — CO #2 Request Mr. Wade Abernathy— City of Fayetteville April 8, 2022 Page 12 o Soil and Base Density Testing. Through coordination with onsite representatives, the below provides a best -estimate of remaining inspection trips or trips that have already occurred for this service relevant to select fill and base course material placements: • Asset Buildings 1 & 2 — 2 trips • PDHQ Parking Lot Base —1 trip • PDHQ Parking Lot Subgrade —1 trip • Utility Lines, Sewer Lines, & Trenches — 6 trips (already occurred) ■ Subtotal = $1,900.00. The above items result in a fee of $1,900.00 for a total of 10 trips. This Fee includes the evaluation of soils in locations that were not anticipated after Change Order #1. It should be noted that the number of trips that exceeded Change Order #1 has resulted in a difference of four (4) density testing trips which have been performed as of the date of this document. This is a result of winter weather conditions and heavy construction traffic that occurred during project operations. o Reinforcing Bar Observation. Through coordination with onsite representatives, the below provides a list of remaining inspection trips or trips that have already occurred for this service relevant to cast -in -place concrete and CMU elements: • Asset Buildings 1 & 2 — 2 trips • Ramp - Retaining Walls and S.O.G. —1 trip (already occurred) • S.O.D. Topping Slabs - Main Building Roof Level and Range Roof Level — 2 trips (already occurred) • Range - CMU Interior Walls Level 1 - Roof Level — 2 trips (already occurred) ■ Subtotal = $1,505.00 The above items result in a fee of $1,505.00 for a total of seven (7) trips. This Fee includes unforeseen inspection services and additional services that exceeded our request on Change Order #1. It should be noted that the number of total trips that were expected after Change Order #1 in comparison to the actual trips conducted has resulted in a difference of 40 total trips that have been performed for the project to date. This is a result of heavy inspection frequencies that were caused by splitting the observation of structures into multiple trips, unforeseen inspections throughout the project, and CMU wall observation trips that had not been communicated to MCE during previous preparation of our services. PDHQ— CO #2 Request Mr. Wade Abernathy— City of Fayetteville April 8, 2022 Page 13 o CMU Grout and Mortar Testing (including Reinforcing Bar Observation while onsite). Through coordination with onsite representatives, the below provides a best -estimate of remaining placements or trips that have already occurred for this service relevant to CMU grout, mortar testing, and sample pickups: • MCE has been requested to provide this service for a total one (1) trip beyond those expected by Change Order #1, which occurred on 1 /4/2022. - Range Interior Walls — 1 trip (already occurred) • Further, a total of one (1) trip is still expected to be required for grout and mortar testing. • Sample Pickup —1 trip ■ Subtotal = $645.00 The above items result in a fee of $645.00 for a total of three (3) trips. This Fee includes unforeseen inspection services and additional services that exceeded our request on Change Order #1. It should be noted that the number of trips that exceeded Change Order #1 has resulted in a difference of nine (9) grout and mortar testing trips and six (6) grout and mortar pickup trips which have been performed up to date. This is a result of heavy inspection frequencies that were unforeseen through the project along with trips of CMU wall observations that had not been accounted for in our proposal. Cast -in -Place Concrete Testing. Through coordination with onsite representatives, the below provides a best -estimate of remaining inspection trips for this service or trips that have already occurred for this service relevant to cast -in -place concrete elements: • Asset Buildings 1 & 2 — 1 trip • Ramp Retaining Walls and SOG —1 trip (already occurred) • Sample Pickup —1 trip (2 trips for SOG have already occurred) ■ Subtotal = $825.00 The above items result in a fee of $825.00 for a total of four (4) trips. This Fee includes unforeseen inspection services and additional services that exceeded our request on Change Order #1. It should be noted that the number of trips that exceeded Change Order #1 has resulted in a difference of three (3) concrete testing and concrete pickup trips which have been performed to date. PDHQ—CO a2 Request Mr. Wade Abernathy— City of Fayetteville April 8, 2022 Page 14 o Asphalt Pavement Testing & Asphalt Coring. These services have not yet been required and is estimated at a fee of $2,150.00 after the Change Order #1 agreement. Through coordination with onsite representatives, the below provides a best -estimate of remaining inspection trips for this service relevant to asphalt pavement testing and asphalt coring: • Asphalt Pavement Testing - This expects four (4) trips onsite during asphalt placements for observation and establishing of rolling pattern. Travel time, mileage, and reporting fees are included in the per -trip amount for this service. • Asphalt Coring A certified technician coring asphalt samples for final laboratory acceptance testing. It is anticipated that up to six (6) cores will be required for laboratory testing. The cores will be tested for bulk -specific gravity and thickness verification. It is anticipated that two (2) trips to obtain core samples and relevant lab testing/reporting for acceptance will be required for this service. Travel time, mileage, and reporting fees are also included in the per -trip amount for this service. The above items result in a fee of $2,150.00 for a total of six (6) trips that still remain after Change Order #1. o Structural Steel and Welding Inspection. • MCE has been requested to provide this service for a total four (4) trips as expected by Change Order #1, which amounts to a total of $3,320.95 in completed services invoiced up to date. • Additional trips for this service are currently not expected to continue for the duration of project operations. A total of $5,000.00 had been requested for this service after the allotment of Change Order #1 leaving a credit amount of $1,679.05. ■ Credit Subtotal = $1,679.05 The above items and descriptions result in a fee that is beyond the current contract amount by $5,990.96 As such, we are requesting a revision to the current agreement so that a total of $5,990.95 is added to compensate for the requested/anticipated additional services. This would bring the total not -to -exceed without approval agreement amount to $64,162.45 for our expected services on the project. This document has been prepared and provided with the intent of alleviating any future request for Change Order on this project. PDHQ—CO #2 Request Mr. Wade Abernathy— City of Fayetteville April S, 2022 Page 15 We greatly appreciate your consideration of this Change Order #2 request document for our services on the project. Please contact us with any questions or concerns that you might have regarding the information contained in this document. Sincerely, Steven J. ead, P.E. Principal I Geotechnical Department Head McClelland Consulting Engineers, Inc., is authorized for the additional fees requested by this Change Order Request #2 document, consisting of five (5) pages. re Mayor Title 4-13-22 Date