Ordinance: 6429
File Number: 2021-0298
SRD BUILDERS, LLC:
AN ORDINANCE TO WAIVE FORMAL COMPETITIVE BIDDING AND APPROVE A COST
SHARE AGREEMENT WITS 3RD BUILDERS, LLC FOR THE EX-7--NSION OF A 4-INCH
WATER LINE ON WEST LA%VSON STREET WITH A REFUND INAN AMOUNT NOT TO
EXCEED $20,484.88 TO BE F'.!kID BY THE CITY OF FAYETTEVILLE, AND 70 APPROVE A
PROJECT CONTINGENCY IN THE AMOUNT OF $2,048.00
WHEREAS, SRD Builders, L:=.0 is developing two townhomes in the place of a single family
residence at 940 West Lawson Street; and
WHEREAS, the current 1.5-inc -i water pipe that serves the property is not large enough to
accommodate the project and th-s development will require approximat? y 20-) _inear feet of 4-inch
water line to reach the project siw; and
WHEREAS, the extension of a =-_nch main in this area will replace the aging and brittle segment of
galvanized water line that is 50 years old; will allow a portion of the cus orners on both sides of
Lawson Aven4e to connect to a I irger pipe; will provide a water connection tl-at co -Ad be extended if
development occurs to the east; and will remove a section of lead pipe from the City's water
distribution system, which is a r.)airement of the new Lead and Copper Rule; a.-td
WHEREAS, the City's portion of -he cost to extend the 4-inch pipe to Oe pro ect site is
approximately 46% with the devcicper paying 54% of the cost of the extensior..
NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL. OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Page 1 Printed on 515121
Ordinance. 6429
File Number: 2021-0298
Section 1: That the City Ccunc1 of the City of Fayetteville, Arkansas Fe-eby deterriines an
exceptional situation exists :n which competitive bidding is deemed not fmsirle or practical and
therefore waives the requirements of formal competitive bidding and app-ove ; a ccst share agreement
with SRD Bui_ders, LLC, fcr the extension of a 4-inch line along West --awscn Street with a refund in
an amount not to exceed $20,484.E8 to be paid by the City of Fayetteville for :he cost of
improvements tl-at exceed the rough proportionality of the impact of the deve.o3ment, and further
approves a project contingency in -he amount of $2,048.49.
PASSED and APPROVED on 5/4/2021
Attest:
Kara Paxtc•n, Ci_y Clerk Tre s er
Page 2 Printed on 515121
City of Fayetteville, Arkansas 113 West Mountain Street
Fayetteville, AR 72701
(479) 575-8323
Text File
File Number: 2021-0298
Agenda Date: 5/4/2021 Version: 1 Stat.ls: Passed
In Control: City Council Meeting File Type: Ordinance
Agenda Number: C.3
SRD BUILDERS, LLC:
AN ORDINANCE TO WAIVE FORMAL COMPETITIVE BIDDING AND APPIOVF A COST
SHARE AGREEMENT WITH SRD BUILDERS, LLC FOR THE EXTENSION OF A 4-INCH WATER
LINE ON WEST LAWSON STREET WITH A REFUND IN AN AMOUN" NOT TO EXCEED
$20,484.88 TO BE PAID BY THE CITY OF FAYETTEVILLE, AND TC1 APPRCVE A PROJECT
CONTINGENCY IN THE AMOUNT OF $2,048.00
WHEREAS, SRD Builders, LLC is developing two townhomes in the place z'a si-tgle -amily residence at.940
West Lawson Street; and
WHEREAS, the current 1.5-inch water pipe that serves the property is nct ]a-ge enough to accommodate the
project and this develcpment will require approximately 200 linear feet of 44-ich water lire to reach the project
site; and
WHEREAS, the extension of a 4-inch main in this area will replace the ag_ng and brittle segment of galvanized
water line that is 50 years old; will allow a portion of the customers on bolt- sites of Lawson Avenue to
connect to a larger pipe; will provide a water connection that could be extended if development occurs to the
east; and will remove a section of lead pipe from the City's water distribution system, which is a requirement of
the new Lead and Copper Rule; and
WHEREAS, the City's portion of the cost to extend the 4-inch pipe to the prof xt si-e is approximately 46%
with the developer paying 54% of the cost of the extension.
NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby cc--en-nines an exceptional
situation exists in which competitive bidding is deemed not feasible or pract.cal and therefore waives the
requirements of formal competitive bidding and approves a cost share agreeme-i with SRD Builders, LLC, for
the extension of a 4-ir_ch line along West Lawson Street with a refund in an amount not to exceed $20,484.88
to be paid by the City of Fayetteville for the cost of improvements that exceed the roLg-i proportionality of the
impact of the development, and further approves a project contingency in the amount o-$2,348.49.
City of Fayetteville, Arkansas Page 1 Printed on 5151202;
Tim Nyander
Submitted By
City of Fayetteville Staff Review Form
2021-0298
Legistar File ID
5/4/2021
City Council Meeting Date - Agenda Item Drily
N/A for Non -Agenda Item
4/15/2021 WATER SEWER (720)
Submitted Date Division / Department
Action Recommendation:
Staff recommends approval of a cost share agreement with SRD Builders, LLC in an a:-nount not to exceed
$20,494.88 for the extension of a 4-inch water line on W. Lawson Stre=_t East of Oakland Avenue, and to approve a
project contingency in the amount of $2,048.49.
Budget Impact:
5400.720.5600-5808.00
'hater anc Sewer
Account Number Fund
04039.1 WaterfSE%ver Impact Fee Cost Sharing
Project Number
Budgeted Item? Yes Current Budget
Funds Obliga-ed
Current Balance
Does item have a cost? Yes Item Cos -
Budget Adjustment Attached? No Budget Adjustrr-en-
Remaining Budge -
Project Title
$
3,180, 649.00
$
2,489,314.96
$ 691,334.04
$
22,533.37
l $
668,800.67
V20180321
Purchase Order Number: Previous Ord'nanoe or Resolution #
Change Order Number:
Original Contract Number:
Comments:
Approval Date:
CITY OF
FAYETTEVILLE
MAP ARKANSAS
MEETING OF MAY 4, 2021
TO: Mayor and City Council
THRU: Susan Norton, Chief of Staff
Water & Sewer Committee
FROM: Tim Nyander, Utilities Director
DATE: April 15, 2021
CITY COUNCIL MEMO
SUBJECT: Lawson & Oakland Cost Share for 4-inch Water Line
RECOMMENDATION:
Staff recommends approval of a cost share agreement with SRD Builders LLC in an amount
not to exceed $20,484.88 for the extension of a 4-inch water line on W. Lawson Street east of
Oakland Avenue, and to app,ove a project contingency in the amount of $2,048.49.
BACKGROUND:
SRD Builders, LLC is developing two lot splits along W. Lawson Street. O-ie single family home
will be removed for the addition of 2 townhomes. The current 1 1/2-inch water pipe is not large
enough accommodate this project.
DISCUSSION:
This development requires aaproximately 200 linear feet of 4-inch PVC water pipe to reach the
project site. The City would split the work 46/54, with the developer paying 100% of the cost for
the private service connections. Three quotes were received, with the low oid from M&M
Excavating, excluding private sewe, lines to be $37,419.76. Installation of orivate service lines
are $3,237.40 Engineering costs were $3,550.
This cost share proposal accomplishes four things. First, it replaces an ageing and brittle
segment of galvanized water pipe that is 50 years old. Second, it allows a portion of the
customers on both sides of Lawson Avenue tc connect to a larger pipe, which will provide more
volume to their meter. Third, it provides a water connection (that could be extended) if
development occurs to the east on Lawson and fourth, it removes a section of lead pipe from
the City's water distribution system, which is a requirement of the new Lead and Copper Rule.
Mailing Address:
113 W. Mountain Street www.fayetteville-ar.gov
Fayetteville, AR 72701
CONTRACTUAL AGREEMENT FOR
COST SHARE OF WATER MAIN INSTALLATION COSTS
This Agreement, made and entered into on this I- day of May, 2021, by and between
the City of Fayetteville, Arkansas ("City") and SRD Builders, LLC ("SRD Builders"), witnesseth:
WHEREAS, SRD Builders has requested that the City share in the cost of constructing a
4-inch water main near the corner of West Lawson Street and North Oakland Avenue, a distance
of approximately 200 feet, so that SRD Builders may develop the property located at the northeast
corner of West Lawson Street and North Oakland Avenue; and
WHEREAS, constructing this segment of 4-inch water main will allow development of
this property, and will provide for ample future capacity which the City recognizes will be
necessary for the area that is served by this water main; and
WHEREAS, § 51.113 of the Fayetteville City Code provides that "the City shall pay the
excess material cost of facilities of a size larger than required to service subdivisions when such
excess size is specified and required by the water and wastewater director for the general benefit
of the sewerage system."
NOW, THEREFORE, the City of Fayetteville, Arkansas and SRD Builders, LLC agree
as follows:
1. The City of Fayetteville, Arkansas agrees to:
A. Reimburse SRD Builders, LLC for 46.3% of the cost to install approximately
200 linear feet of 4-inch water main in the area identified in Exhibit "A" up to
a maximum -not -to -exceed amount of $20,484.88, as was estimated by the
builder's representative and shown on Exhibit `B", attached.
B. Payments due to SRD Builders, LLC, shall be remitted within sixty (60) days
after receipt of valid invoices.
2. SRD Builders, LLC agrees to:
A. Provide the necessary and normal project management, inspection, and testing
as necessary for a complete and acceptable water main installation, including
submittal of plans and specifications to the City's Engineering Department, per
their standard procedures.
B. Provide a copy of the invoices from the Contractor upon City approval of the
water main upgrade.
C. Pay for the water main installation (with reimbursement of 46.3% of the cost
by the City of Fayetteville in a not -to -exceed amount of $20,484.88).
Page 1 of 2
IN AGREEMENT WITH ALL THE TERMS AND CONDITIONS ABOVE, WE
SIGN BELOW:
SRD BUILDERS, LLC
By: _
DIEGO ESPINOZA,
Manager
ATTEST:
By: N�z 1,
vSAS
ATTEST:
KARA PAXTON, City C erk 11 i►��
_•�,, r Mal
Page 2 of 2
EXHIBIT
,-W Law$on st
1.5" GALV-"
Proposed 200 linear foot
waterline extension
=`�
M&M Excavating
377 Sulphu- City Rd
Fayetteville, AR, 72701
(479) 841-5285
mandmexcj.vating@Windstreem.net
For: Diego Espinoza
despinozl@gmail.com
Description
SRD Builders LLC
4" Water line extension approximate y 200 ft
Base and bedding
Materials
Concrete
Materials
Asphalt
Materials
Dumptrucks
Materials
Bond
Material
Labor
P-essure the=k and testing line
Service
4"D R 14 C 900
Materials
14GATW
60 ft service 1C0 ft existing service 200 ft materials
3x:1000 nond �tect tape
Materials
EXHIBIT B
Estimate
Estimate No: 4
Date: 02/09/2021
Quantity
Rate
Amount
1
$0.00
$0.00
1
$3,700.00
$3,700.00
1
$2,700.00
52,700.00
1
$1,000.00
S1,000.00
1
$4,200.00
$4,200.00
1
$1,000.00
$1,000.00
1
$10,000.00
$10,000.00
1
$2,400.00
$2,400.00
200
$3.10
$620.00
360
$0.14
$50.40
1
$18.00
$18.00
1/4
M&M Excavating - Estimate 4 - 02/09/2021
Description
3M wire nut
4 for service 3 for existing service 2 materials
8x4SS tapSLV MJ Outlet
Materials
4MJGV
Materials
562SD V8
Materials
BOXLOC
Materials
Concrete VLV Pad
Materials
4" MJ B & G Pk 316SS
Materials
4" PVC Megalug
Materials
4" Tap
Materials
4x2TAPT CAP
Materials
2x24 Brass Nipple
Materials
#77 blow off hyd
Materials
4" DIP
Materials
20x300 Polywrap
Materials
2x100 polytape
Materials
4" Dip megalug
Materials
Quantity
Rate Amount
9
$3.00 $27.00
New Service 4x = $12
1
$700.00 $700.00
2
$445.00 $890.00
2
$125.00 $250.00
2
$23.00 $46.00
2
$28.00 $56.00
1
$46.00 $46.00
2
$24.00 $48.00
1
$650.00 $650.00
1
$78.00 $78.00
1
$69.00 $69.00
1
$710.00 $710.00
18
$19.00 $ 342.00
1
$110.00 $110.00
1
$6.00 $6.00
1
$24.00 $24.00
2/4
M&M Excavating - Estimate 4 - 02/0y/2021
Description
Quantity Rate
Amount
1104SDB Stand Alone Rest
1 $66.00
$66.00
Materials
.3/4 SS All Thread
12 $6.00
$72.00
Materials
3/4SS Hex Nut
4 $1.80
$7.20
Materials
:/4 Flat SS Washer
4 $0.85
$3.40
Materials
3/4 SS Eyebolt
2 $20.00
$40.00
Materials
1' Ball Corp
7 $58.00
$406.00
4 for service 3 existing service
New �"--- erJice 4x = $232
4x 1 Saddle
7 $26.00
$182.00
4 -or service 3 for existing service
New Service 4x = $104
1x3/4 Ubranch
4 $42.00
$168.00
4 for service
5/8x3/4Setter
11 $110.00
$'_,210.00
8 for service 3 fDr existing service
I
New Sell ce 8x = $880
3/4DP End Connect
11 $18.00
$198.00
8 for service 3 for existing service
I New Service 8x = $144
3/4 CTS End Connect
_1 $18.00
$198.00
8 for service 3 for existing service
New Service 8x = $144
18; 24 PVC Box
7 $50.00
$350.00
4 fcr service 3 for existing service
New Service 4x = $200
18` HDPE Lid
7 $70.00
$490.00
4 for service3 for existing service
New Service 4x = $280
f
1" coated Copper
2?J $7.50
$1,500.00
100 ft for service 100ft for existing servi=e
$750 l
3/4 Coated Copper
'5 $5.25
$393.75
60 ft for service 15ft for existing service
New Service =$315
1/2 540 PVC Pipe
�0 $0.42
$16.80
20 ft for service 2 ] ft for existing service
$8.40
3/4
M&M Excavating - Estimate 4 - 02/09/2021
Description
Quantity
Rate
Amount
1x3/4 Male Adapter
3
$20.00
$60.00
Materials
2" S40 PVC Pipe
60
$0.78
$46.80
Materials
3/4 CTS CPLG
3
$20.00
$60.00
3 for existing service
#77 blow off hyd
1
$710.00
$710.00
Materials
3/4 Insert
3
$2.00
$6.00
3 for existing service
Taxes for itemized materials @ 10.59%
1
$1,081.69
$1,081.69
$10,214.35
Bores
1
$4,000.00
$4,000.00
2 for existing services
Subtctal
$41,006.04
Discount
$6.04
?
TAX 0%
$0.00
Tota 1
$41,000.00
Total
$41,000.00
New -�mtices = $3,237.40 + tax
=$3,580.24
4/4
Blew & Associates, P.A.
3825 N Shiloh Drive
Fayetteville, AR 727)3
(479) 443-4506
www.blewinc.com
INVOICE
BILL TO
Diego Espinoza
DESCRIPTION
TOPO - 940 W. Lawson St, Fayetteville, AR
Wate- Main Extensio'l - 940 W. Lawson St, Fayetteville, AR - Initial
50%
Ref Precious Blew # 19-5051 BALANCE DUE
INVOICE # 20-1059
DATE 04/13/2020
DUE DATE 05/13/2020
CITY RATE AMOUNT
1 900.00 900.00
0.50 2,500.00 1,250.00
$2,150.00
Blew & Associates, P.A.
3825 N Shiloh Drive
Fayetteville, AR 72703
(479) 443-4506
www.blewinc.com
INVOICE
BILL TO
Diego Espinoza
despinozl@gmail.com
DESCRIPTION
Water Main Extension - 940 W. Lawson St, Fayetteville, AR - Final
50%
INVOICE # 20-1059B
DATE 06/05/2020
DUE DATE 07/05/2020
OTY RATE
0.50 2,500.00
AMOUNT
1,250.00
Invoice 20-1059 (Initial 50%of Water Main Extensioi' - Paid 5/6/2020. BALANCE DUE $1'250.00
Blew & Associates, P.A.
3825 N Shiloh Drive
Fayetteville, AR 72703
(479) 443-4506
www.blewinc.com
INVOICE
BILL TO
Diegc Espinoza
despinozl Qa gmail.corn
DESCRIPTION
Hydrant Flow Test - S40 W. Lawson St, Fayetteville, AR
INVOICE # 20-1059C
DATE 07/29/2020
DUE DATE 08/28/2020
QTY RATE AMOUNT
1 150.00 150.00
BALANCE DUE $150.00
MIS 1 SHARh AC RhhMhN 1
SRD BUILDERS, LLC
City of Fayetteville Staff Review Form
2022-0010
Legistar File ID
N/A
City Council Meeting Date - Agenda Item Only
N/A for Non -Agenda Item
Tim Nyander 1/7/2022 WATER SEWER (720)
Submitted By Submitted Date Division / Department
Action Recommendation:
Staff recommends the approval to use contingency funds in the amount of $2,048.00 for a waterline cost share on
W. Lawson St. with SRD Builders, LLC.
5400.7 20.5 600-5808.00
Account Number
04039.1
Project Number
Budgeted Item? Yes
Does item have a cost? Yes
Budget Adjustment Attached? No
Purchase Order Number: 2021-391
Change Order Number: 1
Original Contract Number: 2021-33
Comments:
Budget Impact:
Water and Sewer
Fund
Water/Sewer Impact Fee Cost Sharing
Project Title
Current Budget
$ 1,343,129.76
Funds Obligated
$ 593,457.60
Current Balance
$ 749,672.16
Item Cost
$ 2,048.00
Budget Adjustment
$ -
Remaining Budget
i $ 747,624.16
V20210527
Previous Ordinance or Resolution # Ord. 6429
Approval Date: 1/10/22
_CITY OF
FAYETTEVILLE
ARKANSAS
TO: Mayor Lioneld Jordan
THRU: Susan Norton, Chief of Staff
FROM: Tim Nyander, Utilities Director
DATE: January 7, 2022
SUBJECT: SRD Builders, LLC - Contingency for Waterline Cost Share
on W. Lawson St.
STAFF MEMO
RECOMMENDATION:
Staff recommends the approval to use contingency funds in the amount of $2,048.00 for a
waterline cost share on W. Lawson St. with SRD Builders, LLC.
BACKGROUND:
Ordinance 6429, passed on May 4, 2021, approved a cost share agreement with SRD Builders,
LLC in an amount not to exceed $20,484.88 to extend a 4-inch waterline on W. Lawson St. The
Ordinance also approved a project contingency in the amount of $2,048.00.
DISCUSSION:
During construction, it was determined that additional meter sets were needed that were not in
the original engineering design. Also, materials and construction costs were higher than
anticipated due to volatile materials costs in the market. The final construction cost came in
slightly higher than originally estimated by the builder's representative.
Staff recommends approving the utilization of contingency funds in the amount of $2,048.00 to
reimburse the developer for the increased costs of the waterline extension on Lawson St.
BUDGET/STAFF IMPACT:
Funds are available in the Water/Sewer Impact Fee Cost Sharing account.
Attachments:
Invoice from SRD Builders, LLC
Ordinance 6429
Mailing Address:
113 W. Mountain Street www.fayetteville-ar.gov
Fayetteville, AR 72701
SRD BUILDERS, LLC
2308 N Fox Trl
Fayetteville Ar 72703
479- 236-0130
Project Title: 940 W Lawson
INVOICE Project Description: Required waterline improvement
Date: 01 /6/2022
Waterline engineering (Blew & Assoc)
Topographic study (Blew & Assoc)
Flow test and inspections (Blew & Assoc)
As built drawings (Blew & Assoc)
Labor and materials (M&M Excavating)
50% Owners responsability
Tax
1 $ 2,500 $ 2,500
1 $ 900 $ 900
1 $ 3,615 $ 3,615
1 $ 1,500 $ 1,500
1 $ 42,500 $ 42,500
1 $ 0
1 $ 0
1 $ 0
1 $ 0
1 $ 0
1 $ 0
$ 0
1 $ (25,508) $ (25,508)
Subtotal $ 25,508
$ 0
Total owed by City of Fayetteville Total $ 25,508
Total Allowed by City $22,532.88 Total $22,532.88
1
113 West Mountain Street
Fayetteville. AR 72701
(479) 575-8323
Ordinance: 6429
File Number: 2021-0298
SRD BUILDERS, LLC:
AN ORDINANCE TO WAIVE FORMAL COMPETITIVE BIDDING .AND APPROVE A COST
SHARE AGREEMENT WITS 3RD BUILDERS, LLC FOR THE EX—�NSION OF A 4-INCH
WATER LINE ON WEST LAWSON STREET WITH A REFUND IN AN AMOUNT NOT TO
EXCEED $20,484.88 TO BE F.kID BY THE CITY OF FAYETTEVILLE, AND -O APPROVE A
PROJECT CONTINGENCY IN THE AMOUNT OF $2,048.00
WHEREAS, SRD Builders, L—C is developing two townhomes in the place of a single family
residence at 940 West Lawson Str!et; and
WHEREAS, the current 1.5-in: i water pipe that serves the property is not larg: enough to
accommodate the project and th s development will require approximate-y 20-) .inear feet of 4-inch
water line to reach the project si and
WHEREAS, the extension of a _-:nch main in this area will replace the aging and yrittle segment of
galvanized water line that is 50 .F-rs old; will allow a portion of the customer, on both sides of
Lawson Aven4e to connect to a l sr;er pipe; will provide a water connection that co.dd be extended if
development occurs to the east; and will remove a section of lead pipe frc -m the City's water
distribution system, which is a r_ Jcirement of the new Lead and Copper Rule; and
WHEREAS, the City's portion of -he cost to extend the 4-inch pipe to Lie pro ect site is
approximately 4E% with the de-velcper paying 54% of the cost of the extensior..
NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Page 1 Printed on 5/5/21
Ordinance 6429
File Number 2021-0298
Section 1: That the City Ccunc 1 of the City of Fayetteville, Arkansas I-e-eby dztern. ines an
exceptional situation exists :n which competitive bidding is deemed not f.-asit le or practical and
therefore waives the requirements of formal competitive bidding and approves a ccst share agreement
with SRD Builders, LLC, fcr the extension of a 4-inch line along West --awscn Strict with a refund in
an amount not to exceed $20,484.F8 to be paid by the City of Fayetteville for he cost of
improvements &at exceed the rough proportionality of the impact of the deveiooment, and further
approves a project contingency in -he amount of $2,048.49.
PASSED and APPROVED on 94/2021