Loading...
HomeMy WebLinkAboutOrdinance 6423pF Fp Y0", _ � v LA 113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 Ordinance: 6423 File Number: 2021-0200 HFI FLETCHER, LLC: AN ORDINANCE TO WAIVE FORMAL COMPETITIVE BIDDING AND APPROVE A COST SHARE AGREEMENT WITH HFI FLETCHER, LLC FOR THE EXTENSION OF A SEWER LINE ON FLETCHER AVENUE WITH A REFUND IN AN AMOUNT NOT TO EXCEED $13,461.00 TO BE PAID BY THE CITY OF FAYETTEVILLE, AND TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $2,500.00 WHEREAS, HFI Fletcher, LLC is developing three existing lots along Fletcher Drive, which currently has no public sewer access; and WHEREAS, this particular development requires approximately 174 linear feet of sewer line to reach the project site and an additional 245 linear feet of sewer across the project frontage; and WHEREAS, the City would be responsible for 100% of the offsite work, the parties will equally share in the cost of the onsite work, and the developer will be responsible for 100% of the cost of the private service connections; and WHEREAS, the extension of an 8-inch main in this area will allow for ample future capacity which the City recognizes will be necessary for the area served by this sewer main. NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby determines an exceptional situation exists in which competitive bidding is deemed not feasible or practical and therefore waives the requirements of formal competitive bidding and approves a cost share agreement Page 1 Printed on 417121 Ordinance 6423 File Number 2021-0200 with HFI Fletcher, LLC, for the extension of a sewer line with a refund in an amount not to exceed $13,461.00 to be paid by the City of Fayetteville for the cost of improvements that exceed the rough proportionality of the impact of the development, and further approves a project contingency in the amount of $2,500.00. PASSED and APPROVED on 4/6/2021 Attest: K �\,.•• G1TY pc�9,p, .. AYE7TI_VILLE; �= Kara Paxton, City Clerk Treasurer• idd rON'JJJJi �0���♦♦♦ Page 2 Printed on I/7l21 City of Fayetteville, Arkansas i Text File File Number: 2021-0200 Agenda Date: 4/6/2021 Version: 1 In Control: City Council Meeting Agenda Number: C 2 HFI FLETCHER, LLC: 113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 Status: Passed File Type: Ordinance AN ORDINANCE TO WAIVE FORMAL COMPETITIVE BIDDING AND APPROVE A COST SHARE AGREEMENT WITH HFI FLETCHER, LLC FOR THE EXTENSION OF A SEWER LINE ON FLETCHER AVENUE WITH A REFUND IN AN AMOUNT NOT TO EXCEED $13,461.00 TO BE PAID BY THE CITY OF FAYETTEVILLE, AND TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $2,500.00 WHEREAS, HFI Fletcher, LLC is developing three existing lots along Fletcher Drive, which currently has no public sewer access; and WHEREAS, this particular development requires approximately 174 linear feet of sewer line to reach the project site and an additional 245 linear feet of sewer across the project frontage; and WHEREAS, the City would be responsible for 100% of the offsite work, the parties will equally share in the, cost of the onsite work, and the developer will be responsible for 100% of the cost of the private service connections; and WHEREAS, the extension of an 8-inch main in this area will allow for ample future capacity which the City recognizes will be necessary for the area served by this sewer main. NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby determines an exceptional situation exists in which competitive bidding is deemed not feasible or practical and therefore waives the requirements of formal competitive bidding and approves a cost share agreement with HFI Fletcher, LLC, for the extension of a sewer line with a refund in an amount not to exceed $13,461.00 to be paid by the City of Fayetteville for the cost of improvements that exceed the rough proportionality of the impact of the development, and further approves a project contingency in the amount of $2,500.00. City of Fayetteville, Arkansas page 1 Printed on 41712021 Tim Nyander City of Fayetteville Staff Review Form 2021-0200 Legistar File ID 4/6/2021 City Council Meeting Date - Agenda Item Only N/A for Non -Agenda Item 3/16/2021 WATER SEWER (720) Submitted By Submitted Date Division / Department Action Recommendation: Staff recommends approval of a cost share agreement with HFI Fletcher, LLC in an amount not to exceed $13,461.00 for the extension of a sewer line on Fletcher Avenue between Crescent Drive and Dickson Street, and to approve a project contingency in the amount of $2,500.00. 5400.720.5700-5815.00 Account Number 04039.1 Project Number Budgeted Item? Yes Does item have a cost? Yes Budget Adjustment Attached? No Budget Impact: Water and Sewer Fund Water/Sewer Impact Fee Cost Sharing Current Budget Funds Obligated Current Balance Item Cost Budget Adjustment Remaining Budget Project Title $ 3,180,649.00 $ 2,473,353.96 $ 707,295.04 $ 15, 961.00 �$ 691,334.04 V20180321 Purchase Order Number: Previous Ordinance or Resolution # Change Order Number: Approval Date: Original Contract Number: Comments: CITY OF FAYETTEVILLE ARKANSAS MEETING OF APRIL 6, 2021 TO: Mayor and City Council THRU: Susan Norton, Chief of Staff Water & Sewer Committee FROM: Tim Nyander, Utilities Director DATE: March 16, 2021 CITY COUNCIL MEMO SUBJECT: HFI Fletcher, LLC — Sewer Cost Share Agreement on Fletcher Avenue Between Dickson Street and Crescent Drive RECOMMENDATION: Staff recommends approval of a cost share agreement with HFI Fletcher, LLC in an amount not to exceed $13,461.00 for the extension of a sewer line on Fletcher Avenue between Crescent Drive and Dickson Street, and to approve a project contingency in the amount of $2,500.00. BACKGROUND: HFI Fletcher, LLC is developing three existing lots along Fletcher Drive. Two single family homes will be removed for the addition of 10 infill homes/lots. No public sewer exists today in front of these parcels and a public main extension is necessary. DISCUSSION: This particular development requires approximately 174 linear feet of sewer to reach the project site, and an additional 245 linear feet of sewer across the project frontage. The City would be responsible for 100% of the 'offsite' work, splitting the 'onsite' work 50/50, with the developer paying 100% of the cost for the private service connections. The City has elected to design and construct this project in-house to save money versus private contractor installation. The City's cost is estimated at $13,461.00 and the developers cost is estimated at $16,520.32. BUDGET/STAFF IMPACT: Funds are available in the Water/Sewer Impact Fee Cost Sharing account within the Water & Sewer Fund. Attachments: Cost Share Agreement Exhibit A - Map Cost Share Request Letter Cost Share Response Letter Mailing Address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 CONTRACTUAL AGREEMENT FOR COST SHARE OF SEWER MAIN INSTALLATION COSTS This Agreement, made and entered into on this � day of April, 2021, by and between. the City of Fayetteville, Arkansas ("City") and HFI Fletcher, LLC, witnesseth: WHEREAS, HFI Fletcher, LLC has requested that the City construct and share in the cost of constructing an 8-inch sewer main along a portion of North Fletcher Avenue between East Dickson Street and East Crescent Drive, a distance of approximately 419 feet, to facilitate the lot splits and increase population density; and WHEREAS, the City of Fayetteville will share 50% of the cost of the "onsite" sewer extension identified in the attached "Exhibit A" with HFI Fletcher, LLC, a distance of approximately 245 feet; and WHEREAS, the City of Fayetteville will cover 100% of the cost of the "offsite" sewer extension identified in the attached "Exhibit A," a distance of approximately 174 feet; and WHEREAS, constructing this segment of 8-inch main will allow HFI Fletcher, LLC to develop the property, and allow for ample future capacity which the City recognizes will be necessary for the area that is served by this sewer main; and WHEREAS, this contractual agreement is contingent on the City Planning Department lot split approvals; and WHEREAS, § 51.113 of the Fayetteville City Code provides that "the City shall pay the excess material cost of facilities of a size larger than required to service subdivisions when such excess size is specified and required by the water and wastewater director for the general benefit of the sewerage system." NOW, THEREFORE, the City of Fayetteville, Arkansas and HFI Fletcher, LLC agree as follows: 1. The City of Fayetteville, Arkansas agrees to: A. Furnish the labor, materials, and equipment to install approximately 419 linear feet of 8-inch sewer main on North Fletcher Avenue between East Dickson Street and East Crescent Drive. B. Bear any costs associated with the sewer main installation that exceed the amount HFI Fletcher, LLC agrees to pay below. 2. HFI Fletcher, LLC agrees to: A. Reimburse the City for the materials cost of the sewer main installation up to a maximum -not -to -exceed amount of $16,520.32 plus a 20% contingency of $3,304.06, for a total cost of $19,824.38 which represents the cost estimated by the City of Fayetteville. B. Make payment to the City of Fayetteville within thirty (30) days after receipt of a valid invoice. IN AGREEMENT WITH ALL THE TERMS AND CONDITIONS ABOVE, WE SIGN BELOW: HFI FLETCHER, LLC STERLIN PffkffiTON, Manager ATTEST: Ry: CITY OF FAYETTEVILLE, ATTEST: GLER K KARA PAX Ol ,City Clerk f m: FV144F EXHIBIT A te" Northwest Arkansas C U S H M A N& sage S ite W. JB Hunt Drive I I I 1 800 PARTNERS Rogers, AR 72758 WA K E F I E L D Sute Office Via Email Corey Granderson Tim Nyander Engineering and Utilities City of Fayetteville Intent to Cost Share Dear Mr. Granderson and Mr. Nyander, March 08, 2021 Pursuant to our phone conversation regarding the impending utility work and development at Fletcher and Dickson, I would like to propose an intent to cost share for review and approval by the appropriate departments and the Fayetteville City Council. Ten (10) new homes are proposed along the east side of N. Fletcher Avenue north of Dickson Street. This area does not have access to a public sewer main currently. The existing home at 326 Fletcher has service running north down the street. This project will bring a sewer main approximately 419-feet south from E. Crescent Drive to serve these new lots. Currently there are 3 existing lots with 2 homes, this project will replace these with 10 lots and 10 homes. Due to the simplicity of this project, the Water & Sewer Department propose to perform the installation and design in-house which will save costs both for the city and developer. Based on our in-house cost estimations & design, the project responsibilities are as follows: Total Project Length 419-Feet "Olfsite Length" 174-Feet City pays 100% "Onsite Length" 245-Feet City pays 50% Service Connections 10-each City pays 0% Main Line $ 19,230-00 70% City (174FT City; remaining 245FT split 50/50) Services $ 10,751.32 100% Developer $ 29, 981.32 City $ 13,461.00 45% Developer $ 16,520.32 55% Thank you, Sterling Hamilton Fletcher Cost Share Proposal Response 1 2-25-2021 City Covers 100% of offsite sewer costs, 174LF iCity/Developer split onsite sewer costs 50/50, 245LF Developer covers 100% cost of private service connections I City Labor Main Line $ 19230.00 70% City (174FT City, remaining 245FT split 50/50) Services $ 10.751 32 100% Developer S 29.981.32 Estimated Costs to City City $ 13.461.00 4596 and Developer Developer $ 16,520.32 5596 City will layout/design project in-house, no engineering fees. This would change if field conflicts encountered unexpectedly, requiring detailed design. Unlikely. Developer responsible to mark exact location for 10 service connections. Alignment exhibit and cost break-out sheets on following pages. Ta'v"e*t�%oille THE CITY OF FAYETTEVILLE, ARKANSAS WATER AND SEWER DIVISION 11 3 W-1 M--In fnyt+ttevillt•, AR 77701 P(4791575-8386 F (479) 684-4730 Project Name: 326 N. Fletcher Ave. Date: 18-Feb-21 Project Description: Install 420 Ft. of 8-inch Sewer Main Cost Item Unit Price Total Units Line Item Cost Subtotal Cost Labor Construction Crew ( 4 men) $73.47 80 $5,877.60 Asphalt Crew ( 3 men) $52.22 8 $417.76 Labor Subtotal $6,295.36 Equipment Crew Truck $7.96 80 $636.80 Dump Truck $14.72 80 $1,177.60 Dump Truck $14.72 88 $1,295.36 Track Loader $6.88 80 $550.40 Mini X $10.02 80 $801.60 Asphalt - Patch Truck $15.79 8 $126.32 Asphalt - Crew Truck $7.96 8 $63.68 Asphalt - Mini X $6.88 8 $55.04 Equipment Subtotal $4,706.80 Materials 8" CMA $5.57 1 $5.57 4" SCD 40 PVC PIPE $1.80 300 $540.00 8" SDR 26 SEWER PIPE $4.02 420 $1,688.40 8" SDR26 X 4" SCH40 WYE $61.39 10 $613.90 4" X45 BEND PVC $5.35 10 $53.50 4" MAX ADAPTOR $49.25 1 $49.25 RING $112.45 2 $224.90 LID $78.04 2 $156.08 TAR STRIP $3.00 6 $18.00 SPEED PLUG $30.00 2 $60.00 QUIKRETE $4.75 20 $95.00 48" MANHOLE $750.00 2 $1,500.00 BLUE LUBE $5.33 2 $10.66 WIRE $0.09 450 $40.50 SEWER TAPE $0.02 420 $8.40 SB2/TON $9.50 290 $2,755.00 GRIT/TON $14.00 45 $630.00 PRE MIX/TON $105.00 18 $1,890.00 HOTMIX/TON $60.00 25 $1,500.00 CONCRETE T PATCH $119.00 60 $7,140.00 Materials Subtotal $18,979.16 Sub Total $29,981.32 0 Contingincy Grand Total $35,330.09 Total cost of sewer main, manholes, and (service lines Ta**v�e THE CITY OF FAYETTEVILLE, ARKANSAS WATER AND SEWER DIVISION 113 W-1 V, AR 721:?) P ti/ l) 575 tlln-, Project Name: 326 N. Fletcher Ave. Date: 22-Feb-21 Project Description: Install Sewer Services Cost Item Unit Price Total Units Line Item Cost Subtotal Cost Labor Construction Crew ( 3 men ) $77.70 25 $1,942.53 Construction Crew ( 1 man ) $19.87 21 $417.20 Asphalt Crew ( 3 men) $69.35 4 $277.39 Labor Subtotal $2,637.12 Equipment Crew Truck $7.96 25 $199.00 Dump Truck $14.72 25 $368.00 Slid Steer $6.88 25 $172.00 Excavtor $10.02 25 $250.50 Asphalt - Patch Truck $15.79 4 $63.16 Asphalt - Crew Truck $7.96 4 $31.84 Asphalt - Mini X $10.02 4 $27.52 Asphalt - Dump Truck $14.72 4 $58.88 Equipment Subtotal $1,170.90 Materials 8"SDR 26x4" SCH40 WYE $61.39 10 $613.90 4" SCD 40 PVC PIPE $1.80 300 $540.00 4" X45 BEND PVC $5.35 10 $53.50 4" GLUE CAP $3.00 10 $30.00 QUIKRETE $4.75 20 $95.00 WIRE $0.09 300 $27.00 SEWER TAPE $0.02 320 $6.40 SB2/T0N $9.50 89 $845.50 GRIT/TON $14.00 10 $140.00 PRE MIX/TON $105.00 6 $630.00 HOT MIX/TON $105.00 6 $630.00 CONCRETE $119.00 28 $3,332.00 Materials Subtotal $6,943.30 Grand Total $10,751.32 Break-out costs for iust service lines