HomeMy WebLinkAbout37-21 RESOLUTION113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 Resolution: 37-21 File Number: 2020-1137 RFQ #19-05 FLINTCO, LLC: A RESOLUTION TO APPROVE CHANGE ORDER NO. 1 TO THE CONSTRUCTION MANAGER AT RISK CONTRACT WITH FLINTCO, LLC, IN THE AMOUNT OF $1,278,675.00 FOR THE EARTHWORK BID PACKAGE RELATED TO THE CONSTRUCTION OF THE NEW POLICE HEADQUARTERS AND FIRE STATION NO. 8, TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $100,000.00, AND TO APPROVE A BUDGET ADJUSTMENT - POLICE HEADQUARTERS AND FIREFIGHTING FACILITIES IMPROVEMENTS BOND PROJECT WHEREAS, on December 3, 2019, the City Council passed Resolution 282-19 to approve a Construction Manager at Risk agreement with Flintco, LLC for pre -construction services; and WHEREAS, Change Order No. 1 will authorize the City's contractor to proceed with earthwork for the Police Department headquarters as well as Fire Station No. 8. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves Change Order No. I to the Construction Manager at Risk Contract with Flintco, LLC in the amount of $1,278,675.00 for the earthwork bid package related to the construction of the new Police Headquarters and Fire Station No. 8, and further approves a project contingency in the amount of $160,000.00. Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment, a copy of which is attached to this Resolution. Page 1 Printed on 1120121 Resolution: 37-21 File Number: 2020-1137 PASSED and APPROVED on 1/19/2021 Attest: I= .�n��iitVlLLt• GrON Page 2 Printed on 1120121 City of Fayetteville, Arkansas 113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 i Text File File Number: 2020-1137 Agenda Date: 1/19/2021 Version: 1 Status: Passed In Control: City Council Meetinq File Type: Resolution Agenda Number: C.2 RFQ #19-05 FLINTCO, LLC: A RESOLUTION TO APPROVE CHANGE ORDER NO. 1 TO THE CONSTRUCTION MANAGER AT RISK CONTRACT WITH FLINTCO, LLC, IN THE AMOUNT OF $1,278,675.00 FOR THE EARTHWORK BID PACKAGE RELATED TO THE CONSTRUCTION OF THE NEW POLICE HEADQUARTERS AND FIRE STATION NO. 8, TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $100,000.00, AND TO APPROVE A BUDGET ADJUSTMENT - POLICE HEADQUARTERS AND FIREFIGHTING FACILITIES IMPROVEMENTS BOND PROJECT WHEREAS, on December 3, 2019, the City Council passed Resolution 282-19 to approve a Construction Manager at Risk agreement with Flintco, LLC for pre -construction services; and WHEREAS, Change Order No. 1 will authorize the City's contractor to proceed with earthwork for the Police Department headquarters as well as Fire Station No. 8. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves Change Order No. 1 to the Construction Manager at Risk Contract with Flintco, LLC in the amount of $1,278,675.00 for the earthwork bid package related to the construction of the new Police Headquarters and Fire Station No. 8, and further approves a project contingency in the amount of $100,000.00. Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment, a copy of which is attached to this Resolution. City of Fayetteville, Arkansas Page 1 Printed on 112012021 Wade Abernathy Submitted By City of Fayetteville Staff Review Form 2020-1137 Legistar File ID 1/19/2020 City Council Meeting Date - Agenda Item Only N/A for Non -Agenda Item 12/23/2020 FACILITIES MANAGEMENT (140) Submitted Date Division / Department Action Recommendation: Approval of Change Order #1 with Flintco, LLC, to RFQ# 19-05 Contract for the Police Headquarters Facilities Project in the amount of $1,278,675.00, include a project contingency in the amount of $100,000.00 and approve a Budget Adjustment for the earthwork bid package. This is a Phase 1 Bond Project. 4609.860.7900-5860.02 4610.860.7108-5860.02 Account Number 46090.7900.8040 46100.7108.8040 Project Number Budget Impact: 4609-Police Projects 2019 Bonds 4610-Fire Project 2019 Bonds Fund Police Building, Construction Fire Station #8 Budgeted Item? Yes Current Budget Funds Obligated Current Balance Does item have a cost? Yes Budget Adjustment Attached? Yes Item Cost Budget Adjustment Remaining Budget Project Title $ 38,761,922.00 $ 5,279,806.78 f $ 33,482,115.22 $ 1,278,675.00 $ 32,203,440.22 V20180321 Purchase Order Number: 2019-00000839 Previous Ordinance or Resolution # 282-19 Change Order Number: Original Contract Number: Comments: 1 2019-00000062 Approval Date: CITY OF FAYETTEVILLE %PF ARKANSAS MEETING OF JANUARY 19, 2021 TO: Mayor and City Council THRU: Susan Norton, chief of Staff Paul Becker, Chief Financial Officer Police Chief, Mike Reynolds CITY COUNCIL MEMO FROM: Wade Abernathy, Director Bond and Building Construction Projects DATE: December 23, 2020 SUBJECT: Change Order #1 to RFQ# 19-05 Contract with Flintco, LLC for the Police Headquarters Facilities Project RECOMMENDATION: Staff recommends approval of Change Order #1 to the RFQ # 19-05 contract with Flintco, LLC for the Police Headquarters Facilities Project in the amount of $1,278,675.00 and approve a project contingency in the amount of $100,000.00, BACKGROUND: In April 2019, Fayetteville voters approved the public safety bond question 9 in the 2019 bond initiative, which included a new police headquarters, and identified $38,801,126 for the new facilities. In September, Resolution 202-19 authorized the approval of the Land Sale Agreement with the University of Arkansas System Division of Agriculture in the amount of $2,590,000 for 11.50 acres with PD utilizing 10 acres and Fire utilizing 1.5 acres. The Close of the Land is ongoing. In September 2019, The City of Fayetteville Purchasing Division managed the RFQ process of selecting a construction manager at risk for the Police Headquarters Facilities. The request for statement of qualifications (RFQ) was advertised on 9-3-19 with a deadline of 9-26-19. Ten responses were received. Three construction management firms were short listed for interview. The selection committee chose Flintco to negotiate a CMAR contract for the Police Headquarters. In December 2019, Resolution 282-19 authorized the approval of a Construction Manager at Risk contract with Flintco Construction and included pre -construction services. DISCUSSION: This change order is will kick off the construction of our PDHQ. It is for the earthwork trade was advertised and bid thru our Purchasing Division and is per our procurement policies and practices. The scope of this package includes excavations required for the site and building pads. The change order also includes the earthwork for Fire Station 8. Mailing Address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 Subsequent Bid packages will be forthcoming for Foundations, Structural steel, Building Envelope, and MEP and Finishes. This will ensure we are completed by our August 2022 Bond disbursement deadline. BUDGET/STAFF IMPACT: A budget adjustment will transfer unallocated funds from the Project 46090 (Police Bonds) $1,239,925.00 and 46100 (Fire Bonds) $38,750 to the appropriate accounts. Attachments: Change Order #1 \fir Document G701 - 2017 Change Order PROJECT: (Name and address) Fayetteville Police Headquarters Fayetteville Arkansas OWNER: (Name and address) City of Fayetteville, Arkansas 113 West Mountain Street Fayetteville, AR 72701 CONTRACT INFORMATION: Contract For: General Construction Date: December 03, 2019 ARCHITECT: (Name and address) BRINKLEY SARGENT WIGINTON ARCHITECTS 5000 QUORUM, SUITE 600 DALLAS, TEXAS 75254 CHANGE ORDER INFORMATION: Change Order Number: 001 Date: 12/17/20 CONTRACTOR: (Name and address) Flintco, LLC 184 E. Fantinel Dr. Springdale, AR 72762 THE CONTRACT IS CHANGED AS FOLLOWS: (Insert a detailed description of the change and, if applicable, attach or reference .specific exhibits. Also include agreed upon adjustments attributable to executed Construction Change Directives.) Includes the cost for work associated with WP#1 - Site Grading on the Fayetteville Police Headquarters Project. The following attached documents sall be incorported into this change order: Date Description 12/17/20 Exhibit A - GMP Itemization 12/17/20 Exhibit B - Clarifications & Assumptions The original Guaranteed Maximum Price was $ 82,500.00 The net change by previously authorized Change Orders $ 0.00 The Guaranteed Maximum Price prior to this Change Order was $ 82,500.00 The Guaranteed Maximum Price will be increased by this Change Order in the amount of $ 1,278,675.00 The new Guaranteed Maximum Price including this Change Order will be $ 1,361,175.00 The Contract Time will be increased by Zero (0) days. The new date of Substantial Completion will be TBD NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE CONTRACTOR AND OWNER. A ARCHITECT (Firm namc) SIGNATURE PRINTED NAME AND TITLE DATE Brent Farmer / VP PRINTED NAME AND TITLE 12 /18/20 DATE (Firm PRINTED NAME AND TITLE DATE AIA Document G701 " - 2017. Copyright® 1979, 1987, 2000 , 2001 and 2017 by The American Institute of Architects. All rights reserved. The "American Institute of Architects." Al;,"e AIA Logo, and "AIA Contract Documents' are registered trademarks and may not be used without permission. This document ) was produced by AIA software at 15:12:32 ET on 12/1812020 under Order No.1613645204 which expires on 0911712021, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright®aia.org. User Notes: (389ADMA) t.^7 rLINTCC t EXHIBIT "A" FAYETTEVILLE POLICE HEADQUARTERS - WORK PACKAGE #1 GUARANTEED MAXIMUM PRICE ITEMIZATION December 17th, 2020 GROUP DESCRIPTION TOTAL AMOUNT 01000 GENERAL CONDITIONS 297,352 01900 PROJECT REQUIREMENTS 101,305 3000 EARTHWORK (Fire Station) 38,750 03000 EARTHWORK (Police Headquarters) 459,603 Subtotal 897,010 ALLOWANCES Unsuitable Soils Allowance / Design Contingency 250,000 INSURANCE AND BONDS 48,551 CM CONTINGENCY 25,574 OWNER CONTINGENCY - CONSTRUCTION MANAGEMENT FEE 57,540 Total WP#1 GMP $ 1,278,675 Clarifications -and Assumptions Exhibit "B" Work Package #1: December 17, 2020 Fayetteville Police Headquarters t�rLINTCO 1 ti� PACKAGE #1- EARTHWORK FAYMEVILLE POLICE HEADQUARTERS CLARIFICATIONS, ASSUMPTIONS, INCLUSIONS AND EXCLUSIONS Scope of Work This proposal includes labor, material, equipment, tools, and supervision required to perform the Earthwork scope of work for the new Fayetteville Police Headquarter Facility. All work to be performed in accordance with the contract documents, Preliminary Grading and Storm Drainage Plan dated 9/29/20, Addendum #1 dated December 3rd, 2020, Addendum #2 dated December 71h, 2020 and Specification manual dated November 161h, 2020, Geotechnical Engineering Report (Preliminary Site Evaluation) dated October 181h, 2019, Supplemental Geotechnical Engineering Report dated October 141h, 2020. Design Criteria Where possible, items and systems specified by these C&A's are defined and specific to material, finish and intended use. Where materials, finishes and/or quantities are not clearly defined, this proposal assumes the most practical and economical solution consistent with the design concepts and scope. Where scope is unclear, suggested allowances have been provided. Any work referred to as "By Owner", "By Others", "OFCI" (owner furnished contractor installed), or "N.I.C." (not in contract) is not part of the scope of this proposal unless installation is specified. Where the word "allowance" appears, it shall mean that a fixed sum is included in the cost of the work for design, materials, equipment and/or labor for the complete installed product specified. Allowances are identified with a specific dollar amount. Adjustment in the contract amount may be necessary if costs are less than or in excess of these allowances. Code Requirements We exclude any liability with regard to errors and omissions from the bid documents. In addition, we have assumed that the Architect/Engineer has incorporated into the bid documents all code requirements, ADA requirements and has taken all seismic design into consideration. Construction Manager's Bid Manual The Guaranteed Maximum Price is also based upon the following documents and information: 1. Flintco, LLC Construction Manager's Bid Manual December 08, 2020 General Conditions & Project Requirements General conditions have been included for 4 month duration as service through Work Package #1. General conditions have been included as a lump sum value which will be billed as a percentage completed monthly value throughout the project duration. Fixed General Condition Items shall mean the provision of facilities or performance of supervisory work by the Construction Manager with respect to items that are not included in one of the separate trade contracts and are not customarily so included. They shall include all of the Construction Manager's indirect costs and expenses, supervisory or general overhead costs, and personnel and benefit costs related to the administration and supervision of the work. Extension of project duration due to changes in scope of work or unforeseen conditions warrant general conditions extension as well. General conditions have been included for a four (4) month period and the remainder of the general conditions will be added to the project with subsequent change orders as the remainder of the project is designed and bid. Fixed General Condition Items shall include the following items: 1. Salaries or wages of the Construction Manager's supervisory and administrative personnel managing and overseeing the performance of the Work, all benefits and overhead expenses c-rl, LINTCO 21 incurred in connection with the wages or salaries of Construction Manager's employees performing the Work. 2. Cost and expenses incurred by the Construction Manager in operating and maintaining a field office or in supporting the work from the Construction Manager's main office. 3. Cost and expenses incurred by the Construction Manager during close out. Project Requirements items will be billed as cost of work; and shall include but are not limited to, cost and expenses incurred by the Construction Manager in operating and maintainingjobsite security, safety, and supporting the work from the subcontractors in the field. Example of project requirements are permits, layout, documentation photos, temporary toilets, utilities use, cleanup, waste disposal, etc. Fonds & Insurance General Insurance (0.6%), General Contractor Bond (1%), and Subcontractor Default Insurance (1.25%) have been included. Qualfty Control Services Costs for testing and special inspection services shall be provided by Owner and are excluded. We will provide coordination and scheduling of said services. These services include, but are not limited to engineering testing services, engineering observation and LEED consultation and testing. Schedule This proposal is based on a continuing construction schedule with anticipated activity from January 27th, 2021, through April 27th, 2021. If the Contractor is delayed at any time in the progress of the work by labor disputes, unavoidable casualties, changes in the work, or any other causes beyond Contractor's control, the time of completion shall be extended. Claims for extension of time and/or adjustments to the Contract Sum shall be made within a reasonable time after the occurrence of the delay. This proposal excludes any time delays and cost increases arising from or related to the COVID-19 virus and any government or other third -party action in response thereto. Permits and Fees The Architect/Engineer is responsible for permit review and acceptance by the City of Fayetteville and other Authorities Having Jurisdiction (AHJ). The Owner is responsible for the cost of the building permits, tap fees, impact fees and meters. TemQgra!y IAlit WFacilities Temporary Utilities use fees such as Natural Gas, Water, Sewer and Electric Service is included as cost of work Allowance. Construction Access Construction areas will be security fenced where possible; all access will be controlled by Flintco personnel. Visitors to the site must sign in with the onsite Flintco staff. Prevailing Wage Prevailing wage rates do not apply to this project and are not included. Certified Payroll and/or project audit is excluded. Allowances. Contingency, Fees The following are included: 1. Owner Contingency $0.00 2. Contractor Contingency $25,446 3. Unsuitable Soils Allowance / Design Contingency $250,000 �rLINTCO 31 Unit Prices Mass rock excavation, removal and onsite disposal $125 / CY (in place) Provide, place and compact engineered fill $15 / CY (in place) Additional mass grading $10 / CY (in place) Topsoil import, placement and machine grade $30 / CY (in place) Excavation, removal and offsite disposal of unsuitable soils and replacement $25 / CY (in place) Install B-stone base as construction work surface $30/TON (in place) Labor rate (including full overhead and profit) Journeyman $30/hr Labor rate (including full overhead and profit) Apprentice/Laborer $25/hr Labor rate (including full overhead and profit) Foreman/Superintendent $75/hr Labor rate (including full overhead and profit) Equipment Operator $35/hr Aftemates Fire Station Earthwork (mass grading) is included in the scope of work at a reported bid value of $38,750. General Inclusion$/Exclusions 1. Typical hours of construction operations are 7 am through 7 pm. 2. Certain construction procedures such as concrete placement and material deliveries require work outside of normal hours. Work will be scheduled with onsite personnel. 3. Unforeseen conditions and/or items not located and shown on plans are not included in the GMP. 4. Improvements to and repair of North Porter Road and West Deane Street and parallel walks and parking are not included in the GMP. Once final civil drawings are received, the unit prices listed above will be used to adjust contracted work. SWPPP measures and mass earthwork grading as designated on the Grading and Storm drainage plan. We have included 1' select fill under building slabs to a point 5' outside of the building perimeter and 1' select fill under paving areas to a point 2' beyond edge of curb. A total of 10,000 C.Y. select fill import and 12,000 C.Y. export is included by the earthwork contractor. If Additional undercut and additional fill is required, work may be added as required by employing the Unit Prices and Unsuitable Soils Allowance. $38,750.00 is included in this proposal to complete the Earthwork and Grading for the new Fire Station site. This is direct costs received from the subcontract for this scope of work. This work will be encompassed with the other work being completed onsite resulting in no additional General Conditions or General Requirements to complete this work. END OF DOCUMENT \1rLINTG0 41 City of Fayetteville, Arkansas - Budget Adjustment Form (Legistar) Budget Year Division FACILITIES MANAGEMENT (140) Adjustment Number 2020 /Org2 Requestor: Wade Abernathy BUDGET ADJUSTMENT DESCRIPTION / JUSTIFICATION: Approval of Change Order #1 with Flintco, LLC, to RFQ# 19-05 Contract for the Police Headquarters Facilities Project in the amount of $1,278,675.00, include a project contingency in the amount of $100,000.00 and approve a Budget Adjustment for the earthwork bid package. This is a Phase 1 Bond Project. RESOLUTION/ORDINANCE COUNCIL DATE: 1 / 19/2021 LEGISTAR FILE ID#: 2020-1137 Matthe,w Maddaw 1212212020 5:02 PM Budget Director Date TYPE: JOURNAL #: D - (City Council) G LDAT E: 1/19/2021 CHKD/POSTED: TOTAL - - v.20201 1 12 Increase / (Decrease) Proiect.Sub# Account Number Expense Revenue Project Sub.Detl AT Account Name 4609.860.7900-5860.02 1,239,925 46090 7900.8040 EX Capital Prof Svcs - Engineering/Architects 4609.860.7900-5911.99 100,000 46090 7900.8040 EX Contingency - Capital Project 4609.860.7999-5899.00 (1,339,925) - 46090 7999 EX Unallocated - Budget 4610.860.7108-5860.02 38,750 - 46100 7108.8040 EX Capital Prof Svcs - Engineering/Architects 4610.860.7999-5899.00 (38,750) - 46100 7999 EX Unallocated - Budget H:\BudgetAdjustments\2021-Budget\City Council\01-19-2021\2020-1 137 BA Flintco PDHQ 1 of 1