HomeMy WebLinkAbout2020-12-08 - Agendas - FinalCITY OF 9im FAYETTEVILLE 4VARKANSAS MEETING AGENDA Water, Sewer, and Solid Waste Committee 8 December 2020 5:30 P.M. (Or immediately following Equipment Committee Session) This is a Virtual Meeting Committee: Chairman Mark Kinion; Council Member Sonia Gutierrez, Council Member Sloan Scroggin, Council Member Teresa Turk Copy to: Mayor Lioneld Jordan, Paul Becker, Kara Paxton, Susan Norton, Andrea Foren, Chris Brown, Alan Pugh, Terry Gulley, Peter Nierengarten, Jeff Coles, Brian Pugh, Mark Rogers, Corey Granderson, Aaron Watkins, Greg Weeks, Monty Sedlak, Matthew Benton, Tim Luther, Lee Beshoner From: Tim Nyander, Utilities Director CALL TO ORDER ROLL CALL UPDATES OLD BUSINESS: 1. CH2M Hill Engineers/Jacobs 2020 Operation and Maintenance — Amendment 12 In FY 2021, the scope of services provided by CH2M HILL/Jacobs include: (1) operate and maintain the Noland and West Side Wastewater Treatment Plants (WWTPs); (2) operate and/or maintain 38 wastewater pump station sites; (3) administer the City's NPDES discharge, air, stormwater, and other permits; (4) manage the City's biosolids disposal program; (5) manage the City's industrial pretreatment program; (6) support the SCADA (supervisory control and data acquisition system) network that monitor water and wastewater facilities; (7) pursue operation economies, efficiencies, and permit compliance; (8) provide agreed -to engineering services; and (9) continue to refurbish the sand filters on an incremental basis. The 2020 contract is in the amount of $7,335,359.00, and includes an approximately 1.2% increase from the previous year. STAFF REQUESTS THIS BE FORWARDED TO THE CITY COUNCIL FOR CONSIDERATION FOR APPROVAL Mailing Address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 NEW BUSINESS: 2. Amendment No. 7 with Environmental Consulting Operations ECO, Inc. developed the wetlands and storm water protection best management plans and conducted excellent construction inspection for the WSIP, and was tasked to ensure full compliance with the related regulations and permits. ECO, Inc. also designed the wetlands mitigation site that was required by the Corps of Engineers, which has a mandated seven- year monitoring and reporting period. Funding comes from the Wastewater Treatment Operations Program. DISCUSSION: The contract covers the following work tasks for 2021: 1. Project Administration and Management 2. Annual Ecological Restoration Monitoring 3. Annual Adaptive Management Strategy 4. Update Credit Tracking Ledger for Surplus Wetland Credits 5. Academic Research Project Guidance The details of each of these work tasks are outlined within the proposed Amendment No. 7 between the City of Fayetteville and ECO, Inc. Amendment No. 7 has a decrease of $3,255.00 from Amendment No. 6 in 2020, due to the elimination of the guidance provided during the installation of the solar array adjacent to Woolsey Wet Prairie. STAFF REQUESTS THIS BE FORWARDED TO THE CITY COUNCIL FOR CONSIDERATION FOR APPROVAL 3. Township Tank Agreement with Alltel The City and Alltel Corporation, d/b/a Verizon Wireless, desires to modify their agreement, to modify Alltel's outdated equipment, provide for the future transfer of equipment to the new water tower after it is constructed, and establish the fair market value of rent for the renewal term. This Second Amendment to the lease agreement will allow for Verizon to update their equipment, as well as providing agreeable terms for the transfer of their equipment from the current Township water tank to the new Township water tank to be constructed on a nearby parcel owned by the City. That tank will be constructed within the next two years. STAFF REQUESTS THIS BE FORWARDED TO THE CITY COUNCIL FOR CONSIDERATION FOR APPROVAL 4. Lake Fayetteville Spillway Study Update Presented by Lee Beshoner with FTN Associates 5. Overview of WWTP Monthly Report Discussion of October's Monthly WWTP Report PRESENTATIONS Update on Lake Fayetteville Spillway Project by Lee Beshoner, FTN Associates ATTACHMENTS CH2M Hill Amendment #12 Amendment No. 7 with ECO WWTP October 2020 Monthly Report Township Tank Agreement ADJOURN Next Water, Sewer, Solid Waste Committee meets on Tuesday, January 5t", 2021, 5:30 p.m. 2021 Fayetteville Cost Centers WRRF WRRF East Side WRRF West Side WRRF Lift Station WRRF Biosolids WRRF Lab & IPP Management Operations Operations Maintenance Management Total Cost 2021 Program Program Program Program Program Program Client Cost Centers 5100 5110 5120 5130 5140 5110 Direct Labor $785,018 $923,394 $420,164 $291,584 $279,037 $726,088 $3,425,286 Labor Markup, 15% $117,753 $138,509 $63,025 $43,738 $41,856 $108,913 $513,793 Direct Expense $252,434 $1,279,303 $347,396 $121,116 $416,743 $553,881 $2,970,872 Expense Markup, 10% $25,243 $127,930 $34,740 $12,112 $41,674 $55,388 $297,087 Fixed Fee $128,321 $128,321 Totals 2020 Fayetteville Cost Centers WRRF WRRF East Side WRRF West Side WRRF Lab &IPP WRRF Lift Station WRRF Biosolids Management Operations Operations Maintenance Management Total Cost 2020 Program Program Program Program Program Program Client Cost Centers 5100 5110 5120 5130 5140 5110 Direct Labor $753,475 $851,239 $442,931 $287,239 $264,302 $702,739 $3,301,925 Labor Markup, 15% $113,021 $127,686 $66,440 $43,086 $39,645 $105,411 $495,289 Direct Expense $250,303 $1,289,527 $366,588 $155,132 $357,005 $606,280 $3,024,835 Expense Markup, 10% $25,030 $128,953 $36,659 $15,513 $35,701 $60,628 $302,484 Fixed Fee $126,344 $126,344 Totals $1,268,174 $2,397,405 $912,617 $500,970 $696,653 $ Appendix D - 2 of 2 $7, Appendix D - 2 of 2 AMENDMENT NO.7 TO AGREEMENT FOR ENVIRONMENTAL CONSULTING SERVICES BETWEEN CITY OF FAYETTEVILLE, ARKANSAS AND ENVIRONMENTAL CONSULTING OPERATIONS, INCORPORATED FOR WOOLSEY WET PRAIRIE ECOLOGICAL MONITORING AND MANAGEMENT ENVIRONMENTAL CONSULTING SERVICES THIS AMENDMENT NO.7 to the Agreement For Professional Environmental Consulting Services, dated May 8, 2014 (the "Agreement"), by and between CITY OF FAYETTEVILLE, ARKANSAS (CITY) and ENVIRONMENTAL CONSULTING OPERATIONS, INC. (ECO) for environmental consulting services in connection with monitoring and ecological adaptive management of CITY's wetland mitigation site (SITE) known as Woolsey Wet Prairie is made and entered into for purposes of continuity of Site wetland habitat status in order to maintain surplus wetland credits generated at Site and due to Corps of Engineers (Corps) regulatory requirements to manage and maintain wetland compensatory mitigation in perpetuity to assure Site continues to meet ecological performance standards. WHEREAS, this AMENDMENT NO.7 is a renewal of the May 8, 2014 Agreement that included a provision for automatic renewal of ECO's annual Scope of Services beyond 2014 for additional 1-year terms upon mutual agreement by both CITY and ECO. Unless specifically stated, all other terms and conditions of the Agreement shall remain in full force and effect. Neither this Amendment nor the Agreement may be modified except in writing signed by an authorized representative of the CITY and ECO. NOW THEREFORE, the CITY and ECO agree to amend the Agreement for ECO's Scope of Services as follows: 1. Part A - Project Administration And Management a) General administration and project management activities; b) Perform project initiation activities; c) Provide environmental regulatory and technical information to CITY, CITY Contractors, Citizens of CITY, and Academia; d) Meet with CITY, CITY Contractors, and Academia for information exchange, goal and timeline setting, reviewing management strategies, and action items; e) Perform internal project control including budgeting, scheduling, and quality control; f) Part A applies to January through December 2021. Renewal of ECO's annual Scope of Services will be reviewed by the City Council and amended upon approval for renewal of Part A services beyond 2021. 112520-ECO WWP Amnd No. 7.pdf 2. Part B - Annual Ecological Restoration Monitoring a) Conduct qualitative monitoring activities throughout the growing season to maintain cumulative plant species lists, evaluations of seasonal hydrology and associated plant communities, and identification of stands of invasive plant species to be controlled; b) Observe and document total plant species richness for each wetland cell and the total mitigation SITE in historical comprehensive plant species lists; c) Record locations of concentrated stands of non-native and native invasive plant species and locations of rare Arkansas Natural Heritage Commission tracking plant species on wetland cell maps; d) Develop 2021 Woolsey Wet Prairie Adaptive Management Strategy & Monitoring Report No. 15 that is consistent with historical monitoring and management activities at Site in a format to be used for SITE adaptive management purposes; e) Part B applies to January through December 2021 . Renewal of ECO's annual Scope of Services will be reviewed by the City Council and amended upon approval for renewal of Part B services beyond 2021. 3. Part C - Annual Adaptive Management Strategy a) Continued development and implementation of annual strategy for specific controls of invasive species via selection, coordination, and scheduling of time sensitive hydrology controls, herbicide applications, mowing, hand pulling, and prescribed burning; b) Make SITE visits throughout the growing season to make observations of hydrology, vegetation, and effectiveness of invasive vegetation control; c) Oversee selection, scheduling, and coordination of SITE adaptive management activities and provide guidance pertaining to Site Deed -Restrictive Covenant restrictions to CITY and CITY's Contractors associated with management of Site; d) Provide restoration ecology advisory technical guidance to CITY and CITY's Contractors associated with management of Site for the purpose of implementation of Site management activities that are compliant with Site permanent protection measures and restrictions specified in the CITY's Section 404 permit; e) Document and maintain records of adaptive management activities implemented and the date of use; f) Make adjustments, as necessary, to timing and type of vegetation management to be implemented including, but not restricted to, hydrology management, mowing, herbicide applications, prescribed burning, and hand pulling of invasive plant species; 112520-ECO WWP Amnd No. 7.pdf g) Utilize wetland cell aerial photographs showing locations of concentrated stands of invasive and non-native plant species and locations of rare Arkansas Natural Heritage Commission tracking plant species in order to target and prioritize areas for specific management activities; h) Develop herbicide application specifications that include specific types of herbicides to apply to specific invasive plant species by CITY contractors; i) Schedule and select type of herbicide, adjuvant, and application rate to be used for specific target non-native and invasive plant species at specific locations and document herbicide effectiveness; j) Coordinate, schedule, and observe areas where herbicide applications have been made to evaluate effectiveness for controlling invasive species by CITY contractors; k) Develop burn specifications that clearly identify prescribed Burn Contractor responsibilities as a part of CITY's informal bid process that identify: SITE preparation, notifications, and Burn Contractor responsibilities; 1) Coordinate, schedule, and observe prescribed burn to evaluate Burn Contractor's conformance with state laws, notifications, and specifications; m) Coordinate co -existence of planned construction and operation activities at adjacent solar array with adaptive management activities at the SITE; n) Part C applies to January through December 2021. Renewal of ECO's annual Scope of Services will be reviewed by the City Council and amended upon approval for renewal of Part C services beyond 2021. 4. Part D - Update Credit Tracking Ledger for Surplus Wetland Credits a) SITE has generated surplus of wetland credits above those required by CITY's Section 404 permit for wetland compensatory mitigation. CITY has received Corps approval to use wetland credits to mitigate for wetland impacts caused by the CITY's infrastructure improvement projects within Illinois River watershed, HUC 11110103; b) Under the 2014 Scope of Services, ECO developed a wetland credit ledger to include surplus credits and credit debits from CITY's Van Asche Extension Project for submittal to Corps; c) Under the 2015 Scope of Services, ECO developed a wetland credit ledger to include surplus credits and credit debits from CITY's Clabber Creek Recreational Trail Project for submittal to Corps; d) Under the 2016 Scope of Services, CITY did not utilize any surplus wetland credits for City infrastructure improvement projects requiring wetland compensatory mitigation; 112520-ECO WWP Amnd No. 7.pdf e) Under the 2017 Scope of Services, CITY did not utilize any surplus wetland credits for City infrastructure improvement projects requiring wetland compensatory mitigation; 0 Under the 2018 Scope of Services, CITY did not utilize any surplus wetland credits for City infrastructure improvement projects requiring wetland compensatory mitigation; g) Under the 2019 Scope of Services, CITY did not utilize any surplus wetland credits for City infrastructure improvement projects requiring wetland compensatory mitigation; h) Under the 2020 Scope of Services, CITY did not utilize any surplus wetland credits for City infrastructure improvement projects requiring wetland compensatory mitigation; i) It is unknown at the current time, whether or not Part D services will be necessary for January through December 2021, and will be a function of whether or not surplus credit transactions occur. Should-2021 wetland credit transactions occur, ECO shall update wetland credit ledger accordingly for submittal to Corps at the end of 2021; j) Renewal of ECO's annual Scope of Services will be reviewed by the City Council and amended upon approval for renewal of Part D services beyond 2021. 5. Part E - Academic Research Project Review and Guidance a) During 2017, there was an increased interest in the SITE for academic research projects from various departments of the University of Arkansas ranging from herpetology to soil microbiology. While research projects at the site are exciting and encouraged, the need exists for guidance and oversight to ensure that all parties involved are made aware of the various requirements of the CITY's Section 404 permit and Deed Restricted Covenant for the SITE. Failure to manage research project activities at the SITE has the potential to result in the CITY not being in compliance with the terms and conditions of the CITY's Section 404 permit and the Deed Restricted Covenant for the SITE. b) ECO, Inc. has developed a research request form and guidance document intended for use by proposed research projects that will provide project -specific relative information to ECO, Inc., Jacobs, and the CITY for review and approval, while also educating the applicant about the SITE Section 404 permit requirements. ECO, Inc. will review academic research project proposals and provide project -specific guidance to parties conducting research at SITE. c) Part E applies to January through December 2021. Renewal of ECO's annual Scope of Services will be reviewed by the City Council and amended upon approval for renewal of Part E services beyond 2021. 112520-ECO WWP Amnd No. 7.pdf 7. Compensation For the amended Scope of Services described herein, CITY agrees to pay ECO the sum specified below on Cost Detail Table. The total payment shall be a lump sum "not to exceed" amount of SIXTY THREE THOUSAND U.S. DOLLARS ($63,000.00). Amendment No. 7 - 2021 Cost Detail Amended ECO Scope of Services Fee Estimate Part A - 2021 Project Administration And Management $4,350 Part B - 2021 Annual Ecological Restoration Monitoring $28,000 Part C - 2021 Annual Adaptive Management Strategy $30,050 Part D - 2021 Update Surplus Wetland Credit Tracking Ledger $0 Part E — 2021 Academia Research Project Guidance $600 TOTAL $63,000 The CITY and ECO intending to be legally bound, indicate their approval of this AMENDMENT NO. 7 by their signatures below. ENVIRONMENTAL CONSULTING OPERATIONS, INC. Z--,V-Aj� Bruce Shackleford, President Date: November 25.2020 CITY OF FAYETTEVILLE IC Lioneld Jordan, Mayor Date: ATTEST: By: Lisa Branson, Deputy City Clerk/Treasurer Date: End of November 25, 2020 Amendment No. 7 for Environmental Consulting Services 112520-ECO WWP Amnd No. 7.pdf 61, SECOND AMENDMENT TO TOWER ATTACHMENT LEASE AGREEMENT THIS SECOND AMENDMENT TO TOWER ATTACHMENT LEASE AGREEMENT (the "Second Amendment") is made and entered into this _day of 20, by and between THE CITY OF FAYETTEVILLE, ARKANSAS, acting through duly authorized officials of the City of Fayetteville, Arkansas ("Lessor") and ALLTEL CORPORATION d/b/a Verizon Wireless ("Lessee"). Lessor and Lessee are at times collectively referred to hereinafter as the "Parties" or individually as the "Party." WITNESSETH: WHEREAS, Lessor and Lessee entered into a Tower Attachment Lease Agreement dated October 26, 1994, as amended by that certain First Amendment to Tower Attachment Lease Agreement dated October 12, 2010 (collectively, the "Agreement"), whereby Lessee leases from Lessor certain space on Lessor's water tower and certain ground space on Lessor's Property for the construction of a structure to house Lessee's equipment. WHEREAS, the Parties desire to amend the Agreement to modify Lessee's equipment, provide for the transfer of Lessee's equipment to a new water tower, and establish the fair market value of rent for the renewal term; NOW THEREFORE, in consideration of the premises and the mutual undertakings herein contained and other good and valuable consideration, the receipt and sufficiency of which are hereby acknowledged, the Parties agree as follows: 1. Any capitalized terms used in this Amendment that are not defined herein have the meanings given those terms in the Agreement. 2. Exhibit `B-l" of the Agreement is hereby replaced and superseded by Exhibit "B-2" attached hereto and incorporated herein by reference. In the event of any discrepancies between Exhibit `B-1" and Exhibit `13-2", Exhibit `B-2" shall control. 3. Lessee acknowledges and understands that the City intends to purchase a parcel of land for installation of a new water tower (the "New Tower") and the existing water tower (the "Existing Tower") will be removed from the Property upon completion of the New Tower. Lessee agrees to remove its equipment from the Existing Tower within 25 business days after Lessee's receipt of written notice that construction of the New Towers has been completed. Lessee may install its equipment on the New Tower, provided the New Tower is fully compatible for Lessee's use, in Lessee's sole discretion, and the Parties amend this Agreement to memorialize the location of the New Tower. Lessee may also install a temporary Cell of Wheels ("COW") in a mutually agreeable location on the Property during the relocation so Lessee's use is not interrupted or diminished during the relocations. If the New Tower is not fully compatible for Lessee's use, Lessee may continue using the COW until such time as Lessee notifies Lessor that Lessee is removing the COW, in which case Lessee may terminate the Lease. Notwithstanding the foregoing, Lessee may not operate the COW on the Property beyond the expiration of the current five (5) year renewal term. Lessee shall bear the costs related to removing and transferring its equipment from the Existing Tower. 4. Section 5 of the Agreement (Consideration) is hereby replaced and superseded by the following: Lessee shall pay to Lessor, as monthly rental, the sum of Two Thousand Four Hundred Dollars ($2,400.00) which shall include Lessee's right to use and occupy the ground space surrounding Lessor's tower. Lease payments shall be paid monthly in advance with the first such monthly payment due on the commencement date of this renewal term. 5. Lessor and Lessee each hereby warrant to the other that the person executing this Amendment on behalf of the warranting Parry has the full right, power and authority to enter into, and execute, this Amendment on that Parry's behalf, and that no consent from any other person or entity is necessary as a condition precedent to the legal effect of this Amendment. 6. Except as specifically provided in this Second Amendment, the Agreement shall remain in full force and effect and shall continue to be binding upon, and enforceable against, Lessor and Lessee in accordance with its terms. All covenants, terms and obligations of the Agreement not modified by this Amendment are hereby ratified and affirmed. The terms and provisions of this Second Amendment shall control in the event of any inconsistency or discrepancy between the Agreement and this Second Amendment. IN WITNESS WHEREOF, Lessor and Lessee have executed this Second Amendment effective as of the day and year first above written. WITNESS LESSOR: CITY OF FAYETTEVILLE, ARKANSAS Acting by and through duly authorized officials of the City of Fayetteville, Arkansas M. Name: Title: Date: LESSEE: ALLTEL CORPORATION D/B/A VERIZON WIRELESS By: Name: Title: Date: EXHIBIT "B-2" LESSEE is authorized to install and maintain the following equipment: Six (6) Quintel USA QS8656-5_V3 antennas at 124' AGL, center of radiation Three (3) Amphenol BXA-70063-4CF antennas at 124' AGL, center of radiation Three (3) AHBCC AirScale Dual RRH 4T4R B5/13 320w remote radio heads Three (3) AHFIC AirScale Dual RRH 4T4R B2/B66a 320w remote radio heads One (1) RHSDC-3315-PF-48 OVP/HTTA box Three (3) RHSDC-1064-PF-48 OVP/HTTA box Six (6) transmission lines; diameter 7/8" One (1) hybrid cable; diameter 1.43" Equipment Shelter: 12' x 28' Pre Fab Shelter by Fiberbond Jacobs Fayetteville Client Monthly Report for October 2020 November 20, 2020 City of Fayetteville ON Jacobs Fayetteville - Client Monthly Report for October 2020 Saco s Contents ExecutiveSummary..................................................................................................................................................ii 1. Plant Operations.........................................................................................................................................3 1.1 Process Control........................................................................................................................................................... 3 1.2 Biosolids Process........................................................................................................................................................3 1.3 Compliance..................................................................................................................................................................4 1.4 Successes......................................................................................................................................................................4 1.5 Issues/Resolutions.................................................................................................................................................... 4 1.6 Revenue.........................................................................................................................................................................5 Table 1-1: Revenue generated from the BMS...............................................................................................................5 Figure 1-2: Revenue generated from the BMS via hay, fertilizer, and WTR.......................................................5 2. Maintenance................................................................................................................................................6 2.1 West Side....................................................................................................................................................................... 6 2.2 Noland............................................................................................................................................................................6 2.3 Biosolids Management Site...................................................................................................................................7 2.4 Lift Stations..................................................................................................................................................................8 2.5 Key Performance Indicators/Measures.......................................................................................................... 10 Figure 2-1: Labor Hours by Work Order Type............................................................................................................. 10 Figure2-2: Work Order Count by Type.......................................................................................................................... 10 2.6 Capital Improvement Projects(CIP)................................................................................................................ 10 3. Laboratory/Industrial Pretreatment...................................................................................................12 Table 3-1: Revenue generated from the Industrial Pretreatment Program(IPP)........................................ 12 Figure 3-1: IPP revenue total from surcharges, fees, and fines........................................................................... 13 Figure 3-2: Loads of hauled waste -by hauler and cumulative loads per month .......................................... 13 4. Woolsey Wet Prairie................................................................................................................................14 5. Community Outreach.............................................................................................................................16 6. Sustainability............................................................................................................................................17 7. Health & Safety/Training.......................................................................................................................18 Figure 7-1: Departmental Safety Training Completed............................................................................................ 19 Appendix A. Additional Information.................................................................................................................20 A.1 Effluent & Influent Data....................................................................................................................................... 20 A.1.1 White River Effluent Characteristics................................................................................................................ 20 A.1.2 White River Effluent Characteristics — Minerals.......................................................................................... 20 A.1.3 Goose Creek Effluent Characteristics.............................................................................................................. 21 A.1.4 Paul R. Noland Influent Characteristics.......................................................................................................... 21 A.1.5 West Side Influent Characteristics.................................................................................................................... 22 A.2 Labor Status.............................................................................................................................................................. 23 Jacobs — Fayetteville Project ON Jacobs Fayetteville — Client Monthly Report for October 2020 Saco s Executive Summary October began the "off season" at the treatment plants as permits limits relaxed for the fall and winter while maintenance activity began to focus more heavily on repair and routine maintenance of the assets that were now able to be taken offline. A much -needed major project replacing the antiquated electrical gear at Noland got underway and will continue through the winter. In parallel the 2020 CIP projects moved much closer to be completed before yearend. One piece of equipment continued to cause issues as the dryer at the BMS once again was shutdown for maintenance. Details of the dryer work are noted below but the result of these repeated issues is the time, expense, and impact of sending numerous truckloads of biosolids to the landfill. The dry October weather changed dramatically in the last week of the month with persistent rainfall causing high inflows at both plants and ending the hay season at BMS. Both plants were able to handle the high Loadings without incident. What the rain did not impact was the thriving bird haven at the West Side plant as our newest neighbors moved into the owl box, the bluebird gourds, and the chimney swift towers in force. November will continue the winter work on the basin equipment and the deployment of the new electrical gear at Noland. The essential personnel in operations and maintenance will remain vigilant to keep these facilities well within permit and a safe environment to work in. Please reach out if you have any questions or comments on this report or the facilities themselves. Jacobs — Fayetteville Project ON Jacobs Fayetteville — Client Monthly Report for October 2020 Saco s 1. Plant Operations The Noland and West Side Water Resource Recovery Facilities (WRRF) effluent discharges were 100% in compliance with the National Pollutant Discharge Elimination System (NPDES) permit. Details of effluent quality and influent loadings are shown in Appendix A. 1.1 Process Control Noland During the month of October, the Noland WRRF experienced a total of 6.87 inches of rain. Elevated influent flows peaked at 20.1 million gallons with 4.53 inches of the total rain fall for the month falling within 5 days. Discharge was stopped on October 20th and 28th due to the rain events causing water infiltration into degenerating power transformers. The transformers are scheduled to be replaced during the current electrical upgrade. The infiltration caused one phase to blow a fuse on the pole supplying power to the plant on the first episode with two phases blown during the subsequent event. Ozarks Electric and Skyline Services responded to troubleshoot issues with the lost phases and maintenance took steps to eliminate further water infiltration into the power transformers. West Side The continued increase in influent BOD loading required close monitoring of the return activated sludge (RAS) and wasting rate to meet and maintain the desired food to microorganism(F:M) ratio. During the month of October, the West Side WRRF experienced a total of 6.87 inches of rain. Elevated influent flows peaked at 38 million gallons with 4.53 inches of the total rain fall for the month falling within 5 days. All extra flow was process within the NPDES permit. 1.2 Biosolids Process During the month of October, the WRRF's produced 1,908 wet tons of biosolids with approximately 485 wet tons of biosolids applied into the solar houses prior to the thermal dryer and 390 wet tons processed directly through the thermal dryer. Forty-five belt filter pressed loads of biosolids weighing approximately 1,033 tons were transferred to area landfills in October. These hauled loads consisted of 41 loads due to dryer rotor movement repairs and four loads from a 25% dryer load capacity reduction following the repairs. Five Loads of partially dried biosolids weighing approximately 78 tons were also transferred to area landfills. Total landfill tipping fees amounted to approximately $55,009. The five loads of partially dried biosolids from the solar houses equates to a two -to -one reduction in tonnage when compared to belt filter pressed landfilled biosolids. The completion of the solar house roofing system and BMS focus on changes to wasting demands from operations, weather events, and loading efficiency has decreased the tonnage of belt filter pressed loads landfilled. The solar houses are currently performing at a 300+ hour drying time for 42 tons applied to reduce the 18% dried solids to 52% for landfilling. This represents a significant improvement prior to the roof repair. The BMS site received 8.05 inches of precipitation in October creating difficulty in the final cutting of hay, Water Treatment Residuals (WTR) application, and W3 irrigation. Multiple entities were involved with the decision to continue operating the dryer after the run -out deviation was detected. The Craft Bearing representative and Craft Bearing engineer were contacted, and the local Craft representative was on site to view the dial indicator readings. Communication with the Craft engineer Jacobs — Fayetteville Project ON Jacobs Fayetteville — Client Monthly Report for October 2020 Saco s about the findings resulted in Craft stating their bearing would not withstand that amount of deviation and catastrophic failure could result. The bearing cold has the internal clearance to absorb most of the identified deviation of 0.016 of an inch clearance. When hot at 400+ degrees, the thermal expansion of the bearing components reduces the clearance to less than one half. The resulting deviation forces the shaft to "ride" on the inboard side of the roller bearings for about 60 degrees. This all happens in a 360' rotation of the shaft at 11 rpm. The extreme pressure placed on the roller bearings only occurs during the peak of run -out every 180' inboard and outboard, which is estimated to be less than 20% of the 360' shaft rotation. The result is a corkscrew effect created by the run -out deviation that is greater than the ability of the inner race of the bearing and locking collars to withstand. This causes the shaft to pull through the fixed locking bearing, creating damage to the inner race of the bearing and the rotor shaft, even with the introduction of new fasteners. The inner race locking collar fasteners torqued 10% over the specification approved by the Craft engineer in the dryer operating without biosolids. Operations resumed on October 20th with a 25% reduction in loading to minimize the amount of movement. Despite these precautions, drying had to be stopped to remove the fixed bearing, re -position the rotor, and re -assemble the fixed bearing before drying operations could proceed. Downtime for cooling, maintenance activities, and warm up totaled over 32 hours. There was a six -day operational period between start up and shaft movement that required shut down for re -alignment of the rotor to avoid damage to the floating bearing. The expectation moving forward for a safe and successful drying operation until the proto type thrust plate is installed late November will be six days of operation at 75% capacity, 30 hours of downtime every 6 days for rotor repositioning, and damage minimization to the "emergency -use -only fixed bearing" with the newly refurbished fixed bearing shaft. 1.3 Compliance October provided a successful report month in compliance. With nothing more to report that indicates it was a very clean and compliant month. 1.4 Successes The variable frequency drive (VFD) replacement at West Side required careful planning and coordination between operations and maintenance to provide adequate dissolved oxygen during peak daily loading and to ensure adequate treatment in the bio units. The 2020 BMS harvest season ended on October 16th. October hay sales totaled 551 tons for $45,198 in revenue. Sales ranged from $25 to $105 in revenue with $65 being the October average. The $25 per ton price was a small amount of scrap hay related to weather conditions. 1.5 Issues/Resolutions West Side operations staff faced several challenges during the month of October with planned upgrades to the VFD's for the aerators in both online bio units, and an increase in plant influent biochemical oxygen demand (BOD). Quarterly filter cell bleaching was postponed due to a bleach transfer pump equipment failure. The pump has been repaired and filter cell bleaching has been rescheduled to November 151n Jacobs — Fayetteville Project ON Jacobs Fayetteville - Client Monthly Report for October 2020 Saco s 1.6 Revenue Table 1-1: Revenue generated from the BMS Product Tons Sold/Received Revenue Generated Hay $45,158 Fertilizer 19 $387 Water Treatment Residuals 35 $1,102 Figure 1-1: Revenue generated from the BMS via hay, fertilizer, and WTR Revenue Generated from the BMS $200,000 $180,000 $160,000 $140,000 $120,000 $100,000 $80,000 $60,000 $40,000 $20,000 n n rl n n n I I Oo�o ,ems `occ �o Oo O Monthly E) Cumulative Year to Date Jacobs - Fayetteville Project 5 ON Jacobs Fayetteville — Client Monthly Report for October 2020 Saco s 2. Maintenance 2.1 West Side Upgrades to the West Side bio unit aerator proceeded with Goff Electric contracted to replace 7 aerator VFD's. Each panel was dismantled to prepare for the new Schneider Electric'"' 200-hp drives. Chris Glasco was scheduled to complete the startup and programming of each drive. Bio Unit Aerator Upgrades West Side receives 7 VFD's and new Schneider Electric'"' 200-hp drives 2.2 Noland The rain event of October 281h caused two blown fuses at the power pole near the administration building. Midland Industrial Services removed all fuses and located the fault. Jacobs staff completed all necessary Load shedding procedures and investigated a strong burning odor in the A/B MCC room and the headworks electrical room. No visible arcing or burn marks were found, but water infiltration coming in from the east buss duct into the switchgear was discovered. Midland isolated the buss duct and the transformer on the east train and closed the tie breaker in the switchgear to feed off the west train. IPS-1 primary switch gear also had water infiltration and Midland towel dried the gear and put a tarp over the top of the gear. Power was restored and operations and maintenance proceeded through the process areas sequentially to put the facility back online. Electrical upgrades to the ozone building were started with the demolition of the concrete sidewalk. Midland proceeded with excavation to begin conduit installation for the new switch gear and transformers that will power the ozone equipment. Jacobs — Fayetteville Project ON Jacobs Fayetteville - Client Monthly Report for October 2020 i aco s Blower building control panels were removed to make room for the new switchgear. Midland prepared the areas for upgrades and temporarily powered the essential equipment until the panels are installed. 2.3 Biosolids Management Site AIT was onsite October 13th to review the thermal dryer shaft run -out on the fixed drive end that was previously documented by BMS with recorded dial indicator readings. The deviation from "true" readings, which is equal to or less than 0.008 of an inch, supports the effect of continual rotor movement, even when the dryer is not loaded with biosolids. AIT could not confirm the shaft experienced an unusual amount of run -out as they have never measured one in the field. An explanation on whether this amount of run -out is excessive was not included in their report. AIT has recommended adding a thrust plate to the fixed drive Jacobs — Fayetteville Pro,_ ON Jacobs Fayetteville — Client Monthly Report for October 2020 oaco s end of the dryer that works off "cam followers" mounted to a plate secured to the "taper locked" rotor sprocket and augmented structural bearing mounting frame work. The theory of this proto type is that the resistance for the taper Locked sprocket and plate cam follower assembly will provide more holding power than is generated by the run -out deviation of the rotor shaft. Installation is expected in late November. 0 0Wir— Bearing #3 �-ThrustBearing #�}ThrustThrust Bearing #1rocket Plate o ° Thrust Thrust /0-0 Bearing #1 procket Bearing #15prockThrust Plate Thrust Thrust Thrust ring #3 ° Bearing#4 ° Bearing #4 (Far Side) [Far Side] — r Rotor ° ° s Bearing Thrust Thrustq Bearing #2 o ° o Bearing #2 Thrust Plate Design 2.4 Lift Stations The Fayetteville Water and Sewer crew completed the demolition of Lift station 10 on Futrall drive. This station posed several issues for the city and Jacobs. The wet well was essentially a large grease trap that was very difficult to clean and maintain. Jacobs - Fayetteville Project ON Jacobs Fayetteville — Client Monthly Report for October 2020 Saco s Goff Electric was contracted to replace two 350-hp Schneider ElectricTI VFD's at the Hamestring lift station. Goff removed each panel to prepare for the new drives. These two drives have not been tested due to the pumps that are out for repair. When the rebuilt pumps return, Schneider will be scheduled to complete a factory start up. r 350-hp ` Schneider Electric'`"" VFD's L Ready for Start -Up A Jacobs — Fayetteville Project ON Jacobs Fayetteville - Client Monthly Report for October 2020 oaco s 2.5 Key Performance Indicators/Measures Figure 2-1: Labor Hours by Work Order Type L 1, 0% ❑ 12, 0% ❑ 271, 12% ❑ 638, 2f 57, 2% ❑ administrative ❑ administrative 59, 3% ❑ corrective maintenance emergency ❑ corrective maintenance non emergency corrective maintenance from pm/pdm ❑ preventive maintenance project 1, 55% ❑safety Figure 2-2: Work Order Count by Type ❑ corrective maintenance emergency ❑ corrective maintenance non emergency corrective maintenance from pm/pdm ❑ preventive maintenance project ❑ 1714, 83c ❑ safety 4, 1 % 7 181, 9% 88, 4% 2.6 Capital Improvement Projects (CIP) The new bulk chemicaltank arrived at the Noland facility. This project was sent out for sealed bids in January. The low bidder, Thorpe Plant Services, submitted a replacement proposal in February which received final approval at the April 21 st Council Session. Installation of the new solar house panels at BMS was completed in October. Panels on all six houses were damaged during a May 2019 high wind event, drastically reducing drying efficiency and resulting in increased trips to the landfill. Jacobs — Fayetteville Project ON Jacobs Fayetteville - Client Monthly Report for October 2020 oaco s A purchase order was issued for the repair of pump and motor No.4 at the Hamestring Lift Station. This repair was a break-in CIP item that was presented to the September Water & Sewer Committee. Repair of the Hamestring pump motor No.1 was completed in October. This repair was a break-in item that was presented as 'information only' to the September Water & Sewer Committee. A purchase order was issued for the repair of West Side solids blower No.2. This item was presented as 'information only' to the October Water & Sewer Committee. City Council approved a resolution to award Bid #20-76 to Crossland Heavy Contractors, Inc. in the amount of $212,751.03 to install aeration basin gates at the Noland facility. A $42,550.21 project contingency was also approved. A purchase order was issued for repair of the HyDoz Supply pump No.1. This item was presented as 'information only' to the October Water & Sewer Committee. A proposal by Paladino Painting Co., LLC to repair the Noland clarifier troughs received City Council approval on October 20th. The job was sent out for sealed bids in March 2020. Repair of Noland Influent Pump Station No.2 Pump No. 101 was added as a break-in item Jacobs — Fayetteville Project 11 ON Jacobs Fayetteville — Client Monthly Report for October 2020 Saco s 3. Laboratory/Industrial Pretreatment The lab treated Ashley Gregg to a farewell luncheon to celebrate her new role as Compliance Coordinator with the Jacobs Compliance and Reporting Group. A request was received for the discharge of approximately 60,000 gallons of tap water into the sanitary sewer from the future Casey's General Store #3911, located at 2486 West Mt. Comfort Road. The request has been granted for a temporary discharge authorization that will occur in December. The University of Arkansas had another chilled waterfailure associated with Adohi Hall at the end of October. They were granted a temporary discharge authorization for approximately 10,000 gallons to be pumped out of a manhole to perform repairs. Significant industrial users (SIU) are permitted by the City of Fayetteville to discharge water to the WRRF's. These permits require annual samples to be collected from each SIU's discharge water to verify compliance. Annual industrial compliance sampling was completed at Custom Powder Coating (CPC). Samples were collected for cyanide and metals (Cadmium, Chromium, Copper, Lead, Nickel, Silver, and Zinc) and sent to American Interplex Corporation (AIC) for analysis. Results were within permit limits and exhibited no unusual trends. A walkthrough inspection was performed at Superior Industries International to close out the discharge permit. Production ceased on 12/20/2019 and the dismantling of equipment and tank cleaning has been taking place throughout the facility. The pretreatment department is awaiting final information from Superior before the permit will be closed. Monthly surcharge and waste hauler reports were completed and sent to the City for billing. For revenue generated from the IPP, see Table 3-1 and Figure 3-1. Table 3-1: Revenue generated from the Industrial Pretreatment Program (IPP) Revenue $46,899.11 I Surcharges on September data $2,450.00 I Fees from hauled waste accepted in October $0.00 I Other fees paid in October $0.00 I Fines assessed in October Zero violations for all industrial users I Violations on September data Jacobs — Fayetteville Project ON Jacobs Fayetteville - Client Monthly Report for October 2020 Saco s Figure 3-1: IPP revenue total from surcharges, fees, and fines Revenue Generated Industrial Pretreatment Program $800,000 $700,000 $600,000 $500,000 $400,000 $300,000 $200,000 $100,000 n FI F 1 r, FI n n n n at� at� air PQi� �a� ,J�,� '3 �5` ?e� 'O,oec �,oet �oec �a << C� Q ���e O� ore Monthly Surcharge Fees plus Hauled Waste Fees Cumulative Fees O Figure 3-2: Loads of hauled waste -by hauler and cumulative loads per month Hauled Waste Summary 60 50 40 30 20 1 o ILL I nn� I n I I fl ,oe" o�et met oet �a <<e� OAPT OBJ OPH WRES TOTAL Jacobs — Fayetteville Project ON Jacobs Fayetteville — Client Monthly Report for October 2020 i aco s 4. Woolsey Wet Prairie Integrated Vegetation Management (IVM) field work in October was focused on starting the safety site preparations for the next prescribed burn which will take place in early 2021. Field work entails removing standing dead vegetation from around utility structures within the prescribed burn area, to include telephone poles, electrical boxes, flow control structures, and miscellaneous signage. Additionally, large bands of vegetation near the burn area's outer perimeter will be mown to create precautionary low -flame buffer areas. An additional outer band of bare -soil containment will be created to extinguish remnant flames during the controlled burn event. Burn preparations are anticipated to be completed in November. October was looking to be an incredibly dry month with only a single inch of rain going into the month's final week. The last week experienced over 6 inches of precipitation from four consecutive days of steady rainfall. The greater than normal October precipitation was an excellent start towards re -saturating Woolsey's wetland cells after a relatively dry summer -to -fall transition. Several of the Mexican White Sage transplants reached full maturity and will achieve mature seed development this year. This vulnerable rare plant population, likely the only one documented in Washington County, will continue to thrive under the care of Woolsey management for generations to come. Not only did they start out small and rough in stature but were intentionally planted in areas where other vegetation has struggled to re-establish since the 2005-2008 facility construction. Ed Jacobs — Fayetteville Project 14 ON Jacobs Fayetteville — Client Monthly Report for October 2020 i aco s Jeff Hickle, Tom Meunier, Leonides Moreno, Donna McChristian and Rebecca Andersen completed the assembly of 16 SuperGourd bird houses to enrich the bluebird population at West Side. Jacobs — Fayetteville Project I D ON Jacobs Fayetteville - Client Monthly Report for October 2020 oaco s 5. Community Outreach Preparations were ongoing for the 7th Annual Native Seed Collection and Fall Festival scheduled for November 7th. Every fall, volunteers from the University of Arkansas and Northwest Arkansas Master Naturalists, spend Saturday morning with Jacobs collecting indigenous -native seeds from Woolsey Wet Prairie for this rain garden improvement event. Volunteers then help broadcast the varied mix of collected seeds into the WRRF's various rain garden and bioswale project areas for biodiversity expansion and plant - density improvements. This year the Jacobs team also worked hard revising the event's scope. This year's event will consolidate the facility's many habitat improvement projects under the designation of Blue -Green Infrastructure (BGI) projects while also highlighting key components of the water recovery process itself. This community engagement event allows the Jacobs team to highlight features and benefits of BGI projects, such as rain gardens, managed wetlands, bioswales, and streambank restorations alongside the water recovery process, thus educating volunteers on both point -source and non -point source aspects of water use and subsequent watershed quality. 7th Annual 111beGREEN Infrastruciurc VA&LIL IFIESTM&IL Saturday I Nov 7th 19-11am West Side Water Resource Recovery Facility & Woolsey Wet Prairie Sanctuary 15 South Broyles Avenue in Fayetteville Blob oad Treatment Pollutant Removal Water Resource Recovery "-b w Blo-Olvenity u f` Solids BOD , Nitrogen Phosphorus Id:O1Q_41hpaIdl tfaolhhlBlmud 1(lb+] 1 SS 17,000:9u 350,000+ BUD 11,000;160 325,000+ - Nitrogen 1,200:400 24,000 - Pbo%pllon., l00:15 5,500+ ...�,., :.JACOBS Jacobs — Fayetteville Project ON Jacobs Fayetteville — Client Monthly Report for October 2020 Saco s 6. SustainabiLity October marked Jacobs new year regarding sustainability tracking. In 2020, sustainability highlights for the Noland, BMS & West Side facilities include: • Just over 1,300 pounds of mixed recyclables collected. 250 gallons of used oil recycled. 200 pounds of Nitrite gloves recycled. • 160 pounds of Batteries recycled & Hazardous Wastes safely disposed. • Jacobs staff participated in nearly 300 hours of community service projects including: o Broyles Avenue and Fox Hunter Roadside Clean-ups o White River Watershed Streamside Clean-up o Fayetteville Animal Shelter Collection and Donations o The NWA Barn Owl Livestream Nest Box Project o The Bluebird SuperGourd Project o Chimney Swift Prototype Nest -Roost Towers o Invasive Vegetation Removal and Goose Creek Riparian Corridor Improvements o Native Vegetation Propagation, Seed Collection and Imperiled White Sagewort Transplanting The Jacobs team completed a quarterly roadside clean-up on Old Wire Road and Broyles Avenue with the collection of five bags of trash. r Perfecting the Art of *autification on OLD WIRE ROAD and BROYLE$ AVENUE Jacobs — Fayetteville Project ON Jacobs Fayetteville - Client Monthly Report for October 2020 Saco s 7. Health & Safety/Training The project continues to be heading in a positive direction. Fayetteville was able to achieve over 367 days without a recordable incident. The safety team completed weekly safety inspections without discovering any deficiencies. Wes Cloud, Site Safety Professional, provided Lockout Tagout training, and Permit -Required Confined Space training, and 70E Live Electrical Safety training evaluation. The project is currently in the process of aligning all safety training within one central database. The Jacobs Safety Group maintains the E3 Learning database. The database automatically tracks course progress and sends out notifications to staff and supervisors. The alignment will streamline the process and make it a more efficient way to track training and compliance progress. The project will continue to make strides with its available resources through the dedicated work of the Safety Team. The safety team is comprised of a delegate from each department. The delegates strive to bring about continuous improvement within the project. The operations department had incorporated various safety topics to be included into the daily safety briefings. The goal is to include everyone in the research process for each topic, including new Operators -in -Training. This is an example of employee engagement with safety and is a good measure of success within a safety program. A safety program can greatly increase the odds for a facility to achieve an overall safety awareness culture and a Lower incident rate. The chart below displays a downward trend experienced within general industry upon implementing safety programs and nurturing safety cultures. The incident rate is calculated per 100,000 employees. This data is derived from the Bearau of Labor Statistics. Incldenn rats of nanTalAI accupalianal Injurin and Illnesses, prlva6p Industry 1] Safety 30 1072 7977 1987 12V 1992 la97 2= 2007 2022 2017 ytw Sn�[e. U.S. 9unws of lade[ 5[�teslrcs, SRlxy nl IX[up�tscvml INunes antl IMesfes. Programs give rise to a Significant Decline in Injuries Jacobs — Fayetteville Project 18 ON Jacobs Fayetteville — Client Monthly Report for October 2020 Saco s Figure 7-1: Departmental Safety Training Completed Safety Training ADMIN 13% OF 28 BMS 15% MAI NT 44% ❑ADMIN ❑BMS ❑MAINT OPS All applicable associates attended the following training sessions: Hearing Loss, Spill Response, and Malicious Insider Threat. The Safety Team prepared and presented "Cold Stress" safety training at the October plantwide meeting. Other training sessions at plantwide were: Truck Operation, HSE Accountability, and Sustainable Tracking. Donna McChristian attended the following training sessions: Contaminants of Emerging Concern, Grating and Handrail Inspection, PFAS Advanced Part 4 Investigation Challenges, How to Retain Underrepresented Talent in STEM, Chemistry Industry Innovations, and Central Arkansas Water Virtual Academy. Jacobs — Fayetteville Project Jacobs Fayetteville - Client Monthly Report for October 2020 .;acobs Appendix A. Additional Information A.1 Effluent & Influent Data A.1.1 White River Effluent Characteristics 2020 Monthly WR WR WR WR TSS WR WR WR WR D.O. pH pH Fecal Average CBOD CBOD TSS (lbs/d) Phos Phos Ammonia Ammonia Avg Min Max Coliform Flow (mg/L) (lbs/d) (mg/L) (mg/L) (lbs/d) (mg/L) (lbs/d) Min (s.u.) (s.u.) (MPN/ (MGD) WOO 100ml) Permit Limit October 5.5 578 5.0 525 1.0 105.0 2.4 252 7.5 6.0 9.0 1,000 January 7.2 2.7 176 1.9 126 0.1 7.8 0.6 44 15.7 7.3 7.6 68 February 7.0 3.2 174 2.0 107 0.1 7.6 0.1 6 17.1 7.0 7.4 165 March 8.6 3.5 230 2.9 184 0.2 10.6 0.1 7 15.0 6.8 7.3 20 April 7.9 3.6 242 2.6 176 0.2 11.6 0.1 7 12.8 7.2 7.4 12 May 8.1 4.2 283 1.3 86 0.2 11.6 0.1 6 12.6 7.4 7.6 27 June 6.6 3.8 214 2.9 163 0.2 12-011 0.2 1 10 11.8 7.1 7.5 124 July 4.5 3.5 134 1.1 42 0.2 9.0 0.1 4 16.5 7.3 7.5 51 August 4.6 3.2 120 1.1 40 0.2 6.0 0.1 4 16.8 7.3 7.5 13 September 4.5 2.7 102 1.1 41 0.2 8.9 0.1 4 13.5 7.2 7.4 66 October 4.8 2.2 86 1.3 51 0.1 5.5 0.1 4 14.8 7.1 7.4 113 November December Average 6.4 3.3 176 1.8 102 0.2 9.0 0.2 10 14.6 7.2 7.5 66 A.1.2 White River Effluent Characteristics - Minerals 2020 WR TDS (mo/L) WR TDS (lbs/d) WR Sulfate (mo/L) WR Sulfate (lbs/d) WR Nitrate (mo/L) WR Nitrate (lbs/d) Permit Limit August 500 52,542 119 12,505 report report January 325 20,940 76 3,809 2 105 February 320 18,531 59 3,371 4 229 March 322 22,174 110 4,899 5 214 April 314 20,907 58 3,589 6 384 May 320 21,517 71 4,737 7 440 June 368 19,845 100 5,079 8 396 July 368 14,261 96 4,692 3 156 August 382 13,888 60 2,077 4 132 September 381 14,565 64 2,551 7 279 October 397 14,873 68 2,314 9 296 November December Average 350 18,150 76 3,712 5 263 Jacobs - Fayetteville Project 20 ON Jacobs Fayetteville - Client Monthly Report for October 2020 i aco s A.1.3 Goose Creek Effluent Characteristics 2020 Monthly GC GC GC TSS GC TSS GC GC GC GC D.O. PH PH Fecal Average CBOD CBOD (mg/L) (lbs/d) Phos Phos Ammonia Ammonia Avg Min Max Coliform Flow (mg/L) (lbs/d) (mg/L) (lbs/d) (mg/L) (lbs/d) Min (s.u.) (s.u.) (MPN/100ml) (MGD) (mg/L) Permit 6.6 550.4 10.0 Limit October 834 1.0 83.4 2.3 191.8 7.5 6.0 9.0 1,000 January 10.8 2.0 1.0 84 0.07 5.9 0.2 17.4 10.7 7.1 7.5 5 February 11.1 2.0 E13.'1 1.0 97 0.09 8.7 0.1 9.8 10.9 7.1 7.4 5 March 11.4 2.0 189.3 1.0 95 0.25 22.7 0.2 18.9 10.2 7.1 7.4 5 April 10.5 2.0 176.3 1.0 88 0.41 35.4 0.1 8.9 10.0 7.1 7.4 5 May 11.7 2.0 198.0 1.1 100 0.34 30.8 0.1 10.7 9.7 7.2 7.6 7 June 7.6 2.0 130.0 1.0 64 0.22 14.5 0.14 8.3 9.1 7. 7.6 7 July 6.9 2.0 113 1.0 58 0.09 5.3 0.1 6 8.6 7.1 7.8 10 August 6.8 2.0 111 1.0 55 0.09 5.2 0.1 8 8.6 7. 7.9 16 September 6.4 2.0 110.1 1.0 55 0.09 4.9 0.2 11.0 8.7 7.5 7.9 15 October 7.4 2.0 129.6 1.0 65 0.16 10.6 0.16 10.7 9.3 7. 7.8 7 November December Average 9.1 2.0 151.9 1.0 76 0.2 14.4 0.1 10.9 9.6 7.2 7.6 1 8 A.1.4 Paul R. Noland Influent Characteristics Noland Monthly Hydraulic BOD Organic TSS TSS PO4 PO4 NH3 NH3 WRRF Average Loadings Loading Loading Loading Loading Loading Loading Loading Loading Flow Percent of (lbs/d) Percent of (lbs/d) Percent of (lbs/d) Percent of (lbs/d) Percent of (MGD) Design Design Design Design Design Designed 12.6 (Annual Avg.) 29,666 23,198 765 2,250 January 8.1 64.5% 14,829 50.0% 8,503 36.7% 154 20.1% 952 42.3% February 7.7 61.2% 15,095 50.9% 8,877 38.3% 178 23.3% 819 36.4% March 7.4 58.6% 10,078 34.0% 9,525 41.1% 263 34.3% 857 38.1% April 6.1 48.6% 8,486 28.6% 6,100 26.3% 149 19.4% 650 28.9% May 7.3 57.8% 14,009 47.2% 7,951 34.3% 173 22.6% 650 28.9% June 4.6 36.8% 16,334 55.1% 9,042 39.0% 195 25.5% 710 31.6% July 4.3 34.4% 16,861 56.8% 10,098 43.5% 202 26.4% 626 27.8% August 4.6 36.2% 16,643 56.1% 8,841 38.1% 212 27.7% 722 32.1% September 4.5 36.0% 15,456 52.1% 8,907 38.4% 261 34.1% 1,115 49.6% October 5.8 46.4% 19,074 64.3% 8,780 37.8% 231 30.2% 1,017 45.2% November December Average 6.1 48.0% 14,686 49.5% 8,662 37.3% 202 26.4% 812 36.1% Jacobs - Fayetteville Project 21 Jacobs Fayetteville - Client Monthly Report for October 2020 ON i aco s A.1.5 West Side Influent Characteristics West Side Monthly Hydraulic BOD Organic TSS TSS PO4 PO4 NH3 NH3 WRRF Average Loadings Loading Loading Loading Loading Loading Loading Loading Loading Flow Percent of (lbs/d) Percent of (lbs/d) Percent of (lbs/d) Percent of (lbs/d) Percent of (MGD) Design Design Design Design Design Designed 10.0 (Annual _ Avg.) January 10.8 14,595 14,595 78.2% 11,670 80.0% 584 � 1918 108.3% 11,412 255 43.6% 1,190 62.0% February 11.1 1 .0% 10,065 9.0% 10,193 13.9% ■ 206 3 o ■ .69/6 March 11.4 113.7% 9,847 67.5% 12,653 86.7% 188 32.2% 1,226 63.9% April 10.5 105.0% 9,307 63.8% 9,950 68.2% 139 23.8% 1,264 65.9% May 11.7 116.8% 8,921 61.1% 8,923 61.1% 171 29.2% 1,136 59.2% n 7.6 76.3% 10 7 2° ° 139 2 ° 1 11 ° July 6.9 69.0% 9,833 67.4% 10,522 72.1% 220 37.7% 1,063 55.4% August 6.7 67.5% 10,607 72.7% 10,537 72.2% ■ 209 35.70/6 ■ 1,171 61.1% September 6.4 63.9% 11,480 78.7% 14,604 100.1% 180 30.8% 1,144 59.6% October 7.4 73.7% 15,712 107.7% 13,424 92.0% 210 36.0% 1,270 66.2% November December Average 9.1 90.5% 10,699 73.3% 11,268 77.2% 192 32.8% 1,169 60.9% Jacobs - Fayetteville Project 22 Jacobs Fayetteville - Client Monthly Report for October 2020 A.2 Labor Status .;acobs Department Fayetteville % Job Title Employee Name FTE Admin Area Manager Greg Weeks 95.00% Admin Assistant Project Manager Matt Benton 60.00% Admin - Operations Operations Manager Tim Luther 100.00% Admin Environmental Specialist Jeff Hickle 100.00% Admin Health, Safety, Compliance Professional Wes Cloud 70.00% Admin Project Coordinator Brandi Miller-DeWeese 90.00% Admin Administrative Assistant Christy Taylor 100.00% Admin Administrative Assistant Kassandra Foster 100.00% BMS Lead Operator Jerry Genz 100.00% BMS Lead Operator John Tenberge 100.00% BMS Equipment Operator Johnnie Deason 100.00% BMS Equipment Operator Anthony DeJesus 100.00% BMS Equipment Operator Rick Witherspoon 100.00% BMS Equipment Operator Chris Howard 100.00% BMS Equipment Operator Vacant 100.00% BMS Operator I David Dajani 100.00% BMS Operator Peter Burrow 100.00% BMS Operator In Training Ben Shondelmyer 100.00% BMS Operator In Training Rony Ralpho 100.00% BMS Mechanic Mike Reed 100.00% LAB Admin-Lab/IPP Supervisor Thom Vinson 90.00% LAB Industrial Pretreatment Coordinator Vacant 100.00% LAB Lead Laboratory Analyst Nicholas King 100.00% LAB Laboratory Analyst II Donna McChristian 90.00% LAB Laboratory Analyst Rebecca Anderson 100.00% Maint Maintenance Supervisor Joshua Apeman 100.00% Maint Lead Mechanic Brian Daniels 80.00% Maint Lead Electrician Tim Marr 100.00% Maint Mechanic Rick Scott 100.00% Maint Mechanic Buddy Carter 100.00% Maint Mechanic Steve Cook 100.00% Maint Mechanic Michael Spohn 100.00% Maint Mechanic Vacant 100.00% Maint Mechanic Vacant 100.00% Maint Mechanic in Training Paul Stevenson 100.00% Operations Operations Supervisor Austin Ramsfield 100.00% Operations Operator II Shawn Santellanes 100.00% Operations Operator I Anthony Ramsfield 100.00% Operations Operator I Travis Patton 100.00% Operations Operator Justin Sweeney 100.00% Jacobs - Fayetteville Project I Jacobs Fayetteville — Client Monthly Report for October 2020 oaco s Operations Operator In Training Tom Meunier 100.00% Operations Operator In Training Grace Germon 100.00% Operations Operator In Training Rick Dollarhide 100.00% Operations Operator In Training Kasey Lybrand 100.00% Operations Operator In Training Gabriel Graham 100.00% SCADA SCADA Supervisor Mayo Miller 100.00% SCADA Instrument & Control Tech Pat Cooley 95.00% SCADA Instrument & Control Tech Mark Gleber 100.00% Authorized Positions = 48.0 Filled Positions = 44.0 Filled FTE's= 42.7 TEM EMS Engineering Intern, U of A Will Franke 100.00% Admin Engineering Intern, U of A Summer Wilkie 100.00% Maint Engineering Intern, U of A Leonides Moreno 100.00% FF SPECIAL PROJECTS (Performed in scope) Area Reason Name Hours SCADA Network Upgrade Campos, Edgar 26.5 Maintenance Asset Manager Support Bass, Edward Lee 1.7 Maintenance Asset Manager Support Turley, Johnny D (JD) 132 Jacobs — Fayetteville Project