Loading...
HomeMy WebLinkAboutOrdinance 6384Cf FAyErrf (J T L9VAr NSPS 113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 Ordinance: 6384 File Number: 2020-0990 MIKE PARKER COST SHARE AGREEMENT: AN ORDINANCE TO WAIVE FORMAL COMPETITIVE BIDDING AND APPROVE A COST SHARE AGREEMENT WITH MIKE PARKER FOR CONSTRUCTION OF A SEWER LINE ALONG A PORTION OF NORTH SHADY LANE AND A PORTION OF PROPERTY NORTH OF WEST HOLLY STREET WITH A REFUND IN AN AMOUNT NOT TO EXCEED $40,885.19 TO BE PAID BY THE CITY OF FAYETTEVILLE FOR THE COST OF IMPROVEMENTS THAT EXCEED THE ROUGH PROPORTIONALITY OF THE IMPACT OF THE DEVELOPMENT, AND TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $8,177.04 WHEREAS, Mike Parker has requested that the City share in the cost of constructing an 8-inch sewer main along a portion of North Shady Lane between North Vandeventer Avenue and North Woolsey Avenue and across a portion of undeveloped property north of West Holly Street, a distance of approximately 548 feet, so that the area north of West Holly Street can be developed; and WHEREAS, constructing this segment of 8-inch sewer main will allow development of this property, will extend sewer service to an area in the core of the City that has never been served before, and will also provide for ample future capacity which the City recognizes will be necessary for the area that is served by this sewer main; and WHEREAS, the City proposes to enter into an agreement with Mike Parker to refund an amount of up to $40,885.19, which represents the estimated cost of improvements that exceed the rough proportionality of the development's impact. NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Page 1 Printed on 1212120 Ordinance: 6384 File Number 2020-0990 Section I.: That the City Council of the City of Fayetteville, Arkansas hereby determines an exceptional situation exists in which competitive bidding is deemed not feasible or practical and therefore waives the requirements of formal competitive bidding and approves a cost share agreement with Mike Parker, for the construction of a sewer line along a portion of North Shady Lane and a portion of property north of West Holly Street with a refund in an amount not to exceed $40,885.19 to be paid by the City of Fayetteville for the cost of improvements that exceed the rough proportionality of the impact of the development, and further approves a project contingency in the amount of $8,177.04. PASSED and APPROVED on 12/1/2020 Page 2 Attest: • TY 0 Kara Paxton, City Clerk TreasuFAYE]rEV/ r �• .. i�Z. ei." ON' ,Qv,��� Printed on 1212,20 City of Fayetteville, Arkansas 113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 1 % \ ; Text File —t= File Number: 2020-0990 Agenda Date: 12/1/2020 Version: 1 Status: Passed In Control: City Council Meeting File Type: Ordinance Agenda Number: C.6 MIKE PARKER COST SHARE AGREEMENT: AN ORDINANCE TO WAIVE FORMAL COMPETITIVE BIDDING AND APPROVE A COST SHARE AGREEMENT WITH MIKE PARKER FOR CONSTRUCTION OF A SEWER LINE ALONG A PORTION OF NORTH SHADY LANE AND A PORTION OF PROPERTY NORTH OF WEST HOLLY STREET WITH A REFUND IN AN AMOUNT NOT TO EXCEED $40,885.19 TO BE PAID BY THE CITY OF FAYETTEVILLE FOR THE COST OF IMPROVEMENTS THAT EXCEED THE ROUGH PROPORTIONALITY OF THE IMPACT OF THE DEVELOPMENT, AND TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $8,177.04 WHEREAS, Mike Parker has requested that the City share in the cost of constructing an 8-inch sewer main along a portion of North Shady Lane between North Vandeventer Avenue and North Woolsey Avenue and across a portion of undeveloped property north of West Holly Street, a distance of approximately 548 feet, so that the area north of West Holly Street can be developed; and WHEREAS, constructing this segment of 8-inch sewer main will allow development of this property, will extend sewer service to an area in the core of the City that has never been served before, and will also provide for ample future capacity which the City recognizes will be necessary for the area that is served by this sewer main; and WHEREAS, the City proposes to enter into an agreement with Mike Parker to refund an amount of up to $40,885.19, which represents the estimated cost of improvements that exceed the rough proportionality of the development's impact. NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby determines an exceptional situation exists in which competitive bidding is deemed not feasible or practical and therefore waives the requirements of formal competitive bidding and approves a cost share agreement with Mike Parker, for the construction of a sewer line along a portion of North Shady Lane and a portion of property north of West Holly Street with a refund in an amount not to exceed $40,885.19 to be paid by the City of Fayetteville for the cost of improvements that exceed the rough proportionality of the impact of the development, and further approves a project contingency in the amount of $8,177.04. OW of Fayetteville, Arkansas Page 1 Printed on 12/2/2020 File Number: 2020-0990 City of Fayetteville, Arkansas Page 2 Printed on 1212/2020 Tim Nyander Submitted By City of Fayetteville Staff Review Form 2020-0990 Legistar File ID 12/1/2020 City Council Meeting Date - Agenda Item Only N/A for Non -Agenda Item 11/12/2020 WATER SEWER (720) Submitted Date Division / Department Action Recommendation: Staff recommends approval of a cost share agreement with Mike Parker for the construction of a sewer line to facilitate the development of an area north of West Holly Street, with an amount not to exceed $40,88S.19 to be paid by the City of Fayetteville, and to approve a project contingency in the amount of $8,177.04. 5400.720.5700-5815.00 Account Number 04039.1 Project Number Budgeted Item? Yes Does item have a cost? Yes Budget Adjustment Attached? No Budget Impact: Water and Sewer Fund Water/Sewer Impact Fee Cost Sharing Project Title Current Budget Funds Obligated Current Balance Item Cost Budget Adjustment Remaining Budget $ 3,551,352.00 $ 2,892,949.68 $ 658,402.32 $ 49,062.23 S L------ 609,340.09 V20180321 Purchase Order Number: Previous Ordinance or Resolution # Change Order Number: Approval Date: Original Contract Number: Comments: CITY OF FAYETTEVILLE ARKANSAS MEETING OF DECEMBER 1, 2020 TO: Mayor and City Council THRU: Susan Norton, Chief of Staff FROM: Tim Nyander, Utilities Director DATE: November 12, 2020 CITY COUNCIL MEMO SUBJECT: Mike Parker — Cost Share Agreement for Sewer Construction RECOMMENDATION: Staff recommends approval of a cost share agreement with Mike Parker for the construction of a sewer line to facilitate the development of an area north of West Holly Street, with an amount not to exceed $40,885.19 to be paid by the City of Fayetteville, and to approve a project contingency in the amount of $8,177.04. BACKGROUND: Mike Parker has requested that the City share in the cost of constructing an 8-inch sewer main along a portion of North Shady Lane between North Vandeventer Avenue and North Woolsey Avenue, and a portion of undeveloped property north of West Holly Street., a distance of approximately 548 feet, so that the area north of West Holly Street can be developed. DISCUSSION: The City's portion of the cost share includes extending the sewer line north along N. Shady Ln. approximately 202 linear feet to reach the developer's property (out of the total 548 linear feet of the entire sewer line extension). This is how staff reached the City percentage of 37% in the cost share agreement, for a total not -to exceed amount of $40,885.19 to be paid by the City of Fayetteville. Constructing this segment of 8-inch sewer main will allow development of this property, will extend sewer service to an area in the core of the City that has never been served before, and will also provide for ample future capacity which the City recognizes will be necessary for the area that is served by this sewer main. BUDGET/STAFF IMPACT: Funds are available in the Water/Sewer Impact Fee Cost Sharing account within the Water & Sewer Fund. Attachments: Cost Share Agreement Exhibits Mailing Address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 CONTRACTUAL AGREEMENT FOR COST SHARE OF SEWER MAIN INSTALLATION COSTS This Agreement, made and entered into on this day of December, 2020, by and between the City of Fayetteville, Arkansas ("City") and Mike Parker, witnesseth: WHEREAS, Mike Parker has requested that the City share in the cost of constructing an 8-inch sewer main along a portion of North Shady Lane between North Vandeventer Avenue and North Woolsey Avenue, and a portion of undeveloped property north of West Holly Street., a distance of approximately 548 feet, so that the area north of West Holly Street can be developed; and WHEREAS, constructing this segment of 8-inch sewer main will allow development of this property, will extend sewer service to an area in the core of the City that has never been served before, and will also provide for ample future capacity which the City recognizes will be necessary for the area that is served by this sewer main; and WHEREAS, § 51.113 of the Fayetteville City Code provides that "the City shall pay the excess material cost of facilities of a size larger than required to service subdivisions when such excess size is specified and required by the water and wastewater director for the general benefit of the sewerage system." NOW, THEREFORE, the City of Fayetteville, Arkansas and Mike Parker agree as follows: 1. The City of Fayetteville, Arkansas agrees to: A. Reimburse Mike Parker for 37% of the cost to install approximately 548 linear feet of 8-inch sewer main in the area identified in Exhibit "A" up to a maximum - not -to -exceed amount of $40,885.19 as was estimated by the builder's representative and shown on Exhibit `B", attached. B. Payments due to Mike Parker, shall be remitted within sixty (60) days after receipt of valid invoices. 2. Mike Parker agrees to: A. Provide the necessary and normal project management, inspection, and testing as necessary for a complete and acceptable sewer main installation, including submittal of plans and specifications to the City's Engineering Department, per their standard procedures. B. Provide a copy of the invoices from the Contractor upon City approval of the water main upgrade. Page 1 of 2 C. Pay for the sewer main installation (with reimbursement of 37% of the cost by the City of Fayetteville in a not -to -exceed amount of $40,885.19. IN AGREEMENT WITH ALL THE TERMS AND CONDITIONS ABOVE, WE SIGN BELOW: MIKE PARKER By: MIKE P R CITY OF FAYETTEVILLE, ARKANSAS ATTEST: ATTEST: GOER K % T �� <<.•• CIT)-•1F�'% Kara Paxton, City Clerk :,y�:►T!<p:•.• BAILEY STEEL ' • :wwd; MY COMMISSION01269W7 •, 9,Q C�• ;.; .w� EXPIRES: sever 30, 2026 ,,,y�}.�,,�q�vsAs • •. ,,,. *'�Rlii��`'•• Benton County �I'Y • • • • • Page 2 of 2 I Ir a-T EXH I BIT A GRAPHIC SCALE WfE s -1-7 --- - ------ 7_J I tilIII l P7Z-- : A DEVELOPER 7F r - -I t 71- 'K:77! CITY IL JORGENSEN +ASSOCIATES 40 October 22nd, 2020 City of Fayetteville 113 W. Mountain Fayetteville, AR 72701 Attn: Engineering Department EXHIBIT B Re: Parker Sewer Line Extension Cost Share Request 124 W Sunbridge Drive, Suite 5 Fayetteville, AR 72703 Office: 479.442.9127 Fax: 479.582.4807 This letter will serve as a cost share request with the City of Fayetteville for the Parker sewer line extension plans. I have included the Contractors bid amount and we would request the cost share be 50% from both entities including Engineering fees as broken down below: • Total Construction Cost: $100,455.00 • Total Engineering Cost: $10,045.50 • Total Cost: $110,500.50 • Total Cost to Fayetteville: $55,250.25 • Total Cost to Developer (Mike Parker): $55,250.25 Currently there are a total of 8 homes using this sewer and this proposed extension will result in 10 more homes for a total of 18 houses. The capacity of the existing line has been calculated and is sufficient to handle the extra homes. This utility work is planned to start as soon as possible once we get resolution on this request. We thank you for your consideration of this proposal and please call with any questions, Thank you. Sincerely; Jus in L. Jorgens n, P.E. Unit Price Schedule for Parker Sewer line extension PETREE CONST Water & Sewer Item # Description Quantity Unit Unit Price Amount 1 8" Sanitary Sewerline (SDR-26 PVC) w/ backfill 535.65 LF $39.44 $21,126.04 2 Cast in place Manhole (0'-6') 4 EA $3,480.00 $13,920.00 3 Cast in place Manhole (0'-8') 1 EA $5,220.00 $5,220.00 4 4" Sanitary Sewer Wye 3 EA $580.00 $1,740.00 5 Clean & Test SWR 580 L.F. $5.34 $3,097.20 6 Remove and replace city street per spec 1 L.S. $38,831.32 $38,831.32 7 16" Steel Encasement 20 L.F. $225.00 $4,500.00 8 Erosion control 1 L.S. $2,766.60 $2,766.60 9 Clearing & grubbing 1 L.S. $2,552.00 $2,552.00 10 Construction exit 1 L.S. $2,900.00 $2,900.00 11 Maintenanc bond 1 L.S. $3,200.00 $3,200.00 12 Performance bond 1 L.S. $1,550.00 $1,550.00 13 Traffic Control 1 L.S. $5,220.00 $5,220.00 14 Site restoration incl seed and straw 1 L.S. $6,206.00 $6,206.00 15 Rock Excavation if needed 1 i C.Y. $225.001 $225.00 Total 1 $113,054.16 Notes: 1) Standard stakeout will be provided by Jorgensen & Associates at the Contractors Expense as needed. 2) Lab testing to be paid for by Owner. 3) Contractor to consult Full Set of Plans to provide a complete bid. Items left off Unit Price Schedule need to be added and/or included by Contractor. Construction Plans have not been approved by the City; any addendums to the plans will be addressed by an issued revision and subsequent change orders. Unit Price Schedule for Parker Sewer line extension PAVECON Water & Sewer Item # Description Qua!LtL Unit Unit Price Amount 1 8" Sanitary Sewerline (SDR-26 PVC) w/ backfill 535.65 LF $42.15 $22,577.65 2 Manhole 5 EA $4,460.00 $22,300.00 3 4" Sanitary Sewer Wye 3 EA $300.00 $900.00 5 Sawcut & remove east half of Shad (1,148 sq ft) 1 L.S. $5,950.00 $5,950.00 6 3" ACHM Surface w/ Tack coat 135 S.Y. $69.25 $9,348.75 7 6" Concrete Pad 115 S.Y. $155.25 $17,853.75 8 Class 7 backfill/compact under road (173'x2x3'xl4o) i 2000 75 Tons $25.75 $1,931.25 9 16" Steel Encasement 20 L.F. $108.25 $2,165.00 10 Clean & Test SWR 1 L.S. $5,475.00 $5,475.00 11 Seed/straw/final cleanup 1 L.S. $2,250.00 $2,250.00 12 Erosion Control 1 L.S. $7,500.00 $7,500.00 13 Bond SWR 1 L.S. $1,978.60 $1,978.60 14 Rock Excavation if needed 1 C.Y. $225.00 $225.00 Total $100,455.00 Notes: 1) Traffic control included in line item 5. 3) Contractor to consult Full Set of Plans to provide a complete bid. Items left off Unit Price Schedule need to be added and/or included by Contractor. Construction Plans have not been approved by the City; any addendums to the plans will be addressed by an issued revision and subsequent change orders. Unit Price Schedule for Parker Sewer line extension SWEETSER CONST Water & Sewer Item # Description Quantity Unit Unit Price Amount 1 8" S nitary Sewerline (SDR-26 PVC) w/ backfill 535.65 LF $65.00 $34,817.25 2 Manhole 5 EA $5,000.00 $25,000.00 3 4" Sanitary Sewer Wye 3 EA $400.00 $1,200.00 5 Sawcut & remove east half of Shad (1,148 sq ft) 1 L.S. $11,480.00 $11,480.00 6 3" ACHM Surface w/ Tack coat 135 S.Y. $65.00 $8,775.00 7 6" Concrete 115 S.Y. $75.00 $8,625.00 8 Class 7 backfill/compact under road (173'x2x3'xl40) r 2000 75 Tons $42.00 $3,150.00 9 16" Steel Encasement 20 L.F. $210.00 $4,200.00 9 Clean & Test SWR 1 L.S. $3,600.00 $3,600.00 10 Seed/straw/final cleanup 1 L.S. $2,500.00 $2,500.00 11 Erosion Control 1 L.S. $1,500.00 $1,500.00 12 Bond SWR 1 L.S. $1,640.00 $1,640.00 13 Rock Excavation if needed 1 C.Y. $225.00 $225.00 14 Flowable fill if needed 1 C.Y. $150.00 $150.00 15 Additional Mh Depth 11 F.T. $150.00 $150.00 Total $107,012.25 Notes: 1) Traffic control included in line item 5 3) Contractor to consult Full Set of Plans to provide a complete bid. Items left off Unit Price Schedule need to be added and/or included by Contractor. Construction Plans have not been approved by the City; any addendums to the plans will be addressed by an issued revision and subsequent change orders. NORTHWEST ARKANSAS Democrat : (gazette f7 p SC.;6'c7 Fb.,'ET-E'i1LLE AP.•27C.2••:79.t4 rcc.•5 Ad. Bv9-Pie• •.:,'W.:WAN�C'1 AFFIDAVIT OF PUBLICATION I, Brittany Smith, do solemnly swear that I am the Accounting Legal Clerk of the Northwest Arkansas Democrat-Gazette, a daily newspaper printed and published in said County, State of Arkansas; that I was so related to this publication at and during the publication of the annexed legal advertisement the matter of: Notice pending in the Court, in said County, and at the dates of the several publications of said advertisement stated below, Ordinance:6384 Section I: That the City Council of and that during said periods and at said dates, said newspaper File Number: 2020-0990 the City of Fayetteville,Arkansas printed and had a bona fide circulation in said County; MIKE AGREEMENT:PARR COST SHARE hereby determines an exceptional was ty� situation exists in which competitive that said newspaper had been regularly printed and published AN ORDINANCE TO WAIVE bidding is deemed not feasible or FORMAL COMPETITIVE practical and therefore waives the in said County, and had a bona fide circulation therein for the BIDDING AND APPROVE A requirements of formal competitive period of one month before the date of the first publication of COST SHARE AGREEMENT bidding and approves a cost share WITH MIKE PARKER FOR agreement with Mike Parker,for the said advertisement;and that said advertisement was published CONSTRUCTION OF A SEWER construction of a sewer line along a in the regular daily issues of said newspaper as stated below. LINE ALONG A PORTION OF portion of North Shady Lane and a NORTH SHADY LANE AND A portion of property north of West PORTION OF PROPERTY Holly Street with a refund in an NORTH OF WEST HOLLY amount not to exceed S40,885.19 to City of Fayetteville STREET WITH A REFUND IN be paid by the City of Fayetteville Ord 6384 AN AMOUNT NOT TO EXCEED for the cost of improvements that $40,885.19 TO BE PAID BY THE exceed the rough proportionality of CITY OF FAYETTEVILLE FOR the impact of the development,and THE COST OF IMPROVEMENTS further approves a project THAT EXCEED THE ROUGH contingency in the amount of Was inserted in the Regular Edition on: PROPORTIONALITY OF THE $8,177.04. December 6 2020 IMPACT OF THE PASSED and APPROVED on DEVELOPMENT,AND TO 12/12020 APPROVE A PROJECT Approved: CONTINGENCY IN THE Lioneld Jordan,Mayor Publication Charges: $176.32 AMOUNT OF$8,I77.04 Attest: WHEREAS,Mike Parker has Kara Paxton,City Clerk Treasurer requested that the City share in the 75355414 Dec 6,2020 cost of constructing an 8-inch sewer main along a portion of North Shady Lane between North Brittany Smith Vandeventer Avenue and North Woolsey Avenue and across a portion of undeveloped property Subscribed and sworn to before me north of West Holly Street,a This 9 day off,2020. distance of approximately 548 feet, so that the area north of West Holly Street can be developed;and WHEREAS,constructing this segment of 8-inch sewer main will allow development of this property, will extend sewer service to an area in the core of the City that has never been served before,and will Notary Public also provide for ample future capacity which the City recognizes My Commission Expires: will be necessary for the area that is served by this sewer main;and .c01411_, WHEREAS,the City proposes to �a 2�242 enter into an agreement with Mike Olt " Parker to refund an amount of up to 0 • F0 �G $40,885.19,which represents the � C's" ���nt estimated cost of improvements **NOTE** :E 9F f1 that exceed the rough NOTE Please do not p': ¢fida4it proportionality of the Invoice will be sent. = development's impact. ^aK^'' NOW,THEREFORE,BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE,ARKANSAS: MIKE PARKER COST SHARE AGREEMENT Tim Nyander Submitted By City of Fayetteville Staff Review Form 2021-0678 Legistar File ID N/A City Council Meeting Date - Agenda Item Only N/A for Non -Agenda Item 8/30/2021 WATER SEWER (720) Submitted Date Division / Department Action Recommendation: Staff recommends approval to use contingency funds in the amount of $8,177.04 for the cost share agreement with Mike Parker to construct a sewer line on N. Shady Ln. Budget Impact: 5400.720.5700-5815.00 Water and Sewer Account Number Fund 04039.1 Water/Sewer Impact Fee Cost Sharing Project Number Budgeted Item? Yes Does item have a cost? Yes Budget Adjustment Attached? No Current Budget Funds Obligated Current Balance Item Cost Budget Adjustment Remaining Budget Project Title $ 3,200,474.00 $ 2,556,197.88 �$ --- 644,276.12 $ 8,177.04 $ 636,099.08 V20210527 Purchase Order Number: 2020-799 Previous Ordinance or Resolution # Ord. 6384 Change Order Number: Original Contract Number: Comments: Approval Date: 09/01/21 CITY OF FAYETTEVILLE ARKANSAS TO: Mayor Lioneld Jordan THRU: Susan Norton, Chief of Staff FROM: Tim Nyander, Utilities Director DATE: August 30, 2021 SUBJECT: Contingency for Mike Parker Sewer Cost Share STAFF MEMO RECOMMENDATION: Staff recommends approval to use contingency funds in the amount of $8,177.04 for the cost share agreement with Mike Parker to construct a sewer line on N. Shady Ln. BACKGROUND: Ordinance 6384 approved a cost share agreement with Mike Parker along N. Shady Ln. to facilitate a development north of W. Holly St. The not -to -exceed amount of the cost share agreement was $40,885.19, and a contingency was approved in the amount of $8,177.04. DISCUSSION: During construction, it was determined by City staff that several issues with drainage in the development area would need to be addressed. The preliminary engineering did not account for these changes recognized in the field during construction. The two change orders issued for the project total up to $56,375.00, but a large part of the work included items outside the scope of the sewer cost share agreement. City staff is requesting the use of contingency funds in the amount of $8,177.04 to cover the additional costs pertaining to the sewer construction. BUDGET/STAFF IMPACT: Funds are available in the Water/Sewer Impact Fee Cost Sharing account within the Water and Sewer fund. Attachments: Ordinance 6384 Documentation of Expenditures Mailing Address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 APPLICATION AND CERTIFICATION FOR PAYMENT AIA DOCUMENT G702 TO OWNER: Prime Real Estate & Development PROJECT: Parker Sewer Une APPLICATION NO: S Distributi t on o. 4762 N. Castlewood Lane Fayetteville, AR DATE. 6/7/2021 X OWNER Fayetteville, AR 72764 ENGINEER FROM: CONTRACTOR: Pavecon, Ltd. Co. PERIOD TO: 6/30/2021 PCONTRACTOR 706 S. Main St. ❑ Cave Springs, AR 72718 PROJECT NO: 20-870-017 CONTRACT FOR: Construction of a Sewer Une Extension CONTRACT DATE: September 29, 2020 CONTRACTOR'S APPLICATION FOR PAYMENT The undersigned Contractor certifies that to the best of the Contractor's knowledge, information and Application is made for payment, as shown below, in connection with the Contract belief the Work covered by this Application for Payment has been completed in accordance with the Continuation Sheet, AIA Document G703, is attached. Contract Documents, that all amounts have been paid by the Contractor for Work for which previous Certificates for Payment were Issued and payments received from the Owner, and that current payment shown herein is now due. 1. ORIGINAL CONTRACT SUM $ 102,750.00 2. Net change by Change Orden $ `S6 375 00 — 3. CONTRACT SUM TO DATE (Line 1 + 2) 5� 1S%125.D0 4. TOTAL COMPLETED 8, STORED TO DATE $ 159 125 00 (Column G on G703) n S. RFTAINAGE a. 0.00 %of Completed Work 0.00 (Column D + E on G703) b. %of Stored Material <, 0.00 (Column F on 6703) Total Retainage (lines Sa + Sb or Total in Column I of 6703) 5 0.00 6, TOTAL EARNED LESS RETAINAGE $ 159,225.000 (Une 4 Less Line S Total) 7. LESS PREVIOUS CERTIFICATES FOR PAYMENT (line 6 from prior Certificate) 5 153,825.00 8. CURRENT PAYMENT DUE S 300.00 9. BALANCE TO FINISH, INCLUDING RETAINAGE (Une 3 less Line 6) 0.00 CHANGE ORDER SUMMARY ADDITIONS DEDUCTIONS Total changes approved in previous months by Owner $51,07S.00 $0.00 Total approved this Month $S,300.00 TOTALS $56,375.00 $0.00 NET CHANGES by Change Order 1$56,375.00 CONTRACTOR: PAVECON, LTD By: Date State of: County of: Subscribed and sworn to before me this day of Notary Public: My Commission expires: ENGINEER'S CERTIFICATE FOR PAYMENT In accordance with the Contract Documents, based on on -site observations and the data comprising the application, the Architect certifies to the Owner that to the best of the Architect's knowledge, information and belief the Work has progressed as indicated, the quality of the Work is in accordance with the Contract Documents, and the Contractor is entitled to payment of the AMOUNT CERTIFIED AMOUNT CERTIFIED, 5 (Attach explonation if amount certified differs from the amount applied. Initial all figures on this Applicotion and on the Continuation Sheet that are changed to conform with the amount certified.) ARCHITECT: By: Date: This Certificate Is not negotiable. The AMOUNT CERTIFIED is payable only to the Contractor named herein. Issuance, payment and acceptance of payment are without prejudice to any rights of the Owner oI Contractor under this Contract. EIECFAMECFORMAI AIADUCVMENTGM2 APFUCATION AMDC1411 tION FOR PAYMENT 1"2[DIT,ON AIR, ellal7 IN[AMfR1(AN INSTITUTE OF M[MITFCIS, 17l5 NEW YORKAVE. NW WASNINGTpN,pC 2pp0f,S27I xu CONTINUATION SHEET AIA DOCUMENT 6703 AIA Document G702, APPLICATION AND CERTIFICATION FOR PAYMENT, containing Contractor's signed certification is attached. APPLICATION NO: 5 In tabulations below, amounts are stated to the nearest dollar. APPLICATION DATE: 6/7/2022 617 Use Column I on Contracts where variable retainage for line items may apply. PERIOD TO: 6 0/2/2021 PROTECT O:+ 20 870 017 A B C D E F G H I SCHEDULED VALUE WORK COMPLETED MATERIALS PRESENTLY TOTAL % COMPLETED (G + C) FROM PREVIOUS THIS PERIOD BALANCE TO FINISH fRTAINAGENO. DESCRIPTION OF WORK $ APPLICATION D E STORED AND STORED (C - G) VARIABLE RATE) 2 2 3 8" SanitarySewerline SDR-26 PVC w backfill Manhole 4" Sanitary Sewer Wye 4' sewer service $ 22 S77.65 $ 22.300.00 $ 900.00 $ 2 520.00 ( } $22,577.65 $22,300.00 $900.00 $2 520.00 (NOT IN D ORE TO DATE D+E+F $ 22 577.65 $ 22,300.00 $ 900.00 100.00% 100.00% 100.00% $ $ $ 4 5 Sawcut & remove east half of Shady (1,148 sq ft 3" ACHM Surface w Tack coat 6" Concrete $ 5 9S0.00 $ 9 348.7S $ 17,853.75 $S,9SO.00 $9,348.75 $17,853.75 $ 2,S20.00 $ S,950.00 $ 9,348.75 100.00% 100.00% 100.00% $ $ $ 6 7 8 Class 7 backfili/compact under road (173'x2x3'x140) / 2000 $ 1,931.25 $1,931.25 $ 17 853.75 $ 1,931.25 100.00% 1DO.00% $ $ 9 10 11 12 13 14 15 !CON Steel Encasement Clean Clean Test Seed/straw/final cleanup Erosion Control Bond SWR CO is 2 $ 2 16S.00 $ 5,475.00 $ 225000 $ 7,500.00 $ 1,978.60 5 S1 075.00 $ 5 300.00 $2 165.00 $S 475.00 $2 2SO.00 $7,500.00 $1,978.60 $51,075.00 5 300.00 $ 2 165.00 $ 5,475.00 $ 2,250.00 100.00% $ 100.00% IOO.00S6 $ $ $ 7 SO0.00 $ 1,978.60 $ 51,075.00 $ 5.300.00 100.00% $ lOO.00% 100.0(n $ $ 100.00% S APPLICATION AND CERTIFICATION FOR PAYMENT AIA DOCUMENT G702 TO OWNER: Prime Real Estate & Development PROJECT: Parker Sewer Line APPLICATION NO: 5 Distribution to: 4762 N. Castlewood Lane Fayetteville, AR DATE: 6/7/2021 DOWNER Fayetteville, AR 72764 ENGINEER FROM: CONTRACTOR: PavKon, Ltd. Co. PERIOD TO: 6/30/2021 HCONTRACTOR Q 706 S. Main St. ❑ Cave Springs, AR 72718 PROJECT NO: 20-870-017 CONTRACT FOR: Construction of a Sewer Line Extension CONTRACT DATE: September 29, 2020 CONTRACTOR'S APPLICATION FOR PAYMENT The undersigned Contractor certifies that to the best of the Contractor's knowledge, information and Application Is made for payment, as shown below, in connection with the Contract, belief the Work covered by this Application for Payment has been completed in accordance with the Continuation Sheet, AIA Document G703, Is attached. Contract Documents, that all amounts have been paid by the Contractor for Work for whkh previous Certtfkstes for Payment were issued and payments received from the Owner, and that current payment shown herein is now due. I. ORIGINAL CONTRACT SUM 2. Net change by Change Orders 3. CONTRACT SUM TO DATE 4. TOTAL COMPLETED i STORED TO DATE (Column G on G703) 5. RETAINAGE: s. 0.00 %of Completed Work (Column D + Eon G703) b. %of Stored Material (Column F on G703) Total Retainage (Lines So ♦ Sb or Total in Column t of G703) (Line 1 ♦ 2) $ 0.00 S 0.00 6. TOTAL EARNED LESS RETAINAGE (Line 4 less Una S Total) 7. LESS PREVIOUS CERTIFICATES FOR PAYMENT (line 6 from prior Certificate) S. CURRENT PAYMENT DUE 9. BALANCE TO FINISH, INCLUOING RETAINAGE (Line 3 less Una 6) $ 0.00 S 102,750.00 S 56,37S.00 $ 1S9,125. $ 1S9,12S.00 $ 0.00 $ 159,125.000 $ 153,825.00 1-3 5,300.00 71 CHANGE ORDER SUMMARY ADDITIONS DEDUCTIONS Total changes approved In Previous months by Owner SS1,07S.00 S0.00 Total approved this Month SS,300.00 TOTALS $56,375.00 $0.00 NET CHANGES by Cho nSe Order $S6,37S.00 CONTRACTOR: PAVECON, LTD. State o County Notary Public: My cepmwt ENGINEER'S CERTIFICATE FOR PAYMENT P�'/�- LIANA LAURA WALLAC +ro day tarry Public. State of lex m. Ex0lres 08.05-202 Notary ID 128697016 In accordance with the Contract Documents, based on on -ski observations and the data comprising the application, the Architect certifies to the Owner that to the best of the Architect's knowledge, information and belief the Work has progressed as indicated, the quality of the Work Is In accordance with the Contract Documents, and the Contractor is entitled to payment of the AMOUNT CERTIFIED. AMOUNT CERTIFIED.. S (Attach eaPlonation 11 omount certified differs from the amount applied. Initial oll figures on this Application and on the Continuation Sheet that ore changed to conform with the arnount certifled.) ARCHITECT: By: Date: This Certifkte is not negotiable. The AMOUNT CERTIFIED Is payable only to the Contractor named herein. Issuance, pay -ant and acceptance of payment are without prejudice to any rights of the Owner or Contractor under this Contract. F1fCTRCOWFORMAT I oocLw*NTr7OI AMUCAr10NM10 CERTFICATim F011 IAt WAt 1992FOITION AIA 01992 THE "W "CAF1 W571TUTE Of AM1aTFC7S. 173S MW TOAR AVC, M W. WMNWG70N, DC 200WS292 Pig,r.e,r 4, Parker Sewer Line Extension Change Order #1 20-870-017A Haul off of unsuitable materials from ditch line/ per City of Fayetteville Import select fill for ditch line / per the City of Fayetteville 2' x 2' Grated Inlets WADS Storm Drain Line Concrete Dam to Redirect ground water Rock Excavaton/OverExcavation/Haul off of Rock Additional Erosion Control Concrete Pipe / Street & patch Street Patch for Conrete Pipe CITY Unit 38 42 Loads Loads 3 EA 17S LF 1 160 200 LS CY LF 2S LF 1 LS Unit Price $ 150.04 $ $ 200.00 $ $ 2,600.00 $ $ 24. $ 2,500. $ $ 110.00 $ $ 3.50 $ $ 39.00 $ $ 3,200.00 $ 5,700.00 8,400.00 7,800.00 17,600.00 700.00 975.00 3,200.00 Total = $ 51,075.�j f APPLICATION AND CERTIFICATION FOR PAYMENT TO OWNER: Prime Real Estate & Development 4762 N. Castlewood Lane Fayetteville, AR 72764 FROM: CONTRACTOR: Pavecon, Ltd. Co. 706 S. Main St. CONTRACT FOR: Cave Springs, AR 72718 AIA DOCUMENT G702 PROJECT: Parker Sewer Une APPLICATION NO: Fayetteville, AR DATE: of a Sewer Une Extension CONTRACTOR'S APPLICATION FOR PAYMENT Apolkation Is made for payment, as shown below, in connection with the Contract. Continuation Sheet, AIA Document G703, Is attached. I. ORIGINAL CONTRACT SUM $ 102,750.00 2. Nat change by Change Orden S 3. CONTRACT SUM TO DATE (Une 1 + 2) S 1 Si 4. TOTAL COMPLETED A STORED TO DATE )Column G on 6703) $S S. RETAINAGE: a. 0.00 %of Completed Work TcWu—mn D+ E on G703) b. % of Stored Material F on G703) Total Retablage (Lines Sa + Sb or Total in Column I of G7031 6. TOTAL EARNED LESS RETAINAGE (Une 4 Less tine S Total) 7. LESS PREVIOUS CERTIFlCATES FOR PAYMENT (Une 6 from prior Certificate) B. CURRENT PAYMENT DUE 9. BALANCE TO FINISH, INCLUDING RETAINA66 (Line 3 less Une 6) S 0.00 0.00 S 0.00 S 011,397.eS0 S 46,8b4A9 MA PERIOD TO: 2 1/29/2021 ' 1/31/2021 PROTECT NO: 20-87"17 2020 F0' 9 (-21 Distribution to: X OWNER ENGINEER ? CONTRACTOR alp \1 The undersigned Contractor tertHks that to the best of the Contractor's knowledge, kdomna belief the Work covered by this Appikation for payn e , has been completed In accordance wdth the Contract Documents, that an anwunts have been paid by the Cortraapr for Work for which previous Certificates for Payment were Issued and payments received from the Owner, and that current payment shown herein Is now due. CONTRACTOR: PAVECON, LTD. Data: State of:7210AtJ County of: ZiAi41AX_, Su cribediliqlapWR to Notary Public Myal i ENGINEER'S CERTIFICATE FOR PAYMENT , DIANA LAURA WALLA( d+Y _ - oP}ibtiC. State of Te .. +Q; O>;T 1 Expires 08-05.20 �`' Notary ID 128697016 In accordance with the Contract Documents, based on on site observations and the den comprising the appikatkm, the Architect certifier to the OWrtar that to the best of the Architect's knowledge, Information and belief the Work has programed as Indicated, the nudity of the Work Is In accordance with the Contract Documents, ant the Contractor is entitled to payment of the AMOUNT CERTIFIED. AMOUNT CERTIFIED .. S /Attoth'"Plonatlat It ammount tented dVlws Jrem the amount appNed. Inidol oN j9pures an this APONoaflan and on the Contlauotlon Sheet that are thomOad to eon)onm ARCWTECr: with Me amount certl/kd ) ay: Date: This Certlllcate is not nagotiablt. The AMOUNT CERTIFIED Is payable only to the Contractor named herein. Issuance, payment and acceptance of paymaM an without prejudice to any rights of the Owner or Contractor under this Contract. "Cr""K FOAAMT. AIA OOCURAWT OM- A►PiKAUM AND CFRTaKAnM FM pAV"W. L Mr0MON•AIA •aIMF TM AMOKM/ "TnM 00 AACWFKM 1"S NAY rain AYr., M.W. WAwaftWON. DC X"&%MF PARKER INVESTMENTS LLC W-P167/3031 158 IlOBOX s� FA DATE FAYhiTEVIL1LLE, AR 72703 I i 2 ����,,�/y�� $ CifJ ,3CCz35,- Tr — PAY to�l Y _ ®� THE OMRDER . Grand SavingsBank htcMa SP.Lc � — 1:303187675l: L0044074211' 0 513 t fOR i1144 I�MIMO �I fW ibWG 11�! [ua�1 fO1M11E� M[�T4e�C11K Ww T4150M�K1t 1�1- N APPLICATION AND CERTIFICATION FOR PAYMENT AIA DOCUMENT G702 TO OWNER: Prime Real Estate R Development PROJECT: Parker Sewer Une APPLICATION NO: 4762 N. Castlewood Lane Fayetteville, AR 4 Distribution to: Fayetteville, AR 72764 DATE: 4/22/2021 x OWNER ENGINEER FROM: CONTRACTOR: Pavecon, ltd. Co. PERIOD TO: 4/30/2021 CONTRACTOR 706 S. Main St. Cave Springs, AR 72718 PROJECT NO: 20-870-017 CONTRACT FOR: Cpttspuctim of a Sewer Une Extension CONTRACT DATE: 29, 2020 CONTRACTOR'S APPLICATION FOR PAYMENT Application Is made for payment, as shown below, in connection with the Contract. The undersigned Contractor certifies that to the [test of the C'knowledge, information and Continuation Sheet, AIA Document G703, is attached. belief the Work covered by this Application fContinuation Payment has been completed in accordance with the Contract Documents, that all amounts have been paid by the Contractor for Work for which previous Certificates lot Payment were issued and payments received from the Owner, and that current payment shown herein Is now due. I. ORIGINAL CONTRACT SUM 2. Net change by Change Orders 3. CONTRACT SUM TO DATE 4. TOTAL COMPLETED i STORED TO DATE (Column G on G703) S. RETAINAGE: A. MW %of Completed Work (Column D+ E on GM) b. % of Stored Material (Column F on 6703) Total Retainage (Unes Sa • Sb or Total In Column I of G703) 6. TOTAL EARNED LESS RETAINAGE (Une 4 Less Une S Total) 7. LESS PREVIOUS CERTIFICATES FOR PAYMENT (Une 6 from prior Certificate) 8 CURRENT PAYMENT DUE 4. NALANCE TO FINISH, INCLUDING RETAINAGE (Une 3 hiss Une 6) S S 302,7S0.00 S 51, 75. (Une 1 r 21 S S iS31925-W 6.W 0.00 S 0.00 S 153,i2S.000 S 139,472.65 14.3S2.3S 0.W SUMMARY ADDITIONShanges 7CHANIGERDER approved ious months by Owner SS1D7 50.00 roved this Month 50.00 TOTALS 551,07S.00 S0,00 NET CHANGES byChange Order I$51,07S.00 CONTRACTOR: PAVECON, LTD. By: ��+/lblGLiirC a ♦ 28 ZaN _Date: Stale of:.``ttwlgry County of:Z-OK �vrr op r,, DIANA WUgA WALLACE SErtnuoday1' Public. State of Texas Nolary pubCOMM Expires 08-05.2023 My Notary ID 128697016 rag ENGINEER'S CERTIFICATE FOR PAYMENT In accordance with the Contract Documents, based on on -site observations and the data comprising the apPlicatlon, the Architect certifies to the Owner that to the best of the Architect's knowledge, information and belief the Work has progressed as indicated, the quality of the Work is in accordance with the Contract Documents, and the Contractor is entitled to payment of the AMOUNT CERTIFIED. AMOUNT CERTIFIED. 5 (Attach taplonotion if amount certi%ied diffen from the amount applied. initial ou flpum on this Application and on the Ca itioupMon Sheet that are changed to conform with the amount certified,) ARCHITECT. By: Date: This Certificate is not negotiable. The AMOUNT CERTIFIED Is payable only to the Contractor named herein. Issuance, payment and acceptance of payment are without prejiudice to any rights of the Owner or Contractor under this Contract. EtLC1AONIC rOI1W1. yA DOEUiAEy1GAl AwIKAt,DAANo ESA KArNNEOa ►.,NNft1 1",EDITION AiA 0 1"2 'M AWAKAAI INSTITUTE wARtNREMT 111E MEW TORN AVE, M.W.• WASNINGTOn, at 2®4U/7 l /0 L CONTINUATION SHEET A/A DOCUMENT G703 AIA Document G702. APPI ICATInro ANn rccnarnr.nu APPLICATION NO: a Contractor's signed certification Is attached. 4/22, In tabulations below, amounts are stated to the nearest dollar. APPLICATION DATE: /2021021 PERIOD 7 0/20: 4/30/2 Use Column I on Contracts where variable retainage for line items may apply. PROTECT O:I 1(}870 - A rTEM B C D E F G H I NO. DESCRIPTION OF WORK SCHEDULED VALUE $ WORK COMPLETED MATERIALS PRESENTLY STORED (NOT IN TOTAL COMPLETED AND STORED TO DATE % (G _ C) BALANCE TO FINISH (C _ G) RETAINAGE (IF VARIABLE RATE) FROM PREVIOUS APPLICATION (D+ E) THIS PERIOD D ORE D+E+F 1 8" Sancta Sewerline SDR-26 PVC w backfill $ 22,577.65 $22,577.65 $ 22 2 Manhole 5 22,300.00 $22,300.00 577.65 $ 22,300.00 100.00% $ 3 4" Sancta Sewer Wye $ 900.00 $900.00 100.00% $ 4 4" sewer service $ 2,520.00 $2,520.00 $ 900.00 $ 2,S20.00 100.00% $ 5 Sawcut & remove east half of Shady (1448 ft $ 5,950.00 $5,9S0.00 S 100.00% $ 6 3" AC Surface w Tack coat $ 9,348.75 $4,7D0.00 $4,648.75 5,950.00 $ 9,348.7S 100.00—% $ 7 6" Concrete $ 17,853.75 $17,853.75 $ 100 00% $ Class 7 backfill/compact under road (173'x2x3'x140) / 17,853.7S 100.00% $ 8 2 5 1,931.25 $1,931.25 5 1,931.25 100,00% $ 9 16" Steel Encasement $ 2,165.00 $2,165.00 $ 10 Clean & Test SWR $ S 475.00 $5,47S.00 2,165.00 $ S,475.00 100.00% 100.00% $ $ 11 Seed straw final cleanup Erosion Control $ 2,250.00 $ 7,500.00 $7,500.00 $2,250.00 $ 2,250.00 100.00% $ 12 13 Bond SWR $ 7,500.00 100.00% $ S 1,978.60 $1,978.60 $ 1,978.60 100.00% 14 CO p 1 $ Sl 07S.00 $51,075.00 $ $ 51075.00 100.00% $ - $ 1S3 825.00 5239,472.65 $14,3S2.35 $0.00 $ 153,82S.00 1 100.00% $ PARKER INVESTMENTS LLC 96-8767/3MI 126 PO sox 9951 FAYETTEVILLE,AR 72703 DATE � - L (8 TO PAY$51 �Y o7s� r— � Q� THF(NtlllROh /� �L4-J!_L.�C / SOLI ARS F We a� (' Grand Savings Bannk rrr.aaod�avlop6ukma A ��_ ,� MEMO my r 1:30318?6?51: 100440?42nd 0L2L LOM rM MAUD.WTOW Mo MAioaaa immuom Tw sseww T auwa Am N Y."Ac"ft awe on . or PARKER INVESTMENTS LLC PO BOX 9951 FAYET MVILLE, AR 72703 (Grand Saving.Ba V-daavins"mr cm l MFMU 1:30318?6?51: 66-878N3MI DATE � 7— (16. 100440?4&m 0i25 loon 10R riuwoanAw�a+uru�p a1CWOaq Tw aeCla�iv tou awwanneAcnva wK. on�uoa ate. 125 APPLICATION AND CERTIFICATION FOR PAYMENT H '�14V�__ A!A DOCUMENT G702 TO OWNER: Prime Real Estate 6 Development PROJECT: Parker Sewer Line APPLICATION NO: S Distribution to: 4762 N. Castlewood Lane Fayetteville, AR DATE: 6/7/2021 NENGINEER OWNER Fayetteville, AR 72764 PERIOD TO: 6/30/2021 CONTRACTOR FROM: CONTRACTOR: Pavecon, Ltd. Co. 706 S. Main St. Cave Springs, AR 72718 PROJECT NO: 20-870-017 CONTRACT FOR:--Qirts`trucMon of a Sewer Une Extension CONTRACT DATE: September 29, 2020 CONTRACTOR'S APPLICATION FOR PAYMENT The undersigned Contractor certifies that to the best of the Contractor's knowledge, information and Application Is made for payment, as shown below, in connection with the Contract. belief the Work covered by this Application for Payment has been completed in accordance with the Continuation Sheet, AIA Document G703, Is attached. Contract Documents, that all amounts have been paid by the Contractor for Work for which previous Certificates for Payment were issued and payments received from the owner, and that current payment shown herein Is now due. 1. ORIGINAL CONTRACT SUM 2. Net change by Change Orders 3. CONTRACT SUM TO DATE 4. TOTAL COMPLETED & STORED TO DATE (Column G on 67031 S. RETAINAGE: a. 0.00 %of Completed Work (Corn 0 + E on G703) b. %of Stored Material C umn F on G703) Taal Retainage (Uses So +Sb or Total in Column I of G703) (Line 1 + 2) S 0.00 S 0.00 6. TOTAL EARNED LESS RETAINAGE (tine 4 Lan Line S Total) 7. LESS PREVIOUS CERTIFI ATES FOR PAYMENT (Lice 6 from prim Certificate) B. CURRENT PAYMENT DUE 9. BALANCE TO FINISH, INCLUDING RETAINAGE (Litre 3 less Une 6) $ $ 102,7S0.00 CONTRACTOR: PAVECON, LTD. S 75.00 $ 1S ,12S.00 $ 159,125.00 By: 06V17� Date: State of:" rWA-e, aalul Courntyo S �` Notary Public 'a Ob ltb 4,77{ day s 4 MY 5 0.00 $ 159,225.000 ENGINEER'S CERTIFICATE FOR PAYMENT In accordance with the Contract Documents, based on on-ske observations and the data comprising the application, the Architect certifies to the Owner that to the best of the Architect's knowledge, S j 133715�00 information and belief the Work has progressed as Indicated, the quality of the work Is In accordance j with the Contract Documents, and the Contractor is entitled to payment of the AMOUNT CERTIFIED. i � JJJ 0 �hl1OUNT CERTIFIED .. S / A CHANGE ER SUMMARY N Total changes approved in previous monthsby Owner $51,07S.00 $0.00 Total ved this Month $5,300.00 TOTALS1 $56,375.W $0.00 NET CHANGES by Champ Oder 1 S56,375.00 fLECTAONK aOaMAT AM DOWMENT GN2 44MKAY104 MD CEST51CATM fall P&IMINT • 1"2 r01110N -AY Olin ttach explanation If amount certiped differs from the amount applied. Initial all figures on this AppNtatlon and an the Continuation Sheet that are changed to conform with the omoun r certified.) ARCHITECT: ey: Date: DIANA LAURA WALLAC Ery Public. State of Ter Er £xDlres 08-U5.20: Notary IU 128697016 This Certificate is not negotiable. The AMOUNT CERTIFIED Is payable only to the Contractor named herein. Issuance, payment and acceptance of payment are without prejudice to any rights of the Owner or Contractor under this Contract. — — T/I[ 1 1CAN WSTITVn 0{�epAT� e � R\ 1TSS NEW VM AVE, ILW. WASH"ayoK DC 10006.1210 fLECTAONK aOaMAT AM DOWMENT GN2 44MKAY104 MD CEST51CATM fall P&IMINT • 1"2 r01110N -AY Olin ttach explanation If amount certiped differs from the amount applied. Initial all figures on this AppNtatlon and an the Continuation Sheet that are changed to conform with the omoun r certified.) ARCHITECT: ey: Date: DIANA LAURA WALLAC Ery Public. State of Ter Er £xDlres 08-U5.20: Notary IU 128697016 This Certificate is not negotiable. The AMOUNT CERTIFIED Is payable only to the Contractor named herein. Issuance, payment and acceptance of payment are without prejudice to any rights of the Owner or Contractor under this Contract. — — T/I[ 1 1CAN WSTITVn 0{�epAT� e � R\ 1TSS NEW VM AVE, ILW. WASH"ayoK DC 10006.1210 CONTINUATION SHEET AIA DOCUMENT G703 AIA Document G702, APPLICATION AND CERTIFICATION FOR PAYMENT, containing APPLICATION NO: 5 Contractor's signed certification is attached. APPLICATION DATE: 6/7/2021 In tabulations below, amounts are stated to the nearest dollar. PERIOD TO: 6/30/2021 Use Column I on Contracts where variable retainage for line items may apply. PROJECT NO:I 20-870.017 A B C D E F G H I IT DESCRIPTION OF WORK SCHEDULED VALUE $ WORK COMPLETED MATERIALS PRESENTLY STORED (NOT IN D ORE) TOTAL COMPLETED AND STORED TO DATE (D+E+F % (G + C) BALANCE TO FINISH (C . G) RETAINAGE (IF VARIABLE RATE) NO. FROM PREVIOUS APPLICATION (D + E) THIS PERIOD 1 8" Sanitary Sewerline SOR-26 PVC wl backfill $ 22 577.65 $22 577.65 $ 22,S77.65 100.00% $ 2 Manhole S 22 300.00 $22 300.00 S 22,300.00 100.OD% $ 3 4" Sanitary Sewer $ 900.00 $900.D0 $ 900.00 100.00% S 4 4" sewer service $ 2520.00 $2 520.00 $ 2 520.00 1D0.00% $ S Sawcut & remove east half of Sh 1,148 jqft S 5 950.00 $5,9S0.00 $ 5,950.00 100.D0% $ 6 3" ACHM Surface w Tack coat 5 9,348.75 $9,348.75 S 9,348.75 100.D0% $ 7 6" Concrete $ 17,853.75 $17,853.7S $ 17,8S3.75 100.00% S 8 Class 7 backfill/compact under road (173'x2x3'x140) / 2000 $ 1,931.25 $1,931.25 $ 1,931.25 100.00% $ 9 16" Steel Encasement $ 2 16S-00 $2 165.00 $ 2,165.00 100.00% $ 10 Clean & Test SWR $ S,475.00 $5 475.00 $ 5,475.D0 100.D0% $ 11 Seed straw final cleanup $ 2,250.00 $2,250.00 $ 2,250.00 100.001A $ 12 Erosion Control $ 7,500.00 $7,500.00 $ 7,500.00 100.DO% $ 13 Bond SWR $ 1978.60 $1,978.60 $ 1,978.60 100.DD% $ 14 CO # 1 5 S1 075.00 $51,075.00 $ S1,075.00 100.00% $ 15 CO # 2 S 300.00 $5 300.00 S 300.00 100.00% $ 5 159125.00 S153,82S.00 $5,300.00 $0.00 5 159,125.00 100.00% $ CONTINUATION SHEET AIA Document G702, APPLICATION AND CERTIFICATION FOR PAYMENT, containing AIA DOCUMENT 6703 Contractor's signed certification is attached. APPLICATION NO: In tabulations below, amounts are stated to the nearest dollar. APPLICATION DATE: 1/29/2021 Use Column I on Contracts where variable retainage for fine items may apply. a I PERIOD TO: 1/31/2021 PROJECT NO: ZU Fi 70 O1 A B ITEM C SCHEDULED NO. D WORK COMPLETED E F MATERIALS G TOTAL H I VALUE DESCRIPTION Of WORK $ FROM PREVIOUS THIS PERIOD PRESENTLY COMPLETED 46 IG y C) BALANCC RCTAINAGI TO FINISH APPLICATION STORED AND STORED (IF VA (C - G) (D + E) (NOT IN TO DATE RATE) 1 B' Sanka Sewerli SDR D OR E D+E+F 2 ne 26 PVC w backfill Manhole $ 22,577.65 $16,933.24 $5,644.41 $ 22,577.65 3 4" Sanka Sewer a $ $ 22,300.00 900.00 $11,150.00 $11,1S0.00 $ 22,300 00 100.00% 100 00% $ $ 4 4" sewer service $ 2,520.00 $900.00 $2,520.00 $ 900.00 100.00% $ S Sawcut & remove east half of Shad 1 148 ft $ 5,950.00 $S,950.00 $ 2,520.00 300.00% $ 6 3" ACHM Surface w Tack coat $ 9,348.75 $ 5,9S0.00 100.00% $ - 7 6" Concrete $ 17 853.75 $4,700.00 $17,853.75 $ 4700.00 S0.27% $ 4,648J5 8 ss 7 backfili/compact under road (173'x2x3'x140) / CltSeed/st�rn�w/final $ 17,853.75 100.00% $ $ 2,931.25 $1,931.25 $ 9 asement 5 2 1,931.25 100.00% $ 10 SWR $ 16S.00 S 475.00 $2,165.00 $ 2,165.00 100.00% $ $ 21 cleanu $ 2,250.00 $ 5,475.00 12 Erosion Control $ 7 500.00 $7,500.00 $ 0 $ 2,250.00 13 Bond SWR 1 978.60 $ 7,500.00 100.00% $ - - 0•�4 1978.60 102 750.00 $46,884.49 $41,513.16 88,397.6S 73.10% $ 14,352.35 CONTINUATION SHEET AIA Document G702, APPLICATION AND CERTIFICATION FOR PAYMENT, containing AJA DOCUMENT G703 Contractor's signed certification is attached. APPLICATION NO: 5 In tabulations below, amounts are stated to the nearest dollar. APPLICATION DATE: 6/7/2021 Use Column I on Contracts where variable retainage for line items may apply. Y PP Y PERIOD TO: 6/30/2021 PROJECT NO:� 20-870.01 7 A B ITEM NO. C SCHEDULED D WORK COMPLETED E F MA TEMALS G TOTAL H DESCRIPTION OF WORK VALUE $ FROM PREVIOUS THIS PERIOD PRESENTLY COMPLETED /� {G t C) BALANCE TO FINISH RETAINAGE (IF VARIABLE APPLICATION (D + E) STORED AND STORED (C - G) RATE) (NOTIN TO DATE 1 8" SewerlineSDR-26 PVC $ 22 577.65 $22,577.65 D OR E D2+2E,+5F7 2 MaSanta nhoe $ 22 300.00 522,300.00 $ 7.65 100.00% $ 3 4" Sanita Sewer ul e $ 900.00 $900.00 $ 22,300.00 l00.00% $ 4 4" sewer service 2 520.00 $2520.00 $ 900 00 100 00% $ 5 Sawcut &remove east half of -ha 1 148 s ft $ 5,950.00 , $5,950.00 $ 2,5Z0.00 i00.OtJ% $ - 6 3" ACHM Surface w Tack coat $ 9,348.75 $9,348.75 $ 5,950.00 100.00% $ 7 6" Concrete $ 17,853.75 $17,853.75 $ 9,348.75 100.00% $ 8 Class 7 backfill/compact under road (173'xZx3'x140) / $ 17,953.75 100.009'. $ 2000 $ 1,931.25 $1,931.25 $ 1,931.25 9 16" Steel Encasement 100.00°.6 $ 10 Clean & Test SWR $ $ 2,165.00 $2,165.00 $ 2,165.00 100.-- $ 11 Seed straw final cleanu $ 5,475.00 2,250.00 $5,475.00 $ S,475.00 100.00% $ 12 Erosion Control $ 7 500.00 $2,250.00 $7,SOO.OD $ 2,250.00 100.00% $ 13 Band SWR $ 1,978.60 $1,978.60 $ 7,500.00 100.00% $ 14 CO M 1 $ 51,075.00 $51,075.00 5 1,978.60 100.D0% $ 15 CO p 2 $ 5 300.00 $5 300.00 5 51,075.00 100.00% $ $ 5,300.00 100.00% $ $ 159,125.00 $153,825.00 $5,300.00 $0.00 $ 159,125.00 100.00% S CONTINUATION SHEET AJA OOCUMFNT G703 AIA Document G702, APPLICATION AND CERTIFICATION FOR PAYMENT, containing APPLICATION NO: Contractor's signed certification is attached. In tabulations below, amounts are stated to the nearest dollar. Use Column I on Contracts where variable retainage for line items may apply. APPLICATION DATE: 6/7/2021 PERIOD TO: 6/30/2021 PROJECT NO:20-870-017 A ITIEM NO. N 19 DESCRIPTION OF WORK 8" Sanitary Sewerline SDR-26 PVC w backfill IManhole 4" Sanity Sewer W e 4" sewer service Sawcut & remove east half of Shady(1,148 ft 3" ACHM Surface w Tack coat $ S $ $ S $ C SCHEDULED VALUE $ 22,577.65 22,300.00 900.00 2 520.00 5,950.00 9,348.75 D WORK COMPLETED E F MATERIALS PRESENTLY STORED (NOT IN o ORE $ $ $ $ $ G TOTAL COMPLETED AND STORED TO DATE D+E+F 22,577.65 22,300.00 900.00 2,520.00 5,950.00 5,950.00 % (G + C) 100.00% 500.00% 100.00% 100.00% 300.00% $ $ $ $ $ H BALANCE TO FINISH (C - G) RETAINAGE (If VARIABLE RATE) FROM PREVIOUS APPLICATION (D + E) $22,577.65 $22,300.00 $900.00 52,S20.00 55 950.00 59,348.75 THIS PERIOD 1 2 3 4 5 6 7 8 6" Concrete Class 7 backfill/compact under road (173'x2x3'x140) / 2 $ $ $ $ $ $ $ $ S S 17,853.75 1,931.25 2 16S.00 5,475.00 2 250.00 7,500.00 1,978.60 51075.00 5 300.OD 159.12r.an I $17,8S3.75 $1,931.2S $2,165.00 $5,475.00 $7,500.00 $1,978.60 $51,075.00 51Sa R7S nn I $5 300.00 cc ar., nn $ $ $ $ $ $ $ $ $ $ 17,853.75 1,931.25 2,165.00 ,16$2,250.00 5.00 2,250.00 7,500.00 1,978.60 51,075.00 5,300.00 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% $ $ $ 9 10 11 12 13 14 15 16" Steel Encasement Clean & Test SWR Seed/straw/final cleanup Erosion Control Bond SWR CO # 1 CO # 2 $ $ $ $ $ $ $ - — — — ....alai 1 7 1�-7,1Ln,.4R7 I luu.uu%i 1 5 - ` GF FLYf TTk,'! L f v � �'FR4N5 PS 113 West Mountain Street Fayetteville. AR 72701 (479) 575-8323 Ordinance: 6384 File Number: 2020-0990 MIKE PARKER COST SHARE AGREEMENT: AN ORDINANCE TO WAIVE FORMAL COMPETITIVE BIDDING AND APPROVE A COST SHARE AGREEMENT WITH MIKE PARKER FOR CONSTRUCTION OF A SEWER LINE ALONG A PORTION OF NORTH SHADY LANE AND A PORTION OF PROPERTY NORTH OF WEST HOLLY STREET WITH A REFUND IN AN AMOUNT NOT TO EXCEED $40,885.19 TO BE PAID BY THE CITY OF FAYETTEVILLE FOR THE COST OF IMPROVEMENTS THAT EXCEED THE ROUGH PROPORTIONALITY OF THE IMPACT OF THE DEVELOPMENT, AND TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $8,177.04 WHEREAS, Mike Parker has requested that the City share in the cost of constructing an 8-inch sewer main along a portion of North Shady Lane between North Vandeventer Avenue and North Woolsey Avenue and across a portion of undeveloped property north of West Holly Street, a distance of approximately 548 feet, so that the area north of West Holly Street can be developed; and WHEREAS, constructing this segment of 8-inch sewer main will allow development of this property, will extend sewer service to an area in the core of the City that has never been served before, and will also provide for ample future capacity which the City recognizes will be necessary for the area that is served by this sewer main; and WHEREAS, the City proposes to enter into an agreement with Mike Parker to refund an amount of up to $40,885.19, which represents the estimated cost of improvements that exceed the rough proportionality of the development's impact. NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: P8991 PnVftd on 12&W Ordinance 6384 File Number 2020-0990 Section 1: That the City Council of the City of Fayetteville, Arkansas hereby determines an exceptional situation exists in which competitive bidding is deemed not feasible or practical and therefore waives the requirements of formal competitive bidding and approves a cost share agreement with Mike Parker, for the construction of a sewer line along a portion of North Shady Lane and a portion of property north of West Holly Street with a refund in an amount not to exceed S40,885.19 to be paid by the City of Fayetteville for the cost of improvements that exceed the rough proportionality of the impact of the development, and further approves a project contingency in the amount of S8.177.04. PASSED and APPROVED on 12/1/2020 Attest: ♦`` G`ER K Y Kara Paxton. City Clerk Treasut2r FAY f7 •�: • EILL — �14', �ONt i OP',% v� Page 2 Ah. on 12%w