Loading...
HomeMy WebLinkAbout272-20 RESOULTION113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 Resolution: 272-20 File Number: 2020-0897 BID 420-76 CROSSLAND HEAVY CONTRACTORS, INC.: A RESOLUTION TO AWARD BID #20-76 AND AUTHORIZE A CONTRACT WITH CROSSLAND HEAVY CONTRACTORS, INC. IN THE AMOUNT OF $212,751.03 FOR CONSTRUCTION RELATED TO THE INSTALLATION OF LARGE SLIDE GATES FOR THE AERATION BASIN AT THE NOLAND WATER RESOURCE RECOVERY FACILITY, AND TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $42,550.21 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby awards Bid #20-76 and authorizes Mayor Jordan to sign a contract with Crossland Heavy Contractors, Inc. in the amount of $212,751.03 for construction related to the installation of large slide gates for the aeration basin located at the Noland Water Resource Recovery Facility, and further approves a project contingency in the amount of $42,550.21. PASSED and APPROVED on 11/5/2020 Page 1 Pdlnted on 11/QR0 Resolution: 272-20 File Number: 2020-0897 Attest: v Kara Paxton. City Clerk TreasurdEvi LL NS djjION CO O , +,```` Page 2 Printed on 1116120 City of Fayetteville, Arkansas 113 West Mountain Street Fayetteville, AR 72701 I (479) 575-8323 i Text File = File Number: 2020-0897 Agenda Date: 11/5/2020 Version: 1 Status: Passed In Control: City Council Meeting File Type: Resolution Agenda Number: A 4 BID #20-76 CROSSLAND HEAVY CONTRACTORS, INC.: A RESOLUTION TO AWARD BID #20-76 AND AUTHORIZE A CONTRACT WITH CROSSLAND HEAVY CONTRACTORS, INC. IN THE AMOUNT OF $212,751.03 FOR CONSTRUCTION RELATED TO THE INSTALLATION OF LARGE SLIDE GATES FOR THE AERATION BASIN AT THE NOLAND WATER RESOURCE RECOVERY FACILITY, AND TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $42,550.21 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby awards Bid #20-76 and authorizes Mayor Jordan to sign a contract with Crossland Heavy Contractors, Inc. in the amount of $212,751.03 for construction related to the installation of large slide gates for the aeration basin located at the Noland Water Resource Recovery Facility, and further approves a project contingency in the amount of $42,550.21. City of Fayetteville, Arkansas Page 1 Printed on 111612020 Tim Nyander Submitted By City of Fayetteville Staff Review Form 2020-0897 Legistar File ID 11/5/2020 City Council Meeting Date - Agenda Item Only N/A for Non -Agenda Item 10/13/2020 WASTEWATER TREATMENT (730) Submitted Date Division / Department Action Recommendation: Staff recommends awarding Bid #20-76 and approving a construction contract with Crossland Heavy Contractors, Inc. in the amount of $212,751.03 for construction related to the installation of large slide gates for the aeration basin located at the Noland Water Resource Recovery Facility, and approving a project contingency in the amount of $42,550.21. 5400.730.5800-5801.00 Account Number 02032.1 Project Number Budgeted Item? Yes Does item have a cost? Yes Budget Adjustment Attached? No Budget Impact: Water and Sewer Fund WWTP - Building Improvements Project Title Current Budget Funds Obligated Current Balance Item Cost Budget Adjustment Remaining Budget $ 3,887,656.00 $ 2,992,435.48 895,220.52 $ 255,301.24 $ 639,919.28 V20180321 Purchase Order Number: Previous Ordinance or Resolution # Change Order Number: Original Contract Number: Comments: Approval Date: CITY OF FAYETTEVILLE W4W ARKANSAS MEETING OF NOVEMBER 5, 2020 TO: Mayor and City Council THRU: Susan Norton, Chief of Staff Tim Nyander, Utilities Director FROM: Corey Granderson, Utilities Engineer DATE: October 13, 2020 CITY COUNCIL MEMO SUBJECT: Bid #20-76, Crossland Heavy Contractors, Inc. — Construction Contract for Noland WRRF Aeration Basin Gates Installation RECOMMENDATION: Staff recommends awarding Bid #20-76 and approving a construction contract with Crossland Heavy Contractors, Inc. in the amount of $212,751.03 for construction related to the installation of large slide gates for the aeration basin located at the Noland Water Resource Recovery Facility, and approving a project contingency in the amount of $42,550.21. BACKGROUND: On October 1s', 2020 the City of Fayetteville accepted sealed competitive bids for the Noland WRRF Aeration Basin Gates Installation. Crossland Heavy Contractors, Inc. submitted the lowest bid. All bids are shown here: Crossland Heavy Contractors, Inc. $212,751.03 Goodwin & Goodwin, Inc. $356,800.00 DISCUSSION: The two large slide gates that allow isolation of each half of the aeration basin are leaking and need to be replaced. The gates are located under a structural concrete slab and cannot be accessed without shoring and cutting through this slab. For this reason, Jacobs Engineering was selected and contracted to provide engineering design services for this project via Resolution 142-19. Due to long fabrication periods, the gates themselves were bid previously (Bid#19-61) for fabrication and delivery to the city's facility. BUDGET/STAFF IMPACT: Funds are available for this project in the WWTP — Building Improvements account within the Water & Sewer fund. Attachments: Certified Bid Tab, Bid #20-76 Agreement Jacobs Engineering Recommendation Mailing Address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 CITY OF FAYETTEVILLE ARKANSAS Bid Tabulation Bid 20-76, Construction - Noland Basin Gate Installation Certified Amount $200,000.00 Max Allowed (Certifed Amount + 25%) $250,000.00 Total Cost Crossland Heavy Contractors, Inc. Goodwin & Goodwin, Inc. $212,751.03 $356,800.00 # Items ItemNo. QuantityR UnitofMeasure UnitPrice TotalCost UnitPrice TotalCost #1-1 Mobilization (Not to exceed 5%) 1 1 Lump Sum $9,000.00 $9,000.00 $15,000.00 $15,000.00 #1-2 Bonding and Insurance 2 1 Lump Sum $2,500.00 $2,500.00 $15,000.00 $15,000.00 #1-3 Construction Control) (Staking( 3 1 Lump Sum $1,000.00 $1,000.00 $5,000.00 $5,000.00 #1-4 Install Two New Stainless Steel Gates and 1Remove Two Existing Gates 13 11 Lump Sum $199,751.03 1 $199,751.03 $316,800.00 1 $316,800.00 #1-5 ISite Photos and Video 148 11 Lump Sum 1$500 $5001 $5,000.001 $5,000.00 FAYETTEVILLE A4KAN AiKdNSAi Bid 20-76, Construction - Noland Basin Gate Installation - Bid 20-76, Construction - Nolan Basin Gate Installation Project Overview Project Details Reference ID Bid 20-76, Construction - Noland Basin Gate Installation Project Name Bid 20-76, Construction - Nolan Basin Gate Installation Project Owner Andrea Foren Project Type ITB Department Purchasing Certification of $200,000.00 Funds Project Description Bid 20-76, Construction - Nolan Basin Gate Installation Open Date Sep 06, 2020 12:00 AM CDT Close Date Oct 01, 2020 2:00 PM CDT Highest Scoring Supplier Crossland Heavy Contractors, Inc. Seal status Score 100 pts C 1 Ot' RKAKFAYETTEVILLE AYNpN 11fA1 Requested Information Unsealed on Unsealed by Required City Forms Oct 01, 2020 2:05 PM CDT Adonis Bwashi Bid Bond Oct 01, 2020 2:05 PM CDT Adonis Bwashi Arkansas Secreatary of State Oct 01, 2020 2:05 PM CDT Adonis Bwashi Filing # Arkansas Contractor's License Oct 01, 2020 2:05 PM CDT Adonis Bwashi Pursuant Arkansas Code Annotated §25-1-503, the Contractor agrees and certifies that they do not currently boycott Israel and will not boycott Israel during any time in which they are entering into, Oct 01, 2020 2:05 PM CDT Adonis Bwashi or while in contract, with any public entity as defined in §25- 1-503. If at any time during contract the contractor decides to boycott Israel, the contractor must notify the contracted public entity in writing. Bid 20-76, Bid Form (BT-57KZ) Oct 01, 2020 2:05 PM CDT Adonis Bwashi Conflict of Interest # Declaration of Conflict of Interest You have been chosen as a Committee member for this Evaluation. Please read the following information on conflict of interest to see if you have any problem or potential problem in serving on this committee. ## Code of Conduct All information related to submissions received from Suppliers or Service Providers must be kept confidential by Committee members. ## Conflict of Interest No member of a Committee shall participate in the evaluation if that Committee member or any member of his or her immediate family: * has direct or indirect financial interest in the award of the contract to any proponent; * is currently employed by, or is a consultant to or under contract to a proponent; * is negotiating or has an arrangement concerning future employment or contracting with any proponent; or, * has an ownership interest in, or is an officer or director of, any proponent. Please sign below acknowledging that you have received and read this information. If you have a conflict or potential conflict, please indicate your conflict on this acknowledgment form with information regarding the conflict. I have read and C " 01. FAYETYCVILLS AMPLAW �aruNsws understood the provisions related to the conflict of interest when serving on the Evaluation Committee. If any such conflict of interest arises during the Committee's review of this project, I will immediately report it to the Purchasing Director. Name Date Signed Has a Conflict of Interest? Les McGaugh Oct 05, 2020 10:12 AM CDT No Adonis Bwashi Oct 01, 2020 2:04 PM CDT No FAYETTEVILLE ARICA R ii@C.AMYAY Public Notices Addendum 1 issued - EXTENDED DEADLINE Les McGaugh, Sep 24, 2020 4:20 PM CDT The City has issued addendum 1 to Bid 20-76. Addendum 1 includes a deadline extension and the engineers Addendum 1. CITY OF r�AYETTEYILLE ARKANs Submissions Supplier Crossland Heavy Contractors, Inc. Date Submitted Name Email Oct 01, 2020 1:35 PM Kaylee Mann kmann@heavycontractors.com CDT Confirmation Code MTAxMTQ3 Goodwin & Goodwin, Inc. Sep 30, 20220 9:20 PM David Garcia docryde@yahoo.com MTAxMDE4 CITY OF �� FAYETTEVILLE •NKANStf Scoring Summary Active Submissions Total Within Certified Funds Supplier 1100 pts Pass/Fail Crossland Heavy Contractors, Inc. 100 pts Pass Goodwin & Goodwin, Inc. 59.63 pts Fail Total Bid Price / 100 pts 100 pts ($212,751.03) 59.63 pts ($356,800.00) C.- - ARMANSFS Signatures Name Andrea Foren Andrea ( Project Owner) Foren Signatures Digitally signed by Andrea Foren Date: 2020.10.06 18:11:37-05'00' Les McGaugh Les McGaugh Digitally signed by Les McGaugh (Evaluator) Date: 2020.10.05 15:00:38 -05'00' DOCUMENT 00500 — AGREEMENT BETWEEN OWNER AND CONTRACTOR Contract Name/Title: NOLAND WWTP AERATION BASIN GATE REPLACEMENT Contract No.: 20-76, Construction THIS AGREEMENT is dated as of the 45' day of Q/r in the year 2020 by and between The City of Fayetteville, Arkansas and Ct'OSS (A �GtVVr (hereinafter called Contractor). Conn c4z,iprS) 1.►1G. ARTICLE 1 - WORK 1.01 Contractor shall complete all Work as specified or indicated in the Contract Documents. The work under this Contract includes, but is not limited to: removal and disposal of two (2) 6'-0" x 10'-0" stainless steel slide gates and installation of two (2) 6'-7" x 10'-8" stainless steel slide gates. Any use of a third -party dumpster or roll off container shall be procured from the City of Fayetteville Recycling and Trash Collection Division. Use of a Non -City dumpster or roll off container is not allowed. Contractor is responsible for obtaining all applicable permits; however, fees for the City issued permits shall be waived. The Contract includes work in City of Fayetteville Right-of-way and in General Utility Easements. Refer to Section 00400-Bid Form for quantities. ARTICLE 2 - ENGINEER 2.01 The Contract Documents have been prepared by the City of Fayetteville Engineering Division. City of Fayetteville Engineering Division assumes all duties and responsibilities, and has the rights and authority assigned to City of Fayetteville 00500 Agreement 00500-1 DOCUMENT 00500 — AGREEMENT (continued) Engineering Division in the Contract Documents in connection with completion of the Work in accordance with the Contract Documents. ARTICLE 3 - CONTRACT TIME 3.01 TIME OF THE ESSENCE: A. All time limits for milestones, if any, Substantial Completion, and completion and readiness for final payment as stated in the Contract Documents are of the essence of the Contract. 3.02 DATES FOR SUBSTANTIAL COMPLETION AND FINAL PAYMENT: A. The Work shall be Substantially Completed within 60 calendar days after the date when the Contract Times commence to run as provided in the GENERAL CONDITIONS, and final completion and ready for final payment in accordance with the GENERAL CONDITIONS within 90 calendar days after the date when the Contract Times commence to run. 3.03 LIQUIDATED DAMAGES: A. Owner and Contractor recognize that time is of the essence of this Agreement and that The City of Fayetteville will suffer financial loss if the Work is not completed within the time specified above, plus any extensions thereof allowed in accordance with the GENERAL CONDITIONS. The parties also recognize the delays, expense, and difficulties involved in proving the actual loss suffered by The City of Fayetteville if the Work is not Substantially Completed on time. Accordingly, instead of requiring any such proof, The City of Fayetteville and Contractor agree that as liquidated damages for delay (but not as a penalty) Contractor shall pay The City of Fayetteville Seven Hundred Fifty Dollars ($750.00) for each calendar day that expires after the time specified above in Paragraph 3.02 for Substantial Completion until the Work is Substantially Complete. After Substantial Completion, if Contractor shall neglect, refuse, or fail to complete the remaining Work within the time specified in Paragraph 3.02 for completion 00500 Agreement 00500-2 DOCUMENT 00500 — AGREEMENT (continued) and readiness for final payment or any proper extension thereof granted by The City of Fayetteville, Contractor shall pay The City of Fayetteville Five Hundred Dollars ($500.00) for each calendar day that expires after the time specified for completion and readiness for final payment. ARTICLE 4 - CONTRACT PRICE 4.01 The CITY OF FAYETTEVILLE agrees to pay, and the CONTRACTOR agrees to accept, as full and final compensation for all work done under this agreement, the amount based on the unit prices bid in the Proposal (BID FORM) which is hereto attached, for the actual amount accomplished under each pay item, said payments to be made in lawful money of the United States at the time and in the manner set forth in the Specifications. 4.02 As provided in the General Conditions, estimated quantities are not guaranteed, and determinations of actual quantities and classifications are to be made by ENGINEER as provided in the General Conditions. Unit prices have been computed as provided in the General Conditions. 4.03 Changes, modifications, or amendments in scope, price or fees to this contract shall not be allowed without a prior formal contract amendment approved by the Mayor and the City Council in advance of the change in scope, cost or fees. There shall be no changes without prior written approval of the Engineer of Record and/or the City's designated Professional Engineer. ARTICLE 5 - PAYMENT PROCEDURES �.01 SUBMITTAL AND PROCESSING OF PAYMENTS: A. Contractor shall submit Applications for Payment in accordance with the GENERAL CONDITIONS. Applications for Payment will be processed by Engineer as provided in the GENERAL CONDITIONS. 00500 Agreement 00500-3 DOCUMENT 00500 — AGREEMENT (continued) 5.02 PROGRESS PAYMENTS, RETAINAGE: A. The City of Fayetteville shall make progress payments on account of the Contract Price on the basis of Contractor's Applications for Payment as recommended by Engineer, on or about the 15th day of each month during construction. All such payments will be measured by the schedule of values established in the GENERAL CONDITIONS (and in the case of Unit Price Work based on the number of units completed) or, in the event there is no schedule of values, as provided in the General Requirements. Prior to Substantial Completion, progress payments will be made in an amount equal to the percentage indicated below, but, in each case, less the aggregate of payments previously made and less such amounts as Engineer shall determine, or The City of Fayetteville may withhold, in accordance with the GENERAL CONDITIONS. a. 95% of Work Completed (with the balance being retainage). If Work has been 50% completed as determined by Engineer, and if the character and progress of the Work have been satisfactory to The City of Fayetteville and Engineer, The City of Fayetteville on recommendation of Engineer, may determine that as long as the character and progress of the Work subsequently remain satisfactory to them, there will be no additional retainage on account of Work subsequently completed, in which case the remaining progress payments prior to Substantial Completion will be an amount equal to 100% of the Work Completed less the aggregate of payments previously made; and b. 100% of Equipment and Materials not incorporated in the Work but delivered, suitably stored, and accompanied by documentation satisfactory to The City of Fayetteville as provided in the GENERAL CONDITIONS. 00500 Agreement 00500-4 DOCUMENT 00500 — AGREEMENT (continued) 5.03 FINAL PAYMENT: A. Upon final completion and acceptance of the Work in accordance with the GENERAL CONDITIONS, The City of Fayetteville shall pay the remainder of the Contract Price as recommended by Engineer and as provided in the GENERAL CONDITIONS. ARTICLE 6 - CONTRACTOR'S REPRESENTATIONS 6.01 In order to induce The City of Fayetteville to enter into this Agreement, Contractor makes the following representations: A. Contractor has examined and carefully studied the Contract Documents including the Addenda and other related data identified in the Bid Documents. B. Contractor has visited the Site and become familiar with and is satisfied as to the general, local, and Site conditions that may affect cost, progress, performance, and furnishing of the Work. C. Contractor is familiar with and is satisfied as to all federal, state, and local Laws and Regulations that may affect cost, progress, performance, and furnishing of the Work. D. Contractor has carefully studied all: (1) Reports of explorations and tests of subsurface conditions at or contiguous to the Site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the Site; and (2) Reports and drawings of a Hazardous Environmental Condition, if any, at the Site. Contractor acknowledges that The City of Fayetteville and Engineer do not assume responsibility for the accuracy or completeness of information and data shown or indicated 00500 Agreement 00500-5 DOCUMENT 00500 — AGREEMENT (continued) in the Contract Documents with respect to Underground Facilities at or contiguous to the Site. E. Contractor has obtained and carefully studied (or assumes responsibility of having done so) all such additional supplementary examinations, investigations, explorations, tests, studies, and data concerning conditions (surface, subsurface, and Underground Facilities) at or contiguous to the Site or otherwise which may affect cost, progress, performance, and furnishing of the Work or which relate to any aspect of the means, methods, techniques, sequences, and procedures of construction to be employed by Contractor and safety precautions and programs incident thereto. F. Contractor does not consider that any additional examinations, investigations, explorations, tests, studies, or data are necessary for the performing and furnishing of the Work at the Contract Price, within the Contract Times, and in accordance with the other terms and conditions of the Contract Documents. G. Contractor is aware of the general nature of work to be performed by The City of Fayetteville and others at the Site that relates to the Work as indicated in the Contract Documents. H. Contractor has correlated the information known to Contractor, information and observations obtained from visits to the Site, reports and drawings identified in the Contract Documents, and all additional examinations, investigations, explorations, tests, studies, and data with the Contract Documents. Contractor has given Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Contractor has discovered in the Contract Documents and the written resolution thereof by Engineer is acceptable to Contractor. 00500 Agreement 00500-6 DOCUMENT 00500 — AGREEMENT (continued) J. The Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work. ARTICLE 7 - CONTRACT DOCUMENTS 7.01 CONTENTS: A. The Contract Documents which comprise the entire Agreement between The City of Fayetteville and Contractor concerning the Work consist of the following and may only be amended, modified, or supplemented as provided in the GENERAL CONDITIONS: l . This Agreement. 2. Exhibits to this Agreement (enumerated as follows): a. Notice to Proceed. b. Contractor's Bid. c. Documentation submitted by Contractor prior to Notice of Award. 3. Performance, Payment, and other Bonds. 4. General Conditions. 5. Supplementary Conditions. 6. Specifications consisting of divisions and sections as listed in table of contents of Project Manual. 00500 Agreement 00500- 7 DOCUMENT 00500 — AGREEMENT (continued) 7. Drawings consisting of a cover sheet and sheets as listed in the table of contents thereof, with each sheet bearing the following general title: NOLAND WWTP AERATION BASIN GATE REPLACEMENT 8. Addenda numbers inclusive. 9. The following which may be delivered or issued after the Effective Date of the Agreement and are not attached hereto: All Written Amendments and other documents amending, modifying, or supplementing the Contract Documents pursuant to the GENERAL CONDITIONS. ARTICLE 8 - MISCELLANEOUS 8.01 TERMS: A. Terms used in this Agreement which are defined in the GENERAL CONDITIONS shall have the meanings stated in the GENERAL CONDITIONS. 8.02 ASSIGNMENT OF CONTRACT: A. No assignment by a party hereto of any rights under or interests in the Contract Documents will be binding on another party hereto without the written consent of the party sought to be bound; and specifically but without limitation, moneys that may become due and moneys that are due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by Law), and unless specifically stated to the contrary in any written consent to an assignment, no assignment will release or discharge the assignor from any duty or responsibility under the Contract Documents. 00500 Agreement 00500-8 DOCUMENT 00500 — AGREEMENT (continued) 8.03 SUCCESSORS AND ASSIGNS: A. The City of Fayetteville and Contractor each binds himself, his partners, successors, assigns, and legal representatives to the other party hereto, its partners, successors, assigns, and legal representatives in respect to all covenants, agreements, and obligations contained in the Contract Documents. 8.04 SEVERABILITY: A. Any provision or part of the Contract Documents held to be void or unenforceable under any Law or Regulation shall be deemed stricken, and all remaining provisions shall continue to be valid and binding upon The City of Fayetteville and Contractor, who agree that the Contract Documents shall be reformed to replace such stricken provision or part thereof with a valid and enforceable provision that comes as close as possible to expressing the intention of the stricken provision. 8.05 FREEDOM OF INFORMATION ACT: A. City contracts and documents prepared while performing city contractual work are subject to the Arkansas Freedom of Information Act. If a Freedom of Information Act request is presented to the City of Fayetteville, the contractor will do everything possible to provide the documents in a prompt and timely manner as prescribed in the Arkansas Freedom of Information Act (A.C.A. §25-19-101 et. seq.). Only legally authorized photocopying costs pursuant to the FOIA may be assessed for this compliance. 8.06 LIENS: A. No liens against this construction project are allowed. Arkansas law (A.C.A. §§ 18-44-501 through 508) prohibits the filing of any mechanics' of materialmen's liens in relation to this public construction project. Arkansas law requires and the contractor promises to provide and file with the Circuit Clerk of Washington County a bond in a sum equal to the amount of this contract. Any subcontractor or materials supplier may bring an action for 00500 Agreement 00500-9 DOCUMENT 00500 - AGREEMENT (continued) non-payment or labor or material on the bond. The contractor promises to notify every subcontractor and materials supplier for this project of this paragraph and obtain their written acknowledgement of such notice prior to commencement of the work of the subcontractor or materials supplier. IN WITNESS WHEREOF, The City of Fayetteville and Contractor have signed this Agreement in quadruplicate. One counterpart each has been delivered to Contractor. Three counterparts each has been retained by The City of Fayetteville. All portions of the Contract Documents have been signed, initialed, or identified by The City of Fayetteville and Contractor. This Agreement will be effective on r Lj 20LO which is the Effective Date of the Agreement. CONTRACTOR: By: Daniel A. Thompson (Type or legibly print) d9MM1 agnM bV Daniel Tliornpe°n Daniel Thompson°"°=E`�"°"��°'"°�-`� 000swne Heaw c°m�aan��. rn=oan�a m�ann �.:a:a. mza m i z zsaso� (Signature) Title: Vice President CITY OF FAYETTEVILLE Title: Mayor Contractor shall attach evidence of authority to sign. If Contractor is a corporation, corporate entity or LLC, Contractor shall attach Corporate Resolution authorizing Contractor's signature and execution of Agreement. Further if Contractor is a corporation, corporate entity or LLC, Contractor shall also attach a copy of the Contractor's Articles of Incorporation and a copy form the Arkansas State Secretary of 00500 Agreement 00500 - 10 DOCUMENT 00500 — AGREEMENT (continued) State to document that the corporation, corporate entity or LLC is in current "Good Standing" with the State of Arkansas and such entity is permitted to perform work in the State of Arkansas. J - r (SEAL) Attest ('SEAL) Attest trrrrrr RK FAYEITEVILLE 'l'4jvG �ON� tk j 00500 Agreement 00500- 11 DOCUMENT 00500 — AGREEMENT (continued) Address for giving notices Address for giving notices D • O�X 33so 113 W. Mountain St. W tW� &'�D* (�lQ �.�J Fayetteville. AR 72701 License No. Agent for Service of process (Type or legibly print) Contractor shall attach evidence of authority of Agent for Service process to sign. If Contractor is a corporation, corporate entity or LLC, Contractor shall attach Corporate Resolution authorizing Agent for Service process authority to sign. (If Contractor is a corporation, corporate entity or LLC, attach evidence of authority to sign.) END OF DOCUMENT 00500 00500 Agreement 00500 - 12 ; .acobs October 13, 2020 Attention: Mr. Corey Granderson, PE City of Fayetteville 2435 S Industrial Drive Fayetteville, AR 72701 Project Name: Noland WWTP Aeration Basin Gate Replacement Project Number: Bid 20-76, Construction Subject: Recommendation of Award Dear Mr. Granderson, Jacobs Engineering Group Inc. 401 S Boston Ave Suite 330 Tulsa, OK 74103 918.921.6052 www.jacobs.com On Thursday, October 1, 2020 construction bids were opened for the referenced project. Two responsive bids were received, and Crossland Heavy Construction, Inc is the low bidder with a total bid in the amount of $212,751.03. The certified bid tabulation is attached to this letter for reference. We have reviewed Crossland Heavy Construction's bid and have extensive experience working with them on numerous projects in water and wastewater facilities. Therefore, we recommend awarding the bid to Crossland Heavy Construction, Inc. in the amount of $212,751.03. Respectfully, Luke Lenard, PE Project Manager 225.907.3734 luke.lenard@jacbos.com Attachment: Bid 20-76, Construction Certified Bid Tabulation Jacobs Engineering Group Inc. CITY OF FAYETTEVILLE ARKANS ARKANSAS Bid Tabulation Bid 20-76, Construction - Noland Basin Gate Installation Certified Amount $200,000.00 Max Allowed (CertifedAmount +25%) $250,000.00 Total Cost Crossland Heavy Contractors, Inc. Goodwin & Goodwin, Inc. $212,751.03 $356,800.00 # Items ItemNo. QuantityRE UnitofMeasure UnitPrice TotalCost UnitPrice TotalCost #1-1 Mobilization (Not to exceed 5%) 1 1 Lump Sum $9,000.00 $9,000.00 $15,000.00 $15,000.00 #1-2 Bonding and Insurance 2 1 Lump Sum $2,500.00 $2,500.00 $15,000.00 $15,000.00 #1-3 Construction Controll (Staking( 3 1 Lump Sum $1,000.00 $1,000.00 $5,000.00 $5,000.00 #1-4 Install Two New Stainless Steel Gates and Remove Two Existing Gates 3 1 Lump Sum $199,751.03 $199,751.03 $316,800.00 $316,800.00 #1-5 ISite Photos and Video 148 11 Lump Sum $500 $500 $5,000.00 $5,000.00