Loading...
HomeMy WebLinkAbout278-20 RESOLUTION113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 Resolution: 278-20 File Number: 2020-0853 HAWKINS-WEIR ENGINEERS, INC. AMENDMENT NO. 2 - 2019 DRAINAGE BOND PROJECT: A RESOLUTION TO APPROVE AMENDMENT NO. 2 TO THE PROFESSIONAL ENGINEERING SERVICES AGREEMENT WITH HAWKINS-WEIR ENGINEERS, INC. IN THE AMOUNT OF $273,600.00 FOR ENGINEERING DESIGN SERVICES ASSOCIATED WITH THE PROJECT TO ALLEVIATE FLOODING NEAR THE NORTH COLLEGE AVENUE AND EAST SUNBRIDGE DRIVE INTERSECTION - 2019 DRAINAGE BOND PROJECT WHEREAS, on September 17, 2019, the City Council passed Resolution 211-19 to authorize Mayor Jordan to sign a Professional Engineering Services Agreement with Hawkins -Weir Engineers, Inc. for conceptual drainage design services to alleviate the flooding at the intersection of North College Avenue and East Sunbridge Drive; and WHEREAS, on April 21, 2020, the City Council passed Resolution 124-20 to authorize Amendment No. 1 to the agreement for additional conceptual drainage design services involving an investigation of alternative storm drain routing; and WHEREAS, Hawkins -Weir Engineers, Inc. has provided a proposed scope and additional fee/reimbursables to complete the full design based on the most feasible routing. NOW, THEREFORE, BE IT RESOLVED BV THE CITY COUNCIL OF THE CITY OF FAVETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby authorizes Mayor Jordan to sign Amendment No. 2 to the Professional Engineering Services Agreement with Hawkins -Weir Engineers, Inc. in an amount of $273,600.00 for engineering design services associated with the project to alleviate flooding near the intersection of North College Avenue and East Sunbridge Page 1 Printed on I M20 Resolution: 278-20 File Number.• 2020-0853 Avenue. PASSED and APPROVED on 11/5/2020 Attest: C RK' •T�'% T Kara Paxton, City Clerk TreasurerrrI ; :9 AS Page 2 Printed on 1110120 City of Fayetteville, Arkansas 113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 i Text File File Number: 2020-0853 Agenda Date: 11/5/2020 Version: 1 Status: Passed In Control: City Council Meeting Agenda Number: A 10 File Type: Resolution HAWKINS-WEIR ENGINEERS, INC. AMENDMENT NO.2 - 2019 DRAINAGE BOND PROJECT: A RESOLUTION TO APPROVE AMENDMENT NO. 2 TO THE PROFESSIONAL ENGINEERING SERVICES AGREEMENT WITH HAWKINS-WEIR ENGINEERS, INC. IN THE AMOUNT OF $273,600.00 FOR ENGINEERING DESIGN SERVICES ASSOCIATED WITH THE PROJECT TO ALLEVIATE FLOODING NEAR THE NORTH COLLEGE AVENUE AND EAST SUNBRIDGE DRIVE INTERSECTION - 2019 DRAINAGE BOND PROJECT WHEREAS, on September 17, 2019, the City Council passed Resolution 211-19 to authorize Mayor Jordan to sign a Professional Engineering Services Agreement with Hawkins -Weir Engineers, Inc. for conceptual drainage design services to alleviate the flooding at the intersection of North College Avenue and East Sunbridge Drive; and WHEREAS, on April 21, 2020, the City Council passed Resolution 124-20 to authorize Amendment No. 1 to the agreement for additional conceptual drainage design services involving an investigation of alternative storm drain routing; and WHEREAS, Hawkins -Weir Engineers, Inc. has provided a proposed scope and additional fee/reimbursables to complete the full design based on the most feasible routing. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby authorizes Mayor Jordan to sign Amendment No. 2 to the Professional Engineering Services Agreement with Hawkins -Weir Engineers, Inc. in an amount of $273,600.00 for engineering design services associated with the project to alleviate flooding near the intersection of North College Avenue and East Sunbridge Avenue. City ofFaystteviffe, Arkansas Page f Printed on 111612020 Chris Brown Submitted By City of Fayetteville Staff Review Form 2020-0853 Legistar File ID 11/5/2020 City Council Meeting Date - Agenda Item Only N/A for Non -Agenda Item 10/8/2020 ENGINEERING (621) Submitted Date Division / Department Action Recommendation: Approval of a contract amendment #2 with Hawkins Weir Engineers, Inc. in the amount of $273,600 for a total contract amount not to exceed $374,500 for engineering design services associated with flooding near the intersection of N College Ave and E Sunbridge Dr. Budget Impact: 4604.860.7415-5860.02 4604 - Drainage Projects (2019 Bonds) Account Number 46040.7415.1000 Project Number Fund Drainage Project (2019 Bonds), Sunbridge/College Drainage Phase I Budgeted Item? Yes Current Budget Funds Obligated Current Balance Does item have a cost? Yes Item Cost Budget Adjustment Attached? No Budget Adjustment Remaining Budget Project Title $ 1,410,468.00 $ 69,603.58 $ 1,340,864.42 $ 273,600.00 $ 1,067,264.42 V20180321 Purchase Order Number: 2019-00000661 Previous Ordinance or Resolution # 211-19; 124 20 Change Order Number: Original Contract Number: Comments: #2019-00000036 Approval Date: CITY OF FAYETTEVILLE %PF ARKANSAS MEETING OF NOVEMBER 5, 2020 TO: Mayor and City Council THRU: Susan Norton, Chief of Staff Garner Stoll, Development Services Director Chris Brown, City Engineer CITY COUNCIL MEMO FROM: Alan Pugh, Staff Engineer DATE: October 8, 2020 SUBJECT: Approval of a contract amendment #2 with Hawkins Weir Engineers, Inc. in the amount of $273,600 for a total contract amount not to exceed $374,500 for engineering design services associated with flooding near the intersection of N College Ave and E Sunbridge. RECOMMENDATION: Staff recommends approval of a contract amendment #2 with Hawkins Weir Engineers, Inc. in the amount of $273,600 for a total contract amount not to exceed $374,500 for engineering design services associated with flooding near the intersection of N College Ave and E Sunbridge Dr. BACKGROUND: Hawkins Weir was selected originally for this project by RFQ 19-01 selection #15 with the original contract being approved through resolution 211-19. That contract included conceptual drainage work to determine the impacts of proposed detention basins and the original proposed routing. Subsequently the contract was amended though resolution 124-20 to include an investigation of alternative storm drain routing. Based on the conceptual layouts and investigation, the most feasible routing option determined. DISCUSSION: This project has been identified as one of the projects to be funded by the first phase of the 2019 Drainage Bond Program. Hawkins -Weir Engineers, Inc has provided a proposed scope and an additional fee/reimbursables in the amount of $273,600 to complete the full design based on the most feasible routing. The contract will be paid based on hourly rates for work completed, up to the total contract amount (currently $374,500 including this amendment). The estimated project amount of $1.4 million is subject to changes based on completion of full design. BUDGET/STAFF IMPACT: The design for this project will be paid for with the funds from the 2019 Drainage Bond Project. Attachments: Engineering Agreement Mailing Address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 HAWKINS WEIR E N G I N E E R 5, I N C. Engineering Client Success September 23, 2020 Mr. Alan Pugh, P.E., CFM City of Fayetteville Engineering Department 125 West Mountain Fayetteville, Arkansas 72701 Re: Amendment No. 2 to the Agreement for Professional Services Sunbridge and College Avenue Drainage Improvements Project Fayetteville, Arkansas HWEI Project No. 2019070 Dear Mr. Pugh: Please find attached Amendment No. 2 to the Agreement for engineering services associated with the Sunbridge and College Drainage Improvements Project for the City of Fayetteville, Arkansas. We will commence this work immediately upon your authorization to proceed. If there are changes in scope or protracted delays for reasons beyond our control, we would expect to negotiate with you an equitable adjustment of our compensation taking into consideration the impact of such changes and delays. Should you have any questions, comments, or require additional information, please do not hesitate to call. Sincerely yours, HAWKINS--�WEI/IR ENGINEERS, INC. J. Kyle Salyer, P.E., P.S. JKS/mcw Enclosures: Amendment No. 2 cc: Ms. Becky Horne, Hawkins -Weir Engineers, Inc. 2019070W P092320KS.docx v t O1 ul�LM ml TO THE AGREEMENT For PROFESSIONAL ENGINEERING SERVICES BETWEEN CITY OF FAYETTEVILLE, ARKANSAS AND HAWKINS-WEIR ENGINEERS, INC. In accordance with the AGREEMENT For PROFESSIONAL ENGINEERING SERVICES for the Sunbridge/College, Phase 1 Drainage Project (HW Project No. 2019070), dated September 17, 2019, between the City of Fayetteville, Arkansas (hereinafter called Owner) and Hawkins -Weir Engineers, Inc. (hereinafter called Engineer), Owner hereby authorizes Engineer to proceed with engineering services as modified by this Amendment No. 2. SECTION 1 — SCOPE OF SERVICES 1.1 The City of Fayetteville Engineering Department has directed the Engineer to amend services included in the AGREEMENT on the PROJECT. These amended services include the additional surveying and engineering design services that are needed to complete the final design of the project. The original AGREEMENT and AMENDMENT NO. 1 included conceptual design and alternative alignment evaluation. Detailed services are included in the attached Appendix A, Scope of Services. SECTION 2 — TIME OF SERVICE 2.1 The additional scope of services defined herein will be completed within an additional 270 calendar days added to the 255 calendar days provided in the AGREEMENT and previous AMENDMENT NO. 1. Details of the additional time of services are included in the attached Appendix B, Proposed Schedule. Engineer will proceed with providing the services set forth herein immediately upon execution of this AMENDMENT NO. 2. Amendment No. 2 .docx Page 1 of 2 September 23, 2020 SECTION 3 — COMPENSATION 3.1 Owner shall compensate Engineer for providing the services set forth herein in accordance with the terms of the Agreement. Total payment for Scope of Services described herein shall not exceed Two Hundred Sixty -One Thousand Eight Hundred Dollars ($261,800.00) plus reimbursable expenses of Eleven Thousand Eight Hundred Dollars ($11,800.00) without written approval of Owner. These additional services adjust the Agreement's not to exceed fee to $350,200.00 and the not to exceed reimbursable expenses to $24,300.00, for a total contract amount of $374,500.00. Attachments: Appendix A, Scope of Services dated September 2020 Appendix B, Proposed Schedule dated September 2020 Appendix C, Fee Proposal Breakdown dated September 2020 AUTHORIZATION BY: CITY OF FAYETTEVILLE. ARKANSAS Date: ACCEPTED BY: HAWKINS-WEIR ENGINEERS, INC. , BY: W+ J. Kyle Salyer, P.E., P.S. Vice President Date: 9 A 0fivzo C Jordan, Mayor Amendment No. 2 .docx Page 2 of 2 September 23, 2020 I ., I Appendix A _ w Scope of Services Sunbridge Drive and College Avenue Drainage Improvements City of Fayetteville, Arkansas CITY OF FAYETTEVI!!E HWEI Project No. 2019070 ARKANSAS September 2020 Hawkins -Weir Engineers, Inc. (HW) proposes to provide the following surveying and engineering design services for the referenced project. Except as noted below, design services will be limited to the areas shown on the attached vicinity map. Task Description Task 1 — Field Survey Phase Perform a field and utility location survey of the above ground physical features and improvements on the site as necessary to prepare plans for the construction of the proposed street and drainage improvements 2. Perform a topographic survey of the site, including critical spot elevations on existing improvements such as drainage pipe flow lines, curbs, pavement, and drainage structure improvements 3. Perform a survey to determine existing right-of-way and easements 4. Coordinate with Arkansas One -Call for the marking of existing utilities and field locate them as part of the survey work based on the locations marked in the field by the utility owner 5. Prepare a scaled drawing in AutoCAD format 6. Establish on -site survey horizontal and vertical control points for construction (maximum number of 3 horizontal and 2 vertical control points) Task 2 — Preliminary Design Phase 1. Prepare preliminary plans, documents and data as follows: Perform drainage design calculations and show all existing and proposed drainage facilities on the plans, on both the plan and profile. Show horizontal and vertical location, elevations, grades and structure detail Prepare plans and details of City owned water, sanitary sewer and storm drainage facilities which require relocation to accommodate construction of the proposed drainage improvements c. Prepare construction details which depict all typical items including, but not limited to, drainage inlets and junction boxes, drainage channels and transitions, culvert details, and street crossings 2019070\Appendix A (Amendment No. 2).docx Page 1 d. Draft preliminary notes on plans to fully describe the construction work to be performed e. Prepare recommendation for sequence of construction and prepare preliminary layout of construction phasing and traffic detours, if required f. Prepare preliminary stormwater and erosion control measures on plans 2. Prepare a Request for Proposal (RFP) for Geotechnical Testing 3. Prepare a draft copy of contract documents and specifications 4. Prepare cost estimates for preliminary design 5. Prepare right-of-way information to include the following: a. Identify property subdivisions, existing and proposed rights -of -way and easements, ownership names, addresses, temporary construction easements and related information b. Provide complete information on the plans for proposed acquisitions of right-of-way and permanent and temporary construction easements 6. Coordinate with franchise utility companies including the following: a. Obtain location and size of existing overhead and underground utilities from utility companies b. Attend meetings with each affected utility company to discuss necessary adjustments or relocations 7. Coordinate with the City of Fayetteville to perform field locates by spot digging, utilizing city personnel and equipment 8. Submit Preliminary Design Package including Plans, Specifications, and Estimate and participate in a review meeting with City Staff Task 3 — Final Design Phase 1. Prepare final design calculations, plans, profiles, details, cross sections, street crossings, traffic detours and other items 2. Prepare structural plans for drainage inlets, junction boxes, headwalls, and retaining walls. Utilize the City of Fayetteville format and standard detail drawings where applicable 3. Prepare final stormwater and erosion control measures on plans. As needed, prepare stormwater pollution prevention plan in accordance with the requirements of ADEQ General Permit ARR150000, Part II, Section A.4 4. Prepare Specifications and Contract Documents. The City will provide templates for the front end documents 5. Prepare final construction cost estimate 2019070Vippendix A (Amendment No. 2).docx Page 2 6. Prepare land descriptions and exhibits for permanent and temporary construction Easement Documents (based on an assumed maximum of 20 easements) a. Coordinate with the City of Fayetteville's Land Agent and prepare any required document revisions 7. Participate in a final plan review coordination meeting with the City of Fayetteville Engineering, Street and Utility Departments a. Prepare a meeting summary 8. Participate in a coordination meeting with Franchise Utility Owners a. Prepare a meeting summary 9. Perform internal QA/QC review of design documents 10. Submit public water and sanitary sewer relocation plans to the Arkansas Department of Health 11. Deliver one (1) reproducible full-size copy, two (2) half-size copies, and one (1) electronic copy of the Plans and Specifications to the City for their use Task 4 — Advertising and Bidding Phase 1. Assist the City in advertising the Project for bidding 2. Conduct a Pre -Bid Conference with the Owner and prospective bidders 3. Prepare any necessary bidding Addendums 4. Assist the City in receiving Bids and preparing a Certified Bid Tabulation 5. Review bids and prepare a recommendation to the City for the Award of a Construction Contract 6. Assist in the preparation of Contract Documents for execution between the City and Contractor Exclusions to the Scope of Services The design services provided by Hawkins -Weir do not include the following tasks: 1. Construction Observation or Administration including: submittal review, review or preparation of payment requests, assessment of substantial/final completion, review of Contractor's conformance to construction documents, or preparation of Record Drawings. Any Scope of Services for Construction Phase Services will be considered under a separate agreement or amendment 2. Design or bidding of the project in multiple phases 2019070\Appendix A (Amendment No. 2).docx Page 3 3. Evaluation of drainage pipe material 4. Environmental assessment or evaluation of the site 5. Section 404 U.S. Army Corps of Engineers (USACE) permitting including: wetlands delineation, wetland and stream mitigation, cultural resources survey, and U.S. Fish and Wildlife Endangered Species Clearance 6. Construction layout staking for the Contractor, except that HW will minimally provide three (3) construction control points 7. Design of franchise utility relocation plans or service extensions 8. Bid solicitations 9. As -built survey of the final improvements 10. Arkansas Department of Transportation coordination and permitting 11. Street lighting design Attachments: Vicinity Map 20190701Appendix A (Amendment No. 2).docx Page 4 " z x �V t /+ r 5 I' M ,�, , ES �` I 4t o + ' PROJECT N VILLALp - Z LIMITS - W uj Y e F Y ,PROJECT ., + LIMITS ol �"T ns a elm z r /S r �tr+.r u _,� 4 r _ W .. W Q Z a HAWKI NS 6WE IR APPENDIX A o ENGI N E E R S, I N C. VICINITY MAP Van Buren Fort Smith Fayetteville little Rock rn (479) 474-1227 ( (479) 242-4685 I (479) 455-2206 I (501) 374-4846 FOR: CI TY OF FA YETTEVILLE www.hawkins-weir.com DA TE.• SEPT. 2020 1 SCALE NTS I JOB NO. 2019070 hw Appendix B Proposed Schedule Sunbridge Drive and College Avenue Drainage Improvements City of Fayetteville, Arkansas HWEI Project No. 2019070 September 2020 Project Task Complete Field Survey Prepare Preliminary Design and Submit to Owner Prepare Final Design and Submit to Owner Advertise and Bid Project IVA CITY OF FAYETTEVILLE ARKANSAS Days from Notice to Proceed 60 120 210 270 2019070Wppendix B (Amendment No. 2).docx Page 1 Appendix C ' Sunbridge Drive and College Avenue Drainage Improvements City of Fayetteville, Arkansas HWEI Project No. 2019070 September 2020 Task 1 - Field Survey Phase 1. Perform a field and utility location survey of the above ground prepare plans for the construction of the proposed street and r 2. Perform a topographic suvey of the site, including critical spot lines, curbs, pavement, and drainage structure improvements 3. Perform a survey to determine existing right-of-way and easer 4. Coordinate with Arkansas One -Call for the marking of existing locations marked in the field by the utility owner Task 2 - Preliminary Desiqn Phase atures and improvements on the site as necessary to provements on existing improvements such as drainage pipe flow i tie them down as part of the survey work based on the Total Hours = CITY Of FAYETTEVILLE ARKANSAS Engr VII Engr IV Engr III Surveyor GPS Survey Designer II Tech III Tech I Insp II 4 16 48 4 16 48 4 24 40 4 16 80 80 8 24 0 0 16 80 240 0 80 0 0 Task Subtotall $56,800 1 Engr Engr Engr Surveyor GPS Designer Tech Tech Insp 1. Prepare preliminaryplans, documents and data as follows a. Perform drainage design calculations and show all existing and proposed drainage facilities on the plans, on both the plan and profile. Show horizontal and vertical location, elevations, grades and structure detail 16 8 40 40 b. Prepare plans and details of City owned water and sanitary sewer facilities which require relocation to accommodate construction of the drainage improvements. 16 8 40 40 c. Prepare construction details which depict all typical items including, but not limited to, drainage inlets and junction boxes, drainage channels and transitions, culvert details, and street crossings 20 40 d. Draft preliminary notes on plans to fully describe the construction work to be performed. 16 8 20 20 e. Prepare reommendation for sequence of construction and preliminary layout of construction phase and traffic detours, if required. 16 20 20 40 f. Prepare preliminary stormwater and erosion control measures on plans. 16 8 2. Prepare a RFP for Geotechnical Testing 4 3. Prepare a draft copy of contract documents and specifications 12 32 40 4. Prepare cost estimates for preliminary design 12 16 5. Pre are no ht-of-wa information to include the following a. identify property subdivisions, existing and proposed right-of-way and easements, ownership names, addresses, temporary construction easements and related information 4 4 20 20 16 b. Provide complete information on plans for proposed acquisitions of right-of-way and permanent and temporary construction easements 4 4 20 20 16 6. Coordinate with franchise utility companies including the following: a. Obtain location and size of existing overhead and underground Wiles from utility companies 8 16 b. Attend meetin s with each affected utility company to discuss necessary adjustments or relocations 16 8 16 7. Coordinate with the City of Fayetteville to perform field locates by spot digging, utilizing City personnel and equipment 4 4 8 4 8. Submit Preliminary Design Package including Plans, Specifications, and Estimate and participate in a review meeting with City Staff 1 4 4 8 i orai rtours =I Tzu I 4U I Zbb I 4u I U I 4u I zZU I aU u TaskSubi.1.111 $88 900 2019070\Appendix C (Amendment No. 2).xls Appendix C Sunbridge Drive and College Avenue Drainage Improvements City of Fayetteville, Arkansas M,A'�'tvlfll HWEI Project No. 2019070 September 2020 Task 3 - Final Design Phase boxes, headwalls, and retaining walls. Utilize the City of Fayetteville format and standard detail drawings where applicable 3. Prepare final stormwater and erosion control measures on plans. As needed, prepare stormwater pollution p accordance with the requirements of ADEQ General Permit ARR150000, Part II Section AA 4. Prepare Specifications and Contract Documents. The Citv will provide templates for The front end documents a 11. Deliver one (1) reproducible full-size copy, two (2) half-size copies, and one (1) electronic copy of the the Citv for their use Total Hours = Task 4 - Advertising and Bidding Phase Roimhurcahln Fvnenene and Suhrnnm JfanY Fnne CITY OF FAYETTEVILLE ARKANSAS Task Subtotal $100,900 Engr VII Engr IV Engr III Surveyor GPS Survey Designer II Tech III Tech I Insp 11 2 4 8 8 4 4 4 4 4 4 16 20 8 2 4 4 8 2 4 4 4 2 4 4 8 16 24 40 1 0 1 0 1 0 1 20 1 40 0 iasxsuototai uo,zuu Item Description Total 1. Outside Services - Title Research Assumed - 10 Parcels @ $250/ arcel - Deed of Record and Easement Research $2.500 2. Outside Service - Geotechnical Testing Estimate $5 000 3. Outside Service - Utility Locates ARKUPS 24 Hrs $94/Hr) $2 300 4. Outside Service - Additional CCTV Investigation $1 000 5. ADH Review Fee Review of Plans and Specifications $500 6. Reproduction & Printing Copies of Plans and Specifications $500 1 al t.ovul Fnninourinn Sonrirne Summary Task 1 Field Survey Phase $56,800 Task 2 Preliminary Design Phase $88,900 Task 3 Final Design Phase $100,900 Task 4 Advertising and Bidding Phase $15,200 Reimbursable Expenses and Subconsultant Fees $11,800 I otal tngmeering Fee - Not to tXtleep $Z73,5uo 2019070\Appendix C (Amendment No. 2).xls