Loading...
HomeMy WebLinkAbout241-20 RESOLUTION113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 Resolution: 241-20 File Number: 2020-0772 IN -PLACE MACHINING COMPANY: A RESOLUTION TO APPROVE AN AMENDMENT TO THE CONTRACT WITH IN -PLACE MACHINING COMPANY IN THE AMOUNT OF S20.461.31 FOR ADDITIONAL COSTS ASSOCIATED WITH THE REPAIR OF A ROTOR SHAFT ON THE THERMAL DRYER AT THE BIOSOLIDS MANAGEMENT SITE WHEREAS, on June 4, 2020, the City Council approved Ordinance 6320 authorizing a contract with In -Place Machining Company in the amount of $56,000.00 for an emergency repair of the rotor shaft on the thermal dryer at the Biosolids Management Site and also approved a project contingency in the amount of $8,400.00; and WHEREAS, the original cost estimate for this project was based on the availability of two pieces of equipment at the time the quote was submitted but, due to the City approval process timeline, that equipment was no longer available at the time the contract was approved; and WHEREAS, the emergent need for this project forced In -Place Machinery Company to mobilize with the equipment that was available at the time and, as a result, it was only able to machine one end at a time, instead of both ends at the same time as originally planned leading to an extended period of performance on site with a cost overrun of $20,461.31 for a total cost of $76,461.31. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves an amendment to the contract with In -Place Machining Company in the amount of $20,461.31 for additional fees associated with the repair of a rotor shaft on the thermal dryer at the Biosolids Management Site. Page 1 Printed on 1019120 Resolution: 241-20 File Number.' 2020-0772 PASSED and APPROVED on 10/6/2020 Attest: Kara Paxton, City Clerk FAYETTEVILLE;�— y ? ANSpS WAY(; iONtCpJ``�� Page 2 Printed on 109/20 City of Fayetteville, Arkansas 113 West Mountain Street / Fayetteville, AR 72701 II`( (479)575-8323 Text File File Number: 2020-0772 Agenda Date: 10/6/2020 Version: 1 Status: Passed In Control: City Council Meeting File Type: Resolution Agenda Number: A. 6 IN -PLACE MACHINING COMPANY: A RESOLUTION TO APPROVE AN AMENDMENT TO THE CONTRACT WITH IN -PLACE MACHINING COMPANY IN THE AMOUNT OF $20,461.31 FOR ADDITIONAL COSTS ASSOCIATED WITH THE REPAIR OF A ROTOR SHAFT ON THE THERMAL DRYER AT THE BIOSOLIDS MANAGEMENT SITE WHEREAS, on June 4, 2020, the City Council approved Ordinance 6320 authorizing a contract with In -Place Machining Company in the amount of $56,000.00 for an emergency repair of the rotor shaft on the thermal dryer at the Biosolids Management Site and also approved a project contingency in the amount of $8,400.00; and WHEREAS, the original cost estimate for this project was based on the availability of two pieces of equipment at the time the quote was submitted but, due to the City approval process timeline, that equipment was no longer available at the time the contract was approved; and WHEREAS, the emergent need for this project forced In -Place Machinery Company to mobilize with the equipment that was available at the time and, as a result, it was only able to machine one end at a time, instead of both ends at the same time as originally planned leading to an extended period of performance on site with a cost overrun of $20,461.31 for a total cost of $76,461.31. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE,ARKANSAS: Section I: That the City Council of the City of Fayetteville, Arkansas hereby approves an amendment to the contract with In -Place Machining Company in the amount of $20,461.31 for additional fees associated with the repair of a rotor shaft on the thermal dryer at the Biosolids Management Site. City of Fayetteville, Arkansas Page 1 Printed on 1017/2020 City of Fayetteville Staff Review Form 2020-0772 Legistar File ID 10/6/2020 City Council Meeting Date - Agenda Item Only N/A for Non -Agenda Item Tim Nyander 9/15/2020 WASTEWATER TREATMENT (730) Submitted By Submitted Date Division / Department Action Recommendation: Staff recommends the approval of additional costs in the amount of $20,461.31 associated with repair of the rotor shaft on the thermal dryer at the Biosolids Management Site. Budget Impact: 5400.730.5800-5414.00 Water and Sewer Account Number 02069.1 Project Number Budgeted Item? Yes Does item have a cost? Yes Budget Adjustment Attached? No Fund Plant Pumps and Equipment- WWTP Current Budget Funds Obligated Current Balance Item Cost Budget Adjustment Remaining Budget Project Title $ 1,477,313.00 $ 749,160.81 $ 728,152.19 $ 20,461.31 $ 707,690.88 V20180321 Purchase Order Number: 2020-494 Previous Ordinance or Resolution # 6320 Change Order Number: Original Contract Number: Comments: 1 Approval Date: Q CITY OF �® FAYETTEVILLE ARKANS ARKANSAS MEETING OF OCTOBER 6, 2020 TO: Mayor and City Council THRU: Susan Norton, Chief of Staff FROM: Tim Nyander, Utilities Director DATE: September 15, 2020 CITY COUNCIL MEMO SUBJECT: In -Place Machinery — Additional Costs for Biosolids Dryer Shaft Repair RECOMMENDATION: The staff is recommending approval of additional labor costs associated with the repair of the rotating shaft on the thermal dryer at the Biosolids Management Site by In -Place Machining Company. BACKGROUND: On May 171h, 2020, the thermal dryer rotor shaft moved from its fixed position. We selected In - Place Machining Company to provide a quote to come on site to build up the surface of the shaft and then mill the shaft to within original shaft diameter tolerance for proper seating of the bearings. This firm specializes in repairing rotating equipment shafts in place on a nationwide basis and has the expertise and equipment to perform this unique service. DISCUSSION: In -Place Machining Company submitted a Time & Material quote with an estimated cost of $56,000.00 plus applicable taxes. The City added $8,400.00 as contingency. The original estimate for this project was based on the availability of two pieces of journal equipment being available at the time of the award. Due to the extended approval process the additional equipment was no longer available for this project. The emergent need for this project forced In - Place machinery to mobilize with the equipment that was available at the time. As a result, they were only able to machine one end at a time, instead of both ends at the same time as originally planned. This led to an extended period of performance on site. Their cost overrun is $20,461.31 for a total cost of $76,461.31. In -Place has provided a full itemization of pricing. Regardless of the overrun, the on -site repair saved the City tens of thousands of dollars in shipping the shaft off -site as well as at least a month of downtime on the dryer. Extra landfill costs would have been over $85,000, but would be offset by reduced natural gas costs, leaving a net of $60,000. Staff recommends approval of this cost overrun. BUDGET/STAFF IMPACT: Funds are available in the Plant Pumps and Equipment - WWTP account. This item was presented to the Water, Sewer and Solid Waste Committee on September 8, 2020, and received unanimous approval to forward it to the City Council with a recommendation for approval. Mailing Address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 IN -PLACE MACIYNING coalwk► TO City of Fayettville Arkansas 113 West Mountain Street Fayetteville, AR 72701 *" INVOICE" P.O. NO. 2020-00000494 JOB NO. 57204 INVOICE NO. IPMINV-57204 DATE W31/2020 TERMS Net30 In -Place Machining Comany, LLC 3811 N Holton Street Milwaukee, WI 53212 Webshe: www.lnplace.com Email: Help&nplace.com Interest charged at the rate of 1 1l2% compounded monthly on past due amounts WORK PERFORMED: Undercut, sleeve, and final machine (2)12' diameter 8' long thermal dryerjoumals. Work scope was modified to sleeve thus increased total costs. Work was performed In your Fayetteville, AR facility, and completed on July 2, 2020. IPM Thanks you for your Businessl SHOP LABOR: Technician - Straight Time 96.73 Hours X 99.85 9,658.53 Technician - Overtime 11.00 Hours X 149.78 1,647.58 TOTAL SHOP LABOR: 107.73 11,306.11 SITE & TRAVEL TIME: Technician - Straight Time 16.00 Hours X 107.35 1,717.60 Technician - Straight Time 126.00 Hours X 99.85 12.780.93 Technician - Overtime 115.00 Hours X 149.78 17,224.70 Technician - Double Time 16.00 Hours X 199.70 3,195.20 TOTAL SITE & TRAVEL TIME: 275.00 34,918.43 EXPENSES & PURCHASED SERVICES Alrfare 951.80 Car Rental 857.42 Consumables from IPM Inventory 643.96 Consumabtes Purchases 724.50 Freight 5,041.37 Lodging 2,665.08 Outside Purchased Services 92.64 Per Diem Cash Expense 1,560.00 TOTAL EXPENSES & PURCHASED 12,536.77 SERVICES: EQUIPMENT USE CHARGES: qu pment Usage 12.00 WE— 57 1.475.00 17,700.00 TOTAL EQUIPMENT USE CHARGES: .12.00 17,700.00 Wire / ACH Transfer Instructions (ACH Preferred): Bank JPMcrgan Chase Bank N.A. Acct Name In -Place Machining Company Account# 623470937 ABAN 075000019 {ABA for Wires Onty 021000021) Swift CHASUS33 TOTAL $ 76,461.31 TAX 0.00 SUBTOTAL 76,461.31 MONEY APPLIED 0.00 TOTAL DUE THIS INVOICE (USD) $76,461.31 In -Place Machining Company 3811 N. Holton St. • Milwaukee, WI • 53212 PH. (414) 562-2000 FX.(414)562-2932 www.inplace.com help@lnplace.com August17,2020 Mr. Tim Nyander City of Fayetteville, Arkansas 113 West Mountain Street Fayettville, AR 72701 Via e-mail: tnyander@fayetteville-ar.gov Subject: Notice of project overage Ref. Thermal dryer journal repair IPM Ref: IPM job # 57204 Dear Mr. Nyander, This is to inform you of current overages above and beyond our budgetary quote 40220 Rev 1, purchase order 2020-00000494 to Undercut, sleeve, and final machine (2)12• diameter x 6" long thermal dryer journals located in your Fayetteville, AR facility. The intent of this notice is to highlight increases in project costs and 8mellne that will adversely affect the overall project costs of final invoice. Please note that the below items are estimates only and will be calculated at standard T&M rates below. The original estimate for this project was based on the availability of (2) complete pieces of journal equipment being available at the time of award. Due to the extended approval process the additional equipment was no longer available for this project The emergent need for this project forced us to mobilize with the equipment that was available at the time. As a result of this we were only able to machine one end at a time instead of having a machine on each end as originally planned. This led to an extended period of performance on site. The estimated time to machine the split sleeves was not accurate to the amount of time required to manufacture. This was partially due to the change from the original plan to weld the journals to the decision to install split sleeves instead. This additional time estimate should have been added to Rev 1 but was not included erroneously. Additionally, the expedited shipping charges to deliver the (2) sleeves to site was considerably higher than we had anticipated. This was likely due to the overwhelming reduction in shipping capacity due to COVID-19. Impact Condition The following items have been identified as reasons for schedule or budget impacts. Item Description Estimated Impact Reduction of available machines at time of award Reduction In Machines reduced our onsite machining efficiency. $10,000.00 I ShopMachining Time Additional shop time needed to manufacture (2) split 9 sleeves. $5,000.00 Additional Shipping Costs Higher than expected shipping costs that were directly $5,000.00 related to the project Estimated Increase $20,000.00 Page 1 of 2 In -Place Machining Company 3811 N. Hatton St. • Milwaukee, WI • 53212 PH. (414) 562-2000 • FX.(414)562-2932 www.inplace.com • help@tnplace.com Time, Material, & Expense Pricing A) The following hourly labor rates apply to all in -shop logistics planning and scheduling, mobilization and demobilization, travel, and all on -site time including delay and stand-by time. Straight Time Over Time (First 8 hr / day) (Over 8 hr/day. Sat. Sun) Holidays Techniclan(s) $99.85 $149.78 $199.70 Field Night Shift $107.35 $161.03 $214.70 In -Place Machining Company technicians work a minimum of 12 hours per day, 7 days per week. All delay and stand-by time, including non -working site days will also be charged at a minimum of 12 hours per technician, per day plus expenses. Travel days are charged at actual hours traveled. B) Expenses are charged at our cost plus 15%. Expenses generally includes, but are not limited to, the following: Air & surface transportation, lodging, car rental, and all other purchased services. Consumables, materials, special tooling, etc. whether from IPM inventory or purchased for this job. C) Per diem will be charged at $65.00 per technician, per day. This generally covers all personal meal and Incidental expenses, and is in addition to the rates listed above. D) An equipment usage charge of $1,475.00 per machine setup per shift will apply. This generally covers machines, equipment, hand tools, and instrumentation necessary to complete the project Equipment usage can vary depending on the type and quantity used, and is generally charged for all shifts from the start of site work until completed. An equipment transit charge of 2 shifts is added to the on -site time for equipment transit time (domestic transit) regardless of actual duration, (1 outbound and 1 return.) Thank you again for the opportunity to perform this project for you. We value your business and look forward to working with you for completion of this project in a timely and expert manner. If you have further questions or comments, please feel free to contact me at any time at 414.562.2000 x211, or via fax at 414.562.2932. You can also contact me via e-mail at JAdams@inplace.00m. Please be sure to visit us on the web at www.inplace.com to learn more about our company and the services we offer. Respectfully, In -Place Machining Company Jason Adams, Technical Representative Page 2 of 2 113 west Mountain Street Fayetteville, AR 72701 (479) 575.8323 Ordinance: 6320 File Number: 2020-0447 IN -PLACE MACHINING COMPANY: AN ORDINANCE TO WAIVE CONiPf IITIVE BIDDING AND ACCEPT A QUOTE IN THE AMOUNT OF S56.000.00 PLUS APPLICABLE TAXES FROM IN -PLACE MACHINING COMPANY FOR AN EMERGENCY REPAIR TO THE ROTOR SHAFT ON THE THERMAL DRYER AT THE BIOSOLIDS .MANAGE\4ENf SITE. AND I-0 APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF S3.400.00 WHEREAS, on May 17. 2020. the thermal dryer rotor shafl experienced a malfunction and. after disassembly and inspection of the rotor shaft, it showed slight damage to the bearings seals and significant damage to the rotor shall: and WHEREAS, an operational thermal dryer, in combination with the Biosolids Management Site's solar house dryers, reduces 100.000 pounds of daily biosolids volume to 15.000 pounds of Class -A. Exceptional Quality fertilizer and allows the City to achieve substantial savings on landfill costs each year: and WHEREAS, In -Place Machining Company specializes in repairing rotating equipment shafts and has the expertise, personnel. and equipment to perform the service so the thermal drver can be put back into service quickly. NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE,ARKANSAS: Section I: That the City Council ofthe City of Fayetteville. Arkansas hereby finds the above circumstances make competitive bidding not feasible or practical and therefore waives the Page 1 Prfnfw en d&20 Ordinance: 6320 File Number 2020-0447 requirements of Rbnnal competitive bidding and accepts a quote in the amount of $56.000.00 plus applicable taxes from In -Place Machining Company for an emergency repair to the rotor shaft on the thermal drver at the Biosolids Management Site. and further approves a project contingency in the amount of $8.400.00. Section 2: 'Phis contract is contingent upon In -Place iblachinin g Company providing the City of Fayetteville documentation of its authority to do business in the state of Arkansas. PASSED and APPROVED on 6/4/2020 Attest: , Of JG�� _ FAYETTEVILLE: Kara Paxton. City Clerk Treasurer,��. Page 2 Printed an SWO