HomeMy WebLinkAbout239-20 RESOLUTION113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 Resolution: 239-20 File Number: 2020-0767 OLSSON, INC. AMENDMENT NO. 4: A RESOLUTION TO APPROVE AMENDMENT NO.4 TO THE PROFESSIONAL ENGINEERING SERVICES AGREEMENT WITH OLSSON, INC. IN AN AMOUNT NOT TO EXCEED $58,800.00 FOR ENGINEERING SERVICES RELATED TO THE EAST FAYETTEVILLE WATER SYSTEM IMPROVEMENTS PROJECT WHEREAS, on January 2, 2018, the City Council passed Resolution 19-18 to approve a professional engineering services agreement with Olsson, Inc. for design work on the East Fayetteville Water System and Township Pressure Plane Improvements Project; and WHEREAS, three previous amendments have been approved increasing the scope of work related to this project; and WHEREAS, Amendment No. 4 will provide funding for construction phase services associated with Contract Section I, the rehabilitation of two large pressure sustaining valves and three smaller pressure reducing valves, and will include onsite daily observations and inspections per engineering best practices and state law. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves Amendment No. 4 to the Professional Engineering Services Agreement with Olsson, Inc., a copy of which is attached to this Resolution, in an amount not to exceed S58,800.00 for additional engineering services related to the East Fayetteville Water System and Township Pressure Plane Improvements Project. PASSED and APPROVED on 10/6/2020 Page 1 Printed on 10,9/20 Resolution: 239-20 File Number 2020-0767 Approvek Attest: Lioneld Jor a or Kara Paxton, City � �Y Y Clerk Treasurer Page 2 Primed on 1019120 City of Fayetteville, Arkansas Text File File Number: 2020-0767 Agenda Date: 10/6/2020 Version: 1 In Control: City Council Meeting Agenda Number: A. 4 OLSSON, INC. AMENDMENT NO. 4: 113 West Mountain street Fayetteville, AR 72701 (479)575-8323 Status: Passed File Type: Resolution A RESOLUTION TO APPROVE AMENDMENT NO.4 TO THE PROFESSIONAL ENGINEERING SERVICES AGREEMENT WITH OLSSON, INC. IN AN AMOUNT NOT TO EXCEED $58,800.00 FOR ENGINEERING SERVICES RELATED TO THE EAST FAYETTEVILLE WATER SYSTEM IMPROVEMENTS PROJECT WHEREAS, on January 2, 2018, the City Council passed Resolution 19-18 to approve a professional engineering services agreement with Olsson, Inc. for design work on the East Fayetteville Water System and Township Pressure Plane Improvements Project; and WHEREAS, three previous amendments have been approved increasing the scope of work related to this project; and WHEREAS, Amendment No. 4 will provide funding for construction phase services associated with Contract Section I, the rehabilitation of two large pressure sustaining valves and three smaller pressure reducing valves, and will include onsite daily observations and inspections per engineering best practices and state law. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAVETTEVILLE,ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves Amendment No. 4 to the Professional,Engineering Services Agreement with Olsson, Inc., a copy of which is attached to this Resolution, in an amount not to exceed $58,800.00 for additional engineering services related to the East Fayetteville Water System and Township Pressure Plane Improvements Project. City of Fayetteville, Arkansas Page 1 Printed on 10/7/2020 City of Fayetteville Staff Review Form 2020-0767 Legistar File ID 10/6/2020 City Council Meeting Date - Agenda Item Only N/A for Non -Agenda Item Tim Nyander 9/10/2020 WATER SEWER (720) Submitted By Submitted Date Division / Department Action Recommendation: Staff recommends approval of Amendment No. 4 to the agreement between the City of Fayetteville and Olsson, Inc. in an amount not to exceed $58,800.00 for engineering services related to the East Fayetteville Water System Improvements Project. Budget Impact: 5400.720.5600-5314.00 Water and Sewer Account Number Fund 12009.1801 Water System Rehabilitation/Replacement Project Number Project Title Budgeted Item? Yes Current Budget $ 7,001,729.00 Funds Obligated $ 2,820,330.55 Current Balance I $ 4,181,398.45 Does item have a cost? Yes Item Cost $ 58,800.00 Budget Adjustment Attached? No Budget Adjustment $ - Remaining Budget $ 4,122,598.45 V20180321 Purchase Order Number: 2018-319 Previous Ordinance or Resolution # Change Order Number: 4 Approval Date: Original Contract Number: 2018-6 Comments: CITY OF FAYETTEVILLE ARKANS ARKANSAS MEETING OF OCTOBER 6, 2020 TO: Mayor and City Council THRU: Susan Norton, Chief of Staff Tim Nyander, Utilities Director FROM: Corey Granderson, Utilities Engineer DATE: September 10, 2020 CITY COUNCIL MEMO SUBJECT: Approval of Amendment No. 4 to the Agreement Between the City of Fayetteville and Olsson, Inc. for Engineering Services Related to the East Fayetteville Water System Improvements Project RECOMMENDATION: Staff recommends approval of Amendment No. 4 to the agreement between the City of Fayetteville and Olsson, Inc. for engineering services related to the East Fayetteville Water System Improvements Project in an amount not to exceed $68,800.00. BACKGROUND: On January 2, 2018, the City Council passed Resolution 19-18 to approve a professional engineering services agreement with Olsson, Inc. to begin design work on this project. The project consists of four sub -parts that will each be bid separately. Namely: Contract Section 1: Pressure Sustaining Valves Rehabilitation Contract Section 2: Gulley Road Water Tank Contract Section 3: Gulley and Goshen Pressure Plane Improvements Contract Section 4: Township Pressure Plane Improvements & Tank Amendment No. 1 was passed administratively utilizing contingency dollars to adjust the project scope. Amendment No. 2 was passed via Res. 266-19 to account for engineering time related to permitting and re -design delays. Amendment No. 3 was passed via Res. 203-20 for construction phase services related to Contract Section 2, the elevated water storage tank. Contract Section 1 of this project was successfully bid and will soon begin construction. DISCUSSION: Amendment No. 4 will provide funding for construction phase services associated with Contract Section 1, the rehabilitation of two large pressure sustaining valves and three smaller pressure reducing valves. Olsson will be involved with all project aspects during construction, including onsite daily observations and inspections per engineering best practices and state law. Mailing Address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 AMENDMENT NO.4 To AGREEMENT FOR PROFESSIONAL ENGINEERING SERVICES Between CITY OF FAYETTEVILLE, ARKANSAS And OLSSON, INC. (formerly MCGOODWIN, WILLIAMS, AND YATES, a DIVISION OF OLSSON ASSOCIATES) EAST FAYETTEVILLE AND TOWNSHIP PRESSURE PLANE IMPROVEMENTS WHEREAS, on January 2, 2018: the City of Fayetteville, Arkansas (CITY OF FAYETTEVILLE) and Olsson (formerly McGoodwin. Williams and Yates, a Division of Olsson Associates) of Fayetteville, Arkansas (ENGINEER) entered into an Agreement for engineering services in connection with the East Fayetteville and Township Pressure Plane Improvements (the "Project"); and WHEREAS, on August 13, 2018, the CITY OF FAYETTEVILLE and the ENGINEER agreed to Amendment No.I that included the ENGINEER providing services in connection with the evaluation, design and/or construction administration for a 12-inch waterline along Highway 45: and WHEREAS, on December 3, 2019, the CITY OF FAYETTEVILLE and the ENGINEER agreed to Amendment No.2 that included the ENGINEER providing additional services for the East Fayetteville and Township Pressure Plane Improvements. The work included meetings with Washington County Road Dept., Arkansas Department of Health, property owners, East Fayetteville Contract Section I redesign, geo-technical borings for the new Gulley Rd. and Township tanks, easement acquisition services, and miscellaneous analyses and infrastructure designs; and WHEREAS, on August 4. 2020, the CITY OF FAYETTEVILLE and the Engineer agreed to Amendment No.3 that included the Engineer providing Construction Administration services for the East Fayetteville Service Area Improvements. Contract Section II New Elevated Water Tank project. The work includes project management, onsite meetings with contractor, field survey staking, observation of construction, and field and lab material testing; and WHEREAS, the CITY OF FAYETTEVILLE now wishes to increase the scope of work to include Construction Administration services for the East Fayetteville Service Area Improvements, Contract Section I Existing Infrastructure Modifications project. The work shall include project management, onsite meetings with contractor. field survey staking, observation of construction, and field and lab material testing; and WHEREAS, the current Agreement must now be amended to provide the additional scope and amount of compensation to the ENGINEER for the additional work; and NOW THEREFORE. in consideration of the mutual covenants and Agreements herein contained, CITY OF FAYETTEVILLE and the ENGINEER, the parties hereto, stipulate and agree that the Agreement for Engineering Services dated January 2, 2018, and amended on August 13, 2018, December 3, 2019, and August 4, 2020, is hereby amended in the following particulars: SECTION 5 — PAYMENTS TO ENGINEER 5.1 The maximum not -to -exceed amount authorized for this Agreement is $982.605.00. The CITY OF FAYETTEVILLE shall compensate ENGINEER based on a Unit Price or Lump Sum basis as described in Appendix A. 018-0031 Amendment No.4 Page I The total costs for proposed Amendment No. 4 are based on Olsson's fee schedule and level of effort per task, not to exceed $58,800.00. This will raise the overall engineering project fees from $923,805.00 to $982,605.00. BUDGET/STAFF IMPACT: Funds for this amendment are budgeted and available from the Water System Rehabilitation/ Replacement account. The total costs for proposed Amendment No. 4 are not to exceed $58,800.00. Attachments: Engineering Services Agreement Amendment No. 4 Fee Schedule/Matrix APPENDIX A — SCOPE OF SERVICES Add the following Paragraph A.2.5: A.2.5 Construction Administration Services— East Fayetteville Service Area Improvements, Contract Section I Existing Infrastructure Modifications: Olsson shall provide a suitable staff to perform the Construction Administration services for the East Fayetteville Service Area Improvements. Contract Section I project. Work includes the following: I. Project Management — Includes submittals, RFI's, change orders, work change directives, review of contractors monthly pay estimates, etc. Services also include coordination with contractor, preparation and attending a kick-off meeting as well as monthly progress meetings and Engineer site visits 2. Survey — Includes constructing staking for the modifications to be constructed at a total of three sites located on the east side of the City of FayetteviIle 's.water. service area and one site in Springdale, Arkansas at the existing pressure sustaining valve site. -I. " 3. Resident Project Representative (RPR) — Duties of RPR include project observation and reporting construction activity to Engineer, maintaining•, record of construction activity, performing field material testing including concrete'slurnmp, air content, etc. tests, making concrete cylinders for strength tests, and soil density testing. Scope based on RPR on site approximately four (4) hours per day during construction activities. 4. Material Lab Tests— Work includes' concrete cylinder -breaks, grout prisms, soil and aggregate proctors, gradation and Atterberg tests. 5. Post Construction — Work includes creation of project close-out documents; site visit/final walk through, plans of record, etc. Compensation for these tasks are based on a construction timeline of 60 days to Substantial Completion and 75 days to Final Completion. If project construction runs longer that the aforementioned times. ENGINEER shall invoice CITY OF FAYETTEVILLE the standard hourly billing labor rate charged for those employees actually performing the work, plus reimbursable expenses if any. ENGINEER shall not commence work without CITY OF FAYETTEVILLE'S prior written approval. The staff shall consist of engineers, engineering technicians, and other assistants as may be necessary to carry on the work in an efficient and expeditious manner. A.4 Compensation Add the following Paragraph AAA: AAA Construction Administration Services — East Fayetteville Service Area Improvements, Contract Section I Existing Infrastructure Modifications: The maximum not -to -exceed amount for services described in Section A.2.4 Construction Administration Services — East Fayetteville Service Area Improvements, Contract Section I Existing Infrastructure Modifications is $58,800.00. 018-0031 Amendment No.4 Page 2 For clarification purposes. Amendment No. 4 increases the maximum not -to -exceed amount of the project by $58.800.00. IN WITNESS WHEREOF, CITY OF FAYETTEVILLE, ARKANSAS by and through its Mayor, and ENGINEER, by i[s authorized officer have caused this Amendment to be duly executed this �� day of Q(�],�. 2020. CITY OF FAYETTEVILLE. ARKANSAS OLSSON. INC. 37 ATTEST: City AGREEMENT By: W. Chris Hall. P.E. Team Leader 10) t B. Hammond, P.E. Office Leader JT NO.4 TO ENGINEERING SERVICES 018-0031 Amendment No.4 Page 3 G;-SGG" Data: 07-Aug-20 .lab: 018-0031 East Fa ettavilla Service Area Intarovernerts CSI LABOR HOURS EXPENSES TOTALS Phase/ Task Description of Work Team Leader Senior Engineer Pmjecl Engineer Associate Engineer Assistant Engineer Designer /SeNer CAD Tecn. Conslrlxtion Observation Admin./ Clerical Travel. mile (Car) Travel. SRnp (FOPS/ SURV Vebide) Prints (B". each Copies. esGl Total Man. Days Total Labor Fee Total Expense Fee Total Fee $190.00 $160,00 5145.00 120M 5102.00 E125.00 $118.00 $15.00 $0.58 $15.00 $1,30 $0.15 �TFd Conatructon Administration P 'ecl Manamerneat 32.00 40 W 9.00 5 12.88DOW $ S 12.880.00 SuDnittals 4.00 8.00 24.00 24.00 4.00 16.00 10.00 5 9920.00 S 5 9920.00 Cba a OMers RF1's B Work Change Directives 2.00 8.00 8.00 8.00 am 4.00 4.75 5 5 516.00 S 5 5,616.00 Kick-0K and Praress Meetings 5.00 6.00 12.W 4.50 8000 3.44 5 3291.00 $ 11 5 2 3].00 Survey- Construction 5laki 00 1. 5 1590.00 $ 5 159 Ins eclioNField Maternal Testing161.00 50.00 20A 5 19000M E y50M 5 19 ]50.00 LaD Material Testin 5 12 S 000.00 S 12 Pro ecl CloseouWost CenstmGion Services 2.00 2.00 16.00 U. 2.00 20.00 20.00 24.00 SE0.00 3.]5 5 3)40.00 S 426.]0 S O166.T0 GRAND TOTAL rounded 45.0 1 0.0 1 24.0 1 100.0 1 32.0 1 16.0 1 159.5 1 22.0 1 100.0 10.0 24.0 550.0 52.07 5 57 53].00 1 E 1222.70 1 5 58 BCD.00