Loading...
HomeMy WebLinkAbout223-20 RESOLUTIONOF FPYE rTf t C� 9RK41J5'S 113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 Resolution: 223-20 File Number: 2020-0498 RFQ #18-11 NABHOLZ CONSTRUCTION CHANGE ORDER #3: A RESOLUTION TO APPROVE CHANGE ORDER NO. 3 TO THE CONTRACT WITH NABHOLZ CONSTRUCTION CORPORATION IN THE AMOUNT OF $10,494,726.00 FOR CONSTRUCTION OF PHASE IOF THE CULTURAL ARTS CORRIDOR PROJECT, AND TO APPROVE A BUDGET ADJUSTMENT WHEREAS, on October 2, 2018, the City Council passed Resolution 217-18 to approve a Construction Manager at Risk Services Contract with Nabholz Construction Corporation for pre -construction services for Phase 1 of the Cultural Arts Corridor Project; and WHEREAS, in January 2019, Change Order #1 was approved to include a tree arborist analysis of the Fay Jones Woodland Area; and WHEREAS, in June of 2020, Change Order #2 was approved for pre -construction services related to the replacement parking deck; and WHEREAS, staff recommends approval of Change Order #3 to provide for the construction of Phase 1 of the Cultural Arts Corridor Project including the Fay Jones Woodland area, Razorback Greenway Improvements, and West Avenue Streetscapes. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves Change Order No. 3 to the Contract with Nabholz Construction Corporation in the amount of $10,494,726.00, which includes a 5% project contingency, for construction of Phase 1 of the Cultural Arts Corridor Page 1 Printed on 912120 Resolution: 223-20 File Number: 2020-0498 Project. Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment, a copy of which is attached to this Resolution. PASSED and APPROVED on 9/1/2020 Attest: 'k.� G\,V- ffff R K I CITrO;..�p.� G. F •r Kara Paxton, City Clerk Treasurer EV/44� : X 4'n '.•. gNSAs ,�y Page 2 Printed on WWO City of Fayetteville, Arkansas 113 West Mountain Street Fayetteville, AR 72701 �-� (479) 575-8323 16 ! Text File File Number: 2020-0498 Agenda Date: 9/1/2020 Version: 1 Status: Passed In Control: City Council Meetinq File Type: Resolution Agenda Number: C 1 RFQ #18-11 NABHOLZ CONSTRUCTION CHANGE ORDER #3: A RESOLUTION TO APPROVE CHANGE ORDER NO. 3 TO THE CONTRACT WITH NABHOLZ CONSTRUCTION CORPORATION IN THE AMOUNT OF $10,494,726.00 FOR CONSTRUCTION OF PHASE IOF THE CULTURAL ARTS CORRIDOR PROJECT, AND TO APPROVE A BUDGET ADJUSTMENT WHEREAS, on October 2, 2018, the City Council passed Resolution 217-18 to approve a Construction Manager at Risk Services Contract with Nabholz Construction Corporation for pre -construction services for Phase 1 of the Cultural Arts Corridor Project; and WHEREAS, in January 2019, Change Order #1 was approved to include a tree arborist analysis of the Fay Jones Woodland Area; and WHEREAS, in June of 2020, Change Order #2 was approved for pre -construction services related to the replacement parking deck; and WHEREAS, staff recommends approval of Change Order #3 to provide for the construction of Phase I of the Cultural Arts Corridor Project including the Fay Jones Woodland area, Razorback Greenway Improvements, and West Avenue Streetscapes. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves Change Order No. 3 to the Contract with Nabholz Construction Corporation in the amount of $10,494,726.00, which includes a 5% project contingency, for construction of Phase 1 of the Cultural Arts Corridor Project. Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment. a copy of which is attached to this Resolution. City of Fayetteville, Arkansas Page 1 Printed on 9/2/2020 City of Fayetteville Staff Review Form 2020-0498 Legistar File ID 8/18/2020 City Council Meeting Date - Agenda Item Only N/A for Non -Agenda Item Wade Abernathy 7/31/2020 FACILITIES MANAGEMENT (140) Submitted By Submitted Date Division / Department Action Recommendation: Change order #3 with Nabholz Constrution for the Phase 1 Arts Corridor Project in the amount of $10,494,726, and appprove a budget adjustment. This includes a 5% contingency. 4608.860.7800-xxxx. xx Account Number 46080.7800 Project Number Budget Impact: Arts Corridor Bonds Fund Phase 1 Arts Corridor Improvements Budgeted Item? Yes Current Budget Funds Obligated Current Balance Does item have a cost? Yes Item Cost Budget Adjustment Attached? Yes Budget Adjustment Remaining Budget Project Title $ 20,376,985.00 $ 1,000,408.94 $ 19,376,576.06 $ 10,494,726.00 $ 1,588,945.00 $ 10,470,795.06 V20180321 Purchase Order Number: Previous Ordinance or Resolution # Change Order Number: Approval Date: Original Contract Number: Comments: CITY OF FAYETTEVILLE ARKANSAS MEETING OF AUGUST 18,2020 TO: Mayor and City Council THRU: Susan Norton, Chief of Staff Paul Becker, Chief Financial Officer FROM: Wade Abernathy, Director Bond Projects DATE: 7/28/2020 CITY COUNCIL MEMO SUBJECT: Change Order #3 to RFQ 18-11 Nabholz Construction for the construction of Phase 1 of the Cultural Arts Corridor Project, and approval of a Budget Adjustment. RECOMMENDATION: Staff recommends approval of change order #3 to the Cultural Arts Corridor CMAR contract with Nabholz Construction for the construction of Phase 1 of the Cultural Arts Corridor Project in the amount of $10,494,726 This project includes Fay Jones Woodland area, Razorback Greenway Improvements, and West Avenue Streetscapes. A project contingency of 5% is budgeted. This change order is funded with the 2019 Phase 1 Bond allocation. BACKGROUND: In October 2018 Council approved a CMAR contract with Nabholz for the pre -construction services needed for the Cultural Arts Corridor. The Walton Family Foundation funded these services. Construction services to be fund with Bond procedes. In January 2019 Change Order #1 was issued to include a tree arborist analysis for the Fay ones Woodland Area. In April 2019, Fayetteville voters approved question 8 on the bond initiative for the new cultural arts corridor and replacement parking. Phase 1 Bonds allocated $20,016,970 for this first phase of the CAC and replacement parking. In February 2020, RFQ 20-02 Selection Committee chose Nabholz over several Construction Management Firms mainly based on their experience with Deck Construction. In June of 2020, Council Approved Change Order #2 for the CMAR services for the Replacement parking deck. Mailing Address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 DISCUSSION: This change order includes 20-62 Bids received thru our Purchasing Division on July 911, 2020. Those bids included Earthwork/Storm Drainage/Utility, Stone and Masonry, Landscape and Irrigation, Structural and Miscellaneous Steel, Custom Site Wood, and Electrical. We have worked with Nabholz and NBW to value engineer the project within budget and to include a 5% contingency. BUDGET/STAFF IMPACT: This project will be funded from the 2019 sales and use tax bonds. Phase 1 bonds allocated 20,016,970 for the CAC and replacement parking. A project contingency of 5%is included. Attachments: Change Order #3 �11 giTEGRI 1� Prime Contract Change Order Fayetteville Cultural Arts Corridor Project # 02-19-2526 Nabholz Construction Corporation 113 W. Mountain St. Tel: Fax: Favetteville. AR 72701 Date: 7/31/2020 To Contractor: Architect's Project No: Nabholz Construction Corporation Contract Date: 4/18/2018 3301 N 2nd St (72756), PO Box 277 Contract Number: 02-19-2526 Rogers, AR 72757 Change Order Number: 003 PROJECT CONFIDENTIAL Property of Nabholz Construction Corporation Not for Duplication or Distribution This document includes data prepared in conjunction with the Project that is deemed trade secret or proprietary to Nabholz. This document is shared with the Project team solely for use on this Project consistent with the responsibilities of the Project team. The Recipients shall not duplicate, use, or disclose, in whole or in part, to any person, entity, or party outside the Project team without Nabholz' prior written authorization. The Contract is hereby revised by the following items: Phase 2 GMP Fay Jones Woods and Streetscapes PCO Description Amount 002 Phase 2 GMP Fay Jones Woods and Streetscapes $ 10,494,726.00 This Change Order incorporates the Guaranteed Maximum Price for Phase 2. Phase 2 includes Streetscapes and Fay Jones Woods Pricing is based on the following: 1) GMP Estimate dated 7/31/2020 2) Value Engineering Worksheet dated 7/31/2020 3) 100% CD Drawings and Specifications dated 4/24/2020 4) Addendum 1 dated 5/27/2020 5) Addendum 2 dated June 3, 2020 6) Addendum 3 dated June 8, 2020 7) Addendum 4 dated 6/9/2020 8) Addendum 5 dated 7/7/2020 Reference the attached back up which describes the guaranteed maximum price in its entirety, including but not limited to all allowances, general conditions, general requirements, fees, exclusions, and value engineering options. Revised drawings will be used to confirm value engineering options. Once value engineering has been completed the contingency may need to be adjusted to reflect any variances. Allowances included in this Change Order are as follows: 1) Metal Fabrications Allowance = $783,989 2) Signage and Wayfinding = $10,162 The original Contract Value was. ................. .................................................................................................... $ 80,000.00 Sum of changes by prior Prime Contract Change Orders................................................................................ $ 6,880.00 The Contract Value prior to this Prime Contract Change Order was................................................................ $ 86,880.00 The Contract Value will be changed by this Prime Contract Change Order in the amount of .......................... $ 10,494,726.00 The new Contract Value including this Prime Contract Change Order will be .................................................. $ 10,581,606.00 The Contract duration will be changed by......................................................................................................... 458 Days The revised Substantial Completion date as of this Prime Contract Change Order is ..................................... 9/29/2021 Prolog Manager Printed on: 7/31/2020 Nabholz Page 1 r•r� \111168►rY Nabholz Construction Corporation CONTRACTOR 3301 N 2nd St (72756). PO Box 277 Rogers, AR 72757 Address By Rob Dodd SIGNATURE DATE • S/ Zn Zo Prime Contract Change Order Private Confidential City of Fayetteville OWNER 113 W. Mountain St. Fayetteville, AR 72701 Address By Lioneld Jo d SIGNATU DATE Prolog Manager Printed on: 7/31/2020 Nabholz Page 2 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 GMP Estimate PROJECT NAME Fayetteville Cultural Arts Corridor - Phase 1 PROJECT LOCATION Fayetteville, AR REVIEW DATE 7/31/2020 ARCHITECT Nelson Byrd Woltz ESTIMATED DURATION 15 Mo Job Phase Nabhob Description Takeoff Quantity Grand Total Amount 01 Park Costs 01-7423 Final Cleaning Speedy Cleaners 1.00 Isum 14,034 101-7423 Final Cleaning 1.00 Isum 14,034 03-0010 Concrete Nabadz 1.00 [sum 1,661,404 VE 9 GreggGravity Wall Footings 1.00 Isum 12,044) VE 9 Gre Concrete Work 1.00 Isum 2,029 'VE 10 Concrete Path in Lieu of Asphalt 1.00 Isum 3,667 VE 11 Tactile Pavers in Lieu of Granite 1.00 Isum (51,188) VE 12 Integrally Colored Concrete in Lieu of Exposed 1.00 Isum (3.650) Aggregate VE 15 Greenway Reduction from Center to Meadow 1.00 Isum 96.635 VE 22 Eliminate Concrete at Intersections 1.00 Isum 44,799 VE 23 Eliminate Concrete at Crosswalks 1.00 Isum 21,192 VE 35 Eliminate Dissi ator Structure & Cantilevered Deck 1.00 Isum 14.102 !Concrete A8. 1 1.00 Isum (6,223) 103-0010 Concrete 1.00 Isum 1,413,209 I04-2000 Masonry MCB (Masonry) 1.00 Isum 161,863 !Tricor(Custom) 1.00 Isum 204,692 VE 38 Bioswale Weirs to be Steel in Lieu of Masonry 1.00 Isum (55,799) VE 41 Masonry Consolidation Savings 1.00 Isum (64,853) 04-2000 Masonry 1.00 Isum 245,903 05-7000 Metal Fabrications Metal Fabrications Allowance 1.00 Isum 783,989 VE 6 Eliminate Gabian Wall Railing 1.00 Isum 12,702 VE 9 GreggWall Railing 1.00 Isum 25,405 VE 15 Greenway Reduction from Center to Meadow 1.00 Isum 10.609) VE 35 Eliminate Dissipator Structure & Cantilevered Deck 1.00 Isum 16.259 VE 38 Bioswale Weirs to be Steel in Lieu of Masonry 1.00 Isum 19,003 05-7000 Metal Fabrications 1.00 Isum 739,016 '06-1000 Rough Carpentry Nabadz Carpentry 1.00 Isum 614,980 Carpentry Alt.1 1.DOIsum 54,199) 06-1000 Rough Carpentry 1.00 Isum 560,781 !07-1000 Joint Sealants & Waterproofing i Nabadz Client Services 1.00 Isum 69,254 VE 35 Eliminate Dissipator Structure & Cantilevered Deck 1.00 Isum 1,054 07-1000 Joint Sealants & Waterproofing 1.00 Isum 68,201 09-9100 Painting Paint Innovators 1.00 Isum 83,935 VE 5 Tenemic Paint 1.00 Isum 9,146 VE 30 Fencing Reduction 1.00 Isum 940 Painting AIt.1 1.00 Isum (2.398) Painting Aft.3 1.00 Isum (1.372) 09-9100 Painting 1.00 Isum 69,980 12-4000 Site Furnishings Play Design 1.00 Isum 91,152 Modus Custom Furnishings) 1.00 Isum 95,363 Custom Furnishing s Install 1.00 Isum 7,118 VE 29 Remove Trash and Dog Waste Receptacles 1.00 Isum 13,414 Custom Furnishings Aft. 1 1.00 Isum 2,158 Site Furnishings Aft. 3 1.00 Isum 77,738 12-4000 Site Furnishings 1.00 Isum 100,313 22-0000 Plumbing MCC 1.00Isum 29,683 VE 7 Plumbing at Greenway 1.00 Isum 6.250) 22-0000 Plumbing 1.00 Isum 23,433 26-1000 Electrical Arnold & Blevins 1.00 Isum 1,410,468 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 GMP Estimate PROJECT NAME Fayetteville Cultural Arts Corridor - Phase 1 PROJECT LOCATION Fayetteville, AR REVIEW DATE 7/31/2020 ARCHITECT Nelson Byrd Woltz ESTIMATED DURATION 15 Mo Job NOW Nabholz Daor"- TakaoR pwntlty Grand Total Amount 25-1000 Electrical _SWEPCO Wire Install 1.00 Isum 112,714 Cox Underground Cable Install 1.00 Isum 64,511 Alt 4 A&B 1.00 Isum 17,804) 26-1000 Electrical 1.00 Isum 1,569,890 31-0000 Earthwork and Site Prep Oelke Waterline Work Sewerfine Work VE 9 Gravity Wall on Gregg VE 9 Waterline Work on Gregg1.00 1.00Isum 2,341,713 1.00 Isum 516,207 1.00 Isum 129,066 1.00 Isum (75A 47) Isum (21,374) VE 15 Greenway Reduction from Center to Meadow 1.00 Isum (9,397) VE 16 Fa Jones Woods Drainage Reduction 1.00 Isum (8,532) VE 24 Remove Permeable Pavers 1.00 Isum (13,175) VE 35 Eliminate Dissi ator Structure & Cantilevered Deck 1.00 Isum 20,171) VE 36 Gravel Service Path Scope Reduction 1.00 Isum 7,495 VE 40 Reduce Western Compacted Earth Footpath 1.00 Isum 14.826) 31-0000 Earthwork and Site Prep 1.00 Isum 2,815,858 32-1216 Asphalt Paving Apac 1.00Isum 132,795 Full Depth in Lieu of Mill & Overlay 1.00 Isum 95,852 VE 10 Concrete Path in Lieu of Asphalt 1.00 Isum 1.00 Isum 19,780 208,867 VE 28 City to Provide Asphalt Scope of Work 32-1216 Asphalt Paving 1.00 Isum 0 '32-1723 Pavement Markings and Signage Wayfinding & Si na a Allowance 1.00 Isum 10,162 Centerpoint Contractors 1.00 Isum 23,704 32-1723 Pavement Markings and Si na a 1.00 Isum 33,865 32-3113 Fencing & Gates Robinson Fence 1.00 Isum 73,572 VE 30 Fencing Reduction 1.00 Isum 10,101 32-3113 Fencing & Gates 1.00 Isum 63,471 32-9323 Landscaping Second Nature 1.00 Isum 920,751 VE 11 Tactile Pavers in Lieu of Granite 1.00 Isum 19,815 VE 15 Greenway Reduction from Center to Meadow 1.00 Isum 833) VE 17 Fay Jones Planting Reductions 1.00 Isum (25,405) VE 18 Streetscapes Planting Reductions 1.00 Isum (9,217) VE 20 Bioswale Edging Simplification 1.00 Isum 22,295 VE 24 Remove Permeable Pavers 1.00 Isum 52,515 VE 31 Delete Bioswale Planting Area Boulders 1.00 Isum 7,621 Landscaping Alt. 5 1.00 Isum 34,804) 32-9323 Landscaping 1.00 Isum 787,876 01 Park Costs 1.00 Isum 8,604,830 Fill ? 11 T GMP Estimate PROJECT NAME Fayetteville Cultural Arts Corridor - Phase 1 PROJECT LOCATION Fayetteville, AR REVIEW DATE 7/31/2020 ARCHITECT Nelson Byrd Woltz ESTIMATED DURATION 15 Mo Estimate Totals Description A�unt Totas H.U. Rt. Cost of Work 8,505,386 8.505,386 Building Permit Fee NIC Building Permit NIC 8,505,386 General Liability 89.205 Builder's Risk 15.742 Performance Payment Bond 50 827 Insurance & Bonds 155.774 8,661.160 Construction Contingency 175,000 Owner Contingency 300,000 Contingency 475,000 9,136,160 General Conditions 590.548 General Requirements 275,500 Entegrity Sustainability Consulting 31,950 GCs & GRs Phase 1 897,998 10,034,158 Construction Manager Fee 460,568 Contractors Fee 460.568 10.494,726 Total 10,494, 726 PROJECT CONFIDENTIAL Property of Nabholz Construction Corporation Not for Duplication or Distribution This document includes data that is deemed trade secret or proprietary to Nabholz and prepared in conjunction with the Project. This document is shared with the Project team solely for use on this Project consistent with the responsibilities of the Project team. The Recipients shall not duplicate, use, or disclose, in whole or in part, to any person, entity, or party outside the Project team without Nabholz' prior written authorization. This Sheet is to be used for reference only. Final numbers in the estimate may differ slightly and shall govern. PROJECT NAME: PROJECT #: VA TEAM: U11101Z REPORT DATE.,_ Item 4 Description Custom Furnishings Simplifications 1 VALUE ANALYSIS .. REPORT 7/31/2020 CL r 01 0 Value- X Date Approved Comments Modus is looking at more economical wood profiles and raw steel in lieu of weathering 2 Alternate wood for carpentry in lieu of black locust Pricing cypress option as well as a thermolized southern yellow pine 3 Reduction of wood at site railings 4 Remove Wood from Dissipator Overlook Railing 5 Alternate paint in lieu of Tenemec x . $9.000.00: 6 Remove Improvement to Existing Fence/Guardrail at Gabion Walls x S 12.500.00) Need Value of Wood 7 Deletion of plumbing at Greenway area x =6,150.00'i Plumbing would remain at the Gregg Ave. park area 8 Alternate Lighting Fixtures $0.00 9 Reduction of North Section of Gregg Ave. x i134,006.00) Need Value of Wood 10 Concrete in lieu of asphalt trail x S 15,811.001 To include 38' shorter hard surface area. 11 Tactile Pavers in lieu of Granite Detectable Warning Devices x :31. 501.00; 12 Eliminate Intersection saw cuts x 13 Integrally Colored Concrete in Lieu of Exposed Aggregate x 14 Alternate permeable paver product x Pending further information from landscaper 15 Remove Greenway work from Center to Meadow x Pending Electrical & Wood 16 Fay Jones Woods Drainage Reduction x z58,396.00) 1/3rd Target reduction 17 Fay Jones Planting Reductions x ;525,000.00) Target Value Goal 18 Streelscapes Planting Reductions x ($9.070.00) 19 Eliminate Elevated Walkway"C" x 1561,938.001 20 Bioswale Edging Simplification x I 521,940.00) 21 Re -use existing watermeters where feasible x SO 00 Only $400 per meter & would require verification of existing meters. 22 Eliminate Concrete at intersections x 544.634.00) Asphalt by owner in intersections 23 Eliminate Concrete at crosswalks x $21.114.00) Asphalt by owner 24 Remove Permeable Pavers x .564,643.00) Asphalt would need to be added by city. 25 LID & Bioswale to go to typical street planting design x $55,950.00' Removes LID soil and Drainage 26 Rosetta Outcropping stone at weirs x !$9,996. -.:. 27 Mill & Overlay from South St. to Library Crosswalk x ($16,OOO.00) 28 City to Provide Street Asphalt Scope of Work x ($205,543.00) 29 Remove Trash & Dog Waste Receptacles x ($13,200.00) 30 Fencing Reduction x ($10,865.00) 31 Delete Bioswale Planting area Boulders x ($7.500.00) 32 Greenway Concrete Value $0.00 $143,420 total value from Nabholz 33 Eliminate Overlook Rock Scramble x $0.00 Value to be used in place of the Dissipator. 34 Asphalt Trail in lieu of Concrete from Library Crossing x $0.00 The asphalt option is more expensive than concrete. 35 Eliminate Dissipator Structure & Cantilevered Deck x !$50,950,00) 36 Gravel Service Path Scope Reduction x 57.376.00) 37 Bioswale Weirs to be Timbers in Lieu of Masonry $0.00 38 Masonry Bioswale Weirs to be Steel in lieu of Mason x ($36.210.00J Pricing is based on typical milled steel. For preweathered the savings would only be $17,510. 39 Beam Rack at South Retaining wall at Fay Jones in Lieu of Concrete $0.00 40 Reduce Western Compacted Earth Footpath x ($14,590.00) 41 Masonry Consolidation Savings x ($63,820.00) 42 $0.00 43 Alternate 1 x ($70,144.'-- Remove Wayside Deck 44 1 Alternate 2 x 569,504.00; Remove secondary trail paths in Fay Jones Woods; includes resin bound and compacted earth paths, beamrock steps and 2 foot bridges. Page 1 of 2 Value Analysis and/or Conslructability Suggestions are advisory only and not professional design services. Nabholz takes no responsibility for design. 45 Alternate 3 x Remove Suspension Bridge 46 Alternate 4 x Remove Passive Detection Bollards 47 Alternate 5 x Remove West Avenue Streetscape Irrigation 48 49 Hillcrest Tower Value x 50 TOTAL Reduced OHBP APPROVIED:W I x 361.403.231 TOTAL PENDING: TOTAL REJECTED] WORKING BUDGET: $11,770,482.00 ANTICIPATED SAVINGS REVISED WORKING BUDGET:1 10,248,586.77 SUMMARY TARGET BUDGET:1 $10,319,448.10 CONTINGENCY/ ESCALATION S0.00 DIFFERENCE: Page 2 of 2 Value Analysis and/or Constructability Suggestions are advisory only and not professional design services. Nabholz takes no responsibility for design. City of Fayetteville, Arkansas - Budget Adjustment Form (Legistar) Budget Year Division Adjustment Number Non -Departmental (800) 2020 /Org2 Requestor: Kevin Springer BUDGET ADJUSTMENT DESCRIPTION / JUSTIFICATION: CHANGE ORDER #3 TO RFQ 18-11 NABHOLZ CONSTRUCTION FOR CMAR SERVICES FOR THE CULTURAL ARTS CORRIDOR PROJECT FOR PHASE 1 BID PACKAGES IN THE AMOUNT OF $10,494,726, and approve a Budget Adjustment. , RESOLUTION/ORDINANCE COUNCIL DATE: 8/ 18/2020 LEGISTAR FILE ID#: 2020-0498 KevbvvSpr y 8/3/2020 10:39 AM Budget Director TYPE: JOURNAL #: GLDATE: CHKD/POSTED: Date D - (City Council) TOTAL 222,572 222,572 v.20200528 Increase / (Decrease) Proiect.Sub# Account Number Expense Revenue Project Sub.Detl AT Account Name 4601.860.7800-5804.00 222,572 - 46080 7800 EX Building Costs 4601.860.7800-4420.00 - 61413 46080 7800 RE Payments by Property Owners - base 4601.860.7800-4420.00 - 216,159 46080 7800 RE Payments by Property Owners - base 4602.860.7800-5809.00 223,030 - 46020 7800 EX Improvements - Street 4602.860.7999-5899.00 (223,030) 46020 7999 EX Unallocated - Budget 4603.860.7800-5814.05 424,758 - 46030 7800 EX Improvements - Trails 4603.860.7999-5899.00 (424,758) - 46030 7999 EX Unallocated - Budget 4608.860.7800-5804.00 8,905,781 46080 7800 EX Building Costs 4608.860.7999-5899.00 (8,905,781) 46080 7999 EX Unallocated - Budget 5400.860.5600-5808.00 644,565 - 11011 2019.7800 EX Improvements - Water Line 5400.860.5700-5815.00 74,020 - 11011 2019.7800 EX Improvements - Sewer 5400.720.5600-5808.00 (718,585) - 11011 1 EX Improvements - Water Line HABudget Adjustments\2020_Budget\City Council\08-18-2020\2020-0498 BA CO3 NABHOLZ CMAR CAC.xlsm 1 of 1 Submit Public Comment This page is provided for efficient submission of public comment for City Council and Planning Commission meetings. All submissions must be directly related to a specific agenda item for the next meeting. Please ensure your comments conform to the Rules of Order and Procedure. RULES OF ORDER AND PROCEDURE OF THE FAYETTEVILLE CITY COUNCIL Full Name* Lana Harris Address or Ward* Address • Ward Locate Your Ward Number Ward* Ward 4 Phone Number 4794458002 Email lanalharris@yahoo.com Meeting Body* City Council Agenda Item C 2 3 4 Number/Subject Locate City Council Agenda Item Locate Planning Commission Agenda Item Comments Short and sweet... fund our police! SRO's are vital to our schools. Attachments Section from the RULES OF ORDER AND PROCEDURE OF THE FAYETTEVILLE CITY COUNCIL Adopted 01/07/2020 by Resolution #01-20 & Amended 06/16/2020 by Resolution #170-20: Public Comments. I'LIbliC Comment at a Clty Council meeting shall be allo�ccd tier all members ol-thC audience \rhi> hacC signed all prior to the hcginning ofthc agenda item thc,, xvish to address being opened to? public cummcnt. spcakcn shall be limited to a ma\inn in ol- live (5) minute, to he broken into segments of thrcc and t"o minute,. Amendments mac recei%e puhliC Comments only il'allpro�ed h% the CitN ('ounril by unanimous Consent or majority WIC. li'l,uhliC Comment is allowed li)r an amendment. speakers will onlc be allowed to speak tix three (3) mimics. The Cite Council mac allow hoth a speaker additional time and an unsigned -up hCrson to speak b% unanimous Consent or niajority �Otc Courtesy and Respect. All members of the public, all city staff and elected officials shall accord the utmost courtesy and respect to each other at all times. All shall refrain from rude or derogatory remarks, reflections as to integrity. abusive comments and statements about motives or personalities. Any member of the public who violates these standards shall be ruled out of order by the Mayor. must immediately cease speaking and shall leave the podium. Enter the text you want this field to display NABHOLZ CONSTRUCTION CORPORATION CULTURAL ARTS CORRIDOR PROJECT CHANGE ORDER 5 City of Fayetteville Staff Review Form 2021-0376 Legistar File ID N/A City Council Meeting Date - Agenda Item Only N/A for Non -Agenda Item Wade Abernathy 5/12/2021 FACILITIES MANAGEMENT (140) Submitted By Submitted Date Division / Department Action Recommendation: Approval of Change Order #5 with Nabholz Construction in the amount of Zero Dollars for the Construction of Phase 1 of the Cultural Arts Corridor Project. Account Number 46080.7800 Project Number Budgeted Item? Yes Does item have a cost? No Budget Adjustment Attached? NA Budget Impact: Arts Corridor Bond Fund Phase 1 Arts Corridor Imporvements Project Title Current Budget $ 18,653,413.00 Funds Obligated $ 8,750,753.74 Current Balance $ 9,902,659.26 Item Cost $ - Budget Adjustment Remaining Budget $ _ 9,902,659.26 i Purchase Order Number: 2020-00000689 Change Order Number: 5 Original Contract Number: 2018-00000042 Comments: V20180321 Previous Ordinance or Resolution # 223-20 Approval Date: CITY OF FAYETTEVILLE ARKANSAS TO: Mayor Lioneld Jordan THRU: Susan Norton, Chief of Staff Paul Becker, Chief Financial Officer FROM: Wade Abernathy, Director Bond and Construction Projects DATE: May 12, 2021 STAFF MEMO SUBJECT: Approval of Change Order #5 to RFQ #18 contract with Nabholz Construction for the construction of phase 1 arts corridor project. RECOMMENDATION: Staff Recommends approval of Change Order #5 with Nabholz construction for sum of zero dollars. BACKGROUND: In October 2018 Council approved a CMAR contract with Nabholz for the pre -construction services needed for the Cultural Arts Corridor. The Walton Family Foundation funded these services. Construction services to be fund with Bond proceeds. In January 2019 Change Order #1 was issued to include a tree arborist analysis for the Fay ones Woodland Area. In April 2019, Fayetteville voters approved question 8 on the bond initiative for the new cultural arts corridor and replacement parking. Phase 1 Bonds allocated $20,016,970 for this first phase of the CAC and replacement parking. In February 2020, RFQ 20-02 Selection Committee chose Nabholz over several Construction Management Firms mainly based on their experience with Deck Construction. In June of 2020, Council Approved Change Order #2 for the CMAR services for the Replacement parking deck. In September of 2020, Council approved Change Order #3 for the construction of Phase 1 Arts Corridor Project. In December of 2020, A Zero -Sum change order was approved, which incorporated Value Engineering and SWEPCO savings. DISCUSSION: This Change order includes adjustment in cost for unforeseen conditions including, unsuitable soils, steel, Stone wall upgrade, water meter relocates, temporary retaining wall and sidewalk on west ave. It also includes a substantial credit for the paint not needed on the railings and exposed steel. The cost of these items is funded from the contractor held construction contingency and allowances. BUDGET/STAFF IMPACT: Mailing Address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 N/A Attachments: Change Order Contract Contingency Accounting �KSESArrr i� Prime Contract Change Order J Fayetteville Cultural Arts Corridor Project # 02-19-2526 Nabholz Construction Corporation 113 W. Mountain St. Tel: Fax: Fayetteville, AR 72701 Date: 5/6/2021 To Contractor: Architect's Project No: Nabholz Construction Corporation Contract Date: 4/18/2018 3301 N 2nd St (72756), PO Box 277 Contract Number: 02-19-2526 Rogers, AR 72757 Change Order Number: 005 PROJECT CON FIDENTIAI, Property of Nabholz Construction Corporation Not for Duplication or Distribution This document includes data prepared in conjunction with the Project that is deemed trade secret or proprietary to Nabholz. This document is shared with the Project team solely for use on this Project consistent with the responsibilities of the Project team. The Recipients shall not duplicate, use, or disclose, in whole or in part, to any person, entity, or party outside the Project team without Nabholz' prlor written authorization. The Contract is hereby revised by the following items: COR's #03; #08-09; #11-19 PCO Description Amount 004 Steel Allowance Adjustment $0.00 009 Restraint at the Existing Water Line $0.00 011 RFI #8 Moving Existing Meters $0.00 012 Temporary Sidewalk at Center Street $0.00 014 Reduction of Paint Scope of Work $0.00 015 Unsuitable Soil at Overlook $0.00 016 Unsuitable at Board Form Wall at Entry $0.00 013 Replaced Curb at West Ave $0.00 018 Rustic Rubble Ledge Stone Upgrade $0.00 019 New Water Meter at 119 & 127 $0,00 020 Upgraded ELT-10 Light Fixture $0.00 021 Library Fire Line Saddle $0.00 023 Added Sewer Services at Condos $0.00 026 Flat Earth Archeology $0.00 027 Temporary Retaining Wall $0.00 This Change Order incorporates Change Order Request 3, 8, 9, 11, 12, 13, 14, 15, 16. 17, 18, and 19. Pricing is based on the following: 1) COR 003 - Steel Allowance Adjustments: The total cost of $43,502.38 will be deducted from the construction contingency. 2) COR 008 - Restraint at the existing water line where it was repaired: The total cost of $1,473.67 will be deducted from the construction contingency. 3) COR 009 - Relocate existing water meters. The total cost of $4,166.17 will be deducted from the construction contingency. 4) COR Oil - Unsuitable soils at the Overlook and Board Form walls, and temporary sidewalks. The total cost of $20,212.00 will be deducted from the construction contingency. 5) COR 012 - Reduced the scope of work for the painter. The total cost of $60,000.00 will be added to the construction contingency. 6) COR 013 - Upgraded the Stone at the Streetscapes Retaining Walls. The total cost of $3,092.59 will be deducted from the construction contingency. 7) COR 014 - Upgraded ELT-10 Light Fixture. The total cost of $6,829.23 will be deducted from the construction contingency. 8) COR 015 - RFI #16 - Relocate Water Meters. The total cost of $1,813.41 will be deducted from the construction contingency. 9) COR 016 - RFI #34 - Library Fire Line 6x6 Saddle. The total cost of $4,191.13 will be deducted from the construction contingency. Prolog Manager Printed on: 5/6/2021 Nabholz Page 1 .r \MlE6pli► Prime Contract Change Order Private Confidential 10) COR 017 - RFI #30 -Added Sewer Services at Condos. The total cost of $4,596.09 will be deducted from the construction contingency. 11) COR 018 -Added Flat Earth Archeology to be under Nabholz. The total cost of $3,847.50 will be deducted from the construction contingency. 12) COR 019 - RFI #23 - Added a retaining wall at the Intersection of West Ave and Center St. The total cost of $6,382.50 will be deducted from the construction contingency. The total cost of $40,106.67 will be deducted from the construction contingency. We are also requesting 58 working days (82 calendar days) to be added to the schedule due to lost days. 30 days have been lost to weather, and 28 days were lost to the Black Hills Energy gas relocation on West Ave. The original Contract Value was.......................................................................................................................................... $80,000.00 Sum of changes by prior Prime Contract Change Orders................................................................................................... $10,501,606.00 The Contract Value prior to this Prime Contract Change Order was................................................................................... $10,581,606.00 The Contract Value will be changed by this Prime Contract Change Order in the amount of ............................................. $0.00 The new Contract Value including this Prime Contract Change Order will be..................................................................... $10,581,606.00 The Contract duration will be changed by........................................................................................................................... 82 Days The revised Substantial Completion date as of this Prime Contract Change Order is ........................................................ 12120/2021 Nabholz Construction Corporation CONTRACTOR 3301 N 2nd St (72756), PO Box 277 Rogers, AR 72757 Address By John Strack SIGNATURE DATE 7 City of Fayetteville OWNER 113 W. Mountain St. Fayetteville, AR 72701 Address By Lioneld J d SIGNATUR�lj,'. >� DATE Z Prolog Manager Printed on: 516/2021 Nabholz Page 2 �r �NSEser�y Change Order Request NCC-Detail (with Breakdown of PCOs), Grp by Each Number -Confidential Fayetteville Cultural Arts Corridor Project # 02-19-2526 Nabholz Construction Corporation 113 W. Mountain St. Tel Fax: Fayetteville, AR 72701 To: Wade Abernathy From: John Strack City of Fayetteville Nabholz Construction Corporation 113 W. Mountain St. 3301 N 2nd St (72756), PO Box 277 Fayetteville, AR 72701 Rogers, AR 72757 PROJECT CONFIDENTIAL Property of Nabholz Construction Corporation Not for Duplication or DistributionThis document includes data prepared in conjunction with the Project that is deemed trade secret or proprietary to Nabholz. This document is shared with the Project team solely for use on this Project consistent with the responsibilities of the Project team. The Recipients shall not duplicate, use, or disclose, in whole or in part, to any person, entity, or party outside the Project team without Nabholz' prior written authorization. Description Category Status Steel Allowance Adjustment Contingency Pending Reference See attached backup Required By Days Req Amt Req 11 /4/2020 0 0.00 Notes This Change Order Request incorporates bid package 05.0 Structural Steel Bridges & Walkways (Supply & Install) and 05.1 Miscellaneous Steel (Supply & Install). Pricing is based on the following: 1) 100% CD Drawings and Specifications dated 7/31/2020 2) Addendum 1 dated 5/27/2020 3) Addendum 2 dated 6/3/2020 4) Addendum 3 dated 6/8/2020 5) Addendum 4 dated 6/9/2020 6) Addendum 5 dated 7/7/2020 7) Value Engineering Worksheet dated 7/31/2020 PCO No Date Reference Amt Prop Days Req Category Reason Description Notes 004 10/14/2020 Attached backup Steel Allowance Adjustment 0.00 FCAC Phase 1 Steel Re -Bids 0 Contingency Contingency 05.0 Structural Steel Bridges & Walkways (Supply & Install) 05.1 Miscellaneous Steel (Supply & Install) Item No Item Description 001 05.0 Structural Steel Bridges & Walkways (Supply & Install) 002 05.1 Miscellaneous Steel (Supply & Install) 003 SDI Insurance 004 Steel Allowance 005 Construction Contingency Approved By: Signature Name Change Order Request NCC-Detail (with Breakdown of PCOs), Grp by Each Number -Confidential Amt Prop Reference 720, 870.00 51,000.00 9,648.38 (738,016.00) (43,502.38) Date 02 Bid Form: Fayetteville Cultural Arts Corridor Date of Bid' Submitting Company ("Bidder") Company Name ��� , {-`� - I f 106 -4 Project State License Number—���«n�� Company Representative Name Email Address Cell Phone LA Scope of Work Bid Package Number Bid Package Descript Addenda Bidder acknowledges receipt of the following addenda: Addendum # Dated Addendum # Dated Addendum # Dated Addendum # Dated Addendum # Dated Addendum # Dated iPAS TA Cc Base Bid By submitting this proposal form, bidder acknowledges receipt of and compliance with Nabholz minimum insurance requirements, Master Contract Agreement, Project Contract Agreement, Performance and Payment Bond requirements, Purchase Order, CCIP Program Addendum, and Safety Standards. Bidder agrees to complete the Scope of Work listed below for a lump sum of- 15 Construction Manager's Manual — FAYETTEVILLE CULTURAL ARTS CORRIDOR — PHASE 1 Alternates I. Deduct/Alternate: Wayside Deduct $ 2. Deduct/Alternate: Secondary Trail Paths in Fay Jones Woods; Includes resin bound and compacted earth paths, beamrock steps and (2) foot Bridges. Deduct $ 3. Deduct/Alternate: Suspension Bridge Deduct $ 4. Deduct/Alternate: Passive Detection Bollards Deduct $ 5. Deduct/Alternate: West Avenue Streetscape Irrigation Deduct $ Voluntary Alternates 1 Add/Deduct2. $ Add/Deduct $ Unit Pricing 3. Price per cuyd of mass rock excavation $ 4. Price per cuyd of trench rock excavation S 5. Price per cuyd removal and replacement of unsuitable soils $ 6. Price per ton to furnish and install the boulders for the Tanglewood and Native boulder scrambles. $ Work in Progress & Project Specific Qualifications Bidder shall submit with their proposal a Work in Progress (WIP) Report that lists the ten (10) largest projects currently being constructed. Moreover, final evaluation of Bidder's proposal shall be conditional on review of WIP Report, and Bidder's experience with similar scope and projects. Completion Time All Work shall be completed within the schedules prepared by and agreed to by Nahh0l7 Ridder shall provide adequate manpower and submit documentation for approval necessary to work within the timeframe scheduled. Estimated time period for construction is July 20' — October 21'. Bonding Bid Security is required, for subcontract proposals greater than $50,000, equal to 5% of the bid amount. Payment & Performance Bond Rate Cost in Percent Construction Manager's Manual — FAYETTEVILLE CULTURAL ARTS CORRIDOR — PHASE 1 16 Bidder can provide a Performance and Payment Bond and can meet the requirements set forth in the "Project Contact". (circle one) Name of Surety Surety Agent Phone Number_ 41 9 `� � + - (11 Acceptance of Contract Forms Bidder acknowledges that they have reviewed and accept the Contract Performance and Administration, Sample Master Contract, Sample Project Contract, Payment and Performance Bonds, Sample Purchase Order, Contractor -Controlled Insurance Program Addendum to Master Contract and the Nabholz Safety Standards forms linked in Section 5.02. Proposed modifications must be submitted with bid. Signature Bidder agrees that this proposal remains valid for a period of 60 days. Bidder understands that Nabholz and the Owner reserve the right to reject any or all bids. Bidder acknowledges Nabholz minimum insurance requirements and understands that the Master Contract shall be the basis of any contract offered by Nabholz Construction to Bidder. Proposed modifications of Master Contract language must be submitted with bid. Attach additional sheets if necessary. Upon receipt of notice of acceptance of bid, Bidder agrees to execute and return the contract and required insurance certificates within two weeks of notification. By Title L Q l\- Printed name of individual signing this proposal L (3 art `,i,'% Contact phone _ number L`T ' q5%- Date �- END OF PROPOSAL FORM 16 Construction Manager's Manual- FAYETTEVILLE CULTURAL ARTS CORRIDOR - PHASE 1 02 Bid Form: Fayetteville Cultural Arts Corridor Date of Bid 10/06/20 Submitting Company ("Bidder") Company Name STI Metal Fab Project State License Number 0346250521 Company Representative Name Jarred Edmisten Email Addressjarred@stimetalfab.com Cell Phone 479-361-8973 Scope of Work Bid Package Number 05.0 Bid Package Description Structural Steel Bridges & Walkways (Supply & Install) Addenda Bidder acknowledges receipt of the following addenda: Addendum # 1 Dated 5/27/20 Addendum # 2 Dated 6/03/20 Addendum # 3 Dated 6/08/20 Addendum # 4 Dated 6/09/20 Addendum # 5 Dated 7/07/20 Addendum # Dated Base Bid By submitting this proposal form, bidder acknowledges receipt of and compliance with Nabholz minimum insurance requirements, Master Contract Agreement, Project Contract Agreement, Performance and Payment Bond requirements, Purchase Order, CCIP Program Addendum, and Safety Standards. Bidder agrees to complete the Scope of Work listed below for a lump sum of: $ 720, 870.00 14 Construction Manager's Manual — FAYETTEVILLE CULTURAL ARTS CORRIDOR — PHASE 1 N/A Alternates 1. Deduct/Alternate: Wayside 2. Deduct/Alternate: Secondary Trail Paths in Fay Jones Woods; Includes resin bound and compacted earth paths, beamrock steps and (2) foot Bridges. 3. Deduct/Alternate: Suspension Bridge 4. Deduct/Alternate: Passive Detection Bollards 5. Deduct/Alternate: West Avenue Streetscape Irrigation Voluntary Alternates 1. Q Unit Pricing 3. Price per cuyd of mass rock excavation 4. Price per cuyd of trench rock excavation 5. Price per cuyd removal and replacement of unsuitable soils 6. Price per ton to furnish and install the boulders for the Tanglewood and Native boulder scrambles. Deduct $ na Deduct $ na Deduct $ na Deduct $ na Deduct $ na Add/Deduct $ na Add/Deduct $ na $ na $ na $ na $ na Work in Progress & Project Specific Qualifications Bidder shall submit with their proposal a Work in Progress (WIP) Report that lists the ten (10) largest projects currently being constructed. Moreover, final evaluation of Bidder's proposal shall be conditional on review of WIP Report, and Bidder's experience with similar scope and projects. Completion Time All Work shall be completed within the schedules prepared by and agreed to by Nabholz. Bidder shall provide adequate manpower and submit documentation for approval necessary to work within the timeframe scheduled. Estimated time period for construction is July 20' — October 21'. Bonding Bid Security is required, for subcontract proposals greater than $50,000, equal to 5% of the bid amount. Payment & Performance Bond Rate Cost in Percent 0.90% 15 Construction Manager's Manual — FAYETTEVILLE CULTURAL ARTS CORRIDOR — PHASE 1 Bidder can provide a Performance and Payment Bond and can meet the requirements set forth in the "Project Contact". (circle one) ®'No Name of Surety Agent Seth Allison Surety Agent Phone Number 901- Acceptance of Contract Forms Bidder acknowledges that they have reviewed and accept the Contract Performance and Administration, Sample Master Contract, Sample Project Contract, Payment and Performance Bonds, Sample Purchase Order, Contractor -Controlled Insurance Program Addendum to Master Contract and the Nabholz Safety Standards forms linked in Section 5.02. Proposed modifications must be submitted with bid. Signature Bidder agrees that this proposal remains valid for a period of 60 days. Bidder understands that Nabholz and the Owner reserve the right to reject any or all bids. Bidder acknowledges Nabholz minimum insurance requirements and understands that the Master Contract shall be the basis of any contract offered by Nabholz Construction to Bidder. Proposed modifications of Master Contract language must be submitted with bid. Attach additional sheets if necessary. Upon receipt of notice of acceptance of bid, Bidder agrees to execute and return the contract and required insurance certificates within two weeks of notification. By �c Title Printed name of individual signing this proposal Jarred Edmisten Contact phone number 479-361-8973 Date 10/06/20 END OF PROPOSAL FORM 16 Construction Manager's Manual — FAYETTEVILLE CULTURAL ARTS CORRIDOR — PHASE 1 0 �NtFGaI r Change Order Request NCC-Detail (with Breakdown of PCOs), Grp by Each Number -Confidential Fayetteville Cultural Arts Corridor Project # 02-19-2526 Nabholz Construction Corporation 113 W. Mountain St. Tel Fax Fayetteville, AR 72701 To: Wade Abernathy From: John Strack City of Fayetteville Nabholz Construction Corporation 113 W. Mountain St. 3301 N 2nd St (72756), PO Box 277 Fayetteville, AR 72701 Rogers, AR 72757 PROJECT CONFIDENTIAL Property of Nabholz Construction Corporation Not for Duplication or DistributionThis document includes data prepared in conjunction with the Project that is deemed trade secret or proprietary to Nabholz. This document is shared with the Project team solely for use on this Project consistent with the responsibilities of the Project team. The Recipients shall not duplicate, use, or disclose, in whole or in part, to any person, entity, or party outside the Project team without Nabholz' prior written authorization. Description Category Status Restraint for Existing Water Line Reference Oelke CO #004 Contingency Approved Required By Days Req Amt Req 1 /12/2021 0 0.00 Notes This Change Order Request is for Oelke to install a restraint at the existing water line where it was repaired. The $1,473.67 will be deducted from the construction contingency. PCO No Data Reference, Ant Prop Days Req Category Reason Description Notes Item No Item Description Approved By: Signature Name Amt Prop Reference Date Oelke CONSTRUCTION COMPANY Proposal Request Project: Fayetteville Cultural Arts Corridor GC: Attention: Nabholz Josh Barrett Description : Restraint For the existing water line 1- Material and Labor Ferguson supplied material Oelke Labor 2 men X 2 hours Takeuchi excavator T8290CL x 1 hour Net Costs of Materials State Sales Tax @ 9.75% Net Placing Costs WC / GL Insurance Builders Risk P&P Bond Sub- Total OH&P @ 6 % Effect On Schedule (Change): 0 Days Craig Renfrow Project Manager Oelke Construction Company Date: No. 1-CR 1/4/2021 $ 1,134.76 $ 90.00 $ 125.00 $ 1,349.76 $ 1,349.76 $ 10.12 $ 3.37 $ 27.00 $ 1,390.25 $ 83.42 Total Credit: $ 1,473.67 Josh Barrett Assistant Project Manager Nabholz �KTE6AtTy �"�1► Change Order Request NCC-Detail (with Breakdown of PCOs). Grp by Each Number -Confidential Fayetteville Cultural Arts Corridor Project # 02-19-2526 Nabholz Construction Corporation 113 W. Mountain St. Tel Fax Favetteville. AR 72701 To: Wade Abernathy From: John Strack City of Fayetteville Nabholz Construction Corporation 113 W. Mountain St. 3301 N 2nd St (72756), PO Box 277 Fayetteville, AR 72701 Rogers, AR 72757 PROJECT CONFIDENTIAL Property of Nabholz Construction Corporation Not for Duplication or DistributionThis document includes data prepared in conjunction with the Project that is deemed trade secret or proprietary to Nabholz. This document is shared with the Project team solely for use on this Project consistent with the responsibilities of the Project team. The Recipients shall not duplicate, use, or disclose, in whole or in part, to any person, entity, or party outside the Project team without Nabholz' prior written authorization. Description Category Status Existing Water Meter Relocations Contingency In Negotiation Reference . RFI #8 Required By Days Req Arrit Req 2/4/2021 0 0.00 Notes This Change Order Request is for Oelke to move some existing water meters, and Multi -Craft to hook up the water line PCO No Date Reference Amt Prop Days Req Category Reason Description Notes 011 1/28/2021 RFI #8 RFI #8 Moving Existing Meters Item No Item Description 001 Oelke Move Meters 002 MCC Reconnect Water 003 Construction Contingency Approved By: Signature Name 0,00 0 Change Order Field Condition Amt Prop Reference 1,963.85 2,202.32 (4,166.17) Date Multi -Craft Contractors, Inc. Change Order Request TO: Nabholz PROJECT: Cultural Arts DATE: 19-1an-2021 CDR#: P003 DESCRIPTION OF CHANGE: Reconnect yard services meters ADDED DAYS TO CONTRACT TIME: MATERIALS/EQUIPMENT I CITY JUNIT 1 1$ COST/PER $ COST/TOTAL ISUBTOTAL Star Mechanical 1 ea @ $250.00 = ea @ _ $250.00 $0.00 ea @ ea @ _@ ea @ ea @ _ $0.00 $0.00 __ea _ $0.00 _ $0.00 _ $0.00 _ ea @ _ $0.00 ea @ _ _ $0.00 ea @ _ $0.00 ea @ _ $0.00 ea @ $0.00 ea @ $0.00 ea @ _ $0.00 ea @ @ _ $0.00 ea _ $0.00 consumables 1 lot @ 1$20.00 $20.00 gasoline gal @ $0.00 Materials/Equip. $270.00 LABOR (w/burden) QTY IHOURS 1 1$ PER/HR. $ HOUR/TOTAL Project Manager 1 1 Asst. Project Manager Superintendent Foreman _ 1 15 Journeyman @ $79.50 = $79.50 $0.00 @ $65.00 = @ $66.50 = $0.00 @ $60.00 = $900.00 @ $53.50 = 1$0.00 Apprentice j 1 15 @ $40.50 = $607.50 Helper Drafting j @ $36.50 = $0.00 1@ $67.00 = $0.00 Equipment Operator Fabricator @ $50.00 = $0.00 @ $66.00 = $0.00 Labor $1,587.00 RENTAL IQTY DAY WEEK $ PER $ COST/TOTAL = $0.00 = $0.00 = $0.00 = $0.00 SUBCONTRACTORS Rental $0.00 -- = $0.00 = $0.00 $0.00 Subcontractors $0.00 = SAFETY (Labor) 12.00% $31.74 SALES TAX (Materials) 9.75% $26.33 SALES TAX (Rentals) 10.75% $0.00 P & P Bond 0.00% $0.00 OH&P 15.00% $287.26 TOTAL I $2,202.32 Oelke Construction Co.-Chanze Order Request Job Name: Change Order Request # Date: Description of Request: Fayetteville Cultural Arts Cor. Requested Days 1-CR 27-Jan-21 Move existing water meters back into green space (3 meters) I Price Good For 10 Days Description Material & Labor Quantity Unit Cost 1'ni1 Material Cost Hours Type of Crew Man-hour Cost S S hr. hr. S $ $ S s _ S S hr. hr. S S hr. hr. S S hr. hr. S S hr. hr. S S T hr. hr.1 S MATERIALS( HTOTALl b I LABOR SUBTOTAL S TAX AS APPLICABLE 9.50"4 S LABOR BURDEN 12% 1 S CCCs' MATERIAL Li S LABOR TOTALI S SUBCONTRACTORS Description Sub Pricing Oelke Construction Move 3 meters -hook u street side s 1,596.00 S S S s S - Subcontractor Total S 1.596.00 CREW BREAKDOWN Cost / Hr Operator w/ Equipment A S 50.00 (2)Carpenters B S 60.00 Carpenter or Operator C $ 30.00 Laborer D S 20.00 OCC Direct Cost Description Quantity Unit Cost Unit Material Cost Hours Rate Labor Cost Project Manager $ I 3 hr. hr. s 42.91 hr. $ 42.91 hr. S 42.91 $ 128.73 Superintendent s S - s - s - s S S ti S S s s S _ - s - $ _ S $ S $ $ Overtime Pay enter es/no N es/no error k WeeklyClean L' Ex ense-d ster hr. s hr. s Estimating& Cost . Analysis hr. s hr. S Field Office Expense s S JobsiteTelephone/Fax Gas Oil, Maintenance Expense S s Temporary Utilities S s Material Handling hr. S hr. S Permits, Licenses, Fees, Dues s S Revised as Built Drawings hr. S hr. S Safety Expense hr. S hr. S Travel Pay Expense 5 Men hu $ hr. $ Subsistence Expense 5 Men s s Truck Expense $ $ Tool Expense s S — s $ S $ $ $ $ $ MATERIAL SUBTOTAL TAX AS APPLICABLE 9.509 CCCs' MATERIAL TOTALS S LABOR SUBTOTAL LABOR BURDEN LABOR TOTALI S 171.6a $ s - S 111.64 OCC Material Total $ - OCC's Labor Total $ - OCC Direct Cost Total $ 171.64 Subcontract Total $ 1,596.00 SUBTOTAL $ 1,767.64 OCC's Insurance ra 1.00% $ 17.68 OCCs' Bond @ $ - Change -Order Fee @ 10.00% $ 178.53 OELKE TOTAL FOR CHANGE $1,963.85 Clarifications to Change: Owner's Signature: �pTE6RITy ^r► Change Order Request NCC-Detail (with Breakdown of PCOs), Grp by Each Number -Confidential Fayetteville Cultural Arts Corridor Project # 02-19-2526 Nabholz Construction Corporation 113 W. Mountain St. Tel. Fax. Fayetteville, AR 72701 Change • 011 Date: To: Wade Abernathy From: John Strack City of Fayetteville Nabholz Construction Corporation 113 W. Mountain St. 3301 N 2nd St (72756), PO Box 277 Fayetteville, AR 72701 Rogers, AR 72757 PROJECT CONFIDENTIAL Property of Nabholz Construction Corporation Not for Duplication or DistributionThis document includes data prepared in conjunction with the Project that is deemed trade secret or proprietary to Nabholz. This document is shared with the Project team solely for use on this Project consistent with the responsibilities of the Project team. The Recipients shall not duplicate, use, or disclose, in whole or in part, to any person, entity, or party outside the Project team without Nabholz' prior written authorization. Description Category Status Unsuitable Soils and Temporary Sidewalks In Negotiation Reference RFI #17 Notes Required By Days Req Ant Req 4/26/2021 0 0,00 PCO No Date Reference Amt Prop Days Req Category Reason Description Notes 012 4/9/2021 0.00 0 Contingency Inspection Result Temporary Sidewalk at Center Street The city inspector requested us to pour back temporary concrete sidewalks in lieu of leaving gravel sidewalks. Item No Item Description Amt Prop Reference 001 Temp Sidewalk at Center 3,762.00 002 Construction Contingency (3,762.00) 015 4/19/2021 RFI #17 0.00 0 Change Order Field Condition Unsuitable Soil at Overlook The soil under the footings did not meet bearing capacity. The city approved us replacing the unsuitable soil with concrete at $350 per CY. It took a total of 38 cubic yards. Item No Item Description Amt Prop Reference vtsr<ss►rr � I• I 001 Unsuitable Soil at Overlook 002 Construction Contingency 016 4/19/2021 Unsuitable at Board Form Wall at Entry Item No Item Description 001 Unsuitable Soil 002 Construction Contingency Approved By: Signature Name Change Order Request NCC-Detail (with Breakdown of PCOs), Grp by Each Number -Confidential 13, 300.00 (13, 300, 00) 0.00 0 Change Order Field Condition The soil under the footing of the two board form walls at trail entrance across from the raised crosswalk from the Fayetteville Public Library did meet the design capacity. Footings were over excavated to meet design requirements. Additional concrete was used at $350 per CY A total of 9 cubic yards were used. Amt Prop Reference 3,150.00 (3,150.00) Date Change Order Request NCC-Detail (with Breakdown of PCOs), Grp by Each Number -Confidential Concrete - Fayetteville Arts Corridor Project # 02-21-8216 Nabholz Concrete Services - Rogers 113 W. Mountain St. Tel Fax Fayetteville. AR 72701 To: Josh Barrett Nabholz Construction Corporation 3301 N 2nd St (72756), PO Box 277 Rogers, AR 72757 From: Ashley Ferris Nabholz Concrete Services - Rogers 3301 N Second Street (Rogers, AR 72756) PO Box 277 Roqers, AR 72757-0277 PROJECT CONFIDENTIAL Property of Nabholz Construction Corporation Not for Duplication or DistributionThis document includes data prepared in conjunction with the Project that is deemed trade secret or proprietary to Nabholz. This document is shared with the Project team solely for use on this Project consistent with the responsibilities of the Project team. The Recipients shall Description C"Ory Status Overlook & Extra Sidewalks Pending Reference Required By Days Req Amt Req 423202 t 0 20,212,00 Notes PCO No Date Reference Amt Prop Days Req Category Reason Description Notes 006.1 4/14/2021 Overlook & Extra Sidewalks Item No Item Description 001 Unsuitables at Overlook - 38 cubic yards 002 Additional Sidewalks at Center Street 003 Unsuitables at Wall Footings - 9 cubic yards Approved By: Signature Name 20,212.00 0 Change Order 38 cubic yards of over -excavation at overlook, 9 cubic yards at wall footings, and temporary sidewalks at Center Street, Amt Prop Reference 13, 300.00 3,762.00 3,150.00 Date Change Order Request NCC-Detail (with Breakdown of PCOs). Grp by Each 01ZNumber -Confidential Fayetteville Cultural Arts Corridor Project # 02-19-2526 Nabholz Construction Corporation 113 W. Mountain St. Tel. Fax Fayetteville, AR 72701 To: Wade Abernathy From: John Strack City of Fayetteville Nabholz Construction Corporation 113 W. Mountain St. 3301 N 2nd St (72756), PO Box 277 Fayetteville, AR 72701 Rogers, AR 72757 PROJECT CONFIDENTIAL Property of Nabholz Construction Corporation Not for Duplication or DistributionThis document includes data prepared in conjunction with the Project that is deemed trade secret or proprietary to Nabholz. This document is shared with the Project team solely for use on this Project consistent with the responsibilities of the Project team. The Recipients shall not duplicate, use, or disclose, in whole or in part, to any person, entity, or party outside the Project team without Nabholz' prior written authorization. Description Category Status Reduction in Paint Scope Approved Approved Reference Required By Days Req Amt Req 4/16/2021 0 000 Notes PCO No Date Reference Amt Prop Days Req Category Reason Description Notes 014 4/9/2021 0.00 0 Change Order Contingency Reduction of Paint Scope of Work The paint scope has been reduced to staining of the wood fence in lieu of painting the structural steel or sealing the wood handrails. Item No Item Description Amt Prop Reference 001 Paint Reduction (60,000.00) 002 Construction Contingency 60,000.00 Approved By: Signature Name Date v�rr Change Order Request NCC-Detail (with Breakdown of PCOs). Grp by Each Number -Confidential Fayetteville Cultural Arts Corridor Project # 02-19-2526 Nabholz Construction Corporation 113 W Mountain St- Tel Fax Fayetteville. AR 72701 To: Wade Abernathy From: John Strack City of Fayetteville Nabholz Construction Corporation 113 W. Mountain St. 3301 N 2nd St (72756), PO Box 277 Fayetteville, AR 72701 Rogers, AR 72757 PROJECT CONFIDENTIAL Property of Nabholz Construction Corporation Not for Duplication or DistributionThis document includes data prepared in conjunction with the Project that is deemed trade secret or proprietary to Nabholz. This document is shared with the Project team solely for use on this Project consistent with the responsibilities of the Project team. The Recipients shall not duplicate, use, or disclose, in whole or in part, to any person, entity, or party outside the Project team without Nabholz' prior written authorization. Description Category status Rustic Rubble Ledge Stone Upgrade Contingency Approved Reference Notes PCO No Date Reference Required By Days Req Alit Req 5/5/2021 0 0.00 Description Notes 018 4/28/2021 Stone Mockup Rustic Rubble Ledge Stone Upgrade Item No Item Description 001 Stone Upgrade 002 SDI Insurance 003 Construction Contingency Approved By: Signature Name Amt Prop Days Req Category Reason 0.00 0 Owner Change Design Change Stone at retaining walls upgraded to Rustic Rubble Ledge. Amt Prop Reference 3,054.41 38.18 (3,092.59) Date TriCor Masonry LLC 300 N College Ave. Suite 306 Fayetteville, Ar 72701 Phone: 479-877-5307 Attn: Josh Barratt Customer Name: Nabholz Project: Fayetteville Arts Phone: 479-202-3506 Email: iosh.barrettanabholz.com CHANGE ORDER Date Change order# 4/27/2021 2 From: Kenny Batson Email: kennyatricorgrl).com Phone#: 479-877-5307 Fax: Terms Jobsite Address Net 30 Fayetteville, AR. Clty Description I Unit Price Total 1 LS- Stone Rustic Ruble Ledge in leu of spec stone Cut Stone by Flagstone 3 3.054.41 $ 3.054.41 Sub -Total $ 3,054.41 Sales Tax 2.5000% $ - Notes: 54.4 Accepted: By: Kenny Batson Tricor Masonry LLC Title: Date: Date: 4/27/2021 �Ns�sRrrr Change Order Request NCC-Detail (with Breakdown of PCOs). Grp by Each Number -Confidential Fayetteville Cultural Arts Corridor Project # 02-19-2526 Nabholz Construction Corporation 113 W. Mountain St. Tel Fax Fayetteville. AR 72701 To: Wade Abernathy From: John Strack City of Fayetteville Nabholz Construction Corporation 113 W. Mountain St. 3301 N 2nd St (72756), PO Box 277 Favetteville. AR 72701 Rogers. AR 72757 PROJECT CONFIDENTIAL Property of Nabholz Construction Corporation Not for Duplication or DistributionThis document includes data prepared in conjunction with the Project that is deemed trade secret or proprietary to Nabholz. This document is shared with the Project team solely for use on this Project consistent with the responsibilities of the Project team. The Recipients shall not duplicate, use, or disclose, in whole or in part, to any person, entity, or party outside the Project team without Nabholz' prior written authorization. Description Category Status Upgraded ELT-10 Light Fixture In Negot!ation Reference Required By Days Req Ant Req 5, T 7C21 0 0 00 Notes The spec'd ELT-10 light fixture has been discontinued. The replacement light fixture is an increase in cost. PCO No Date Reference Amt Prop Days Req Category Reason Description Notes 020 4/28/2021 ELT-10 Light Submittal Upgraded ELT-10 Light Fixture Item No Item Description 001 Upgraded ELT-10 Light Fixture 002 SDI Insurance 003 Construction Contingency Approved By: Signature Name 0.00 0 Lump Sum Design Change Amt Prop Reference 6,744.92 84.31 (6,829.23) Date Request for Change Po BOX 688 North Little Rock, AR 72115 RFC Number: RFC2 Date: 04/30/2021 Re ardin : RFC2 is to change the bid day ELT10 fixture to the newly specified higher lumen option. To: ARNOLD AND BLEVINS 391 JEAN MARY DR SUITE B SPRINGDALE, AR 72762 Requested By: Phone: BLAKE BOONE (479) 442-8755 Job Site: Fay Cultural Arts Corridor 1718 Aldersgate Road Little Rock, AR 72205 E-mail: bboone@abnorthwest.com Recipients: Phone: E-mail: BLAKE BOONE (479) 442-8755 bboone@abnorthwest.com Requested Change: Change to Contract New ELT10 $ 5250.00 Freight $ 200.00 Tax $ 572.25 Markup $ 722.67 Rounding $ -0.92 Please respond by: 05/03/2021 BLAKE BOONE ARNOLD AND BLEVINS RFC Total BLAKE BOONE ARNOLD AND BLEVINS $ 6744.00 Date: Apr 23, 2021 Quote: ARKANSAS21-135198-1 Project CULTURAL ARTS CORRIDOR - UPGRADED DESIGN Location FAYETTEVILLE AR Quote ARKANSAS21-135198-1 To: Kenny Enderland UPCHURCH ELECTRCIAL SUPPLY, D 2355 N. GREGG STREET FAYETTEVILLE AR 72703 Phone: (479) 521-2823 Fax: (479) 524-6673 EMail: kenderland@mayerelectric.com Remarks: THANK YOU FOR THIS OPPORTUNITY! QTY Type MFG Part Quote Page 1 /2 Bell & McCoy 6001 Murray Street Little Rock AR 72209 Phone: (501) 570-8170 Fax: (501) 570-8190 From: BEVERLY GARDISSER Quoter Ph: Email: bgardisser@bellandmccoy.com For Bid Date Apr 23, 2021 Expires May 23, 2021 Architect: Tillett Lighting Design Assoc. - NY Engineer: HSA ENGINEERING -FORT SMITH Note ORGANIC LIGHTING - UPDATED DESIGN 4.22.21 Note ELT-10 ORGANIC 1011 FT. TOTAL - LINILED POWER SIDE- 27K - SIDE EMITTING ASYMMETRIC - 97 LMIFT. - 1.3W/FT. Note ELT-10 ORGANIC BRIDGE: (1) 9'11 ", (3) 32'11", (1) 30'11" Note ELT-10 ORGANIC WALK A: (4) 32'11 ", (1) 225", (1) 4' Note ELT-10 ORGANIC WALK B: (5) 32'11 ", (1) 264", (1) 21' Note ELT-10 ORGANIC WALK C: (7) 32'11 ", (1) 97', (1) 4' Note ELT-10 ORGANIC OVERLOOK: (7) 32'11 ", (1) 172" (1) 8' Note ELT-10 ORGANIC SEE ATTACHED LAYOUT DRAWING 1,011 ELT-10 ORGANIC 011739 -LINILED SIDE POWER - 27K - SIDE EMITTING - 97LM/FT - 1.3W/FT 36 ELT-10 ORGANIC 011291 - LINILED SIDE MIRROR WELDED CONNECTOR, IP68 310 ELT10 ORGANIC 011369 P.E.T. CLEAR MOUNTING CHANNEL - SELF ADHESIVE/SCREWABLE/CUTTABLE - 39" LONG Note ORGANIC PET CHANNEL ABOVE HAS DOUBLE SIDED ADHESIVE ALONG THE ENTIRE CHANNEL & ALSO HAS INTERNAL BOTTOM CAVITY FOR FLATHEAD SCREWS Note ORGANIC THE FLATHEAD SREWS ARE NOT INCLUDED BUT RECOMMENDED FOR THIS APPLICATION - CHANNEL NEEDS TO BE SECURED TO STRUCTURE WITH SCREWS 3 ELT10 ORGANIC 011355 - 10OW POWER SUPPLY - DIMMABLE 120V MAGNETIC DC DRIVER Put Our Team To Work For You! www.bellandmccoy.com BEVERLY GARDISSER Page 1/2 Date: Apr 23, 2021 Quote: ARKANSAS21-135198-1 Project CULTURAL ARTS CORRIDOR - UPGRADED DESIGN Location FAYETTEVILLE AR Quote ARKANSAS21-135198-1 Quote Page 212 Bell & McCoy 6001 Murray Street Little Rock AR 72209 Phone: (501) 570-8170 Fax: (501) 570-8190 From: BEVERLY GARDISSER Quoter Ph: Email: bgardisser@bellandmccoy.com QTY Type MFG Part 11 ELT10 ORGANIC 011356 - 150W POWER SUPPLY - DIMMABLE - 120V MAGNETIC DC DRIVER Note ELT10 ORGANIC DC POWER SUPPLIES HVE PUSH -TO -RESET CIRCUIT BREAKER ON THE OUTPUT & IS ENCASED IN COATED METAL BOX W12 KNOCK -OUTS ON BOTTOM, IP6 4 ELT10 ORGANIC 011300 - NEMA 4R BOX - WET ENCLOSURE (FOR 20W & 40W POWER SUPPLIES - 2 PER BOX) 4 ELT10 ORGANIC 011301 - NEMA 4 SUB PANEL L12" X W10" 1 ELT-10 BMLC-O E&DA Total for Submittal Change Adder Notes: ORGANIC WILL BE PLUS FREIGHT - THEY DO NOT HAVE A FREIGHT ALLOWANCE Terms and conditions of sale: Quotations are subject to approval Manufacturer's written terms and conditions of sale apply Please verify all colors, finished, ballasts required and voltages Customer is responsible for accuracy of voltages and determination of multiple ballast needs for switching Customer's written purchase order takes precedence Prices firm for 30 days, and are subject to increase without notice Lamps are not included unless otherwise noted Standard manufacturer freight terms apply Standard lead times vary between manufacturers and products $5,250.00 Put Our Team To Work For You! www.bellandmccoy.com BEVERLY GARDISSER Page 2/2 �tEsn►rr Change Order Request NCC-Detail (with Breakdown of PCOs). Grp by Each Number -Confidential Fayetteville Cultural Arts Corridor Project # 02-19-2526 Nabholz Construction Corporation 113 W. Mountain St. Tel Fax Fayetteville, AR 72701 To: Wade Abernathy From: John Strack City of Fayetteville Nabholz Construction Corporation 113 W. Mountain St. 3301 N 2nd St (72756), PO Box 277 Fayetteville, AR 72701 Rogers, AR 72757 PROJECT CONFIDENTIAL Property of Nabholz Construction Corporation Not for Duplication or DistributionThis document includes data prepared in conjunction with the Project that is deemed trade secret or proprietary to Nabholz. This document is shared with the Project team solely for use on this Project consistent with the responsibilities of the Project team. The Recipients shall not duplicate, use, or disclose, in whole or in part, to any person, entity, or party outside the Project team without Nabholz' prior written authorization. Description Category Status RFI #16 Relocate Water Meters Contingency In Negotiation Re%rettce RFI #16 Required By Days Req Amt Req 0 0.00 Notes This COR is to relocate the water meter shown at property 127 to the property line between 127 and 119. The new double meter will serve both units at 119 PCO No Date Reference Amt Prop Days Req Category Reason Description Notes 019 4/28/2021 RFI #16 0.00 0 Contingency Design Change New Water Meter at 119 & 127 Relocated water meter for 127 and 119 West ave to the shared lot line. This is per city specification and consistent with conversations Olsson had with Jason Carte and Corey Granderson. Item No Item Description Amt Prop Reference 001 Relocated Water Meter 1,791.02 002 SDI Insurance 22.39 003 Construction Contingency (1,813.41) Approved By: Signature Name Date Oelke Construction Co.-Ghanee Order Reauest Job Name: Change Order Request # Date: Description of Request: Fayette%ille Cultural Arts Cor. Requested Days 6 6-Apr-21 119 S West Avenue water meter relocate to property line I Price Good For 10 Days Description Material & Labor Quantity Unit Cost Unit Material Cost (lours Ta of Crew Man-hour Cost S 0 S 0 hr. hr S _ 0 S S 0 hr. hr S 0 S S 0 hr hr. S 0 S S 0 hr. hr S 0 S S 0 hr. hr. S 0 S S 0 hu hr. S .1IA I LKL\L JI 15 1 UTAL J - LABOR SUB IUTAL S TAX AS APPLICABLF. 9.50°o S LABOR BLRID 12% S CCCs'.Nl.%TERL%[. TOTALl S LABOR I OTALl S SUBCONTRACTORS Description Sub Pricing \1I I Backhoe Service Install new water meter S 1500.00 S- S S S S Subcontractor Total SI,500.00 CRM: BREAKDOM', i luanbl% T c Cost ! 1{r t erator w 1: ui ment A S 50.00 12 Carpenicts B S 60.00 Carpenter or Operator C S 30.00 Laborer D S 20.00 OCC Direct Cost Description Quantity Unit Cost Unit Material Cost flours Rate Labor Cost Project %tanager 0 S 0 S0.00 I hr. I S 42.91 hr. S 42.91 Assistant Supermientlent 0 0 S 0 S0.00 1 M. I S 42.91 hr S 42.91 Overtime Pay 0 0 S 0 S0.00 enter es no 1 0 - s es no error p Weekly Clean Up Ex sedum ster S 0 S0.00 o hr. S hr. S Estimating .& Cost Anal sis 0 0 S 0 S0.00 0 hr. S hr. S Field Office Expense 0 0 S 0 S0.00 0 S S Jobsite TelephonciTax 0 S S0.00 0 S S Gas Oil Maintenance Ex rare 0 S $0.00 0 s S Tem rary (Aduies 0 0 S 0 $0.00 0 S S Maierial lixidling 0 0 S 0 50.00 0 hr. S hr. S Permits, Licenses Fees Dues 0 0 S 0 S0.00 0 0 $ S Revised as Built Drawings 0 0 S 0 S0.00 0 hr. S hr. S Safety Expense 0 0 S 0 S0.00 0 1 hr. S hr S Travel Pav Ex IS) \len 0 0 S 0 So.00 0 hr S hr S Subsistence Ex se(5) Men 0 0 S 0 S0.00 0 S S Truck Expense 0 0 S 0 $0.00 0 S S Tool Expensc 0 0 S 0 S0.00 0 S S 0 o S o So.00 0 S S 0 0 s o So.00 0 S S 0 0 S 0 soon 0 $ S 0 0 S 0 S0.00 0 S S 0 0 S o $0.00 0 S S NL\TERIAl. SUBTOTAL TAX AS APPLICABLE 9.50% CCCs' ?I t ERIAL TOTAL S LABORSUBTOTAL S 85.82 LABOR BURDEN 12% S 10.30 I LABOR TOTAL 5 96.12 S S OCC Material Total $ OCC's Labor Total $ OCC Direct Cost Total S 96.12 Subcontract Total S 1,500.00 SUBTOTAL S 1,596.12 OCC's Insurance ,ter 1.00% S 15.96 OCC's' Bond !a 1.00°0 $ 16.12 Change -Order Fec a 10.0090 $ 102.82 OELKE TOT:U. FOR CHANGE S1,791.02 Clarifications to Change: Ott ner's Signatu re: w�►r Change Order Request NCC-Detail (with Breakdown of PCCs). Grp by Each Number -Confidential Fayetteville Cultural Arts Corridor Project # 02-19-2526 Nabholz Construction Corporation 113 W. Mountain St. Tel. Fax Fayetteville, AR 72701 To: Wade Abernathy From: John Strack City of Fayetteville Nabholz Construction Corporation 113 W. Mountain St. 3301 N 2nd St (72756), PO Box 277 Fayetteville, AR 72701 Rogers, AR 72757 PROJECT CONFIDENTIAL Property of Nabholz Construction Corporation Not for Duplication or DistributionThis document includes data prepared in conjunction with the Project that is deemed trade secret or proprietary to Nabholz. This document is shared with the Project team solely for use on this Project consistent with the responsibilities of the Project team. The Recipients shall not duplicate, use, or disclose, in whole or in part, to any person, entity, or party outside the Project team without Nabholz' prior written authorization. Description Category status RFI #34 Tapping Saddle at Library Fire Line Contingency In Negotiation Reference RFI #34 Notes This COR is to install a tapping saddle at the library fire line. PCO No Date Reference Description Required By Days Req Amt Req 0 0.00 Notes Amt Prop Days Req Category Reason 021 5/4/2021 RFI #34 0.00 0 Contingency Design Change Library Fire Line Saddle The city inspector requested we change the install, so we don't have to shut down the fire line at the library for 24 hours. Item No Item Description Amt Prop Reference 001 6x6 Saddle 4,139.39 002 SDI Insurance 51.74 003 Construction Contingency (4,191.13) Approved By: Signature Name Date Oelke Construction Co. -Change Order Request Job Name: Change Order Request # Date: Description of Request: Fayetteville ( ulttlral Arts Cor. Requested Days 8 3-May-21 Library Fire Line 6X6 lapping saddle I Price Good For 10 Days Description Material & Labor Quantity Unit Cost knit Material Cost Hours T e of Crew Ian -hour Cost 0 S 0 111 hr S - rs S 0 hr hr. S 0 S 0 hr. hr. S i 0 S 0 hr hr S 0 S 0 hr. hr S 0 S 0 hr, hr. S .NL\TERlAL SLBTOIALI S I LABOR SUBTOTALI S TAX AS APPLICABLE 9 30%1 S LABOR BLRCDEN 12% S CCCs' INL\TERL\L TOTAL S LABOR TOTAL S SUBCON"1"RACI'ORS Description Sub Pricing MH Backhoe Fire Line 6x6 lapping saddle S 3,640.00 S s _ S 5 - SubcontractorTotal _ $ 3,640.00 CREW BREAKDOWN Quantity T pe Cost / Hr •rawr wi F. ui ment A S 50.00 12 Carpenters B S 60.00 Carp,nterur Operator C S 30.00 Labor D S 2000 OCC Direct Cost Description OuantiU ('nit Co,t ("nit Material Cost Hours Rate Labor Cost Job Superintendent Superintendent Ii S 0 SO.00 I hr. S 42.91 hr. S 42.91 0 0 S 0 SO.00 1 I hr. S 4291 hr S 42.91 Overtime Pare 0 0 S 0 SO.00 enter es'no 0 #yes nu error # Weekly Clean Up Ex ense-duns ster S 0 s000 o hr. S hr $ Esunuitinst & Cost Analysis 0 0 S - 0 SO.00 0 hr. S hr. S Field Office Expense 0 0 S 0 SO.00 0 S S Jobsite Telephone/Fax 0 S Woo 0 S S Gas, Oil, Maintenance Expense 0 S - S000 0 S S Temporary Utilities 0 0 S - 0 SO.00 0 S S Material Handling 0 0 S 0 SO.Oo 0 hr. S hr. S Permits Licenses Fee., Mies 0 0 S _ 0 50.00 0 0 S S Revised as Built Drawings 0 0 S 0 SO.00 0 hL S hr. S Safety Expense o 0 S 0 SO.00 0 hr. s hr. S Travel Pay Ex se 5 Men 0 0 S 0 Sow 0 hr. S hr S Subsistence Expense 5 \Ten 0 0 S 0 SO.00 0 S S Track Expense 0 0 S 0 SO.00 0 S S Tool Expense 0 0 S 0 S0.00 0 S S 0 0 S 0 SO.00 0 $ S 0 0 S 0 S0.00 0 S S 0 0 S 0 SO.00 0 s S 0 0 S 0 SO.00 0 S S 0 0 S 0 SO.00 0 S S MATERLAL SUBTOTAL TAX AS APPLICABLE 9.50% CCCs' JIATERL-\L TOTAL S LABOR SUBTOTAL S 85.82 LABOR BURDEN 0% S - LABOR TOTALI S S S OCC Material Total S OCC's Labor Total S - OCC Direct Cost Total $ 85.82 Subcontract Total S 3,640.00 SUBTOTAL S 3,725.82 OCC"s Insurance a 1.00% $ . 37.26 OCCs' Bond a: 0.00% S - ChanRe-Order Fee fin, 10.000/b $ 376.31 Ot:LKL TOT:\1, FOR CILINGE S4,139.39 Clarifications to Change: Owner's Signature: Change Order Request NCC-Detail (with Breakdown of PCOs). Grp by Each Number -Confidential Fayetteville Cultural Arts Corridor Project # 02-19-2526 Nabholz Construction Corporation 113 W. Mountain St. Tel Fax. Fayetteville, AR 72701 To: Wade Abernathy From: John Strack City of Fayetteville Nabholz Construction Corporation 113 W. Mountain St. 3301 N 2nd St (72756), PO Box 277 Fayetteville, AR 72701 Rogers, AR 72757 PROJECT CONFIDENTIAL Property of Nabholz Construction Corporation Not for Duplication or Dist►ibutionThis document includes data prepared in conjunction with the Project that is deemed trade secret or proprietary to Nabholz. This document is shared with the Project team solely for use on this Project consistent with the responsibilities of the Project team. The Recipients shall not duplicate, use, or disclose, in whole or in part, to any person, entity, or party outside the Project team without Nabholz' prior written authorization. DescriptionCategory Status Additional Sewer Service at 203, 205, & 207 Contingency In Negotiation Reference Required By Days Req Amt Req RFI #30 0 000 Notes 4 This COR is to install three additional sewer services at condos. PCO No Data Reference Amt Prop Days Req Category Reason Description Notes 023 5/4/2021 RFI #30 Added Sewer Services at Condos Item No Item Description 001 Added Sewer Services 002 SDI Insurance 003 Construction Contingency Approved By: Signature Name O Oc :ont I i Icq e I ., ',or Amt Prop Reference 4,539,35 56.74 (4,596.09) Date Oelke Construction Co. -Chance Order Request Job Name: ( hange Order Request q Date: Description of Request: Fayetteville Cultural Arts Cor. 9 3-A1ay-21 Sewer Services Requested Days I Price Good For 10 Days Description )Material & Iabor Quantity [;nit Cost Unit Material Cost flours T e of Crew Man-hour Cost S 0 S 0 hr. hr s 0 S S S 0 0 hr hr. hr. hr. S S 0 S 0 S S o hr hr. S 0 S S 0 hu hr. s 0 S S 0 hr hr. S WL I ERIAL SUBTOTALl S I LIBOR SUBTOTALl S TAX AS APPLICABLE 9.501/6S LABOR BURDEN 12% S CCCs'JIATERIALTOTAI. S LABORTOTAL[ S SUBCONTRACTORS Description Sub Pricing %IH Backhoe .SUN LT scBlcQ -'u' S I.200.00 Mit Backhoc Sewwer Ser ice 209 S 1,200 00 MI Backhoe Sewer Ser%ice] 99 S 1,600.00 S S S - SubcontractorTotal S 4,000.00 CREW BREAKDOWN Quantity Tv - Cost / tlr rerator w.' F ui ment A S 50.00 2 Carpenttrs B S 60.00 Carpenter or Operator C S 30.00 Laborer D S 20.00 OCC Direct Cost Description Quantity Unit Cost Unit Material Cost Hours Rate Labor Cost Job Superintendent 0 S 0 S0.00 I hr S 4201 hr S 42.91 Supenntentlent 0 0 S 0 $o.00 I I hr S 42 91 hr S 4291 Overtime Pay 0 0 S 0 $0.00 enter yes no 0 e es no error k Weekly Clean Up Ex -dum ster $ 0 S0.00 0 hr S hr. S Estimating & Cost Analysis 0 0 S - 0 S0.00 0 hr. S hr. S Field Office Expense 0 0 S 0 S0.00 0 S S Jobsue I elephone,Fax 0 S $0.00 0 S S Gas, Oil, Maintenance Expense 0 S S0.00 0 S $ Temporary Utilities 0 0 S 0 Woo 0 S $ ,Material Handling 0 0 S 0 S0.00 0 hr S hr. S Permits Licensm Fees, Dues 0 0 S 0 S0.00 0 0 S S Revised as Built Drawings 0 0 S 0 50.00 0 hr. S hr. S Safety Expense 0 0 S 0 S0.00 o hr. S hr. S Travel Pay Ex 5) Men 0 1 0 S 0 $0.00 0 1 hr. S hr.1 S Subsistence Expense 5 Men 0 0 S 0 S0.00 0 1 S S Truck Expense 0 0 S 0 S0.00 0 S S Tool Expense 0 0 S 0 S0.00 0 $ S 0 0 S 0 S0.00 0 S S 0 0 S 0 S0.00 0 S S 0 0 S 0 S0.00 0 S S 0 0 S 0 S0.00 0 S S 0 0 S 0 S0.00 0 $ 1 S MA I ERLAL St It10FAL TAX AS APPLICABLE 9.506q CC`Cs'NL1LTKRILkL rOTALl S LABORSUBTOTALI LABOR BURDEN 01ie LABOR TOTALI S $5.82 S IS S S 85.82 OCC Material Total $ OCC's Labor Total $ - OCC Direct Cost Total S 85.82 Subcontract Total $ 4,000.00 SUBTOTAL S 4,085.82 OCC's Insurance a 1 1HY, $ 40.86 OCCs' Band it 0,00% $ Change -Order Fce rr 10,00% S 412.67 OELKE TOTAL FOR CHANGE: S4,539.35 Clarifications to Change: Owner's Signature- �WSEse�tr Change Order Request NCC-Detail (with Breakdown of PCOs). Grp by Each Number -Confidential Fayetteville Cultural Arts Corridor Project # 02-19-2526 Nabholz Construction Corporation 113 W. Mountain St. Tel Fax. Favetteville. AR 72701 Change Order Request: 018 Date: To: Wade Abernathy From: John Strack City of Fayetteville Nabholz Construction Corporation 113 W. Mountain St. 3301 N 2nd St (72756). PO Box 277 Favetteville. AR 72701 Rogers. AR 72757 PROJECT CONFIDENTIAL Property of Nabholz Construction Corporation Not for Duplication or DistributionThis document includes data prepared in conjunction with the Project that is deemed trade secret or proprietary to Nabholz. This document is shared with the Project team solely for use on this Project consistent with the responsibilities of the Project team. The Recipients shall not duplicate, use, or disclose, in whole or in part, to any person, entity, or party outside the Project team without Nabholz' prior written authorization. Description CaUW" status Flat Earth Archeology Contingency In Negotiation Reference Flat Earth Archeology Contract Notes This COR is to add Flat Earth Archeology monitoring. Required By Days Req Ant Req 0 0.00 PCO No Date Referents Atnt Prop Days Req CaNgM Reason DescHptfon Notes 026 5/4/2021 Flat Earth Archeology Contract 0.00 0 Contingency Inspection Result Flat Earth Archeology A qualified professional archeologist will be onsite while ground disturbing activities occur within the boundaries of the archeological site associated with the trails project to adhere to the approved monitoring plan. Item No Item Description Amt Prop Reference 001 Flat Earth Archeology 3.800.00 002 SDI Insurance 47.50 003 Construction Contingency (3,847,50) Approved By: Signature Name Date Fiat Eartk ArckeoloM, L.LC 117 Financial Drive Cabot, AR 72023 (501) 286-7124 - office Website: FlatEarthArcheology.com Email: chrisb@flateartharcheology.com Nabholz Josh Barrett March 31, 2021 RE: Archeological monitoring at Site 3WA476 in relation to the SWL-2020-00223 (Fayetteville Cultural Arts Corridor) project in Fayetteville, Washington County, Arkansas Mr. Barrett: This quote is submitted in relation to the archeological monitoring requested by the Arkansas Department of Heritage — State Historic Preservation Office and the United States Corps of Engineers — Regulatory Division for ground disturbing work at the above referenced archeological site in Washington County, Arkansas. Flat Earth Archeology can provide a qualified archeological monitor for your project needs. All archeological work/monitoring will conform to the standards set for the state of Arkansas as described in A State Plan for the Conservation of Archeological Resources in Arkansas (Davis, ed. 1982, amended 2010) and the standards set by the U.S. Secretary of Interior's Standards and Guidelines for Archeological and Historic Preservation. A written monitoring plan needed for this project will be supplied by Flat Earth Archeology for SHPO & USACE review/approval. A monitoring plan details the specifics regarding the archeological monitoring (i.e. artifact collection, curation of artifacts, recording cultural resources during monitoring... etc.). A qualified professional archeologist will be onsite while ground disturbing activities occur within the boundaries of the archeological site associated with the trails project to adhere to the approved monitoring plan. Daily monitoring logs (completed daily after monitoring in the field) will be completed and submitted to the City of Fayetteville and James Beers — USACE archeologist. After the monitoring/ground disturbance is completed at the archeological sites, a monitoring report will be produced and submitted to USACE for review. Once the report has been approved by USACE and SHPO, the project will have fulfilled the monitoring obligations requested by the state and the USACE. Hard copies of the required monitoring report, completed within 10 business days from the completion of the monitoring, will be sent to you (along with digital versions) and James Beers of the USACE for review. USACE will submit a copy of the report to SHPO and any interested tribal representatives. Two required hard copies of the report will be sent by Flat Earth Archeology to the Arkansas Archeological Survey in Fayetteville for the state archives along with all artifacts collected during the monitoring. You or your representative will obtain necessary permission for access to all property. We will not investigate areas where landowner permission is denied. The cost estimate of the cultural resources work includes: • archeological monitoring (labor, mileage, per diem, lodging) • project paperwork • laboratory analysis • production of the written report for the project and recommendations • hard copies of the monitoring report (a digital version can be supplied to all parties also) • fees associated with permanent curation of artifacts and paperwork at the University of Arkansas Curation Facilities The cost of the archeological monitoring is a daily rate (monitor on site) of $700.00 per monitor. Due to the duration of this project, invoices for monitoring will be sent monthly for the daily rate throughout the project (if monitoring occurred in the previous month). There will also be a one-time fee of 1$ ,000.00 for the writing and production of the required monitoring report after the completion of fieldwork. The final invoice for the report fee will be sent with the report. Sincerely, Chris Branam, RPA Contract Number: Project: NABHO Arkansas Professional Services Project Contract Between Nabholz Construction Corporation and Flat Earth Archeology LLC 02192526PS001 Project 02-19-2526 Cost 10-2615 SUB Between Nabholz: And Consultant: Architect: Number: Fayetteville Cultural Arts Corridor 113 W. Mountain St. Fayetteville, AR 72701 Nabholz Construction Corporation 3301 N 2nd St (72756), PO Box 277 Rogers, AR 72757 Flat Earth Archeology LLC 117 Financial Dr Cabot, AR 72023 Arkansas License#: Nelson Byrd Woltz Landscape Architects 310 E. Market St. Charlottesville, VA 22902 This agreement is made as of the 5/5/2021 "Contract Date"). Code: THIS PROJECT CONTRACT by and between Flat Earth Archeology LLC, ("Consultant"), and Nabholz Construction Corporation, ("Contractor"), agree as follows: ARTICLE L Documents. This Project Contract is supplemental to the terms and condition of the Master Professional Services Agreement ("MPSA") Between Contractor and Consultant dated Wednesday, May 5, 2021, and any amendments thereto, ("MPSA"). Together the MPSA and this Project Contract form a separate contract between Contractor and Consultant applicable only to the Project ("Contract"). Consultant agrees to furnish all material and perform all Services as described in Article II hereof for the Project in accordance with this Project Contract, the MPSA and the contract between Owner' and Contractor, and with the General Conditions of said contract, Supplementary General Conditions, the Drawings and Specifications and addenda prepared by Nelson Byrd Woltz Landscape Architects, ("Architect" or "Owner's authorized agent"), all of which documents agreed to by the parties thereto or identified by the Architect or Owner's authorized agent, form a part of a contract between the Contractor and the Owner dated Wednesday, April 18, 2018, and are hereby made a part of this Contract and may collectively be referred to as the Contract Documents. The Contract Documents will be made available to Consultant upon request. ARTICLE 11. Scope of Services. Consultant and Contractor agree that the materials and equipment to be furnished and Services to be done by Consultant (hereinafter "Services") are: ' The term "Owner' may also refer to Nabholz' client. For exemplary purposes only, "Owner" may refer to the Project General Contractor when Nabholz contracts directly with the General Contractor as a lower -tier subcontractor. AR PSPC Version 06.06.2017 Page 1 of 3 Provide a qualified archaeologist to monitor Site 3WA476 for the Cultural Arts Corridor Project in Fayetteville, AR. Include a written monitoring plan needed for this project for SHPO & USACE to review/approval, include daily monitoring logs, and include the final monitoring report to be approved by USACE and SHPO. Include all fees associated with this scope of work. The cost of the archeological monitoring is a daily rate (monitor on site) of $700.00 per monitor. This contract will include four days of monitoring at a cost of $2.800.00. Any additional required days will be issued through change orders at a $700.00 per day for a monitor. This contract will include a one-time fee of $1,000.00 for the writing and production of the required monitoring report after the completion of field work. Inclusions: 001 Exhibit A - Attached 002 Exhibit S & C - Attached 003 Payment requests are due on or before the 20th of the billing month. Email only to tonya.newton@nabholz.com. Must use the attached Nabholz form and excel versions of the document are available upon request. Any second tiers over $20k must be listed on the sov with company name, contact name, address, and phone number. 004 Per 100% CD Drawings and Specifications dated 4/24/2020. 005 ASI #1 drawings dated 9/18/2020, ASI #2 dated 11/3/2020, and ASI #3 dated 4/7/2021. Exclusions• ARTICLE III. Commencement. The Date of Commencement is the effective date of this Contract as first written above, unless otherwise set forth below: ARTICLE IV. Payment. 1. The Contractor agrees to pay the Consultant for the performance of the Services the sum of Three thousand eight hundred and 00/100 Dollars ($3,800.00) in current funds, subject to additions and deductions for changes as may be agreed upon, in writing, and to make monthly payments in accordance with Article 7 of the MPSA unless otherwise specified herein: (Insert Relevant Payment terms if Different from Article 7 of the M PSAJ 2. Monthly invoices are to be submitted on the 20th day of month. 3. Consultant shall submit Payment Requests in the form attached hereto or by invoice as directed. ARTICLE V. Supplemental. 1. This Project Contract is supplemental to the terms and conditions of the MPSA as if the MPSA was fully set forth herein. Failure to include any provision of the MPSA in this Project Contract is not an agreement to omit the provision. All defined terms herein shall be used in the MPSA and all defined terms in the MPSA shall be used in this Project Contract. AR PSPC Version 06.06.2017 Page 2 of 3 2. This Project Contract and the MPSA are project specific, and no term, provision, or modification of the MPSA, shall apply to any other project unless expressly included in the project contract for the other project(s). 3. Consultant attests that it holds a valid license for the Services to be performed in the State in which the Project is to be performed or that no license is required for the performance of the Services. 4. Consultant must be available by phone and email during working hours and provide a 24-hour emergency phone number (English speaking). IN WITNESS WHEREOF the parties hereto have executed this Contract, the day and year first above written. Flat Earth Archeology LLC Nabholz Construction Corporation (Consultant) (Contractor) BY: BY: Title: Date: Attest: Title: Date: Attest: AR PSPC Version 06.06.201 i Page 3 of 3 �N?E6RIty Change Order Request NCC-Detail (with Breakdown of PCOs). Grp by Each Number -Confidential Fayetteville Cultural Arts Corridor Project # 02-19-2526 Nabholz Construction Corporation 113 W. Mountain St. Tel. Fax. Fayetteville. AR 72701 To: Wade Abernathy From: John Strack City of Fayetteville Nabholz Construction Corporation 113 W. Mountain St. 3301 N 2nd St (72756), PO Box 277 Fayetteville, AR 72701 Rogers, AR 72757 PROJECT CONFIDENTIAL Property of Nabholz Construction Corporation Not for Duplication or DistributionThis document includes data prepared in conjunction with the Project that is deemed trade secret or proprietary to Nabholz. This document is shared with the Project team solely for use on this Project consistent with the responsibilities of the Project team. The Recipients shall not duplicate, use, or disclose, in whole or in part, to any person, entity, or party outside the Project team without Nabholz' prior written authorization. Description Category Status Temporary Concrete Board Form Wall Contingency Approved Reference RFI #23 Required By Days Req 5/12/2021 0 Notes This COR is to add a temporary concrete board form wall at the intersection of West Avenue and Center Street. PCO No Date Reference Amt Prop Days Req Category Description 027 5/4/2021 RFI #23 Temporary Retaining Wall Item No Item Description 001 Concrete Board form Wall 002 Construction Contingency Approved By: Signature Name Notes Reason Amt Req 0.00 0.00 0 Contingency Design Change A temporary retaining wall is required to install intersection at Center and West. During the CAC the city selected a board form concrete wall. Amt Prop Reference 6,382,50 (6,382.50) Date w�►r 1 Change Order Request NCC-Detail (with Breakdown of PCOs), Grp by Each Number -Confidential Concrete - Fayetteville Arts Corridor Project # 02-21-8216 Nabholz Concrete Services - Rogers 113 W Mountain St. Tel Fax Fayetteville. AR 72701 Change • 003.2 Date: 514/2021 To: Josh Barrett Nabholz Construction Corporation 3301 N 2nd St (72756), PO Box 277 Rogers, AR 72757 From: Ashley Ferris Nabholz Concrete Services - Rogers 3301 N Second Street (Rogers, AR 72756) PO Box 277 Roaers. AR 72757-0277 PROJECT CONFIDENTIAL Property of Nabholz Construction Corporation Not for Duplication or DistributionThis document includes data prepared in conjunction with the Project that is deemed trade secret or proprietary to Nabholz. This document is shared with the Project team solely for use on this Project consistent with the responsibilities of the Project team. The Recipients shall Description Category Status Temporary Concrete Retaining Wall Pending Nobs [5/4/2021 Nabholz Concrete Services - Rogers - Ashley Ferris] Pricing per email correspondence from Josh Barrett dated April 29 2021 PCO No Date Reference Description 006 5/4/2021 Temporary Concrete Retaining Wall Item No Item Description 001 Footings - 3 cubic yards 002 Wall - 75 square feet 003 Overhead & Fee Approved By: Signature Name Required By Days Req And Req 0 5,95125 Amt Prop Days Req Category Reason Notes 5,951.25 0 Change Order Board form wall = additional $431.25 Amt Prop Reference 1,800.00 3,375.00 776,25 Date Fayetteville Cultural Arts Corridor CITY of T�_ FAYETTEVILLE igolz Master Schedule ARKANSAS A1000 Mobikze A1060 Open S SrhoclAve (Crossland) A1010 Instal Temporary Construction Fence A1680 Structural Steel Submittals A1720 Structural Steel Submittals Approved A1020 Instal Fence Screening A1120 Structural Steel Materials Procurement A1740 100% CD's Prairie St & West Ave A1690 Structural Steel Fab 13 A3330 Rain Out 14 A3230 Rain Out 15 A3320 Black Hill Energy - Relocate Gas Line 16 A3240 Rain Out 17 A3250 Rain Out 18 A3260 Rain Out 19 A3270 Rain ON 20 A3290 Covid Delay - Nabhob, Concrete 21 A3280 Ram ON 22 A3300 Weather Delay - Cold Temps 23 A3400 Snow Days 24 A3340 Rain ON 25 A3410 Ram ON 2fi A3420 Rain Out 27 A3430 Rain Out 28 29 A1050 Close West Ave B Install Traffice Control 30 A1030 Demo South Half of West Ave 31 A1040 Grade South Hall of West Ave 32 A1070 Instal Storm Drain South Half 33 A1080 Instal Water Lines 3< A1140 Demo North Half of West Ave 35 A1150 Grade North Hag of West Ave. 36 A1100 Curb & Gutter South Hal 37 A1160 Instal Storm Drain North Hat 38 A1090 Relocate Gas Line 39 AW50 Concrete Retaining Wall at SoutlJWest Intersection d0 A2370 Concrete Retaining Wall at Dissipator 41 A2710 Crosswalk Boardform Retaining Wall 42 A1190 Electrical Primary Baseline Remaining Work O O Baseline Milestone .Actual Work Critical Remaining Work ♦ ♦ Milestone 5 09-02-20A 09-08-20A 1 10.09-20A 10-09-20A 10 10-19-20A 11-10-20A 15 11-09-20A 12-21-20A 10 12-23-20A 01-11-21A 2 12-28-20A 12-28-20A 1 12-31-20A 01-11-21A 90 01-11-21 A 08-04-21 50 01-12-21 A 05-27-21 4 10-26-20 A 10-29-20 A 2 11-24-20A 11-25-20A 28 12-02-20A 01-13-21A 1 12-02-20 A 12-02-20 A 1 12-11-20A 12-11-20A 2 12-14-20A 12-15-20A 2 12-30-20A 12-31-20A 5 01-18-21 A 01-22-21 A 2 01-25-21 A 01-28-21 A 4 02-00-21 A 02-12-21 A 5 02-15-21 A 02-19-21 A 1 03-25-21 A 03-25-21 A 1 04-16-21 A 04-16-21 A 2 04-28-21 A 04-29-21 A 1 05-04-21 A 05-D4-21 A 1 10.12-20A 10-12-20A 5 10.13-20 A 10-20-20 A 5 11-02-20A 11-15-20A 10 11-11-20 A 03-18-21 A 30 11-16-20A 01-29-21 A 5 11-17-20A 05-10-21' 5 11-18-20A 05-14-21 8 11-19-20A 05-13-21 37 11-23-20A 01-19-21 A 15 11-30-20A 01-73-21 A 10 02-23-21 A 03-24-21 A 5 03-08-21 A 03-17-21 A 10 03-26-21 A 04-01-21 A 20 04-05-21 A 05-18-21 100 % 0 Mabilm 100% ' Open S SchoolAvo (Crossland) 100% M Instal Temporary Construction Fence 100% MIIIIIIIIIII Structural Steel Subrrdala 100% = Structural Steel Submittal 100% Instal Fence Screening 100% PM Structural Steel Materials 0% 70% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100 100% 100% 100% 100% 100 100% 100% 100% 60% 20% 37.5 % 100% 100% 100% 100% 100% 60% Page 1 of 6 — 100% CD's Pravw St 8 West Ave Structural Steel Fab Rain Out Rain Out Black His Energy - Reioc to Gas Line Rain Out Rain Out t Rein Out 1 Rain ON ♦ CoAd Delay - Nabhop oncrete Rein Out Weather Delay- old Temps Snow Days Ram Ou Rs n Out 4 Rain Out Rain ON r Clow West Ave& I instal Traffice Control Demo South Hagof West Ave Grade South Hall of West Ave Instal Instal Wate Lines Instal Storm Drain Rek—le Gas Luna Co IL n Drain South Hal Dena North Heg of West Ave Grade North Half of West Ave. 1 Curb & Gutter South Half Hag Retaining Wall at South/West Intersection rate Retaining Wal at Dtsstpator .walk Boardbrm Retaining Wall 05-07-21 0 Oracle Corporation ReportOwner/Construction Contingency PROJECT NAME: I Fayetteville Cultural Arts Corridor 101z PROJECT If:02-19-2526 L7NA;REPORT DATE: 5/6/2021 Note: DescriptionItem IL > Ir CONSTRUCTION CONTINGENCY• trr tr 1 COR #03 Steel Bid Allowance Difference - PCCO #05 COR #05 ASI #1 Concrete Reduction - (17,505.18) Handrail at Dissipator - 4.100.00 2 Added pavement markings crosswalks at intersections - 11,299.00 PCCO #04 Landscaping Allowance Difference - 0 Water 8 Sewer ADH Revisions - (10,823.78) Site Utilities added - 14.293.02 CDR #04: Item #1 Custom Furnishings Simplifications - (7,042.00) Item #2 Alt Wood (Thermalized Ash) ILO Black Locust - (15,755.00) Item #4 Remove Wood from Dissipator Overlook Rail - (3,850.00) Item #2 was originally $29, 112.00, but this included savings 3 Item #6 Remove wood at existing fence improvements - (8,800.00)- for the Alt #1 Wayside Deck omission. Therefore, the savings Item #15 Reduced Greenway - (45,134.00) dropped to $15,755.00 Mo the wayside deck. PCCO #04 Item #16 Fay Jones Drainage - 8,396.00 Item #23 Concrete Crosswalks at West Ave. - 21, 114.00 Item #46 Alternate #4 Passive Detection Bollards - 19.207.00 COR #06Roc PR #1 Omit Rack Wall and Replace Trees at the Streetswpe - (3Z.188.79) The once to go from board form to rubbed concrete .0 be 4 Move trail and grading ford 2 8 _ 51.600 cheaper then board form. Therefore. the savings would board forthwork rm Additional concrete trail and board form concrete wall - 32,892.00 concrete be a total of $3, 849.41. PCCO #04 5 CDR #07 SWEPCO Allowance SWEPCO to not charge the city for their scope of work. All money moved to construction contingency. PCCO #04 6 COR #08 Oelke to install restraint at existing water line repair at West Ave - PCCO #05 7 COR #09 - RFI #8 - Existing Water Meter Relocations • PCCO #05 9 COR #10 - RFI #19 - Reroute Sewer at Ovedook 10 CDR #11 - RFI #17 Unsuitable at Overlook . 11 COR #11 - Temporary Sidewalk at Center Street - 12 CDR #11 - Unsuitable at Board Form Wall at Trail Entry - 14 CDR #13 - Stone Upgrade .. 15 COR #14 Upgraded ELT-10 Light Fixture .. 16 CDR #15 - RFI #16 Relocate Water Meters 17 CDR #16- RFI #34 -Library Fire Line 6x6 Saddle ? 18 COR #17 - RFI #30 -Added Sewer Services at Condos 19 CDR #18 - Flat Earth Contract 4 _ - - 20 Added flashing and Dampproofing masonry retaining walls at West Ave. t 6.847.03 X 21 Added stone veneer at concrete head wall at tributary c i 6,693,745- X #1 Beam Rock: $10,860 by S.N. #2 Concrete: Board Form. $6,382.50 22 COR #19 - Temporary Retaining Wall at Center and West Rubbed Concrete. $5.951.25 #3 Sheet Piling: >$101k by Foundation Specialties #4 Gabion Baskets. $6,582.18 by Oelke. $12, 000 by S.N. 23 Additional water meters at 127 & 203 24 25 Construction Contingency Remaining Balance $ 280,357.88 OWNER CONTINGENCY• tr 1tr rr t 2 Page 1 of 2 i.