Loading...
HomeMy WebLinkAboutOrdinance 6344113 West Mountain Street Fayetteville, AR 72701 (479)575-8323 Ordinance: 6344 File Number: 2020-0587 STONEBROOK ACQUISITIONS, LLC: AN ORDINANCE TO WAIVE FORMAL COMPETITIVE BIDDING AND APPROVE A COST SHARE AGREEMENT WITH STONEBROOK ACQUISITIONS, LLC FOR THE INSTALLATION OF A 36-INCH STORM SEWER WITH A REFUND IN AN AMOUNT NOT TO EXCEED $165,829.60 TO BE PAID BY THE CITY OF FAYETTEVILLE FOR THE COST OF IMPROVEMENTS THAT EXCEED THE ROUGH PROPORTIONALITY OF THE IMPACT OF THE DEVELOPMENT, AND TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $25,000.00 WHEREAS, on March 23, 2020, the Planning Commission approved the Stonebrook Subdivision located south and east of the intersection of South River Meadows Drive and East Huntsville Road; and WHEREAS, the City and residents in the area expressed concern over an existing drainage problem along Roberts Road that can be resolved more easily at the time construction of the subdivision than at a later time; and WHEREAS, the City proposes to enter into an agreement for the developer to install a 36-inch storm sewer with a refund from the City in an amount of up to $165,829.60, which represents the estimated cost of improvements that exceed the rough proportionality of the development's impact; and WHEREAS, the City will benefit from this arrangement as it will provide resolution to a long standing drainage issue that occupies time and materials of the Transportation Department; and WHEREAS, allowing the developer to utilize its own contractors for the development will allow the City to achieve significant savings. Page 1 Printed on M20 Ordinance: 6344 File Number: 2020-0587 NOW, THEREFORE, BE IT ORDAINED BV THE CITY COUNCIL OF THE CITY OF FAVETTEVILLE, ARKANSAS: Section l: That the City Council of the City of Fayetteville, Arkansas hereby determines an exceptional situation exists in which competitive bidding is deemed not feasible or practical and therefore waives the requirements of formal competitive bidding and approves a cost share agreement with Stonebrook Acquisitions, LLC for the installation of a 36-inch storm sewer with a refund in an amount not to exceed $165,829.60 to be paid by the City of Fayetteville for the cost of improvements that exceed the rough proportionality of the impact of the development, and further approves a project contingency in the amount of $25,000.00. PASSED and APPROVED on 8/4/2020 Attest: GLER K ;���y•' CITyo Fy'% Kara Paxton, City Clerk Treasurer = F1yE7.;' '-,tip'•. q�vsAs . •. �,,. Page 2 Printed on 8/5✓20 City of Fayetteville, Arkansas 113 West Mountain Street %- Fayetteville, AR 72701 (479) 575-8323 } Text File ' File Number: 2020-0587 Agenda Date: 8/4/2020 Version: 1 Status: Passed In Control: City Council Meeting File Type: Ordinance Agenda Number: C. 5 STONEBROOK ACQUISITIONS, LLC: AN ORDINANCE TO WAIVE FORMAL COMPETITIVE BIDDING AND APPROVE A COST SHARE AGREEMENT WITH STONEBROOK ACQUISITIONS, LLC FOR THE INSTALLATION OF A 36-INCH STORM SEWER WITH A REFUND IN AN AMOUNT NOT TO EXCEED $165,829.60 TO BE PAID BY THE CITY OF FAYETTEVILLE FOR THE COST OF IMPROVEMENTS THAT EXCEED THE ROUGH PROPORTIONALITY OF THE IMPACT OF THE DEVELOPMENT, AND TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $25,000.00 WHEREAS, on March 23, 2020, the Planning Commission approved the Stonebrook Subdivision located south and east of the intersection of South River Meadows Drive and East Huntsville Road; and WHEREAS, the City and residents in the area expressed concern over an existing drainage problem along Roberts Road that can be resolved more easily at the time construction of the subdivision than at a later time; and WHEREAS, the City proposes to enter into an agreement for the developer to install a 36-inch storm sewer with a refund from the City in an amount of up to $165,829.60, which represents the estimated cost of improvements that exceed the rough proportionality of the development's impact; and WHEREAS, the City will benefit from this arrangement as it will provide resolution to a long standing drainage issue that occupies time and materials of the Transportation Department; and WHEREAS, allowing the developer to utilize its own contractors for the development will allow the City to achieve significant savings. NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby determines an exceptional situation exists in which competitive bidding is deemed not feasible or practical and therefore waives the requirements of formal competitive bidding and approves a cost share agreement with Stonebrook Acquisitions, LLC for the installation of a 36-inch storm sewer with a refund in an amount not to exceed $165,829.60 to be paid by the City of Fayetteville for the cost of improvements that exceed the rough City of Fayetteville, Arkansas page 1 Printed on 8/5/2020 File Number 2020-0587 proportionality of the impact of the development, and further approves a project contingency in the amount of $25,000.00. City of Fayetteville, Arkansas Page 2 Printed on 81512020 City of Fayetteville Staff Review Form 2020-0587 Legistar File ID 8/4/2020 City Council Meeting Date - Agenda Item Only N/A for Non -Agenda Item Chris Brown 7/13/2020 ENGINEERING (621) Submitted By Submitted Date Division / Department Action Recommendation: Approval of this cost share with Stonebrook Acquisitions LLC in the amount of $165,829.60 for the installation of a 36-inch storm sewer with appurtenances with the construction of Stonebrook Subdivision to address a long standing drainage issue within the City and a project contingency of $25,000.00. Budget Impact: 4470.621.8820-5809.00 Sales Tax Capital Improvement Account Number Fund 02116.1 Cost Share/ROW/Intersection/Street Calming Project Number Budgeted Item? Yes Does item have a cost? Yes Budget Adjustment Attached? No Current Budget Funds Obligated Current Balance Item Cost Budget Adjustment Remaining Budget Project Title $ 730,606.00 $ 98,088.40 $ 632,517.60 $ 190,829.60 $ 441,688.00 V20180321 Purchase Order Number: Previous Ordinance or Resolution # Change Order Number: Original Contract Number: Comments: Approval Date: CITY OF FAYETTEVILLE ARKANSAS MEETING OF AUGUST 4, 2020 TO: Mayor and City Council THRU: Susan Norton, Chief of Staff Garner Stoll, Development Service Director Chris Brown, City Engineer FROM: Alan Pugh, Staff Engineer DATE: July 16, 2020 CITY COUNCIL MEMO SUBJECT: Approval of this cost share with Stonebrook Acquisitions LLC in the amount of $165,829.60 for the installation of a 36-inch storm sewer with appurtenances with the construction of Stonebrook Subdivision to address a long standing drainage issue within the City and a project contingency of $25,000.00. RECOMMENDATION: Staff recommends approval of this cost share with Stonebrook Acquisitions LLC in the amount of $165,829.60 for the installation of a 36-inch storm sewer with appurtenances with the construction of Stonebrook Subdivision to address a long standing drainage issue within the City and a project contingency of $25,000.00. BACKGROUND: For many years a drainage problem has existing for many homes along the west side of S Roberts Road just south of E Huntsville Road. There is a large area that holds water and cannot drain without either infiltrating into the ground or being physically pumped out of the area. This has caused several homes to be surrounded by water and/or flood in the past and caused the Transportation Division many hours of work pumping out the low areas. Photos of one of the flooding events in December of 2015 can be found attached to this memorandum. DISCUSSION: During the review process for the Stonebrook Subdivision, a possible solution to the drainage issues along Roberts Road was discovered. By constructing a storm pipe from an existing outfall near 1146 S Saint Andrews Circle to the southeast corner of the Stonebrook Subdivision, it would be possible to drain the area by gravity flow during and after rain events. Being as this appears to be the only option to have the area drain by gravity flow, staff is recommending a cost share to have the storm drain installed along with the construction of Stonebrook Subdivision. The developer of Stonebrook has agreed to include this as a portion of their construction contract and have the City pay the additional costs associated with the issue. The City proposes to pay for 100% of the additional costs because the developer of the Stonebrook Subdivision is not creating the issue as it has existed for many years. It should be noted that the attached bid tab shows both Phase I and Phase 11 improvements. Currently, staff is only recommending the installation of the Phase I improvements by the Mailing Address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 National Flood Hazard Layer FIRMette 30 3'15.44"N y FEMA Legend SEE FIS REPORT FOR DETAILED LEGEND AND INDEX MAP FOR FIRM PANEL LAYOUT n ,' TIriN R2�ri4�•18 f -*. Z0019 M M ; '♦ FLOOD WAY Zor+e.''AE PROJECT LOCATION T 6N R29W S19 I- SM1110111 IF 40 W IF 'If �" X /► •µ "' e. 0. i , .yM1, 4, , i; A r ' A•=1 • • USGS ?h IN R0 ill ato rMc,e )ed April 2019. r.. ,.. � . r n n /% 1AI?'dR 1S, 1N • ��i.v,vvv 0 250 500 1,000 1,500 2,000 Without Base Flood Elevation (BFE) Z.- A, V. A`. SPECIAL FLOOD With BFE or Depth z­, Ar 40, A.R, VE, AR HAZARD AREAS Regulatory Floodway 0.2% Annual Chance Flood Hazard, Areas of 1% annual chance flood with average depth less than one foot or with drainage areas of less than one square mile Future Conditions 1% Annual Chance Flood Hazard . r i Area with Reduced Flood Risk due to )THER AREAS OF f 1 Levee. See Notes. z, FLOOD HAZARD r�' Area with Flood Risk due to Levee SCREEN Area of Minimal Flood Hazard Effective LOMRs OTHER AREAS Area of Undetermined Flood Hazard GENERAL — — Channel, Culvert, or Storm Sewer STRUCTURES I I I I I I I Levee, Dike, or Floodwall Cross Sections with 1% Annual Chance 17•5 Water Surface Elevation - — Coastal Transect ...... Sq..-. Base Flood Elevation Line (BFE) Limit of Study Jurisdiction Boundary -- --- Coastal Transect Baseline OTHER _ Profile Baseline FEATURES Hydrographic Feature Digital Data Available N No Digital Data Available MAP PANELS Unmapped Q The pin displayed on the map is an approximate point selected by the user and does not represent an authoritative property location. This map complies with FEMA's standards for the use of digital flood maps if it is not void as described below. The basemap shown complies with FEMA's basemap accuracy standards The flood hazard Information Is derived directly from the authoritative NFHL web services provided by FEMA. This map was exported on 2/il/2020 at 5:02:55 PM and does not reflect changes or amendments subsequent to this date and time. The NFHL and effecttve Information may change or become superseded by new data over time. This map image is void if the one or more of the following map elements do not appear: basemap Imagery, flood zone labels, legend, scale bar, map creation date, community identifiers, FIRM panel number, and FIRM effective date. Map Images for unmapped and unmodernized areas cannot be used for regulatory purposes. CONTRACTUAL AGREEMENT FOR COST SHARE OF STORM SEWER INSTALLATION COSTS This Agreement, made and entered into on this 4th day of August, 2020, by and between the City of Fayetteville, Arkansas ("City") and Stonebrook Acquisitions, LLC ("Stonebrook"), witnesseth: WHEREAS, on March 23, 2020, the City of Fayetteville Planning Commission approved a the Stonebrook Subdivision located south and east of the intersection of S River Meadows Drive and E Huntsville Road; and WHEREAS, as a portion of the approval the City and residents expressed concern over and existing drainage problem along Roberts Road that could be resolved with the construction of the subdivision and would be very difficult to resolve if not included in the construction of the subdivision; and WHEREAS, the applicant was acceptable to working with the City to revise the subdivision plans to resolve this drainage issue provided the City would be acceptable to funding the additional improvements; and WHEREAS, the City of Fayetteville would benefit from the cost share as it will provide resolution to a long standing drainage issue that occupies time and materials of the Transportation Division and well as closure of Roberts Road during large rains so that water ponded in the low areas can be pumped out before it floods homes; NOW, THEREFORE, the City of Fayetteville, Arkansas and Stonebrook agree as follows: 1. The City of Fayetteville, Arkansas agrees to: A. Reimburse Stonebrook for approximately 97% of the cost to install approximately 1,120 linear feet of 36-inch storm sewer with appurtenances and additional design/inspection fees in the area identified in Attachment "A" up to a maximum -not -to -exceed amount of $165,829.60 as was estimated by the builder's representative and shown on Attachment "B", attached. B. Remit payments due to Stonebrook within sixty (60) days after receipt of valid invoices. 2. Stonebrook agrees to: A. Provide the necessary and normal project management, inspection, and testing as necessary for a complete and acceptable storm sewer installation, including submittal of plans and specifications to the City's Engineering Department, per their standard procedures. B. Provide a copy of the invoices from the Contractor upon City approval of the storm sewer installation. C. Pay for the storm sewer installation (with reimbursement of approximately 97% of the cost by the City of Fayetteville in a not -to -exceed amount stated under item I.A. of this agreement. It is understood that in the instance of unforeseen circumstances such as rock excavation, the City and Stonebrook will negotiate a change order agreeable to both parties on a unit cost basis subject to City Council approval. If no unit cost exists in the original contract, one will be negotiated between the City and Stonebrook. 4. It is further understood that the contract for construction of the storm sewer is between Stonebrook and its Contractor and that the City has no contractual obligation with either the Contractor or the Engineer. The City's only obligation shall be to participate in this agreement with a not -to -exceed reimbursable amount of as stated in item I.A. of this agreement IN AGREEMENT WITH ALL THE TERMS AND CONDITIONS ABOVE, WE SIGN BELOW: STONEBROOK ACQUISITIONS, LLC CITY OF FA TTEVILLE, ARKANSAS By: % By: Kevin Riggins, Owner I ELD RD , Mayor�� ATTEST: GLE R K By: �`•. ' CITy • �5v o Kara Patton, City erk ��• V144e:;= f Attachment A \ �. AW >.LJo ; - / ON -TREATABLE AREA " ,I ..... TO SHEET ELo. OPf . J 1pEAlED AREA ' ''i _ _ \. � \. .... p 65 ACRES TOTAL & W ACRES TOTAL Y // — — �^— — — —. • 0.1t ACRES INPER �5� i • �r 1192 ACHES WKRN S 9 I f \Y, .�/ e.• o a_ �s-, ...... � o .. � ..:.. .. 3— Storm - Sewer i included in cost share FOREST /OPEN SPACE_. I ' I.. 0ANIm .56 ACRES I + l• d D.BA M TOTAL +, \ 0.51 ACRES .'-CAS g �- -10AW --- I I � 14 — — • K REVISION DATE DESCRIPT'ON TWIST COWR/OPEN SPACE \ NTBE 0.45 S y t /✓ I. tl 4 1 / UN-TREATA&E AREA TO w % ! SNEETFLOW OFF IMPERVIOUS AREA MAP 1.47 �ACACRES TOTAL 0.R1 RES INPERNOUS g STONEBROOK SUBDIVISION FAYETTEVILLE, AR SCALE. 1"-60' DATE: Jena 10. 2020 DRAWN BY: CPL ENGINEERING SERVICES, INCORPORATED \/ E, ARKAN SAS ------- ---- SPRINGDAL W.O.0 20905 SHEET 2 Attachment B Stonebrook Cost -Share HOUSTON BECKHAM Item No. quantity Unit Item Description Unit Price Total Amount 1 1 LS Removal of Line 61, Drop Inlet 6-9, and End Treatment $13,700.00 $ 13,700.00 2 1120 LF 36" RCP Pipe CLIII ISegments 6A-6H) $87.00 $ 97,440.00 3 1 EA Flared End Section 6-1 $1,300,00 $ 1,300.00 4 1 EA Junction Box 6-2 $4,900.00 $ 4,900.00 5 1 EA Junction Box 6-4 $4,700.00 $ 4,700.00 6 1 EA Junction Box 6-5 $4,500.00 $ 4,500.00 7 1 EA Junction Box 6-6 $4,900.00 $ 4,900.00 8 1 EA Junction Box 6-7 $4,900.00 $ 4,900.00 9 1 EA Area Inlet 6.8 $4,900.00 $ 4,900.00 10 1 1 EA Replace Ex Drop Inlet 6-9 (Does not include removal) (SP32) $4,500.00 $ 4,500.00 Phase 1 CITY IMPROVEMENTS Original Engineering Fees Inspection Fees (4%) Total Improvements City's Portion Developer's Portion $145,740.00 $19,260.00 $5,829.60 $170,829.60 $165,829.60 $5,000.00 Change Order #1 Stonebrook Subdivision City of Fayetteville Staff Review Form 2022-0232 Legistar File ID N/A City Council Meeting Date - Agenda Item Only N/A for Non -Agenda Item Alan Pugh 3/8/2022 ENGINEERING (621) Submitted By Submitted Date Division / Department Action Recommendation: Approval of Change Order #1 in the amount of $9,425.00 for the Stonebrook Subdivision drainage improvement cost share Budget Impact: 4470.621.8820-5809.00 Sales Tax Capital Improvement Account Number Fund 02116.1 Cost Share/ROW/Intersection/Street Calming Project Number Budgeted Item? Yes Does item have a cost? Yes Budget Adjustment Attached? No Current Budget Funds Obligated Current Balance Item Cost Budget Adjustment Remaining Budget Project Title $ 701,212.00 $ 241,056.73 $ 460,155.27 $ 9,425.00 i $ 450,730.27 V20210527 Purchase Order Number: 2020-749 Previous Ordinance or Resolution # 6344 Change Order Number: 1 Approval Date: 3-21-22 Original Contract Number: 2020-00000072 Comments: CITY OF FAYETTEVILLE ARKANSAS TO: Mayor Jordan THRU: Susan Norton, Chief of Staff Chris Brown, Public Works Director FROM: Alan Pugh, Staff Engineer DATE: March 8, 2022 STAFF MEMO SUBJECT: Approval of Change Order #1 in the amount of $9,425.00 for the Stonebrook Subdivision drainage improvement cost share RECOMMENDATION: Staff recommends approval of Change Order #1 in the amount of $9,425.00 for the Stonebrook Subdivision drainage improvement cost share. BACKGROUND: On August 4, 2020, the City Council approved ordinance 6344 waiving competitive bidding and entering into a cost -share with Stonebrook Acquisitions LLC for the installation of a 36-inch storm sewer in an amount not to exceed $165,829.60. This project was funded to deal with a years old problem of standing water and flooding that occurred along Roberts Road. During the review of the Stonebrook Subdivision, a solution was designed draining the water through the subdivision and discharging this water downstream. DISCUSSION: During construction it was determined that the pipe needed to be reconfigured slightly on the downstream end in order to avoid mature trees and make crossing several utilities much easier. It was also determined that the upstream end needed slight revision in order to lessen the slopes around the upstream flared end section while staying on the Stonebrook Property. These improvements are included on the attached change order. The total change order is still well within the approved $25,000 contingency. BUDGET/STAFF IMPACT: This project is funded by the Sales Tax Capital Improvements Fund Attachments: Change order #1 Vicinity Map Ordinance 6344 Mailing Address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 CHANGE ORDER C!Tv OF FAYETTEVILLE ARKANSKAAS Change Order No. To Contractor: Stonebrook Acquisitions, LLC The Contract is changed as follows: Contract Title: Stonebrook Subdivision Drainage Improvements Date of Issuance March 8, 2022 ORDI N ANC EIRESOLUTION:289-20 Effective March 8, 2022 Bid Bid Previous Unit Contract Revised Revised Original Revised Contract Item Item Estimated of Unit Estimated Unit Estimated Estimated Changes No. Description Quantity Measure Price Quantity Price Cost Cost Relocation of Storm 35 Drain/additional junction box 0 LS $0.00 1 $6,925.00 $6,925.00 Remove FES/pipe and re -grade 0 LS $0.00 1 $2,500.00 $2,500.00 36 area $0.00 Summation of Cost $9,425.00 Net Cost for this Change Order $9,425.00 The original Contract Price was $ 165,829.60 ._..__.....__..._.....___.....__...__....._....._........._.........._.......__....._...__................................__....._. Net change by previously authorized change orders $ - ._...-....... ................... _..... _..... ................... _..._........._....._..._.............................................. The Contract Price prior to this Change Order was $ 165,829.60 The Contract Price will be adjusted by $ 9,425.00 ..................................................... .... ..... ....... ..... ..... ....... ......................... ........ ................. The new Contract Price including this Change Order will be $ 175,254.60 ......... ............ ..... ....... ................... ---- —--- ------ The Contract Time(s) will be increased by 0 calendar days Required dates of Completion as of the date of this Change Order therefore are: Substantial Completion 15-Mar-22 -------- --------------------------- -------------- Final Completion 15-Apr-22 NOTE: This summary does not reflect changes in the Contract Price or Time(s) which have been authorized by Work Change Directives not incorporated in this or previous Change Orders. 1 /� Stonebrook Ac uisitions LLC Cl OF F ETT VIL C J -21-22 BY DATE I Y DATE National Flood Hazard Layer FIRMette ji. A 01 w l l I. I I IF \ PPI. t` TteN R3uw saa •`"�` A'`f • ;EH'-)F rdININIAL FLOOGr Y vx1 FEMA .r• M e � Y a PROJECT LOCATION • "� r S I I I i ILI x "> �r a ► i �_ _i t 4 :.. f E a• Th .r_ f # Vat 1.. relied- nrd 1.6,000 y. N 0 250 500 1,000 1 501 Legend SEE IIS REPORT FOR DETAILED LkQND AND INDEX MAP FOR I IRM PANEL LAYOUT Without Bass Flood Elevation (BFE) j Sono A. V. A99 SPECIAL FLOOD With BFE or Depth Z.- AE AO. AN VE AN HAZARD AREAS Regulatory Floodway 0.2%Annual Chance Flood Hazard, Areas of 1% annual chance flood with average depth less than one foot or with drainage areas of less than one square mile Future Conditions 1.% Annual Chance Flood Hazard - Area with Reduced Flood Risk due to OTHER AREAS OF Levee. See Notes. FLOOD HAZARD Area with Flood Risk due to Levee �i0 SCRFFj Area of Minimal Flood Hazard Effective LOMRs OTHER AREAS Area of Undetermined Flood Hazard GENERAL Channel. Culvert, or Storm Sewer STRUCTURES I I r I r I I Levee, Dike, or Floodwal e 2m Cross Sections with 1% Annual Chance 17-3 Water Surface Elevation Coastal Transect ....-. Base Flood Elevation Line (8FE) Limit of Study lurlsdict on Boundary --- --- Coastal Transect Baseline OTHER _ Profile Baseline FEATURES Hydrographic Feature Digital Data Available No Digital Data Available MAP PANELS Unmapped 0 The pin displayed on the map Is an approximate point selected by the user and does not represent an authoritative property location. This map complies with FEMA's standards for the use of digital flood maps it It is not void as described below. The basemap shown complies with FEMA's basemap accuracy standards The flood hazard information is derived directly from the authoritative NFHL web services provided by FEMA. This map web exported on 2. 11. 2020 at 5:02:55 PM and dons not rellecl changes or amendments bubsequenl to this date and time. The NFHL and effective information may change or become superseded by new data over time. This map Image Is void it the one or more of the following map a; elements do not appear: basemap Imagery. flood zone labels. legend. scale bar, map creation date. community Identifiers. FIRM panel number. and FIRM effective date. Map images for unmapped and unmodernlzed areas cannot be used for regulatory purposes. CF iAYETlP v � �'OK4NS�S 113 West Mountain Street Fayetteville. AR 72701 (479) 575-8323 Ordinance: 6344 File Number: 2020-0587 STONEBROOK ACQUISITIONS, LLC: AN ORDINANCE TO WAIVE FORMAL COMPETITIVE BIDDING AND APPROVE A COST SHARE AGREEMENT WITH STONEBROOK ACQUISITIONS, LLC FOR THE INSTALLATION OF A 36-INCH STORM SEWER WITH A REFUND IN AN AMOUNT NOT TO EXCEED $165,829.60 TO BE PAID BY THE CITY OF FAYETTEVILLE FOR THE COST OF IMPROVEMENTS THAT EXCEED THE ROUGH PROPORTIONALITY OF THE IMPACT OF THE DEVELOPMENT, AND TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF S25,000.00 WHEREAS, on March 23. 2020, the Planning Commission approved the Stonebrook Subdivision located south and east of the intersection of South River Meadows Drive and East Huntsville Road; and WHEREAS. the City and residents in the area expressed concern over an existing drainage problem along Roberts Road that can be resolved more easily at the time construction of the subdivision than at a later time. and WHEREAS. the City proposes to enter into an agreement for the developer to install a 36-inch storm sewer with a refund from the City in an amount of up to $165,829.60, which represents the estimated cost of improvements that exceed the rough proportionality of the development's impact. and WHEREAS, the City will benefit from this arrangement as it will provide resolution to a long standing drainage issue that occupies time and materials of the Transportation Department; and WHEREAS, allowing the developer to utilize its own contractors for the development will allow the City to achieve significant savings. Ppo 1 Printed on 8/5✓20 Ordinance 6344 File Number 2020-0587 NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section I: That the City Council of the City of Fayetteville. Arkansas hereby determines an exceptional situation exists in which competitive bidding is deemed not feasible or practical and therefore waives the requirements of formal competitive bidding and approves a cost share agreement with Stonebrook Acquisitions. LLC for the installation of a 36-inch storm sewer with a refund in an amount not to exceed S 165.829.60 to be paid by the City of Fayetteville for the cost of improvements that exceed the rough proportionality of the impact of the development. and further approves a project contingency in the amount of $25.000.00. PASSED and APPROVED on 8/4/2020 Attest: `�vCAE R K'z,2.6- a, .•'•CITyC.Fy�� ,c,• �u G• Kara Paxton. City Clerk Treasurer = Fq �` �c :l '- Page 2 Punted on &%W