HomeMy WebLinkAbout194-20 RESOLUTION113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 Resolution: 194-20 File Number: 2020-0528 BID #20-39 TRI STAR CONTRACTORS, LLC - 2019 TRANSPORTATION BOND PROJECT: A RESOLUTION TO AWARD BID #20-39 AND AUTHORIZE A CONTRACT WITH TRI STAR CONTRACTORS, LLC IN THE AMOUNT OF $6,820,075.20 FOR THE CONSTRUCTION OF THE ZION ROAD - VANTAGE DRIVE TO CROSSOVER ROAD PROJECT, TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $341,000.00, AND TO APPROVE A BUDGET ADJUSTMENT- 2019 TRANSPORTATION BOND PROJECT BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby awards Bid #20-39 and authorizes Mayor Jordan to sign a contract with Tri Star Contractors, LLC in the amount of $6,820,075.20 for the construction of the Zion Road - Vantage Drive to Crossover Road Project, and further approves a project contingency in the amount of $341,000.00. Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment, a copy of which is attached to this Resolution. PASSED and APPROVED on 7/21/2020 Page 1 Printed on 7123120 Resolution: 194-20 File Number.' 2020-0528 Attest: �II I i r I►►►►► rRF�,�i 0 9sG FAYET-TEVILLE *; Kara Paxton, City Clerk Treasurer; 4) G ON1C0 Page 2 Printed on 7123120 City of Fayetteville, Arkansas 113WestMountainStreet Fayetteville, AR 72701 i \ (479) 575-8323 1 i A Text File File Number: 2020-0528 Agenda Date: 7/21/2020 Version: 1 Status: Passed In Control: City Council Meetinq File Type: Resolution Agenda Number: C. 2 BID #20-39 TRI STAR CONTRACTORS, LLC - 2019 TRANSPORTATION BOND PROJECT: A RESOLUTION TO AWARD BID #20-39 AND AUTHORIZE A CONTRACT WITH TRI STAR CONTRACTORS, LLC IN THE AMOUNT OF $6,820,075.20 FOR THE CONSTRUCTION OF THE ZION ROAD - VANTAGE DRIVE TO CROSSOVER ROAD PROJECT, TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $341,000.00, AND TO APPROVE A BUDGET ADJUSTMENT- 2019 TRANSPORTATION BOND PROJECT BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby awards Bid #20-39 and authorizes Mayor Jordan to sign a contract with Tri Star Contractors, LLC in the amount of $6,820,075.20 for the construction of the Zion Road - Vantage Drive to Crossover Road Project, and further approves a project contingency in the amount of $341,000.00. Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment, a copy of which is attached to this Resolution. City of Fayetteville, Arkansas Page 1 Printed on 712212020 Matt Casey Submitted By City of Fayetteville Staff Review Form 2020-0528 Legistar File ID 7/21/2020 City Council Meeting Date - Agenda Item Only N/A for Non -Agenda Item 6/25/2020 Submitted Date Action Recommendation: ENGINEERING (621) Division / Department Approval of a contract in the amount of $6,820,075.20 with Tri Star Contractors, LLC for the construction of the Zion Road — Vantage to Crossover Project, approval of a project contingency of $341,000.00 (5%) and approval of a budget adjustment. Budget Impact: """­ I I", 4602 - Streets Project 2019 Bonds 5400.860.5600-5808.00 5400.860.5700-5815.00 5400 - Water & Sewer Account Number Fund 46020.7212 11011.2019.7212 Project Number Budgeted Item? Yes Does item have a cost? Yes Budget Adjustment Attached? Yes Purchase Order Number: Change Order Number: Original Contract Number: Zion Rd. Improvements Water & Sewer Relocations - Bond Projects Current Budget Funds Obligated Current Balance Item Cost Budget Adjustment Remaining Budget Project Title $ 50,557,254.00 $ 13,344,489.78 $ 37,212,764.22 $ 7,161,075.20 $ 7,161,077.00 { $ 37,212,766.02 Previous Ordinance or Resolution # Approval Date: V20180321 Comments: Item cost includes the construction contract of $6,820,075.20 plus the project contingency $341,000.00. CITY OF FAYETTEVILLE ARKANSAS MEETING OF JULY 21, 2020 TO: Mayor and City Council THRU: Susan Norton, Chief of Staff Garner Stoll, Development Services Director Chris Brown, City Engineer FROM: Matt Casey, Engineering Design Manager DATE: July 6, 2020 CITY COUNCIL MEMO SUBJECT: Approval of a contract in the amount of $6,820,075.20 with Tri Star Contractors, LLC. for the construction of the Zion Road — Vantage to Crossover Project, approval of a project contingency of $341,000(5%) and approval of a budget adjustment. RECOMMENDATION: Approval of a contract in the amount of $6,820,075.20 with Tri Star Contractors, LLC for the construction of the Zion Road — Vantage to Crossover Project, approval of a project contingency of $341,000.00 (5%) and approval of a budget adjustment. BACKGROUND: Zion Road from College Avenue to Highway 265 was included in the previous Transportation Improvement Bond Program. The first phase of construction between College Avenue and Vantage Drive was completed in 2008. In 2013, the second phase, between Vantage Drive and Highway 265, was approved for funding through the bond program. On May 6, 2014, the Fayetteville City Council approved a contract with MCE. for the design of the second phase of Zion Road. The design was completed in early 2015, but there were not sufficient bond funds remaining at the time to fully fund the construction of the project. On July 16, 2019, the Council approved a contract with MCE to update the plans to include a revised cross section consisting of a three -lane section with a 10' wide multi -use trail on the north side and a 6' wide sidewalk on the south side. DISCUSSION: On June 24, 2020, the City received six (6) construction bids for this project. Tri Star Contractors, LLC submitted the low bid which was approximately 19% below the Engineer's Estimate of $8,422,851.21. Engineering staff recommends awarding this contract to Tri Star Contractors, LLC. The contract time is 510 days (17 months) for final completion. BUDGET/STAFF IMPACT: The roadway and drainage improvements ($4,395,109.35) are funded by the 2019 Transportation Bond Program. The water and sewer relocations in this project ($2,424,965.85) are funded by the Water and Sewer Fund Capital Improvement project appropriation. There Mailing Address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 was $4,900,000 allocated in the Transportation Bond Fund for the Zion Road project. The design and land acquisition of this project were $33,500 and $67,000.00 respectively from this fund. Construction phase services and materials testing are estimated to be $52,794.00. With this construction contract and contingency ($220,000), it brings the current Zion Road project total to $4,768,403.35. Attachments: Section 0500 Agreement Bid Submittal Bid Tab Vicinity Map Ili 141 T TT T. k 30' F+ MIN. y TYP. SEC. "1' / 1 ' �1 " - TYP. SEC..2" o ,y- 1. fl `(� .I .k p '`� het• w �a t*Al VARIES - 10' TYP. 30' F/F �TYR MULTI -USE SIDEWALK TRAIL 10' 10' 10' TRAVEL CENTER TRAVEL 18" WIDE LANE LANE LANE CURB & GUTTER TYPICAL SECTION "1" VARIES 8, VARIES 8• TYP. 30' TO 32' TYp, VARIES VARIES EX. 101 I FSWi MULTI-USE TRAIL 10' MIN. 10' 10' MIN. TRAVEL CENTER TRAVEL 18" WIDE LANE LANE LANE CURB & LANE WIDTHS VARY GUTTER TYPICAL SECTION "2" �CITY OF ZION ROAD IMPROVEMENTS � FAYETTEVILLE VANTAGE DR. TO CROSSOVER RD. ARKANSAS 2019 BOND PROGRAM DOCUMENT 0400-BID FOR11 Contract Name: ZION ROAD PHASE H- N. VANTAGE DR. TO N. CROSSOVER RD, Bid Number: 20-39, CONSTRUCTION BID TO: Owner: The City of Fayetteville, Arkansas 113 West Mountain Street Fayetteville, Arkansas 72701 BID FROM: Bidder: Tri Star Contractors, LLC 1910 Waukesha Rd Siloam Springs, AR 72761 (479) 238-1088 ARTICLE 1- INTENT 1.01 The undersigned Bidder proposes an agrees, if this Bid is accepted, to enter into an agreement with Owner in the form included in the Contract Documents to perform and furnish all Work as specified or indicated in the Contract Documents for the Bid price and within the Bid time indicated in this Bid and in accordance with the other terms and conditions of the Contract Documents. ARTICLE 2- TERMS AND CONDITIONS 2.01 Bidder accepts all of the terms and conditions of the Invitation to Bid and Instructions to Bidders, including without limitation those dealing with the disposition of Bid security. This Bid will remain subject to acceptance for 90 days after the day of Bid opening. Bidder will sign and deliver the required number of counterparts of the Agreement with the Bonds and other documents required by the Bidding Requirements within 15 days after the date of Owner's Notice of Award. 0400-Bid Form 0400-1 19-2139 Zion Road Phase H DOCUMENT 0400-BID FORM (continued) ARTICLE 3- BIDDER'S REPRESENTATIONS 3.01 In submitting this Bid, Bidder represents, as more fully set forth in the Agreement, that: A. Bidder has examined and carefully studied the Bid Documents, and the following Addenda, receipt of all which is hereby acknowledged: Number Date 6-10-20 (o-VI.20 (o -ta-ZD B. Bidder has visited the Site and become familiar with and is satisfied as to the general, local, and Site conditions that may affect cost, progress, performance, and furnishing of the Work. C. Bidder is familiar with and is satisfied as to all federal, state, and local Laws and Regulations that may affect cost, progress, performance, and furnishing of the Work. D. Bidder has carefully studied all: (1) reports of explorations and tests of subsurface conditions at or contiguous to the Site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the Site; and (2) reports and drawings of a Hazardous Environmental Condition, if any, at the Site. Bidder acknowledges that such reports and drawings are not Contract Documents and may not be complete for Bidder's purposes. Bidder acknowledges that Owner and Engineer do not assume responsibility for the accuracy or completeness of information and data shown or indicated in the Bid Documents with respect to Underground Facilities at or contiguous to the Site. E. Bidder has obtained and carefully studied (or assumes responsibility for having done so) all such additional or supplementary examinations, 0400-Bid Form 0400-2 19-2139 Zion Road Phase 11 DOCUMENT 0400-BID FORM (continued) ARTICLE 5- CONTRACT TIMES 5.01 Bidder agrees that the Work will be substantially completed and completed and ready for final payment within the number of calendar days indicated in the Agreement. 5.02 Bidder accepts the provisions of the Agreement as to liquidated damages in the event of failure to complete the Work within the times specified in the Agreement. ARTICLE 6- BID CONTENT 6.01 The following documents are attached to and made a condition of this Bid: A. Required Bid security in the form of a cashier's check from a bank located in the —TAMA- fp Arkans,�s or a Bid Bond ' the unt of jk 4 C `d+-t rr rX -Q o..a(D llSo?(0. 9 (p } tro B. A tabulation of Subcontractors and other persons and organizations required to be identified in this Bid. ARTICLE 7- COMMUNICATIONS 7.01 Communications concerning this Bid shall be addressed to the Bidder as follows: Tri Star Contractors, LLC 1910 Waukesha Rd Siloam Springs, AR 72761 Email tristarcontractors@yahoo.com Phone No.479-238-1088 Fax No. 479-238-030 0400-Bid Form 0400-15 19-2139 Zion Road Phase II DOCUMENT 0400-BID FORM (continued) ARTICLE 8- TERMINOLOGY 8.01 The terms used in this Bid which are defined in the GENERAL CONDITIONS or Instructions to Bidders will have the meanings assigned to them. Arkansas State Contractor License No.0186220320 If Bidder is: An Individual Name (type or printed): By: (SEAL) (Individual's Signature) Doing business as: Business address: Phone No: Fax No. Email Address: A Partnership Partnership Name : (SEAL) By: general partner -attach evidence of authority to sign) Name (type or printed): Business address: Phone No: Email Address: 0400-Bid Form 19-2139 Zion Road Phase If Fax No. 0400-16 DOCUMENT.0400-BID FORM (continued) A Corporation or LLC Corporation Name: Tri Star Contractors (SEAL) State of Incorporation: Arkansas Type (General Business, Professional, Service, Limited Liability):LLC By: f1�--- .�-jYi= general partner -attach evidence of authority to sign) Name (type or printed): Anthony Nicholas Goedereis II -r;ti— President TE SEAL) (Signature of Business address: Tri Star Contractors 1910 Waukesha Rd Siloam Springs, AR 72761 Phone No:479-238-1088 Fax No.479-238-0030 Email Address: tristarcontractors@yahoo.com Tax ID Number (TIIN)20-8197387 DUN S# Cage Code: F DOCUMENT 0400 0400-Bid Form 0400-t7 19-2139 Zion Road Phase II STATE OF AIRIKANSAS Charlie Daniels SE.CUTARY OF STATE To All to Whom These Presents Shall Come, Greetings: I, Charlie Daniels, Secretary of State of Arkansas, do hereby certify that the following and hereto attached instrument of writing is a tme and perfect copy of Articles of Organization of TRI STAR CONTRACTORS, LLC filed in this office October 5, 2006 In TestLmony Whereof, I have hereunto set my hand and affixed my official Seal. Done at my office in the City of Little Rock, this 5th day of October 2006. Secretary of State 03-25-11;02:24PM; ;4794422774 # 4/ 4 11 • • I C c NICHOLAS GOEDEMS, U M C. Responses Success: All data is valid! Itern No, Quarouty Unit of Me..... Unit Price Total C0111- Bid Schedule 1 Act 291, 1993 Trench & Excavation Safety Success: All values provided #1 1 Systems 1 1 LS $500 00 $ 500.00 Success: All values provided 41 2 Erosion Control 2 LS $ 45 000 00 S 45 000 00 Success: All values provided #1 11 Insurance and Bonding 3 1 LS $200438,60 5200.438.50 Success: All values provided #' 4 Roadway Construction Control 4 LS $30.000.00 S 3000000 Success: All values provided #1 5 Traffic Control and Maintenance 5 1 LS $50,000,00 $50.000,00 Success: All values provided #1 6 Clearing, Grubbing. & Demolition 6 LS $ 100 000.00 S 100,000.00 Mobilization (Street and Drainage, SCH 1) (Shall Success: All values provided #1-7 not exceed 5 % of Total Bid) 1 LS 5209,009.23 $209.009.23 Success: All values provided #1 8 Undercut and Backfill (Allowance) 8 470 CY S 22.00 $ 10 340.00 Success: All values provided #1 9 Rock Excavation (Allowance) 9 250 CY $150.00 $37,500.00 Success: All values provided #1 10 Unclassified Excavation (Plan Quantity) 10 22770 CY $8.75 $199.237 50 Success: All values provided #1 11 Select Embankment (Plan Quantity) 11 4685 CY $ 11.75 $55,048.75 Success: All values provided #1 12 Embankment (Plan Quantity) 12 13340 CY S 10.75 S 143 405 00 Success: All values provided 01-13 Subgrade Preparation (Plan Quantity) 13 15406 CY S 2.00 S 30.812.00 Success: All values provided #1-14 Undercut and Stone Backfill (Allowance) 14 5CC TON S 69.00 S 34.500 00 Success: All values provided #1-15 4" Topsoil Placement (Yard Areas) 15 10575 SY $ 5,00 $ 52,875.00 Success: All values provided #1 16 4" Topsoil Placement (Other Areas) 16 8630 Sy $5.00 $43.150.00 Success: All values provided 01 17 18" RCP, Under Pavement 17 400 LF $65,00 $26,000.00 Success: All values provided # '8 18" RCP, Outside Roadway :8 LF $ 50 00 S 81.750.00 Success: All values provided #1 19 24" RCP, Under Pavement 19 ' 19 LF $ 75.00 $ B.925.00 Success: All values provided #! 2e 24" RCP. Outside Roadway 2c -.-r LF S 60 00 S 44 22000 Success: All values provided #1 21 30" RCP, Outside Roadway 21 142 LF $ 75.00 $ 10,650,00 Success: All values provided #1 22 53" x 34" HERCP, Under Pavement ... LF $ 250.00 $ 22.750 00 Success: All values provided #1-23 53" x 34" HERCP, Outside Roadway 23 41 LF $235.00 $ 9,635.00 Success: All values provided #1 24 42" RCP, Outside Roadway LF S 14900 S 4 76800 Success: All values provided #1-25 Reconstruct Existing Inlet Tops 25 6 EA $ 37.50 $ 225.00 Success: All values provided #1-26 4' Drop Inlet 26 25 EA $ 3,400,00 $ 85.000.00 Success: All values provided #1-27 4' Drop Inlet, Connnected to RC Box Culvert 27 2 FA $ 4,500.00 s 9,000.00 Success: All values provided #1-28 5' Drop Inlet 28 9 EA $ 5,000.00 $ 45,000.00 Success: All values provided #1-29 6' Drop Inlet 29 4 EA $ 5,400.00 $ 21,600.00 Success: All values provided #1-30 10' x 6' Drop Inlet Box 30 1 EA $ 10,000,00 $ 10.000.00 Success: All values provided #1-31 4' Junction Box 31 4 FA $ 3,200.00 $ 12,800.00 Success: All values provided #1-32 6' Junction Box 32 4 EA $ 5.700 00 $ 22,800 00 Success: All values provided #1-33 Drop Inlet Extensions (4') 33 18 FA $1,000.00 $18,000.00 Success: All values provided #1-34 Drop Inlet Extensions (8') 34 16 FA $ 1,600.00 $ 25.600.00 Success: All values provided 01-35 Drop Inlet Extensions (12') 35 1 FA $ 3,000.00 $ 3.000.00 Success: An values provided #1-36 Reconstruct Existing Inlet with Reverse Throat 36 1 EA $ 5.000.00 $ 5.000.00 Success: All values provided #1-37 Connect Pipe to Existing Drainage Structure 37 1 FA $1,200.00 $ 1,200.00 Success: All values provided #1-38 Combination Inlet Frame/Top 38 3 EA $ 3.800.00 $ 11,400.00 Success: All values provided #1-39 18" Flared End Section 39 5 FA s 1200.00 $ 6,000.00 Success: All values provided #1 <0 24" Flared End Section 40 1 EA $ 1.700.00 $ 1 700.00 Success: AN values provided #141 4' x 4' Reinforce Concrete Box Culvert 41 114 LF $ 400.00 $ 45,800.00 Concrete Headwall w/ Wingwalls to 4' x 4' RC Box Success: AN values provided #1-42 Culvert and Appurtances 42 1 LS $ 7,000.00 $ 7,000.00 Concrete Headwall W Wingwalls to Dual 42" RCP Success: All values provided #143 and Appurtances 43 1 LS $ 9.500.00 $ 9,500.00 Success: All values provided #144 Rip -Rap 44 40 SY $ 50,00 $ 2,000.00 Success: AN values provided #145 Cold Milling Pavement (2") 45 3511 SY $ 5.00 $ 17,555.00 Success: AN values provided #146 2" ACHM Superpave Surface Course (Overlay) 46 740 TON $ 105,00 $ 77.700.00 Success: All values provided #147 3" ACHM Superpave Surface Course 47 2000 TON $ 110.00 $ 220,000.00 Success: AN values provided #1-48 3" ACHM Superpave Binder Course 48 2025 TON $ 115,00 $ 232.875,00 Success: All values provided #149 ACHM Superpave Binder Leveling Course 49 100 TON $119.00 $11,900.00 Success: All values provided #1-50 8" Class 7 Aggregate Base Course 50 14250 SY $ 11.00 $ 156,750.00 Success: All values provided #1-51 ACHM Patching of Existing Roadway 51 30 TON $150.00 $ 4,500,00 Success: AN values provided #1-52 Aggregate Based for Roadway Maintenance 52 100 TON $ 40,00 $ 4,000.00 Success: AN values provided #1-53 Prime Coat 53 11330 SY $1.95 $ 22,093.50 Success: AN values provided #1-54 Concrete Curb and Gutter 54 8375 LF $ 18.00 $ 150,750.00 Success: All values provided #1-55 Modified Concrete Curb and Gutter 55 780 LF $ 20,00 $ 15,600 00 Success: All values provided #1-56 Type B Concrete Curb and Gutter 56 380 LF $ 22.00 $ 8,360.00 Success: AN values provided #1-57 3" Curb (at Raised Concrete Apron) 57 75 LF $ 19.O0 S 1,425.00 Success: All values provided #1-58 12" Wide Ribbon Curb (Mini -Roundabout) 58 151 LF S 17.00 $ 2.567.00 Success: All values provided #1-59 I'Valley Curb (at Intersections) 59 265 LF $ 22.00 S 5,8W.00 Success: AN values provided #160 (4" Depth) 6' Wide Concrete Sidewalk 60 2260 SY $ 52.00 $ 117,520.00 Success: All values provided #161 (4" Depth) 10'Wide Concrete Trail 61 5000 SY $ 52.00 $ 312,000.00 Success: All values provided #162 (8" Depth) 10' Wide Colored Concrete Trail 62 240 SY $ 100.00 $ 24,000.00 Crossings (per Detail TC1) Success: All values provided #163 Concrete ADA Ramp 63 225 SY $ 96.75 $ 21,768.75 Success: All values provided #164 Cast -in Place Detectable Waring Panel 64 524 SF $ 27,00 $ 14. 148.00 Concrete Driveway Apron (6" Thick Approach Success: AN values provided #165 and Sidewalk) 65 670 SY $ 60.00 $ 40,200.00 Success: AN values provided #166 6" Thick Concrete Driveway 66 760 SY $ 60.00 $ 45,600.00 Success: All values provided 9167 3" Thick Asphalt Driveway 67 130 SY $ 28.00 $ 3,640.00 Success: All values provided #168 Aggregate Base Course Driveway 68 155 SY $ 15.00 $ 2,325.00 Success: AN values provided 0169 Raised Concrete Apron (at Mini Roundabout) 69 22 SY $ 76.00 $1.650.00 Success: AN values provided #1-70 Concrete Bus Pull -Out Apron 70 205 SY S 85.00 $ 17.425.00 Variable Height Cast4n4nace Reinforced Success: AN values provided #1 71 Concrete Retaining Walls 71 390 LF $ 200.00 $ 78,000.00 Steel Handrail (Retaining Walls and Success: AN values provided #1-72 Headwalls/ W i ngwal ls) 72 440 LF $ 100.00 $ a4,000.00 Success: AN values provided #1-73 Concrete Channel Paving 73 80 SY $ 60,00 $ 4,800.00 Success: AN vakles provided #1-74 6" Thick Concrete Flume w/ Energy Dissipaters 74 5 SY $ 150.00 $ 750,00 Success: All values provided 01-75 Solid Sod (excludes Topsoil) 75 9980 SY $ 4.00 $ 39,920.00 Success: All values provided #1-76 Seeding and Mulching 76 2 ACRE $ 2.200.00 $ a 400.00 Success: All values provided #1-77 6" Solid Striping, White (Thermoplastic) 77 59 LF $1.50 $ 88.50 Success: All values provided #1-78 12" Solid Striping, White (Thermoplastic) 78 110 LF $ 9,00 $ 990.00 Success: All values provided #1-79 24" Solid Striping, White (Thermoplastic) 79 200 LF $ 35.00 $ 7,000.00 Success: AN vales provided #1-80 6" Solid Striping, Yellow (Thermoplastic) 80 11350 LF $ 1.50 $ 17.025.00 Success: AN vales provided #1-81 8" Solid Striping, Yellow (Thermoplastic) 81 172 LF $ 4.50 $ 774.00 Success: AN values provided #1-82 6" Skip Striping, Yellow (Thermoplastic) 82 2576 LF $ 1_50 $ 3.864.00 Success: All values provided #1-83 6" Skip Striping, Yellow (Reflective Paint) 83 1290 LF $ 2.00 $ 2,580.00 Success: All values provided #1-84 6" Solid Striping, Yellow (Reflective Paint) 84 290 LF $ 2.00 S 580.00 Success: All values provided #1-85 6" Dashed Striping, White (Thermoplastic) 85 30 LF $1.50 $ 45.00 Success: All values provided #1-86 Triangle Yield Line 86 30 LF $ 32,00 $ 960.00 Success: All values provided #1-87 1Y' Stop Bar (Thermoplastic) 87 95 LF $ 8.00 $ 760.00 Success: All values provided #1-88 24" Crosswalk Markings (Thermoplastic) 88 340 LF $ 25,00 $ 8,500,00 Success: All values provided #1-89 Pavement Symbols (Thermoplastic) 89 51 EA $ 385.00 $19,635.00 Success: All values provided #1-90 "YIELD" Pavement Symbols (Thermoplastic) 90 3 EA $ 550,00 $ 1,650.00 Success: All values provided 011-91 Remove and Replace Mailboxes 91 5 EA $ 300.00 $1,500.00 Retangular Rapid -Flashing Beacon, (Carmanah Success: AN values provided #1-92 R920) 92 2 EA $ 15,000,00 $ 30.000.00 Success: All values provided #1-93 Street Signs Installation, as Indicated on Plans 93 29 EA $ 350.00 $10,150.00 Success: All values provided #1-94 Project Signs 94 2 EA $ 750.00 $ 1.500.00 Success: All values provided #1-95 Illuminated Collapsible Bollard 3 Base Light 95 3 EA $ 6.000.00 $ 18.000.00 Complete and Operational Success: All values provided #1-96 Integrally Colored Stamped Concrete (Splitter 96 221 SY $ 120.00 $ 26.520.00 Islands and Apron) Success: AN values provided #1-97 26' Diameter Mountable Center Island 97 59 SY $ 100.00 S 5,900.00 Su ,case: AN values provides #1-98 Glass 360 Degree Reflective Curb Markers 98 53 EA $ 64,00 $ 3,392,00 Success: All values provided #1-99 Construction Adjacent to Pond 99 1 LS $ 40,000.00 $ 40,000.00 Success: All values provided #1-100 Construct Cable Fence with Gates 100 1 LS $ 20 000.00 $ 20.000.00 Success: All values provided 01-101 Black Gum Tree, 2" Caliper, Installed 101 49 EA $ 537.32 $26,328.68 Success: All values provided #1-102 Willow Oak Tree, 2" Caliper, Installed 102 49 EA $ 537.32 $ 26,328.68 Success: All values provided 91-103 Thornless Honey Locust Tree 103 6 EA $ 537.32 $ 3,223.92 Success: All values provided #1-104 Northen Red Oak Tree, 2" Caliper, Installed 104 23 EA $ 537.32 $ 12,358.36 Success: All values provided #1-105 Princeton Elm Tree, 2" Caliper, Installed 105 48 EA $ 537.32 $ 25,791.36 Success: All values provided #1-106 Oklahoma Red Bud Tree, T' Caliper, Installed 106 9 EA $ 537 32 $ 4,835.88 Drip Irrigation System with Two RPZ Beckflow Success: All values provided #1-107 Preventers, Installed, Complete 107 1 LS $ 42,537.00 $ 42,53T00 Type S1 Light Fixture, Pole and Foundation (14' Success: All values provided #1-108 Pole), Installed, Complete 108 69 EA $ 5.641 00 $ 389 229.00 Type S2 Light Fixture, Pole and Foundation (30' Success: All values provided #1-109 Pole), Installed, Complete 109 6 EA $ 4,634.00 $ 27,804.00 Success: All values provided #1-110 1" Conduit in Trench 110 6708 LF $ 5.93 $ 39.778.44 Success: All values provided #1-111 Junction Boxes, Installed ill 78 EA $ 455.00 $ 35.490.00 Success: All values provided #1-112 Conductors (2C1#8 & 1C/#8) Installed in Conduit 112 6708 LF $ 2.40 $ 16.099.20 Success: Ali values provided #1-113 Electrical Service, Installed 113 2 LF $ 1,200.00 $ 2,400.00 Success: AN values provided #1-114 Commercial Pedestal, Installed 114 2 EA $ 10 500.00 $ 21 000.00 Success: All values provided 01-115 5' Juntion Box 115 1 EA $ 3,500.00 $ 3.500.00 Bid Schedule 2 Success: AN values provided #2-1 Act 291, 1993 Trench & Excavation Safety 116 1 LS $ 500,00 $ 500 00 Systems Success: All values provided #2-2 Mobilization (Water and Sewer Utilities) 117 1 LS $ 58,413.60 $ 58,413.50 Success: AN values provided #2-3 Traffic Control (Water and Sewer Utilities) 118 1 LS $20,000,00 $20.000.00 Success: AN valves provided #24 124nch PVC, C-900, DR-14 Water Main 119 5095 LF $ 48.00 $ 244,080.00 Success: AN values provided #2-5 12-Inch PVC, C-900, DR-14 Restrained Joint 120 475 LF $ 75.00 $ 35.625.00 Water Main Success: A0 values provided #26 84nch PVC, C-900, DR-14 Restrained Joint Water 121 Sao LF $ 60.00 $ 34,800.00 Main Success: AN values provided #2.7 6-Inch PVC, C-900, DR-14 Restrained Joint Water 122 215 LF $ 50,00 $10750.00 Main Success: All values provided #26 S-inch Class 350 Restrained Joint DIP Water Main 123 5o LF $105.00 $ 5,250.00 Success: All values provided #2-9 Existing Storm Sewer Protect, Point Repair and 124 1 LS $ 15,000.00 $ 15,000.00 Temerorary Reroute - Water Success: All values provided #2-10 16-Inch Min. DID. Direct Bury Steel Casing 125 265 LF $ 120.00 $ 31,800.00 Success: All values provided #2-11 24-Inch Min. DIN. Direct Bury Steel Casing 126 150 LF $ 125.00 $ 18,750.00 Success: All values provided #2-12 124nch x ldnch Service Tap 127 13 EA $ 250,00 $ 3,250.00 Success: All values provided #2-13 8-Inch x 1-Inch Water Service Tap 128 1 EA $ 350.00 $ 350.00 Success: All values provided #2-14 64nch x 14nch Service Tap 129 6 EA $ 250.00 $1,500.00 Success: All values provided #2-15 1-Inch Coated Copper Service Tubing 130 400 LF $ 30.00 $12 000.00 Success: All values provided #2-16 24nch Min. DID. HDPE SDR-9 Casing 131 335 LF $ 28.00 $ 9.380.00 Success: All values provided #2-17 Single 1-Inch Meter Setting, Complete 132 6 EA $ 1.400.00 $ 8.400.00 Success: AN values provided #2-18 Single 5/64nch Irrigation Meter Setting, Complete 133 2 EA $1,200,00 $ 2,400,00 Success: All values provided #2-19 Double Meter Setting Reconnect 134 4 EA $ 900.00 $ 3.600 00 Success: All values provided #2-20 Single Meter Setting Reconnect 135 7 EA $ 900.00 $ 6,300.00 Success: All values provided #2-21 Abandon Exist WM and Service Line 136 2 EA $ 1,800.00 $ 3,600.00 Success: All values provided 02-22 12-Inch Butterfly Valve with Box 137 29 EA $ 8,290.00 $ 240,410.00 Success: All values provided #2-23 8-Inch Gate Valve with Box 138 11 EA $ 1,950.00 $ 21 450.00 Success: All values provided 02-24 64nch Gate Valve with Box 139 15 EA S 1,500.00 $ 22,500.00 Success: All values provided #2-25 Ductile Iron Fittings for Water Main 140 5755 LBS $ 8.00 $ 46,040.00 Success: Ali values provided #2-26 Three Way Fire Hydrant Assembly 141 13 EA $ 5,500.00 $ 71,500.00 Success: All values provided #2-27 Salvage Fire Hydrant to Owner 142 6 EA $ 950.00 $ 5.700.00 Success: All values provided #2-28 Abandon Valve 143 17 EA $ 850,00 $ 14,450.00 Success: All values provided #2-29 Abandon Existing Water Main Under Roadway 144 4000 LF $ 18,00 $ 72.000.00 Sta. 0+36 Connect New Water Main to Existing Success: AN vaMres provided 02-30 Water Main 145 1 EA $ 2,000.00 $ 2,000,00 12-Inch x 12-Inch Tapping Sleeve, 12-Inch Success: All values provided #2-31 Tapping Valve with Box 146 2 EA S 7.500.00 $ 15.000.00 84nch x 84nch Tapping Sleeve, 8-Inch Tapping Success: All values provided #2 32 Valve with Box 147 7 EA $ 5,000.00 $ 35,000.00 6-Inch x 6-Inch Tapping Sleeve, 6-Inch Tapping success: All values provided #2-33 Valve with Box 148 3 EA $ 4,000.00 $ 12,000.00 Success: AN values provided #2-34 Anchor Collar for 6-Inch Water Main 149 4 EA $1.500,00 $ 6,000.00 Success: All values provided #2-35 Anchor Collar for 12-Inch Water Main 150 1 EA $ 2,000.00 $ 2.000.00 Success: AN values provided 1112-36 Bench- Double Cut and Cap Existing Water Main 151 3 EA $1,349.00 $ 4,047.00 Success: AN values provided #2-37 8-Inch- Double Cut and Cap Existing Water Main 152 8 EA $ 1 449.00 $ 11.592.00 Success: All values provided 82-38 124nch- Double Cut and Cap Existing Water Main 153 2 EA $1.749.00 $ 3.498,00 Success: AN values provided #2-39 Full Depth Class 7 Aggregate Base Course 154 4200 LF $ 10.00 $ 42.000.00 Backfill (Water) Success: A6 values provided 0240 Pavement Repair (Water) 155 580 LF $ 75.00 $ 43,500.00 Success: All values provided #241 Disinfection and Testing Water Main 156 1 LS $ 5,500,00 $ 5,500.00 Success: Aft values provided #242 Rod( Removal - Water 157 200 cr $ 150.00 $ 30.000.00 Bid Schedule 3 Success: All values provided #3-1 Act 291, 1993 Trench a, Excavation Safety 158 1 LS $ 500,00 $ 500.00 Systems - Sewer Success: All values provided #3-2 Mobilization - Sewer 159 1 LS $ 60.025.25 $ 60.025,25 Success: All values provided #3-3 Traffic Control - Sewer 160 1 LS $ 2,500.00 $ 2.500.00 Success: All values provided #34 16-Inch PVC SDR-26 Gravity Sewer Main 161 2430 LF $ 65,00 $ 157,950.00 Success: AN values provided #3-5 15-Inch PVC SDR-26 Restrained Joint Sewer Main 162 435 LF $ 110.00 $ 47.850.00 Success: All values provided #3-6 8-Inch PVC SDR-26 Sewer Main 163 1000 LF $ 55.00 $ 55,000.00 Success: All values provided #3-7 6-Inch PVC SDR-26 Sewer Main 164 220 LF $ 50.00 S11.00000 Success: All values provided #3-8 44nch PVC C-900 DR-18 Sewer Main 165 20 LF $ 40.00 $ 800.00 Success: All values provided #3-9 16-Inch D.I., Epoxy Lined wl Polywrap, Sewer 166 670 LF $ 140.00 $ 93S00.00 Main Success: All values provided #3-10 84nch D.1., Epoxy Lined wl Polywrap Sewer Main 167 265 LF $ 85.00 $ 22,525.00 Success: All values provided #3-11 30-Inch Steel Encasement by Bore 168 225 LF $ 125.00 $ 28.125,00 Success: All values provided #3-12 304nch Steel Encasement by Direct Bury 169 210 LF $ 300.00 $ 63,000.00 Success: All values provided #3-13 Sewer Main Trenching & Backfill, 0-6 Feet Deep 170 430 LF $ 10.00 $ 4,300.00 Success: All values provided 4113-14 Sewer Main Trenching d Backfill, 6-10 Feet Deep 171 2465 LF $12.00 $ 29.580.00 Sewer Main Trenching Backfill, 10-14 Feet Success: All values provided #3-15 DP 172 1365 LF $ 15.00 $ 20,475.00 Success: All values provided #3-16 Sewer Main Trenching & Backfill, 14-18 Feet 173 350 LF $19.00 $ 6,650.00 Deep Success: All values provided #3-17 Sewer Main Trenching 3 Backfill, >18 Feet Deep 174 430 LF $ 22.00 S 9.460.00 Success: All values provided 03-18 4' Diameter Manhole, 0.6 Feet Deep 175 16 EA S 3,900.00 $ 62,400.00 Success: AN values provided #3-19 4' Diameter Drop Manhole, 0-6 Feet Deep 176 1 EA $ 4,300.00 $ 4.300.00 V Diameter Manhole, Extra Depth Over 6 Feet Success: An values provided #3-20 177 31 VF $ 350.00 $10.850.00 Success: All values provided #3-21 5' Diameter Manhole, 0-10 Feet Deep 178 12 EA $ 6.900,00 $ 82.800.00 Success: All values provided #3-22 5' Diameter Drop Manhole, 0-10 Feet Deep 179 1 EA $ T200.00 $ 7.200.00 5' Diameter Manhole, Extra Depth Over 10 Feet Success: All values provided #3-23 180 46 VF $ 490.00 $ 22,540.00 Success: All values provided #3-24 V Diameter Manhole Epoxy Coating 181 133 VF $ 300A0 $ 39.900,00 Success: An values provided #3-25 5' Diameter Manhole Epoxy Coating 182 166 VF $ 350.00 $ 58, 100.00 Success: All values provided #3-26 Abandon Existing Sewer Main Under Roadway 183 3200 LF $15.00 $ 48.000.00 Success: All values provided #3-27 Abandon Manhole 184 18 EA $ 750.00 $ 13.500.00 Success: AN values provided 03-28 Low Pressure testing Sewer Main 185 1 LS S 5,500.00 $ 5,500.00 Success: AN values provided #3-29 Vacuum Testing Sewer Manhole 186 1 LS $ 4,500.00 $ 4.500 00 Success: All values provided #3-30 CAst Iron MAhole Ring and Lid 187 30 EA $ 250.00 $ 7,500.00 Success: All values provided #3-31 Concrete Dams 188 3 EA $ 100.00 $ 300.00 Success: All values provided #3-32 Flowable Fill 189 10 CV $ 10.00 $ 100.00 Success: All values provided #3-33 Force Main Tracer Wire Access Port 190 2 EA $ 250.00 $ 500.00 Success: All values provided #3-34 Salvage Force Main Air Release Valve 191 1 EA $1,250.00 $1,250.00 Full Depth Class 7 Aggregate Base Course Success: All values provided #3-35 Backfill (Sewer) 192 3775 LF $ 15.00 $ 56.625.00 Success: All values provided #3-36 Post Construction CCTV of Sewer Main 193 4855 LF $ 3.00 $14,565.00 Success: All values provided #3-37 Pavement Repair - Sewer 194 580 LF $ 75,00 $ 43.500.00 Success: All values provided #3-38 Ductile Iron Fittings for Sewer Force Main 195 20 LBS $ 28.00 $ 560.00 Existing Storm Sewer Protect, Point Repair and Success: A6 values provided #3-39 Temporary Reroute - Sewer 196 1 LS $15,000.00 $ 15.000.00 Success: All vah� provided #3-40 Rock Removal - Sewer 197 800 Cv $100.00 $ 80,000.00 %t r Bid Tabulation Bid 20-39, Construction - Zion Road; Vantange to Crossover b Items Item No. Quantity Requid Unit of Measure Unit Price iota) Cost Unit PriceCostPrice Total Unk Total Cost Unit Price Total Cast ..It Price Total Cost Urill ce Total Cost 91-1 Act 291, 1993 Trench i....vallon Safety Systems I 1 LS S20,000.00 $20,000.00 $12,000.00 $12,000.00 $10,D00.00 $10,000.00 $50,0000D $50,000.00 $225,000.00 $225,DDD.00 $500 $500 41-2 Erosion Control 2 1 LS $1SO,000.00 $150,000.00 $85,000.00 $85,000.00 $85,D00.00 $85,000.00 $125,000.00 $125,000.00 $165,000.00 S365,Dt100D $45,D00.00 $45,000.00 91-3 Insurance and Bonding 3 1 LS $50,D00.DO $50,000.00 '- $140.D00.00 $140,000.00 $101,200.00 $101,200.00 $200,000.DO $200,000,00 $132,097.00 $132,087.00 $200,439,60 $200,438.60 91-4 Roadway Construction Control 4 1 LS 575,000.0" $75,000.00 $100,000.00 $1DO,000.00 $210,000.00 $210,000.00 $125,000.00 $125,000.00 $49,000. DO $38,000.00 $30,000.00 $30,000.00 91-5 Traffic Control and Maintenance 5 1 LS S145,000.00 $145,000.00 5150,00D.00 :150,000.00 $130,000.00 :150000.00 $138,000.00 $138,000.00 '2101:1 1200,000.00 1383,800.00 5383,:00.no $'0,000.00 $50,000.00 91.6 Clearing, Grubbing,&Demolition 6 1 LS $160,000.00 $160,000.00 $279,000.00 $279,000:00 $250,000.nO $200,00000 5343,600.00 $343,6MOD S300,000.00 $300,090.00 91-7 Mobilixatlon lStreet and Drainage, 6CH II (Shall not exceed 5%of Total Bld) 7 1 LS $260,000.00 $260,ODO.00 $260,000.00 $260,000.00 $132,000,00 $132AINBM $200,000.00 $200,000.00 $187,500.00 $187,500.00 $209,009.23 $209,009.23 pi-8 Undercut and Backfill(Allowancel 8 470 Cy $75 $35,250.00 $18 $9,460.00 $40 $18,800.00 $45 $21,150.00 $29 $13,630.00 $22 $10,340.00 91.9 Rock Excaiation(Allowance) 9 250 CY $145 $36,25000 $35 $9,750.00 $175 $43,750.00 $200 $50,00000 $225 $56,250.00 " $150 $37,500.Do 91-10 Unclassified Excayation(Plan Quantity) 10 22770 CY $13 $296,010.00 $to S227,700.00 $Is $409.860.00 $14 $318,790.00 $22 5S00,940.00 $8.75 $199,237.50 91-II Select Embankment (Plan Quantity) 11 4685 CY $26 $121,810.00 $11 $51,535.00 $18 $84,330.00 $22 $103,070.00 $26 $121,810.00 $11.75 555,048.75 9112 Embankment (Plan Quantity) 12 13340 Cy $19 $253,460.DO '^ $12 S160,080.00 $10 $133,400.00 $14 $186,760.00 $26 $346,840.00 $10.75 $143,405.00 91-13 Subgrade Preparation (Plan Quantity) 13 15406 Cy $1.5S $2114M.30 $2 $30,812.00 $2.85 $43,907.10 $14 $215,684.00 $to $154,060.00 $2 $30,812.00 91-14 Undercut and Stone Backflll(Aliowancel 14 500 TON $55 $27,500.00 $28 $14,000.00 $29 $14,000.00 $30 $15,000.00 $45 $22,500.00 $69 $34,500.00 91-15 4" Topsoil Placement (Yard Areas) 15 10575 SY S3.51 $37,119.25 $4 $42,300. DO $3.75 $39,65625 SS 552,87S.00 $6 $63,450.00 $5 $52,875.00 91-16 4" Topsoil Placement (OtherAreas) 16 8630 SY $3.51 $30,292.30 $4 $34,520.DO $3.75 $32,362.SO ;: $5 $43,150.DO $6 $51,790.00 $5 $43,150.00 91 17 18" RCP, Under Pavement 17 400 LF S70.SO $28,200.00 $87 $34,800.D0 $as $35,7DO.00 $75 $30,000.00 $57.40 $22,594.90 $65 $26,000.DO NJ '1 18" RCP, Outside Roadway 18 1635 LF $38.60 $63,111.00 $51 $83,385.00 $66 5107.910.00 $50 $81,750.00 $49.20 $80,442.00 $50 $81,750.00 91-19 24" RCP, Under Pavement 19 119 LF $95.50 $11,364.50 $96 $11,424,00 $lot $12,019.00 $85 $10,115.00 $84 $9,996.00 $75 $4,925.00 91-20 24" RCP, Outside Roadway 20 737 LF S50.02 $36,964.74 $60 $44,220.00 $77 $56,749.00 $60 $44,220.00 $72 $53,064.00 $60 544,220.00 91-21 30" RCP, Outside Roadway 21 142 LF $72 $10,224.00 $83 $11,786.00 $94 $13,348.00 sins $14,910,00 $105 $14,910.00 $75 $10,650.00 9122 53"z34'. HERCP, Under Pavement 22 91 LF $243 $22,113.UO $200 $18200,p $248 $27,568.00 $200 $1/,20p,00 $360 $32,760.00 $250 $22,750.00 p1.73 53"xER34" HCP, Outside Roadway 23 41 LF $195 $7,995,00 $165 Al" $193 $7,913.00 $165 $6,705A0 $308 $12,628.00 $235 59.635.00 91-24 42" RCP, outside Roadway 24 32 LF $225 $7,200,00 5140 $4r48M $167 $5,344.00 $tso $4,90000 $219 $7,009.00 $149 $4,768.00 1- 25 Re construct Existing Inlet Tops 25 6 EA $3,700,00 $22,200.00 $3,000.00 $18,000.00 $2,050.00 $12,30000 SI,500.00 $9,000.00 52,5D000 $15,000.00 537,50 $223.00 p1-26 4'Dmp Inlet 26 25 EA $4,025.f10 $100,625.00 $3,500.00 $87,500.00 $S,20000 $130,000.00 $4,000.00 $100,000.00 53,6DO.D0 $90,000.00 $3,400.00 $851000.00 91-27 4' Drop Inlet, Connected to RC Box Culvert 27 2 EA $4,375.D0 $8,750.On $3,800.00 $7,600.00 $5,400.00 $10,8D0.00 $5,000.00 510,000.DO 53,600.00 $7,200.00 $4,500.00 $9,000.00 91-28 5' Drop Inlet 28 9 EA S4.575.00 $41,175.00 $4,800.DO $43,200.00 $6,700,00 $60.300.00 $5,000.00 S4S,000.On $6,300.00 $56,700,00 55,ODO.00 $45,000.00 91-29 6' Drop Inlet 29 4 EA 58,400.00 $33,600,00 $7,200.00 $28,900.00 $8,900.00 $35,60000 $7,OOD.00 $29,000.00 $7,300.00 S29,200.00 $5,400.00 $21,600.00 91-30 10'x 6' Drop Inlet Box 30 1 EA $11,605,00 $11,605,00 S17,000.DO 517,000.00 $11,300.00 S11,30000 $I5,000.00 $15,00000 59,SD0.00 $9,500.00 $20,000.00 $10,000,00 91-31 4:lunn.on Box 31 4 EA $4,190.00 $16,760,00 $3,900.D0 $15,600.DO $5,600.00 $22,400.00 $4,DDD00 $16,000.00 $3,600.00 $14,400.00 $3,200.00 $12,90D.00 1-32 6Junction Box 32 4 EA $6,810.00 $27,240.00 $7,500.00 S30,000.D0 $9,500.00 $38,DO0.00 S7,D00.00 $28,000.00 $7,3DO.00 $29,200. DO $5,700.00 $22,90D.00 p1-33 Drop Inlet Extensions (4') 33 18 FA $915 $16,470.00 $1,550.00 $77,900.D0 $1,120.00 $20,160,00 $1,200,00 $21,600.00 $2,000.00 $36,000.00 $1,000.00 $18,000.00 9134 Drop Inlet Ex tensions (B') 34 16 EA 51,075.00 $17,200.00 $3,200.00 $51,2DO.00 $1,895.00 $30,320.00 $2,000,00 $32,DOO.00 $4,000.00 $64,000.00 $1,600,00 525,600.00 91-35 Drop Inlet Extensions(12') 35 1 EA $1,960.00 $1,960.00 $3,910.00 $3,910.00 $2,725.00 $2,725.00 $3,000.00 $3,000.00 $6,000.00 $6,DOO.00 $3,000.00 $3,000.00 91-36 Reconstruct Existing Inlet with Reverse Throat 36 1 EA $3,075.00 53,07S.DO $4,2SO.00 $4,250.00 $2,960.00 $2,960,00 $2,500.00 $2,500.00 $3,800.00 $3.800.00 $5,000.00 $5,000,00 91-37 Connect Pipe to Existing Drainage Structure 37 1 EA $1,420.00 51,420.00 S1,2D0.00 $1,Mlllll $1,435.00 $1,435.00 $2,000.00 $2,000.00 53,500.00 $3,500.00 51,200.00 $11200.00 91-38 Combination Inlet Frame/Top 38 3 EA $7,950.00 $23,85000 $4,590.00 $13,770.00 $3,550.00 $10,650.00 $1,500.00 $4,500.00 $7,200.00 $21,600.DO 53,80000 $11,400,00 91-39 Is- Flared End Section 39 5 EA $974 $4,620.DO 5640 $3,200.00 $1,040.00 $5,200.00 $600 $3,000.00 $750 $3,750.00 $1,20000 $6,000.00 91-40 24" Flared End Section 40 1 FA $1,165.00 $1,165.00 $780 $790 $1,235.00 $1,235.00 $800 $ROO 5800 $800 $1,700,00 $1,700.00 91 41 4' x 4' Reinforce Concrete Box Culvert -41 114 LF $360 $41,040.00 $425 $48,450.00 $498 $56,772.00 $S75 $65.550 00 $510 $58,140.00 $400 $45,600,00 91-42 Concrete Headwall w/ Wingwalls to 4x 4' RC Box Culvert and Appurtances 42 1 LS $14,800.00 $14,800 00 SIO,ODD.00 $10,000.00 56,97500 $00M S35,000.00 S3S,OD0 00 572,200.00 $72,200.00 $7,000.00 57,000.00 91-43 Concrete Headwall w/ Wingwalls to Dual 42" RCP and Appurtances 43 1 LS $14,900.00 $14,800.00 511,40D.DO $11,400.00 $8,000.00 SIA" $30,000.00 $30,00000 510,ODO.00 $10,000.00 $9,50D.00 $9,500.00 91-44 Rip -Rap 44 40 SY $120 $4,800,00 $26 Room $115 $4,600.00 $175 $5,D0o.00 $75 $3,000.00 $50 $2,000.00 91-45 Cold Milling Pavement (2") 45 3511 SY $SAS $20,539.35 $6,70 $23,523.70 $6.55 $22,997OS $6 $21,066,00 $7 $24,577.00 $5 $17,555.00 I91-46 2" ACHM Superpave Surface Course (Overlay) 46 740 TON $87.30 $64,602.00 Sion $74,000.D0 $98 $72,S20.00 $97 $71,780.00 $97 $71,780.00 $105 $77,700.00 j91-47 3" ACHM Superpave Surface Course 47 2000 TON S82.30 $164,600.00 $92 $184,000,00 $92 $194.000,00 593 $186,000,00 S92.30 $184,600.00 $110 $22O,000.00 8,18 3" ACHM Superpave Binder Course 48 2025 TON $71.55 $144,889.75 $80 $162,D00.00 $90 $162,000,00 582 $166.050,00 `: $81.55 $165,138.75 $115 $232,875.00 k1-49 ACHM Superpave Binder Leveling Course 49 100 TON $103 $10,300.00 5120 $12,OD0.D0 $115 $11,500.00 $115 $11,500.00 $120 $12,000.00 S119 $11,900.00 f11.50 8" Class 7 Aggregate Base Course SO 14250 SY $10 $142,590.00 $12.70 $180,97500 $14 $199,500.00 $14 $199,500.00 $24 $342,000.00 $11 $156,750.00 9151 ACHM Patching of Existing Roadway 51 30 TON $306 $9,I8U.00 $100 $3,000.00 $343 510,790.00 $275 S6,750.00 $350 $10,500.00 $150 $4,5130.DO 91-52 Aggregate Based for Roadway Maintenance 52 100 TON $115 $11,500.00 $36 $3,600.00 536 $3,600.00 $80 $9,000.00 $36 $3,500.00 S4D $4,00000 91-53 Prime Coat 53 11330 SY $1.25 $24,102J0 $1.50 595.00 $1.40 $15,862.DO $2 $22,660.00 $1.25 $14,162.50 $1.95 $22,093.50 91-S4 Concrete Curb and Gutter 54 8375 LF $18.50 $154,937.50 $14 SI17,169250.00 $15.50 $129,812.SO $26 S217,750.00. S22 $184,250.00 $18 S350,750.00 91-SS Modified Concrete Curb and Gutter 55 780 LF $75 $19,500.00 $14 $10,920.00 $16.50 $12,970.00 $26 $20,290.00 $24 $18,720.00 $20 $15,600.00 01-56 Type 6 Concrete Curb and Gutter 56 380 LF $45 $17,10000 1 $13.50 $5,230.00 $18.50 $7,030.00 $76 $9,880.00 $24 $9,120.00 $22 $8,360.00 3"Curb(at Raised Concrete Apron) 57 75 LF $57 $4,275.00 $12.70 $952.30 $IB $1,350.00 $30 S7,2SO.00 $24 $1,a00.00 $19 $1,425.00 12" Wide Ribbon Curb (Mini -Roundabout) 58 151 LF $58 $8,758.00 $16 "am $26 $3,926.00 $32 $4,932.00 $30 $4,530.00 $17 $2,567.00 V Valley Curb (at Intersections) 59 26S IF Sao $15,900.00 $14 $91710A0 $19.50 $5,167,50 $32 $8.490.00 $24 $6,360.00 $22 $5,830.00 (a- Depth) 6' Wide Concrete Sidewalk 60 2260 SY S60 $135,600.00 $50 $113,000.00 544 $MA6000 $55 $124.300.00 $55 5124,300.00 S52 $117,520.00 (4" Depth) 30' Wide Concrete Trail 61 60DO SY $55 $330,000.00 $52 $312.000.00 S44 $264000.00 $55 $330,000.00 $55 $330,000.00 $52 $312,000.00 (8'Depth) 30'Wide Colored Concrete Trail Crossings (per Detail TCl) 62 240 SY $ISS $37,200.00 $94.21 $22,610.40 $99 $23,760.00 $130 $31,200.00 $195 $46,800.00 $100 $24,000.00 Concrete ADA Ramp 63 225 SY $90 $20,250.00 $60 $13,500= $50 $111290.1110 $65 514,625.00 $as $19,125.00 $96.75 $21.768.75 Cast -in Place Detectable Warning Panel 64 524 SF $45 $23,580.00 $60 $31,440.00 $22.50 $11,79A00 $25 $13,100.00 $35 $18,340.00 $27 514,148.00 Concrete Driveway Apron (6" Thick Approach and Sidewalk) 65 670 SY $90 $60,30000 $65 $43,550.00 $56 53) 520.00 $55 $36,0.90Oo $75 $50,250.00 $60 $40,200.00 6" Thick Concrete Driveway fib 760 SY $79 $59,280.00 $64 $48,640.00 $51 $34,740.W $55 $41.800.00 $75 $57,000.00 $60 $45,600.0C 3" Thick Asphalt Driveway 67 130 SY $40 $5,200.00 $50 $6,500.00 $28 $3,600.00 $35 $4 550.00 $55 $7,150.00 $28 $SA40M Aggregate Base Course Driveway 68 155 SY $22 $3,410.00 $15 $2,325.00 $13.50 $2,092,50 $12 $1A90.W $36 $5,580.00 $15 $2,325.00 Raised Concrete Apron (at Mini Roundabout) 69 22 SY $195 $4,290.00 $156 $3.432.00 $75 $1,6WA0 $175 53,850.00 $125 $2,750.00 $75 $L050.00 Concrete Bus Pull -Out Apron 70 205 SY $107.50 $22,037.50 $80 $16,400.00 $55 $11,273A0 $85 $17,425.00 $125 $25,625.00 $85 $17.425.00 Variable Height Cast -in -Place Reinforced Concrete Retaining Walls 71 390 IF $720 $290,900.00 S240 $93,600.00 $566 $220,740.00 S450 5775,500.00 $166 $111474111.00 $200 $78,000.00 Steel Handrail (Retaining Walls and Headwalls/Wingwalls) 72 440 IF $135 $59,400.00 $25 $11,000.p $100 $44,000.00 $85 $37,400.00 $247 $64.680.00 $100 $44,000.D0 Concrete Channel Paving 73 8D SY $400 S320D0.00 $72 $5,760.00 $62 $4,960.00 $ISO $12,000.00 $125 $10,OD0.00 $60 $4,11100.00 6" Thick Concrete Flume w/ Energy Dissipaters 74 5 SY $380 $1,900.00 $82 $420 $108 $540 $200 $1,000.D0 $300 $1,500.00 $150 57`, Solid Sod (excludes Topsoil) 75 9980 SY $3.40 $33,932.00 $4.40 $43,912.00 $3.60 $35,928.00 $6 $59,990.00 $4.70 546,906.00 $4 $39,920.0, Seeding and Mulching 76 2 ACRE $2,353.89 $4,707.78 $2,880.00 $5,760.00 $2,475.00 $4,950.00 54,000.00 $8,000.00 $3,090.00 $6.160.00 $2,200.00 $4AW.00 6" Solid Striping White (Thermoplastic) 77 59 IF $1.35 $79.65 $1.50 $88.50 $1.40 582.60 $1.50 $88.50 $1.50 $88.50 $1.50 $88.50 12" Solid Striping White (Thermoplastic) 78 110 IF $7.57 $9111IL70 $8.50 $935.00 $7.75 $952.50 $to $1,300.00 $8.40 $924.00 $9 $990 24" Solid Striping White (Thermoplastic) 79 200 LF $15.13 $34"" $17 $3,400.00 $15.50 $3.100.00 $20 54,000.00 $16.80 $3,360.00 $35 $7.000.00 6" Solid Striping Yellow (Thermoplastic) 80 11350 LF $1.35 $I511il 0 $1.50 $17,025.00 $2.40 $15,890.00 $1.50 $17,075.00 $1.50 $17,025.00 $1.50 $17,025.00 B" Solid Striping Yellow (Thermoplastic) 81 172 LF $4.32 $748.04 $4.95 $834.20 $4.50 $774.00 $20 $3,440.00 $4.80 $825.60 $4.50 $774.00 6" Skip Striping Yellow (Thermoplastic) 82 2576 LF $1.35 $SA77A0 $1.50 $3,964.00 $1.40 $3,606.40 $1.50 $3,964.00 $1.50 $3,864.00 $1.50 $3,964.00 6" Skip Striping Yellow (Reflective Paint) 83 1290 LF $2.16 $2,786.40 $2.40 $3,096.00 $2.25 $2,902.50 $2.50 $3.225.00 $2.40 $3,096.00 $2 $2,580.00 5" Solid Striping Yellow (Reflective Paint) 84 290 LF $2.16 $626.40 $2.40 $696.00 $2.25 $652.50 $2.50 $725.00 $2.40 $696.00 $2 $5ao 6" Dashed Striping White (Thermoplastic) 85 30 LF $1.35 $40.50 } $1.50 $45.00 $1.40 542.00 $1.50 545.00 $1.50 $45.00 $1.50 $45.00 Triangle Yield Line 86 30 IF $32.42 $972.60 $36.30 $1,089.00 $33.25 $997.50 S40 $1,200.00 $36 $I,OB0.00 $32 $960 12" Stop Bar (Thermoplastic) 87 95 LF $7.57 $719.15 $8.50 $807.50 $7.75 $736.25 $SO $950 58.40 $798.00 $8 $760 24" Crosswalk Markings (Thermoplastic) 88 340 LF $21.62 $7,350AC 524.20 $8.228.00 $22.25 $7,565.00 S25 $9,500.00 $24 58,160.00 $25 $9,500.00 Pavement Symbols (Thermoplastic) 89 51 EA $378.26 $19,291.26 5423.50 $21.598.50 $388 $19,788.00 5425 $21.675.00 $420 $21,420.00 $385 $19,635.00 "YIELD" Pavement Symbols (Thermoplastic) 90 3 EA $540.38 $1,621.14 $605 $1,815.00 $554 $1,662.00 $625 $1,875.00 5600 $1,800.00 $550 SIASO.00 Remove and Replace Mailboxes 91 5 EA $270.19 $1,350.95 $300 51,500.00 $277 $1,395.00 $325 $1,625.00 $300 $1,500.00 $300 $1,500.00 Retangular Rapid -Flashing Beacon,(Carmanah R920) 92 2 EA $11.898.32 523,776.64 $5.170.00 $10,140.00 $12,310.00 $24,620.00 $13.000.00 $26,000.00 $12.000.00 $24,000.00 $15,000.00 $30,000.00 Street Signs Installation, as lndicatedon Plans 93 29 EA $324.23 "AOL67 $365 $10,595.00 $333 $9,657.00 5400 $11,6W.00 $360 $10,440.00 $350 $10,150.00 Project Signs 94 2 EA $810.57 $1,621.14 51,150.00 $2,300.00 $831 $1.662.00 $1,500.D0 $3,000.00 $900 $1,800.00 $750 $1,50.00 Illuminated Collapsible Bollard & Base Light Complete and Operational 95 3 EA $5,133.59 $15AW.77 $6,500.00 $19,500.00 $5,320.00 $15,960.00 $6,000.00 $19.000.00 $5,700.00 $17,100.00 $6,000.00 $18,000.00 Integrally Colored Stamped Concrete (Splitter Islands and Apron) 96 221 SY $204 545,084.00 $182 $40,222.00 $98 $21,659.0111 $135 $29,935.00 $195 $43,095.00 $120 $26,520.00 26' Diameter Mountable Center Island 97 59 SY $214.31 $12,644.29 $135 $7,965.00 $102 $6.018.00 $225 $13,275.00 y $195 $11,505.00 $100 $5.M.00 Glass 360 Degree Reflective Curb Marken 96 53 EA $84.41 $4,473.73 $75 $3,975.00 $135 $7.155.00 $35 "As&00 $95 $5,035.00 $64 $3,392.00 Construction Adjacent to Pond 99 1 IS $275,000.00 $275,000.00 $15,000.00 $15,000.00 $78,000.00 $78,000.00 $25.000.00 $75,000.00 S12,600.00 $12A0040 $40,000.00 S40,D00.00 Construct Cable Fence with Gates 100 1 IS $15,130.59 $15,130.59 $16,500.00 $26,500.00 $12.600.00 $12,600.00 $8.000.00 $8.000.00 S1S,400.00 $15.400.00 $20,000.00 $20,0D0.00 Black Gum Tree, 2" Caliper, Installed 101 49 EA $580.71 $28,454.79 $675 $33,075.00 $607.25 $29.755.25 5400 $19,600.00 51,077.00 $52,773.00 $537.32 $26,328.68 Willow Oak Tree, 2" Caliper, Installed 102 49 EA $580.71 $28,454.79 $675 $33,075.00 $607.25 $29,755.25 5400 $19,600.00 53.077.00 $52,773.00 $537.32 $26,328.68 Thornless Honey Locust Tree 103 6 EA $580.71 $3,494.26 5675 $4,050.00 $607.25 $3,643.50 $400 $2,a00.00 51,077.00 $6,462.00 $537.32 $3,223.92 Northen Red Oak Tree, 2- Caliper, Installed 104 23 EA $580.71 $13,356.33 $675 $15,525.00 $607.25 $13,966.75 5400 $9,200.00 $1,077.00 $24,771.00 $537.32 $12,358.36 Princeton Elm Tree, 2" Caliper, Installed 105 48 EA $580.71 $27,874.08 $675 $32,400.00 $607.25 $29,148.00 $400 $19,200.00 $1,077.00 $51,696.00 $537.32 $25,791.36 Oklahoma Red Bud Tree, 2" Caliper, Installed 106 9 EA $580.71 $5,226.39 $675 $6,075.00 $607.25 $5,465.25 $400 $3,600.00 $2,077.00 $9,693.00 $537.32 54,835.88 Drip Irrigation System with Two RPZ Backflow Preventers, Installed, Complete 107 1 LS 545,972.68 545,972.68 $52,680.00 $52,680.00 548,071.00 548,071.00 $20,000.00 $20,000.00 SS7,420.00 $57.420.00 542,537.00 542,537.00 Type S1 Light Fixture, Pole and Foundation (14' Pole), Installed, Complete 108 69 EA $7,619.33 $525,733.77 $7,020.DO 5484,380.00 $6,375.00 5439,875.00 $6,800.00 5469,200.00 $7.800.00 $538,200.00 $5,641.00 $389,229.00 Type S2 Light Fixture, Pole and Foundation (30' Pole), Installed, Complete 109 6 EA $8.132.69 $49,796.14 $6,785.00 $40,710.00 $5,238.00 $31,429.00 56,SWOD $39,000.00 $7,925.00 547.550.00 $4,634.00 $27,904.00 1" Conduit in Trench 110 6709 If $6.92 $46,419.36 $5.40 $36,223.20 $6.70 $44,943.60 $5 $3g340.W $8.40 $56,347.20 $5.93 539,778.44 Junction Boxes, Installed 111 78 EA $903.51 $70,473.79 $370 $29,11150.00 $469 $36.592.00 $400 531,200.00 $890 $69,420.00 5455 $35,490.00 Conductors (2C/98&1C/98) Installed in Conduit 112 6708 IF $2.59 $17,373.72 $5.15 $34,546.20 $2.34 $19Onia $3 $20,124.00 $2.90 $19,453.20 $2.40 $16,099.20 Electricel Service, Installed 113 2 IF $2,701.99 $5,403.78 $7,670.00 $15,340.00 $1,170.00 $2,81al $3.800.00 $7,600.00 $2,900.00 $5,800.00 $1,200.00 $2,400.00 Commercial Pedestal, Installed 114 2 EA $12.969.08 $25,938.16 $10,030.00 $20,090.00 $10,625.00 $21,250.00 $15.000.00 $30.000.00 $12,900.00 $25,8000D $10,500.00 $21,000.00 5'Juntion Box 115 1 EA $5,500.00 $5,500.00 $6,000.00 $6,000.00 $6,500.00 $6,500.00 $10,000.00 $10,ODO.00 56,500.00 $6,500.00 $3,500.00 $3,500.00 Act 291, 1993 Trench & Excavation Safety Systems 116 1 IS $23,776.64 $23,776.64 $5,000.00 $5,000.00 $6,500.00 56,500.00 $5,000.00 $5,000.00 525,000.00 $25,000.00 SSW $5W Mobilization (Water and Sewer Utilities) 117 1 LS $75,652.95 575,652.95 $SO,000.00 $50,000.00 $35,000.00 $35,000.00 $30.000.00 $gq,90$.N $110,000.00 $110,000.00 $58,413.60 $58,413.60 Traffic Control (Water and Sewer Utilities) 118 1 IS $21,615.13 $21,615.13 $6,000.00 $OAgga,M $15.000.00 $15,000.00 $30,000.00 $30,000.00 $30,000.00 $30,000.00 520,000.00 $20.000.00 12-Inch PVC, C-900, DR-14 Water Main 119 5085 IF $99.70 $456,124.50 543.40 $221~ S74 $376,290.00 S60 $305,100.00 $60 $305,100.00 S48 $244,080.00 12-Inch PVC, C-900, DR-14 Restrained Joint Water Main 120 475 LF $149.14 $70,841.50 $53.40 $39,990.00 $119 $56,525.00 $85 $40,375.00 $95 $40,375.00 $75 $35,625.00 8-Inch PVC, C-900, DR-14 Restrained Joint Water Main 121 580 LF $111.32 $64,565.60 $45.25 $21a gal $89 $51,040.00 $65 $37,700.00 $65 $37,700.00 S60 $34,800.00 6-Inch PVC, C-900, DR-14 Restrained Joint Water Main 122 215 LF $101.59 $21,841.85 $27.80 $SAVJN $90 $17,200.00 $55 $11,825.00 $55 $11,825.00 $50 $10,750.00 9-Inch Class 350 Restrained Joint DIP Water Main 123 50 LF $134.01 $6,700.50 $57 $a,000.00 $107 $5,350.00 $85 $4,250.00 $95 54,250.00 $105 $5,250.00 Existing Storm Sewer Protect, Point Repair and Temerorary Reroute - Water 124 1 IS $16,211.35 $16,211.35 $9,000.00 $9,000.00 $9,900.00 $9,900.00 $8,000.00 $BAWA0 58,000.00 $$ANO 0 $15,000.00 $15,000.00 16-Inch Min. Dia. Direct Bury Steel Casing 125 265 LF $153.47 540,669.55 $110 $71111,100.11111 $121 $32,065.00 MO $39,750.00 $150 $39.750.00 $120 $31,800.00 24Anch Min. Dia. Direct Bury Steel Casing 126 ISO LF $241.01 536,151.50 $180 $27,000.00 $190 $28,500.00 $200 $30,000.00 $200 $30,000.00 $125 $111,750.W 12-Inchx1-Inch Service Tap 127 13 EA $810.57 $10,537.41 $480 $6,240.00 5425 $5.525.00 5800 $10.400.00 SSW $10,400.00 $250 $3,250.00 8-Inchxl-Inch Water Service Tap 128 1 EA $616.03 5616.03 5470 $470 5400 $400 5600 $600 S600 $600 $350 $350 6-Inchx1-Inch Service Tap 129 6 EA $518.76 $3,112.56 5450 $2,700,00 $325 $1,950.00 5400 $2,400.00 S400 $2,400.00 $250 $1,5W.00 1-Inch Coated Copper Service Tubing 130 400 LF $31.34 $12,536.00 $20 $111,111011.0111 $25 $10,000.00 $22 Se,em.00 $22 $8,800.00 $30 512,000.W 2-Inch Min. Dia. HOPE SDR-9 Casing 131 335 LF $15.13 $5,068.55 $47 $15,745.00 $12.50 $4AVJ* $40 $13,400.00 $40 $13,400.00 $28 59,380.W N2-17 Single 1-Inch Meter Setting, Complete 132 6 EA $1,621.14 $9,726.84 $2,200.00 $7j=M $1,300.00 $7,800.00 $1,200.00 $7,200,00 S3,200.00 $7,200.00 $1,40100 $8.400.00 N2-18 Single 5/8-Inch Irrigation Meter Setting, Complete 133 2 EA $1.567.10 $3.134.20 $940 $&1" $1,250.00 $2,500.00 $2,200.00 $2 400,00 $1.200.00 $2,400.00 $1,200.00 $2,400.00 N2-19 Double Meter Setting Reconnect 234 4 EA $1,090.76 $4,323.04 $2,250.00 $5,000.00 $850 $l,4WA0 $1,0D0.00 54000.00 $1.000.00 S4,000.00 9e $900 $3,6W.00 N2-20 Single Meter Setting Reconnect 135 7 EA $1.080.76 $7,565.32 $900 $6,300.00 $850 $5,950.00 S600 $4,30CA0 $600 $44WAO i wo $6,300.00 N2-21 Abandon Exist WM and Service Line 136 2 EA $324.23 S648.46 S600 $1,200.00 $250 $500 $400 $800 $400 $800 $1,900.00 $3,600.00 N2.22 12-Inch Butterfly Valve with Box 137 29 EA S6,268.39 $181,783.31 $5,500.00 $159,500.00 $5.350.00 $IS5,190.Og $5,800.00 $168,200.00 $5,900.00 5168,200.00 $8,290.00 $240,410.00 2-23 8-Inch Gate Valve with Box 138 11 EA $2,053.44 $22,597.94 $1,790.00 $19,690.00 $1,650.00 $18,150.00 $2,500.00 S27,500.00 $2,500.00 $27,500.00 $1,950.00 $21,450.00 42-24 6-Inch Gate Valve with Box 139 15 EA $1.513.06 $22,695.90 $1,325.00 $19,875DO - 51,200.00 $18,000.00 $1,800.00 $27,000.00 $1,800.00 $27,000.00 $1,500.00 $22,500.00 III Ductile Iron Fittings for Water Main 140 5755 LBS $12.97 $74.642.35 $6.90 $39,70-50 S1140 $66.758.00 $9 $51,795.00 $9 $51,795.00 $8 $46,040.00 a2-26 Three Way Fire Hydrant Assembly 141 13 EA $5,295.71 $68,844.23 $3,570.00 $46,410.00 54,200.00 $54,600.00 54,800.00 $62,400.00 $4,800.00 $62,400,00 $5,500.00 $71.500.00 N2-27 Salvage Fire Hydrant to Owner 142 6 EA $540.38 $3,242.28 $60D $3,600,00 $450 $2,700.00 $am S4,800.00 $800 $4,800.W $950 $5,700.00 92-29 Abandon Valve 143 17 EA $379,26 $6,430.42 $250 $4,250.00 $300 $5,100.00 $200 s804MA0 $200 118,400.00 $850 $14,450.M 112-29 Abandon Existing Water Main Under Roadway 144 4000 LF $18.37 $73,480.00 $17 $68,000.00 $15.25 $61,000.00 SID $444ma $10 f4D1000.DD $18 $72,Wl, -. 012-30 Sta. 0+36 Connect New Water Main to Existing Water Main 145 1 EA $5,403.79 $5,403.78 $3,500.00 $3,500.00 $2,300.00 $2.300.00 $3,000.00 $3.000.00 $3.000.D0 $3,000.00 $2,000.00 $2AW.00 42-31 12-Inch x 12-Inch Tapping Sleeve, 12-Inch Tapping Valve with Box 146 2 EA S8,754.13 $17,508.26 S8,650.00 $17,300.00 $6,900.00 #41111gm SID000.00 $20.000.00 $10,000.00 $20,000.00 $7,500.00 $15,000.00 112-32 8-Inch x &Inch Tapping Sleeve, 8-Inch Tapping Valve with Box 147 7 EA $5,619.93 $39,339.51 $5,850.00 $40,950.00 $4,40D.00 $ggMg,O $5,500.00 $38,500.00 $5,500.00 $38.500.00 $5,000.00 $35,000.DO 42-33 6-Inch x 6-Inch Tapping Sleeve. 6-Inch Tapping Valve with Box 148 3 EA $3,350.34 $1111ALg2 $4,800.00 $14,400.00 $3,940.00 $11,820.00 $5,30000 $15,900.00 S5.300.00 $15,900.W 54,000.00 $1210D0.00 42-34 Anchor Collar for 8-I nch Water Main 149 4 EA $3,242.27 $12,969.08 $1,600.00 $6.400.00 $2,SOO.00 $10.000.00 $1.SOO.W $6AWA0 SI.500.00 $6,000.00 $1,500.00 $GAWA0 42-35 Anchor Collar for 12-1 nch Water Main ISO 1 EA $4,647.25 $4,647.25 $2,600.00 $2,600.00 $3,590.00 $3,590.00 $1,800.00 $SAOOAO $1.80o.00 $1,ow $2,000.00 520W.W 42-36 6-Inch. Double Cut and Cap Existing Water Main 151 3 EA $2,053.44 S6,160.32 $1.500.00 54,500.00 $1,925.00 $5,475.00 $2.000.00 $6.000.00 $2,000.00 $6,000.00 $1,349.00 $4,047.00 42-37 8-Inch- Double Cut and Cap Existing Water Main 152 8 EA $2,485.74 $19.995.92 $2,000.00 $16,000.00 $1,940.00 $15,520.00 $3,000.00 $24,000.00 $3,000.00 524,OOD.00 $1,449.00 $11,592.00 92-39 12-Inch- Double Cut and Cap Existing Water Main 153 2 EA $3,782.65 $7.565.30 $2,700.00 $5,400.00 $2,980.00 $5,960.00 $4,000.00 $8,000.00 $4,000.00 $8.000.00 $1,749.00 $3,498.00 42-39 Full Depth Clan? Aggregate Base Course Backfill(Water) 154 4200 LF $2S.94 $109,948.00 $16.70 S70,140.00 $21 $99.200.00 $25 $105.000.00 S25 $105,000.00 $10 $42,000.00 412-40 Pavement Repair (Water) 155 580 LF S87,42 W.703.60 $39 $22GWM $53 $30,740.00 Sao $46,400.00 $80 546,400.00 $75 543,100.W N2.41 Disinfection and Testing Water Main 156 1 LS $16,211.35 $16,211.35 $2,500.00 $2,3110.00 $7,200.00 $7,200.00 0.000.00 $8,000.00 $8,000.00 $8.000.00 $5,500.00 $5,500.00 82-42 Rock Removal - Water 157 200 CY $162.11 $32,422.00 $25 sSAW.00 $226 $25.200.00 $200 S40,000.00 $200 $40,000.00 $150 $30,000.00 43-1 Ad 291, 1993 Trench & Excavation Safety Systems- Sewer 159 1 LS $75,652.95 $75,652.95 $14,000.00 $14,000.00 $60,000.00 $60,000.00 $60,000.W $60,000.00 $60.000.00 $60,000.00 $500 $500 a3-2 Mobill2ation-Sewer 159 1 LS $108,075.64 $108,075.64 $SD,ODO.00 $50,000.00 $95,000.00 $85,000.00 $30,0D0.00 $30AMOD S30,000.00 $W,O" $60,025.25 $60,025.25 43-3 Traffic Control - Sewer 160 1 LS $59,360.85 $58,360.85 $6,000.00 $6,000.00 $60,D00.DO $60,000.00 $30,OD0.00 $30,000.00 $30,000.00 $30.000.00 $2,500.00 $2,500 XI 434 15-Inch PVC SDR-26 Gravity Sewer Main 161 2430 LF $51.98 S126,068.40 $25 $60,750.00 $45 S309,350.00 $60 $145,900.00 $60 $145,800.00 $65 $157,950.00 43-5 15Anch PVC SDR-26 Restrained Joint Sewer Main 162 435 LF $97.27 S42,312A5 $105 $45,675.00 $75 $32,g2S00 $110 547,850.00 Silo $47,850.00 $110 S47,850.00 43-6 8-Inch PVC SDR-26 Sewer Main 163 1000 LF $20.53 $20,530.00 $13.30 $13,300.00 $18 $18,003.00 $55 $55.000.00 $55 $55,ODO.00 $55 $55,000.00 113-7 6-Inch PVC SDR-26 Sewer Main 164 220 LF $23.79 $5.231.60 $10.60 $2,332.00 $19 $4,190.00 $50 $11,000.00 $50 $11,000.00 S50 $11,ODO.00 N3-8 4-Inch PVC C-900 DR-19 Sewer Main 165 20 LF $12.97 $259.40 $10 $200 $21 $220 S40 $800 $40 $800 S40 $800 N3-9 16-Inch D.1., Epoxy Lined w/ Polywrap, Sewer Main 166 670 LF $1S6.71 $204,995.70 $114 $76,3110.00 $123 $82,410.00 $ISO $S00,S00.00 $150 $100,500.00 $140 $93,800.00 113-10 8-Inch D.I., Epoxy Lined w/ Polywrap Sewer Main 167 265 LF $94.30 $22,339.50 $58 $15,970.OD S66 $17,490.00 $100 $26,500.00 $100 S26,500.00 $85 S22,525.00 113-11 30-Inch Steel Encasement by Bore 168 225 LF S3,350.95 $303,963.75 $935 $210,375.00 $1,059.00 S238,275.00 S600 $135.000.00 $600 $135.000.00 $125 $22LU5.00 43-12 30-Inch Steel Encasement by Direct Bury 169 210 LF $379.26 $79,434.60 $102 $21,420.W $296 $62,160.00 $300 $63,000.00 $300 $63.000.00 $300 $63,00000 1i Sewer Main Trenching & Backfill, G-6 Feet Deep 170 430 LF $37.83 $16,266.90 $30.10 $12.943.00 $31 $13.330.00 $15 $6,450.00 $35 $6,450.00 $10 $4,300.00 113-14 Sewer Main Trenching & Backfill, 6-10 Feet Deep 171 2465 LF $43.23 $106,561.95 $38.50 $94,902.50 $35 $86,275.00 S20 $49,300.00 $20 S49,300.00 $22 $29,530.00 03-IS Sewer Main Trenching & Backfill, 10-14 Feet Deep 172 1365 LF $73.49 5100,313.85 $53.20 $72.618.00 $59 $80,535.00 S30 $40,9SO.00 $30 $40,950.00 $15 $20,475. W 43-16 Sewer Main Trenching& Backfill, 14.18 Feet Deep 173 350 LF $102.67 $35.934.50 $110 $38,500.00 $92 $28,700.00 $50 $17,500.00 $50 $17,500.00 $19 $6,650.00 03-17 Sewer Main Trenching & Backfill, »8 Feet Deep 174 430 LF $153.47 $65,992.10 $150 S64,500.00 $122 $52,460.00 $75 $32,250.00 S75 $32.250.00 $22 $8,460.00 83-19 4' Diameter Manhole, 0-6 Feet Deep 275 16 EA $5,403.79 $86,460.48 $2,000.00 $32,000.00 $3,534.00 $56,544.00 $5,500.00 $88,000.00 $S,SOOAO $98.000.00 $3,900.00 $62,400.00 43-19 4' Diameter Drop Manhole, Ofi Feet Deep 176 1 EA $7,187.03 $7,197.03 $2,700.00 $2,700.00 S4,678.00 $4,678.00 $6,800.00 %,800.00 $6,800.00 $6,800.00 $4,300.00 54,300.00 43-20 4' Diameter Manhole, Extra Depth Over 6 Feet Deep 177 31 VF $335.03 $10,385.93 $145 $4,49s.00 $270 $8,370.00 $300 $9,300.00 $300 $9,300.00 $350 $10,850.00 43-21 Voltmeter Manhole, G-10 Feet Deep 178 12 EA $9,456.62 $113,479.44 $3,600.00 $43.200.00 $6,074.00 $72.898.00 $7,500.00 $90.000.00 $7,500.00 $90,ODO.00 $6,900.00 $82,8DO.00 N3-22 5' Diameter Drop Manhole, 0-10 Feet Deep 179 1 EA $10,942.66 $10,942.66 $4,350.00 $4,350.00 $7,242.00 $7,242,00 $8,800.00 $8,800.00 $8,800.00 S8,800.00 $7,200.00 $7,200.00 a3-23 5' Diameter Manhole, Extra Depth Over 10 Feet Deep 190 46 VF $399.89 $18,394.48 $200 $9,200.00 $319 $24,674.00 $425 519,550.00 S425 $19,550.00 $490 $22,540.00 113-24 4' Diameter Manhole Epoxy Coating 181 133 VF $259.39 $34,497.54 $330 $43,890.00 $213 $2"2111.00 $375 $49.875.00 5375 $49,875.00 $300 $39,900.00 N3-25 5' Diameter Manhole Epoxy Coating 182 166 VF $291.90 $48,438.80 $420 $69,720.00 $225 $g7,gMN $450 $74,700.00 $450 $74,700.00 $350 $58,100.00 113-26 Abandon Existing Sewer Main Under Roadway 183 3200 LF $15.13 $49,416.00 $22 $70,400.00 $12 $1104011W $13 $41,600.00 $13 $41,600.00 $15 $48,000.00 03-27 Abandon Manhole 184 18 EA $1,513.06 $27,235.08 $900 $16,200.00 $1,257.00 $22,626.00 $1,000.00 $18.000.00 $1,000.00 $19,000.00 $750 $13.500.00 113-28 Low Pressure testing Sewer Main 185 1 LS $16.211.35 $16,211.35 $3,600.00 $SAWAO $7,648.00 $7,648.00 $19.000.00 $18,000.00 $18.000.00 S38,000.00 $5.500.00 S5,500.00 113-29 Vacuum Testing Sewer Manhole 196 1 LS $8,646.05 $8,646.05 $3,600.00 $SAWA0 $4.233.00 $4,233.00 $15.000.00 $15,000.00 $15.000.00 $15,000.00 $4,5W.00 S4,500.00 43-30 CAst Iron MAhole Ring and Lid 187 30 EA $464.73 $13,941.90 54W $12,000.00 $378 $11,340.00 $350 $10,500.00 $350 $30,500.00 $250 $7,500.00 43-31 Concrete Dams lag 3 EA $1,080.76 $3,242.29 $900 $2,700.00 S809 $2,427.00 $1,000.00 $3,000.00 $1,000.00 $3,000.00 $100 $300 113-32 Flowable Fill 189 30 CY $162.11 $1.621.10 $ISO $1,500.00 $142 $1,420.00 $125 $1.250.00 $125 51,25000 $10 $100 113-33 Form Main Tracer Wire Access Port 190 2 EA $302.61 $605.22 $150 $300 $241 5482 $100 $2D0 SIOD $200 $250 5500 113-34 Salvage Force Main Air Release Valve 191 1 EA $270.19 $270.19 $200 $2W $216 S216 $8DO Saw SSW Saw $1,250.00 S1,250.W 113-35 Full Depth Class 7 Aggregate Base Course Backfill (Sewer) 192 3775 LF $71.33 $269.270.75 $65 $320,875.00 $59 $222,725.00 SGS $245,375.00 $65 $245,375.00 $15 s36 ilmoo 103-36 Post Construction CCTV of Sewer Main 193 4855 LF $2.16 $10,486.80 $4 $19,420.00 $1.7S $111,Mf.25 $4 $19,420.00 54 $19,420.00 '. $3 $14.565.00 03-37 Pavement Repair - Sewer 194 580 LF $97.42 $50,703.60 $66.50 $38,570.00 $54 $31,320.04 $90 S46,400.00 $80 $46,400.00 $75 $43,500.00 013-38 Ductile Iron Fittings for Sewer Force Main 195 20 LBS $21.62 $432.40 $10 ►2110 $18 $360 $15 $300 $15 $300 $28 $560 013-39 Existing Storm Sewer Protect, Point Repair and Temporary Reroute - Sewer 196 1 LS $15,130.59 $15,130.59 $19,000.00 $18,00000 $10,200.00 $10,200.00 $8,000.00 $8AWA0 $8,000.00 $8AOOA0 $15,000.00 $15,000.00 p3-40 Rock Removal - Sewer 197 ROD Cy Is $297.21 $237,768.00 Is $20 $26AIN1,011 sa $244 $195,200.00 a $200 $160,00000 1 $200 $160,000.00 $100 SSO'000.00 va- un ..veer u n P-mg, FAYETTEVILLE ARK AH SAS Scoring Summary Active Submissions Total Certified Funds Total Base Bid Price Supplier / 100 pts Pass/Fail / 100 pts Tri Star Contractors, LLC 100 pts Pass 100 pts ($6,820,075.20) Boyles Construction, Inc. 93.81 pts Pass 93.81 pts ($7,269,897.70) Crossland Heavy Contractors, Inc. 82.28 pts Pass 82.28 pts ($8,288,379.72) Goodwin & Goodwin, Inc. 78.17 pts Pass 78.17 pts ($8,724,128.50) APAC-Central, Inc. 71.23 pts Pass 71.23 pts ($9,574,666.03) Sweetser Construction, Inc. 68.69 pts Pass 68.69 pts ($9,929,029.75) City of Fayetteville, Arkansas - Budget Adjustment Form (Legistar) Budget Year Division Adjustment Number /Org2 ENGINEERING (621) 2020 Requestor: Matt Casey BUDGET ADJUSTMENT DESCRIPTION / JUSTIFICATION: Approval of a contract in the amount of $6,820,075.20 with Tri Star Contractors, LLC for the construction of the Zion Road —Vantage to Crossover Project, approval of a project contingency of $341,000.00 (5%) and approval of a budget adjustment. RESOLUTION/ORDINANCE COUNCIL DATE LEGISTAR FILE ID# 7/21/2020 2020-0528 Matth4?,w Maddo-w 612612020 10:12 AM Budget Director TYPE: JOURNAL #: Date D - (City Council) GLDATE: 7/21/2020 CHKD/POSTED: / TOTAL - - v.20200528 Increase / (Decrease) Proiect.Sub# Account Number Expense Revenue Project Sub.Detl AT Account Name 4602.860.7212-5809.00 4,395,110 - 46020 7212 EX Improvements - Street 4602.860.7212-5911.99 220,000 - 46020 7212 EX Contingency - Capital Project 4602.860.7999-5899.00 (4,615,110) - 46020 7999 EX Unallocated - Budget 5400.860.5600-5808.00 1,231,936 11011 2019.7212 EX Improvements - Water Line 5400.860.5600-5911.99 61,600 11011 2019.7212 EX Contingency - Capital Project 5400.860.5700-5815.00 1,193,031 11011 2019.7212 EX Improvements - Sewer 5400.860.5700-5911.99 59,400 - 11011 2019.7212 EX Contingency - Capital Project 5400.720.5600-5808.00 (135,017) - 06035 2600 EX Improvements - Water Line 5400.720.5700-5314.00 (6,364) - 06035 2750 EX Professional Services 5400.720.5600-5808.00 (58,937) - 06035 3100 EX Improvements - Water Line 5400.720.5600-5808.00 (2,345,649) - 11011 1 EX Improvements - Water Line H:\Budget Adjustments\2020_Budget\City Council\07-21-2020\2020-0528 BA Zion Construction Agreement 1 of 1 DOCUMENT 00500 — AGREEMENT BETWEEN OWNER AND CONTRACTOR Contract Name/Title: ZION ROAD PHASE 11: N. VANTAGE RD. TO N. CROSSOVER RD. Contract No.: THIS AGREEMENT is dated as of the V day of in the year 2020 by and between The City of Fayetteville, Arkansas and ( einafter called Contractor). 1(k Spar Co�t�'�iC�-oc S ARTICLE 1- WORK 1.01 Contractor shall compete all Work as specified or indicated in the Contract Documents. The work under this Contract includes, but is not limited to: The Contract includes, but is not limited to, the full reconstruction of approximately 3,340 LF three -lane roadway of Zion Road between North Vantage Road and Taliesin Lane, as well as approximately 200 LF of Old Missouri Road including the associated earthwork, curb and gutter, sidewalk, drainage, mini -roundabout, driveways, fencing, retaining walls, landscaping, lighting and miscellaneous related items. Approximately 5,300 L.F. of 10' wide concrete trail will be constructed on north side of Zion Road. In addition, approximately 2,000 LF of Zion Road between Taliesin Lane and North Crossover Road will have partial reconstruction, that will include, lane widening and a combination of asphalt overlay and mill/overlay and miscellaneous related items. Water and Sewer mains shall be relocated in association with the project, from Vantage Drive to Crossover Road. ARTICLE 2 - ENGINEER 2.01 The Project has been designed by the City of Fayetteville, Engineering Division, who is hereinafter called Engineer. The Engineer assumes all duties and responsibilities, and has the rights and authority assigned to Engineer in the Contract Documents in connection with completion of the Work in accordance with the Contract Documents. 00500 Agreement 00500-1 19-2139 Zion Road Phase 11 DOCUMENT 00500 — AGREEMENT; CONTINUED ARTICLE 3 - CONTRACT TIME 3.01 TIME OF THE ESSENCE: A. All time limits for milestones, if any, Substantial Completion, and completion and readiness for final payment as stated in the Contract Documents are of the essence of the Contract. 3.02 DATES FOR SUBSTANTIAL COMPLETION AND FINAL PAYMENT: A. The Work will be Substantially Completed within 480 calendar days after the date when the Contract Times commence to run as provided in the GENERAL CONDITIONS, and completed and ready for final payment in accordance with the GENERAL CONDITIONS within 510 calendar days after the date when the Contract Times commence to run. 3.03 LIOUIDATED DAMAGES: A. Owner and Contractor recognize that time is of the essence of this Agreement and that The City of Fayetteville will suffer financial loss if the Work is not completed within the time specified above, plus any extensions thereof allowed in accordance with the GENERAL CONDITIONS. The parties also recognize the delays, expense, and difficulties involved in proving the actual loss suffered by The City of Fayetteville if the Work is not Substantially Completed on time. Accordingly, the City of Fayetteville and Contractor agree that as liquidated damages for delay (but not as a penalty) Contractor shall pay The City of Fayetteville Seven Hundred Fifty Dollars ($750.00) for each calendar day that expires after the time specified above in Paragraph 3.02 for Substantial Completion until the remainder of the Work is Substantially Complete. After Substantial Completion, if Contractor shall neglect, refuse, or fail to complete the remaining Work within the time specified in Paragraph 3.02 for completion and readiness for final payment or any proper extension thereof granted by The City of Fayetteville, Contractor 00500 Agreement 00500-2 19-2139 Zion Road Phase 11 DOCUMENT 00500 — AGREEMENT: CONTINUED shall pay The City of Fayetteville Seven Hundred Fifty Dollars ($750.00) for each calendar day that expires after the time specified for completion and readiness for final payment. ARTICLE 4 - CONTRACT PRICE 4.01 The CITY OF FAYETTEVILLE agrees to pay, and the CONTRACTOR agrees to accept, as full and final compensation for all work done under this agreement, the amount based on the prices bid in the Proposal (BID FORM) which is hereto attached, for the actual amount accomplished under each pay item, said payments to be made in lawful money of the United States at the time and in the manner set forth in the Specifications. 4.02 As provided in the General Conditions estimated quantities are not guaranteed, and determinations of actual quantities and classifications are to be made by ENGINEER as provided in the General Conditions. Unit prices have been computed as provided in the General Conditions. ARTICLE 5 - PAYMENT PROCEDURES 5.01 SUBMITTAL AND PROCESSING OF PAYMENTS: A. Contractor shall submit Applications for Payment in accordance with the GENERAL CONDITIONS. Applications for Payment will be processed by Engineer as provided in the GENERAL CONDITIONS. 5.02 PROGRESS PAYMENTS, RETAINAGE: A. The City of Fayetteville shall make progress payments on account of the Contract Price on the basis of Contractor's Applications for Payment as recommended by Engineer, on or about the I Sth day of each month during construction. All such payments will be measured by the schedule of values established in the GENERAL CONDITIONS (and in the case of Unit Price Work based on the number of units completed) or, in the event there is no schedule of values, as provided in the General Requirements. 00500 Agreement 00500-3 19-2139 Zion Road Phase II DOCUMENT 00500 — AGREEMENT: CONTINUED 1. Prior to Substantial Completion, progress payments will be made in an amount equal to the percentage indicated below, but, in each case, less the aggregate of payments previously made and less such amounts as Engineer shall determine, or The City of Fayetteville may withhold, in accordance with the GENERAL CONDITIONS. a. 95% of Work Completed (with the balance being retainage). b. 100% of Equipment and Materials not incorporated in the Work but delivered, suitably stored, and accompanied by documentation satisfactory to The City of Fayetteville as provided in the GENERAL CONDITIONS. 2. Upon Substantial Completion, The City of Fayetteville shall pay an amount sufficient to increase total payments to Contractor to 95% of the Contract Price (with the balance being retainage), less such amounts as Engineer shall determine, or The City of Fayetteville may withhold, in accordance with the GENERAL CONDITIONS 5.03 FINAL PAYMENT: A. Upon final completion and acceptance of the Work in accordance with the GENERAL CONDITIONS, The City of Fayetteville shall pay the remainder of the Contract Price as recommended by Engineer and as provided in the GENERAL CONDITIONS. ARTICLE 6 - CONTRACTOR'S REPRESENTATIONS 6.01 In order to induce The City of Fayetteville to enter into this Agreement, Contractor makes the following representations: A. Contractor has examined and carefully studied the Contract Documents including the Addenda and other related data identified in the Bid Documents. 00500 Agreement 00500-4 19-2139 Zion Road Phase II DOCUMENT 00500 — AGREEMENT: CONTINUED B. Contractor has visited the Site and become familiar with and is satisfied as to the general, local, and Site conditions that may affect cost, progress, performance, and furnishing of the Work. C. Contractor is familiar with and is satisfied as to all federal, state, and local Laws and Regulations that may affect cost, progress, performance, and furnishing of the Work. D. Contractor has carefully studied all: (1) reports of explorations and tests of subsurface conditions at or contiguous to the Site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the Site; and (2) reports and drawings of a Hazardous Environmental Condition, if any, at the Site. Contractor acknowledges that The City of Fayetteville and Engineer do not assume responsibility for the accuracy or completeness of information and data shown or indicated in the Contract Documents with respect to Underground Facilities at or contiguous to the Site. E. Contractor has obtained and carefully studied (or assumes responsibility of having done so) all such additional supplementary examinations, investigations, explorations, tests, studies, and data concerning conditions (surface, subsurface, and Underground Facilities) at or contiguous to the Site or otherwise which may affect cost, progress, performance, and furnishing of the Work or which relate to any aspect of the means, methods, techniques, sequences, and procedures of construction to be employed by Contractor and safety precautions and programs incident thereto. F. Contractor does not consider that any additional examinations, investigations, explorations, tests, studies, or data are necessary for the performing and furnishing of the Work at the Contract Price, within the 00500 Agreement 00500-5 19-2139 Zion Road Phase II DOCUMENT 00500 — AGREEMENT; CONTINUED Contract Times, and in accordance with the other terms and conditions of the Contract Documents. G. Contractor is aware of the general nature of work to be performed by The City of Fayetteville and others at the Site that relates to the Work as indicated in the Contract Documents. H. Contractor has correlated the information known to Contractor, information and observations obtained from visits to the Site, reports and drawings identified in the Contract Documents, and all additional examinations, investigations, explorations, tests, studies, and data with the Contract Documents. I. Contractor has given Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Contractor has discovered in the Contract Documents and the written resolution thereof by Engineer is acceptable to Contractor. J. The Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work. ARTICLE 7 - CONTRACT DOCUMENTS 7.01 CONTENTS: A. The Contract Documents which comprise the entire Agreement between The City of Fayetteville and Contractor concerning the Work consist of the following and may only be amended, modified, or supplemented as provided in the GENERAL CONDITIONS: 1. This Agreement. 2. Exhibits to this Agreement (enumerated as follows): a. Notice to Proceed. 00500 Agreement 00500-6 19-2139 Zion Road Phase lI DOCUMENT 00500 — AGREEMENT: CONTINUED b. Contractor's Bid. c. Documentation submitted by Contractor prior to Notice of Award. d. Federal funding documentation 3. Performance, Payment, and other Bonds. 4. General Conditions. 5. Supplementary Conditions. 6. Specifications consisting of divisions and sections as listed in table of contents of Project Manual. 7. Drawings consisting of a cover sheet and sheets as listed in the table of contents thereof, with each sheet bearing the following general title: ZION ROAD — PHASE I1 N. VANTAGE RD. TON CROSSOVER RD. 8. Addenda numbers to (�, inclusive. 9. The following which may be delivered or issued after the Effective Date of the Agreement and are not attached hereto: All Written Amendments and other documents amending, modifying, or supplementing the Contract Documents pursuant to the GENERAL CONDITIONS. 00500 Agreement 00500-7 19-2139 Zion Road Phase II DOCUMENT 00500 — AGREEMENT; CONTINUED ARTICLES - MISCELLANEOUS 8.01 TERMS: A. Terms used in this Agreement which are defined in the GENERAL CONDITIONS shall have the meanings stated in the GENERAL CONDITIONS. 8.02 ASSIGNMENT OF CONTRACT: A. No assignment by a party hereto of any rights under or interests in the Contract Documents will be binding on another party hereto without the written consent of the party sought to be bound; and specifically but without limitation, moneys that may become due and moneys that are due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by Law), and unless specifically stated to the contrary in any written consent to an assignment, no assignment will release or discharge the assignor from any duty or responsibility under the Contract Documents. 8.03 SUCCESSORS AND ASSIGNS: A. The City of Fayetteville and Contractor each binds himself, his partners, successors, assigns, and legal representatives to the other party hereto, its partners, successors, assigns, and legal representatives in respect to all covenants, agreements, and obligations contained in the Contract Documents. 8.04 SEVERABILITY: A. Any provision or part of the Contract Documents held to be void or unenforceable under any Law or Regulation shall be deemed stricken, and all remaining provisions shall continue to be valid and binding upon The City of Fayetteville and Contractor, who agree that the Contract Documents shall be reformed to replace such stricken provision or part thereof with a valid and 00500 Agreement 00500-8 19-2139 Zion Road Phase II DOCUMENT 00500 —AGREEMENT; CONTINUED This Agreement will be effective on 20Z9which is the Effective Date of the Agreement. CONTRACTOR :�c*k tY.�� or`*MCt'flCS CITY OF FAYETTEVILLE By: Any✓`' V f Tit Ie: Tc�p 5 ICA U, (SEAL) Attest — , Add or giving notices ,�lin wauke.sha'Rd . S��OCdiYI SQC_� � � 'l2'110� License No. Agent for Service of process (If Contractor is a corporation, attach evidence of authority to sign.) END OF DOCUMENT 00500 00500 Agreement 19-2139 Zion Road Phase 11 (SEAL) ``W1111rrrrriii GOER K �� `�.• 01TY O•.9J Attest = • - •�+ Address for giving notices _ : FpYE�EVIL •�_ . �E: 2 �Z, AllD(��'t t ; n Sf. �• G IONil ' i 01 ````. (attach evidence of authority to �� lO� sign and resolution or other documents authorizing execution of Agreement) Approved As to Form: Attorney For: 00500- 10 DOCUMENT 00500 — AGREEMENT; CONTINUED enforceable provision that comes as close as possible to expressing the intention of the stricken provision. OTHER PROVISIONS: Not Applicable. IN WITNESS WHEREOF, The City of Fayetteville and Contractor have signed this Agreement in quadruplicate. One counterpart each has been delivered to Contractor and Engineer. Two counterparts each has been delivered to The City of Fayetteville. All portions of the Contract Documents have been signed, initialed, or identified by The City of Fayetteville and Contractor or identified by Engineer on their behalf. 00500 Agreement 00500-9 19-2139 Zion Road Phase II Change Order 1 Zion Road City of Fayetteville Staff Review Form 2021-0213 Legistar File ID N/A City Council Meeting Date - Agenda Item Only N/A for Non -Agenda Item Matt Casey 3/15/2021 ENGINEERING (621) Submitted By Submitted Date Division / Department Action Recommendation: Approval of Change Order 1 for the Zion Road — Vantage to Crossover Project Budget Impact: 5400.860.5600-5808.00 5400 - Water & Sewer Account Number Fund Zion Rd. Improvements 11011.2019.7212 Water & Sewer Relocations - Bond Projects Project Number Project Title Budgeted Item? Yes Current Budget $ 1,847,021.00 Funds Obligated $ 1,726,019.23 Current Balance $ 121,001.77 Does item have a cost? Yes Item Cost $ 13,000.00 Budget Adjustment Attached? NA Budget Adjustment Remaining Budget S 77 V20180321 Purchase Order Number: 2020-00000589 Previous Ordinance or Resolution # 194-20 Change Order Number: Approval Date: 3/16/21 Original Contract Number: 2020-00000043 Comments: CITY OF FAYETTEVILLE ARKANSAS TO: Mayor Lioneld Jordan THRU: Susan Norton, Chief of Staff Chris Brown, Public Works Director FROM: Matt Casey, Engineering Design Manager DATE: March 11, 2021 STAFF MEMO SUBJECT: Approval of Change Order 1 for the Zion Road — Vantage to Crossover Project RECOMMENDATION: Staff recommends approval of Change Order 1 for the Zion Road — Vantage to Crossover Project which will increase the contract amount by $13,000.00 and the contract time by 14 days. BACKGROUND: On June 24, 2020 the City Council approved a contract with Tri Star Contractors, LLC for the construction of this project. Construction began in July of 2020 and is expected to be complete by February 2021. DISCUSSION: After the start of construction for this project, the contractor discovered a 6" private sewer line that was in conflict the construction of the 12" water main. Also, in another location on the project, vertical alignment changes were necessary to avoid damaging an existing water line. To account for these conflicts, additional vertical bends were required. Vertical bends on a water main this size require a considerable amount of concrete to be placed under each bend to anchor the line in place and prevent the bends from separating due to the large volume and pressure of the water. The contractor has provided a cost of $13,000 for this additional work. BUDGET/STAFF IMPACT: The water and sewer relocations in this project ($2,424,965.85) are funded by the Water and Sewer Fund Capital Improvement project appropriation. The City Council approved a construction contingency of $220,000 for this project, of which $61,600 is allocated to the water portion of the project. This contingency will be used to cover the cost of this change order. Attachments: Change Order 1 Vicinity Map Mailing Address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 CHANGE ORDER CITY OF FAYETTEVILLE ARKANSAS Change Order No. I Contract Title: Zion Road Phase 11 Improvements Date of Issuance March 4, 2021 To Contractor: TR1-STAR CONTRACTORS LLC ORDINANCEIRESOLUTION:194-20 The Contract is changed as follows: Effective March 4. 2021 Bid Bid Previous Unit Contract Revised Revised Original Revised Contract Item Item Estimated of Unit Estimated Unit Estimated Estimated Changes No. Description Quantity Measure Price Quantity Price Cost Cost 2-43 12" Vertical Tie -Down Blocking 0 EA S0.00 2 S6,500.00 $13,000.00 Summation of Cost $13,000.00 Net Cast for this Change Order $13,000.00 The original Contract Price was $ 6,820,075.20 Net change by previously authorized change orders $ The Contract Price prior to this Change Order was $ 6,820,075.20 The Contract Price will be adjusted by $ 13,000.00 The new Contract Price including this Change Order will be _ _ $ 6,833,075.20 The Contract Time(s) will be increased by 14 calendar days Required dates of Completion as of the date of this Change Order therefore are: Substantial Completion _ �— 26-Jan-22 ----------- —----- ----------------- —------- —---- ------------- Final Completion 25-Feb-22 NOTE: This summary does not reflect changes in the Contract Price or Time(s) which have been thorized by Work Change Directives not incorporated in this or previous Change Orders. TRI-STAR CONSTRACTORS LLC OF.FA VI CV& C�aeGi✓'�.¢aa. 3/8/21 6/21 BY DATE B DATE 66FF 1YP.SEC. 'F VARIES 10' TYP.� 30' F/F B' 6' _ I TYP.� 1 MULTI -USE SIDEWALK TRAIL 10' 10, NT � 10' TRAVEL CENTER TRAVEL 18" WIDE LANE LANE LANE CURB & TYPICAL SECTION "1" GUTTER i 11�1i�i 1'�t�1 1 I �. 30' FIF MIN. FYP. SEC. "2" 4 VARIES s, VARIES 8• TYP 30' TO 32' TYp VARIES VARIES EX. 101 I F sw MULTI -USE TRAIL 10' MIN. 10' 10' MIN. TRAVEL CENTER TRAVELJ'111'\� 18"WIDE LANE LANE LANE CURB & LANE WIDTHS VARY GUTTER TYPICAL SECTION "2" JcITYOF ZION ROAD IMPROVEMENTS � FAYETTEVILLE VANTAGE DR. TO CROSSOVER RD. ARKANSAS 2019 BOND PROGRAM Change Order 2 for the Zion Road City of Fayetteville Staff Review Form 2021-0495 Legistar File ID N/A City Council Meeting Date - Agenda Item Only N/A for Non -Agenda Item Matt Casey 7/19/2021 ENGINEERING (621) Submitted By Submitted Date Division / Department Action Recommendation: Staff recommends approval of Change Order 2 for the Zion Road - Vantage to Crossover project, which will increase the contract amount by $160,703.50 and 25 days. GL: 4602.860.7212-5809.00 Project: 46020.7212 Amount: $61,737.50 Fund: Transportation GL: 5400.860.5600-5808.00 Project: 11011.2019.7212 Amount: $2,250 Fund: W/S (Water Portion) GL: 5400.860.5700-5815.00 Project: 11011.2019.7212 Amount: $96,716 Fund: W/S (Sewer Portion) Budget Impact: 4602.860.7212-5809.00 -5808.00 4602 - Streets Project (2019 Bonds) 5400.860.5700-5815.00 5400 -Water &Sewer Account Number Fund 46020.7212 11011.2019.7212 Zion Rd. Improvements Project Number Project Title Budgeted Item? Yes Current Budget $ 6,335,736.00 Funds Obligated $ 6,000,859.24 Current Balance $ 334,876.76 Does item have a cost? Yes Item Cost $ 160,703.50 Budget Adjustment Attached? No Budget Adjustment Remaining Budget $ 174,173.26 V20210527 Purchase Order Number: 2020-00000589 Previous Ordinance or Resolution # 194-20 Change Order Number: Original Contract Number: Comments: 2020-00000043 Approval Date: 7/21/21 ®CITY OF FAYETTEVILLE ARKANSAS TO: Mayor Lioneld Jordan THRU: Susan Norton, Chief of Staff Chris Brown, Public Works Director FROM: Matt Casey, Engineering Design Manager DATE: July 9, 2021 STAFF MEMO SUBJECT: Approval of Change Order 2 for the Zion Road — Vantage to Crossover Project RECOMMENDATION: Staff recommends approval of Change Order 2 for the Zion Road — Vantage to Crossover Project which will increase the contract amount by $160.703.50 and 25 days. BACKGROUND: On June 24, 2020 the City Council approved a contract with Tri Star Contractors, LLC for the construction of this project. Construction began in July of 2020 and is expected to be complete by February 2021. DISCUSSION: After the start of construction for this project, the contractor discovered a large tree that had to be removed for the installation of the water and storm water utilities. This tree was not identified on the plans for removal and therefore was not considered in the project bidding. The contractor has provided a cost of $2,250.00 for this additional work. Also, an existing double run of 42" metal storm sewer that was planned to be saved and left in use with this project was found to be in very poor condition with the bottom rusting out. The contractor has provided a cost for the removal and replacement of this pipe of $51,737.50. Next, it was found that with the installation of the retaining wall and the grading along the large existing pond, the existing overflow weir would be removed. The contractor has provided a cost for the construction of a new concrete weir of $10,000.00. Last, engineering staff discovered that there was not sufficient asphalt repair included in the bid for the installation of the new sanitary sewer. The contractor has provided a cost o $96,716.00 for this work. BUDGET/STAFF IMPACT: The roadway and drainage improvements ($4,397,359.35) are funded by the 2019 Transportation Bond Program. The water and sewer relocations in this project ($2,424,965.85) are funded by the Water and Sewer Fund Capital Improvement project appropriation. The total cost for this change order is $160,703.50, with $61,737.50 from the Transportation Bond and $98,966.00 from the Water and Sewer funds. The City Council approved a construction contingency of $341,000 for this project, of which $220,000 is allocated to the transportation and drainage portion of the project and $121,000 for the water and sewer work. Change Order #1 Mailing Address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 (2021-0213) approved the use of $13,000.00 of the water and sewer contingency leaving $108,000.00 remaining. This contingency will be used to cover the cost of this change order and the revised balance will be $156,012.50 for the Transportation Fund and $9,034.00 for the Water and Sewer Fund. Attachments: Change Order 2 CHANGE ORDER CITY OF FAYETTEVILLE ARKANS A A A S Contract Title: Zion Road Phase II Improvements Change Order No. 2 Date of Issuance July 8, 2021 To Contractor: TRI-STAR CONTRACTORS LLC ORDINANCE/RESOLUTION:194-20 The Contract is changed as follows: Effective July 8, 2021 Bid Bid Previous Unit Contract Revised Revised Original Revised Contract Item Item Estimated of Unit Estimated Unit Estimated Estimated Change, No. Description Quantity Measure Price Quantity Price Cost Cost 53" x 34" HERCP, Under 1-22 Pavement 91 LF $250.00 121 $250.00 22,750.00 $30,250.00 53" x 34" HERCP, Outside 1-23 Roadway 41 LF $235.00 51 $235.00 9.635.00 $11,985.00 1-72 Steel Handrail (Retaining Walls 440 IF $100.00 455 $100.00 44.000.00 $45.500.00 and Headwalls/Wingwalls 1-116 12' x 6' Drop Inlet Box 0 EA $0.00 2 $11,670.00 - $23.340.00 1-1 l7 53" x 34" Flared End Section 0 EA $0.00 2 $4,250.00 $8,500.00 Demo of Existing Dual 42" I-118 CMP 0 LS $0.00 I $6,500.00 $6,500.00 1-119 Pavement Repair(T-Patch) 0 SY $0.00 65 $31.50 $2.047.50 1-120 Pond Weir 0 IS $0.00 1 $10,000.00 $10,000.00 3-41 Tree Removal @ Sta. 6+00 0 LS $0.00 1 $2,250.00 $2,250.00 3-42 Preparation for Asphalt T-Patch 0 LF $0.00 3800 $10.32 $39,216.00 ACHM Superpave Binder 3-43 Course 0 TON $0.00 500 $115.00 $57,500.00 Summation of Cost 76,385.00 $237,088.50 _ Net Cost for this Change Order $160,703.50 I ne ongmal contract rnce was $ 6,820,075.20 Net change by previously authorized change orders $ 13,000.00 The Contract Price prior to this Change Order was $ 6,833,075.20 The Contract Price will be adjusted by $ 160,70350 The new Contract Price including this Change Order will be _ $ 69993,778.70 The Contract Times will be increased b O y 25 calendar days Required dates of Completion as of the date of this Change Order therefore are: Substantial Completion 12-Feb-22 Final Completion — — 22-Mar-22 NOTE: This summary does not reflect changes in the Contract Price or Time(s) which in this or previous Change Orders. TRI-STAR CONSTRACTORS LLC AL.sK�/_ � � 7/15/21 BY 17 61 DATE BY been authorized by Work Change Directives not incorporated ir'4Mt 4-, 7/21/21 DATE Matt Casey Submitted By Change Order 3 Zion Road - Vantage to Crossover City of Fayetteville Staff Review Form 2021-1015 Legistar File ID N/A City Council Meeting Date - Agenda Item Only N/A for Non -Agenda Item 12/9/2021 ENGINEERING (621) Submitted Date Division / Department Action Recommendation: Staff recommends approval of Change Order 3 for the Zion Road - Vantage to Crossover project, which will increase I the contract amount by $9,000.00 and 1 day. GL: 5400.860.5700-5815.00 Project: 11011.2019.7212 Amount: $9,000.00 Fund: W/S (Sewer Portion) Budget Impact: 46027212-5809.00 .00 4602 - Streets Project (2019 Bonds) .860. 5400.860.5700-5815.00 5400 -Water &Sewer Account Number Fund 46020.7212 11011.2019.7212 Zion Rd. Improvements Project Number Budgeted Item? Yes Current Budget Funds Obligated Current Balance Does item have a cost? Yes Item Cost Budget Adjustment Attached? No Budget Adjustment Purchase Order Number: 2020-00000589 Change Order Number: Original Contract Number: 2020-00000043 Comments: Remaining Budget Project Title $ 6,378,004.00 $ 6,210,663.79 $ 167,340.21 $ 9,000.00 $ 158,340.21 V20210527 Previous Ordinance or Resolution # 194-20 Approval Date: 12/14/21 CITY OF FAYETTEVILLE ARKANSAS TO: Mayor Lioneld Jordan THRU: Susan Norton, Chief of Staff Chris Brown, Public Works Director FROM: Matt Casey, Engineering Design Manager DATE: December 9, 2021 STAFF MEMO SUBJECT: Approval of Change Order 3 for the Zion Road — Vantage to Crossover Project RECOMMENDATION: Staff recommends approval of Change Order 3 for the Zion Road — Vantage to Crossover Project which will increase the contract amount by $9,000.00 and 1 day. BACKGROUND: On June 24, 2020 the City Council approved a contract with Tri Star Contractors, LLC for the construction of this project. Construction began in July of 2020 and is expected to be complete by February 2021. DISCUSSION: Part of the work included in this project is the construction of a new sanitary sewer manhole to connect the new sewer system to the existing system. The new manhole is to be constructed over the existing sewer main and then the pipe would be cut to allow the flow from the new mains to enter the existing system. The contractor discovered that the sewer main in this location is encased in a steel encasement pipe. In order to construct the manhole in this location, the encasement will have to be cut either side of the manhole and removed without damaging the sewer main. City staff evaluated relocating the manhole to a better connection point, but the proposed sewer main had already been installed. A new location could not be chosen without removing and replacing work the contractor already performed. It was decided that the best and most economical option is to remove the encasement. The contractor has provided a cost of $9,000.00 for this work. BUDGET/STAFF IMPACT: The roadway and drainage improvements ($4,397,359.35) are funded by the 2019 Transportation Bond Program. The water and sewer relocations in this project ($2,424,965.85) are funded by the Water and Sewer Fund Capital Improvement project appropriation. The total cost for this change order is $9,000.00 from the Water and Sewer funds. The City Council approved a construction contingency of $341,000 for this project, of which $220,000 is allocated to the transportation and drainage portion of the project and $121,000 for the water and sewer work. Change Order #1 approved the use of $13,000.00 of the water and sewer contingency. Change Order #2 approved the use of $98,966.00 of the water and sewer contingency leaving Mailing Address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 $9,034.00 remaining. This contingency will be used to cover the cost of this change order and the revised balance will be $158,262.50 for the Transportation Fund and $34.00 for the Water and Sewer Fund. Attachments: Change Order 3 CHANGE ORDER CITY OF ��FAYETTEVILLE ARKANS ARKANSAS Change Order No. 3 Contract Title: Zion Road Phase II Improvements Date of Issuance November 29, 2021 To Contractor: TRUSTAR CONTRACTORS LLC ORDINANCE/RESOLUTION:194-20 The Contract is changed as follows: Effective November 29, 2021 Bid Bid Previous Unit Contract Revised Revised Original Revised Contract Item Item Estimated of Unit Estimated Unit Estimated Estimated Changes No. Description Quantity Measure Price Quantity Price Cost Cost 3-44 Remove Ex. Encasement for New Manhole (Sta. 0+65) & Install New End Seals 0 LS $0.00 1 $9.000.00 $9,000.00 Summation of Cost $9,000.00 Net Cast for this Change Order $9,000.00 The original Contract Price was $ 6,820,075.20 Net change by previously authorized change orders $ 173,703.50 The Contract Price prior to this Change Order was $ 6,993,778.70 The Contract Price will be adjusted by $ 9,000.00 The new Contract Price including this Change Order will be -------------- $ 7,002,778.70 The Contract Time(s) will be increased by 1 calendar days Required dates of Completion as of the date of this Change Order therefore are: Substantial Completion 13-Feb-22 Final Completion 23-Mar-22 NOTE: This summary does not reflect changes in the Contract Price or Time(s) which have been authorized by Work Change Directives not incorporated in this or previous Change Orders. s TRI-STAR CONSTRACTORS LLC CITY O Y TTEV E 1212121 12/14/21 BY DATE BY DATE City of Fayetteville Staff Review Form 2022-0685 Legistar File ID N/A City Council Meeting Date - Agenda Item Only N/A for Non -Agenda Item Matt Casey 7/27/2022 Submitted By Submitted Date Action Recommendation: Zion Road — Vantage to Crossover Project ENGINEERING (621) Division / Department Staff recommends approval of Change Order 4 with Tri-Star Contractors in the amount of $145,334.87 for the Zion Road — Vantage to Crossover project. This change order will use Transportation contingency funds. Budget Impact: 4602.860.7212-5809.00 4602 - Streets Project (2019 Bonds) Account Number 46020.7212 Project Number Budgeted Item? Yes Does item have a cost? Yes Budget Adjustment Attached? No Fund Streets Projects (2019 Bonds) - Zion Rd. Impr. Current Budget Funds Obligated Current Balance Item Cost Budget Adjustment Remaining Budget Project Title $ 2,914,300.00 $ 2,746,109.50 $ 168,190.50 $ 145,334.87 $ 22,855.63 V20210527 Purchase Order Number: 2020-00000589 Previous Ordinance or Resolution # 194-20 Change Order Number: 4 Original Contract Number: 2020-00000043 Comments: Approval Date: 7/29/22 .CITY OF FAYETTEVILLE V4W ARKANSAS TO: Mayor Lioneld Jordan THRU: Susan Norton, Chief of Staff Chris Brown, Public Works Director FROM: Matt Casey, Engineering Design Manager DATE: July 26, 2022 STAFF MEMO SUBJECT: Approval of Change Order 4 for the Zion Road — Vantage to Crossover Project RECOMMENDATION: Staff recommends approval of Change Order 4 for the Zion Road — Vantage to Crossover Project which will increase the contract amount by $145,334.87. BACKGROUND: On June 24, 2020 the City Council approved a contract with Tri Star Contractors, LLC for the construction of this project. Construction began in July of 2020 and is expected to be complete in the Fall of 2022. DISCUSSION: Tri Star Contractors requested that the City consider an adjustment to certain bid items pricing due to inflation and fuel prices. Tri Star submitted documentation of their cost increases over the past year that far exceeds what a contractor typically must contend with on a multi -year construction project. City staff agreed that pricing adjustment were appropriate to account for the increases in fuel, trucking, asphalt and base rock on certain bid items. These price adjustments are included in this change order. Additional items include a 1-year tree watering and guarantee due to the removal of irrigation from the contract, and adjustment of a manhole elevation and additional demolition of concrete on a side street due to elevation changes. BUDGET/STAFF IMPACT: The roadway and drainage improvements ($4,397,359.35) are funded by the 2019 Transportation Bond Program. The water and sewer relocations in this project ($2,424,965.85) are funded by the Water and Sewer Fund Capital Improvement project appropriation. The total cost for this change order is $267,311.58 from the Water and Sewer funds and $145,442.71 for the Transportation Bond fund. The City Council approved a construction contingency of $341,000 for this project, of which $220,000 was allocated to the transportation and drainage portion of the project and $121,000 for the water and sewer work. Change Order #1 approved the use of $13,000.00 of the water and sewer contingency. Change Order #2 approved the use of $98,966.00 of the water and sewer contingency. Change Order #3 approved the use of $61,737.50 of the transportation contingency leaving $158,262.50 and $9,000.00 of the water Mailing Address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 CHANGE ORDER CITY of IFAYETTEVILLE ARKANSKAAS Contract Title: Zion Road Phase 11 Improvements Change Order No. 4 Date of Issuance August 1, 2022 To Contractor: TRI-STAR CONTRACTORS LLC ORDINANCE/RESOLUTION:194-20 The Contract is changed as follows: Effective August 1, 2022 Bid Bid Previous Unit Contract Revised Revised Original Revised Contract Item Item Estimated of Unit Estimated Unit Estimated Estimated Changes No. Description Quantity Measure Price Quantity Price Cost Cost 2" ACHM Superpave Surface 46 Course (Overlay) 740 TON $105.00 740 $128.69 77,700.00 $95,230.60 3" ACHM Superpave Surface 47 Course 2000 TON $110.00 2000 $133.69 220,000.00 $267,380.00 3" ACHM Superpave Binder 48 Course 2025 TON $115.00 2025 $139.86 232,875.00 $283,216.50 ACHM Superpave Binder 49 Leveling Course 100 TON $119.00 100 $143.86 11,900.00 $14,386.00 8" Class 7 Aggregate Base 50 Course 14,250.00 SY $11.00 10,454.66 $11.00 156,750.00 $115,001.26 8" Class 7 Aggregate Base 1-121 Course-CO-4 0.00 SY $0.00 3,795.34 $13.21 - $50,136.44 ACHM Patching of Existing 51 Roadway 30 TON $150.00 30 $173.69 4,500.00 $5,210.70 (4" Depth) 6' Wide Concrete 60 Sidewalk 2,260.00 SY $52.00 1,173.96 $52.00 117,520.00 $61,045.92 (4" Depth) 6' Wide Concrete 1 122 Sidewalk-CO-4 0.00 SY $0.00 1,086.04 $53.92 - $58,559.28 (4" Depth) 10' Wide Concrete 61 Trail 6000.00 SY $52.00 3779.60 $52.00 312,000.00 $196.539.20 (4" Depth) 10' Wide Concrete 1123 Trail-CO-4 0.00 SY $0.00 2220.40 $53.92 - $119,723.97 One year tree warranty & 1-124 watering 0.00 LS $0.00 1.00 $10,000.00 $10,000.00 Adjust Manhole to Grade MH 1-125 2-2 0.00 LS $0.00 1.00 $800.00 $800.00 Demolition of Existing 1-126 Concrete CO-4 0.00 SY $0.00 135.00 $10.00 $1,350.00 The original Contract Price was Net change by previously authorized change orders The Contract Price prior to this Change Order was The Contract Price will be adjusted by The new Contract Price including this Change Order will be The Contract Time(s) will be increased by Required dates of Completion as of the date of this Change Order therefore are: Summation of Cost 1,133,245.00 $1,278,579.87 Net Cost for this Change Order $145,334.87 $ 182,70350 $ 7,002,778.70 $ 145,334.87 7,148,11357 - (I calendar days Substantial Completion 21-Feb-22 ------------------------------------------------------------------------ Fnal Completion 23-Mar-22 NOTE: This summary does not reflect changes in the Contract Price or Time(s) which have been authorized by Work Change Directives not incorporated in this or previous Change Orders. TRI-STAR CONSTRACTORS LLC CITY F FAYE VILLE rytcstti,f/ F. �� 7/26/22 7/29/22 BY DATE Y DATE Matt Casey Submitted By Tri-Star Contractors Change Order No. 6 City of Fayetteville Staff Review Form ZUZ3-USb4 Item ID NA City Council Meeting Date - Agenda Item Only N/A for Non -Agenda Item 3/21/2023 ENGINEERING (621) Submitted Date Division / Department Action Recommendation: Staff recommends approval of Change Order 6 with Tri-Star Contractors in the amount of $27,450.00 for the Zion Road - Vantage to Crossover project. This change order will be funded through previously approved contingency. 4602.860.7212-5809.00 Account Number 46020.7212 Project Number Budgeted Item? Yes Does item have a direct cost? Yes Is a Budget Adjustment attached? No Purchase Order Number: Change Order Number: Original Contract Number: Comments: 2020-00000589 6 2020-00000043 Budget Impact: 4602 - Streets Project (2019 Bonds) Fund Streets Projects (2019 Bonds) -Zion Rd. Impr. Project Title Total Amended Budget $ 884,895.00 Expenses (Actual+Encum) $ 830,280.90 Available Budget Item Cost $ 27,450.00 Budget Adjustment $ - Remaining Budget V20221130 Previous Ordinance or Resolution # 1� Approval Date: 03/30/2023 CITY OF FAYETTEVILLE ARKANSAS TO: Mayor Lioneld Jordan THRU: Susan Norton, Chief of Staff Chris Brown, Public Works Director FROM: Matt Casey, Engineering Design Manager DATE: March 21, 2023 STAFF MEMO SUBJECT: Approval of Change Order 6 for the Zion Road — Vantage to Crossover Project RECOMMENDATION: Staff recommends approval of Change Order 6 with Tri-Star Contractors in the amount of $27,450.00 for the Zion Road - Vantage to Crossover project, which will be funded from previously approved contingency. BACKGROUND: On June 24, 2020 the City Council approved a contract with Tri Star Contractors, LLC for the construction of this project. Construction began in September of 2020 and is expected to be complete in the Summer of 2023. DISCUSSION: During the construction of this project, the contractor discovered that the work would remove and/or damage a large section of the irrigation system for the Lakewood Subdivision. In order to correct this issue, staff worked with Tri Star Contractors and the Lakewood POA to obtain a cost to repair the system. The contractor has provided a cost of $27,450.00 for this work. BUDGET/STAFF IMPACT: Roadway and drainage improvements are funded by the Transportation Bond Program, and water/sewer relocations in this project are funded by the Water and Sewer Fund Capital Improvement project appropriation. The Transportation Fund will fund the additional costs of this change order. Tri Star Contractors Original (Legistar 2020-0528) CO 1 (Legistar 2021-0213) CO 2 (Legistar 2021-0495) CO 3 (Legistar 2021-1015) CO 4 (Legistar 2022-0685) CO 5 (Legistar 2022-0686) CO 6 CONTRACT Transportation Water/Sewer Bond $ 4,395,109.35 61,737.50 $ 2,424,965.85 13,000.00 98,966.00 9,000.00 145,334.87 264,597.22 27,450.00 $ 4,484,296.85 $ 2,955,863.94 CONTINGENCY Transportation Water/Sewer Bond $ 220,000.00 (61,737.50) (145, 334.87) 35,000.00 (27,450.00) $ 20,477.63 $ 121,000.00 (13,000.00) (98,966.00) (9,000.00) 85,000.00 $ 85,034.00 Mailing Address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 PURCHASE ORDER DETAIL GL ACCOUNT PROJECT AMOUNT 4602.860.7212-5809.00 46020.7212 $ 27,450.00 Attachments: Change Order 6 CHANGE ORDER CITY OF FAYETTEVILLE ARKANS A R KA N S A S Contract Title: Zion Road Phase II Improvements Change Order No. 6 Date of Issuance March 21.2023 To Contractor: TRI-STAR CONTRACTORS LLC ORDINANCEJRESOLUTION:194-20 The Contract is changed as follows: Effective March 21, 2023 Bid Bid Previous Unit Contract Revised Revised Original Revised Contract Item Item Estimated of Unit Estimated Unit Estimated Estimated Changes No. Description Quantity Measure Price Quantity Price Cost Cost 1-127 Lakewood Subdivision Irrigation Repair LS 1.00 S27,450.00 $27.450.00 the Owner The original Contract Price was Net change by previously authorized change orders The Contract Price prior to this Change Order was The Contract Price will be adjusted by The new Contract Price including this Change Order will be The Contract Time(s) will be increased by Required dates of Completion as of the date of this Change Order therefore are. Summation of Cost $27,450.00 Net Cost for this Change Order $27,450.00 $ 6,820,075.20 $ 592,635.59 $ 79412,710.79 $ 27,450.00 -- _ $ 7,440,160.79 0 calendar days Substantial Completion 21-Feb-22 •----------------------------------------------------------- — Final Completion 23-Mar-22 NOTE: This summary does not reflect changes in the Contract Price or Time(s) which have been authorized by Work Change Directives not incorporated in this or previous Change Orders. TRI-STAR CONSTRACTORS LLC CIT OFAY-IrEVIL E 3121/23 - �113/30/2023 BY ;-7 DATE BY ( / DATE V C O N T R A C T O R S Advanced By Irrigation Lakewood POA 12/6/22 Zion Rd/Lantana Fayetteville, AR 1) Job Description: Irrigation System Repairs/Revisions/Installation This bid includes all repairs and/or revisions needed to bring property back to an operational state. Bid includes the installation of 4" popup heads with MP rotator nozzles and strip nozzles on newly installed turf zones. This estimate does not include any repairs to system outside the scope of damages due to recent construction of Zion Rd. Existing backflow preventer will be utilized. New mainline for damaged irrigation system will be installed. Upon completion, system will be pressure checked for any leaks pertaining to this estimate. Bid is contingent upon adequate sleeving installation under all necessary concrete areas (Lantana Ln.) Should further sleeving be necessary, a change order will be submitted for directional boring. After assessment it was found that main line, wire, and —10 irrigation zones were damaged and will need to be replaced/repaired. This damage is/was operational from the controller on Randall. This existing controller will be utilized. This will include the installation of new 1-1/2" PVC Sch 40 mainline, irrigation wiring, new irrigation zones where needed, and repairs to existing salvageable zones. Once completed the damaged irrigation system along Zion Rd. will be 100% operational. Materials: 1-1/2" PVC Sch 40 Mainline 1-1/4" & 1" PVC Class Laterals (Spray Zones) Poly Barbs Misc. PVC Fittings Glue/Primer/Teflon '/" Poly Pipe 10" Valve Boxes 13 Strand Direct Burial Wiring 4" Pop -Up Heads Waterproof Wire Nuts 1-1/2" Rainbird Valves MP Rotator Spray Nozzles 47 North Double Springs Rd. • Farmington, AR 72730 Phone: 479.305.0270 ABI L-) 1-I��jA� Advanced By Irrigation Estimated Job Completion: If applicable, a utility locate will be called in and will be allowed 48 hours to complete due to state laws. Contact ABI Systems, LLC for a scheduled start date. All installations come with a one-year warranty, from date of completion. ***PAYMENT DETAILS: 50% draw due upon 50% completion: remaining 50% due upon 100% completion of 'off Total Job Cost Not to Exceed: $22875.00 Client Signature Date ABI Rep. Date 47 North Double Springs Rd. • Farmington, AR 72730 Phone: 479.305.0270 ABI JYS7rJJU_ Advanced By Irrigation Materials: Item Total: Unit: Qty: Unit Price: Total: 1-1/2" PVC Sch 40 Mainline LF 640 $1.54 $985.60 10" Valve Boxes EA 7 $14.79 $103.53 1-1/4" PVC Class Laterals LF 700 $.84 $588.00 1" PVC Class Laterals LF 700 $.46 $322.00 13 Strand Direct Burial Wiring LF 750 $.87 $652.50 Poly Barbs EA 160 $.21 $33.60 1-1/2" Rainbird Valves EA 7 $117.99 $825.93 4" Pop -Up Heads EA 80 $1.69 $135.20 MP Rotator/Strip Spray Nozzles EA 80 $6.32 $505.60 '/" Poly Pipe LF 200 $.24 $48.00 Waterproof Wire Nuts EA 35 $1.53 $53.55 Rainbird Expansion Module EA 1 $67.97 $67.97 Misc. PVC Fittings ALL $300.00 Glue/Primer/Teflon ALL $30.00 *Prices and quantities are subject to slight changes during the design phase of this project* 47 North Double .Springs Rd. • Farmington, AR 72730 Phone: 479.30 5.0270 /ye t ,i,� L1 Z71M S Advanced By Irrigation ABI SYSTEMS IS COMMITTED TO CUSTOMER SATISFACTION. THEREFORE, ALL WORKMANSHIP AND EQUIPMENT IS GUARANTEED FOR A PERIOD OF ONE YEAR FROM THE COMPLETION DATE. IN THE EVENT THAT A DEFECT IN WORKMANSHIP, PARTS, OR MATERIALS IS REPORTED TO ABI SYSTEMS BY THE OWNER WITHIN THE APPLICABLE PERIOD, WE WILL CORRECT THE DEFECT IN WORKMANSHIP, OR WILL REPAIR OR REPLACE THE DEFECTIVE PART(S) AT NO COST TO THE OWNER. ALL DEFECTIVE PARTS, UPON REPLACEMENT, BECOME PROPERTY OF ABI SYSTEMS. ALL WARRANTIES APPLY PROVIDED ONLY ABI SYSTEMS MAINTAINS THE SYSTEM. SHOULD ANY OTHER CONTRACTOR, COMPANY, OR PERSON(S) TAMPER WITH OR ATTEMPT TO SERVICE THE SYSTEM IN ANY WAY WILL CAUSE FOR TERMINATION OF WARRANTY. THIS GUARANTEE DOES NOT EXTEND TO DAMAGES RESULTING FROM ACCIDENT, MISUSE, THEFT OR ALTERATION. ALL PVC PIPE WILL BE CLASS 200 UNLESS OTHWERWISE STATED IN THE MATERIALS SECTION OF THE CONTRACT. THE IRRIGATION MANAGER MAINTAINS FINAL AUTHORITY AND DISCRETION REGARDING WARRANTY CLAIMS. ABI SYSTEMS IS NOT RESPONSIBLE FOR UNFORESEEN CIRCUMSTANCES BEYOND OUR CONTROL, I.E., EXCESSIVE WATER PRESSURE, WATER HAMMER, AND TREE ROOTS. THE WARRANTY DOES NOT COVER PROPERTY LAYOUT CHANGES AFTER THE PROJECT COMPLETION. ABI SYSTEMS EXTENDS TO THE OWNER ALL OF THE WARRANTIES AND GUARANTEES PROVIDED BY THE MANUFACTURER ON ALL EQUIPMENT USED. RELEVANT COPIES OF SUCH WARRANTIES WILL BE PROVIDED TO THE OWNER UPON REQUEST. 47 North Double Springs Rd. • Farmington, AR 72730 Phone: 4 79.305.02 70 Contractor fee of 20% = $4,575 Total for this Change directive = $27,450.00 TRI STAR CONTRACTORS Office (479) 238-1088 1 Fax (479) 238-0030 P.O. Box 219 Siloam Springs, AR 72761