HomeMy WebLinkAbout189-20 RESOLUTION113 West Mountain Street
Fayetteville, AR 72701
(479) 575-8323
Resolution: 189-20
File Number: 2020-0538
BID #20-51 DIAMOND C CONSTRUCTION COMPANY:
A RESOLUTION TO AWARD BID #20-51 AND AUTHORIZE A CONTRACT WITH
DIAMOND C CONSTRUCTION COMPANY IN THE AMOUNT OF $148,928.05 FOR
IMPROVEMENTS TO THE RAZORBACK GREENWAY TUNNEL UNDER THE FULBRIGHT
EXPRESSWAY AND TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF
$25,000.00
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE,
ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby awards Bid #20-51 and
authorizes Mayor Jordan to sign a contract with Diamond C Construction Company, a copy of which
is attached to this Resolution, in the amount of $148,928.05 for improvements to the Razorback
Greenway tunnel under the Fulbright Expressway, and further approves a project contingency in the
amount of $25,000.00.
PASSED and APPROVED on 7/21/2020
Attest:
Kara Paxton, City Clerk Treasurer
Page 1 Printed on 7123120
City of Fayetteville, Arkansas 113 West Mountain Street
Fayetteville, AR 72701
(479) 575-8323
r
} Text File
File Number: 2020-0538
Agenda Date: 7/21/2020 Version: 1 Status: Passed
In Control: City Council Meeting File Type: Resolution
Agenda Number: A. 2
BID #20-51 DIAMOND C CONSTRUCTION COMPANY:
A RESOLUTION TO AWARD BID #20-51 AND AUTHORIZE A CONTRACT WITH DIAMOND C
CONSTRUCTION COMPANY IN THE AMOUNT OF $148,928.05 FOR IMPROVEMENTS TO THE
RAZORBACK GREENWAY TUNNEL UNDER THE FULBRIGHT EXPRESSWAY AND TO
APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $25,000.00
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby awards Bid #20-51 and
authorizes Mayor Jordan to sign a contract with Diamond C Construction Company, a copy of which is
attached to this Resolution, in the amount of $148,928.05 for improvements to the Razorback Greenway tunnel
under the Fulbright Expressway, and further approves a project contingency in the amount of $25,000.00.
City of Fayetteville, Arkansas Page 1 Printed on 712212020
Matt Mihalevich
Submitted By
City of Fayetteville Staff Review Form
2020-0538
Legistar File ID
July 21st, 2020
City Council Meeting Date - Agenda Item Only
N/A for Non -Agenda Item
6/30/2020 DEVELOPMENT SERVICES (620)
Submitted Date Division / Department
Action Recommendation:
Staff recommends award of Bid 20-51 and authorization of a contract with Diamond C Construction Company in the
amount of $148,928.05 and approval of a $25,000 contingency for improvements to the Razorback Greenway
tunnel under the Fulbright Expressway.
4470.800.8830-5420.00
Account Number
02016.1901
Project Number
Budgeted Item? Yes
Does item have a cost? Yes
Budget Adjustment Attached? No
Budget Impact:
Trail Maintenance
Fund
(RTP) Tunnel Under Fulbright Expressway
Project Title
Current Budget
Funds Obligated
Current Balance
Item Cost
Budget Adjustment
Remaining Budget
$ 174,400.00
174,400.00
$ 173,928.05
471.95
V20180321
Purchase Order Number: Previous Ordinance or Resolution #
Change Order Number:
Original Contract Number:
Comments:
Approval Date:
CITY OF
FAYETTEVILLE
ARKANSAS
MEETING OF JULY 21ST, 2020
TO: Mayor and City Council
THRU: Susan Norton, Chief of Staff
Terry Gulley, Transportation Services Director
Chris Brown, City Engineer
FROM: Matt Mihalevich, Trails Coordinator
DATE: June 301h, 2020
CITY COUNCIL MEMO
SUBJECT: 2020-0538 — Razorback Greenway Fulbright Tunnel Improvements
RECOMMENDATION:
Staff recommends award of Bid 20-51 and authorization of a contract with Diamond C
Construction Company in the amount of $148,928.05 and approval of a $25,000 contingency
for improvements to the Razorback Greenway tunnel under the Fulbright Expressway.
BACKGROUND:
A section of the Razorback Greenway passes under the Fulbright Expressway near
Washington Regional Medical Center through a 10-foot-tall by 10-foot-wide concrete box
culvert tunnel. This box culvert was constructed with the expressway for the flow of Scull
Creek. In 2008, the eastern cell of the culvert was converted for pedestrian and bicycle use to
safely pass under N. Futrall Dr., the Fulbright Expressway, and N. Shiloh Dr. The box culvert
tunnel was originally constructed to convey water and not designed for a future trail. As a
result, the tunnel is constantly wet and uncomfortable to trail users. Making the tunnel floor
dry has been highly requested by citizens over the years.
In April of 2018, the City of Fayetteville applied for a grant to fund the improvements to the
tunnel through the Recreational Trails Program as Resolution 86-18. The grant funding was
approved in December of 2018 in the amount of $88,000 and the revenue was recognized as
Resolution 31-19.
DISCUSSION:
To create a dry and safer experience for users of the Razorback Greenway, city engineering staff
has designed a new concrete floor to be placed through the entire 685-foot length of the tunnel to
elevate the trail above the water flow. A side channel will be incorporated to carry the seeping
water along the east edge to a storm drain on the north side where it will be routed to Scull
Creek. The inside of the tunnel will also be painted as part of the project.
A flood study has been completed by staff engineer, Alan Pugh to comply with the Federal
Emergency Management Agency (FEMA) requirements for adding the new floor to the tunnel.
Steel plates will be installed on the southern side of the box culverts to create a bevel that will
increase the hydraulic efficiency of the tunnel and offset the decrease in volume resulting by
Mailing Address:
113 W. Mountain Street www.fayetteville-ar.gov
Fayetteville, AR 72701
adding the new concrete floor. All permits have been approved and the project is ready for
construction.
Four bidders responded to the request for formal bids on June 23,d, 2020 and Diamond C
Construction Company was the lowest responsive bidder at $148,928.05. Engineering staff
recommends awarding this contract to Diamond C Construction Company. The contract time is
60 days for final completion.
BUDGET/STAFF IMPACT:
The Recreational Trails Program grant will fund the $88,000 of the construction cost. The
remaining $60,928.05 plus $25,000 contingency has been budgeted through the trail
development capital improvements program for trail maintenance.
ATTACHMENTS:
Fulbright Tunnel Improvements Map
Fulbright Tunnel Detail
Bid 20-51 recommendation of award
Section 0500 Agreement signed by Diamond C Construction Company
Diamond C Construction Company Submittal
Syr:,w
_ FAYETTEVILLE CITY OF Razorback Regional Greenway +
ARKANSAS o �z5 z5o soo �5o i,000 Fulbri ht Expressway Tunnel Improvements
Feet 9 P Y P %:41,,r
SCULL CREEK FLOW
FULBR�GHT EXPRESSWAY
EXISTING CONCRETE CULVERT
LIGHT
O
10'
A.H.T.D. CLASS M
CONCRETE PER
SECTIONS 633 AND 802
5" SLUMP, 4-8% AIR
4,500 PSI WITH N
MACRO —SYNTHETIC
FIBERS AT 4POUNDS/CY
0.45 water/cement
Ln
1.5% CROSS SLOPE
EXISTING CONCRETE CULVERT
POWER WASH EXISTING CONCRETE
SURFACE AND APPLY EPDXY
BONDING PRIMER PRIOR TO
PLACEMENT OF CONCRETE.
4" EDGE STRIPE
1 8"
EXISTING 12" DRAINAGE
TROUGH TO REMAIN
J" CAMPER TO PREVENT
CRACKING —SEAL SEAM BETWEEN
EXISTING CONCRETE AND NEW
CONCRETE.
ARDEX OR APPROVED EQUAL
COLD JOINT
11
::::r arnta
Items Item
Bid 20-51, Construction - Tunnel Under Fulbright Expressway
Benchmark
Construction of NWA,
InC.
Total Cost
$ 158,852.02
Selected #
0
Selected ($)
$ 0
QuantityRc Spec Unitof UnitPrice TotalCost
Crossland Heavy
Goodwin & Goodwin,
Contractors, Inc.
Diamond C Construction
Inc.
$ 159,724.9
$ 148,928.05
5 351,780.0
0
15
0
$ 0
$ 148,928.05
$ 0
UnitPrice TotalCost
UnitPrice TotalCost
UnitPrice TotalCost
1 MOBILIZATION (NOT TO EXCEED 5% OF TOTAL BID)
1
AHTD 601 LS
$ 5,632.97 $ 5,632.97
!$ 4,120.0 $ 4,120.0
$ 5,175.0 $ 5,175.0
$ 15,000.0 $ 15,000.0
2 4,500 PSI CONCRETE TRAIL (FIBER REINFORCED)(FLOOR PRIMER)
80
SP - 2 CY
$ 953.39 $ 76,271.2
, $ 800 $ 64,000.0
$ 620.54 $ 49,643.2
$ 800 $ 64,000.0
3 CEMENTATIOUS LEVELER (55if BAGS)
120
SP - 2 BAG
$ 46.08 $ 5,529.5999 $ 140 $ 16,800.0
$ 76.01000 $ 9,121.2
$ 225 $ 27,000.0
4 TRAIL TRAFFIC CONTROL DETOUR AND SIGNS
1
SP-3 604 LS
$ 4,390.0 $ 4,390.0
5 1,700.0 $ 1,700.0
$ 7,130.0 $ 7,130.0
$ 8,000.0 $ 8,000.0
5 REMOVAL AND DISPOSAL OF EXISTING CONCRETE TRAIL
40
AHTD 202 SY
$ 48.75 $ 1,950.0
5 25 $ 1,000.0
$ 89.13 $ 3,565.2
$ 75 $ 3,000.0
6 1/4" COR-TEN STEEL PLATES AND ANCHORS (3 - 4'X10') (3 - 3'X31')
1
SP - 4 LS
$ 10,020 0 $ 10,020.0
$ 21,500.0 $ 21,500.0
$ 11,500.0 $ 11,500.0
$ 135,000.1$ 135,000.0
7 18" DOMED DRAIN BASIN WITH 8" PVC INVERT
1
SP - 5 EA
$ 1,850.0 $ 1,850.0
$ 4,000.0 $ 4,000.0
$ 2,185.0 $ 2,185.0
$ 4,000.0 $ 4,000.0
8 8" SCH. 40 SEWER PIPE
88
SP-5 LF
$ 56.82 $ 5,000.16
$ 60 $ 5,280.0
$ 61.43 $ 5,405.84
$ 60 $ 5,280.0
9 PIPE FOOTING & ANCHORS
1
SP - 5 LS
$ 510 $ 510
$ 1,800.0 $ 1,800.0
$ 1,239.7 $ 1,239.7
$ 3,000.0 $ 3,000.0
10 12" CONCRETE RETAINING WALL (PER ARDOT SI-2)
1
SP - 6 802 LS
$ 1,640.0 $ 1,6400
$ 3,150.0 $ 3,150.0
$ 1,137.35 $1,137.35
$ 10,000.0 $ 10,000.0
11 TUNNEL WALL AND CEILING CLEANING & PAINTING (WHITE)
20558
SP - 7 SF
$ 1.55 $ 31,864.9
$ 1.88 $ 38,649.041$2,000-0
$ 2.02 $ 41,527.16
$ 2.5 $ 51,395.0
12 4" YELLOW PAINT (EDGE AND CENTER STRIPE)
635
AHTD 718 LF
$ 2.03 $ 1,289.05
$ 2 5 1,270.0
$ 1.82 $1,155.7
$ 3 $ 1,905.0
13 SOLID SLAB SOD
80
AHTD 624 SY
$ 4.75 $,SoYJlf' `°'2$
5.5 $ 440.0
$ 14.38 $ 1,150.4
$ 15 $ 1,200.0
14 EROSION CONROL
1
AHTD 621 LS
$ 1,260.0 $ 1,260.0
$ 800 $ 800
$ 4,025.65 $ 4,025.65
$ 3,000.0 $ 3,000.0
15 INSURANCE & BONDING
1
TERMS & CI LS
$ 4,480.0 $ 4,480.0
$ 2,000.0
$ 4,966.65 $ 4,966.65
$ 20,000.0 $ 20,000.0
.� Chi• O; IY1LL■
ARKARS�AAIUAf
Bid 20-51, Construction - Tunnel Under
Fulbright Expressway - Bid 20-51,
Construction - Fulbright Expressway Tunnel
Improvements
Project Overview
Project Details
Reference ID Bid 20-51, Construction - Tunnel Under Fulbright Expressway
Project Name Bid 20-51, Construction - Fulbright Expressway Tunnel Improvements
Project Owner Andrea Foren
Project Type ITB
Department Purchasing
Certification of $150,000.00
Funds
The City of Fayetteville, AR is accepting sealed bids from properly
licensed professionals improvements to the Razorback Greenway tunnel
under the Fulbright Expressway in northern Fayetteville. The project
Project Description includes, but not limited to, the complete cleaning of the existing tunnel,
placement of a new concrete floor through the entire length of the tunnel,
adding storm drainage pipe and grate, and installing steel flood plates on
south face of the box culvert.
Open Date May 17, 2020 12:00 AM CDT
Close Date Jun 23. 2020 2:00 PM CDT
Cif• O•
PAT TTIVILLE
AEKAOM"
Highest Scoring Supplier
Diamond C Construction
Seal status
Requested Information
Bid Bond
Required Forms
Arkansas Contractors Licence
Application #/ Date of
Application
Arkansas Secretary of State
Filing #
Pursuant Arkansas Code
Annotated §25-1-503, the
Contractor agrees and certifies
that they do not currently
boycott Israel and will not
boycott Israel during any time
in which they are entering into,
or while in contract, with any
public entity as defined in §25-
1-503. If at any time during
contract the contractor decides
to boycott Israel, the contractor
must notify the contracted
public entity in writing.
Conflict of Interest
Unsealed on
Jun 23, 2020 2:05 PM CDT
Jun 23, 2020 2:05 PM CDT
Jun 23, 2020 2:05 PM CDT
Jun 23, 2020 2:05 PM CDT
Jun 23, 2020 2:05 PM CDT
Score
100 pts
Unsealed by
Les McGaugh
Les McGaugh
Les McGaugh
Les McGaugh
Les McGaugh
# Declaration of Conflict of Interest You have been chosen as a Committee member for this
Evaluation. Please read the following information on conflict of interest to see if you have any
problem or potential problem in serving on this committee. ## Code of Conduct All information
cI O•
.� ASKANS EriLL■
w�tutuws
related to submissions received from Suppliers or Service Providers must be kept confidential by
Committee members. ## Conflict of Interest No member of a Committee shall participate in the
evaluation if that Committee member or any member of his or her immediate family: ` has direct or
indirect financial interest in the award of the contract to any proponent; * is currently employed by,
or is a consultant to or under contract to a proponent; * is negotiating or has an arrangement
concerning future employment or contracting with any proponent; or, " has an ownership interest in,
or is an officer or director of. any proponent. Please sign below acknowledging that you have
received and read this information. If you have a conflict or potential conflict. please indicate your
conflict on this acknowledgment form with information regarding the conflict. I have read and
understood the provisions related to the conflict of interest when serving on the Evaluation
Committee. If any such conflict of interest arises during the Committee's review of this project, I will
immediately report it to the Purchasing Director.
Name Date Signed Has a Conflict of Interest?
Les McGaugh Jun 23. 2020 2:15 PM CDT No
_ - p1
.MRANSFAVET\riLL■
A�RAN�At
Public Notices
No messages
FA►fTTIVILL■
AAAgAAI
Submissions
Supplier
Date Submitted
Jun 23, 2020 11:45 AM
Diamond C Construction
CDT
Crossland Heavy
Jun 23, 2020 11:31 AM
Contractors, Inc.
CDT
Jun 23, 2020 12:43 PM
Goodwin & Goodwin. Inc.
CDT
Benchmark Construction
Jun 24, 2020 11:05 AM
of NWA, Inc.
CDT
Name Email
Mike Cordeirc mike@diamondcconst.com
Kaylee Mann kmann@heavycontractors.com
David Garcia docryde@yahoo.com
Steve Smith benchmarkconst@att.net
Confirmation Code
ODcwNTQ=
ODcwNTE=
ODcwODc=
ODcyNTA=
FAVI'"wuu
Mt
Scoring Summary
Active Submissions
Total Certified Funds Total Base Bid Price
Supplier / 100 pts Pass/Fail 1 100 pts
Diamond C Construction 100 pts Pass 100 pts ($148.928.05)
Benchmark Construction of NWA. 93.75 pts Pass 93.75 pts ($158.852.02)
Inc.
Crossland Heavy Contractors, Inc. 93.24 pts Pass 93.24 pts ($159,724.90)
Goodwin & Goodwin, Inc. 42.34 pts Fail 42.34 pts ($351380.00)
.- pf
.� ARKAMS EYILL■
A�KANiAf
Signatures
Name
Andrea Foren Andrea
(Project Owner) Foren
Signatures
Digitally signed by
Andrea Foren
Date: 2020.06.26
15:10:58-05'00'
Les McGaugh Digitally signed by Les McGaugh
(Evaluator) Les McGaugh Date: 2020.06.25 15:58:41-05'00'
DOCUMENT 00500 — AGREEMENT
BETWEEN OWNER AND CONTRACTOR
Contract Name/Title: RAZORBACK GREENWAY TUNNEL IMPROVEMENTS
Contract No.: (to be assigned after City Council approval)
THIS AGREEMENT is dated as of the day of 5in the year 2020 by
and between The City of Fayetteville, Arkansas and Diamond C4dstruction Company
(hereinafter called Contractor).
ARTICLE 1 - WORK
1.01 Contractor shall complete all Work as specified or indicated in the Contract
Documents. The work under this Contract includes, but is not limited to:
1. Mobilization/Demobilization
2. Trail detours
3. Cleaning of existing tunnel floor, walls and ceiling
4. Placement of concrete floor in tunnel and transitions
5. Installation of storm pipe and grate
6. Replacement of concrete trail where storm pipe crosses
7. Painting of Tunnel
8. Installation of steel flood plates on south end of the box culvert
ARTICLE 2 - ENGINEER
2.01 The Project has been designed by the City of Fayetteville, who is hereinafter called
Engineer. The Engineer assumes all duties and responsibilities, and has the rights
and authority assigned to Engineer in the Contract Documents in connection with
completion of the Work in accordance with the Contract Documents.
City of Fayetteville 00500 - 1 Job 040759
Razorback Greenway Tunnel Improvements
DOCUMENT 00500 — AGREEMENT (continued)
ARTICLE 3 - CONTRACT TIME
3.01 TIME OF THE ESSENCE:
A. All time limits for milestones, if any, Substantial Completion, and
completion and readiness for final payment as stated in the Contract
Documents are of the essence of the Contract.
3.02 DATES FOR SUBSTANTIAL COMPLETION AND FINAL PAYMENT:
A. The Work will be Substantially Completed within 30 calendar days after the
date when the Contract Times commence to run as provided in the
GENERAL CONDITIONS, and completed and ready for final payment in
accordance with the GENERAL CONDITIONS within 60 calendar days
after the date when the Contract Times commence to run.
3.03 LIQUIDATED DAMAGES:
A. Owner and Contractor recognize that time is of the essence of this
Agreement and that The City of Fayetteville will suffer financial loss if the
Work is not completed within the time specified above, plus any extensions
thereof allowed in accordance with the GENERAL CONDITIONS. The
parties also recognize the delays, expense, and difficulties involved in
proving the actual loss suffered by The City of Fayetteville if the Work is not
Substantially Completed on time. Accordingly, instead of requiring any such
proof, The City of Fayetteville and Contractor agree that as liquidated
damages for delay (but not as a penalty) Contractor shall pay The City of
Fayetteville Two Hundred Dollars ($200.00) for each calendar day that
expires after the time specified above in Paragraph 3.02 for Substantial
Completion until the Work is Substantially Complete. After Substantial
Completion, if Contractor shall neglect, refuse, or fail to complete the
remaining Work within the time specified in Paragraph 3.02 for completion
and readiness for final payment or any proper extension thereof granted by
The City of Fayetteville, Contractor shall pay The City of Fayetteville Two
City of Fayetteville 00500 - 2 Job 040797
Razorback Greenway Tunnel Improvements
DOCUMENT 00500—AGREEMENT (continued)
Hundred Dollars ($200.00) for each calendar day that expires after the time
specified for completion and readiness for final payment.
ARTICLE 4 - CONTRACT PRICE
4.01 The CITY OF FAYETTEVILLE agrees to pay, and the CONTRACTOR agrees to
accept, as full and final compensation for all work done under this agreement, the
amount based on the prices bid in the Proposal (BID FORM) which is hereto
attached, for the actual amount accomplished under each pay item, said payments to
be made in lawful money of the United States at the time and in the manner set forth
in the Specifications.
4.02 As provided in the General Conditions estimated quantities are not guaranteed, and
determinations of actual quantities and classifications are to be made by ENGINEER
as provided in the General Conditions. Unit prices have been computed as provided
in the General Conditions.
4.03 Changes, modifications, or amendments in scope, price or fees to this contract shall
not be allowed without a prior formal contract amendment approved by the Mayor
and the City Council in advance of the change in scope, cost or fees.
ARTICLE 5 - PAYMENT PROCEDURES
5.01 SUBMITTAL AND PROCESSING OF PAYMENTS:
A. Contractor shall submit Applications for Payment in accordance with the
GENERAL CONDITIONS. Applications for Payment will be processed by
Engineer as provided in the GENERAL CONDITIONS.
5.02 PROGRESS PAYMENTS, RETAINAGE:
A. The City of Fayetteville shall make progress payments on account of the
Contract Price on the basis of Contractor's Applications for Payment as
recommended by Engineer, on or about the 15th day of each month during
construction. All such payments will be measured by the schedule of values
City of Fayetteville 00500 - 3 Job 040797
Razorback Greenway Tunnel Improvements
DOCUMENT 00500 — AGREEMENT (continued)
established in the GENERAL CONDITIONS (and in the case of Unit Price
Work based on the number of units completed) or, in the event there is no
schedule of values, as provided in the General Requirements.
Prior to Substantial Completion, progress payments will be made in an
amount equal to the percentage indicated below, but, in each case, less the
aggregate of payments previously made and less such amounts as Engineer
shall determine, or The City of Fayetteville may withhold, in accordance
with the GENERAL CONDITIONS.
a. 90% of Work Completed (with the balance being retainage). If
Work has been 50% completed as determined by Engineer, and
if the character and progress of the Work have been satisfactory
to The City of Fayetteville and Engineer, The City of
Fayetteville on recommendation of Engineer, may determine that
as long as the character and progress of the Work subsequently
remain satisfactory to them, there will be no additional retainage
on account of Work subsequently completed, in which case the
remaining progress payments prior to Substantial Completion
will be an amount equal to 100% of the Work Completed less the
aggregate of payments previously made; and
b. 100% of Equipment and Materials not incorporated in the Work
but delivered, suitably stored, and accompanied by
documentation satisfactory to The City of Fayetteville as
provided in the GENERAL CONDITIONS.
2. Upon Substantial Completion, The City of Fayetteville shall pay an amount
sufficient to increase total payments to Contractor to 95% of the Contract
Price (with the balance being retainage), less such amounts as Engineer shall
determine, or The City of Fayetteville may withhold, in accordance with the
GENERAL CONDITIONS.
City of Fayetteville 00500 - 4 Job 040797
Razorback Greenway Tunnel Improvements
DOCUMENT 00500 — AGREEMENT (continued)
5.03 FINAL PAYMENT:
A. Upon final completion and acceptance of the Work in accordance with the
GENERAL CONDITIONS, The City of Fayetteville shall pay the remainder
of the Contract Price as recommended by Engineer and as provided in the
GENERAL CONDITIONS.
ARTICLE 6 - CONTRACTOR'S REPRESENTATIONS
6.01 In order to induce The City of Fayetteville to enter into this Agreement, Contractor
makes the following representations:
A. Contractor has examined and carefully studied the Contract Documents
including the Addenda and other related data identified in the Bid
Documents.
B. Contractor has visited the Site and become familiar with and is satisfied as to
the general, local, and Site conditions that may affect cost, progress,
performance, and furnishing of the Work.
C. Contractor is familiar with and is satisfied as to all federal, state, and local
Laws and Regulations that may affect cost, progress, performance, and
furnishing of the Work.
D. Contractor has carefully studied all:
(1) reports of explorations and tests of subsurface conditions at or
contiguous to the Site and all drawings of physical conditions in or
relating to existing surface or subsurface structures at or contiguous
to the Site; and
(2) reports and drawings of a Hazardous Environmental Condition, if
any, at the Site. Contractor acknowledges that The City of
Fayetteville and Engineer do not assume responsibility for the
accuracy or completeness of information and data shown or indicated
City of Fayetteville 00500 - 5 Job 040797
Razorback Greenway Tunnel Improvements
DOCUMENT 005011 — AGREEMENT (continued)
in the Contract Documents with respect to Underground Facilities at
or contiguous to the Site.
E. Contractor has obtained and carefully studied (or assumes responsibility of
having done so) all such additional supplementary examinations,
investigations, explorations, tests, studies, and data concerning conditions
(surface, subsurface, and Underground Facilities) at or contiguous to the Site
or otherwise which may affect cost, progress, performance, and furnishing of
the Work or which relate to any aspect of the means, methods, techniques,
sequences, and procedures of construction to be employed by Contractor and
safety precautions and programs incident thereto.
F. Contractor does not consider that any additional examinations,
investigations, explorations, tests, studies, or data are necessary for the
performing and furnishing of the Work at the Contract Price, within the
Contract Times, and in accordance with the other terms and conditions of the
Contract Documents.
G. Contractor is aware of the general nature of work to be performed by The
City of Fayetteville and others at the Site that relates to the Work as indicated
in the Contract Documents.
H. Contractor has correlated the information known to Contractor, information
and observations obtained from visits to the Site, reports and drawings
identified in the Contract Documents, and all additional examinations,
investigations, explorations, tests, studies, and data with the Contract
Documents.
1. Contractor has given Engineer written notice of all conflicts, errors,
ambiguities, or discrepancies that Contractor has discovered in the Contract
Documents and the written resolution thereof by Engineer is acceptable to
Contractor.
City of Fayetteville 00500 - 6 Job 040797
Razorback Greenway Tunnel Improvements
DOCUMENT 00500 — AGREEMENT (continued)
J. The Contract Documents are generally sufficient to indicate and convey
understanding of all terms and conditions for performance and furnishing of
the Work.
ARTICLE 7 - CONTRACT DOCUMENTS
7.01 CONTENTS:
A. The Contract Documents which comprise the entire Agreement between The
City of Fayetteville and Contractor concerning the Work consist of the
following and may only be amended, modified, or supplemented as provided
in the GENERAL CONDITIONS:
l . This Agreement.
2. Exhibits to this Agreement (enumerated as follows):
a. Notice to Proceed.
b. Contractor's Bid.
c. Documentation submitted by Contractor prior to Notice of
Award.
3. Performance, Payment, and other Bonds.
4. General Conditions.
5. Supplementary Conditions.
6. Specifications consisting of divisions and sections as listed in table of
contents of Project Manual.
City of Fayetteville 00500 - 7 Job 040797
Razorback Greenway Tunnel Improvements
DOCUMENT 00500 — AGREEMENT (continued)
7. Drawings consisting of a cover sheet and sheets as listed in the table of
contents thereof, with RAZORBACK GREENWAY TUNNEL
IMPROVEMENTS
8. The following which may be delivered or issued after the Effective Date of
the Agreement and are not attached hereto: All Written Amendments and
other documents amending, modifying, or supplementing the Contract
Documents pursuant to the GENERAL CONDITIONS.
ARTICLE 8 - MISCELLANEOUS
8.01 TERMS:
A. Terms used in this Agreement which are defined in the GENERAL
CONDITIONS shall have the meanings stated in the GENERAL
CONDITIONS.
8.02 ASSIGNMENT OF CONTRACT:
A. No assignment by a party hereto of any rights under or interests in the
Contract Documents will be binding on another party hereto without the
written consent of the party sought to be bound; and specifically but without
limitation, moneys that may become due and moneys that are due may not be
assigned without such consent (except to the extent that the effect of this
restriction may be limited by Law), and unless specifically stated to the
contrary in any written consent to an assignment, no assignment will release
or discharge the assignor from any duty or responsibility under the Contract
Documents.
8.03 SUCCESSORS AND ASSIGNS:
A. The City of Fayetteville and Contractor each binds himself, his partners,
successors, assigns, and legal representatives to the other party hereto, its
partners, successors, assigns, and legal representatives in respect to all
covenants, agreements, and obligations contained in the Contract Documents.
City of Fayetteville 00500 - 8 Job 040797
Razorback Greenway Tunnel Improvements
DOCUMENT 00500 — AGREEMENT (continued)
8.04 SEVERABILITY:
A. Any provision or part of the Contract Documents held to be void or
unenforceable under any Law or Regulation shall be deemed stricken, and all
remaining provisions shall continue to be valid and binding upon The City of
Fayetteville and Contractor, who agree that the Contract Documents shall be
reformed to replace such stricken provision or part thereof with a valid and
enforceable provision that comes as close as possible to expressing the
intention of the stricken provision.
8.05 FREEDOM OF INFORMATION ACT:
A. City contracts and documents prepared while performing city contractual
work are subject to the Arkansas Freedom of information Act. If a Freedom
of Information Act request is presented to the City of Fayetteville, the
contractor will do everything possible to provide the documents in a prompt
and timely manner as prescribed in the Arkansas Freedom of information Act
(A.C.A. §25-19-101 et. seq.). Only legally authorized photocopying costs
pursuant to the FOIA may be assessed for this compliance.
OTHER PROVISIONS: Not Applicable.
IN WITNESS WHEREOF, The City of Fayetteville and Contractor have signed this Agreement
in quadruplicate. One counterpart each has been delivered to Contractor and Engineer. Two
counterparts each has been delivered to The City of Fayetteville. All portions of the Contract
Documents have been signed, initialed, or identified by The City of Fayetteville and Contractor or
identified by Engineer on their behalf.
City of Fayetteville 00500 - 9 Job 040797
Razorback Greenway Tunnel Improvements
DOCUMENT 00500 — AGREEMENT (continued)
This Agreement will be effective on J , 20ZO which is the
Effective Date of the Agreement. y_;` `°
DIAMOND C CONSTRUCTION COMPANY
Name Written: /V //f C. t o-af jl o
G
Signature: >h�
Title: �e f
(SEAL)
Attest
(SEAL)
CLERI '
Attest ..CITY •gyp';
.NCO
•'�- F��<<F : Win''
COUf,;�,
d"Ji6
City of Fayetteville 00500 - 10 Job 040797
Razorback Greenway Tunnel Improvements
DOCUMENT 00500 —AGREEMENT (continued)
Address for giving notices
Address for giving notices
1259 WEST MAIN P.O. BOX 803 113 W. Mountain Street
GENTRY, AR 72734 Fayetteville AR. 72701
License No. 0318010321 (attach evidence of authority to
Agent for Service of process
(If Contractor is a corporation,
attach evidence of authority to
sign.)
END OF DOCUMENT 00500
sign and resolution or other documents
authorizing execution of Agreement)
Approved As to Form:
By: q6
Attorney For:
City of Fayetteville 00500 - 11 Job 040797
Razorback Greenway Tunnel Improvements
DOCUMENT 00400 —BID FORM
Contract Name: RAZORBACK GREENWAY TUNNEL IMPROVEMENTS
Bid Number 20-51
BID TO:
Owner: The City of Fayetteville, Arkansas
113 West Mountain Street
Fayetteville, Arkansas 72701
BID FROM:
Bidder: DIAMOND C CONSTRUCTION
1259 WEST MAIN P.O. BOX 801
GENTRY, AR 72734
ARTICLE 1 - INTENT
1.01 The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an
agreement with Owner in the form included in the Contract Documents to perform
and furnish all Work as specified or indicated in the Contract Documents for the Bid
price and within the Bid time indicated in this Bid and in accordance with the other
terms and conditions of the Contract Documents.
ARTICLE 2 - TERMS AND CONDITIONS
2.01 Bidder accepts all of the terms and conditions of the Invitation to Bid and
Instructions to Bidders, including without limitation those dealing with the
disposition of Bid security. This Bid will remain subject to acceptance for 90 days
after the day of Bid opening. Bidder will sign and deliver the required number of
counterparts of the Agreement with the Bonds and other documents required by the
Bidding Requirements within 15 days after the date of Owner's Notice of Award.
00400 Bid Form 00400 — l Job 040797
Razorback Greenway Tunnel Improvements
DOCUMENT 00400 —BID FORM (continued)
ARTICLE 3 - BIDDER'S REPRESENTATIONS
3.01 In submitting this Bid, Bidder represents, as more fully set forth in the Agreement,
that:
A. Bidder has examined and carefully studied the Bid Documents, and the
following Addenda, receipt of all which is hereby acknowledged:
Number Date
B. Bidder has visited the Site and become familiar with and is satisfied as to the
general, local, and Site conditions that may affect cost, progress,
performance, and furnishing of the Work.
C. Bidder is familiar with and is satisfied as to all federal, state, and local Laws
and Regulations that may affect cost, progress, performance, and furnishing
of the Work.
D. Bidder has carefully studied all: (1) reports of explorations and tests of
subsurface conditions at or contiguous to the Site and all drawings of
physical conditions in or relating to existing surface or subsurface structures
at or contiguous to the Site; and (2) reports and drawings of a Hazardous
Environmental Condition, if any, at the Site. Bidder acknowledges that such
reports and drawings are not Contract Documents and may not be complete
for Bidder's purposes. Bidder acknowledges that Owner and Engineer do
not assume responsibility for the accuracy or completeness of information
and data shown or indicated in the Bid Documents with respect to
Underground Facilities at or contiguous to the Site.
00400 Bid Form 00400-2 Job 040797
Razorback Greenway Tunnel Improvements
DOCUMENT 00400 —BID FORM (continued)
E. Bidder has obtained and carefully studied (or assumes responsibility for
having done so) all such additional or supplementary examinations,
investigations, explorations, tests, studies, and data concerning conditions
(surface, subsurface, and Underground Facilities) at or contiguous to the Site
or otherwise which may affect cost, progress, performance, or furnishing of
the Work or which relate to any aspect of the means, methods, techniques,
sequences, and procedures of construction to be employed by Bidder and
safety precautions and programs incident thereto.
F. Bidder does not consider that any additional examinations, investigations,
explorations, tests, studies, or data are necessary for the determination of this
Bid for performing and furnishing of the Work in accordance with the times,
price, and other terms and conditions of the Contract Documents.
G. Bidder is aware of the general nature of work to be performed by Owner and
others at the Site that relates to Work for which this Bid is submitted as
indicated in the Contract Documents.
H. Bidder has correlated the information known to Bidder, information and
observations obtained from visits to the Site, reports, and drawings identified
in the Contract Documents, and all additional examinations, investigations,
explorations, tests, studies, and data with the Contract Documents.
Bidder has given Engineer written notice of all conflicts, errors, ambiguities,
or discrepancies that Bidder has discovered in the Contract Documents, and
the written resolution thereof by Engineer is acceptable to Bidder.
The Contract Documents are generally sufficient to indicate and convey
understanding of all terms and conditions for performing and furnishing the
Work for which this Bid is submitted.
K. This Bid is genuine and not made in the interest of or on behalf of any
undisclosed person, firm, or corporation and is not submitted in conformity
with any agreement or rules of any group, association, organization, or
corporation; Bidder has not directly or indirectly induced or solicited any
00400 Bid Form 00400-3 Job 040797
Razorback Greenway Tunnel Improvements
DOCUMENT 00400—BID FORM (continued)
other Bidder to submit a false or sham bid; Bidder has not solicited or
induced any person, firm, or a corporation to refrain from bidding; and
Bidder has not sought by collusion to obtain for himself any advantage over
any other Bidder or over Owner.
L. Bidder will perform the Work in compliance with all applicable trench safety
standards set forth in Occupational Safety and Health Administration
(OSHA) Part 1926 — Subpart P — Excavations.
ARTICLE 4 - BID PRICE
Bidders are required to provide pricing for all line items, including deductive alternate items.
Failure to provide deductive alternate pricing can result in bid rejection. The City intends to
award this contract to the lowest qualified responsive responsible bidder based on the total base
bid as long as the base bid amount falls within the amount of funds certified for the project plus
25%. In the event no bid falls within the amount of funds certified for the project, plus 25%, the
City will utilize the deductive alternates in order to further evaluate bids until a bid received falls
within the amount certified, plus 25%. In the event all deductive alternates are subtracted from
the total base bid and no bid falls within the amount certified, plus 25%, all bids shall be rejected
and become confidential.
Bidder will complete the Work in accordance with the Contract Documents for the following
price(s):
00400 Bid Form 00400 — 4 Job 040797
Razorback Greenway Tunnel Improvements
DOCUMENT 00400 —BID FORM (continued)
I rEM
SPEC.
ES 1.
T
NO.
REF
DESCRIPTION
UNIT
QT)
Unit Pricc
I otal
AHTD
MOBILIZATION (NOT TO EXCEED 5%
1
LS
1
X
=
601
OF TOTAL BID)
SP - 2
4.500 PSI CONCRETE TRAIL (FIBER
CY
80
X
=
_
REINFORCED)(FLOOR PRIMER)
SP - 2
CEMENTATIOUS LEVELER (55# BAGS)
BAG
120
X
=
SP - 3
TRAIL TRAFFIC CONTROL DETOUR
LS
1
X
=
4
604
AND SIGNS
AHTD
REMOVAL AND DISPOSAL OF
5
SY
40
X
=
202
EXISTING CONCRETE TRAIL
1/4" COR-TEN STEEL PLATES AND
6
SP - 4
LS
1
X
=
ANCHORS (3 - 4'XIY) (3 - 3'XI F)
18" DOMED DRAIN BASIN WITH 8"
7
SP - 5
1
x
=
PVC INVERT This Form was
8
SP - 5
8" SCH. 40 SEWER PIPE Completed online 88
in Bonfire
9
SP-5
PIPE FOOTING & ANCHORS LS I
X
=
10
SP-6
12" CONCRETE RETAINING WALL
LS
I
X
=
802
(PER ARDOT SI-2)
TUNNEL WALL AND CEILING
11
SP-7
SF
2Q558
X
=
CLEANING & PAINTING ( WHITE)
AHTD
4" YELLOW PAINT (EDGE AND
12
LF
635
X
=
718
CENTER STRIPE)
13
AHTD
SOLID SLAB SOD
SY
80
X624
=
14
AHTD
EROSION CONROL
LS
I
X
=
TERMS
15
&
INSURANCE & BONDING
LS
I
X
=
CON D.
Total Base B'
$
TOTAL BID*
Words Numbers
*Total amount to complete project including all items listed above.
Notice: All bidders shall submit the "Anti -Collusion and debarment certification" form
with the bid.
00400 Bid Form 00400-5 Job 040797
Razorback Greenway Tunnel Improvements
DOCUMENT 00400 —BID FORM (continued)
ARTICLE 5 - CONTRACT TIMES
5.01 Bidder agrees that the Work will be substantially completed and completed and ready
for final payment within the number of calendar days indicated in the Agreement.
5.02 Bidder accepts the provisions of the Agreement as to liquidated damages in the event
of failure to complete the Work within the times specified in the Agreement.
ARTICLE 6 - BID CONTENT
6.01 The following documents are attached to and made a condition of this Bid:
A. Required Bid security in the form of a bank cashier's check or a Bid Bond
and in the amount of SEVEN THOUSAND FOUR HUNDRED FORTY SIX
DOLLARS & THIRTY SEVEN CENTSDollars ($ 7,446.37 ).
B. A tabulation of Subcontractors and other persons and organizations required
to be identified in this Bid.
ARTICLE 7 - COMMUNICATIONS
7.01 Communications concerning this Bid shall be addressed to the Bidder as follows:
DIAMOND C CONSTRUCTION
1269 WEST MAIN P.O. BOX 803
GENTRY, AR 72734
Phone No. 479-736-8801
FAX No. N/A
00400 Bid Form 00400-6 Job 040797
Razorback Greenway Tunnel Improvements
DOCUMENT 00400 —BID FORM (continued)
ARTICLE 8 - TERMINOLOGY
8.01 The terms used in this Bid which are defined in the GENERAL CONDITIONS or
Instructions to Bidders will have the meanings assigned to them.
SUBMITTED on 06123 20 20.
Arkansas State Contractor License No. 0318010321
(Or date of application submitted for licensure)
Tax ID No. 36474857
DUNS No. 117156865
CAGE No. 8CT88
If Bidder is:
An Individual
Name (type or printed):
By: (SEAL)
(individual's Signature)
Doing business as:
Business address:
Phone No.: FAX No.:
00400 Bid Form 00400-7 Job 040797
Razorback Greenway Tunnel Improvements
DOCUMENT 00400 —BID FORM (continued)
A Partnership
Partnership Name:
M.
(Signature of general partner — attach evidence of authority to sign)
Name (type or printed):
Business address:
Phone No.:
FAX No.:
A Corporation or LLC
Corporation or LLC Name: DIAMOND C CONSTRUCTION (SEAL)
State of Incorporation: ARKANSAS
Type (General Business, Professional, Service, Limited Liability):
GENERAL BUSINESS
By:
(Signature — attach evidence of authority to sign)
Name (type or printed): MIKE CORDEIRO
Title: PRESIDENT
(CORPORATE SEAL)
Attest:
(Signature of Corporate Secretary)
Business address: 1269 WEST MAIN P.O. BOX 803
GENTRY, AR 72734
Phone No.: 479-736-8801 FAX No.: N/A
END OF DOCUMENT 00400
00400 Bid Form 00400-8 Job 040797
Razorback Greenway Tunnel Improvements
12/15/11 Page 1 of 2
SPONSOR - CITY OF FAYETTEVILLE
SUPPLEMENT TO PROPOSAL
ANTI -COLLUSION AND DEBARMENT CERTIFICATION
FAILURE TO EXECUTE AND SUBMIT THIS CERTIFICATION SHALL RENDER THIS BID
NONRESPONSIVE AND NOT ELIGIBLE FOR AWARD CONSIDERATION.
As a condition precedent to the acceptance of the bidding document for this project, the bidder shall file
this Affidavit executed by, or on behalf of the person , firm, association, or corporation submitting the
bid. The original of this Affidavit shall be filed with the SPONSOR at the time proposals are
submitted.
AFFIDAVIT
I hereby certify, under penalty of perjury under the laws of the United States and/or the State of
Arkansas, that the bidder listed below has not, either directly or indirectly, entered into any agreement,
participated in any collusion, or otherwise taken any action in restraint of free competitive bidding in
connection with the submitted bid for this project, is not presently barred from bidding in any other
jurisdiction as a result of any collusion or any other action in restraint of free competition, and that the
foregoing is true and correct.
Further, that except as noted below, the bidder, or any person associated therewith in the capacity of
owner, partner, director, officer, principal investigator, project director, manager, auditor, or any
position involving the administration of Federal funds:
a. is not currently under suspension, debarment, voluntary exclusion, or determination of ineligibility
by any Federal agency;
b. has not been suspended, debarred, voluntarily excluded or determined ineligible by any Federal
agency within the past 3 years;
does not have a proposed debarment pending; and
d. has not been indicted, convicted, or had an adverse civil judgment rendered by a court of competent
jurisdiction in any matter involving fraud or official misconduct within the past 3 years.
12/15/11
Page 2 of 2
SPONSOR - CITY OF FAYETTEVILLE
SUPPLEMENT TO PROPOSAL
ANTI -COLLUSION AND DEBARMENT CERTIFICATION
FAILURE TO EXECUTE AND SUBMIT THIS CERTIFICATION SHALL RENDER THIS BID
NONRESPONSIVE AND NOT ELIGIBLE FOR AWARD CONSIDERATION.
EXCEPTIONS:
APPLIED TO
N/A
INITIATING AGENCY
DATES OF ACTION
Exceptions will not necessarily result in denial of award, but will be considered in determining bidder
responsibility. Providing false information may result in criminal prosecution or administrative
sanctions.
Job No. 040741 DIAMOND C CONSTRUCTION
(Nam of Bidder)
F.A.P. No. RTP-1302 (305)
(Signature)
06/23/2020 PRESIDENT
(Date Executed) (Title of Person Signing)
The following Notary Public certification is OPTIONAL and may or may not be completed at the
contractor's discretion.
State of ARKANSAS )
County of BENTONN )ss.
being duly sworn, deposes and says that he is
PRESIDENT of DIAMOND C CONSTRUCTION
(Title) (Name of Bidder)
and that the above statements are true and correct.
Subscribed and Sworn to before mg thi day of , 20 a D
My commission expires:
JACKIE BADER
�T'• MY COMMISSION 912376088 (Notary Public)
(NOTARY SEAL)
,c : �_ EXPIRES: March 16, 2030
:.;.•• :
9t�iis� • Benton County
7/26/96
Page I of 2
SPONSOR - CITY OF FAYETTEVILLE
SUPPLEMENT TO PROPOSAL
CERTIFICATION FOR FEDERAL -AID CONTRACTS
The prospective contractor certifies, by signing and submitting this proposal, to the best of his or her
knowledge and belief, that:
No Federal appropriated funds have been paid or will be paid, by or on his or her behalf,, to any
person for influencing or attempting to influence an officer or employee of any Federal agency, a
Member of Congress, an officer or employee of Congress, or any employee of a Member of
Congress in connection with the awarding of any Federal contract, the making of any Federal
grant, the making of any Federal loan, the entering into of any cooperative agreement, and the
extension, continuation, renewal, amendment, or modification of any Federal contract, grant, loan,
or cooperative agreement.
2 If any funds other than Federal appropriated funds have been paid or will be paid to any person for
influencing or attempting to influence an officer or employee of any Federal agency, a Member of
Congress, an officer or employee of Congress, or an employee of a Member of Congress in
connection with this Federal -Aid contract, the prospective contractor shall complete and submit
Standard Form-LLL, "Disclosure of Lobbying Activities", in accordance with its instructions.
(Available from Arkansas State Highway and Transportation Department, Programs and Contracts
Division).
This Certification is a material representation of fact upon which reliance was placed when this
transaction was made or entered into. This Certification is a prerequisite for making or entering into this
transaction imposed by Section 1352, Title 31, U. S. Code.
During the period of performance of this contract, the contractor and all lower tier subcontractors must
file a Form-LLL at the end of each calendar year quarter in which there occurs any event that requires
disclosure or that materially affects the accuracy of the information contained in any previously filed
disclosure form. Any person who fails to file the required Certification shall be subject to a civil penalty
of not less than $10,000 and not more than $100,000 for each failure.
The prospective contractor also agrees by submitting his or her proposal that he or she shall require that
the language of this Certification be included in all lower tier subcontracts which exceed $100,000 and
that all such subcontractors shall certify and disclose accordingly.
7/26/96
Page 2 of 2
SPONSOR - CITY OF FAYETTEVILLE
SUPPLEMENT TO PROPOSAL
CERTIFICATION
THIS CERTIFICATION SHALL BE COMPLETED BY THE BIDDER AS
PART OF THIS PROPOSAL
The bidder DIAMOND C CONSTRUCTION , proposed subcontractor ,
hereby certifies that he has , has not X , participated in a previous contract or
subcontract subject to the equal opportunity clause, as required by Executive Orders 10925, 11114, or
11246, and that he has , has not X , filed with the Joint Reporting Committee, the
Director of the Office of Federal Contract Compliance, a Federal Government contracting or
administering agency, or the former President's Committee on Equal Employment Opportunity, all
reports due under the applicable filing requirements.
(Currently, Standard Form 100 [EEO-1] is the only report required by the Executive Orders or their
implementing regulations.)
JOB NO.040741
F.A.P. NO. RTP-1302 (305)
DIAMOND C CONSTRUCTION
2=-L
By: G�
(Signature)
06/23/2020 PRESIDENT
(Date Executed) (Title of Person Signing)
NOTE: The above certification is required by the Equal Employment Opportunity Regulations of the
Secretary of Labor (41 CFR 60-1.7 (b) (1)), and must be submitted by bidders and proposed
subcontractors only in connection with contracts and subcontracts which are subject to the equal
opportunity clause. Contracts and subcontracts which are exempt from the equal opportunity clause are
set forth in 41 CFR 60-1.5. (Generally only contracts or subcontracts of $10,000 or under are exempt.)
Proposed prime contractors and subcontractors who have participated in a previous contract or
subcontract subject to the Executive Orders and have not filed the required reports should note that
41 CFR 60-1.7 (b) (1) prevents the award of contracts and subcontracts unless such contractor submits a
report covering the delinquent period or such other period specified by the Federal Highway
Administration or by the Director, Office of Federal Contract Compliance, U. S. Department of Labor.