Resolution: 178-20
File Number: 2020-0484
JBZ, INC. D/B/A ELLINGSON CONTRACTING CHANGE ORDER NO. 2:
A RESOLUTION TO APPROVE CHANGE ORDER NO. 2 TO THE CONTRACT WITH JBZ,
INC. D/B/A ELLINGSON CONTRACTING IN THE AMOUNT OF $163,000.00 FOR ROOF
FRAMING, SHINGLES, SIDING AND TRIM ASSOCIATED WITH THE WOOLSEY
FARMSTEAD RESTORATION PROJECT
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE,
ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby authorizes Mayor Jordan
to sign Change Order No. 2 to the contract with JBZ, Inc. d/b/a Ellingson Contracting in the amount of
$163,000.00 for roof framing, shingles, siding and trim associated with the Woolsey Farmstead
Restoration Project.
PASSED and APPROVED on 7/7/2020
``���ltrrrr►rrr��
Attest: \�����,FtK 1 TR
-'&I Y•F'�s ��
• FAYETTEVILLE ;
Kara Paxton, City Clerk Treasur �9'• ANSNc,
iNG TONS ������•
Page 1 Printed on 718120
113WestMountainStreet
City of Fayetteville, Arkansas
E> Fayetteville, AR 72701
(479)575-8323
Text File
File Number: 2020-0484
Agenda Date: 7/7/2020 Version: 1 Status: Passed
In Control: City Council Meeting File Type: Resolution
Agenda Number: A. 6
JBZ, INC. DB/A ELLINGSON CONTRACTING CHANGE ORDER NO.2:
A RESOLUTION TO APPROVE CHANGE ORDER NO.2 TO THE CONTRACT WITH JBZ, INC.
DB/A ELLINGSON CONTRACTING IN THE AMOUNT OF $163,000.00 FOR ROOF FRAMING,
SHINGLES, SIDING AND TRIM ASSOCIATED WITH THE WOOLSEY FARMSTEAD
RESTORATION PROJECT
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby authorizes Mayor Jordan to sign
Change Order No. 2 to the contract with JBZ, Inc. d/b/a Ellingson Contracting in the amount of $163,000.00
for roof framing, shingles, siding and trim associated with the Woolsey Farmstead Restoration Project.
c1W of Fayeltevll/e, Arkansas Page 1 Pdlnted on 7/8/2020
City of Fayetteville Staff Review Form
2020-0484
Legistar File ID
7/7/2020
City Council Meeting Date - Agenda Item Only
N/A for Non -Agenda Item
Wade Abernathy 6/19/2020 FACILITIES MANAGEMENT (140)
Submitted By Submitted Date Division / Department
Action Recommendation:
Staff Recomends approval of Change Order #2 to Bid 19-39 Woolsey Farmstead Restoration Contract with JBZ,
Inc., dba Ellingson Contracting in the amount of $163,000 for roof framing, wood shingles, and exterior siding
and trim.
4470.090.8900-5315.00
Account Number
15008.1
Project Number
Budgeted Item? Yes
Does item have a cost? Yes
Budget Adjustment Attached? No
Budget Impact:
Sales Tax Capital Improvement
Fund
Woolsey Homestead Historic
Current Budget
Funds Obligated
Current Balance
Item Cost
Budget Adjustment
Remaining Budget
Resjetlark*
$ 464,990.00
$ 282,306.43
$ 182,683.57
$ 163,000.00
$ 19,683.57
V20180321
Purchase Order Number: 2019-00000782 Previous Ordinance or Resolution # 245-19
Change Order Number:
Original Contract Number
Comments:
2
#2019-00000052
Approval Date:
CITY OF
FAYETTEVILLE
ARKANSAS
MEETING OF JULY 7, 2020
TO: Mayor and City Council
THRU: Susan Norton, Chief of Staff
Paul Becker, Chief Financial Officer
CITY COUNCIL MEMO
FROM: Wade Abernathy, Director Bond Projects and Construction
DATE: June 19, 2020
SUBJECT: Approval of Change Order #2 with JBZ,Inc. dba Ellingson Contracting for
Bid 19-39 Restoration of Woolsey Farmstead.
RECOMMENDATION:
Staff recommends approval of change order #2 to the contract with Ellingson Contracting in the
amount of $163,000 for the removal and replacement of the historical roof framing, installation
of wood shingles, and removal and replacement of historical siding and trim.
BACKGROUND:
In September 2014, Council approved Resolution # 165-14, which included the 2015-2019 CIP
funding for the Woolsey Homestead Historic Restoration Project. It was based on
Recommendations in a Condition Assessment Report submitted to the city in Jan. 2014 as
prepared by Ruby Architects Inc. The Report identified a 3-phase plan over the next 4 years for
cleanup, temporary stabilization, master plan, and final stabilization of the Structure and
Cemetery.
Staff has completed all possible items in the 2015 phase 1 as well as several items budgeted for
2017 phase 2. A Historical Structures Report as well as a Master Plan prepared by Allison
Architects was developed with direct input from the Woolsey Farmstead Visionary Committee.
June 9, 2016 per RFQ 16-01 Selection 5: The selection committee voted to use Allison
Architects for the programing and phasing as well as Architectural Services for final stabilization
of the structure to begin phase 3 of the initial report.
July of 2016, Council approve an Architectural Contract to include programing, phasing and
budget plan, and completion of Construction Drawings for Final Stabilization of the Woolsey
House Structure.
May 27, 2019 per RFQ 19-01, The selection committee voted to use Revival Architecture for the
above listed scope of projects. Aaron Ruby has been the Architect that has provide all service
since the first planning in 2014. He now is the principal Architect of Revival Architecture. the
selection committee wanted continuity for the project, and to remain working with Aaron.
June 7, 2019, Council approved a Architectural Services with a fixed fee contract with Revival
Architecture in the amount of $31,750.00 for permanent stabilization, interior finish and
Mailing Address:
113 W. Mountain Street www.fayetteville-ar.gov
Fayetteville, AR 72701
Cemetery restoration.
November 2019, Council approved resolution 245-19 a contract with Ellingson Contracting in
the amount of $279,099 for Phase 1 to include selective demolition, and permanent
stabilization.
DISCUSSION:
This change order covers portions of phase 2 that can be funded from the 2020 CIP.
With council approval of future CIP budgets, additional phase will be completed. Those are to
include window and doors and porches, chimneys and ada accessibility.
BUDGET/STAFF IMPACT:
The approved 2020 CIP funds for this project in the amount of 163,000 will be applied to this
change order.
Attachments:
Change Order #2.
PROJECT:
A Restoration of the Historic
Woolsey Farmstead
OWNER:
City of Fayetteville
113 W. Mountain St.
Fayetteville, AR 72701
REVIVAL
ARCH ITECTURE
301 tilain Scrcct. SLlltc 203
North Ladc hock, :AR -21 14
5o1.951.3316
www.revivalarch.com
CHANGE ORDER
FROM ARCHITECT:
Revival Architecture, Inc.
301 Main St. Suite 203
N. Little Rock, AR 72114
TO CONTRACTOR:
Ellingson Contracting
108 E. University St.
Siloam Springs, AR 72761
This Change Order is not valid until signed by the Architect, Contractor & Owner
DESCRIPTION: The Contract is changed os follows:
CHANGE ORDER NO: 2
ISSUE DATE: June S, 2020
CONTRACT DATE: Oct. 16, 2019
1. Demo. the existing roof framing & layers. Install new roof framing and wood shingle roof as originally
drawn and specified (previously Deduct Alt #3 and portion of Deduct Alt. #1 accepted at time of contract).
Change sill detail from previous 5x8 treated wood sills to more conventional 2x8's. (ADD $74,132.00)
2. Add back into project exterior siding and trim (previously omitted during VE), includes slight modifications
to wood material order.
The original Contract Sum was $ 329,299.00
The net change by previously authorized Change Orders $ 50 200.00
The Contract Sum prior to this Change Order was $ 279,099.00
The Contract Sum will be Increased / DerFeaspel by this Change Order in the amount of $ 163,000.00
The new Contract Sum including this Change Order will be $ 442,099.00
The Contract Time will be Increased / t,,.,.Feas a � Unehanged by 100 days.
The date of Substantial Completion as of the date of this Change Order therefore is: March 7, 2021(360 +100
460 days from the Written Notice to Proceed of December 2, 2019)
ATTACHMENTS:
Revival Architecture, Inc. Ellingson Contracting City of Fayetteville
ARCHITECT (firm name) CONTRACTOR (firm name) OWNER (firm name)
301 Main St, Suite 203
North Little Rock, AR 72114
PO Box 7202
Siloam SorinRs. AR 72761
- -J '
BY (signature)
Mr. David Ellingson, Owner
113 West Mountain St.
Fayetteville, AR 72701
BY (signature)
PROJECT:
A Restoration of the Historic
Woolsey Farmstead
OWNER:
City of Fayetteville
113 W. Mountain St.
Fayetteville, AR 72701
REVIVAL
ARCH ITECTURE
301 V9a111 Su-cct. SWIG 203
North Lade Rock. All 71 114
50 1.951.3316
www.revivalarch.com
PROPOSAL REQUEST
FROM ARCHITECT:
Revival Architecture, Inc.
301 Main St. Suite 203
N. Little Rock, AR 72114
TO CONTRACTOR:
Ellingson Contracting
108 E. University St.
Siloam Springs, AR 72761
PROPOSAL REQUEST NO: 1
REVISED
ISSUE DATE: May 1, 2020
CONTRACT DATE: Oct. 16, 2019
This Proposal Request is not a Change Order or directive to proceed with the work. It is a request for
information related to the proposed change as outlined below. Do not proceed with the work described below
until receiving a written Change Order.
DESCRIPTION: Provide separate prices for each item listed, in the form of a credit or add, to include materials and
labor and in accordance with the General Conditions of the Contract as follows:
1. Provide a price to add back into the project contract the demo of the existing roofing layers and framing
and re -installation of new roof framing and wood roof shingles. Note: OMIT originally detailed solid deck
and underloyment. Provide random width, rough sawn %" actual cypress or white oak, no underloyments
except at ridge (refer to detail). Change rake detail to new detail attached 5/A-6.0.
2. Provide a credit to provide double 2x8 rim joists/beams in lieu of 5x8 sills previously detailed. Use hot
dipped galvanized joist hangers for new 2x8 floor joists as originally drawn.
ATTACHMENTS: Revised floor plan A-1.1 with revised foundation detail dated March 20, 2020. Revised roof
plan and details sheet A-6.0 dated May 1, 2020.
ISSUED BY THE ARCHITECT:
(Si a ure)
Aaron Ruby, JIA, LEED AP, Principal/Owner
Cc: Wade Abernathy, City of Fayetteville
WALL STUDSAND LINES IN BLUE REPRESENT
ORIGINAL WOOD FRAME, STILL EXTANT.
MATERIALS SHOWN IN RED ARE NOT EXTANT
AND ARE TO BE RE -CONSTRUCTED TO 1840'S PERIOD
ORIGINAL INTERIOR PANELING, THOUGH SHOWN IN RED.
WILL BE KEPT IN PLACE TO GREATEST EXTENT POSSIBLE
,- F PLAN
SCALE IA=1'B'
n
BRIDGE DETAIL �✓
SLALE 3'=t'V /
2 TYPICAL SHINGLE PATTERN DETAIL NOTENTHIS INFORLMTIONISPROVIDFGN'NENROOF CONSTRUCTION TYP. EAVE DETAIL _
N iTD STAIN UAL'BYTIECEOAR,SHAKEASHINGLEdUREAUIrSSBI J yyF
IT EOHEREFORCONVENIENCEP,,DUTMCIOR-1 ,-
'IMF FAMIII NR WITH NFORLN CUNTAINFD WITHIN THIS
— .'ATIONANDKEEPACOPYOFIIAIf.BITEAI.YLTMLB
1 REOUIREAENTS WRE BF STRICTLY ENFORCER RYAHCHIIFCI
�TYP. RAKE DETAIL
5 LE"a•-ra•
s
rd
N
w
N�N
�1
O
O
M
00
u
4.
O
O
Z
U =I
d
tIn O
02
GFNFPAI NOTES
1�1
I, THIS PROJFCT INVOI VFS WOHK ON A HISTORIC BUII DING AND AS SULH.
ml
THE CONTRACTOR SHALL TAKE EXTRA PRECAUTIONS TO ENSURE NO UNNECESSARY
C.DNDIT Tl S EN— THE SI RUC LURE AI ANY IINE THERE SHALL SE A STRICT
NO—INGPp ICYINSIDFUNGNTHEROOFATANYTIME NGCFFNFIANFS
TOROBE HEFNII IEU
3., CONI RACTTIR SHAH BE HESPONSIBUE FOR VLRIFYINGOi E%ISINO CONDITIONS PRIOR
TO NTI MANGENT OFSTRUCTURAI REPAIR NECESSARY TO F%ISTLNGMfiFRS OR OFLNING
CAN BE SEEN FROM THE Alit ANO OUPNT IVE
f.I sII RTNIFINf, SHINCAFSSHALL Rf HAND-0RNEN-NOf%CEPTNNS PFFFR iOSPfCIFK;AHONS
FFA
FOIL FURTHER WFORNATION
C
ellingson contracting
CHANGE ORDER REQUEST
Date: 5/28/2020
To: Aaron Ruby
Revival Architecture
Re: Woolsey Historic Farmhouse Renovation
535 S. Broyles Ave, Fayetteville, AR
Fayetteville, AR 72701
Change Order Request #1
Description of Proposed Change:
Ellingson Contracting
PO Box 7202
Siloam Springs, AR 72761
PR #1: Adding Back Project Scope of Work that was Originaly deducted from Contract Agreement:
-Add back in Roof Demo and Framing
-Add back in Roof Shingle Work, with 3/4" slats under shingles.
-Revisions to Rake and Ridge details.
-Revisions to Sill Framing details.
-Add in General Conditions, Equipment, and 60 additional days of Contract Time for Work.
The total cost of this proposal is as follows:
Alternate #3 - Roof Removal & Reframing $27,078.00
Roofing Revisions - Labor $9,563.00
Roofing Revisions - Material $7,041.93
Sill Framing Revisions -$2 095.63
Gen. Cond. - 2 months @ $9801 - From Bid $19,602.00
Equipment - 2 months @ $2500 - From Bid $5,000.00
Sub Total $66,189.30
Bond & Insurance from Bid (2.S% & 1.5%) $2,647.57
Mark -Up (8%) $5,295.14
Lump Sum Total $74 132
Upon your approval, we intend to make this change/addition immediately.
If you have any questions please feel free to contact me.
Sincerely,
O
David R. Ellingson
Ellingson Contracting Name
Mobile: 479-215-6889 Signature
Date
Acceptance of Change
Change Order Request #1
Line Item Break -Out
Lump Sum Changes
Alt. #3 from Original Bid - Roof Removal & Reframing $ 27,078.00
$ 27,078.00
Labor
Deduct Plywood Roof Decking
$
(786.00)
Deduct Original Roof Underlayment
$
(262.00)
Add random width 3/4" rough saw Cypress
$
3,144.00
Add limited underlayment at ridge (new detail)
$
524.00
Add 'cocks comb' at ridge
$
131.00
Deduct/Reduce Overhang at Roof Rake Edges
$
(1,048.00)
Add membrane flashing at Roof Rake Edges
$
524.00
Deduct Lead Flashing at Roof to Chimney Condition
$
(524.00)
Add No 1 Blue Label Grade Western Red Cedar Shingles
$
7,860.00
$
9,563.00
Material
Deduct Plywood Roof Decking
$
(672.00)
Deduct Original Roof Underlayment
$
(185.00)
Add random width 3/4" rough saw Cypress
$
2,310.00
Add limited underlayment at ridge (new detail)
$
52.50
Add 'cocks comb' at ridge
$
37.50
Deduct/Reduce Overhang at Roof Rake Edges
$
(225.00)
Add membrane flashing at Roof Rake Edges
$
78.75
Deduct Lead Flashing at Roof to Chimney Condition
$
(304.00)
Add No 1 Blue Label Grade Western Red Cedar Shingles
$
5,949.18
$
7,041.93
Sill Framing Revisions
Omit Original Timber Beams
$
(1,745.00)
Add standard 2x8 framing with hangers
$
400.00
Labor Reduction
$
(750.63)
$
(2,095.63)
Equipment
Equipment - 2 months @ $2500 - From Bid
$
5,000.00
$
5,000.00
General Conditions
Gen. Cond. - 2 months @ $9801 - From Bid $ 19,602.00
$ 19,602.00
PROJECT:
A Restoration of the Historic
Woolsey Farmstead
OWNER:
City of Fayetteville
113 W. Mountain St.
Fayetteville, AR 72701
REVIVAL
ARCHITECTURE
301 Main Street, Suite 203
North Little Rock, AR 72114
501.951.3316
www.revivalarch.com
PROPOSAL REQUEST
FROM ARCHITECT:
Revival Architecture, Inc.
301 Main St. Suite 203
N. Little Rock, AR 72114
TO CONTRACTOR:
Ellingson Contracting
108 E. University St.
Siloam Springs, AR 72761
PROPOSAL REQUEST NO: 2
ISSUE DATE: May 1, 2020
CONTRACT DATE: Oct. 16, 2019
This Proposal Request is not a Change Order or directive to proceed with the work. It is a request for
information related to the proposed change as outlined below. Do not proceed with the work described below
until receiving a written Change Order.
DESCRIPTION: Provide separate prices for each item listed, in the form of a credit or add, to include materials and
labor and in accordance with the General Conditions of the Contract as follows:
1. Provi to add windows and doors as originally detailed sheets A-5.0 and AA-,5.1,ddgtPd�ltrn��
28,2019, though in alw&enf-gun tity than previously shown. Refferenncc �cevrou5►y issued, revised sheet A-
2.0 dated April 13, 2020 and previously is o on7 sheet A-1.1 dated March 19, 2020, for
updated quantity and placement. _
2. Provide a price g, trim and roofing (steps, handrail, ramp exclude �d rear porches as
A-
3. Provide a price for exterior siding and trim as originally detailed and specified, in species, sizes and
qualities to be coordinated and negotiated.
ATTACHMENTS:
ISSUED BY THE ARCHITECT:
-- (NI,
(Si a ure)
Aaron Ruby, JIA, LEED AP, Principal/Owner
Cc: Wade Abernathy, City of Fayetteville
Date:
To:
Ellingson Contracting
ellingson contracting PO Box 7202
Siloam Springs, AR 72761
CHANGE ORDER REQUEST
Aaron Ruby
Revival Architecture
5/28/2020 rev
Re: Woolsey Historic Farmhouse Renovation
535 S. Broyles Ave, Fayetteville, AR
Fayetteville, AR 72701
Change Order Request #4
Description of Proposed Change:
PR #2 - Item #3 - Exterior Siding and Trim
-Pricing for orginally detailed and specified work.
-Credit for anticipated material and labor efficiency modifications.
-Add in General Conditions, Equipment, and 40 additional days of Contract Time for Work.
The total cost of this proposal is as follows:
Labor
$26,785.50
Material
$37,185.00
Gen. Cond. - 1.25 months @ $9801 - From Bid
$12,251.25
Equipment - 1.25 months @ $2500 - From Bid
$3,125.00
Sub Total
$79,346.75
Bond & insurance from Bid (2.5% & 1.5%)
$3,173.87
Mark -Up (8%)
$6,347.74
Lump Sum Total
$88,868
Upon your approval, we intend to make this change/addition immediately.
If you have any questions please feel free to contact me.
Sincerely,
� iz at
David R. Ellingson Acceptance of Change
Ellingson Contracting Name
Mobile: 479-215-6889 Signature
Date
Change Order Request #4
Line Item Break -Out
Labor
Exterior Siding and Trim - Values from Original Bid $ 31,440.00
Credit for Potential Labor Savings on Siding Methods $ (4,654.50)
$ 26,785.50
Exterior Siding and Trim - Values from Original Bid
Credit for Material Modifications and Efficiency
Equipment - 1.25 months @ $2500 - From Bid
Gen. Cond. - 1.25 months @ $9801 - From Bid
Material
$
39,465.00
$
(2,280.00)
$
37,185.00
Equipment
$ 3,125.00
$ 3,125.00
General Conditions
$ 12,251.25
$ 12,251.25