HomeMy WebLinkAbout160-20 RESOLUTION113 West Mountain Street
Fayetteville, AR 72701
(479) 575-8323
Resolution: 160-20
File Number: 2020-0416
BID #20-30 MIDLAND INDUSTRIAL SERVICES, LLC:
A RESOLUTION TO AWARD BID #20-30 AND AUTHORIZE A CONTRACT WITH
MIDLAND INDUSTRIAL SERVICES, LLC IN THE AMOUNT $1,036,491.85 FOR THE
CONSTRUCTION OF CRITICAL ELECTRICAL UPGRADES AT THE NOLAND WATER
RESOURCE RECOVER FACILITY
WHEREAS, the electrical systems and components at the Noland Water Resource Recovery Facility
are aging and need frequent repair and a comprehensive design of necessary upgrades has been
completed by Allgeier, Martin and Associates, Inc.; and
WHEREAS, the project will be constructed in two phases, with the first phase addressing
higher -voltage components.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby awards Bid #20-30 and
authorizes Mayor Jordan to sign a contract with Midland Industrial Services, LLC in the amount of
$1,036,491.85 for the construction of critical electrical upgrades at the Noland Water Resource
Recovery Facility.
PASSED and APPROVED on 6/4/2020
Page 1 Printed on 618120
Resolution 160-20
File Number 2020-0416
``III1111111I/I��
Attest: �� ARK, I T RFq
0,4-' •;G�'•�
FAYETTEVILLE :
Kara Paxton, City Clerk Treasurer'%�zq • q
RKAf�ISPS ' .`b
Page 2 Printed on 618120
City of Fayetteville, Arkansas 113 West Mountain Street
Fayetteville, AR 72701
- (479) 575-8323
Text File
File Number: 2020-0416
Agenda Date: 6/2/2020 Version: 1 Status: Passed
In Control: City Council Meetinq File Type: Resolution
Agenda Number: C 5
BID #20-30 MIDLAND INDUSTRIAL SERVICES, LLC:
A RESOLUTION TO AWARD BID #20-30 AND AUTHORIZE A CONTRACT WITH MIDLAND
INDUSTRIAL SERVICES, LLC IN THE AMOUNT $1,036,491.85 FOR THE CONSTRUCTION OF
CRITICAL ELECTRICAL UPGRADES AT THE NOLAND WATER RESOURCE RECOVER
FACILITY
WHEREAS, the electrical systems and components at the Noland Water Resource Recovery Facility are
aging and need frequent repair and a comprehensive design of necessary upgrades has been completed by
Allgeier, Martin and Associates, Inc.; and
WHEREAS, the project will be constructed in two phases, with the first phase addressing higher -voltage
components.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby awards Bid #20-30 and
authorizes Mayor Jordan to sign a contract with Midland Industrial Services, LLC in the amount of
$1,036,491.85 for the construction of critical electrical upgrades at the Noland Water Resource Recovery
Facility.
City of Fayetteville, Arkansas Page 1 Printed on W512020
Tim Nyander
Submitted By
City of Fayetteville Staff Review Form
2020-0416
Legistar File ID
6/2/2020
City Council Meeting Date - Agenda Item Only
N/A for Non -Agenda Item
5/14/2020
Submitted Date
Action Recommendation:
WASTEWATER TREATMENT (730)
Division / Department
Staff recommends awarding Bid #20-30 and approving a construction contract with Midland Industrial Services, LLC
in the amount of $1,036,491.85 for construction of critical electrical upgrades at the Noland Water Resource
Recovery Facility (WRRF).
Budget Impact:
5400.730.5800-5400.00 Water and Sewer
Account Number
Fund
02032.1
WWTP Building Improvements
Project Number
Project Title
Budgeted Item? Yes
Current Budget
$ 3,207,504.00
Funds Obligated
$ 1,067,314.69
Current Balance
r—
$ 2,140,189.31
Does item have a cost? Yes
Item Cost
$ 1,036,491.85
Budget Adjustment Attached? No
Budget Adjustment
$ -
Remaining Budget $ 1,103,697.46
V20180321
Purchase Order Number: Previous Ordinance or Resolution #
Change Order Number:
Original Contract Number:
Comments:
Approval Date:
CITY OF
FAYETTEVILLE
ARKANSAS
MEETING OF JUNE 2, 2020
TO: Mayor and City Council
THRU: Susan Norton, Chief of Staff
Tim Nyander, Utilities Director
FROM: Corey Granderson, Utilities Engineer
DATE: May 13, 2020
CITY COUNCIL MEMO
SUBJECT: Bid #20-30, Midland Industrial Services, LLC — Construction Contract for
Noland WRRF Electrical Installation
RECOMMENDATION:
Staff recommends awarding Bid #20-30 and approving a construction contract with Midland
Industrial Services, LLC in the amount of $1,036,491.85 for construction of critical electrical
upgrades at the Noland Water Resource Recovery Facility (WRRF).
BACKGROUND:
On April 22, 2020 the City of Fayetteville accepted sealed competitive bids for the Noland
WRRF Electrical Installation project. Midland Industrial Services, LLC submitted the lowest bid.
All bids are shown here:
Axis Electric, LLC $1,719,300.00
Fleming Electric, Inc. $1,431,000.00
Midland Industrial Services, LLC $1,036,491.85
Multi Craft $2,217,278.50
Oil Capital Electric $2,008,704.00
DISCUSSION:
The electrical systems and components at the Noland WRRF are aging, do not meet modern
safety codes, and need frequent repair. A comprehensive design of necessary upgrades was
completed by Allgeier, Martin and Associates, Inc. and the project will be constructed in two
phases. This phase includes the higher -voltage components.
BUDGET/STAFF IMPACT:
Funds were budgeted and are available for this project in the WWTP Building Improvements
account within the Water and Sewer fund.
Attachments:
Recommendation of Award from Allgeier-Martin
Certified Bid Tab, Bid #20-30
Agreement
Mailing Address:
113 W. Mountain Street www.fayetteville-ar.gov
Fayetteville, AR 72701
U
� ALLGEIER, MARTIN and ASSOCIATES, INC.
Consulting Engineers
May 6, 2020
Mr. Cory Granderson, P.E.
City of Fayetteville
113 West Mountain St.
Fayetteville, AR 72701
Re: Fayetteville
2020 Noland VW TP Electrical Upgrade Contract
Dear Mr. Granderson:
Enclosed is a copy of the bid tabulation and our recommendation for the 2020 Noland WWTP
Electrical Upgrade contract.
We recommend Midland Industrial Service, LLC with a bid of $1,036,491.85.
Sincerely,
ALLGEIER, MARTIN and ASSOCIATES, INC.
A. Brent Corwin, P.E.
Electrical Project Manager
ABC/db
Enclosures
cc Tim Nyander
CORPORATE vvwwarnce.corn
7231 East 24th Street Joplin, MO 648041417.680.7200 Joplin • Kansas City + Rolla • Sprirxjfield
CITY of
PAYETTSVILLN
Bid 20-30, Construction - Noland WWTP Electrical Install
ARKAUS
ARKAIiiRAf
Midland
industrial
A■is Electric, U.0
Fleming
Electric, Inc.
Services, LLC
Multi
Craft
Oil Capital Electric
Total Cost
$ 1,719,300.0
$ 1,431,000.0
$ 1,036,491.85
$ 2,217,278.5
$ 2,008,704.0
Selected 4
0
0
27
0
0
Selected ($)
$ 0
$ 0
$ 1,036,491.85
$ 0
$ 0
# locked
Items
Selected
Lowest
QuantityRequired
UnitofMeasure
UnitPrice
TotalCost
UnitPrice
TotalCost
UnitPrice
TotalCost
UnitPrice
TotalCost
UnitPrice TotalCost
Backup Generators this includes fuel, maintenance, rental
'
#1.1 FALSE
and all operating costs to operate
$ 53,724.0
$ 53,724.0
1
LS
$ 255,200.0
$ 255,200.0
5 279,500.0
$ 279,500.0
�- $ 53,724.0
$ 53,724.0
$ 954,960.0 $ 954,860.0
$ 717,500.0 $ 717,500.0
All remaining 15kV equipment, cables and ansillary material
111-2 FALSE
to make a complete and functional system
$ 15,072.0
$ 15,072.0
1
LS
$ 239,340.2
$ 239,340.2
5 157,508.75 $ 157,508.75
$ 15,072.0
$ 25,072.0
595,500.0
$ 95,500.0
$ 150,300.0 $ 150,300.0
The Labor & Material to completely install the Pre-
#1-3 FALSE
Engineered Metal Building at the Aeriation Basin Bldg.
$ 10,372.0
$ 10,372.0
1
LS
$ 46,200.0
$ 46,200.0
$ 24,000.0
5 24,000.0
$ 10,372,0
$ 10,372.0
$ 11,270.0
$ 11,270.0
$ 19,600.0 $ 19,600.0
The Material only cost for all of the 480-volt switchgear,
motor control centers and distribution panels. This does not
#1-4 FALSE
include any cables or connectors.
$ 324,860.0
$ 268,700.0
1
LS
$ 282,375.5
$ 282,375.5
$ 268,700 0
$ 268,700.0
$ 324,860.0
$ 324,860.0
$ 310,000.0 5 110p00 0
$ 275,500.0 $ 275,500.0
All 480-volt equipment, cables and conduit shown in the
attached drawings beginning at the transformer secondaries
#1-5 FALSE
(Labor Only)
$ 175,000.0
$ 93,000.0
1
LS
$ 218,058.5
$ 218,058.5
;:; $ 204,000.0
$ 204,000.0
$ 175,000.0
$ 175,000.0
$ 93,000 n
$ 93,000.0
$ 263,900.0 $ 263,900.0
All remaining 480-vole equipment, cables and conduit shown
in the attached drawings beginning at the transformer
#1-6 FALSE
secondaries (Material Only)
$ 139,255.0
$ 61,024.0
1
LS
5182,631.63 $ 182,631.63
$ 234,300.0
$ 234,300.0
$ 139,255.0
13 255:0 $ 61,0240
$ 61,024.0
S 249,100.0 $ 249,100.0
#1-7 FALSE
Mobilization ( Shall not Exceed 5%ol total bid price)
$ 47,598.4
$ 47,598.1
1
LS
$ 79:171.11
$ 79,271.77
$ 69,500.0
$ 69,500.0
$ 47,598.4
$ 84,D00.0
$ R4.000.0
$ 76,700.0 $ 76,700.0
#1-8 FALSE
Bonding and Insurance
S 17,SOB.O
$ 2,106.5
1
LS
$ 25,267.0
$ 25,267.0
$ 26,500.0
$ 26,500.0
$ 17,SQD.O $17 A
$ 2,106.5
b206.4i, ,".
$ 27,300.0 $ 27,300.0
#2-1 FALSE
4/0 URD-AL 15kV CONDUCTOR
$ 25,704.0
$ 18,207.0
5355
LF
$ 19.8
$ 106,029.0
' $ 3.8
$ 20,349.0
' $ 4.8
$ 25,704.0
?5 23
$ 123,165 0 ;, S 3.4 6 Waw =.
#2-2 FALSE
15-UG17-1500
$ 21,429.0
$ 12,800.0
4
EA
$ 6,R20.0
$ 27,280.0
$ 4,200.0
$ 16,800.0
$ 5,357.0
$ 21,428.0
' $ 3,500.0
$ 14,000.0
$ 1,200.0 $04*
#2-3 FALSE
15-UG17-750
$ 10714.0
$ 5,720.0
2
EA
$ 2,R60.0
$ 5,720.0
$ 4,000.0
$ 8,000.0
$ 5,357.0
$ 10,714.0
$ 3,000.0
S 6,000.0
$ 2,870.0 $ 5,740.0
#2-4 FALSE
15-UG17-500
$ 21:428.0
$ 10,120.0
4
EA
$ 2,860.0
$ 11,140,D
$ 3,800.0
$ 15,200.0
$ 5,357.0
$ 21,428.0
$ 5,500.0
$ 22,000.0
$ 2,530.0
#2-5 FALSE
PAD WORK (Labor and Material)
$ 34,104.0
$ 8,800.0
8
EA
$ 1,100.0
$8,800.0
$ 2,750.0
$ 22,000.0
$ 4,263.0
$ 34,104.0
; $ 10,250.0
$ 92,000.0
". $ 7,785.0 $ 62,280.0
#2-6 FALSE
UC1
$ 0
$ 0
1
EA
$ 1,650.0
$ 1,650.0
$ 1,500.0
$ 1,500.0
$ 0
$ 0
I' $ 4,700.0
$ 4,700.0
; $ 3,650.0 $ 3,650.0
#2-7 FALSE
15-UM33A
$ 8,995.0
$ 2,600.0
1
EA
$ 4,620.0
$ 4,620.0
$ 2,600.0
$ 2,600.0
$ 8,995.0
$ 8,995.0
$ 12,555.0
$ 12,555.0
: $ 3,539.0 $ 3,539.0
#2-8 FALSE
UM48-2
$ 5,746.0
$ 5,746.0
13
EA
S 1,078.0
$ 14,014.0
$ 5U0
$ 6,500.0
$ 442
$ 5,746.6
$ 566
$ 7,358.0
$ 1,087.0 $ 14,131.0
#2-9 FALSE
VISTA-413
$ 17,930.0
$ 2,400.0
1
EA
$ 20,900.0
$ 20,900.0
$ 2,400.0
$ 2,400.0
$ 17,930.0
$ 17,930.0
$ 6,000.0
$ 6,000.0
$ 5,794.0 $ 5,794.0
#2-10 FALSE
VISTA-624
$ 20,229.0
$ 3,200.0
1
EA
$ 23,100.0
$ 23,100.0
$ 3,200.0
$ 3,200.0
$ 20,229.0
$ 20,229.0
, $ 7,000.0
$ 7,000.0
$ 21,640.0 $ 21,640.0
#2-11 FALSE
4" Conduit
$ 2,565.0
$ 703.0
95
FT
$ 16.5
$ 1,567.5
$ 13
$ 1,235.0
$ 27
$ 2,565.0
$ 57
$ 5,415.0
5 7 4 $ 703.0
#2-12 FALSE
#4 AWG
$ 4,349.45
$ 1,445.0
1445
LF
$ 9.9
$ 14,305.5
$ 1.25
$ 1,806. 25
$ 3.01
$ 4,349.45
$ 37
$ 53,465 0
5 1 $1,445A
#2-13 FALSE
1/0 AWG
$ 390
$ 195.0
130
LF
$ 11.88
$ 1,544.4
$ 1.5
$195.0
$ 3
$ 39D
' $ 48
$ 6,240.0
,, $ 1.7 $ 221.0
#2-14 FALSE
4/0 URD-AL 15kV CONDUCTOR
$ 21,480.0
$ 18,795.0
5370
LF
5 16.5
$ 88,605.0
5 3.8
$ 20,406.0
$ 4
$ 21,480.0
"I $ 23
$ 123,S10 0
; $ 3.5 $ 32,79"
#2-15 FALSE
UG17-1500
$ 27,198.0
$ 21,930.0
6
EA
$ 5,280.0
$ 31,680.0
$ 4,200.0
$ 25,200.0
$ 4,533.0
$ 27,198.0
$ 3,685.0
$ 22,110.0
., S 3,655.0 $ 21,M4 ,
#2-16 FALSE
UG17.500
$ 18,900.0
$ 6,600.0
4
EA
$ 1,650.0
$ 6,600.0
53,800.0
$ 15,200.0
$ 4,725.0
$ 18,900.0
$ 3,750.0
$ 15,000.0
$ 2,970.0 $ 11,880.0
#2-17 FALSE
UCl
$ 0
$ 0
1
EA
$ 1, 120.0
$ 1,320.0
$ 1,500.0
$ 1,500.0
$ 0
$ 0
` $ 4,000.0
$ 4,000.0
$ 4,635.0 $ 4,635.0
#2-18 FALSE
UM3E-3 (Fig. 7)
$ 9,450,0
$ 2,400.0
2
EA
59,1500
$ 18,700.0
$ 1,200.0
$ 2,400.0
$ 4,725.0
$ 9,450.0
$ 42,500.0
$ 85,000.0
$ 4,929.0 $ 9,858.0
#2-19 FALSE
UM48-2
$ 2,500.0
$ 500
1
EA
$ 10800
$ 3,080.0
5 500
$ SOO
$ 2,500.0
$ 2,500.0
'S $ 6,000.0
$ 6,000.0
$ 1,436.0 $ 1,436.0
Unofficial results
.� .....
.YE'...TTE TEVIILE
Bid 20-30, Construction - NWWTP Electrical
Install - Bid 20-30, Construction - NWWTP
Electrical Upgrade
Project Overview
Project Details
Reference ID Bid 20-30, Construction - NWWTP Electrical Install
Project Name Bid 20-30, Construction - NWWTP Electrical Upgrade
Project Owner Les McGaugh
Project Type ITB
Department Purchasing
Amount Certified $1,100,000
The City of Fayetteville, AR is accepting sealed bids from properly
licensed professionals for the 2020 Noland WWTP Electrical Upgrade
contract. The Work under this Contract may include, but is not limited to,
Project Description the replacement of an estimated 1,800 feet of 15kV underground cable.
Also included are the replacement of ten 12.470-480/277 V pad -mounted
transformers, two 15kV pad -mounted switchgear. Replacement of four
480-volt switchboards and multiple 480 V underground service cables as
further defined in the Contract Documents.
Open Date Feb 24, 2020 12:00 PM CST
Close Date Apr 22, 2020 2:00 PM CDT
Highest Scoring Supplier Score
.� EViLLE
......
ARKANLAS
Midland Industrial Services, LLC
Seal status
Requested Information
W-9
Required Signature Form
Bid 20-30, Construction -
NWWTP Electrical Install (BT-
48UY)
Arkansas Contractor's License
Arkansas Secretary of State
Filing #
Bid Bond
Conflict of Interest
Unsealed on
Apr 22, 2020 2:02 PM CDT
Apr 22, 2020 2:02 PM CDT
Apr 22, 2020 2:02 PM CDT
Apr 22, 2020 2:02 PM CDT
Apr 22, 2020 2:02 PM CDT
Apr 22, 2020 2:02 PM CDT
100 pts
Unsealed by
Les McGaugh
Les McGaugh
Les McGaugh
Les McGaugh
Les McGaugh
Les McGaugh
# Declaration of Conflict of Interest You have been chosen as a Committee member for this
Evaluation. Please read the following information on conflict of interest to see if you have any
problem or potential problem in serving on this committee. ## Code of Conduct All information
related to submissions received from Suppliers or Service Providers must be kept confidential by
Committee members. ## Conflict of Interest No member of a Committee shall participate in the
evaluation if that Committee member or any member of his or her immediate family: * has direct or
indirect financial interest in the award of the contract to any proponent; * is currently employed by,
or is a consultant to or under contract to a proponent; * is negotiating or has an arrangement
concerning future employment or contracting with any proponent; or, * has an ownership interest in.
or is an officer or director of, any proponent. Please sign below acknowledging that you have
received and read this information. If you have a conflict or potential conflict, please indicate your
conflict on this acknowledgment form with information regarding the conflict. I have read and
understood the provisions related to the conflict of interest when serving on the Evaluation
Committee. If any such conflict of interest arises during the Committee's review of this project. I will
immediately report it to the Purchasing Director.
c x.-
.�
EVILLE
APXANSxxwr+sws
Name Date Signed Has a Conflict of Interest?
Les McGaugh Apr 22, 2020 2:03 PM CDT No
Andrea Foren Apr 24. 2020 1:24 PM CDT No
.� FAY TEVILLE
♦AN4Nf •f
Submissions
Supplier
Date Submitted
Name
Email
Confirmation Code
Fleming Electric, Inc.
Apr 22, 2020 12:53 PM
Jay Noe
jnoe@fleminc.com
Nzg3NTY=
CDT
Multi Craft
Apr 22, 2020 1:55 PM CDT
jerod Bradshaw
jbradshaw@multi-craft. net
Nzg3ODM=
Axis Electric, LLC
Apr 22, 2020 1:13 PM CDT
Jason Kuncl
jkuncl@axis-electric.com
Nzg3Njl=
Oil Capital Electric
Apr 22, 2020 1:18 PM CDT
Richard Morrison
rmorrison@oce.us.com
Nzg3NjY=
Midland Industrial
Services, LLC
Apr 22, 2020 1:15 PM CDT
Amber Ritchie
aritchie@midlandllc.com
Nzg3NjU=
fAV TEVILLE
•o��Ns�s
Scoring Summary
Active Submissions
Total
Supplier / 100 pts
Midland Industrial Services, LLC 100 pts
Fleming Electric, Inc.
72.43 pts
Axis Electric, LLC
60.29 pts
Oil Capital Electric
51.6 pts
Multi Craft 46.75 pts
Within Certified Amount
Total Base Bid
Pass/Fail / 100 pts
Pass 100 pts ($1,036,491.85)
Fail 72.43 pts ($1,431,000.00)
Fail 60.29 pts ($1,719,300.00)
Fail 51.6 pts ($2,008,704.00)
Fail 46.75 pts ($2,217,278.50)
ARKAEVILLE
�nK�NSwsws
Signatures
Name
Les McGaugh
(Project Owner)
Les McGaugh
(Evaluator)
Andrea Foren
(Evaluator)
Andrea
Foren
Signatures
Digitally signed by
Andrea Foren
Date: 2020.04.24
15:13:56-05'00'
CITY OF
FAYETTEVILLE
ARKANSAS
May 6, 2020
Joe Austin, Owner
Midland Industrial Services, LLC
110 N. Center St.
Elkins, AR 72727
Sent via email: office@midlandllc.com
Re: City of Fayetteville, Arkansas; BID 20-30, Construction, Noland WWTP
Electrical Upgrade
Dear Sir,
The City of Fayetteville Arkansas publicly opened bids received on April 22, 2020 for BID
20-30, Construction, Noland WWTP Electrical Upgrade.
Your company is the low bidder. Your bid is $1,036,491.85.
The City of Fayetteville's contract review process requires that you sign the proposed
"Agreement" (DOCUMENT 00500) and provide all required attachments and documents
prior to City staff review.
The staff review process is an internal pdf review by many departments including
budget, accounting, legal, purchasing, City Clerk and Chief of Staff.
In addition to the City staff review, the Fayetteville City Council Water and Sewer
Committee, and then the Fayetteville City Council, will review the proposed contract.
Please complete/fill in and sign, but do not date, the attached copy of DOCUMENT
00500 — AGREEMENT pages 1 — 11 and return to me (pdf preferred).
Please note that this request and your signing of the proposed Agreement does not
guarantee that the City of Fayetteville City Council will approve the contract. This
request does not obligate the City of Fayetteville in any manner, but this request is the
start of the review process for the proposed contract. You will not have an
Agreement/Contract until the City of Fayetteville City Council has approved the
proposed contract and both you and the Mayor of Fayetteville have executed the
approved Agreement/Contract.
Mailing Address:
113 W. Mountain Street www.fayetteville-ar.gov
Fayetteville, AR 72701
The review schedule is proposed as:
Water and Sewer Committee May 12, 2020
City Council Agenda Session May 26, 2020
City Council Meeting June 2, 2020
If possible, I need your signed Agreement and attachments by Thursday May 141h
PDFs are preferred.
I appreciate your help to start the City's contract review process. Please call me and/or
email if you have any questions, or if 1 can assist in any way.
Sincerely,
Corey Granderson, P.E.
Fayetteville Utilities Engineer
479-444-3452
cgranderson(a).fayetteville-ar.gov
Attachments:
Certified Bid Tabulation
DOCUMENT 00500 — AGREEMENT pages 1 — 11
Contractor's Proposal (bid)
DOCUMENT 00500 — AGREEMENT
BETWEEN OWNER AND CONTRACTOR
Contract Name/Title: 2020 Noland W WTP Electrical Upgrade
Contract No.: 20-30, Construction
THIS AGREEMENT is dated as of the IL day of in the year 2020 by and
between The City of Fayetteville, Arkansas and Midland Industrial Services, LLC (hereinafter
called Contractor).
ARTICLE 1- WORK
1.01 Contractor shall complete all Work as specified or indicated in the Contract
Documents. The work under this Agreement includes, but is not limited to:
1.02
A. This project consists of the replacement of approximately 1,800 linear feet of
15kV, 4/0 AL underground cable in conduit. There will be two sets of 15kV
pad -mounted switchgear that will be replaced. There will be ten 12,470-
480/277 V pad -mounted transformers ranging from 500 kVA to 1500 kVA
that will be replaced. Pad work will also be required for existing concrete
pads.
B. Included in this project is the replacement of 480 V entrance cables from the
new transformers to 480 V switchboards and motor control centers. Some
buss duct will be replaced with entrance cables. Several secondary tap boxes
will be installed adjacent to the new transformers. There will be four 480 V
switchboards that will be replaced.
C. Since this project is located at a wastewater treatment plant, it is crucial that
the plant stay in operation. They site has two backup generators and the
capability to bypass certain operations. The Contractor will be required to
provide some backup generation to assist in keeping the plant operational
during various stages of construction. The backup generation will be at the
480 V level.
00500 Agreement 00500- 1
3
DOCUMENT 00500 — AGREEMENT (continued)
1.03 The Contractor agrees to perform the work described in the Contract Documents and
comply with the terms therein for the amounts shown in the Bid Proposal. Refer to
Section 00400-Bid Form for quantifies.
1.04 Any use of a third party dumpster or roll off container shall be procured from the
City of Fayetteville Recycling and Trash Collection Division. Use of a Non -City
dumpster or roll off container is not allowed.
1.05 Contractor is responsible for obtaining all applicable permits. The fees for City of
Fayetteville (only) issued permits shall be waived.
1.06 The Contract may include work in City of Fayetteville right-of-way, ARDOT (State)
right-of-way, railroad right-of-way and in General or Utility Easements.
ARTICLE 2 - ENGINEER
2.01 The Contract Documents have been prepared by Brent Corwin, Brent Corwin with
Allgeier, Martin and Associates, Inc. assumes all duties and responsibilities, and has
the rights and authority assigned to Engineer in connection with completion of the
Work in accordance with the Contract Documents.
2.02 The City of Fayetteville assumes all duties and responsibilities, and has the rights
and authority assigned to The City of Fayetteville as Owner in connection with
completion of the Work in accordance with the Contract Documents.
ARTICLE 3 - CONTRACT TIME
3.01 TIME OF THE ESSENCE:
A. All time limits for milestone, if any, Substantial Completion and completion
and readiness for final payment as stated in the Contract Documents are of
the essence of the Contract.
3.02 DATES FOR COMPLETION AND FINAL PAYMENT:
A. The Work shall be substantially completed within 210 calendar days after the
date when the Contract Times commence to run as provided in the
GENERAL CONDITIONS, and final completion and ready for final
payment within 240 calendar days after the date when the Contract Times
commence to run as provided in the GENERAL CONDITIONS.
3.03 LIQUIDATED DAMAGES:
00500 Agreement 00500-2
DOCUMENT 00500 — AGREEMENT (continued)
A. Owner and Contractor recognize that time is of the essence of this
Agreement and that The City of Fayetteville will suffer financial loss if the
Work is not completed within the time specified above, plus any extensions
thereof allowed in accordance with the GENERAL CONDITIONS. The
parties also recognize the delays, expense, and difficulties involved in
proving the actual loss suffered by The City of Fayetteville if the Work is not
Substantially Completed on time. Accordingly, instead of requiring any such
proof, The City of Fayetteville and Contractor agree that as liquidated
damages for delay (but not as a penalty) Contractor shall pay The City of
Fayetteville Five Hundred Dollars ($500.00) for each calendar day that
expires after the time specified above in Paragraph 3.02 for Substantial
Completion until the Work is Substantially Complete. After Substantial
Completion, if Contractor shall neglect, refuse, or fail to complete the
remaining Work within the time specified in Paragraph 3.02 for completion
and readiness for final payment or any proper extension thereof granted by
The City of Fayetteville, Contractor shall pay The City of Fayetteville Five
Hundred Dollars ($500.00) for each calendar day that expires after the time
specified for completion and readiness for final payment.
ARTICLE 4 - CONTRACT PRICE
4.01 The CITY OF FAYETTEVILLE agrees to pay, and the CONTRACTOR agrees to
accept, as full and final compensation for all work done under this agreement, the
amount based on the unit prices bid in the Proposal (BID FORM) which is hereto
attached, for the actual amount accomplished under each pay item, said payments to
be made in lawful money of the United States at the time and in the manner set forth
in the Specifications.
4.02 As provided in the Contract estimated quantities are not guaranteed, and
determinations of actual quantities and classifications are to be made by ENGINEER
as provided in the General Conditions. Unit prices have been computed as provided
in the Contract Documents.
00500 Agreement 00500-3
DOCUMENT 00500 — AGREEMENT (continued)
4.03 Changes, modifications, or amendments in scope, price or fees to this contract shall
not be allowed without a prior formal contract amendment approved by the Mayor
and the City Council in advance of the change in scope, cost or fees.
Further, there shall be no changes to the scope and/or contract
documents without prior written approval of the Engineer of Record
and the City's designated Professional Engineer.
ARTICLE 5 - PAYMENT PROCEDURES
5.01 SUBMITTAL AND PROCESSING OF PAYMENTS:
A. Contractor shall submit Applications for Payment in accordance with the
GENERAL CONDITIONS. Applications for Payment will be processed by
Engineer as provided in the GENERAL CONDITIONS.
5.02 PROGRESS PAYMENTS, RETAINAGE:
A. The City of Fayetteville shall make progress payments on account of the
Contract Price on the basis of Contractor's Applications for Payment as
recommended by Engineer, on or about the 15th day of each month during
construction. All such payments will be measured by the schedule of values
established in the GENERAL CONDITIONS (and in the case of Unit Price
Work based on the number of units completed) or, in the event there is no
schedule of values, as provided in the General Requirements.
Prior to Substantial Completion, progress payments will be made in
an amount equal to the percentage indicated below, but, in each case,
less the aggregate of payments previously made and less such
amounts as Engineer shall determine, or The City of Fayetteville
may withhold, in accordance with the GENERAL CONDITIONS.
a. 95% of Work Completed (with the balance being retainage). If
Work has been 50% completed as determined by Engineer, and
if the character and progress of the Work have been satisfactory
to The City of Fayetteville and Engineer, The City of
Fayetteville on recommendation of Engineer, may determine that
as long as the character and progress of the Work subsequently
remain satisfactory to them, there will be no additional retainage
on account of Work subsequently completed, in which case the
00500 Agreement 00500-4
DOCUMENT 00500 — AGREEMENT (continued)
remaining progress payments prior to Substantial Completion
will be an amount equal to 100% of the Work Completed less the
aggregate of payments previously made; and
b. 100% of Equipment and Materials not incorporated in the Work
but delivered, suitably stored, and accompanied by
documentation satisfactory to The City of Fayetteville as
provided in the GENERAL CONDITIONS.
5.03 FINAL PAYMENT:
A. Upon final completion and acceptance of the Work in accordance with the
GENERAL CONDITIONS, The City of Fayetteville shall pay the remainder
of the Contract Price as recommended by Engineer and as provided in the
GENERAL CONDITIONS.
ARTICLE 6 - CONTRACTOR'S REPRESENTATIONS
6.01 In order to induce The City of Fayetteville to enter into this Agreement, Contractor
makes the following representations:
A. Contractor has examined and carefully studied the Contract Documents
including the Addenda and other related data identified in the Bid
Documents.
B. Contractor has visited the Site(s) and become familiar with and is satisfied as
to the general, local, and Site conditions that may affect cost, progress,
performance, and furnishing of the Work.
C. Contractor is familiar with and is satisfied as to all federal, state, and local
Laws and Regulations that may affect cost, progress, performance, and
furnishing of the Work.
D. Contractor has carefully studied all:
(1) Reports of explorations and tests of subsurface conditions at or
contiguous to the Site and all drawings of physical conditions in or
relating to existing surface or subsurface structures at or contiguous
to the Site. and
00500 Agreement 00500-5
DOCUMENT 00500 — AGREEMENT (continued)
(2) Reports and drawings of Hazardous Environmental Condition, if
any, at the Site. Contractor acknowledges that The City of
Fayetteville and Engineer do not assume responsibility for the
accuracy or completeness of information and data shown or indicated
in the Contract Documents with respect to Underground Facilities at.
or contiguous to the Site.
E. Contractor has obtained and carefully studied (or assumes responsibility of
having done so) all such additional supplementary examinations,
investigations, explorations, tests, studies, and data concerning conditions
(surface, subsurface, and Underground Facilities) at or contiguous to the Site
or otherwise which may affect cost, progress, performance, and furnishing of
the Work or which relate to any aspect of the means, methods, techniques,
sequences, and procedures of construction to be employed by Contractor and
safety precautions and programs incident thereto.
F. Contractor does not consider that any additional examinations,
investigations, explorations, tests, studies, or data are necessary for the
performing and furnishing of the Work at the Contract Price, within the
Contract Times, and in accordance with the other terms and conditions of the
Contract Documents.
G. Contractor is aware of the general nature of work to be performed by The
City of Fayetteville and others at the Site that relates to the Work as indicated
in the Contract Documents.
H. Contractor has correlated the information known to Contractor, information
and observations obtained from visits to the Site, reports and drawings
identified in the Contract Documents, and all additional examinations,
investigations, explorations, tests, studies, and data with the Contract
Documents.
Contractor has given Engineer written notice of all conflicts, errors,
ambiguities, or discrepancies that Contractor has discovered in the Contract
Documents and the written resolution thereof by Engineer is acceptable to
Contractor.
00500 Agreement 00500-6
DOCUMENT 00500 — AGREEMENT (continued)
J. The Contract Documents are generally sufficient to indicate and convey
understanding of all terms and conditions for performance and furnishing of
the Work.
ARTICLE 7 - CONTRACT DOCUMENTS
7.01 CONTENTS:
A. The Contract Documents which comprise the entire Agreement between The
City of Fayetteville and Contractor concerning the Work consist of the
following and may only be amended, modified, or supplemented as provided
in this Agreement and in the GENERAL CONDITIONS:
1. This Agreement.
2. Exhibits to this Agreement (enumerated as follows):
a. Notice to Proceed.
b. Contractor's Bid.
c. Documentation submitted by Contractor prior to Notice of
Award.
3. Performance, Payment, and other Bonds.
a. The Performance and Payment Bond shall be one hundred
percent (100%).
b. The Contractor shall file the Performance, Payment and
Warranty Bonds at the Washington County Clerk's office prior
to providing a file marked copy of the filed Performance,
Payment and Warranty Bonds to the Owner or Engineer.
4. General Conditions.
5. Supplementary Conditions.
6. Specifications consisting of divisions and sections as listed in Table
of Contents of Project Manual.
7. Drawings consisting of a cover sheet and sheets as listed in the Table
of Contents thereof (Drawings), with each sheet bearing the
following general title:
2020 Noland W WTP Electrical Upgrade
8. Addenda numbers 1-4 inclusive.
00500 Agreement 00500-7
DOCUMENT 00500 — AGREEMENT (continued)
9. The following which may be delivered or issued after the Effective
Date of the Agreement and are not attached hereto: All Written
Amendments and other documents amending, modifying, or
supplementing the Contract Documents pursuant to the GENERAL
CONDITIONS.
ARTICLE 8 - MISCELLANEOUS
8.01 TERMS:
A. Terms used in this Agreement which are defined in the GENERAL
CONDITIONS shall have the meanings stated in the GENERAL
CONDITIONS.
8.02 ASSIGNMENT OF CONTRACT:
A. No assignment by a party hereto of any rights under or interests in the
Contract Documents will be binding on another party hereto without the
written consent of the party sought to be bound; and specifically but without
limitation, moneys that may become due and moneys that are due may not be
assigned without such consent (except to the extent that the effect of this
restriction may be limited by Law), and unless specifically stated to the
contrary in any written consent to an assignment, no assignment will release
or discharge the assignor from any duty or responsibility under the Contract
Documents.
8.03 SUCCESSORS AND ASSIGNS:
A. The City of Fayetteville and Contractor each binds himself, his partners,
successors, assigns, and legal representatives to the other party hereto, its
partners, successors, assigns, and legal representatives in respect to all
covenants, agreements, and obligations contained in the Contract Documents.
8.04 SEVERABILITY:
A. Any provision or part of the Contract Documents held to be void or
unenforceable under any Law or Regulation shall be deemed stricken, and all
remaining provisions shall continue to be valid and binding upon The City of
Fayetteville and Contractor, who agree that the Contract Documents shall be
reformed to replace such stricken provision or part thereof with a valid and
00500 Agreement 00500-8
DOCUMENT 00500 — AGREEMENT (continued)
enforceable provision that comes as close as possible to expressing the
intention of the stricken provision.
8.05 FREEDOM OF INFORMATION ACT:
A. City contracts and documents prepared while performing city contractual
work are subject to the Arkansas Freedom of Information Act. If a Freedom
of Information Act request is presented to the City of Fayetteville, the
contractor will do everything possible to provide the documents in a prompt
and timely manner as prescribed in the Arkansas Freedom of Information Act
(A.C.A. §25-19-101 et. seq.). Only legally authorized photocopying costs
pursuant to the FOIA may be assessed for this compliance.
8.06 LIENS:
A. No liens against this construction project are allowed. Arkansas law
(A.C.A. §§ 18-44-501 through 508) prohibits the filing of any mechanics' of
materialmen's liens in relation to this public construction project. Arkansas
law requires and the contractor promises to provide and file with the Circuit
Clerk of Washington County a bond in a sum equal to the amount of this
contract. Any subcontractor or materials supplier may bring an action for
non-payment or labor or material on the bond. The contractor promises to
notify every subcontractor and materials supplier for this project of this
paragraph and obtain their written acknowledgement of such notice prior to
commencement of the work of the subcontractor or materials supplier.
IN WITNESS WHEREOF, The City of Fayetteville and Contractor have signed this Agreement
in quadruplicate. One counterpart each has been delivered to Contractor. Three counterparts
each has been retained by The City of Fayetteville. All portions of the Contract Documents have
been signed, initialed, or identified by The City of Fayetteville and Contractor.
00500 Agreement 00500-9
� a�casr�r
04
e a
w1P �y
�RXAttB�`�
Arkansas Secretary of State
Mark Martin
State Capitol Building • Little Rock, Arkansas 72201-1094 . 501.682.3409
I, Mark Martin, Arkansas Secretary of State of the State of Arkansas, and as such, keeper of the
records of domestic and foreign corporations, do hereby certify that the following and hereto
attached instrument of writing is a true and perfect copy of
Articles of Organization
Filed in this office on Dec 31, 2009
MIDLAND INDUSTRIAL SERVICES LLC
In Testimony Whereof, I have hereunto set my hand
and affixed my official Seal. Done at my office in the City
of Little Rock, this 15th day of September, 2016.
Mark Martin
Ckansas Secretary�of State
By: _
Juli Butler
Arkansas SecretC Eyta3al 0bbu1Et)12CQ002 -Uate Filed: 12-31-2009 12:10 PM - Total Pages: 2
The undersigned authorized manager or member or person
forming this Limited Liability Company under the Small Business
Entity Tax Pass Through Act, Act 1003 of 1993, adopts the
following Articles of Organization of such Limited Liability
Company:
First: The Name of the Limited Liability Company is:
MIDLAND INDUSTRIAL SERVICES LLC
Must contain the words "Limited Liability Company," "Limited
Company," or the abbreviation "L.L.C.," "L.C.," "LLC," or "LC."
The word "Limited" may be abbreviated as "Ltd.", and the "Company"
may be abbreviated as "Co." Companies which perform Professional
Service MUST additionally contain the words "Professional Limited
Liability Company," "Professional Limited Company," or the
abbreviations "P.L.L.C.," "P.L.C., "PLLC," or "PLC" and may not
contain the name of the person who is not a member except that of a
deceased member. The word "Limited" may be abbreviated as "Ltd."
and the word "Company" may be abbreviated as "Co."
Second: Address of registered office of the Limited Liability Company
which may be, but need not be, the place of business shall
be:
Street Address: 604 PUPPY CREEK ROAD
city: LOWELL
State: AR ZIP: 72745-
Third: The name of the registered agent and the physical business
address of said agent shall be:
Name: DAVID LEE STONE
Street Address: 604 PUPPY CREEK ROAD
City: LOWELL
State: AR ZIP: 72745-
Fourth: IF THE MANAGEMENT OF THIS COMPANY IS VESTED IN A
MANAGER OR MANAGERS, A STATEMENT TO THAT
EFFECT MUST BE INCLUDED IN THE SPACE PROVIDED OR
BY ATTACHMENT:
MANAGEMENT OF THIS COMPANY IS VESTED
IN A MANAGER OR MANAGERS
The Name of the person(s) authorized to execute this
document:
Name 1: DAVID LEE STONE
Name 2: JOSEPH EARL AUSTIN
Name 3:
CERTIFIED COPY
Signature of authorized manager, member or person
forming this Company:
DAVID LEE STONE
DOCUMENT 00500 — AGREEMENT (Continued)
This Agreement will be effective on �(�l./l� , 2070which is the
Effective Date of the Agreement.
CONTRACTOR: CITY OF FAYETTEVILLE
'Title:__� ) uo V) ef Title: Ma
Contractor shall attach evidence of authority to sign.
If Contractor is a corporation, corporate entity or LLC, Contractor shall attach Corporate
Resolution authorizing Contractor's signature and execution of Agreement.
Further if Contractor is a corporation, corporate entity or LLC, Contractor shall also attach a copy
of the Contractor's Articles of Incorporation and a copy form the Arkansas State Secretary of
State to document that the corporation, corporate entity or LLC is in current "Good Standing"
with the State of Arkansas and such entity is permitted to perform work in the State of Arkansas.
Amber Rkchle
Notary Public
Madison County, Arkansas
Comm. E Ma 10, 2026
CommisAwma 0696000 (SEAL)
Attest— Attest
00500 Agreement 00500 - 10
DOCUMENT 00500 — AGREEMENT (continued)
Address for giving notices Address for giving notices
113 W. Mountain St.
Favetteville AR 72701
License No.
Agent for Service of process
(Type or legibly print)
ature)
Contractor shall attach evidence of authority of Agent for Service process to sign. If Contractor
is a corporation, corporate entity or LLC, Contractor shall attach Corporate Resolution
authorizing Agent for Service process authority to sign.
(If Contractor is a corporation, corporate entity
or LLC, attach evidence of authority to
sign.)
Approved as to Form:
By:
Attorney For:
END OF DOCUMENT 00500
00500 Agreement 00500- 11
EXECUTION OF BID -
Actual specification of any deficient item shall be noted on the bid sheet or separate attachment. If specifications of item bid
differ from provided literature, deviation shall be documented and certified by the manufacturer as a regular production
option.
Upon signing this Bid, the bidder certifies that:
1. He/she has read and agrees to the requirements set forth in this proposal, including specifications, terms,
standard conditions, and any pertinent information regarding the articles being bid on.
2. Unless otherwise noted and explained, the unit bid and listed meets or exceeds all of these requirements as
specified by The City of Fayetteville.
Pursuant Arkansas Code Annotated §25-1-503, the Contractor agrees and certifies that they do not currently
boycott Israel and will not boycott Israel during any time in which they are entering into, or while in contract, with
any public entity as defined in §25-1-503. If at any time during contract the contractor decides to boycott Israel,
the contractor must notify the contracted public entity in writing.
4. The Bidder can and will comply with all specifications and requirements for delivery, documentation and support
as specified herein.
5. I, as an officer of this organization, or per the attached letter of authorization, am duly authorized to certify the
information provided herein is accurate and true.
6. Bidder shall comply with all State and Federal Equal Opportunity and Non -Discrimination requirements and
conditions of employment in addition to all federal, state, and local laws.
7. Bidder shall disclose any possible conflict of interest with the City of Fayetteville, including, but not limited to, any
relationship with any City of Fayetteville employee. Response shall disclose if a known relationship exists between
any principal or employee of your firm and any City of Fayetteville employee or elected City of Fayetteville official.
If no relationship exists, this should also be stated in your response. Failure to disclose such a relationship may
result in cancellation of a purchase and/or contract as a result of your response.
X 1.) NO KNOWN RELATIONSHIP EXISTS
2.) RELATIONSHIP EXISTS (Please explain):
8. Bidder will perform the Work in compliance with all applicable trench safety standards set forth in Occupational
Safety and Health Administration (OSHA) Part 1926 — Subpart P — Excavations.
9. As A bidder on this project, you are required to provide debarment/suspension certification indicating that you
are in compliance with the below Federal Executive Order. Certification can be done by completing and signing
this form.
a. Federal Executive Order (E.O.) 12549 "Debarment and Suspension" requires that all contractors receiving
individual awards, using federal funds, and all sub -recipients certify that the organization and its
principals are not debarred, suspended, proposed for debarment, declared ineligible, or voluntarily
excluded by any Federal department or agency from doing business with the Federal Government.
City of Fayetteville, AR
Page 1 of 2
b. Your signature below certifies that neither you nor your principal is presently debarred, suspended,
proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction
by any federal department or agency.
Unsigned bids will be rejected. Items marked * are mandatory for consideration.
*NAME OF FIRM:Midland Industrial Services, LLC
Purchase Order/Payments shall be issued to this name
*D/B/A or Corporation Name Midland Industrial Services, LLC
*BUSINESS ADDRESS: 1 1 O N Center St
*CITY: Elkins
*PHONE: 479-296-6014
*E-MAIL: office@midlandllc.com
*BY: (PRINTED NAN
*AUTHORIZED SI&
*TITLE: O W n e
*STATE: AR *ZIP: 72727
FAX:479-296-6091
DUNS NUMBER: CAGE NUMBER:
*TAX ID NUMBER: 27-1 592822 AR CONTRACTORS LICENSE #021 0060520
Acknowledge Addendums:
Addendum No. 1 Dated: 3/26/20 Acknowledged by: Jeff Smith
Addendum No. 2 Dated: 3/26/20 Acknowledged by: Jeff Smith
Addendum No. 3 Dated: 4/1 /20 Acknowledged by: Jeff Smith
Addendum No. Dated: Acknowledged by
City of Fayetteville, AR
Page 2 of 2
Responses Midland Industrial Services, LLC
Success: All data is valid!
(— Numeric
Lump Sum Bid Schedule
Backup Generators - this includes fuel,
Success: All values provided
91.1
maintenance, rental and all operating costs to
I
LS
$ 53,724.00
$ 53,724.00
operate
All remaining 15kV equipment, cables and
Success: All values provided
»'.2
ansillary material to make a complete and
1
LS
$ 15,072.00
$ 15,072.00
functional system
The Labor & Material to completely install the
Success: All values provided
#1-3
Pre -Engineered Metal Building at the Aeriation
1
LS
$ 10,372.00
$ 10.372.00
Basin Bldg.
The Material only cost for all of the 480-volt
Success: All values provided
#1-4
switchgear, motor control centers and
1
LS
$ 324,860.00
$ 324,860-00
distribution panels. This does not include any
cables or connectors.
All 480-volt equipment, cables and conduit
Success: All values provided
#1-5
shown in the attached drawings beginning at
1
LS
S 175,000.00
$ 175.000 00
the transformer secondaries (Labor Only)
All remaining 480-volt equipment, cables and
Success: All values provided
91-6
conduit shown in the attached drawings
1
LS
$ 139,255.00
$ 139,255.00
beginning at the transformer secondaries
(Material Only)
Success: All values provided
p1.7
Mobilization ( Shall not Exceed 5% of total bid
1
LS
$47,598.40
$47,598.40
price)
Success: All values provided
41-8
Bonding and Insurance
1
LS
$ 17,500.00
$ 17.500.00
Per Unit Price Schedule
Success: All values provided
92-1
4/0 URD-AL 15kV CONDUCTOR
5355
LF
$4.80
$25.704.00
Success: All values provided
42.2
15-UG17-1500
4
EA
$ 5,357.00
$ 21.428.00
Success: All values provided
42-3
15-UG17.750
2
EA
$ 5,357.00
$ 10,714.00
Success: Ail values provided
15-UG17-500
4
EA
S 5.357.00
$ 21.428.00
Success: All values provided
:2-5
PAD WORK (Labor and Material)
8
EA
54.263.00
$ 34.104.00
Success: All values provided
#2.6
UC1
1
EA
$0.00
$0.00
Success: All values provided
#2-7
15-UM33A
1
EA
$8.995.00
$8,995.00
Success: All valu•s prodded
#2-8
UM48.2
13
EA
$ 442.00
$ 5.746.00
Surreys: All values provided
42.9
VISTA-413
1
EA
$17,930.00
$17.930.00
Success: All values provided
#2-10
VISTA-624
1
EA
$ 20.229.00
$ 20,229.00
Success: All values pro,ded
#2-11
4"Conduit
95
FT
$27.00
$2.565.00
Success: All values provided
#2-12
#4 AWG
1445
LF
$ 3.01
$ 4.349.45
Succe: s: All values provided
#2.13
1/0 AWG
130
LF
$3.00
$390,00
S66CeSS All values provided
a2-14
4/0 URD-AL 15kV CONDUCTOR
5370
LF
$ 4 00
$ 21.480 00
Succcr s: a values prov'ded
#2-15
LIG17-1500
6
EA
$4.533.00
$27.198.00
Success: All values provided
#2-16
UG17.500
4
EA
$ 4,725.00
$ 18,900,00
Success: wil values provided
#2-17
UC1
1
EA
$0.00
$0.00
Sucre<;: All values., mided
#2.18
UM3E-3(Fig. 7)
2
EA
$4.725.00
$9.45000
Su_cesc: All values providW
#2-19
UM48-2
1
EA
$ 2,500.00
$ 2.500.00
I�d7kD0il7ld)ui�
DOCUMENT 00410 — BID BOND
KNOW ALL MEN BY THESE PRESENTS: that ive
Midland Industrial Services, LLC
110 N. Center Street,
Elkins, Arkansas 72727
as Principal, hereinafter called the Principal, and
U.S. Specialty Insurance Company
13403 Northwest Freeway
Houston. Texas 77040
a corporation duly organized under the laws of the State of --Texas as Surety,
hereinafter called Surety, are held and firmly bound onto
City of Fayetteville, Arkansas
113 West Mountain Street
Fayetteville, Arkansas 72701
as Obligee, hereinafter called Owner, in the sum of Five Percent of the Amount of the BidxxxxxxxxXXXXXXXXXXXX
xxxxxXXXXXXXXXXXXXxxxxxxxxxroocxxxxxxxxxx Dollars ($ 5% of Amount of Bid), for the payment of which
sum, well and truly to be made, Principal and said Surety, bind ourselves, our heirs, executors,
administrators, successors and assigns, jointly and severally, firmly by these presents.
WHEREAS, Principal has submitted a Bid for:
2020 Noland W WTP Electrical Upgrade, Bid 20-30, Construction.
NOW, TI IEREFORE, if the Owner shall accept the Bid of Principal and the Principal shall enter
into a Contract with the Owner in accordance with the terns of such Bid, and give such Bond or
Bonds as may be specified in the Bidding or Contract Documents with good and sufficient surety
for the faithful performance of such Contract and for the prompt payment of labor and material
furnished in the prosecution thereof, or in the event of the failure of Principal to enter such
Contract and give such Bond or Bonds, if the Principal shall pay to the Owner the difference not
to exceed the penalty hereof between the amount specified in said Bid and such larger amount for
which the Owncr may in good faith contract with another party to perform the Work covered by
said Bid then this obligation shall be null and void, otherwise to remain in full force and effect.
Signed and sealed this 15 day of April 2020 .
00410-Bid Bond.doc 00410 1
DOCUMENT 00410 — BID BOND (continned)
PRINCIPAL
Midland Industrial Services, LLC
By
Y
re
V osG us ,
(Type or print)
SURETY
U.S. Specialty Insurance Company
ByYfilUL—d4,-1U
(Signature)
Diana Ball. Attornev-In-Fact
(Type or print)
(CORPORATE SEAL)
ATTORNEY -IN -PACT (CORPORATE SEAL)
(Signature)
Diana Ball. Attornev-in-Fact
(Type or print)
This Bond shall be accompanied with
Attorney-in-Fact's authority from Surety
END OF DOCUMENT 00410
00410-Bid Uond.doc 00410 2
Form W'9 Request for Taxpayer
(Rev. DecemDepartment
er the
Identification Number and Certification
fkpartment of the Treasury
Internal Revenue Service
w
CS
/ Name (as shown on your income tax return).
Midland Industrial Services, LLC
on this line: do not leave this line
name/disregarded entity name, if different from above
Give Form to the
requester. Do not
send to the IRS.
3 Check appropriate box for federal tax classification: check only one of the following seven boxes: 4 Exemptions (codes apply only to
❑ IndividuaUsole proprietor or ❑ C Corporation ❑ S Corporation ❑ Partnership ❑ Trusuestate certain entities. not individuals: see
instructions on page 3).
single -member LLC
Limited liability company. Enter the tax classification C=C corporation, S=S corporation, P= artnershi ► Exempt payee code (if any)
❑ tY Pa Y ( Po rP P P) P
le -member LLC that is disregarded, do not check LLC; check the a Exemption from FATCA reporting
Note. For a single -member
rig eg ppropriate box k1 the line above for
the tax classification of the single -member owner. code (if any)
❑ Other (see instructions) ► Npp . IU.—n tea~ ow m. us J
5 Address (number, street, and apt. or suite no.) ) Requester's name and address (optional)
110 N Center St
6 City, state, and ZIP c
Elkins, AR 72727
7 List account numbed
Per Ifdentlticatlon Number
Enter your TIN in the appropriate box. The TIN provided must match the name given on line 1 to avoid social security number
backup withholding. For individuals, r this this is generally your social security number (SSN). However, for a - m
resident alien, sole proprietor, or disregarded entity, see the Part I instructions on page 3. For other
entities, it is your employer identification number (EIN). If you do not have a number, see How to get a
TIN on page 3. or
Note. If the account is in more than one name, see the instructions for line 1 and the chart on page 4 for I Employer identification number
guidelines on whose number to enter.
2 7- 1 1 5 1 9 1 2 1 8 1 2 1 2
Certification
Under penalties of perjury, I certify that:
1. The number shown on this form is my correct taxpayer identification number (or I am waiting for a number to be issued to me); and
2. 1 am not subject to backup withholding because: (a) I am exempt from backup withholding, or (b) I have not been notified by the Internal Revenue
Service (IRS) that I am subject to backup withholding as a result of a failure to report all interest or dividends, or (c) the IRS has notified me that I am
no longer subject to backup withholding; and
3. 1 am a U.S. citizen or other U.S. person (defined below); and
4. The FATCA code(s) entered on this form (if any) indicating that I am exempt from FATCA reporting is correct.
Certification instructions. You must cross out item 2 above if you have been notified by the IRS that you are currently subject to backup withholding
because you have failed to report all interest and dividends on your tax retum. For real estate transactions, item 2 does not apply. For mortgage
interest paid, acquisition or abandonment of secured property, cancellation of debt, contributions to an individual retirement arrangement (IRA), and
generally, payments other than interest aA9 dnds, you are not required to sign the certification, but you must provide your correct TIN. See the
instructions on page 3. /� /
sign Signature .%--� 01/22/2020
Here I U.S. person ► I Date ►
General In
Section reference ar 4h-Criternal Revenue Code unless otherwise noted.
Future developments. Information about developments affecting Form W-9 (such
as legislation enacted after we release it) is at www.irs.gov/tw9.
Purpose of Form
An individual or entity (Form W-9 requester) who is required to file an information
return with the IRS must obtain your correct taxpayer identification number (TIN)
which may be your social security number (SSN), individual taxpayer identification
number (ITIN), adoption taxpayer identification number (ATIN), or employer
identification number (EIN), to report on an information return the amount paid to
you, or other amount reportable on an information return. Examples of information
returns include, but are not limited to, the following:
• Form 1099-INT (interest earned or paid)
• Form 1099-DIV (dividends, including those from stocks or mutual funds)
• Form 1099-MISC (various types of income. prizes, awards, or gross proceeds)
• Form 1099-B (stock or mutual fund sales and certain other transactions by
brokers)
• Form 1099-S (proceeds from real estate transactions)
• Form 1099-K (merchant card and third party network transactions)
• Form 1098 (home mortgage interest), 1098-E (student loan interest). 1098-T
(tuition)
• Form 1099-C (canceled debt)
• Form 1099-A (acquisition or abandonment of secured property)
Use Form W-9 only if you are a U.S. person (including a resident alien), to
provide your correct TIN.
It you do not return Form W-9 to the requester with a TIN. you might be subject
to backup withholding See What is backup withholding? on page 2.
By signing the fitled-out form, you:
1. Certify that the TIN you are giving is correct (or you are waiting for a number
to be issued),
2. Certify that you are not subject to backup withholding, or
3. Claim exemption from backup withholding if you are a U.S. exempt payee. It
applicable, you are also certifying that as a U.S. person, your allocable share of
any partnership income from a U.S. trade or business is not subject to the
withholding tax on foreign partners' share of effectively connected income, and
4. Certify that FATCA code(s) entered on this form (f any) indicating that you are
exempt from the FATCA reporting, is correct. See What is FATCA reporting? on
page 2 for further information.
Cat. No 10231X Form W-9 (Rev.12-2014)
Bid 20-30, Construction - NWWTP Electrical Upgrade - Proposal Data
Supplies
Axis Electric, LLC
Scorecard Open..
Fleming Electric. Inc.
Scorecard Open...
Midland Industrial Services, LLC
Scorecard Open.
Arkansas Contractor's License #
0219360520
0023160420
0210060520
Multi Craft 0025810520
Scorecard Open...
Oil Capital Electric 0154080620
Scorecard Open.
Show/Hide .+. Search
Arkansas Secretary of State filing #
800198684
710507441
800169216
100036197
80041833
Submissions
Supplier
Fleming Electric, Inc.
Multi Craft
Axis Electric, LLC
Oil Capital Electric
Midland Industrial
Services, LLC
Date Submitted
Name
Email
Confirmation Code
Apr 22, 2020 12:53 PP0
Jay Noe
jnoe@fleminc.com
Nzg3NTY=
CDT
Apr 22, 2020 1:55 PPA CDT
jerod Bradshaw
jbradshaw@multi-craft.net
Nzg3ODlvl=
Apr 22, 2020 1:13 PIv1 CDT
Jason Kuncl
jkuncl@axis-electric.com
Nzg3Njl=
Apr 22, 2020 1:18 PIv1 CDT
Richard Morrison
rmorrison@oce.us.com oce.us.com
Nzg3NjY=
Apr 22, 2020 1:15 PM CDT
Amber Ritchie
aritchie@midiandllc.com
Nzg3NjU=